2013-28172 Reso r RESOLUTION NO. 2013-28172 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RETROACTIVELY APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2, TO THE EXISTING PROFESSIONAL ARCHITECTURE & ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND SCHWEBKE-SHISKIN & ASSOCIATES, INC. (SSA), DATED DECEMBER 14, 2011, FOR THE BAYSHORE NEIGHBORHOOD NO. 8E — SUNSET ISLANDS I & II RIGHT OF WAY PROJECT; IN THE NEGOTIATED NOT-TO-EXCEED AMOUNT OF $107,098; TO PROVIDE EXTENDED RESIDENT PROJECT REPRESENTATION AND ADDITIONAL CONSULTING SERVICES DURING CONSTRUCTION OF THE PROJECT; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, On July 13, 2011, the Mayor and City Commission approved the award of the construction contract for the Right-of-Way Infrastructure Improvement Program — Neighborhood No. 8E Bayshore, Sunset Islands I & II (the Project) to David Mancini & Sons, Inc. (DMSI); and WHEREAS, the Project time in the contract with DMSI called for a total of 395 calendar days (or 13 months); and WHEREAS, on December 14, 2011, the City adopted Resolution No. 2011-27792, authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Schwebke-Shiskin & Associates, Inc. pursuant to Request for Qualifications (RFQ) No. 36- 10/11 for Resident Project Representative Services (RPR), in the amount of $249,995, including reimbursable expenses, for a period of thirteen (13) months (the Agreement); and WHEREAS, on October 17, 2012, Amendment No. 1 to the Agreement was executed, in the amount of $24,999, to provide additional Resident Project Representative Services, to provide roadway re-alignment coordination drawings, and an initial driveway harmonization analysis; and WHEREAS, as stated above, the base contract time for the Resident Project Representative Services was for a period of thirteen (13) months, commencing upon the second Notice to Proceed issued on December 12, 2011, and ending on January 11, 2013; and WHEREAS, the Agreement provides for a pre-negotiated fixed fee of $17,038 per month for additional services, if required; and WHEREAS, the extended time required for this Project is four (4) months, for a total of$68,152 in additional Resident Project Representative Services; and WHEREAS, during the course of the Project, several requests were made by the Resident Project Representative ta�rovide additional information required for the resolution of unforeseen conditions and additional scope; and WHEREAS, these services were beyond the scope of the Agreement, and include the revision of pollution control structures due to constructability issues at driveways, certification of watermains within the, Project, utility company coordination, and driveway harmonization; and WHEREAS, a detailed stormwater modeling analysis and recommendation was also requested by staff in order to ascertain the potential future needs of the drainage system; and WHEREAS, the total additional fee requested by the Consultant for the work necessary to provide additional consulting services and additional resident project representative services to the Project completion is $107,098; and WHEREAS, staff finds both the scope and negotiated fee to be reasonable and appropriate, and the hourly billing rates are within the current approved amount negotiated for all City consultants; and WHEREAS, the Capital Improvement Project Office has evaluated the Consultant's cost proposal and is in agreement that the proposal is reasonable; and WHEREAS, this Amendment No. 2 to the Agreement will revise the total contract sum to a not-to-exceed total of$382,092. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission of the City of Miami Beach, Florida, hereby authorize the Mayor and City Clerk to execute Amendment No. 2 in the negotiated, not to exceed amount of $107,098, to an existing Agreement between the City of Miami Beach and Schwebke-Shiskin & Associates, Inc., dated December 14, 2011, to provide additional Resident Project Representative Services for the Bayshore Neighborhood No. 8E — Sunset Islands I & II Right-of-Way Project; with previously appropriated funding. PASSED AND ADOPTED THIS 171j, DAY OF I' 2013. ATTEST: CITY CLERK N�!...BF OR INCORP ORATED? CH.2.6N APPROVED AS TO FORM & LANGUAGE UTION 9 � �e L at3 COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Retroactively Approving And Authorizing The Mayor And City Clerk To Execute Amendment No. 2,To The Existing Professional Architecture& Engineering Services Agreement Between The City Of Miami Beach And Schwebke-Shiskin &Associates, Inc.(SSA), Dated December 14, 2011, For The Bayshore Neighborhood No. 8e—Sunset Islands I &II Right Of Way Project. Key Intended Outcome Supported: Ensure value and timely delivery of quality capital projects. Supporting Data(Surveys, Environmental Scan,etc.): The 2012 Customer Satisfaction Survey indicated that over 81% of residents rated recently completed capital improvement projects as "excellent" or "good". Recently completed capital improvement projects (81%), storm drains a(37%), and condition of roads(44%). Item Summa /Recommendation: On May 3, 2011, the City of Miami Beach issued ITB No. 27-10/11 for construction of right-of-way improvements for Bayshore Neighborhood 8E for Sunset Islands I & II. The Mayor and City Commission awarded this ITB to David Mancini & Sons, Inc. at its July 13, 2011 meeting. On December 14, 2011, the City of Miami Beach adopted Resolution No. 2011-27792, authorizing the Mayor and City Clerk to execute a Professional Services Agreement (PSA) with Schwebke-Shiskin & Associates, Inc. pursuant to Request for Qualifications (RFQ) No. 36-10/11, for Resident Project Representative Services (RPR), in the amount of$249,995, including reimbursable expenses, for a period of 13 months for Neighborhood No. 8 Bayshore (Package E)—Sunset Islands I & II project. The base contract time for these services was for a period of 13 months commencing upon the second notice to proceed issued on December 12, 2011 to the period ending on January 11, 2013. The contract provides for a pre-negotiated fixed fee of $17,038 per month for additional services if required. The extended time required for this project would be from the end of the 13 month period starting on January 11, 2013 until the project delivery date which is currently scheduled for May 10, 2013, a total of 4 months, for a not-to-exceed total of$68,152. During the course of the project several requests were made by staff to the resident project representative to provide additional information required for the resolution of unforeseen conditions and additional scope. These services were beyond the scope of the contract and included the revision of pollution control structures due to constructability issues at driveways, certification of watermains within the project, franchise utility company coordination and driveway harmonization. A detailed stormwater modeling analysis and recommendation was also requested by staff in order to ascertain the potential future needs of the drainage system. Funding for the additional cost of $38,946 for these services were previously appropriated in the 2013 Capital budget. The funds required to bring the Consultant services to a current status and extend them to the projected final completion date of May 10, 2013, is $107,098. Staff finds both the scope and negotiated fee to be reasonable and appropriate, and the hourly billing rates are within the current approved amount negotiated for all City consultants. The Administration recommends appr oval of the resolution. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 $2,166 Pay-As-You-Go Account#302-2665-061357 2 $1,761 Pay-As-You-Go Account#302-2665-069357 3 $7,730 Capital Reserve Account#304-2665-061357 4 $1,973 Capital Reserve Account#304-2665-069357 5 $3,564 Gulf Breeze 2006 account#423-2665-061357 6 $21,183 Water&Sewer Enterprise Fund#425-2665-061357 7 $25,001 Stormwater Enterprise Fund#427-2665-061357 OBPI 8 $43,720 Stormwater Bonds 2011 Series#431-2665-069357 Total $107,098 Financial impact Summary: City Clerk's Office Legislative Tracking: Maria Hernandez, ext.2584 Sign-Offs: De art nt rector Asst City M e City Man 1geA FV JGG JLM T:\AGENDA\2 \April 1ASS 1 &2-Schwebke Shiskin-Amen 2\SS 1 &2-SCHWEBKE-Amendment 2-SUMM.docx MIAMIBEACH AGEPIDA ITEM c7� DATE V/7-/3 ® MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMI SION MEMORANDUM TO: Mayor Matti Herrera Bower and Mei nbers of t e City Commission FROM: Jimmy L. Morales, City Manager DATE: April 17, 2013 SUBJECT: A RESOLUTION OF THE MAY R AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RETROACTIVELY APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2, TO THE EXISTING PROFESSIONAL ARCHITECTURE & ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND SCHWEBKE-SHISKIN & ASSOCIATES, INC. (SSA), DATED DECEMBER 14, 2011, FOR THE BAYSHORE NEIGHBORHOOD NO. 8E — SUNSET ISLANDS I & II RIGHT OF WAY PROJECT; IN THE NEGOTIATED NOT-TO-EXCEED AMOUNT OF $107,098; TO PROVIDE EXTENDED RESIDENT PROJECT REPRESENTATION AND ADDITIONAL CONSULTING SERVICES DURING CONSTRUCTION OF THE PROJECT; WITH PREVIOUSLY APPROPRIATED FUNDING. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME SUPPORTED Ensure Value and Timely Delivery of Quality Capital Projects. FUNDING Funding in the amount of$107,098 has been previously appropriated in the Capital Budget, as follows: $ 3,927 Pay-As-You-Go account 302 $ 9,703 Capital Reserve Fund 304 $ 3,564 Gulf Breeze 2006 Fund 423 $ 21,183 Water and Sewer Enterprise Fund $ 25,001 Stormwater Enterprise Fund 43,720 2011 Stormwater Bonds account $ 107,098 Total BACKGROUND On May 3, 2011, the City of Miami Beach issued ITB No. 27-10/11 for construction of right-of- way improvements for Bayshore Neighborhood 8E for Sunset Islands I & II. The Mayor and City Commission awarded this ITB to David Mancini & Sons, Inc. at its July 13, 2011 meeting. The project provided for neighborhood right-of-way improvements including the installation of water mains, storm water infrastructure, outfall relining and reconstruction; and milling and resurfacing of existing roadways. The project time in the contract called for a total of 395 calendar days, or 13 months. Commission Memorandum Sunset Islands 1 &2—Schwebke-Shiskin&Associates, Inc. —Amendment No. 2 April 17, 2013 Page 2 of 3 On December 14, 2011, the City of Miami Beach adopted Resolution No. 2011-27792, authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Schwebke-Shiskin & Associates, Inc. pursuant to Request for Qualifications (RFQ) No. 36- 10/11, for Resident Project Representative Services (RPR), in the amount of $249,995, including reimbursable expenses, for a period of 13 months for Neighborhood No. 8 Bayshore (Package E)— Sunset Islands I & II project. On October 17, 2012, Amendment No. 1 was executed in the amount of $24,999 to provide additional resident project representative services to provide roadway re-alignment coordination drawings and an initial driveway harmonization analysis. ANALYSIS The RPR's duties and responsibilities include general coordination and communication with the City, the City's Architect/Engineer Consultant and the Contractor; attend and participate in the Pre-Construction Meeting with the City as well as all project progress meetings; conduct field inspections on a daily basis throughout the course of the project; monitor specialty A/E Consultant site visits; prepare daily reports; provide photographic records of construction activities; review materials and workmanship of the project and report to the City any deviations from the Contract Documents; monitor delivery of materials to the job site; review shop drawings; issue non-compliance notices when required; identify any existing facilities damaged by the contractor; perform independent review of any change orders submitted by the contractor; coordinate requests for information with the A/E Consultant; monitor progress of construction and ensure the Contractor's adherence to the schedule; verify pay requisition quantities and sign off on all pay requisitions; coordinate various tests for quality control of the project; monitor record drawing mark-ups; recognize hazards while in the normal conduct of onsite business; review and monitor the Contractor's adherence to an acceptable quality control program; keep a log of all forced work efforts related to a disputed change order; verify compliance with the Maintenance of Traffic (MOT) plan in the field; forward water main shutdown requests to the City; verify substantial completion; and attend "walk-through" inspections of the work; attend and participate in a final completion walk-through and inspection and prepare a final Certificate for Payment. The base contract time for these services was for a period of 13 months commencing upon the second notice to proceed issued on December 12, 2011 to the period ending on January 11, 2013. The construction schedule of the project was extended for a period of approximately 4 months. This was due to extensions of time awarded to the contractor via change orders for additional work and rain delays. The contract provides for a pre-negotiated fixed fee of $17,038 per month for additional RPR services after the expiration of the contract time. The extended time required for this project would be from the end of the 13 month period on January 11, 2013 until the project completion which is currently scheduled for May 10, 2013 for a total not-to-exceed amount of$68,152. During the course of the project in 2012, several requests were made by staff to the resident project representative to provide additional information required for the resolution of unforeseen conditions encountered and added scope. These services were beyond the scope of the contract and included the revision of pollution control structures due to constructability issues at driveways, certification of watermains within the project, franchised utility company coordination and driveway harmonization. A detailed stormwater modeling analysis and recommendation was also requested by staff in order to ascertain the potential future needs of the drainage system. These additional services are considered unauthorized purchases, Commission Memorandum Sunset Islands 1 &2—Schwebke-Shiskin&Associates, Inc. —Amendment No. 2 April 17, 2013 Page 3 of 3 however funding for the additional cost of $38,946 for these services was requested in the 2013 capital budget and are, therefore, previously appropriated. The summary of the additional requested services is as follows: RPR Time Extensions $ 68,152 RPR Added Scope $ 38,946 TOTAL $ 107,098 CONCLUSION The Administration recommends the execution of Amendment No. 2, in the negotiated, not to exceed amount of $107,098, to an existing Agreement between the City of Miami Beach and Schwebke-Shiskin & Associates, Inc., dated December 14, 2011, to provide additional Resident Project Representative Services for the Bayshore Neighborhood No. 8E — Sunset Islands I & II right of way project; with previously appropriated funding. Exhibit A: Amendment No. 2 Schedule A, Scope of Services and Schedule B, Fee Schedule JLM/ lDIGI/ T:\AGENDA\2013\Apri1 17\SS 1 &2-Schwebke Shiskin-Amendment 2\SS 1 &2-SCHWEBKE-Amendment No.2- MEMO.docx Exhibit A AMENDMENT No. 2 TO THE PROFESSIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE BAYSHORE NEIGHBORHOOD NO. 8E — SUNSET ISLAND I & II RESIDENT PROJECT REPRESENTATIVE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND SCHWEBKE-SHISKIN & ASSOCIATES DATED DECEMBER 14, 2011, SAID AMENDMENT IN AN AMOUNT NOT-TO-EXCEED $107,098; TO PROVIDE ADDITIONAL SERVICES FOR EXTENDED RESIDENT PROJECT REPRESENTATIVE SERVICES DURING CONSTRUCTION AND VARIOUS ADDITIONAL CONSULTING SERVICES This Amendment No. 2 to the Agreement, made and entered this day of 2013, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and SCHWEBKE-SHISKIN & ASSOCIATES, INC, a Florida Corporation, having its offices at 3240 Corporate Way, Miramar, Florida, 33025 (hereinafter referred to as the Consultant). RECITALS WHEREAS, on December 14, 2011, the Mayor and City Commission approved resolution no. 2011-27792 authorizing the execution of an Agreement between the City of Miami Beach and Schwebke-Shiskin & Associates, Inc. (Consultant), for a not-to-exceed amount of $249,995, including reimbursable expenses for Resident Project Representative Services for Neighborhood No. 8 Bayshore (Package E)—Sunset Islands I & II (the Project); and WHEREAS, the Project includes Resident Project Representative Services for a period of up to thirteen (13) months; and WHEREAS, the contract includes pre-negotiated monthly extended RPR services in the amount of$17,038 per month; and WHEREAS, on October 17, 2012, the Capital Improvement Projects (CIP) Office approved Amendment No. 1 to the Agreement, for a not-to-exceed amount of $24,999, for additional services for the re-alignment of roadway and driveway harmonization analysis; and WHEREAS, on February 20, 2013, the consultant submitted a proposal for additional professional services associated with additional scope of work; and WHEREAS, the total additional fee requested by the Consultant for the additional work is $107,098; and WHEREAS, City staff have evaluated the Consultant's cost proposal and are in agreement that the proposal is reasonable; and WHEREAS, additional funds have been appropriated within the capital budget for the additional work; and WHEREAS, Amendment No. 2 to the Agreement will revise the total contract sum to a not-to-exceed total of$382,092. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS The Agreement is amended to include and incorporate the additional work, as set forth in Schedule A, attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA Rafael Granado, City Clerk Matti Herrera Bower, Mayor ATTEST: CONSULTANT: SCHWEBKE-SHISKIN & ASSOCIATES, INC. Secretary President Print Name Print Name APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION City Attorney Date T:\AGENDA\2013\April 17\Sunset Islands 1 & 2 - Schwebke Shiskin - Amendment No. 2\SS 1 & 2 - SCHWEBKE - Amendment No. 2.docx SCHEDULE "A" SUNSET ISLANDS NO. I & II SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: ADD the following TASK 5—ADDITIONAL SERVICES: Task 5.3—Additional Services — Revision of Pollution Control Structures: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional design efforts to modify the previously designed pollution control structures. During construction of the drainage system and review of the construction plans, it was found that several of the previously design pollution control structures were within, or within close proximity, of an existing driveway. In many instances the pollution control structures were designed to be above grade. This would result in obstructions, or hazards, within or near a drivable area. In consideration of the proposed infrastructure improvements by Chen-Moore & Associates, Inc., it was decided that the CONSULTANT shall prepare the necessary exhibits and calculations to process permits through the applicable agencies to allow for modification of the pollution control structures. Professional services to be provided by the CONSULTANT shall include: - Prepare plans and calculations required to modify the pollution control structures. - Process the plans, calculations and other exhibits for approval through the City of Miami Beach Public Works Department and Miami-Dade County Department of Environmental Resources Management for modification of the Class II Permit. Basis of Scope: The above scope was prepared based on the following assumptions: - The previously designed infrastructure improvements originating from Chen-Moore & Associates, Inc. are free of any errors and omissions. - The Engineer of Records agrees with the required modification of the Pollution Control Structures to lower the previously designed weir crest elevations. Deliverables: - Sketches and calculations of the proposed modifications. - A Class II permit modification letter from DERM. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$4,100. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\april 17\sunset islands I &2-schwebke shiskin-amendment no.2\additional services02-schedule a.doc Task 5.4—Additional Services —Certification of Watermains: It was decided that the CONSULTANT shall certify all watermains within the project. This process is required to obtain a clearance from the Department of Health so that the contractor can begin transferring water services from the existing watermain to the new watermain. Professional services to be provided by the CONSULTANT shall include: - Witness pressure tests for the full duration of time required to certify that the pressure test was performed in compliance with AWWA Standards. - Prepare pressure test reports to be signed and sealed by a Florida Registered Professional Engineer. - Review watermain as-built drawings for compliance with pertinent regulations. - Prepare and process watermain certification applications through the City of Miami Beach Public Works Department and the Miami-Dade County Health Department. Basis of Scope: The above scope was prepared based on the following assumptions: - The previously designed infrastructure improvements originating from Chen-Moore & Associates, Inc. are free of any errors and omissions. - Bacteriological samples, Signed and Sealed asbuilt drawings by a Professional Land Surveyor and other required documentation not mentioned under"Professional services to be provided by the CONSULTANT" are provided to the CONSULTANT. Deliverables: - Copies of the documentation required for certification of the watermains, i.e. applications, pressure test results, bacteriological sample test reports, and as-built drawings. - Clearance letter from the Miami-Dade County Health Department. Schedule: - Additional services will commence upon notification of Notice Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$4,300. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\april 17\sunset islands 1 &2-schwebke shiskin-amendment no.2\additional services02-schedule a.doc Task 5.5—Additional Services — Utility Coordination: . Due to unforeseen conditions within the project the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional efforts by the Resident Project Representative to assist in the coordination of utility relocations. In consideration of this work it was decided that the CONSULTANT shall prepare sketches, exhibits, plans and other documents, as needed, to assist in utility coordination and relocations to allow for the construction of water, drainage and roadway facilities. Professional services to be provided by the CONSULTANT shall include: - Preparation of plans, sketches, exhibits and other documents for coordination with Utility companies. - Attend meetings and walkthroughs of the project with the various utility companies, contractor and the City of Miami Beach, as needed. Basis of Scope: The above scope was prepared based on the following assumptions: - The CONTRACTOR is responsible for utility coordination. Our firm will be assisting in coordination efforts. Deliverables: Sketches, PDF's, and other forms of media, as needed, for coordination meetings and conversations with utility companies. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$9,500. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\april 17\sunset islands l &2-schwebke shiskin-amendment no.2\additional services02-schedule a.doc Task 5.6—Additional Services — Driveway Harmonization Consulting Services: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional Engineering Consulting and Resident Project Representative services to review, analyze and provide opinions regarding driveway harmonization re-design sketches provided by the Engineer of Record. Based on the previous analysis performed by this firm it was determined that the Engineer of Record, Chen-Moore & Associates, Inc., would need to prepare individual sketches for harmonization of driveways determined to be lower in elevation than the elevation of the roadway designed as part of the infrastructure improvements for Sunset Islands 1 & 2. It was agreed that additional engineering consulting services will be provided by the CONSULTANT to verify that the design prepared by the DESIGN CONSULTANT will provide a positive gradient to the recently installed valley gutters. The CONSULTANT will also analyze and determine the scope of work required based on the sketched prepared by the DESIGN CONSULTANT to prepare a detailed cost estimate for the additional work. Professional services to be provided by the CONSULTANT shall include: - Analysis of dreiveway harmonization drawings prepared by Chen-Moore &. - Prepare engineer's cost estimates for driveways requiring harmonization in consideration of the higher roadway elevations. Basis of Scope: The above scope was prepared based on the following assumptions: - The purpose of this work is to review driveway harmonization sketches for slopes consistent with providing a positive drainage flow to the recently installed valley gutters. Deliverables: - An engineer's cost estimate will be provided for each driveway requiring harmonization. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$7,099. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\april 17\sunset islands I &2-schwebke shiskin-amendment no.2\additional services02-schedule a.doc Task 5.7—Additional Services— Detailed Stormwater Modeling, Analysis and Recommendations: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional Engineering Consulting services to prepare a detailed stormwater management model to more accurately define conditions of the designed stormwater management system by the Engineer of Record and DESIGN CONSULTANT, Chen-Moore & Associates, Inc. Due to storm events, high tide conditions and the resulting flooding conditions witnessed at the end of September 2012 the CITY requested the Schwebke-Shiskin & Associates, Inc., the CONSULTANT, to analyze and provide opinions and recommendations regarding the gravity stormwater management system designed by the DESIGN CONSULTANT. Professional services to be provided by the CONSULTANT shall include: - Prepare a detailed stormwater model of the stormwater management system designed by Chen-Moore &Associates, Inc. - Prepare maps and exhibits of the designed stormwater management system and of the proposed recommendations for a functional stormwater gravity system. - Prepare a stormwater management study including a summary of the design conditions and results, detailed results obtained from the stormwater management model, and summary of recommendations for a functional stormwater gravity system. Basis of Scope: The above scope was prepared based on the following assumptions: - The purpose of this work is to analyze the designed gravity stormwater management system and provide recommendations for a functional gravity stormwater system. - The Engineer of Record will process, permit and coordinate the recommended modifications of the designed stormwater management system with the CITY and the CONTRACTOR. Deliverables: - A stormwater management study with summary of recommendations with pertinent sketches and reports. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$13,947. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\april 17\sunset islands 1 &2-schwebke shiskin-amendment no.2\additional services03-schedule a.doc C/) - ~- - \ , , » 2 / % . 0 /\ 't 00 _ n — c 2 ».@ §~Cl) < - . ® /§ LO 20 � ( z 5 bq m . D L \ § . ' k . co W N 2 . co 0 cq ID k U b w . w o w § z Q m LL � � 0 — \ — 0 k § d M Z = 2 «_ m 0a » `� U 0 > � 0 S \ uw \ � .2\ ƒ ) / k w . 0 / & Z _j � I 2 ILU z q / 2 0 § E U) U & < Q § § § _ m - e W 0 m \ w ƒ i � f « ] L < / ) n § \ 0 \ z ƒ ± 04 k ± / / 0 < w 2 - < 0 \ � } \ u = « z w - U)< %.j « e J o z 12 w k LL 0 ƒ < § ) \ 2 £ _ 0 = e u 3 0 U)§ z z \ / < 0 z \ 0 0 0 = » « u 0 z E ® E \ w k F- w / § § \ § oo < m ° $ L" n q c �C ® . ƒ2 a a a a a a . F- 0?013--q-e 1-7 Z AMENDMENT No. 2 TO THE PROFESSIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE BAYSHORE NEIGHBORHOOD NO. 8E - SUNSET ISLAND I & II RESIDENT PROJECT REPRESENTATIVE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND SCHWEBKE-SHISKIN & ASSOCIATES DATED DECEMBER 14, 2011, SAID AMENDMENT IN AN AMOUNT NOT-TO-EXCEED $107,098; TO PROVIDE ADDITIONAL SERVICES FOR EXTENDED RESIDENT PROJECT REPRESENTATIVE SERVICES DURING CONSTRUCTION AND VARIOUS ADDITIONAL CONSULTING SERVICES This Amendment No. 2 to the Agreement, made and entered this 2kD day of fLt-I.- 2013, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and SCHWEBKE-SHISKIN & ASSOCIATES, INC, a Florida Corporation, having its offices at 3240 Corporate Way, Miramar, Florida, 33025 (hereinafter referred to as the Consultant). RECITALS WHEREAS, on December 14, 2011, the Mayor and City Commission approved resolution no. 2011-27792 authorizing the execution of an Agreement between the City of Miami Beach and Schwebke-Shiskin & Associates, Inc. (Consultant), for a not-to-exceed amount of $249,995, including reimbursable expenses for Resident Project Representative Services for Neighborhood No. 8 Bayshore (Package E) - Sunset Islands I & II (the Project); and WHEREAS, the Project includes Resident Project Representative Services for a period of up to thirteen (13) months; and WHEREAS, the contract includes pre-negotiated monthly extended RPR services in the amount of$17,038 per month; and WHEREAS, on October 17, 2012, the Capital Improvement Projects (CIP) Office approved Amendment No. 1 to the Agreement, for a not-to-exceed amount of $24,999, for additional services for the re-alignment of roadway and driveway harmonization analysis; and WHEREAS, on February 20, 2013, the consultant submitted a proposal for additional professional services associated with additional scope of work; and WHEREAS, the total additional fee requested by the Consultant for the additional work is $107,098; and WHEREAS, City staff have evaluated the Consultant's cost proposal and are in agreement that the proposal is reasonable; and WHEREAS, additional funds have been appropriated within the capital budget for the additional work; and WHEREAS, Amendment No. 2 to the Agreement will revise the total contract sum to a not-to-exceed total of$382,092. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS The Agreement is amended to include and incorporate the additional work, as set forth in Schedule A, attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA o' 13 P4 I Rafael Granado, City Cl rk Mat Herrera Bower, ayor ATTEST: CONSULTANT: SCHWEBKE-SHISKIN & ASSOCIATES, INC. Secretary President �0 A h 5014 o 66-c::) Print Name Print Name APPROVED AS TO - FORM & LANGUAGE & FO XECUTION A ey �, Date T:\AGENDA\2013\April 17\Sunset Islands 1 & 2 - Schwebke Shiskin - Amendment No. 2\SS 1 & 2 - SCHWEBKE - Amendment No. 2.docx SCHEDULE "A" SUNSET ISLANDS NO. I & II SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: ADD the following TASK 5—ADDITIONAL SERVICES: Task 5.3—Additional Services — Revision of Pollution Control Structures: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional design efforts to modify the previously designed pollution control structures. During construction of the drainage system and review of the construction plans, it was found that several of the previously design pollution control structures were within, or within close proximity, of an existing driveway. In many instances the pollution control structures were designed to be above grade. This would result in obstructions, or hazards, within or near a drivable area. In consideration of the proposed infrastructure improvements by Chen-Moore & Associates, Inc., it was decided that the CONSULTANT shall prepare the necessary exhibits and calculations to process permits through the applicable agencies to allow for modification of the pollution control structures. Professional services to be provided by the CONSULTANT shall include: - Prepare plans and calculations required to modify the pollution control structures. - Process the plans, calculations and other exhibits for approval through the City of Miami Beach Public Works Department and Miami-Dade County Department of Environmental Resources Management for modification of the Class II Permit. Basis of Scope: The above scope was prepared based on the following assumptions: - The previously designed infrastructure.improvements originating from Chen-Moore & Associates, Inc. are free of any errors and omissions. - The Engineer of Records agrees with the required modification of the Pollution Control Structures to lower the previously designed weir crest elevations. Deliverables: - Sketches and calculations of the proposed modifications. - A Class II permit modification letter from DERM. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$4,100. SS&A will invoice the City on a monthly basis based on the percentage complete. 0agenda\2013\april 17\ss I &2-schwebke shiskin-amendment 2\additional services-schedule a.doc Task 5.4—Additional Services — Certification of Watermains: It was decided that the CONSULTANT shall certify all watermains within the project. This process is required to obtain a clearance from the Department of Health so that the contractor can begin transferring water services from the existing watermain to the new watermain. Professional services to be provided by the CONSULTANT shall include: - Witness pressure tests for the full duration of time required to certify that the pressure test was performed in compliance with AWWA Standards. - Prepare pressure test reports to be signed and sealed by a Florida Registered Professional Engineer. - Review watermain as-built drawings for compliance with pertinent regulations. - Prepare and process watermain certification applications through the City of Miami Beach Public Works Department and the Miami-Dade County Health Department. Basis of Scope: The above scope was prepared based on the following assumptions: - The previously designed infrastructure improvements originating from Chen-Moore & Associates, Inc. are free of any errors and omissions. - Bacteriological samples, Signed and Sealed asbuilt drawings by a Professional Land Surveyor and other required documentation not mentioned under"Professional services to be provided by the CONSULTANT" are provided to the CONSULTANT. Deliverables: - Copies of the documentation required for certification of the watermains, i.e. applications, pressure test results, bacteriological sample test reports, and as-built drawings. - Clearance letter from the Miami-Dade County Health Department. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$4,300. SS&A will invoice the City on a monthly basis based on the percentage complete. tAagenda\2013\apriI 17\ss 1 &2-schwebke shiskin-amendment 2\additional services-schedule a.doc Task 5.5—Additional Services— Utility Coordination: Due to unforeseen conditions within the project the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional efforts by the Resident Project Representative to assist in the coordination of utility relocations. In consideration of this work it was decided that the CONSULTANT shall prepare sketches, exhibits, plans and other documents, as needed, to assist in utility coordination and relocations to allow for the construction of water, drainage and roadway facilities. Professional services to be provided by the CONSULTANT shall include: - Preparation of plans, sketches, exhibits and other documents for coordination with Utility companies. - Attend meetings and walkthroughs of the project with the various utility companies, contractor and the City of Miami Beach, as needed. Basis of Scope: The above scope was prepared based on the following assumptions: - The CONTRACTOR is responsible for utility coordination. Our firm will be assisting in coordination efforts. Deliverables: - Sketches, PDF's, and other forms of media, as needed, for coordination meetings and conversations with utility companies. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$9,500. SS&A will invoice the City on a monthly basis based on the percentage complete. t:\agenda\2013\apiil 17\ss 1 &2-schwebke shiskin-amendment 2\additional services-schedule a.doc Task 5.6—Additional Services — Driveway Harmonization Consulting Services: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional Engineering Consulting and Resident Project Representative services to review, analyze and provide opinions regarding driveway harmonization re-design sketches provided by the Engineer of Record. Based on the previous analysis performed by this firm it was determined that the Engineer of Record, Chen-Moore &Associates, Inc., would need to prepare individual sketches for harmonization of driveways determined to be lower in elevation than the elevation of the roadway designed as part of the infrastructure improvements for Sunset Islands 1 & 2. It was agreed that additional engineering consulting services will be provided by the CONSULTANT to verify that the design prepared by the DESIGN CONSULTANT will provide a positive gradient to the recently installed valley gutters. The CONSULTANT will also analyze and determine the scope of work required based on the sketched prepared by the DESIGN CONSULTANT to prepare a detailed cost estimate for the additional work. Professional services to be provided by the CONSULTANT shall include: - Analysis of dreiveway harmonization drawings prepared by Chen-Moore &. - Prepare engineer's cost estimates for driveways requiring harmonization in consideration of the higher roadway elevations. Basis of Scope: The above scope was prepared based on the following assumptions: - The purpose of this work is to review driveway harmonization sketches for slopes consistent with providing a positive drainage flow to the recently installed valley gutters. Deliverables: - An engineer's cost estimate will be provided for each driveway requiring harmonization. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$7,099. SS&A will invoice the City on a monthly basis based on the percentage complete. Oagenda\2013\april 17\ss I &2-schwebke shiskin-amendment 2\additional services-schedule a.doc Task 5.7 —Additional Services— Detailed Stormwater Modeling, Analysis and Recommendations: As required by site conditions, the Sunset Islands 1 & 2 Bid Package No. 8E project will require additional Engineering Consulting services to prepare a detailed stormwater management model to more accurately define conditions of the designed stormwater management system by the Engineer of Record and DESIGN CONSULTANT, Chen-Moore & Associates, Inc. Due to storm events, high tide conditions and the resulting flooding conditions witnessed at the end of September 2012 the CITY requested the Schwebke-Shiskin & Associates, Inc., the CONSULTANT, to analyze and provide opinions and recommendations regarding the gravity stormwater management system designed by the DESIGN CONSULTANT. Professional services to be provided by the CONSULTANT shall include: - Prepare a detailed stormwater model of the stormwater management system designed by Chen-Moore & Associates, Inc. - Prepare maps and exhibits of the designed stormwater management system and of the proposed recommendations for a functional stormwater gravity system. - Prepare a stormwater management study including a summary of the design conditions and results, detailed results obtained from the stormwater management model, and summary of recommendations for a functional stormwater gravity system. Basis of Scope: The above scope was prepared based on the following assumptions: - The purpose of this work is to analyze the designed gravity stormwater management system and provide recommendations for a functional gravity stormwater system. - The Engineer of Record will process, permit and coordinate the recommended modifications of the designed stormwater management system with the CITY and the CONTRACTOR. Deliverables: - A stormwater management study with summary of recommendations with pertinent sketches and reports. Schedule: - Additional services will commence upon notification of Notice to Proceed (NTP) by the City. Fee: - This additional service will be completed for a lump sum fee of$13,947. SS&A will invoice the City on a monthly basis based on the percentage complete. 0agenda\2013\april 17\ss I&2-schwebke shiskin-amendment 2\additional services-schedule a.doc 00 °0 00 00 00 m ~ ° r°, u°> o rn ° N Q o v of r c2 � o O U � J i 69 E9 a EH fA TM O 11] O r I M : O O OD co Q co I Q_' Z V a O M LLI Z> (n co M N Q Q 6R —_ — __.O N (O� ~ Oi 0 N 0 LL W oM rn o co F Z f/7 Z W Q W (n_- ,o J W Z Z o co Q (9 I I N W o W 'U^ F a. M O c) M 1` � j O N N W U UJ N co M ° N Z W W Q () N LL a 2 mWW0 oo m m co LU > o 0 Q W DQZZ � W 0 0. } V LL j W Q � N0 = 0 pVU"Q U) a bq U =e1 J �o 'o�N� o_� �0 O V Z W N lf] 'O W H 0 N W o a - - Z ° c 2 0 �' E fA U g "' Q Q w o � o0 o0 v) m LLJ U Ly w U) Q N o o >Q Z x N a� > Q L L J _ U 0 (n O Z W J 2 i ' N � V � L) Z Q Q ZO Q w O ~ ~ Z QQ w O y Q O N � Q O � J0Z2 X a c0a ai Moc < x g w LL — 0 2 J o N Z Z (Qj OU Q 0 Z Q w p p w 0 x o Y ►_ cn - w Q _ w J °a_ � 0IDoo °Q = g c p ui n ui n n ui F Z