LTC 103-2013 FDOT Reconstruction of Alton Road MIAMI BEACH
103-2013 LETTER TO COMMISSION
TO: Mayor Matti Herrera-Bower and Members of the City Commission
FROM: Kathie G. Brooks, Interim City ManagerO kC Me
�' ;?1
DATE: March 28, 2013 ! w
SUBJECT: FDOT RECONSTRUCTION OF ALTON ROAD
Yi
The purpose of this Letter to Commission is to provide an update on the Florida Department.:of
Transportation (FDOT) reconstruction of Alton Road beginning on April 1, 2013 `,�d, in
particular, the Maintenance of Traffic (MOT) Plan and its affects on West Avenue.
Based on information recently provided by the FDOT and meetings with staff, beginning the
week of April 1, 2013, the contractor for the Alton Road Roadway Project is scheduled to begin
removing the median between Dade Boulevard and Michigan Avenue. Work hours will be from
7 a.m. to 6 p.m., Monday through Friday. One southbound and one northbound lane will be
closed in order to remove the existing median and establish a temporary traffic shift. The
southbound left turn movement at Dade Boulevard will be closed during this phase. Typical
Lane closure hours will be from 9 a.m. to 3:30 p.m. to avoid impacting peak periods of traffic on
Alton Road.
Following the median removal, the contractor will install a new water main between Michigan
Avenue and Dade Boulevard which should commence during the week of April 8th. Because of
the median removal, the contractor will maintain two southbound lanes and two northbound
lanes open at all times in this section. Subsequently, the water main will be installed between
Dade Boulevard and 17th Street. During this phase, one southbound lane may be closed and
parking restricted daily on Alton Road.
From April 1 st to April 19th, the contractor will be checking for underground utility conflicts on 10th
Street and 14th Street from Alton Road to Bay Road. This work may require closure of one lane
on southbound Alton Road and side streets. Certified flaggers will be used to help direct traffic.
FDOT has advised that on the week of April 29th, the contractor and engineering team will be
evaluating congestion levels on Alton Road due to the single-lane closures in the southbound
direction. If warranted, FDOT is tentatively scheduled to begin restriping the West Avenue
corridor between April 29, 2013 and May 6, 2013. Only the portion of West Avenue south of 8th
Street will be used as an official detour route due to closure of southbound Alton Road from 8th
Street to 5th Street for the installation of drainage tentatively scheduled to start May 6th. During
this time, the water main installation will reduce southbound traffic to one lane for approximately
500 feet at a time. However, as early as July 2013, the entire West Avenue corridor may be
used as an official detour route.
The contractor has deployed Variable Message Signs (VMS) to be placed at key locations
throughout the City. The City continues to request more VMS in order to improve the community
outreach. These additional signs and more explicit information will serve to inform motorists of
the differing stages of construction and identify alternative routes to be used.
LTC—FDOT Alton Road Reconstruction
Page 2 of 2
The City has expressed concerns regarding the limited use of off-duty police officers. In this
highly urbanized environment, the City Administration believes that active police enforcement
will be essential to the proper flow of traffic along both Alton Road and West Avenue corridors
during construction. The City of Miami Beach has a vested interest in ensuring that construction
impacts to the flow of traffic are minimized, and recommends that FDOT utilize the City's police
officers, who regularly work in the community, to address traffic and safety concerns and needs
of the community. This would ensure a proactive approach to traffic enforcement and reduce
the risk of congestion. The new City Manager is meeting with FDOT Secretary Pego on April 1,
2013 to review the traffic impacts and discuss the use of off-duty Miami Beach Police.
FDOT will provide weekly construction alerts/updates as the project progresses. For more
information, please contact Senior Project Engineer Enrique Tamayo, P.E., at (305) 534-5330,
or Public Information Specialist Heather Leslie at (305) 905-5876,
heather(cD-hmlpublicoutreach.com.
Please feel free to contact me if you have any questions or concerns.
Attachment:
FDOT Construction Alert
u
JGC- RWS/JRG
F:\WORK\$ALL\(1)EMPLOYEE FOLDERS\Jose R.Gonzalez\LTC\LTC-FDOT Alton Road Reconstruction-RWS version.docx
F:\WORK\$ALL\(1)EMPLOYEE FOLDERS\Josiel Ferrer\LTC
CONSTRUCTION ALERT '
State Road (SR) 907/Alton Road
Upcoming Construction Activities
FIN#:249911-1/3-52-01
Project Begins:April 2013
EIGHT WEEK CONSTRUCTION SCHEDULE LOOK AHEAD
Beginning the week of Monday,April 1,2013,the contractor for the Alton Road Roadway Project is scheduled to begin mobilizing crews and
preparing the roadway for the installation of a new water main.Work hours are from 7 a.m.to 6 p.m.,with daytime travel lane closure hours
from 9 a.m.to 3:30 p.m.,Monday through Friday.Areas of on-street parking will be temporarily closed,as needed,to provide space for work.
Upcoming activities are scheduled as follows. Please note this schedule could change due to bad weather or other unforeseen conditions.
APRIL 1 THROUGH APRIL 5 APRIL 22 THROUGH MAY 10
Alton Road from Dade Boulevard to Michigan Avenue Alton Road from Dade Boulevard to Michigan Avenue
• Equipment and material set up.One northbound and/or one • New water main testing to begin.Water sampling stations with
southbound lane on Alton Road may be closed. dripping water will be set up throughout the area.Please do not
• Removal of palms,landscaping and sections of curb along the disturb sampling stations.
median to set up temporary traffic shift. Afton Road from Dade Boulevard to 17 Street
Alton Road at 10 Street and 14 Street;10 Street from Alton Road to • The contractor will begin excavating the roadway to prepare for
Bay Road;14 Street from Alton Road to Bay Road the new water main installation.One southbound lane may be
• The contractor will be checking for underground utility conflicts. closed daily on Alton Road. Left turn movements may be restricted
One lane on southbound Alton Road and side streets may be at times.
closed.Certified flaggers will be used to help direct traffic. MAY 10 THROUGH MAY 24
APRIL 8 THROUGH APRIL 19 Alton Road from Dade Boulevard to Michigan Avenue
Afton Road from Dade Boulevard to Michigan Avenue • The contractor will make the final connection of the new water
• The contractor will begin excavating the roadway,installing the main.One southbound lane may be closed daily on Alton Road.
new water main and setting up temporary street lighting.One Alton Road from 17 Street to north of 16 Street
southbound lane may be closed and the southbound left turn lane • New fire hydrants will be installed.One northbound lane may be
on Alton Road at Dade Boulevard will be converted to a through closed daily on Alton Road.
travel lane.
Alton Road at 10 Street and 14 Street;10 Street from Alton Road to Access to businesses and sidewalks will be maintained at all times.
Bay Road;14 Street from Alton Road to Bay Road The construction team will coordinate the closure of driveways;
• The contractor will be checking for underground utility conflicts. however,at least one entrance will be maintained at all times.Lane
One lane on southbound Alton Road and side streets may be closure and project information will be posted weekly on the
closed.Certified flaggers will be used to help direct traffic. Department's website.
HELPFUL TIPS
• Allow extra time to reach your destination
• Obey all posted signs,No Parking signs and speed limits.Cars may be towed at the owner's expense.
• Watch for signs with information about upcoming work and traffic conditions
ALWAYS PUT SAFETY FIRST
For your safety and the safety of others,please use caution when driving,walking or biking around any construction zone.Wearing a safety belt is the
single most effective way to protect people and reduce fatalities in motor vehicle crashes.The Department takes steps to reduce construction
effects,but you might experience the following around the work site:
• Side street,travel lane and on-street parking closures
• Sidewalk closures with detours guiding pedestrians to cross the street at signalized intersections
• Increased dust, noise and vibrations
• Workers and equipment moving around the area
• Expect increased truck activity along 6 Street between Alton Road and West Avenue due to contractor's staging area
FOR MORE INFORMATION
For more information,please contact CCEI Senior Project Engineer Enrique Tamayo,P.E.at(305)364-3064,or Public Information Specialist
Heather Leslie at(305)905-5876 or Heather @hmlpublicoutreach.com.
■ • -• �D(
<#
CONSTRIK"t10N
■ 1000 NW 111 AVENUE MIAMI,FL 33172
CONST • KI RT ,�
State Road (SR) 907/Alton Road
Upcoming Construction Activities
•
FIN #249911-1/3-52-01
Project Begins:April 2013
` t
6"
y a
lath a IF TT
'.9' i
^- > ><
{ { Q
17th St d 17th St
.:._ }� •_.,- __ . --— Work zone from
April 1 through
-r: t ism it May 24
Work zone from
t? I April 1 through
1'th 8t _ N
1151111 St April 19
-
' 3 Work zone from
�.
i, April 22 through
14111M1 6111, May 10
,. Work zone from
Pwk ww May 10 through
12th Olt s May 24
Please note this schedule th Z f ttl St 1t could change due to bad
r
weather or other
H ; unforeseen conditions.