Contract Amendment Harbour Construction Inc $3,853,733.21 Ca�+ 101271,o
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Harbour Construction, Inc.
J.O.C. Contract No.: 387.00.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $398539733.21
The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on December 20, 2010, is hereby amended as
follows:
1. The original contract amount noted in Amendment 1 for $3,853,734 was erroneously
established. The correct original contract amount is $3,853,733.21.
2. The additional document shall be adhered to the original purchase order:
• Davis-Bacon Heavy Construction Wage Rate FL 267(see attached)
3. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision:
Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal
cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile,
Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All
other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing
should be under the `Highway' wage rate table as this work pertains to the proposed bike path.
This document constitutes an amendment to the above numbered contract. All provisions of that contract,
except those which are explicitly changed above by this amendment shall remain in full force and effect.
ACCEPTANCE AND APPROVALS
Bar the on ra, r: 15D
o�
Signature uthorized Official) (Date)
By the City of Miami Beach:
Name: Mayor MqA' �rrrfrri le: M a v
�N\
o
11" 3 S
----- — – ED Si a re(Authori Oficial) COR„= 101RA1 ate)
APPROVED AS TO
” `� FORM LANGUAGE
F
1P ECUTION
�: . ,. ,�
K _� �
ATTEST �►.- Zlct
�`if�i A+tnmo�i 11a�tQ
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Harbour Construction, Inc.
J.O.C. Contract No.: 387.01.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $2979039.88
The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on March 7, 2011, is hereby amended as follows:
1. The additional document shall be adhered to the original purchase order :
• Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached)
2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision:
Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal
cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile,
Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All
other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing
should be under the `Highway' wage rate table as this work pertains to the proposed bike path.
This document constitutes an amendment to the above numbered contract. All provisions of that contract,
except those which are explicitly changed above by this amendment shall remain in full force and effect.
ACCEPTANCE AND APPROVALS
By the ont actUx YOW (PtleName: � , I
0
V
l
Signatur Outhorized Official) (Date)
By the City of Miami Beach:
Name: �
"A_ • v
Y/S/_3
��JF
`��'I 'CRATED'
Si atu (Authori z d Officia i Y (Date) APPROVED AS TO
FORM & LANGUAGE
&FOR EXECUTION
Page 1 of 5
AT ST Ci torne1*L1'- Date
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Harbour Construction, Inc.
J.O.C. Contract No.: 387.03.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $7109197.84
The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on April 28, 2011, is hereby amended as follows:
1. The additional document shall be adhered to the original purchase order :
• Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached)
2. All Labor involving the following_items of work must be paid under the Heavy Wage Rate Decision:
Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal
cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile,
Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All
other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing
should be under the `Highway' wage rate table as this work pertains to the proposed bike path.
This document constitutes an amendment to the above numbered contract. All provisions of that contract,
except those which are explicitly changed above by this amendment shall remain in full force and effect.
ACCEPTANCE AND APPROVALS
By the qoInt r cto : E s-, 06
Name: l,Pt 1(1 e: '�
JAACk 2J0
Signature( thorized Official) (Dat
By the City of Miami Beach: , T
1 4:
e ,
Name: �� 7f1 � �f�d`^ P ' �, ,r' / � 1✓
INCO«P ORATED: APPROVED AS TO
<_`�
Si re(Autho Official) �� �-----� �G) (Date)
&FORM&-tANGUAGE
FOR EXECUTION
P f
Page 1 o 5 Attorne Date
ATTEST
b
i
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Barbour Construction, Inc.
J.O.C. Contract No.: 357.04.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $49932.03
The contract between Barbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on August 29, 2011, is hereby amended as
follows:
1. The additional document shall be adhered to the original purchase order :
• Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached)
2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision:
Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal
cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile,
Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All
other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing
should be under the `Highway' wage rate table as this work pertains to the proposed bike path.
This document constitutes an amendment to the above numbered contract. All provisions of that contract,
except those which are explicitly changed above by this amendment shall remain in full force and effect.
ACCEPTANCE AND APPROVALS
B the Contract
By _ �
Name: Y1 �- ! `U� itle:
i
Signature( uthorized Official) (Date)
By the City of Miami Beach: .��1 ,�
Name: ��"f7 -��`l�� _ �� ifie:''
'•INCORPI 10RATED-'
• 1 �,d � r7
•
ori icSi atur, a "'�'r r :,-;� �,;'� (Date) APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
3 Page 1 of 5
- ATTEST - _ _ _ - Cit' Attorney $L Date
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Harbour Construction, Inc.
J.O.C. Contract No.: 387.07.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $7229009.27
The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on July 13, 2012, is hereby amended as follows:
1. The original contract amount noted in Amendment 1 for $40,852.93 was erroneously
established. The correct original contract amount is $722,009.27.
2. The additional document shall be adhered to the original purchase order :
Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached)
3. All Labor involving the following items of work must be paid under the Heavy Wage Rate
Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items
within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps,
etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all
work incidental to those items. All other work consisting of a new bike path, lighting
improvements, traffic barrier wall and railing should be under the `Highway' wage rate table
as this work pertains to the proposed bike path.
This document constitutes an amendment to the above numbered contract. All provisions of that
contract, except those which are explicitly changed above by this amendment shall remain in full
force and effect.
ACCEPTANCE AND APPROVALS
By the ontr cto � C�'�"U�(i✓�
jQ!
Name: - � lad � Title:
ti
Signatur uthorized Official) (Da e)
By the City of Miami Beach:
Name: G t klt46� cl tl" Gt U r
NCORP ORATED:
Signa re (Authorize Of icia ��j� �` (Date) APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
Page 1 of 5
ATTE T �;ity ttorney Date
Contract Amendment
Multi-Purpose
City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and
South Beach Neighborhood Bicycle Project
Contractor: Barbour Construction, Inc.
J.O.C. Contract No.: 387.11.PW.37-09/10
Amendment No.: 2
Term of Contract: 376 Calendar Days
Original Contract Amount: $3219140.97
The contract between Barbour Construction, Inc. (Contractor) and the City of Miami Beach,
which was last executed and signed by the parties on April 13, 2012, is hereby amended as follows:
1. The additional document shall be adhered to the original purchase order :
• Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached)
2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision:
Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal
cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile,
Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All
other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing
should be under the `Highway' wage rate table as this work pertains to the proposed bike path.
This. document constitutes an amendment to the above numbered contract. All provisions of that contract,
except those which are explicitly changed above by this amendment shall remain in full force and effect.
ACCEPTANCE AND APPROVALS
By the Co tr tors
Name: ti o Q `^""
Title:
0� \4
Signa ure uthorized Official) (Date)
By the City of Miami Beach:
Name: 'l�17Y7 �-y Cc► .~ a�r T. to Q &T
�-
u
IUCOR°11 10RATE F':
APPROVED AS TO
Signa re Authoriz ffcia �; ��{ `- � ' (Date) FORM & LANGUAGE
-- — --- ---- ---- --- '�, %'' FOR EXECUTION
?�1 Page l of 5
J
ATTEST
orne l* Date
General Decision Number: FL100267 03/12/2010 FL267
Superseded General Decision Number: FL20080267
State: Florida
Construction Type: Heavy
County: Miami-Dade County in Florida.
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Modification Number Publication Date
0 03/12/2010
ELEC0349-007 08/31/2009
Rates Fringes
ELECTRICIAN
Electrical contracts
including materials that
are over $2, 000, 000. . . . . . . . .$ 29. 61 8.71
Electrical contracts
including materials that
are under $2, 000, 000. .. . . . $ 27.15 8.44
---------------------------------------------------------------
* ENGI0487-017 01/16/2010
Rates Fringes
OPERATOR: Backhoe. . . . . . . . . . . . . ...$ 27.57 8.78
OPERATOR: Crane
All Tower Cranes (Must
have 2 operators) Mobile,
Rail, Climbers, Static-
Mount; All Cranes with
Boom Length 150 Feet &
Over (With or without jib)
Friction, Hydro, Electric
. or Otherwise; Cranes 150
Tons & Over (Must have 2
operators) ; Cranes with 3
Drums (When 3rd drum is
rigged for work) ; Gantry &
Overhead Cranes; Hydro
Cranes Over 25 Tons but
not more than 50 Tons
(Without
Oiler/Apprentice) ;
Hydro/Friction Cranes
without Oiler/Apprentices
when Approved by Union; &
All Type of Flying Cranes;
Boom Truck. . . . . . . . . . . . . . . . . .$ 28.30 8.78
Cranes with Boom Length
Less than 150 Feet (With
or without jib) ; Hydro
Cranes 25. Tons & Under, &
Over 50 Tons (With
Oiler/Apprentice) ; Boom
Truck. . . . . . . . . . . . . . . . . . . . . . .$ 27.57 8.78
OPERATOR: Drill. . . . . . . . . . . . . . . . .$ 25.05 8.78
OPERATOR: Loader. . . . . . . . . . . . . . . .$ 24.89 8.78
OPERATOR: Oiler. . . . . . . . . . . . . . . . .$ 22.24 8.78
----------------------------------------------------------------
IRON0272-005 10/01/2006
Rates Fringes
IRONWORKER, STRUCTURAL. . . . . . . . . . .$ 26.70 6.43
----------------------------------------------------------------
LABO1652-004 05/01/2009
Rates Fringes
LABORER: Grade Checker. . . . . . . . . . .$ 14.50 4.67
----------------------------------------------------------------
PAIN0365-007 07/01/2008
Rates Fringes
PAINTER: Brush, Roller and
Spray. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.00 6.15
SUFL2009-164 06/24/2009
Rates Fringes
CARPENTER, Including Form Work. . .$ 17.00 2.51
CEMENT MASON/CONCRETE FINISHER. . .$ 16. 61 5.52
LABORER: Common or General. . . . . .$ 13.09 1.26
LABORER: Landscape. . . . . . . . . . . . . .$ 7.25 0.00
LABORER: Power Tool Operator
(Hand Held Drills/Saws,
Jackhammer and Power Saws
Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 10. 63 2.20
OPERATOR: Asphalt Paver. . . . . . . . .$ 11.59 0.00
OPERATOR: Backhoe Loader
Combo. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.10 2.44
OPERATOR: Blade/Grader. . . . . . . . . .$ 16.00 2.84
OPERATOR: Bulldozer. . . . . . . . . . . . .$ 14. 95 0.81
OPERATOR: Excavator. . . . . . . . . . . . .$ 21.16 1.67
OPERATOR: Mechanic. . . . . . . . . . . . . .$ 14 .32 0.00
OPERATOR: Roller. . . . . . . . . . . . . . . .$ 10. 95 0.00
OPERATOR: Scraper. . . . . . . . . . . . . . .$ 11.00 1.74
OPERATOR: Trackhoe. . . . . . . . . . . . . .$ 20. 92 5.50
VV
I
I
OPERATOR: Tractor. . . . ... . . . . . . . . .$ 10.54 0.00
TRUCK DRIVER: Lowboy Truck. . . . . .$ 12.73 0.00
TRUCK DRIVER: Off the Road
Truck. . . . . . . . . . . . . . . . . . . . . . . . . .$ 12.21 1. 97
TRUCK DRIVER: Dump Truck. . . . . . . . .$ 9. 60 0.00
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
--------------------------------------------------------
--------------------------------------------------------
Unlisted classifications needed for work not included within
the scope of the
classifications listed may be added after award only as
provided in the labor
standards contract clauses (29 CFR 5.5 (a) (1) (ii) ) ..
----------------------------------------------------------------
In the listing above, the "SU" designation means that rates
listed under the
identifier do not reflect collectively bargained wage and
fringe benefit
rates. Other designations indicate unions whose rates have
been determined
to be prevailing.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1. ) Has there been an initial decision in the matter? This can
be:
• an existing published wage determination
• a survey underlying a wage determination
• a Wage and Hour Division letter setting forth a position on
a wage
determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries
of surveys, should be with the Wage and Hour Regional Office
for the area in
which the survey was conducted because those Regional Offices
have
responsibility for the Davis-Bacon survey program. If the
response from this
initial contact is not satisfactory, then the process described
in 2. ) and
3. ) should be followed.
With regard to any other matter not yet ripe for the formal
process
described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2. ) If the answer to the question in 1. ) is yes, then an
interested party
(those affected by the action) can request review and
reconsideration from
the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7)
Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested
party's position and by any information (wage payment data,
project
description, area practice material, etc. ) that the requestor
considers
relevant to the issue.
3. ) If the decision of the. Administrator is not favorable, an
interested
party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board) . Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4 . ) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION