Loading...
2013-28262 Reso RESOLUTION NO. 2013-28262 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AN ASSIGNMENT TO THE EXISTING AGREEMENT BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. (C3TS OR ASSIGNOR) FOR THE ESTABLISHMENT OF A PRE-APPROVED LIST OF PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE); WITH SUCH ASSIGNMENT TO BE RETROACTIVELY EFFECTIVE TO NOVEMBER 30, 2012. WHEREAS, on March 12, 2008, the Mayor and City Commission accepted the recommendation of the City Manager to authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Corzo Castella Carballo Thompson Salman, P.A. (C3TS), pursuant to Request for Qualifications No. 01-07/08, for Professional Construction Engineering and Inspection Services (CEI) Firms to Provide Various CEI Services on an "As Needed" Basis (the "Agreement"); and WHEREAS, C3TS informed the City in writing on November 30, 2012, that Stantec Consulting Services, Inc. (Stantec) purchased the assets of C3TS, with the result that the ongoing business and affairs of C3TS are now wholly owned by Stantec; and WHEREAS, pursuant to Section 3.6.2 of the Contract, assignment of the Contract requires the written consent of the City; and WHEREAS, the Administration has exercised its due diligence on Stantec and recommends said assignment; and WHEREAS, Stantec will be responsible for and maintain all required warranties and responsibilities, for previously completed projects by C3TS, as well as and any ongoing project with the City which existed prior to the effective date of the assignment; NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, approving an assignment to the existing Agreement between the City and Corzo Castella Carballo Thompson Salman, P.A. (C3TS or Assignor) for the establishment of a pre-approved list of professional construction engineering and inspection (CEI) firms to provide various CEI services on an "as needed" basis to Stantec Consulting Services Inc. (as Assignee), with such assignment to be retroactively effective on November 30, 2012. PASSED AND ADOPTED THIS 1 71A DAY OF ��l 2013. ATTEST: Rafael Gran do, CITY CL R i Herrera B er, MAYOR T:\AGENDA\2013\July 17\Procurement writ s ' s to c-RESO 1 of 4.doc ORP ORA�E�. APPROVED AS TO :INS cr) FORM &LANGUAGE �.•• & FOR EXECUTION CH . b >1 i�� City Attor y Date COMMISSION ITEM SUMMARY Condensed Title: Approve Assignment to Existing Agreements between the City and Corzo Castella Carballo Thompson Salman, P.A. "C3TS" as Assignor), to Stantec Consulting Services Inc. as Assignee) Key Intended Outcome Supported: Maximize efficient delivery of services Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Customer Satisfaction-Survey indicated that 79% of businesses rated recently completed capital improvement projects as "excellent" or"good." Item Summa /Recommendation: The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations: • Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-approved list of Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI services on an "as-needed" basis; • RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and • RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for the Sunset Islands 3 &4 Neighborhood Right-Of-Way Improvement Project. The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed" basis. C3TS has notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment A). In its due diligence, the City requested Stantec to provide information on how the firm meets the minimum requirements for each of the agreements to be assigned (see Attachment B). Stantec's qualifications comply with the requirements of the relevant solicitation and are nearly identical to those proposed by C3TS at the time of their proposal reviews and awards. In addition, Stantec was asked to confirm whether it would agree to all terms and conditions for each agreement and that the same project team members proposed and approved by the City for each agreement are still in place (for the exception of one individual). Stantec also affirmed that it will comply with all terms and conditions presented in each agreement(see Attachment C). RECOMMENDATION Based on Stantec's confirmation letter, due diligence review by the Procurement Division and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS / Stantec performance has been acceptable, the City Manager recommends to the Mayor and City Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful negotiations. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 N/A OBPI Total Financial Impact Summary: N/A City Clerk's Office Legislative Tracking: David Martinez, ext. 6972 Sign-Offs: De` rt nt Di for Ass' t:Cit Ma er Ci M er DM AD M KGB JLM TAAGEN 0 3\July \P ocurement\Consent to Assignment S to Stantec ummary.doc 6 MIAMIBEACH AGE'NDA.IT'EM c7 DATE {; R A f. :N B Eobk C 'u City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and M bers of the ity Commission FROM: Jimmy L. Morales, City Manager DATE: Jul 17 2013 Y SUBJECT: APPROVE ASSIGNMENT TO E ISTING AGREEMENTS BETWEEN THE CITY AND CORZO CASTELLA CAR ALLO THOMPSON SALMAN, P.A. ("C3TS99) (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE): 1. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING AGREEMENT FOR THE ESTABLISHMENT OF A PRE-APPROVED LIST OF PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS (NO. 01-07/08) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99) (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013. 2. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR THE PALM AND HIBISCUS NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT (RFQ 35-10/11) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99) (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013. 3. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR THE SUNSET ISLANDS 3 & 4 NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT (NO. 04-11/12) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS9 ) (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013. 4. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING AGREEMENT FOR PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS (NO. 52-11/12) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99) (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS. ADMINISTRATION RECOMMENDATION Adopt the Resolution. I Commission Memorandum— Consent to Assignment C3TS to Stantec July 17, 2013 Page 2 of 2 KEY INTENDED OUTCOME SUPPORTED Ensure Well-Designed, Quality Capital Projects. ANALYSIS The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations: • Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre- approved list of Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI services on an "as-needed" basis; • RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and • RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement Project. The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed" basis. In a letter dated November 30, 2012, Mr. Ramon Castella, Vice-President of C3TS, notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment A). On June 27, 2013, the City requested from Stantec to provide information on how the firm meets the minimum requirements for each of the agreements to be assigned (see Attachment B). In addition, Stantec was asked to confirm whether it would agree to all terms and conditions for each agreement. On July 8, 2013, Stantec confirmed that the same project team members proposed and approved by the City for each agreement are still in place (for the exception of one individual) and that their qualifications are the same as those evaluated at the time of award by the City. Stantec also affirmed that it will comply with all terms and conditions presented in each agreement (see Attachment C). CITY MANAGER'S DUE DILIGENCE & RECOMMENDATION Based on Stantec's confirmation letter, due diligence review by the Procurement Division and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS / Stantec performance has been acceptable, the City Manager recommends to the Mayor and City Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful negotiations. CONCLUSION The Administration recommends that the Mayor and City Commission adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications Nos. 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful negotiations. JLM/MT/KGB/DM/AD T:\AGENDA\2013\Ju1y 13\Procurement\Consent to Assignment-C3TS to Stantec-MEMO.doc C31S November 30, 2012 City of Miami Beach Capital Improvement Projects 777—17'"Street Miami Beach,Florida 33139 Engineers Attention: Ms.Kathie O.Brooks,AICP,City Manager Accihltects Planners Reference: Contract:P01BPO 014004—53 d Street Restrooms POIBPO 016974--Wh Street&Ocean Drive Restirooms PO1BPO 018213—Flamingo Park Football Fief&Tract Project PO1BP0 0119515—Neighborhood 13—Paltry&Hibiscus Islands V74 Resolution—Sunset Islands 3&4 Improvements P01BP0 018998 4 Review Contractor's Claim South Pointe Ph II PAfBPO 0+18610—Overview punch list Fire Station#2 C3TS Project'Nos.01317-011,014;016;017;018;019,021 Dear Ms_ Brooks: 'lease be informed that on November 30, 2012, Stantec Consulting Services Inc. (OStantec") purchased ED0005022 certain of the assets of Corzo Castella Carballo Thompson Salman, P.A. ('C3TS")with the result that the AAC002142 ongoing business and affairs of C3TS is now wholly owned by Stantec. Stantec will maintain the present office locations of C3TS with no interruption in operations or client services, and all future projects and operations will be under the Stantec name. Stantec provides professional consulting services in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics for infrastructure and facilities projects. We support public and private sector clients in a diverse range of markets at every stage, from the initial conceptualization and financial feasibility study to project completion and beyond. Our services are provided on projects around the world through approximately 12,000 employees operating out of more than 190 locations In North America and 4 locations internationally. ' vision 1 Stantec's vi s o includes working ith the best clients on the best projects and providing the best 9 1� J P 9 services. Accordingly, please be assured that the continuity of your current project will be unaffected by this new arrangement.The caliber of the personnel currently working on your project will not change and, except for the assignment requested herein, no other aspect will be affected. In this regard, we request your approval to assign all existing contracts in the name of C3TS to Stantec. Kindly indicate your consent to the request for assignment by returning a duplicate copy of this letter; executed on behalf of City of Miami Beach to Stantec Consulting Services,Inc.. Sincerely, CORZO CASTELLA CARBALLO TH MPSON SALMAN,PA Ramon astella, P.E. Vice-President The undersigned hereby consents to the assignment of the Contract noted above to Stantec Consulting Services Inc.effective , 2012. City of Miami Beach d �a} tat04 iee1 3F Sea+b�t G f sgrurar�letw C4,0 Miami ftwhd cx 901 Forwe de Leon Blvd.,Suite 900,Cpl Gables,Floddo 33134 305.44$.2904 1.800-448.0227 Fo"irnile 305.445.3366 Web Site:www.c3ts.com Equal Opporlunity Employer I I MIAMIBEACH City of Miami Beach,1700 Convention Center Drive,Miami Beach,Florida 33139,www.miamibeachfl.gov j PROCUREMENT DIVISION a Tel: 305-673-7490,Fax;786-394-4624 June 27, 2013 VIA E-MAIL: ramon.castellaa-stantec.com Ramon Castella, P.E. Stantec Consulting Services, Inc. 901 Ponce de Leon Boulevard, Suite 900 Coral Gables, FL 33134-3070 i RE: ASSIGNMENT OF CONTRACTS FROM CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. (C3TS) TO STANTEC CONSULTING SERVICES, INC. Dear Mr. Castella, Due to Stantec Consulting Services, Inc.'s (Stantec) acquisition of Corzo Castella Carballo Thompson Salman, P.A. (C3TS), the contracts for the following solicitations must be assigned, through City Commission approval, from C3TS to Stantec: • RFQ 01-07/08 -- For the Establishment of a Pre-Approved List of Professional Construction Engineering and Inspection Services (CEI) Firms to Provide Various CEI I Services on an "As Needed" Basis • RFQ 35-10/11 — For a Design Criteria Professional to Prepare the Design Criteria Package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, which Is Intended to Be a Design-Build Contract; and to Serve as the City's Rep-r esentative During the Selection of the Design-Build Firm for the Project, Concerning the Evaluation of the Responses Submitted by the Design-Build Firms; Review and Approve for Compliance of the Detailed Working Drawings for the Project; and for Evaluation of the Compliance of the Project Construction with the Design Criteria Package • RFQ 04-11/12 — For a Design Criteria Professional to Prepare the Design Criteria Package for the Sunset Islands 3 & 4 Neighborhood Right-of-Way Improvement Project, which Is Intended to Be a Design-Build Contract; and to Serve as the City's Representative During the Selection of the Design-Build Firm for the Project, Concerning the Evaluation of the Responses Submitted by the Design-Build Firms; Review and Approve for Compliance of the Detailed Working Drawings for the Project; and for Evaluation of the Compliance of the Project Construction with the Design Criteria Package { • RFQ 52-11/12 — For Professional Construction Engineering and Inspection (CEI) Firms to Provide Various CEI Services on an "As Needed" Basis i As part of the City's responsiveness review, Stantec must provide the following information confirming that it meets the minimum requirements/documentation set in the solicitations noted 1 above: • RFQ 01-07/08 • Organizational Chart • Project Team licenses, certifications, resumes We are committed to providing excellent public service and safety to all who live, work,and play in our vibrant,tropical,historic community. • Florida Department of Professional Regulation License • List of all projects in the past five (5)years-SF 254 or 330 would suffice • List of all legal claims in the past five (5)years • Minimum of five (5)similar projects- please provide scope of work, client contact information, project cost, and project start and completion dates • Minimum experience and qualifications (see Attachment A) • RFQ 35-10/11 and RFQ 04-11/12 • Firm's number of years providing similar service • Project Team licenses, certifications, resumes for each project o Ten (10) client references • List of similar projects in the past ten (10)years • List all legal claims in the past five (5)years • Demonstrate prior experience in serving as the Design Criteria Professional for public facilities and in the preparation of Design Criteria Packages for public and municipal facilities in particular in horizontal right-of-way construction • Project Teams must include a professional civil engineer licensed in Florida • Project Managers must have a minimum of five (5) years of experience developing Design Criteria Packages for horizontal right-of-way construction and -- -- -- - — -- --three-(3) projects valued-at-$5 million-or-greater-- -- - -- - - - -- o Minimum of five (5) completed similar projects - please provide scope of work, client contact information, project cost, and project start and completion dates o Narrative descriptions for each project o Methodologies and approaches for each project o Organizational Chart • RFQ 52-11/12 o Ten (10) client references • Project Team licenses, certifications, resumes • Florida Department of Professional Regulation License • List of all projects in the past five (5)years-SF 254 or 330 would suffice -- - • List ofall-Ie-gal claims-in-the p-ast-five-(57)-years --- -- o Project Manager must have a minimum of five (5) years of experience and have completed three (3) similar projects • Minimum of five (5) similar projects-please provide scope of work, client contact information, project cost, and project start and completion dates • Minimum experience and qualifications (see Attachment A) • Organizational Chart • Project methodology and approach In addition, Stantec must also confirm that it agrees to the contract terms and conditions for each project; as well as, the conditions provided in the RFQ proposal responses submitted by C3TS at the time of the RFQ solicitations, which were provided to your courier today. Please submit the required information by Wednesday, July 3, 2013. Should you need additional information, please contact me at 305-673-7000 ext. 6230 or e-mail: theocarrasco@miamibeachfi.gov. ha.n - Theo Carrasco, Ph.D., CPPO, CPPB Senior Procurement Specialist 6 We are committed to providing excellent public service and safety to all who live,work,and play in our vibrant,tropical,historic community. A40&w" C Stantec Consulting Services Inc. _ 901 Ponce de Leon Blvd.,Suite 900 Coral Gables,Florida 33134 Ph(305_445-2900 Fax:(305)445-3366 Stantec July 8, 2013 City of Miami Beach Procurement Division 1700 Convention Center Drive Miami Beach, Florida 33139 Attention: Theo Carrasco, Ph.D., CPPO, CPPB Senior Procurement Specialist Reference: Assignment of Contracts from Corzo Castella Carballo Thompson Salman,P.A. (C3TS) to Stantec Consulting Services Inc. RFQ 01-07/089 RFQ 35-10/119 RFQ 04-11/129 RFQ 52-11/12 Dear Mr. Carrasco: In response to your recent request for additional information and confirmation concerning this matter, please note that the C3TS local staff, offices, management, organization and resources are now all part of Stantec. In response to the specific items,please note the following: • RFQ 01-07/08 • Organizational Chart All project personnel and roles are as detailed in our original Statement of Qualifications, except for Mr. William Francis—who is no longer with the firm. • Project Team licenses, certifications, resumes All project team licenses, certifications and resumes are as contained in our original Statement of Qualifications, except for Mr. William Francis—who is no longer with the firm. • Florida Department of Professional Regulation License Please see Florida Department of Professional Regulation licenses, as well as FDOT & Miami-Dade County Pre-qualification certificates for Stantec, included in Attachments. • List of all projects in the past five(5) years—SF 254 or 330 would suffice The list of local projects in the past five years — 254, are as included in our original Statement of Qualifications. • List of all legal claims in the past five(5)years List of local claims in the past five years is as included in our original Statement of Qualifications. r Stantec July 8,2013 City of Miami Bead Procurement Division Page 2 of 4 o Alininiu,m of five (5) similar projects — please provide scope of word, client contact Information,prvjeet cost,and project start and completion dues Similar 10cal projects are as included in our original Statement rrf Qualifications. o Minimum experience and qualifications(see Attachment A) Minimum local experience and qualifications are as included in our original Statement of Qualifications. RFQ 35-10/11 and rRFQ -1€!i2 o Firm's number of years providing similar service The firm's number oj`year..s providing similar services locally is as detailed an our original Statement f'o, ualifi Lions. o Project Teams licenses,certifications,resumes for each project A-11 pro,jeer team licenses, -certifications and resunies are as contained in our ofginal Statement of Qualijications, except for Mfr, William Francis —who is no longer with the firm. o 'fen(10)client references The client references are as contained in our original Statement of Qualifications. o List of similar projects in the past ten(10)years List ofvimilar local projects are as detailed in our original Statement of Qualifications. o List all legal claims in the past five(5)years List of local claims in the past five years is as included in our original Statement of Qualifications. o Demonstrate prior experience in serving as the Design Criteria Professional for public facilities and in the preparation of Design Criteria Packages for public and municipal facilities in particular in horizontal right-of-way construction Prior local experience in serving as DCP for public facilities is its detailed in our original Statement of Qualifications. o Project Teams must include a professional civil engineer licensed in Florida Project tears includes several professional civil engineers licenses in Florida, a.s detailed in our original Statement of Qualifications, o Project Managers roust have a minimum of five ( gears of experience developing Design Criteria Packages for horizontal right-of-way construction and three (3) projects valued at$5 million or greater Project Managers are as detailed its our original Statement of Qualijicafions, o Minimum of five (5) completed similar projects— lease provide scope of wr�r:�, client contact information,project cost,and project start and completion dates Similar local projects are as included in our original Statement of Qualifications. o Narrative descriptions for each project The narrative de-eription for each project are as detailed in our original Statement of Qualifications. stantec July 8,2013 City of Miami Beach Procurement Division Page 3 of 4 0 Methodologies and approaches for each project The methodologies and approaches are as detailed in our original Statement of Qualificationv. * Organizational Chart All protect personnel and roles are as detailed in our original Statement of Qualifia:alions, except,for.Mr. llr'illiam Francis—who is no longer with the firm. RFQ 52-11/12 o Ten (10)client references The client references are as contained in our original Statement of Qualifications. o Project Team licenses, certifications,resumes All project team licenses, certifications and resumes are as contained in our original Statement of Qualifications, exceptfor Mr. William Francis—who is no longer with the firm. o Florida Department of Professional Regulation License Please see Florida Department of Professional Regulation- license, as well as FDOT & Miami-Dade Count, Pre-qualification certificates,for starntec, included in Attachments. o List of all projects in the past five(5)years—SF 254 or 330 would suffice. The list of local projects in the past five years — 254, are as included in our original Statement of Qualifications. o List of all legal claims in the past five(5)years List of local claims in the past five years is as included in our original Statement of Qualiyicatiom. o Project Manager must .Dave a minimum of five (5) years of experience and have completed three(3)similar projects j Proect Manager with requisite experience is as detailed in our original Statement of Qualifications. 0 Minimum of five (5) similar projects -- please provide scope of work, client contact information,.project cost,and project start and completion.dates Similar local project s are as included in our original Statement of Qual fications. o Minimum experience and qualifications(see Attachment A) Minimum local experience and qualifications are as included in our original Statement of Qualifications. o Project Methodologies and approach The methodologies and approach are as detailed in our original Statement of Qualifications. 5tantee agrees,to the contract tennis and conditions of the current contracts being assigned for RFQ 01- 07,'08, RFQ 35-10/11 & RlrQ 04-11/12. .Regarding RFQ 52-11112, roc have a few minor issues as previously detailed to you by Mr. Sean Compel. ATTACHMENTS a h' St - Mu a Y " �A K �Elhf�rre� rh Ol c p rovis on w ry tat meed s r}nc s _ a tie urrflu oe � I� '' p ► +�Chhcipter X71,:Ftiridc�Satu . iz MM IS. da Acr�d�r= f ;22820 150 9 S STATE'O FLORID DE PA 'CMFlk T C} .�U&lNE�S AND PI FESSI NAL EGULATtO'N . . 800 kRDIOF ARCH ITECTURE&INTERIOR°DESIGN, 1 1 -The, CHITEC'9':CORPORATIO Undefft, -Chaot0w,4 i FS x �=Exper�tl�n tee fE®�8 215 �� ` TAPTEG CONILIRICt `IES INC QN::ia�R'* �Sy ,e. ,` '��', . � �Y Yli\./�iY/ •'' IIV � �J > - • �7°,� �g - JF el w� 'VIVA. RUN 58 Po. Via+ ^x�.. 'r PQ Certificate No.: 200X112167170434 Approval Dane. 41312013 Expiration Cato: 4,€1201 Miami-Cede County, Florida Internal Servioss Departrrlent •CNr w� r�ia6 E;r'r +;'a r..'h „ +..' .. �^ `elf-P f'� s: ,�. - c.. c M'd 1-.ff e �t�'�'-• . e ' x Y r f 1 _ v. : _ .. . y r7 L} �x i r•e:1, fElr, b Sttec Consulting Services Inc. Thif ffiwk `irmed 1: 9 0! Ponce de peon Bird,Suite 900 Cora[Gables,FL 33134 The above name applicant Is pre-q�aiified to provide professional A/E services for Miami-ode qty for the period indicated above. The eppi cant has=nMitted its firm to comply with the spy conditions fisted below, 1. Pre-Qualified to offer professional services oniy in the Miami-Bade County technical categories shown in the attached"Statement of Technical Qualifications."All technical category restrictions must be strictly adhered to, 2, Pre-Qualification Certificaton(PQC)consolidates the technical certification.affirmative action plan,and vendor registration into one streamlined certification process resulting in the issuance of a Pre-Qualifcatton Certificate, 3. Deport any significant changes, such as contact person,qualifier,ownership,, firm address,etc.,.to Professional Services Certfcation located at 111 NW 1 Stet, Suite 1350, Miami, Fl 33125, with In-30 days of such a change_ 1-allure to.report said changes to the County may result in the Immediste suspension or termination of your firm's Pro ualifiration Certification, 4. Firms are responsible for observing and adhering to Miami-[fade County's Administrative Order 3-39"Standard process for construction of capital improvements,acquisition of professional services, construction contracting, charge orders and reporting 5. Failure to renew your firm's PQC at feast thirty(30)days prior to your firm's current expirafon date may result in the suspensk)n and/or termination from County programs and current or future contracts until your fan's Pre- Qualif€cation Certification has been properly renewed.Any lapses in the cer ificafion of any of the rewired PQC areas (vendor registration, affirmative action plan, or technical certification)grill result in a.lapse in your POO, Firms are remponsibte for observing and adhering to all submission deadlines, S. Any renewal applications and/or supporting documents submitted after the application deadUrve might delay the review of your firm's PQC certification to the next available Technical Certification Committee meeting_ The PQC application, submission deacflirtes. and the Techniicat Certification Cornmittee tweting calendar can be found on Proourement //Management web -site located at:l�rtc`Ilww+w�iamfda8e eov,�internalservi slcre- o. �ifificat�t�n�rttficatfan.as� 7, Pe ft Miami-Cade County representatives to have access during normal business hours to audit bonds and records to verify information submitted with this application. This rtght of access shall commence on the approval date of this certifitate and shall terminate on its expiration date. Please rote that if at any time Miami-Cade County's has reason to elleve that any person or firm has willfully and knowingly provided incorrect information or made false statements.,the County may refer the matter to the State Attorney's Oflaoe and/or other investigative agencies, initiate debarment procedures, and/or pursue sanctions or othe.r legal remedies in accordance with Miami-[lade County policy andlor applicable federal,state and local laws. Nubia,lar�uiri� . .. 11 t 1 Professional Services CerUflication 306-375-5637 ,i MIAMI- E Miami-Dam County Intema 1 Set-vices Department Statement of Technical Certifleation Categories Firm: STANTEC CONSULTING SERVICES INC. 901 Ponce de Leon Blvd Sale 940 Oral Gables, Fl. 33134 CATEGORY APPROVAL EXPIRATION iCATEGORY DESCI P'Tlt N QATE ' ATE 1 01 TRANSPORTATION PLANNING•URBAN AREA AND REGIONAL 4132013 4130/2015 TRANSPORTATION PLANNING 2.02 MASS TRANSIT SYSTEMS-MASS TRANSIT FEASIBILITY&TECHNICAL 413/2013 4/3012015 STUDIES 2.06 MASS TRANSIT SYSTEMS-MASS TRANSIT SAFETY CERTIFICA116N FOR 41312013 413€/2015 SYSTEM ELEMENTS 3.01 HIGHWAY SYSTEMS-SITE DEVELOPMENT AND PARKING LOT DESIGN 41312013 413012015 3.02 HIGHWAY SYSTEMS-HIGHWAY DESIGN 4/312013 4/30/2015 " 3.03 HIGHWAY SYSTEMS-BRIDGE DESIGN 4/3/2013 4/3012015 3.44 HIGHWAY,SYSTEMS-TRAFFIC ENGINEERING STUDIES 413/2013 4/3012015 3,06 HIGHWAY SYSTEMS-TRAFFIC CALMING 4/3/2013 413012415 3.09 HIGHWAY SYSTEMS-SIGNING, PAVEMENT MARKING,AND 413/2013 413(12015 CHANNELIZATION 3.10 HIGHWAY SYSTEMS-LIGHTING 41312013 4/30/2015 3.11 HIGHWAY SYSTEMS-SIGNALIZATICN 41312013 4130 015 5.01 . ..... .PORT AND WATERWAY SYSTEMS-ENGINEERING DESIGN 41312013 4I3012015 5.02 PORT AND WATERWAY SYSTEMS-ARCHITECTURAL DESIGN 41312013 413012015 5.09 PbRT AND WATERWAY SYSTEMS-ENVIRONMENTAL DESIGN 4=013 4130/2015 6.01 'WATER AND SANITARY SEINER SYSTEMS-WATER DISTRIBUTION AND 4/3/2013 4130)2015 SANITARY SEWAGE COLLECTION AND-TRANSMISSION SYSTEMS 6.02 WATER AND SANITARY SEWER SYSTEMS-MAJOR WATER AND 41312013 4/30/2015 SANITARY SEWAGE PUMPING FACILITIES " 3 Lug M.Millan, R.A., Chairperson Chief, Professional Services Division Internal Servlm Department fi tf MIAMI DAIDE Miami-Dade County I'ntcrnal Services Department Statement of Technical Cep ti Categories Fitt: STANTEC CONSULTING SERVICES INC. 901 Ponce de Leon Blvd Suite 900 Coral Gebfes, FL 33134 CATEGORY APPROVAL EXPIRATION NO; CATEGORY DESCR.IP ON 5.03 WATER AND SANITARY SEWER SYSTEMS-WATER AND SANITARY 41312013 4]3012015 SEWAGE TREATMENT PLANTS 10.01 ENVIRONMENTAL ENGINEERING-STORM WATER DRAINAGE DESIGN 413/2013 413012015 ENGINEERING SERVICES 10.03 ENVIRONMENTAL.ENGINEERING-BIOLOGY SERVICES "4/312013 4130]2015 10,05 ENVIRONMENTAL ENGINEERING-CONTAMINATION ASSESSMENT AND 4/312013 4130/2015 MONITORING 10.10 ENVIRONMENTAL ENGINEERING-COASTAL PROCESSES AND OCEAN 413/2013 413012015 ENGINEERJNG 11.00 GENERAL STRUCTURAL ENGINEERING 4/312013 4/3=015 12.00 GENERAL..MECHANICAL ENGINEERING 4/312013 4/3012015 13.00 GENERAL"ELECTRICAL ENGINEERING 413/201.3 4130/2015 14.00 ARCHITECTURE 4!312013 41 !2015 16,00 GENERAL CIVIL ENGINEERING 4!3!2013 413012.015 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 4/3120/3 413012015 16.00 ARCHITECTURAL CONSTRUCTION MANAGEMENT 41312013 4/30/2015 22.00 ADA TITLE Il CONSULTANT 41=013 413012015 Luisa M.Mipen, R.A., Cheoemon Chief,Pt fessional Smvbn Division Internal"Sergi s Department I Florida Department t?f Transportation 605 Sumatinct:Street A."SANN-1 1 PR VS N 1),1, (ION 1-NNOR 321349-0450 SLOWTA10 April 15, 2013 Robert Carballo, PE, Vice President STANTEC, CONSULTING SERVICES, INC. 901 Ponce DeLeon Boulevard, Suite 900 Coral Gables. Florida 3313'4 Dear Mr, Carballo: The Florida Department of Transportation has reviewed your application for qualification package and determined that the data submitted is adequate to qualify your firm for the following types of work: Group 2 Project Development and Environmental (PD&E) Studies Group 3 Highway Design- Roadway 31 Minor Highway Design 3.2 Major Highway Design 3,3 Controlled Access Highway Design Group 4 Highway Design - Bridges 4.11 - Miscellaneous Structures 4.1.2 -Minor Bridge Design 4.21 - Major Bridge Design -Concrete 4.2.2 - Major Bridge Design-Steel 4-2.3 - Major Bridge Design- Segmental Group 5 - Bridge Inspection 5,1 Conventional Bridge Inspection 5.2 Movable Bridge Inspection 5.3 Complex Bridge Inspection 5.4 Bridge Load Rating Group 6 Traffic Engineering:and Operations Stud- ies 6.1 - Traffic Engineering Studies 6.2 -Traffic Signal Timing 6.3.1 Intelligent Transportation Systems Analysis and Design 6.3,2 Intelligent Transportation Systems Implementation 6.3.3 Intelligent Transportation Traffic Engineering Systems Communications Group 7 Traffic Operations Design 71 Signing, Pavement Marking and Channelization 7.2 Lighting T3 Signalization wm Group 8 Survey and Mapping 8,1 Control Surveying 842 Design, Right of Way& Construction Surveying 83 Photogrammetric Mapping 8.4 light of Way Mapping Group 9 Soil Exploration, Material Testing and Foundations 9A Soil Exploration 9-4-1 Standard Foundation Studies Group 10 Construction Engineering Inspection 10,1 Roadway Construction Engineering Inspection 10-3 Construction Materials Inspection 1.0.4 Minor Badge & Miscellaneous Structures CEI 110.5,11 - Major Bridge CEI -Concrete 10,52 - Major Bridge CEI -Steel Group 11 - Engineering Contract Administration and Management Group. 13 - Planning 13.3 - Policy Planning 13.4 Systems Planning 13.5 SubarealCorridor Planning 13.6 Land Planning/Engineering 13.7 Transportation Statistics Group 14 Architect Group 15 Landscape Architect Your Unlimited Notice of Qualification shall be valid until June 30. 2014 at such time as your December 31, 2013 overhead:audit will be due to comply with the Departments requirement on overhead audits.We will automatically notify your firm 45 to 60 days prior to your update deadline. On the basis of data submitted the Department has approved your accounting system and considers the rates listed below as acceptable rates for qualification purposes. Facilities Horne/Branch Field Capital Cost Overtime Office Office of mongy Premium Direct Expense Overhead Rate 171,97%* 123.29%* 0.494%* Reimbursed 09-91%(Home)' -*Interim 14.60%(Fieid)*O "Rent and utilities excluded from field office rate- These costs will be directly reimbursed on contracts that require the consultant to provide field office. Should you have any questions, please feel free to contact me at.8501414-4485, Sincerely, e1% i�mkft&RQ 8 Lorraine E. Odom Professional Services Qualification Administrator LEO/cbhk Terrance N. Glunt PE Senior Project Manager, Civil Stantec Mr. Glunt has over 36 years of experience in the management and administration of engineering divisions responsible for all aspects of design and construction of government and agency related facilities including marina and boating access facilities, recreation complexes, urban and Interstate roadways and bridges, utility corridors, municipal public works and administration facilities, nuclear power plants, landfills and aviation facilities throughout Florida and the United States. His specific experience includes engineering design and coordination of multiple projects, construction engineering and inspection, quality control/constructability review, rigid and flexible pavement design and analysis, hydrologic evaluations, geotechnical and environmental studies, DRI and PD&E involvement, environmental and drainage permitting, preparation of grant applications and coordination of numerous miscellaneous civil and structural contracts with State, County and Municipal entities.Mr. Glunt has been responsible for the start-up of numerous offices for his current firm, as well as for his previous employers; involving research and development, establishment of budgets and procurement of all facilities, equipment,vehicles and staff. He has been a Resident Engineer on FDOT construction projects in numerous Districts and the Engineering Manager and Director of both Geotechnical and Construction Divisions for a medium-sized engineering firm. EDUCATION PROJECT EXPERIENCE Bachelor of Science in Civil Engineering, Florida Bridges International University, Miami Beach, Florida, 1985 10th Avenue North Bridges Over the Keller Canal*, Palm Beach County, Florida Bachelor of Science in Environmental Sciences,Juniata Engineer of Record responsible for the design and permitting of College, Huntington, Pennsylvania, 1976 a bridge rehabilitation of an existing 5 lane pretsressed,post- tensioned traffic bridge along with two new 125'steel Certification,Threshold Inspector, No. 0950, 2012 pedestrian bridges. Bridge modifications included the removal of the sidewalks and outside prestressed slabs, modification to the pier bents, installation of new prestressed slabs and traffic Certification, ACI, Level 1 Field Technician, 2012 railing barriers, wingwalls and drainage upgrades. Roadway work included 500'transitions on each approach to the bridge, OSHA, 40-hour Hazardous Materials Technician, new curb and gutter,drainage modifications to the adjacent HAZMAT, 2012 structures,guardrailand handrail installation, sidewalk adjustments, articulating block revetment on the canal banks for REGISTRATIONS slope protection and pavement markings and signage.Permits were procured from Lake Worth Drainage District for inclusion in their canal R/W. Professional Engineer#40130, State of Florida Lugo Avenue Bridge Abutment Remediation / Rehabilitation*, Coral Gables, Florida Senior Engineer for the development of erosion remediation/rehabilitation plans for the bridge abutments. CEI Construction Services, Non-Interstate Safety Barrier Terminal Replacement* Senior Project Engineer for removal and replacement of guardrail terminals and bridge anchorages at more than 375 locations throughout Miami-Dade and Monroe Counties. *denotes projects completed with other firms One Team. Infinite Solutions. Terrence N. Glum PE Senior Project Manager, Civil Nicodemus Slough* Design Review of Facilities & Processes Senior Geotechnical Engineer responsible for design of earthen Constructability Reviews for Various FDOT or County dike and bridge approaches for SFWMD field station access. Projects* Evaluation included flow net analysis,slope stability analysis, Constructobility Reviews for various FDOT or County projects, permeability considerations and revetment protection at bridge including:SR IOA over Bayou Texor Bridge, Escombia County, approaches. 4-Lane bridge with temporary by-pass bridge over navigable waterway,SR 482(Sandlake Road)/SR 435(Kirkman Road) St. Lucie Boulevard Bridges*, Florida Interchange, Orange County, five bridge widening including Senior Forensic Engineer responsible for the determination of C.I.P.decks on DOT beams, drilled shafts and MSE walls;195 the cause of failure of three revetments during construction. The /US 17 Interchange, Volusia County, three bridge widenings investigation resulted in rehabilitation of 1000 linear feet of including C.I.P.decks on DOT beams,driven piles and MSE failed sheet pile wall. The repair scheme developed included a walls;195/SR 40 interchange, Volusia County, two bridge combination of tie-backs and rubble rip-rap revetment in an widening including DOT beams, driven piles and MSE walls; environmentally sensitive wetland. Broward County Wastewater Transmission System,Countywide wastewater collection lines to main treatment plant at Copan's Park East Trailhead*, Plantation, Florida Road,Prima Vista Boulevard Bridges(major),St.Lucie County This Design-Build project features a pedestrian bridge to provide over St. Lucie River, Two 4-Lane Bridges:(C.1.P. deck on DOT access for city residents,a walking trail,a 100 square-foot beams,one bridge with six bents(driven piles);one bridge with shelter, a 1200 square-foot tot lot area, benches, bike racks, four bents, over navigable waterway,Evan's Crary Bridge interpretive signage,drinking fountains, neighborhood signs, a (major),Martin County over St. Lucie River,4-Lane Bridge: decorative fence along the east side to separate this site from (1300'driven pile foundations)over navigable waterway,Port the neighboring commercial site,a central turf area surrounded St. Lucie Boulevard Bridges over St. Lucie River(major),4-Lane by a turf knoll, and on-street parking. This park allows for Bridges:(C.1.P. deck on DOT beams, four bents each on driven access to a future C-12 Canal Multi Use Recreational Trail piles)over navigable waterway;SR 7 Flyover over Sample (MURT). Road(major),Broward County, 6-Lane Bridge: (C.I.P. deck with stay-in-place forms supported on steel girders, 232'simply supported);Lyon's Road Bridge(minor),Broward County over Hillsboro Canal, 4-Lane Bridge: (C.1.P.deck on DOT beams, ' driven piles with four bents,rip rap revetments);Military Trail Bridge(minor),Broward Drainage and Stormwater Planning &Design Port Everglades Container Terminal Stormwater Well*, Fort Lauderdale, Florida Senior Geotechnical Engineer for the design of a 24 inch diameter Stormwater well in cargo container terminal. Weli was placed in pavement area with all components placed below grade.Designed and permitted through Broward County EPD and FDEP. Full scale flow testing was applied in field to adjust depth and eventually verify capacities. *denotes projects completed with other firms Terrance N. Glum PE Senior Project Manager, Civil Woodside Drive Drainage Study&Master Plan*, Coral Basin D-8 Drainage Basin Improvements*, Palm Beach, Springs, Florida Florida Principal in Charge for this project which involved an initial Principal in Charge for this project to evaluate the existing D-8 master plan to determine potential roadway and drainage drainage basin in the Town of Palm Beach comprising 250+ improvements needed to eliminate standing water problems in acres of residential neighborhood and roadways. Specific tasks the corridor. The design involved the replacement of the included evaluation of existing basin utilizing iCPR modeling roadway,curbing,drainage system and landscaping techniques,and full design plans for basin-wide drainage components of the project. Three residential sub-divisions improvements.Additional duties included surveying, bordered the project and each had special requirements for underground soft-dig utility locates,utility relocation, borders and entrance features. The roadway was widened at geotechnical investigation,and permitting through the South various locations to accommodate turn lanes into these Florida Water Management District(SFWMD). communities. Two separate drainage districts bordered the corridor and involved permitting through both agencies for Plantation Midtown Drainage Study*, Plantation, Florida storm water collection and eventual outfall into their facilities. QA/QC officer for this study to analyze the drainage system of Project required phasing to accommodate access to resident a 760 Acre area known as Plantation Midtown, a mixed use driveways. area with Residential, Commercial and Institutional Zoning. The purpose of the study was to provide a backbone drainage Sanford Avenue Drainage&Utility Improvements*, Palm system that would allow future development and redevelopment Beach, Florida in accordance with the Master Plan. The existing system was Principal in Charge for this project which included the full re- modeled using iCPR with information from available records design of a two-block section of Sanford Avenue in the Town of and survey of the existing drainage system. Future development Palm Beach. The design included replacement of the roadway, was also modeled in accordance to the maximum development curbing,drainage system, water,sewer and street lighting potential of the area. The study recommends drainage components of the project. Town of Palm Beach required special improvements that would allow the future development and low profile curb elements and new design had to conform to creates an integrated system to be easily maintained by the existing driveway profiles while still improving drainage City. These recommendations were coordinated into current characteristics. Design of the sanitary and water systems had to Roadway/Landscaping improvements Projects and future C1P tie in to existing facilities at each end of the project, while projects in order to minimize construction in the area. The upgrading piping and MAS structures.Project also included drainage master plan developed in the study and construction conduit for cable television,BellSouth and FP&L to eliminate plans for specific drainage improvements were permitted overhead service lines. Project required phasing to through Old Plantation Water Control District,SFWMD and the accommodate access to resident driveways. City of Plantation. Basins"A" and "B" Stormwater Pump Stations*, Basin D-2 Stormwater Pump Station*, Palm Beach Lauderhill, Florida County, Florida Senior engineer for these projects which both required two Senior design engineer of a municipal stormwater pump station 40,000 gpm line shaft axial flow pumps with 145 hp natural for the Town of Palm Beach in Palm Beach County, Florida. The gas caterpillar engines with a third pump for back-up. Pumps project included preparation of the Engineering Design Report, operate in an automatic mode and start when storm stage levels Drawings and Specifications. The station has a discharge rise. The facility includes a reinforced masonry structure that capacity of 55,500 gpm(124 cfm)into Lake Worth(Atlantic houses the engines, controls generator and communications ICWW). The Station included three(3) 18,500 gpm electric equipment. The projects were constructed within a combined submersible mixed-flow 200 hp propeller driven pumps within a budget of$3.5 million. large reinforced concrete below-ground wet well. The station discharges thru three(3)large diameter pipes to a discharge structure and then via a spillway into Lake Worth. The control building houses an 800 kW diesel emergency generator,Motor Control Center, the Automatic Transfer Switch(ATS),and the Station Control Panel. *denotes projects completed with other firms Terrance N. Glum PE Senior Project Manager, Civil Environmental Engineering Broward County Traffic Engineering Maintenance Environmental/PD&E Studies*, Florida Facility*, Fort Lauderdale, Florida Environmental/PD&E Studies for the following projects:PD&E Project Director for the engineering design,permitting and utility study for Key Deer Mitigation project on US i in Big Pine Key; coordination for this 2.1 million dollar public works facility for PD&E study for University Drive from Sample Rd. to the the County Traffic Operations Center. The project included tilt Sawgrass Expressway in Broward County;PD&E study for wall construction,on-site drainage retention, major underground Hallandale Beach Boulevard from 195 to West of SR 7 in utility and communication corridors,environmentally sensitive Broward County,PD&E study for Okeechobee Road west of Le areas and hazardous materials storage considerations. Jeune Road in Dade County;PD&E study for NW 36th Street from NW 27th Avenue to Biscayne Boulevard in Dade County, Marine/Waterfront Engineering PD&E study for Powerline road form Palm Beach County Line to Matheson Hammock Marina Pier Replacements*, Miami- Sample Road in Broward County,PD&E study for Roosevelt Dade County, Florida Boulevard in Key West,Monroe County,Trash Transfer Project manager forproject which included replacement of al! Facilities on Key Largo, Long Key, and Cudjoe Key in Monroe County. six of the existing concrete fixed piers with concrete floating docks. New utility services, including water, sanitary,cable and telephone, electrical and fire protection were provided for these Geotechnical Investigations piers and for future replacement of four other piers. The existing Geotechnical Investigations*, Florida bulkheads were rehabilitated or replaced as needed due to Geotechnical investigation for pavement,drainage systems, corrosion.Maintenance dredging was performed through a foundations and retaining wall design for various FDOT and dredge and fill permit for the main channel as well as the County projects, including: Turnpike Interchange for Dolphin individual boating channels for each pier. Six boat ramp finger Stadium;195 interchange at 22nd Avenue in Boynton Beach; piers were replaced with new precast concrete piers and piling. Turnpike Widening of 12 bridges in Palm Beach and Martin County;Turnpike Interchange at Atlantic Avenue in Delray Crandon Park Marina Pier Replacements*, Key Beach;Federal Highway in Boca Raton;Broward County Biscayne, Florida Wastewater Transmission System;Racetrack Road, Broward Project manager for project that included replacement of four of County;Lyons Road with Bridge, Broward County;Military Trail the existing concrete fixed piers with concrete floating docks. with Bridge,Broward and Palm Beach Counties;Atlantic New utility services, including water,sanitary,cable and Avenue extension with Bridge, Broward County,Lantana Road, telephone, electrical and fire protection were provided for these Palm Beach County, Prima Vista Boulevard with bridges,St. piers and for future replacement of four other piers. The existing Lucie County;Martin Grade Road,Martin County;Geotechnical bulkheads were rehabilitated or replaced as needed due to Investigation for$250 million solid waste facility at Central Disposal Sanitary Landfill in Broward County. corrosion.Maintenance dredging was performed through a dredge and fill permit for the main channel as well as the individual boating channels for each pier.Eight boat ramp Maintenance Facilities finger piers were replaced with new precast concrete piers and Pine Island Maintenance Facility*, Davie, Florida piling. Project Director for the engineering and architecture design, permitting and utility coordination for this 50+acre park Old Man River Diversion Project, Army Corps.of specific public works facility. The project included masonry Engineers,Atchafalaya River Basin*, Louisiana construction,on-site drainage retention and septic systems, Inspector responsible for installation of concrete piles for major earthwork and foundation improvements and hazardous dolphins and rip-rap diversion structures along the Mississippi materials storage considerations. River. Duties also included inspection of sheet pile coffer dams, mass excavation and backfilling operations and tremie concrete. *denotes projects completed with other firms Terrance N. Glum PE Senior Project Manager, Civil Cap's Restaurant*, Lighthouse Point, Florida Alsdorf Park Boat Ramps*, Pompano, Florida Expert witness in litigation over construction of seawall and rip- Project Engineer in charge of design,permitting and rap revetment adjacent to mitigation and private dock and construction administration for the rehabilitation of a three slip marina. boat ramp facility. The project included reconstruction of ramps and approaches,boat trailer parking lot resurfacing for 90 Lauderdale Yacht Basin*, Fort Lauderdale, Florida space parking lot,pedestrian walkways, landscaping and Senior Engineer responsible for analysis and feasibility studies irrigation upgrades, drainage improvements, boat wash down for DRI for major commercial marina facility. Duties included area,fighting upgrades and signage for heavily used boat scour analysis, turning basin design, seawall, ramp and slope ramp complex on FIND leased property to City of Pompano design, as well as overall permitting for dredge and fill for Beach. Project required phased construction to maintain boat entire complex on New River. and trailer access to ramps during reconstruction. Commercial and Residential Dredge and Fill Permitting* Deerfield Island Boardwalk and Docks*, Deerfield Senior Engineer for the permitting of commercial and residential Beach, Florida dredge and fill projects in Ft. Lauderdale, Pompano Beach, Project Manager for the design and construction management Lighthouse Point, Deerfiled Beach, Boca Raton, Delray Beach, of a 2000 LF boardwalk replacement project that included Boynton Beach,Monolopon, Rivera Beach,Jupiter,Juno Beach 1200 LF of new boardwalk, 800 LF of railing replacement, and Jensen Beach. three new floating docks for visitor access,ADA walkways from docks to boardwalk,and minor restroom upgrades. Boardwalks Palm Beach Seawall Repairs*,Town of Palm Beach, utilized recycled plastic lumber, and floating docks were Florida aluminum with wooden decking and wailers. Phase 1 of the Senior Engineer for the rehabilitation of 2.5 miles of seawall rebuilding effort included upgrading the structural integrity of along the Atlantic Ocean. The design included the evaluation of the aging boardwalk system and installing recycled plastic e docking material. Since the park is only accessible by boat or existing failed sections. The development of repairs included the County's ferry service, ail construction materials had to be various repair types. These included deadmen and tie-back, brought in on barges. Phase!I included marina upgrades,ADA- placement of rubble rip-rap to prevent kick out and toe failure, as well as lull replacement utilizing soldier T-piles and precast accessible docks,and additions!recycled plastic boardwalks to panels. all the park amenities, restrooms,picnic areas and educational kiosk. Tamarac Canal Bulkhead Improvements*,.Tamarac, Burt Reynolds Park Boat Ramp Staging Docks*,Jupiter, Florida Florida Principal in Charge responsible for the design,permitting and c Project Manager for the design and permitting of 285 LF of new construction administration for the replacement of four canal staging docks in the ICWW for access to the new boat ramps. end bulkhead and culvert crossings for the City of Tamarac at different locations throughout the City as part of the first phase Design incorporated ACOE design guidelines for seagrass of a citywide upgrade. Tamarac maintains and controls the mitigation and mangrove protection. Permitting included pg SFWMD, FDEP and ACOE permits along with a variance canal system within the city limits and due to age and erosion granted by letter of permission from NOAH/NMFS. along city street crossings,decided to repair the seawalls and Construction used wood timber design with fiberglass deck bulkheads at their crossings. The firm was selected to perform a grating to allow sunlight to pass through for seagrass study and subsequently design and permit the replacements. propagation. *denotes projects completed with other firms Terrance N. Glunt PE Senior Project Manager, Civil Waterway Park*,Jupiter, Florida Mixed-Use Project manager for development of new boat ramp facility in Country Lakes*, Miramar, Florida northern Palm Beach County. Duties included site plan Senior Geotechnical Engineer responsible for development of development,design,permitting and construction administration Master Excavation Plan for 1200 acre residential and for this 30 acre natural park along Indiantown Road and the commercial tract. Design included development of earthwork 1CWW. Permitting issues included development of a gopher specification,on site limerock production from excavated tortoise reserve, mangrove and seogross mitigation,compliance material,blasting regulations,design of littoral shelves for with county manatee protection program,stormwater runoff and mitigation areas,slope stability analysis and volume an FDOT permit for the entrance off of indiantown Road.. The computations for 150+areas of lakes along 1-75. project included 4 boat ramps,concrete floating dock finger piers and staging docks,concrete seawall protection,education Sawgrass Mills Development*, Sunrise, Florida kiosks,picnic pavilions, restroom facilities,parking for 50 boat Senior Geotechnical Engineer responsible for development of trailers and on site roadway and parking systems. Master Excavation Plan for 1 100 acre residential,commercial, business and mall site. Design included development of Materials Testing earthwork specifications,on site limerock production from Material Investigations* excavated material, blasting regulations,design of littoral Material investigation for pavement analysis and design, shelves for mitigation areas,slope stability analysis and volume utilities, drainage systems, foundations and retaining wall computations for 180+areas of interconnected lakes. design for various FDOT and County projects, including: Turnpike Interchange for Dolphin Stadium;195 Interchange at Plantation Midtown Improvements and Greenway Transit 22nd Avenue in Boynton Beach;Turnpike Widening of 12 Route Phase I*, Plantation, Florida bridges in Palm Beach and Martin County;Turnpike Interchange Project Manager for the master plan,engineering design,and at Atlantic Avenue in Delray Beach;Federal Highway in Boca construction administration of this project that consisted of Raton;Broward County Wastewater Transmission System revitalizing the entire central business district of the City and Corridor Study. creating a mixed use area conducive to pedestrian friendly use and access. The project included the reconstruction of 2.5 miles Military Infrastructure of mixed use walkways, textured crosswalks,parallel parking, Key West Naval Air Station, U.S. Department of the landscaped medians,and a roundabout at a key intersection of Navy* the City. The firm'design will be the template for all Resident Engineer for quality assurance/quality control improvements to follow in the City's midtown area. We have inspection and testing of$14 million construction improvements worked with the City in designing the route that the first phase at an active military airfield. Responsibilities included of the bus transit will operate as well as helped them research supervision of all construction inspection, testing, surveying and the different type of transit vehicles available to them. in engineering functions. Duties included shop drawing review, working hand in hand with the City on this issue,we are product approval, mix design approval, os-built plan ensuring that the design we deliver meets the needs and production,contractor manpower projections and pay expectations for the entire scope of their greenway project. estimates. Received commendation from the U.S.Department of the Navy. Project also included installation of new storm drain Municipal system with pollution control devices and retention areas. North Miami Beach Public Works Facility*, North Miami Beach, Florida Key West Naval Air Station for U.S. Department of the Project Manager for construction administration of this 1.5 Navy* million dollar facility including coordination of all inspection, Forensic Pavement Engineer responsible for pavement testing,pay applications,claims analysis,schedule review and evaluation of Runway 7-25. Study included destructive testing certification of completion. program along with historical research and comparison to proposed resurfacing plan. Study resulted in potential cost savings of over$500,000. *denotes projects completed with other firms Terrance N. Glum PE Senior Project Manager, Civil Parking Waterway Park*,Jupiter, Florida David Williams Forensic Study*,Coral Gables, Florida Project manager for development of new boat ramp facility in Forensic Engineer responsible for study of structural integrity of northern Palm Beach County.Duties included site plan underground parking at luxury hotel in downtown Coral development, design,permitting and construction administration Gables. Study included determination of damage to existing for this 30 acre natural park along Indiontown Road and the facilities with recommendations for repairs. ICWW. Permitting issues included development of a gopher tortoise reserve, mangrove and seagrass mitigation,compliance Parks,Open Spaces &Cemeteries with county manatee protection program,stormwater runoff and Shenandoah Park*, Davie, Florida on FOOT permit for.the entrance off of Indiontown Road.. The Project Manager for this Design/Build project, including master project included 4 boat ramps,concrete floating dock finger planning,design and construction management. This active piers and staging docks,concrete seawall protection,education park included tennis and basketball courts, in line skating rink kiosks,picnic pavilions,restroom facilities,parking for 50 boat trailers and an site roadway and parking systems. and drainage. Firefighters Park*, Margate, Florida Doral Park*, Doral, Florida Project Manager for this Design/Build project which included This new 15-acre complex includes two synthetic turf FIFA master plan,construction management for active and passive soccer fields;tennis courts;basketball courts;bocce and other park construction including architectural, drainage,parking, lawn sports venues;tournament sand volleyball courts;a utilities and construction inspection services. community center,picnic pavilions;ADA playgrounds;paths with fitness stations;lighting;asphalt parking areas;and a covered drop off for students accessing the adjacent school Deerfield Beach Middle School Park*, Deerfield Beach, property. The firm had to develop a program to facilitate the Florida removal of trash and debris from the site which had been Project Manager for the planning, design, and construction established as a class III landfill prior to development as a park. management of a 15-acre recreational facility with four new The covered student drop off was provided by tensile fabric baseball/multi-use fields, a football/soccer field,a competition structures designed to meet current South Florida wind loading aquatics complex and associated buildings with parking for criteria. The synthetic turf soccer fields involved the installation over 300 vehicles. Duties include master planning, utility and of geogrid tensile fabric as well as on underdrain system that drainage design,architectural and structural design,permitting would allow the fields to be played on in less than on hour after and construction administration. a major rain event.Also included were bleachers established on both sides of each field for tournament play. North Community Park*, Coral Springs, Florida Principal in Charge for the planning, design and construction Roadways management of a 36-acre recreational facility with a new SR 71 Sample Road Interchange* baseball/multi-use field, two soccer fields,athletic courts for Resident Engineer for the construction of a new$12 million basketball and tennis and associated building with parking for interchange incorporating steel girders,MSE walls, over 500 vehicles. Duties include utility design, structural environmentally sensitive drainage construction, utility design,drainage modifications and permitting. relocations, lighting, signalization and landscaping. Project involved the longest simply supported steel beam construction in the state of Florida. CEI Construction Services, Sample Road/SR 7 Interchange Project* Resident Engineer on project involving construction of$ 8.3 million structural steel flyover with associated roadway, reinforced earth walls,drainage, lighting and signalization. Bridge was classified as major. *denotes projects completed with other firms Terrance N. Glum PE Senior Project Manager, Civil CEI Construction Services, Sunset Drive Bridge Woodside Drive Drainage Study*, Coral Springs, Replacement between Sunset Island No. 1 &2* Florida Resident Engineer for the replacement of an existing bridge Project Manager for this drainage study,covering a one-mile- which included a new 246 foot,seven-span, two-lane long roadway corridor in the City of Coral Springs. The project continuous cast-in-place concrete slab bridge. This project included the assessment of the drainage system,as well as included roadway approach work,phased construction, and improvement recommendations. extensive public involvement. Bridge was classified as minor. Project also included relocation of city water,storm water, and CEI Construction Services, SR 834 (Sample Road) &* sewer lines,as well as installation of new storm water lines and Resident Engineer responsible for supervision of all construction deep drainage injection wells. activities on a major roadway reconstruction project that involved widening to 6 lanes,concrete pavement, resurfacing, CEI Construction Services Resurfacing of Beeline signalization,roadway lighting, landscaping, and utility Expressway from MP 0.0 to MP 8.4* relocation for approximately 2 miles of major urban roadway. Resident Engineer on resurfacing of approximately 8 miles of Beeline Expressway including all interchange ramps. Work was CEI Construction Services SR 834 (Sample Road) &* performed at night with major MOT implications,ramp closures, Resident Engineer responsible for supervision of all construction notification to the traveling public and constant coordination activities including widening,placement of concrete pavement, effort with FHP,the Contractor and the PIO. resurfacing,signalization,roadway lighting, landscaping and utilities for approximately 3 miles of major roadway. CEI Construction Services Resurfacing of Florida's Turnpike from MP 217 to MP 242* Prima Vista Boulevard*, St. Lucie County, Florida Resident Engineer on resurfacing of approximately 20 miles of Senior Geotechnical Engineer for the design of 1.2 miles of Florida's Turnpike. Project had major MOT implications with four-lane roadway through on environmentally protected coastal serious impact to traveling public in tourist area. mitigation area. The project involved the use of synthetic geogrid for stabilization of muck,design of rubble rip-rap CEI Construction Services Resurfacing of Florida's revetment along a 0.7 mile section of causeway.A flow net Turnpike from MP 217 to MP 242*, Osceola County, evaluation was performed along with the design of channel Florida slope protection for two AASHTO Girder bridge structures. Resident Engineer on resurfacing of approximately 20 miles of Florida's Turnpike. Project had major MOT implications with St. Lucie County Beach Access Projects*, St. Lucie serious impact to traveling public in tourist area. County, Florida Project Manager for the design and construction management CEI Construction Services, SR 5 (Dixie Highway) of five beach access projects for St. Lucie County. Projects Resurfacing, Widening and Lighting* involved parking lots on beach side, fencing and/orgates, Senior Project Engineer responsible for all phases of roadway wooden boardwalks at dune crossover points and information construction of a 2-mile section of US i that involved milling and gazebos as needed at various locations.Some of the parks resurfacing, Superpave asphalt,retaining and barrier wall were pre-existing but with no previously defined access walks construction,lighting,signalization,striping,signage,curb and and others were completely new locations with no former gutter, sidewalks, and landscaping. access. CEI Construction Services, SR 994 (Quail Roost Drive) Sports, Recreation & Leisure Roadway Resurfacing* Coral Springs Gun Range*, Coral Springs, Florida Senior Project Engineer responsible for all phases of roadway Project Manager for the master planning, design,and resurfacing of a 5-mile section of SR 994 involving striping, construction management for new police rifle and pistol range signage,Superpave asphalt, embankment, bridge joint repairs, including gun ranges,enclosed firing area, restroom/changing building, utilities, lighting and landscaping. MOT supervision, and railroad crossings. *denotes projects completed with other firms Terrance N. Glunt PE Senior Project Manager, Civil Palm Beach Gardens Tennis Complex*, Palm Beach Structural Engineering Gardens, Florida Various Forensic Roofing Studies* Project Manager for this Design/Build project which Project Manager responsible for investigation of roof integrity encompassed the design and construction management of a 10- for numerous building structures for purposes of refinancing acre tennis complex.Additional services included permitting, operations. Duties included inspection,analysis,evaluation and on-site visits and inspections. recommendations to lenders. Wellington Tennis Center Reconstruction*, Wellington, Water Florida Municipal Well No.B*, Lauderhill, Florida Project Manager for this project that included the rehabilitation Senior Hydrology Engineer for the analysis and development of of a 12-court hard-court tennis complex for the Town of a 2600 gpm water supply well in Lauderhill, Florida. Evaluated Wellington. The asphalt courts were resurfaced and the soil profile and developed construction methodologies for remainder of the facility was upgraded with new fencing, installation of the 120 foot deep well. Coordinated with well netting,and shade structures. head and treatment plant designers to incorporate design into overall project. Oversaw field testing of well flows during Coconut Creek Recreational Center Expansion*, installation to insure capacity. Coconut Creek, Florida Principal in Charge for this Recreational Center in the City of Ferndale 20"Watermain/24" Force Main*, Delray Coconut Creek. The firm provided the master plan,design and Beach, Florida construction management services for this active park,which This project included the design and permitting of a new 20- included three tot lots,exercise stations,shelters and a inch diameter ductile iron water main approximately 4,000 feet volleyball court, in addition to the construction of 168 linear feet long,along with 200 LF of 24"Force Main. Project included of boardwalk through an environmental wooded area. The two aerial canal crossings of the Lake Worth Drainage District boardwalk floor is constructed of a plastic lumber manufactured canals and direct burial piping along Lake Ida Road. from recycled materials,and the railings are made of pressure Coordination with three other projects was needed for tie-ins at treated timber. those locations.Additionally, the project included detailed investigations of utilities and possible conflicts along route of the TY Park Castaway Island*, Hollywood, Florida main. The project construction cost was$800,000.00. The firm Project Manager for this Design/Build project which included also performed construction administration during construction design and construction management of interactive woterplay phase and provided final certification to FDEP and PBCHD. theme park including utilities,drainage and concession area. Doral Meadows Baseball &Soccer Field*, Doral, Florida Principal in Charge for the renovations to an existing six-acre park including the complete reconfiguration of two baseball fields,two football fields and all associated pathways and plazas. The football fields were replaced with synthetic turf complete with an underdrain system that allows the fields to be played on within an hour after a major rain event. in addition, the project included an ADA accessible playground with shade structures, a picnic shelter,paths with fitness stations, lighting and installation of a drainage system to upgrade the property. included in the design was the removal of a substantial quantity of muck which covered the entire site to a depth of about five feet. Permitting also included an approval by South Florida Water Management to allow installation of some park elements within an existing easement located on the property. *denotes projects completed with other firms