2013-28250 Reso RESOLUTION NO. 2013-28250
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE AMENDMENT NO. 25 TO THE
PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF
MIAMI BEACH, FLORIDA, AND CH2M HILL, INC. FOR THE
PROFESSIONAL LANDSCAPE, ARCHITECTURAL AND
ENGINEERING SERVICES FOR THE RIGHT-OF-WAY
INFRASTRUCTURE IMPROVEMENT PROGRAM FOR
NEIGHBORHOOD NO. 8 BAYSHORE AND SUNSET ISLANDS,
DATED MAY 16, 2001 (THE AGREEMENT), IN THE NEGOTIATED
NOT-TO-EXCEED AMOUNT OF $4439861 FOR ADDITIONAL
CONSTRUCTION ADMINISTRATION SERVICES, FOR A PERIOD
EIGHT (8) MONTHS AND FOR ADDITIONAL DESIGN SERVICES FOR
THE RIGHT OF WAY INFRASTRUCTURE IMPROVEMENTS FOR THE
CENTRAL BAYSHORE NEIGHBORHOOD NO. 8A PACKAGE; AND
$59000 FOR REIMBURSABLE EXPENSES, FOR A GRAND TOTAL
NOT-TO-EXCEED AMOUNT OF $448,861; WITH PREVIOUSLY
APPROPRIATED FUNDING.
WHEREAS, on May 16, 2001, the Mayor and City Commission adopted
Resolution No. 2001-24387, approving and authorizing the Mayor and City Clerk to
execute a professional services agreement with CH2M Hill for the Right-of-Way
Infrastructure Improvements Program Neighborhood No. 8 Bayshore and Sunset Island
project (the Project), pursuant to Request for Qualifications No. 134-99/00; and
WHEREAS, the Agreement provides for the detailed planning services for
various streetscape, landscape, and utility improvements within the Bayshore and
Sunset Island neighborhoods; and
WHEREAS, on January 19, 2011, the City of Miami Beach adopted Resolution
No. 2011-27587, approving and authorizing the Mayor and City Clerk to execute a
contract with Lanzo Construction Co. (LCC), pursuant to invitation to Bid 18-09/10, for
right-of-way infrastructure improvement program Neighborhood No. 8 — Central
Bayshore (Package A) and Lake Pancoast (Package C); and
WHEREAS, the project scope of work included installation of a new water main
to upgrade the existing 6 inch water main, drainage installation, roadway paving and
restoration, concrete sidewalk, and landscaping; and
WHEREAS, on July 18, 2012, the Mayor and City Commission adopted
Resolution No. 2012-27972, approving the amendment to the BODR for the Bayshore
Right of Way improvement project to include the implementation of the items agreed to
by the City for Home Owners Association (HOA) requests, provide additional storm
water upgrades including valley gutters to the area known as Zone 4 in the BODR, as
well as complete milling and resurfacing of the roadway in lieu of an asphalt overlay; and
WHEREAS, since the execution of the original Agreement on May 16, 2001,
there have been a total of twenty-four (24) amendments which have been either adopted
by the City Commission or administratively approved; and
WHEREAS, The original contract time for Construction Administration Services to
CH2M Hill was for a period of twenty-six (26) months commencing upon the second
notice to proceed issued to LCC on October 31, 2011; and
WHEREAS, the construction schedule of the project has been extended for a
period of approximately eight (8) months; and
WHEREAS, this is due to extensions of time awarded to the contractor via
change orders for additional work, rain delays, and additional scope as detailed in
Resolution No. 2013-28162; and
WHEREAS, in order to extend CH2M Hill's services beyond the original Contract
time, it will be necessary to approve the cost for additional construction administration
services; and
WHEREAS, CH2M Hill's construction administration services will include ongoing
participation in the critical aspects of the project, coordination between the City, its
Consultants and Contractors (LCC and Atkins North America, Inc), project certification,
and close out; and
WHEREAS, throughout the project of Central Bayshore there have been impacts
to the design due to unforeseen conditions in the field and owner requests that warrant
localized modifications to the existing design; and
WHEREAS, these revisions to the existing plans and the submittal of revised
permits have been completed except for Prairie Avenue modifications.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND THE CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City
Commission hereby approve and authorize the Mayor and City Clerk to execute
Amendment No. 25 to the professional services agreement between the City of Miami
Beach, Florida, and CH2M Hill for the Professional Landscape Architectural and
Engineering Services for the Right-of-Way Infrastructure Improvements Program for
Neighborhood No. 8 Bayshore and Sunset Islands, dated May 16, 2001, in the
negotiated not-to-exceed amount of $443,861 for additional construction administration
services, for a period of eight.(8) months and for additional design services for the right
of way infrastructure improvements for the Central Bayshore Neighborhood No. 8A
package; and $5,000 for reimbursable expenses, for a grand total not-to-exceed amount
of$448,861; with previously appropriated funding.
PASSED AND ADOPTED this day of J" , 2013.
ATTEST:
zii
RAFAEL GRANADO, CI LRp ORATED; I RRE B WER,
.. :•� AYOR APPROVED AS TO
VX
FORM & LANGUAGE
TAAGENDA\2013\June 5\Bayshore\C :AA Iy-;R%u etif° • 5 ESO.docx & FOR EXECUTION
,��. r7 I? �3<<�_
City t"itly 00 1�,o
COMMISSION ITEM SUMMARY
Condensed Title:
A Resolution Authorizing The Mayor And City Clerk To Execute Amendment 25 To The Professional Service
Agreement Between The City Of Miami Beach, Florida, And CH2M Hill For The Professional Landscape,
Architectural And Engineering Services For The Right-Of-Way Infrastructure Improvement Program For
Neighborhood No. 8 Bayshore And Sunset Islands, Dated May 16th, 2001 (The Agreement), For Additional Design
Services And For Additional Eight (8) Months Of Construction Administration Services, In The Negotiated Not-To-
Exceed Amount Of$443,861, And $5,000 For Reimbursable Expenses, For A Grand Total Not-To-Exceed Amount
Of$448,861,With Previously Appropriated Fundin .
Key Intended Outcome Supported:
Ensure Well Maintained Infrastructure and Ensure Well Designed,Quality Capital Projects.
Supporting Data (Surveys, Environmental Scan, etc.): Ensure value and timely delivery of a quality capital
project.
Issue:
Shall the City Commission approve the amendment to the design contract?
Item Summa /Recommendation:
On May 16, 2001, the City of Miami Beach approved and authorized the execution of an agreement with CH2M Hill,
Inc. (CH2M)for planning, design, and construction administration professional services for the Bayshore and Sunset
Islands Neighborhood No.8 Right-of-Way Infrastructure Improvements Project.
On January 19, 2011, the City of Miami Beach adopted Resolution No. 2011-27587, approving and authorizing the
Mayor and City Clerk to execute a contract with Lanzo Construction Co.(LCC), pursuant to invitation to Bid 18-09/10,
for right-of-way infrastructure improvement program Neighborhood No. 8—Central Bayshore (Package A)and Lake
Pancoast(Package C).The project scope of work included installation of a new water main to upgrade the existing 6
inch water main, drainage installation, roadway paving and restoration,concrete sidewalk,and landscaping.
On July 18, 2012, the Mayor and City Commission adopted Resolution No. 2012-27972, approving the amendment
to the BODR for the Bayshore Right of Way improvement project to include the implementation of the items agreed
to by the City for Home Owners Association (HOA) requests, provide additional storm water upgrades including
valley gutters to the area known as Zone 4 in the BODR, as well as complete milling and resurfacing of the roadway
in lieu of an asphalt overlay. 1.
Since the execution of the original Agreement on May 16, 2001, there have been a total of twenty-four (24)
amendments which have been either adopted by the City Commission or administratively approved. Amendment No.
25 is being presented herein for approval by the Mayor and City Commission.
The construction schedule of the project has been extended for a period of approximately eight(8) months. This is
due to extensions of time awarded to the contractor via change orders for additional work, rain delays, and additional
scope as detailed in Resolution No. 2013-28162. In order to extend CH2M Hill's services beyond the original
Contract time, it will be necessary to approve the cost for additional construction administration services. CH2M Hill's
construction administration services will include ongoing participation in the critical aspects of the project,
coordination between the City,its Consultants and Contractors, project certification, and close out.
Throughout the project of Central Bayshore there have been impacts to the design due to unforeseen conditions in
the field and owner requests that warrant localized modifications to the existing design. These revisions to the
existing plans and the submittal of revised permits have been completed.
The fee being requested by CH2M HILL for these tasks reflects a negotiated, not to exceed amount of$443,861,and
an additional amount of$5,000 for reimbursable expenses, for a total amount of$448,861. A detailed breakdown of
the scope of services and fee is included herein as Amendment No.25.
The Administration recommends that the Mayor and City Commission approve the resolution.
Advisory Board Recommendation:
N/A
Financial Information:
Source of Amount Account
F 1 $403,975 Storm Water Bond 2011 Series#431-2205-061357
2 $44,886 Water&Sewer—Gulf Breeze#423-2205-061357
Total $448,861
City Clerk's Office Legislative Tracking:
Darlene M. Fernandez, P.E. Ext. 6401
Sign-Offs:
De a (rA e Assistant C' na er City M r
DM
J MILIn JLIVI
T:IAGENDA120131July 1 aysh'bre1CH2M Hill-Amendment No 25-SUMMNAV x
AGENDA ITE G7�
MIAMIBEACH SATE -1
i
MIAMI BEACH
City of Miami Beath, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Matti Herrera Bower and Members of th ity Commission
FROM: Jimmy L. Morales, City Manager
DATE: July 17, 2013
SUBJECT: A RESOLUTION OF THE MAY R AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, P VIDING AUTHORIZATION TO THE MAYOR
AND CITY CLERK TO EXECUTE AMENDMENT NO. 25 TO THE PROFESSIONAL
SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA,
AND CH2M HILL, INC. FOR THE PROFESSIONAL LANDSCAPE,
ARCHITECTURAL AND ENGINEERING SERVICES FOR THE RIGHT-OF-WAY
INFRASTRUCTURE IMPROVEMENT PROGRAM FOR NEIGHBORHOOD NO. 8
BAYSHORE AND SUNSET ISLANDS, DATED MAY 16, 2001 (THE AGREEMENT),
IN THE NEGOTIATED NOT-TO-EXCEED AMOUNT OF $443,861 FOR
ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES, FOR A PERIOD
OF EIGHT (8) MONTHS AND FOR ADDITIONAL DESIGN SERVICES FOR THE
RIGHT OF WAY INFRASTRUCTURE IMPROVEMENTS FOR THE CENTRAL
BAYSHORE NEIGHBORHOOD NO. 8A PACKAGE; AND $5,000 FOR
REIMBURSABLE EXPENSES, FOR A GRAND TOTAL NOT-TO-EXCEED AMOUNT
OF $448,861; WITH PREVIOUSLY APPROPRIATED FUNDING.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
KEY INTENDED OUTCOME SUPPORTED
Ensure Value and Timely Delivery of Quality Capital Projects.
FUNDING
Funding in the amount of $448,861 has been previously appropriated in the Capital Budget as
follows:
Central Bayshore Neighborhood - 8A:
$403,975 2011 Storm water Bonds, Account#431-2205-061357
44,886 Gulf Breeze -Water&Sewer Series 2006, Account#423-2205-061357
$448,861 Total (BP- 8A)
BACKGROUND
On May 16, 2001, the City of Miami Beach (City) adopted Resolution No. 2001-24387,
approving and authorizing the execution of an agreement with CH2M Hill, Inc. (CH2M Hill) for
professional services for the Right-of-Way (ROW) Infrastructure Improvements Program for
Neighborhood No. 8 — Bayshore and Sunset Islands project pursuant to Request for
Qualifications (RFQ) No. 134-99/00. The agreement was for planning, design, and
construction administration services for the collective Bayshore Neighborhoods which was
originally one (1) project and was subsequently separated into five (5) individual projects via
amendments to the original agreement. These five projects included Central Bayshore
i
r ti
Commission Memorandum
Central Bayshore Package A-CH2MHILL-Amendment No. 25
July 17, 2013
Page 2 of 3
Neighborhood 8A (Package 8A), Lower North Bay Road Neighborhood 8B (Package 813),
Lake Pancoast Neighborhood 8C (Package 8C), and the Sunset Islands (Packages 8D and
8E).
On April 9, 2003, the City Commission approved the Basis of Design Report (BODR),
completed and submitted by CH2M Hill for the Neighborhood No. 8 Bayshore / Sunset Islands
Project. This BODR was the culmination of a comprehensive planning effort that included input
from and reviews by residents, various City Departments, and the Design Review Board
(DRB).
On January 19, 2011, the City of Miami Beach adopted Resolution No. 2011-27587, approving
and authorizing the Mayor and City Clerk to execute a contract with Lanzo Construction Co.
(LCC), pursuant to invitation to Bid 18-09/10, for right-of-way infrastructure improvement
program Neighborhood No. 8 — Central Bayshore (Package A) and Lake Pancoast (Package
C). The project scope of work included installation of a new water main to upgrade the existing
6 inch water main, drainage installation, roadway paving and restoration, concrete sidewalk,
and landscaping. The project time in the contract called for a total of 730 calendar days.
The first Notice to Proceed (NTP-1) was issued to LCC on August 19, 2011. The Pre-
Construction conference took place on October 26, 2011 and the second Notice to Proceed
(NTP-2) was issued on October 31, 2011. The project has a 24 month schedule and is
currently at 60% completion.
On July 18, 2012, the Mayor and City Commission adopted Resolution No. 2012-27972,
approving the amendment to the BODR for the Bayshore Right of Way improvement project to
include the implementation of the items agreed to by the City for Home Owners Association
(HOA) requests, provide additional storm water upgrades including valley gutters to the area
known as Zone 4 in the BODR, as well as complete milling and resurfacing of the roadway in
lieu of an asphalt overlay.
Since the execution of the original Agreement on May 16, 2001, there have been a total of
twenty-four (24) amendments which have been either adopted by the City Commission or
administratively approved. Lists of all previous Amendments are being attached as part of
Exhibit A. Amendment No. 25 is being presented herein for approval by the Mayor and City
Commission.
ANALYSIS
Construction Administration (CA) Services:
The original contract time for Construction Administration Services to CH2M Hill was for a
period of twenty-six (26) months commencing upon the second notice to proceed issued to
LCC on October 31, 2011. The construction schedule of the project has been extended for a
period of approximately eight (8) months. This is due to extensions of time awarded to the
contractor via change orders for additional work, rain delays, and additional scope as detailed
in Resolution No. 2013-28162. In order to extend CH2M Hill's services beyond the original
Contract time, it will be necessary to approve the cost for additional construction administration
services.
CH2M Hill's construction administration services will include ongoing participation in the critical
aspects of the project, coordination between the City, its Consultants and Contractors (LCC
and Atkins North America, Inc), project certification, and close out. These services are further
detailed in Amendment No. 25 (Exhibit B).
a
Commission Memorandum
Central Bayshore Package A-CH2MHILL-Amendment No. 25
July 17, 2013
Page 3 of 3
Design Modifications:
Throughout the project of Central Bayshore there have been impacts to the design due to
unforeseen conditions in the field and owner requests that warrant localized modifications to
the existing design. These changes include modifications to the water main, streetscape, and
storm water facilities in the Central Bayshore area. These revisions to the existing plans and
the submittal of revised permits have been completed except for Prairie Avenue modifications.
SUMMARY
The fee being requested by CH2M Hill for design modifications including reimbursable
expenses, additional permitting services, and construction administration services is $448,861.
The breakdown by task is summarized below.
Amendment No. 25- CH2MHILL
Task Amount
Labor $142,749
1-Central Bayshore Design Modifications Expenses $1,500
2-Prairie Avenue Modifications Labor $27,112
Expenses $500
3- Permitting (Allowance) Labor $25,000
Ex enses $500
4-Construction Administration Services Labor $224,000
Expenses $2,000
5- Miscellaneous Services (Allowance) Labor $25,000
Expenses $500
Grand Total $448,861
CONCLUSION
The Administration recommends that a Resolution of the Mayor and Commission of the City of
Miami Beach, Florida, authorizing the Mayor and City Clerk to execute Amendment No. 25 to
the professional services agreement between the City of Miami Beach, Florida, and CH2M Hill,
Inc. for the professional landscape, architectural and engineering services for the right-of-way
infrastructure an existing Agreement between the City of Miami Beach and CH2M Hill, dated
May 16, 2001, for a period of eight (8) months, to provide additional Contract Administration
Services for the Bayshore Neighborhood No. 8A— Central Bayshore right of way project in the
negotiated, not to exceed amount of $443,861, and an additional amount of $5,000 for
reimbursable expenses, for a total amount of$448,861, with previously appropriated funding.
Attachments:
Exhibit A: Amendments Summary
Exhibit B: Amendment No. 25-Scope of Services-CH2M Hill
JLM/MT/DM/DF
T:\AGENDA\2013\Ju1y 17\Bayshore\CH2MHILL-Amendments No.25-MEMO.docx
r �
Exhibit A
Prior List Approved Amendments
Amount Approved:
Original Contract Value $1331174
Amendment No.1 $1,913,302
Amendment No.2 $0
Amendment No.3 $12,850
Amendment No.4 $21500
Amendment No.5 $559863
Amendment No.6 $3721230
Amendment No.7 $581128
Amendment No.8 $245900
Amendment No.9 $35200
Amendment No.10 $8,680
Amendment No.11 $105400
Amendment No.12 $1425955
Amendment No.13 $225156
Amendment No.14 $15,403
Amendment No.15 $29145
Amendment No.16 $2,947
Amendment No.17 $15,344
Amendment No.18 $15,196
Amendment No.19 $10800
Amendment No.20 $0
Amendment No.21 $198,718
Amendment No.22 $70000
Amendment No.23 $2075841
Amendment No.24 $13,988
Total Revised Contract Value: $490399920
Descriptions:
Original Agreement:
May 16, 2001, the Mayor and City Commission adopted Resolution No. 2001-24387
approving and authorizing the Mayor and City Clerk to execute an agreement with
the Consultant for professional services (the Agreement) for the Right-of-Way
Infrastructure Improvements Program Neighborhood No. 8 Bayshore and Sunset
Island project (the Project), pursuant to Request for Qualifications No. 134-99/00.
The Agreement provides. for the detailed planning services for various streetscape,
landscape, and utility improvements within the Bayshore and Sunset Island
Neighborhoods and planning effort for the Bayshore and Sunset Island
neighborhoods has been completed and detail design activities are underway.
Page 1 of 5
Exhibit A
Amendment No. 1:
December 10, 2003, the Mayor and City Commission adopted Resolution No. 2003-
25432, Approving additional design services for planning, design, permitting,
bidding/award, and construction administrative services for the Bayshore and Sunset
Island neighborhoods in the not-to-exceed amount of$1,913,302 and resulting in a
revised contract fee of$2,046,476.
Amendment No. 2:
February 24, 2005, the Agreement was administratively executed; to re-package
Sunset Island 1 and 2 from Bid Package 8D to Bid Package 8B at no additional cost,
resulting in not change to contract.
Amendment No. 3:
November 8, 2005, the Agreement was administratively executed to include the
completion of a topographic survey along Pine Tree Drive, from West 28th to West
401h Streets, along the east side of the road, in the no-to-exceed amount of$12,850;
resulting in a revised contract fee of$2,059,326.
Amendment No. 4:
February 17, 2006, the Agreement was administratively executed to include the
evaluation, permitting and preparation of construction cost alternative for the
installation of curb/valley gutters to Sunset Islands 1 and 2, in the not-to-exceed
amount of$2,500; resulting in a revised contract fee of$2,061,826.
Amendment No. 5:
February 16, 2006, the Agreement was executed to include the installation of four
(4) drainage test wells to provide additional information for the preparation of a
Letter of Reasonable Assurance to be submitted to the Florida Department of
Environmental Protection (FDEP), as required in the permit application for the
Project, in the not-to-exceed amount of$55,863; resulting in a revised contract fee of
$2511709.
Amendment No. 6:
September 6, 2006, the Mayor and City Commission adopted Resolution No. 2006-
26283, approving Amendment No. 6 to the Agreement for the design of "P3.2"
classified water main replacement required by the City's Public Works Department,
.in the not-to-exceed amount of $372,230: resulting in a revised contract fee of
$29489,919.
Amendment No. 7:
September 7, 2006, the Mayor and City Commission adopted Resolution No. 2006-
26283, approving Amendment No. 7 to the Agreement for the design of bike
lanes/routes required by the City's Public Works Department, in the not-to-exceed
amount of$58,128; resulting in a revised contract fee of$2,548,047.
Amendment No. 8:
September 9, 2006, the Agreement was administratively executed to include the
design of alternative parking in the Lake Pancoast are, in the not-to-exceed amount
of$24,900; resulting in a revised contract fee of$2,572,947.
Page 2 of 5
Exhibit A
Amendment No. 9:
September 9, 2006, the Agreement was administratively executed to include the
design of road edge treatment to Sunset Islands 1 and 2, in the not-to-exceed amount
of$3,200; resulting in a revised contract fee of$2,576,147.
Amendment No. 10:
September 9, 2006, the Agreement was administratively executed to include the
design of resident requested modifications in the Lake Pancoast are; in the not-to-
exceed amount of 8,680; resulting in a revised contract fee of$2,584,827.
Amendment No. 11:
August 6, 2007, the Agreement was administratively executed for an additional
thirty seven (37) soil borings in Sunset Island No. 1 to verify underground utility
services and potential conflicts, in the not-to-exceed amount of$10,400; resulting in
a revised contract fee of$2,595,227.
Amendment No. 12:
April 11, 2007, the Mayor and City Commission adopted Resolution No. 2007-
26504, approving Amendment No.12 to the Agreement for additional services
regarding verification of additional underground utilities to avoid conflicts in 103
boring sites along North Bay Road between Sunset Drive and Alton Road, in the
not-to-exceed amount of$27,500; and 334 boring sites for Bid Package 8A—Central
Bayshore, in the not-to-exceed amount of$94,675; and perform a traffic study at the
intersection of West 28th Street and Prairie Avenue, in the not-to-exceed amount of
$20,780; all resulting in a revised contract fee of$2,738,182.
Amendment No. 13:
December 20, 2007, the Agreement was administratively executed for additional
services to expand the traffic study of alternative design concepts for the 28th Street
and Prairie Avenue intersection (previously authorized under Amendment No. 12),
in the not-to-exceed amount of $22,156; resulting in a revised contract fee of
$2,7601338.
Amendment No. 14:
December 20, 2007, the Agreement was administratively executed for additional
services to implement miscellaneous design revisions to bike lanes, traffic tables,
crosswalks, the 28th Street and Prairie Avenue intersection, and water mains, in the
not-to-exceed amount of$15,403; resulting in a revised contract fee of$2,775,741.
Amendment No. 15:
December 7, 2007, the Agreement was administratively executed for additional
services to prepare a re-application package for Historic Preservation Board for the
Lake Pancoast Bid Package, in the not-to-exceed amount of $2,145; resulting in a
revised contract fee of$2,777,886.
Amendment No. 16:
December 7, 2007, the Agreement was administratively executed for additional
services for design services, preparation of materials, and attendance at a meeting
with residents discussing for the intersection of 28th Street and Prairie
options t o s o
�
Avenue, in the not-to-exceed amount of$2,947; resulting in a revised contract fee of
$2,780,833.
Page 3 of 5
Exhibit A
Amendment No. 17:
January 6, 2009, the Agreement was administratively executed for additional
services for design services, preparation of materials and attendance at various Board
and civic meetings discussing options on Sunset Islands No. 1 and 2, in the not-to-
exceed amount of$15,344; resulting in a revised contract fee of$2,796,177.
Amendment No. 18:
January 6, 2009, the Agreement was administratively executed for additional
services for design services necessary for the preparations of a technical
memorandum evaluating the use of infiltration trenches in lieu of a stormwater pump
station in Lake Pancoast, in the not-to-exceed amount of $15,196; resulting in a
revised contract fee of$2,811,373.
Amendment No. 19:
October 14, 2009, the Mayor and City Commission adopted Resolution No. 2009-
27223 approving Amendment No. 19 to the Agreement which provided for
additional design scope on Sunset Islands No. 3 and 4; in the not-to-exceed amount
of$1089000.
Amendment No. 20:
April 13, 2011, the Mayor and City Commission adopted Resolution No. 2011-
27643, approving Amendment No. 20 to the Agreement to reallocate funds from
construction administration to bidding and award services for the Neighborhood No.
8 Bayshore and Sunset Island, in the amount of $340,069.99, and decreasing the
total construction administration budget from $371,441 to $31,371.01; resulting in
no change to the overall contract fee.
Amendment No. 21:
April 13, 2011, the Mayor and City Commission adopted Resolution No. 2011-
27644, approving Amendment No. 21, to the Agreement which provided additional
services for design documents and permitting services to procure the DERM Tree
Removal Permits for the Bayshore Neighborhood No. 8 and Sunset Island Projects,
to participate in value engineering, for design modification and associated re —
permitting services to incorporate the level of service review comments, for a total
not-to-exceed amount of $198,717.97; resulting in a revised contract fee of
$311181090.97.
Amendment No. 22:
October 4, 2011, the Mayor and City Commission adopted Resolution No. 2011-
27682, approving additional Construction Administration services, for a period of
twenty-six (26) months for the Bayshore Neighborhoods No. 8A, and 8C, Packages
in the amount of$640,586 and $59,414, for reimbursable, for a grand total not-to-
exceed amount of$700,000, resulting in a revised contract sum of$3,818,090.97.
Amendment No. 23:
July 18, 2011, the Mayor and City commission adopted Resolution 2012-27972,
approving Amendment No. 23, to provide additional design services for proposed
changes to the Basis of Design Report for Neighborhood No. 8 Bayshore/Sunset
Page 4 of 5
Exhibit A
Islands (BODR), as requested by the Central Bayshore Homeowner Association, as
well as additional stormwater upgrades to the area known as Zone 4 for the
Neighborhood No. 8A Packages, in the amount of $200,401, and $7,440 for
reimbursable, for a grand total not-to-exceed amount of $207,841; resulting in a
revised contract sum of$4,025,932.
Amendment No. 24:
September 19, 2011, the Acting City Manager Form Approved Amendment No. 24,
to provide additional design services for replacement of the outfall off Lake Pancoast
Drive and separate fire hydrant spacing drawings in a not-to-exceed amount of
$12,948, and $1,040 for reimbursable, for a total not-to-exceed amount of$13,988,
resulting in a revised contract sum of$4,039,920.
Page 5 of 5
Exhibit B
Amendment 25 (Task Order)
Design Modifications, Additional Permitting Services, and
Services During Construction for the City of Miami Beach
Neighborhood No. 8, Design Packages A — Phase II — Central
Bayshore Area
This Task Order Amendment when executed, shall be incorporated in, and shall become an
integral part of the STANDARD AGREEMENT FOR PROFESSIONAL SERVICES, dated
May 16, 2001 between the City of Miami Beach (CITY) and CH2M HILL, INC.
(CONSULTANT).
PROJECT DESCRIPTION
The CITY is continuing implementation of a drainage and neighborhood improvements
program in the vicinity of the Miami Beach Golf Club. Specifically, the Lower North Bay
area is identified as Neighborhood No. 8 (Bayshore/Sunset Island community).
Construction associated with Neighborhood No. 8, which includes infrastructure
improvements including the stormwater drainage system and associated utility and
roadway improvements has been underway for some time in the Central Bayshore and Lake
Pancoast areas of the neighborhood. This work will help reduce stormwater discharge into
Biscayne Bay, provide flood relief in the North Bay area and provide for neighborhood
improvements.
For the ease of construction management, Neighborhood No. 8 was divided into four
packages by the CITY.These include:
Package A-Central Bayshore
Package B-Lower North Bay Road
Package C-Lake Pancoast
Package D-Sunset Islands
This Task Order addresses:
• Additional design modifications to meet CITY requested changes to the design of
water main, streetscape and stormwater facilities in the Central Bayshore Area to
alleviate neighborhood concerns, update the design to meet current conditions, and
coordinate with proposed revisions to the Basis of Design Report(BODR). There are
also numerous locations throughout the project area where a changed condition has
occurred since the original design was completed, requiring localized modifications
to the design.
• Additional permitting services to update permits obtained to date that were based
on the original design to include design modifications. The CITY desires to include
the requested changes as part of the current project construction work.
• Additional Services During Construction for what has been designated as Phase II of
Package A - Central Bayshore Area only, including the gravity stormwater wells in
the Flamingo Road area. Resident Project Representative (RPR) or daily project
construction inspection services will be provided by the CITY or by another
consultant working in conjunction with the CONSULTANT project team and the
CITY-provided construction manager will provide ongoing supervision to the RPRs.
This scope of services is based on the CITY providing the services of Atkins Engineering to
provide construction management and construction observation services to adequately
support CONSULTANT as the Engineer of Record for the project and a dedicated
construction manager (CITY staff) for each construction project to direct the inspection
activities, coordinate with residents and other activities and in general provide assurance
that the construction activities are proceeding in accordance with the contract documents.
SCOPE OF SERVICES
Task 1 — Central Bayshore Design Modifications
CONSULTANT will provide design services to update the construction documents and
include the following changes to the design. The design changes are subject to the final
approval of the City Public Works Department (DPW) and other authorities. It is
anticipated that all project design changes will be incorporated into the existing construction
contracts by change order:
1. Develop the criteria for the cleaning and restoration of the existing 6 inch diameter
water main in Pinetree Drive (approximately 2900 linear feet). The additional work
will be added to the existing construction contract drawings by change order.
2. Extend the water mains on West 28th, 30th and 31St Streets to connect with the water
main along Pinetree Drive and eliminate the dead-end water mains.
3. Relocate the stormwater pump station on West 34th Street to avoid interference with
a recently constructed driveway and garage. This was an unforeseen condition.
Since the stormwater pump station will be located in the same general location,
relocation will not result in any significant increase in construction cost.
4. Relocate the stormwater pump station on West 37th Street to avoid interference with
a row of oak trees that have been planted in the right-of-way since the original
design. This was an unforeseen condition. Since the stormwater pump station will
be located in the same general location, but located in the street (subject to DPW
approval),relocation will not result in any significant increase in construction cost.
5. Relocate the stormwater piping, as requested by the Parks Department(golf course),
in Chase Avenue along the golf course to avoid interference with screening
vegetation that has matured and grown in since the original design.
6. Provide combustible gas detectors in the design for all stormwater pumping stations.
Combustible gas detectors are now required by changes in the National Electric
Code that have been instituted since the original design work was completed, and
the project bid for construction. The units will be incorporated into the project
during submittal review and into the contract by change order.
2
7. Provide well pressure sensors at each pump station to alert DPW of clogged or well
failure conditions. The units will be incorporated into the project during submittal
review and into the contract by change order.
8. Redesign the streetscape in the area between West 34th Street and West 40th Street to
accommodate revised street widths as mandated by the homeowner's association.
Redesign includes relocation of valley gutters, connection to drainage inlets and re-
grading for surface water flow management. CONSULTANT will design the entire
streetscape area between 34th and 40th and Chase and Sheridan as a result of
changes to the street widths - all the grading, the connections to inlets, sections,
paving,street markings,etc.
9. Redesign the intersection of Flamingo Drive and Pinetree Drive in accordance with
the Florida Department of Transportation Safety Study - 2007 High Crash List
Locations provided by the CITY.
10. Redesign 40th Street from Chase Avenue to Pinetree Drive to accommodate differing
site conditions resulting from maturing vegetation,new signalization poles,drainage
revisions and driveway modifications. Design will incorporate as many of the
BODR provisions as possible.
11. Consultant will conduct a comprehensive review of the bid documents including bid
items and quantities original and revised to incorporate all the new design changes
into the existing contract documents. Change orders will use existing unit prices
where appropriate to add and delete items from the contract as needed.
Documentation for items not currently part of the construction contract will be
developed for negotiation with the contractor. CONSULTANT will provide a cost
estimate for the proposed design changes.
• Design changes in this item refer to all the changes to phase one and all the
additional design changes for Phase two that were not included in amendment "23".
12. Design modifications are required to avoid impacts to existing landscaping on the
south side of NW 34th Street due to the construction of a stormwater pumping
station. Two options are proposed to be considered by the City Of Miami Beach to
mitigate the vegetation issue. Option No. 1 provides relocation for the east well to a
site within the existing driveway and a relocation of the west well. Option No. 2
provides a relocation of the east well to within the existing roadway along 34th
Street and a relocation of the west well. Both options require associated changes
include relocating the proposed passive relief manhole, electrical control panel, and
stormwater piping. Both options propose design modifications in an attempt to limit
the impact to the existing landscaping on the north side of NW 34th Street. The
options proposed do not create added impact to the existing small trees located
along the North side of 34th Street. Prior to modifying the design drawings,
CONSULTANT will need approval from the CITY on the proposed relocation
concept and whether Option No. 1 or Option No. 2 is selected by the CITY. Once
CITY approval is obtained,CONSULTANT will modify the required NW 34th Street
drawings. Modifications are required to the Storm Water Plan and Profile Drawings
and associated details sheets.
3
Deliverables:
1. Revised drawings showing the proposed design changes to be added to the current
contract documents by change order.
2. Develop project change orders to incorporate design changes into the construction
contract(s).
Task 2— Prairie Avenue Modifications.
Remove the valley gutters on Prairie Avenue and add concrete flumes to the
drainage inlets from 28th Street to 40th Street. CONSULTANT to revise the contract
drawings accordingly to reflect the referenced modifications. In addition,
CONSULTANT to update the Engineer's Opinion of Cost Estimate to reflect
addition of concrete flumes to the drainage inlets from 28th Street to 40th Street.
Deliverables:
1. Revised drawings showing the proposed design changes to be added to the current
contract documents by change order.
2. Develop project change orders to incorporate design changes into the construction
contract(s).
Task 3— Permitting
CONSULTANT will utilize funding in amendment "23" to cover permitting cost and
activities, however, some proposed funding is a part of this amendment for additional
miscellaneous permitting activities. Consultant will prepare or update as required, the
permits affected by the proposed design changes.
Specific activities will include:
• Submit revised drawings, calculations, and permit application forms as required
to CITY for their review.
• Incorporate comments/revisions from CITY and then submit to the appropriate
permitting authority.
• Provide response to up to two (2) requests for additional information, if
requested by the referenced permitting authorities.
• Up to two (2) meetings with the referenced permitting authorities as required to
facilitate the permitting processes.
• Incorporate comments/revisions from permitting authorities,if required.
• CONSULTANT will communicate and coordinate with regulatory agencies as
required to facilitate the permit approval process.
The CITY will allow CONSULTANT to charge permitting activities to amendment "23".
CONSULTANT will request additional funding if the projected permitting activities in
amendment "23" and this amendment are exhausted. The permitting authorities that may
be affected by the proposed design changes include the following authorities. It is not
expected that the proposed design changes will affect any of the stormwater, dewatering or
environmental permits.
4
• City of Miami Beach Department of Public Works
• Miami-Dade County Department of Regulatory and Economic Resources(RER)
• Miami-Dade County Department of Public Works
The CONSULTANT shall advise the CITY in writing when the anticipated labor has
been expended,based on the above level of effort,so the CITY may arrange for the issuance
of requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Deliverables:
1. Completed application forms or permit update requests.
2. All permit deliverables will include the appropriate number of signed and sealed
full-size sets and half-size drawing sets as well as one electronic PDF.
Task 4— Engineering Services During Construction
CONSULTANT will furnish to the CITY, limited services during construction of Phase II
Package A - Central Bayshore Area. These services are detailed below and describe the
scope of work, deliverables, and completion schedules. The general construction phase
services provided by CONSULTANT include the following basic activities:
1. Project Management for Package A-Central Bayshore Area(Phase II)
2. Specialty construction inspection services
3. Project Engineer services during construction
4. Providing Administrative and Technical Submittal Reviews
5. Providing Change Order Reviews for Package A-Central Bayshore Area(Phase II)
6. Preparing Substantial Completion Documents for Project Closeout for Package A -
Central Bayhore Area(Phase II),final project close-out and certification.
The minimum recommended staffing plan for City-provided staff for daily observation and
construction management is as follows:
• One CITY provided construction manager - available full-time for the duration of
construction(8 months)
• One CITY provided project assistant - half-time for the duration of the project (8
months) to manage contract documentation required for the CITY's project
management and records.
• At least one CITY (or other consultant) provided RPR's or construction inspectors -
onsite five (5) days per week for the duration of construction(8 months). Additional
inspection services may be required during peak construction periods or as required
by the contractor's schedule.
CONSULTANT will perform the following tasks associated with construction activities
related to the construction of Package A - Central Bayshore Area (Phase II) project.
CONSULTANT's level of effort is based upon a construction duration period of 8
consecutive months for Package A-Phase II.
5
Sub-Task 4.1 -Weekly Construction Meetings
CONSULTANT shall attend and participate in weekly meetings with the CITY and
CONTRACTOR for the Project. The purpose of these meetings shall be to review the
status of construction progress, shop drawing submittals and contract document
clarifications and interpretations.. These meetings shall also serve as a forum for
discussion of construction issues, potential changes/conflicts and any other applicable
matters. For the purposes of estimating this scope of services, weekly meeting
attendance by the CONSULTANT shall be based on thirty-two (32)weekly meetings.
At each meeting, the CONTRACTOR shall provide and present a two-week look-ahead
work schedule to allow for proper coordination of necessary work efforts.
The CITY shall prepare and distribute meeting minutes to all attendees and other
appropriate parties in advance of subsequent meetings. The weekly meetings shall be
attended by the CONSULTANT's project manager or designated representative.
The CONSULTANT shall advise the CITY in writing when the anticipated labor has
been expended,based on the above level of effort,so the CITY may arrange for the issuance
of requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Deliverables:
1. Attendance and participation in weekly progress meetings with Contractors.
Schedule:
Weekly throughout the project duration.
Sub-Task 4.2-Requests for Information/Contract Document Clarification (RFIs/CDCs)
When a RFI/CDC involves the interpretation of design issues or design intent,
CONSULTANT may be requested by the CITY to prepare responses to RFIs/CDCs.
CONSULTANT will provide a written response in a timely manner, log, process, and
distribute all RFIs/CDCs requested by the CITY for response.The CITY will address any
requests from residents.
For the purposes of estimating this scope of services, CONSULTANT has included the
evaluation of RFI/CDC's at the average rate of four (4) items per month for a total of
thirty-two(32) RFI/CDC requests.
The CONSULTANT shall advise the CITY in writing when the anticipated labor has
been expended, based on the above level of effort, so the CITY may arrange for the
issuance of requisite authorizations to the CONSULTANT to fund additional fees so that
services remain uninterrupted.
Deliverables:
1. Respond to RFIs/CDCs as requested by the CITY that involve design
interpretations.
Schedule: Ongoing throughout project construction duration.
6
Sub-Task 4.3- Requests for Changes to Construction Cost and/or Schedule
Changes may be the result of unforeseen conditions or interferences identified by the
CONTRACTOR during the routine progress of work, inadvertent omissions
(betterment) issues in the contract documents, or additional improvements requested by
the CITY or CONSULTANT after the project bid date. CONSULTANT shall prepare an
analysis of the change request indicating reasons for acceptance,references to applicable
sections of the Contract Documents that validate or disclaim the change request, and if
accepted, a statement noting that the requested cost/schedule impacts are fair and
reasonable.
The CONSULTANT will receive, log, and process all requests for project cost and/or
schedule changes from the CONTRACTOR. The CONSULTANT will perform an initial
independent review of the change request as to relative merit prior to forwarding to the
CITY. The CITY will review CONSULTANT's analysis and upon acceptance, shall
execute the change request and forward it to the CONTRACTOR,for processing.
For purposes of estimating this scope of services, the CONSULTANT includes
evaluation of change requests at the average rate of two(2)items per month for a total of
sixteen(16)change order requests.
The CONSULTANT shall advise the CITY in writing when the anticipated labor has
been expended,based on the above level of effort,so the CITY may arrange for the issuance
of requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Deliverables:
1. Perform independent review of request for cost increase and/or time extension.
2. Prepare change request documentation for CITY's use in Change Order
preparations.
3. Participate in change request review meetings,with CITY and CONTRACTOR to
resolve and/or negotiate the equitable resolution of request; meeting
coordination and scheduling will be the responsibility of the CITY.
Schedule:
Ongoing throughout project construction duration.
Sub-Task 4.4- Processing of Submittals
CONSULTANT shall review shop drawings and product submittals throughout the
duration of the construction period. Within 10 working days from receipt at the
CONSULTANT engineering office, the CONSULTANT shall review and return
submittals to the CITY office.CITY will receive submittals from the CONTRACTOR,log,
and distribute submittals to CONSULTANT for review.
For the purposes of this scope of services, and considering that most submittals will
have already been part of the ongoing project,the CONSULTANT assumes ten(10)shop
drawing submittals for review.
Any submittals that are rejected and need to be resubmitted and reviewed will be
considered a new submittal and will be counted towards the total number of submittals
indicated above. A percentage of re-submittals are anticipated and are included in the
totals above.
The CONSULTANT shall advise the CITY in writing when the anticipated labor has
been expended,based on the above level of effort,so the CITY may arrange for the issuance
of requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Deliverables:
1. Review shop drawings and product submittals and return them to CITY's office
via E-BuilderTM. The CITY will reimburse the CONSULTANT for the E-
BuilderTM license for CONSULTANT use on this project.
Schedule:
Processing of Shop Drawings is ongoing throughout project construction duration.
Sub-Task 4.5 Field Observation Services
Field observation services by qualified RPR's or construction inspectors will be provided
by the CITY's consultant. The CITY will provide adequate, full-time, qualified
construction RPR's or construction inspectors for the duration of the projects such that
the overall level of effort will allow the CONSULTANT as the Engineer of Record to
certify that the construction work is being performed in accordance with the contract
documents. The field observers provided will work under the general guidance of the
CITY's construction manager and CONSULTANT who will determine reporting
requirements. CONSULTANT will advise the CITY if and when the level of service
provided by the construction observation team fails to meet the level of effort or
standard of care required to certify the project construction. The construction work is
currently planned to proceed as follows:
• Package A-Central Bayshore Area(Phase II)-(8 months)
Specialty professionals will be provided by the CONSULTANT as needed for specific
mechanical,electrical and geotechnical inspections in each project area.
The project inspection team is comprised of the CITY construction manager, and the
CITY provided RPR's or construction inspectors. The team will be directed by the
CITY's construction manager with support and guidance from the CONSULTANT's
project manager.
To provide adequate verification of construction activities such that the CONSULTANT
can attest to the acceptability of the work performed,the'team will be responsible for:
■ Conducting on-site observations of the work in progress to include materials and
workmanship to assist in determining if the provisions of the Contract
Documents and permit conditions are being fulfilled. Based on
reports/observations from the RPR as reported through the CITY's construction
manager, CONSULTANT shall report to the CITY, in writing, whenever it is
believed that work is unsatisfactory,faulty or defective and/or does not conform
to the intent of the Contract Documents; does not meet the specified
requirements for inspections, tests; or completed work that has been damaged
prior to final payment. Based on the observations, the CONSULTANT makes a
recommendation to CITY, and informs the CITY, to reject items not meeting the
requirements of the contract documents.
• Maintaining daily logs of the observed work and submit reports using the CITY's
E-BuilderTM management system.The daily log shall include records of when the
CONTRACTOR is on the job-site, weather conditions, potential change orders,
observed changed conditions, testing activities and results, general field
observations, and specific observations as in the case of testing. The RPR will
record, in writing, the outcome of these inspections. The RPR will maintain and
file paper copies of the daily logs on site and shall submit the daily logs on a
daily basis using the CITY's E-BuilderTM management system.
• Coordinate with the CITY's Public Information Officer where utility outages may
be required pending notification by the CONTRACTOR. Confirm that the
CONTRACTOR has made the required notifications to the utility owners and the
CITY for public notifications that may be required. Any required notifications
will be the responsibility of the CITY and/or the CONTRACTOR and not the
CONSULTANT.
• Coordinate various tests for quality control on the project as directed by the
CITYs construction manager and as required by the conditions of the contract.To
this end, the RPR will issue calls for the materials testing in cooperation with the
CONTRACTOR and the needs of the work. The RPR will verify that tests,
equipment and systems start-up are conducted in the presence of appropriate
personnel and that the CONTRACTOR maintains adequate records thereof; and
observes, records, and reports appropriate details relative to the testing
procedures and start-ups.
• Provide a photographic record of the overall progress of construction.
Photographs shall be digital snapshot type taken to define the progress of the
project and shall be electronically filed by month with date and time annotated
on each photo. The E-BuilderTM system will be used as a means to gather and
store the various photos obtained by the RPR during construction. The RPR will
upload all photos to the E-BuilderTM system on a weekly basis.
• Check CONTRACTOR's material certifications and samples; verify that
delivered materials match approved shop drawings.
• Direct and supervise the sampling and testing of materials to be performed by
independent testing laboratories under subcontract to the CITY. This task
includes the receipt,review of invoices from the independent testing laboratories
for payment by the CITY.
• Review with the CONTRACTOR the monthly pay application to confirm. the
status of completed and uncompleted work and stored materials. The schedule
of values used by the CONTRACTOR and monthly pay requests will be
approved by the CITY's construction manager. The CONSULTANT shall advise
the CITY of quantities being approved for subsequent concurrence for payment
purposes.
9
• Monitor on a monthly basis, in conjunction with CONTRACTOR's pay
application review, that record drawing mark-ups are being properly maintained
by the CONTRACTOR.
• Coordinate with CONSULTANT's project manager and staff as needed to
resolve/address CONTRACTOR's Requests for Information,Contract Document
Clarifications,Field Orders,and other related issues and correspondence.
• Maintaining daily observation reports and providing direction for other record_
keeping required for the project.
• Participating in weekly progress meetings with CITY and CONTRACTOR at the
project site. CONSULTANT'S Project Manager or a representative will attend the
weekly progress meetings.
• Participating in meetings to address CONTRACTOR change requests, as needed.
CONSULTANT'S Project Manager or a representative will attend the change
order meetings(one per change order).
• Verifying that the work has progressed to the substantial completion point in
accordance the Contract Documents. Performing a substantial completion
inspection with the CONTRACTOR and CITY and preparing a punch list that
describes items remaining to be completed; the punch list will be attached to the
certificate of substantial completion.
CONSULTANT shall provide specialty site visits by various design disciplines (civil,
mechanical,hydro-geological, landscaping, etc.) as requested by the CITY. For purposes
of this scope of services, the CONSULTANT has assumed twenty-four(24) specialty site
visits associated with the following work:
• Twenty(20)site visits associated with drainage well testing.
• Four(4)site visits associated with other engineering disciplines,as needed.
Due to the nature of projects involving injection wells and the close coordination with
the Florida Department Environmental Protection(FDEP) that will be required to satisfy
the permits for these wells, the level of effort noted above is the minimum that will be
required. If additional hydrogeological engineering is required as a result of the permits
that have not been issued or by different geological conditions that are encountered, the
CONSULTANT shall advise the CITY in writing when the anticipated labor has been
expended, based on the above level of effort, so the CITY may arrange for the issuance
of requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Deliverables:
1. Inspection field and test reports for CONSULTANT's field activities.
2. Photographic records as appropriate for CONSULTANT's field activities.
Schedule:
Ongoing throughout duration of project construction.
10
Sub-Task 4.6-Project Closeout
Upon receiving notice from the CONTRACTOR advising the CITY's construction
manager that the Project is substantially complete, CONSULTANT, in conjunction with
the CITY's construction manager and other appropriate project or CITY staff, shall
conduct an overview of the Projects. The overview shall include review and resolution
of"punch lists" of items needing completion or correction prior to consideration of final
acceptance of each project. The CITY construction management team shall develop and
maintain the punch lists with assistance from CONSULTANT. The lists shall be
forwarded to the CONTRACTOR for the project. For purposes of this provision,
substantial completion shall be deemed to be the stage in construction of the Project
where the Project can be utilized for the purposes for which it was intended, and where
minor items may not be fully completed, but all items that affect the operational
integrity and function of the Project are capable of continuous use.
Upon notification from the CONTRACTOR and the CITY construction management
team that all remaining "punch list" items have been resolved, the CONSULTANT, in
conjunction'with appropriate CITY staff, shall perform a final review of the finished
Project. Based on successful completion of all outstanding work items by the
CONTRACTOR,CONSULTANT shall assist in closing out the construction contracts for
Package A-Central Bayshore Area(Phase II).
The CITY shall prepare certified record drawings from CONTRACTOR's as-built plan
mark ups and drawings submitted during the construction period. CONSULTANT will
review CITY prepared record drawings and submit comments for the CITY to finalize
record drawings for the project area. CONSULTANT will provide one digital copy of
each of the record drawing sets; prepare permit certification applications and cover
letters for FDEP, RER, Miami-Dade Public Works, South Florida Water Management
District (SFWMD) and Miami-Dade County Health Department (MDHD) for a total of
five anticipated permit close-outs for Package A-Central Bayshore Area(Phase II). Any
additional work required to close out the permits (including responses to questions)
from the respective agencies listed above is not included in this amendment.
Deliverables:
1. Receive CONTRACTOR notification that the project has reached Substantial
Completion and determine whether the project, in the judgment of the
CONSULTANT, qualifies under the requirements of the specifications and
standard of care to be considered Substantially Complete.
2. Coordinate and attend one field meeting (walk-through) to review Substantial
Completion for the project.
3. Receive CONTRACTOR's notification that punch list items are completed and
CONSULTANT shall schedule a final field visit to review and substantiate
project completion for each project.
4. Provide recommendation to the CITY that the project has reached Final
Completion based on CONSULTANT's judgment and review of completed
punch lists for each project. It is assumed that the project will be finalized during
the one month close-out period following the issuance of substantial completion.
11
5. Assist the CITY with technical decisions and recommendations on warranty
work completion for each project.
6. Prepare review comments for CITY prepared record drawings for certification
and project closeout of each permit.Submit final record drawings,agency(FDEP,
RER, SFWMD, Miami-Dade County Public Works, and MDHD) applications,
and cover letters to request release of the project for operational purposes for
each project
7. Prepare final project change orders for projects.
The CONSULTANT shall advise the CITY in writing when the anticipated labor has been
expended, based on the above level of effort, so the CITY may arrange for the issuance of
requisite authorizations to the CONSULTANT to fund additional fees so that services
remain uninterrupted.
Schedule:
Project closeout will be completed within 30 calendar days following CITY's
issuance of certificate of substantial completion.
Task 5 — Miscellaneous Requests
CONSULTANT will furnish to the CITY, consulting services not covered by this
amendment as directed by the city. Compensation for this work will be done on a time and
expenses bases. The CONSULTANT shall advise the CITY in writing when the anticipated
labor has been expended, based on this level of effort, so the CITY may arrange for the
issuance of requisite authorizations to the CONSULTANT to fund additional fees so that
services remain uninterrupted
Deliverables:
1. Perform Consulting work as requested by the CITY
2. Prepare opinions,studies,reports ... etc. applicable to each request
3. Participate in meetings as requested CITY and CONTRACTOR
Schedule:
Ongoing throughout the project duration.
I
Assumptions:
1. All Tasks will be completed as required to keep the construction project on
schedule and to avoid delays,subject to the CITY's timely review of deliverables.
2. Permit applications for the agencies outlined above will be provided for
execution by the CITY concurrent with design submittals.
3. All review documents will be provided electronically by use of File Transfer
Protocol(FTP),Sharepoint,or E-BuilderTM document transfer sites.
4. CITY will pay all permitting fees. Permitting labor and expenses can be charged
to Amendment "23". When Amendment "23" labor and expense budgets are
exhausted,work associated with permitting can be charged to this amendment.
12
5. CITY will provide written application comments within two weeks of receipt of
the review package. CONSULTANT will respond to comments in writing within
one week of receipt from CITY.
6. Construction and bid phase services for a new construction contract (if
necessary)are not included in this Amendment.
7. CONSULTANT shall be paid for the cost of reproduction services plus
applicable markup for reproduction of reports, contract documents and
miscellaneous items,as indicated in the scope of work or as requested by CITY.
8. CONSULTANT shall be reimbursed for local project travel and costs for
employee travel associated with this Amendment. Non-local travel shall be
reimbursable as approved by the City.
9. Construction Contract completion time including close-out is estimated at 8
months for Package A-Central Bayshore Area(Phase II).
10. CONSULTANT is not responsible for obtaining or paying for permits from
Federal, State or local regulatory agencies that are required for this project.
CONSULTANT shall not be responsible for regulatory agency delays or any
delays caused for reasons beyond the direct control of the CONSULTANT.
11. The CITY will provide project construction management and RPR or
construction inspection services to manage construction activities and provide
assurance that the work is being performed in accordance with the contract
documents. The CITY's internal QA/QC program will provide guidance to the
RPR's to promote consistency in the services provided.
12. The CITY agrees to provide surveying services by a third party if deemed
necessary by the consultant at no cost to consultant. City's surveyor agrees to
conduct its work as co-ordinated by the CONSULTANT. The CONSULTANT
shall be reimbursed for its labor and expenses related to this activity.
ENGINEER's Personnel at Construction Site
13. The presence or duties of CONSULTANT's personnel at a construction site,
whether as onsite representatives or otherwise, do not make CONSULTANT or
CONSULTANT's personnel in any way responsible for those duties that belong
to CITY and/or the construction contractors or other entities, and do not relieve
the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, means,
techniques, sequences, and procedures -necessary for coordinating and
completing all portions of the construction work in accordance with the
construction Contract Documents and any health or safety precautions required
by such construction work.
14. CONSULTANT and CONSULTANT's personnel have no authority to exercise
any control over any construction contractor or other entity or their employees in
connection with their work or any health or safety precautions and have no duty
for inspecting, noting, observing, correcting, or reporting on health or safety
deficiencies of the construction contractor(s) or other entity or any other persons
at the site except CONSULTANT's own personnel.
15. The presence of CONSULTANT's personnel at a construction site is for the
purpose of providing to CITY a greater degree of confidence that the completed
13
construction work will conform generally to the construction documents and that
the integrity of the design concept as reflected in the construction documents has
been implemented and preserved by the construction contractor(s).
CONSULTANT neither guarantees the performance of the construction
contractor(s) nor assumes responsibility for construction contractor's failure to
perform work in accordance with the construction documents.
PROJECT BUDGET
The total fee proposed for this scope of work shall be a time and materials basis, not-to-
exceed amount of $448,861, including allowable reimbursable expenses as shown in
Attachment A.
Invoicing will be monthly and based on allowable contract hourly rates and subsequent
amendments and adjustments by the CITY and as agreed between the CITY and
CONSULTANT,with the exception of task one. Invoicing for task one will be completed on
a lump sum basis for labor and expenses. With the approval by the CITY, CONSULTANT
may utilize unused budgets within subtasks or approved amendments/task order as long
as the overall fee limit is not exceeded.
Should accumulated incurred costs reach the not-to-exceed amount, CONSULTANT shall
notify the CITY the level of effort required to complete the scope of services, and request
that a contract amendment be executed for the additional funds and extension of period of
performance, if so required. CONSULTANT shall resume our efforts upon such time that
the contract amendment is fully executed.
Item Labor Expense Total
Task 1 -Central Ba shore Design Modifications $142,749 $1,500 $144,249
Task 2-Prairie Ave.Modifications $27,112 $500 $27,612
Task 3-Permittin Allowance $25,000 $500 $25,500
During Construction 224 2 0 226 000
Task 4-Engineering Services Du $ ,000 $ ,00 $ ,
Task 5-Miscellaneous Requests Allowance $25,000 $500 $25,500
Total Amendment No.25 $446,212 $5,000 $448,861
TIME OF COMPLETION
The Design, miscellaneous Permitting and Services During Construction associated with
Package A - Central Bayshore Area (Phase II) as itemized above will be completed in eight
(8)months upon receipt of authorization issued by the CITY to the CONSULTANT.
Execution of this Task Order Amendment constitutes CITY's Notice to Proceed with the
scope of work described herein, and in accordance with the Standard Agreement for
Professional Services dated May 16,2001.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.25,to be
executed in their name by their duly authorized officials of the date first set forth above.
14
Approved by:
CITY OF MIAMI BEACH, FLORIDA CH2M HILL, INC.
Date: Date:
Matti H. Bower, Matt Alvarez, P.E.
Mayor Florida Operations Manager
Attest:
Attest:
Rafael E. Granado Secretary
City Clerk
15
M
T-
C)
N
ti
O N CO LO O L Lfi Z N N N N Lri 00
QO
1 N 14-
o
O
L
O
69 60- 69 6F3 60-
Z
Z (B N (B (Q (�
O O O O O
V
CC H H H H H
� .6 -6 -6 L -6
(n (n (n Cn (n
.E c
cc
ti U � O Ul O O O lO
0 O N N N N N
0
>% a N
U cc
CD
61%69 6F? 69 6N} 69 61? 6c} 6R 69
L L �
N
N U U C v, L- (1) cn (J)® o (L) o m o a) o a) o (1)
-0 N -0 N M N -0 N .0 N
Q� K Co N J a) J a) J N J N
E E d LV Q Q Q Q Q
_ cc w W W W W W
E a
a�
cu W C4 Cc
c
cc
v o
cc .
a� a o L a
tm cu Cl)c c
'tn L) co
� ® o —
c rn : N
c (j)
N U � U cr
=O O O N
N
N Q
cc 0
0 N c N
> 0)
Vim-• m Q rte-. N N
O +, c =
C E U
G .(a fn
U CL a W
cm LL
.r r- N M to
® N cu fB N N o