Contract Amendment Harbour Construction Inc $3,853,733.21 Ca�+ 101271,o Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Harbour Construction, Inc. J.O.C. Contract No.: 387.00.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $398539733.21 The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on December 20, 2010, is hereby amended as follows: 1. The original contract amount noted in Amendment 1 for $3,853,734 was erroneously established. The correct original contract amount is $3,853,733.21. 2. The additional document shall be adhered to the original purchase order: • Davis-Bacon Heavy Construction Wage Rate FL 267(see attached) 3. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS Bar the on ra, r: 15D o� Signature uthorized Official) (Date) By the City of Miami Beach: Name: Mayor MqA' �rrrfrri le: M a v �N\ o 11" 3 S ----- — – ED Si a re(Authori Oficial) COR„= 101RA1 ate) APPROVED AS TO ” `� FORM LANGUAGE F 1P ECUTION �: . ,. ,� K _� � ATTEST �►.- Zlct �`if�i A+tnmo�i 11a�tQ Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Harbour Construction, Inc. J.O.C. Contract No.: 387.01.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $2979039.88 The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on March 7, 2011, is hereby amended as follows: 1. The additional document shall be adhered to the original purchase order : • Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached) 2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS By the ont actUx YOW (PtleName: � , I 0 V l Signatur Outhorized Official) (Date) By the City of Miami Beach: Name: � "A_ • v Y/S/_3 ��JF `��'I 'CRATED' Si atu (Authori z d Officia i Y (Date) APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION Page 1 of 5 AT ST Ci torne1*L1'- Date Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Harbour Construction, Inc. J.O.C. Contract No.: 387.03.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $7109197.84 The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on April 28, 2011, is hereby amended as follows: 1. The additional document shall be adhered to the original purchase order : • Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached) 2. All Labor involving the following_items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS By the qoInt r cto : E s-, 06 Name: l,Pt 1(1 e: '� JAACk 2J0 Signature( thorized Official) (Dat By the City of Miami Beach: , T 1 4: e , Name: �� 7f1 � �f�d`^ P ' �, ,r' / � 1✓ INCO«P ORATED: APPROVED AS TO <_`� Si re(Autho Official) �� �-----� �G) (Date) &FORM&-tANGUAGE FOR EXECUTION P f Page 1 o 5 Attorne Date ATTEST b i Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Barbour Construction, Inc. J.O.C. Contract No.: 357.04.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $49932.03 The contract between Barbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on August 29, 2011, is hereby amended as follows: 1. The additional document shall be adhered to the original purchase order : • Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached) 2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS B the Contract By _ � Name: Y1 �- ! `U� itle: i Signature( uthorized Official) (Date) By the City of Miami Beach: .��1 ,� Name: ��"f7 -��`l�� _ �� ifie:'' '•INCORPI 10RATED-' • 1 �,d � r7 • ori icSi atur, a "'�'r r :,-;� �,;'� (Date) APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 3 Page 1 of 5 - ATTEST - _ _ _ - Cit' Attorney $L Date Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Harbour Construction, Inc. J.O.C. Contract No.: 387.07.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $7229009.27 The contract between Harbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on July 13, 2012, is hereby amended as follows: 1. The original contract amount noted in Amendment 1 for $40,852.93 was erroneously established. The correct original contract amount is $722,009.27. 2. The additional document shall be adhered to the original purchase order : Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached) 3. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS By the ontr cto � C�'�"U�(i✓� jQ! Name: - � lad � Title: ti Signatur uthorized Official) (Da e) By the City of Miami Beach: Name: G t klt46� cl tl" Gt U r NCORP ORATED: Signa re (Authorize Of icia ��j� �` (Date) APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION Page 1 of 5 ATTE T �;ity ttorney Date Contract Amendment Multi-Purpose City of Miami Beach—Dade Boulevard Bike Path including Collins Canal Seawall Restoration and South Beach Neighborhood Bicycle Project Contractor: Barbour Construction, Inc. J.O.C. Contract No.: 387.11.PW.37-09/10 Amendment No.: 2 Term of Contract: 376 Calendar Days Original Contract Amount: $3219140.97 The contract between Barbour Construction, Inc. (Contractor) and the City of Miami Beach, which was last executed and signed by the parties on April 13, 2012, is hereby amended as follows: 1. The additional document shall be adhered to the original purchase order : • Davis-Bacon Heavy Construction Wage Rate FL 267 (see attached) 2. All Labor involving the following items of work must be paid under the Heavy Wage Rate Decision: Rip Rap Material, Bulk head Caps, Dredging, Removal of all existing items within existing canal cross-section (King Piles, Concrete Bags, Collapsed Seawall, Caps, etc.), #57 Stone, Geotextile, Sheet Pile, Manatee Grate, Dingy Dock, Water main, and all work incidental to those items. All other work consisting of a new bike path, lighting improvements, traffic barrier wall and railing should be under the `Highway' wage rate table as this work pertains to the proposed bike path. This. document constitutes an amendment to the above numbered contract. All provisions of that contract, except those which are explicitly changed above by this amendment shall remain in full force and effect. ACCEPTANCE AND APPROVALS By the Co tr tors Name: ti o Q `^"" Title: 0� \4 Signa ure uthorized Official) (Date) By the City of Miami Beach: Name: 'l�17Y7 �-y Cc► .~ a�r T. to Q &T �- u IUCOR°11 10RATE F': APPROVED AS TO Signa re Authoriz ffcia �; ��{ `- � ' (Date) FORM & LANGUAGE -- — --- ---- ---- --- '�, %'' FOR EXECUTION ?�1 Page l of 5 J ATTEST orne l* Date General Decision Number: FL100267 03/12/2010 FL267 Superseded General Decision Number: FL20080267 State: Florida Construction Type: Heavy County: Miami-Dade County in Florida. HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines) Modification Number Publication Date 0 03/12/2010 ELEC0349-007 08/31/2009 Rates Fringes ELECTRICIAN Electrical contracts including materials that are over $2, 000, 000. . . . . . . . .$ 29. 61 8.71 Electrical contracts including materials that are under $2, 000, 000. .. . . . $ 27.15 8.44 --------------------------------------------------------------- * ENGI0487-017 01/16/2010 Rates Fringes OPERATOR: Backhoe. . . . . . . . . . . . . ...$ 27.57 8.78 OPERATOR: Crane All Tower Cranes (Must have 2 operators) Mobile, Rail, Climbers, Static- Mount; All Cranes with Boom Length 150 Feet & Over (With or without jib) Friction, Hydro, Electric . or Otherwise; Cranes 150 Tons & Over (Must have 2 operators) ; Cranes with 3 Drums (When 3rd drum is rigged for work) ; Gantry & Overhead Cranes; Hydro Cranes Over 25 Tons but not more than 50 Tons (Without Oiler/Apprentice) ; Hydro/Friction Cranes without Oiler/Apprentices when Approved by Union; & All Type of Flying Cranes; Boom Truck. . . . . . . . . . . . . . . . . .$ 28.30 8.78 Cranes with Boom Length Less than 150 Feet (With or without jib) ; Hydro Cranes 25. Tons & Under, & Over 50 Tons (With Oiler/Apprentice) ; Boom Truck. . . . . . . . . . . . . . . . . . . . . . .$ 27.57 8.78 OPERATOR: Drill. . . . . . . . . . . . . . . . .$ 25.05 8.78 OPERATOR: Loader. . . . . . . . . . . . . . . .$ 24.89 8.78 OPERATOR: Oiler. . . . . . . . . . . . . . . . .$ 22.24 8.78 ---------------------------------------------------------------- IRON0272-005 10/01/2006 Rates Fringes IRONWORKER, STRUCTURAL. . . . . . . . . . .$ 26.70 6.43 ---------------------------------------------------------------- LABO1652-004 05/01/2009 Rates Fringes LABORER: Grade Checker. . . . . . . . . . .$ 14.50 4.67 ---------------------------------------------------------------- PAIN0365-007 07/01/2008 Rates Fringes PAINTER: Brush, Roller and Spray. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.00 6.15 SUFL2009-164 06/24/2009 Rates Fringes CARPENTER, Including Form Work. . .$ 17.00 2.51 CEMENT MASON/CONCRETE FINISHER. . .$ 16. 61 5.52 LABORER: Common or General. . . . . .$ 13.09 1.26 LABORER: Landscape. . . . . . . . . . . . . .$ 7.25 0.00 LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 10. 63 2.20 OPERATOR: Asphalt Paver. . . . . . . . .$ 11.59 0.00 OPERATOR: Backhoe Loader Combo. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.10 2.44 OPERATOR: Blade/Grader. . . . . . . . . .$ 16.00 2.84 OPERATOR: Bulldozer. . . . . . . . . . . . .$ 14. 95 0.81 OPERATOR: Excavator. . . . . . . . . . . . .$ 21.16 1.67 OPERATOR: Mechanic. . . . . . . . . . . . . .$ 14 .32 0.00 OPERATOR: Roller. . . . . . . . . . . . . . . .$ 10. 95 0.00 OPERATOR: Scraper. . . . . . . . . . . . . . .$ 11.00 1.74 OPERATOR: Trackhoe. . . . . . . . . . . . . .$ 20. 92 5.50 VV I I OPERATOR: Tractor. . . . ... . . . . . . . . .$ 10.54 0.00 TRUCK DRIVER: Lowboy Truck. . . . . .$ 12.73 0.00 TRUCK DRIVER: Off the Road Truck. . . . . . . . . . . . . . . . . . . . . . . . . .$ 12.21 1. 97 TRUCK DRIVER: Dump Truck. . . . . . . . .$ 9. 60 0.00 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. -------------------------------------------------------- -------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii) ) .. ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1. ) Has there been an initial decision in the matter? This can be: • an existing published wage determination • a survey underlying a wage determination • a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2. ) and 3. ) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2. ) If the answer to the question in 1. ) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc. ) that the requestor considers relevant to the issue. 3. ) If the decision of the. Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4 . ) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION