2013-28262 Reso RESOLUTION NO. 2013-28262
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, APPROVING AN ASSIGNMENT TO THE EXISTING
AGREEMENT BETWEEN THE CITY AND CORZO CASTELLA CARBALLO
THOMPSON SALMAN, P.A. (C3TS OR ASSIGNOR) FOR THE
ESTABLISHMENT OF A PRE-APPROVED LIST OF PROFESSIONAL
CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO
PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS TO
STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE); WITH SUCH
ASSIGNMENT TO BE RETROACTIVELY EFFECTIVE TO NOVEMBER 30,
2012.
WHEREAS, on March 12, 2008, the Mayor and City Commission accepted the
recommendation of the City Manager to authorizing the Mayor and City Clerk to execute a
Professional Services Agreement with Corzo Castella Carballo Thompson Salman, P.A.
(C3TS), pursuant to Request for Qualifications No. 01-07/08, for Professional Construction
Engineering and Inspection Services (CEI) Firms to Provide Various CEI Services on an "As
Needed" Basis (the "Agreement"); and
WHEREAS, C3TS informed the City in writing on November 30, 2012, that Stantec
Consulting Services, Inc. (Stantec) purchased the assets of C3TS, with the result that the
ongoing business and affairs of C3TS are now wholly owned by Stantec; and
WHEREAS, pursuant to Section 3.6.2 of the Contract, assignment of the Contract
requires the written consent of the City; and
WHEREAS, the Administration has exercised its due diligence on Stantec and
recommends said assignment; and
WHEREAS, Stantec will be responsible for and maintain all required warranties and
responsibilities, for previously completed projects by C3TS, as well as and any ongoing project
with the City which existed prior to the effective date of the assignment;
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, approving an assignment to the
existing Agreement between the City and Corzo Castella Carballo Thompson Salman, P.A.
(C3TS or Assignor) for the establishment of a pre-approved list of professional construction
engineering and inspection (CEI) firms to provide various CEI services on an "as needed" basis
to Stantec Consulting Services Inc. (as Assignee), with such assignment to be retroactively
effective on November 30, 2012.
PASSED AND ADOPTED THIS 1 71A DAY OF ��l 2013.
ATTEST:
Rafael Gran do, CITY CL R i Herrera B er, MAYOR
T:\AGENDA\2013\July 17\Procurement writ s ' s to c-RESO 1 of 4.doc
ORP ORA�E�. APPROVED AS TO
:INS cr)
FORM &LANGUAGE
�.•• & FOR EXECUTION
CH . b >1 i��
City Attor y Date
COMMISSION ITEM SUMMARY
Condensed Title:
Approve Assignment to Existing Agreements between the City and Corzo Castella Carballo Thompson
Salman, P.A. "C3TS" as Assignor), to Stantec Consulting Services Inc. as Assignee)
Key Intended Outcome Supported:
Maximize efficient delivery of services
Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Customer Satisfaction-Survey
indicated that 79% of businesses rated recently completed capital improvement projects as "excellent"
or"good."
Item Summa /Recommendation:
The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo
Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations:
• Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-approved list of
Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI
services on an "as-needed" basis;
• RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for
the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and
• RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for
the Sunset Islands 3 &4 Neighborhood Right-Of-Way Improvement Project.
The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional
Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed"
basis.
C3TS has notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the
result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment
A).
In its due diligence, the City requested Stantec to provide information on how the firm meets the
minimum requirements for each of the agreements to be assigned (see Attachment B). Stantec's
qualifications comply with the requirements of the relevant solicitation and are nearly identical to those
proposed by C3TS at the time of their proposal reviews and awards. In addition, Stantec was asked to
confirm whether it would agree to all terms and conditions for each agreement and that the same project
team members proposed and approved by the City for each agreement are still in place (for the
exception of one individual). Stantec also affirmed that it will comply with all terms and conditions
presented in each agreement(see Attachment C).
RECOMMENDATION
Based on Stantec's confirmation letter, due diligence review by the Procurement Division and
confirmation by the Office of Capital Improvement Projects (CIP) that C3TS / Stantec performance has
been acceptable, the City Manager recommends to the Mayor and City Commission to adopt
resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to
Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful
negotiations.
Advisory Board Recommendation:
N/A
Financial Information:
Source of Amount Account
Funds: 1 N/A
OBPI
Total
Financial Impact Summary: N/A
City Clerk's Office Legislative Tracking:
David Martinez, ext. 6972
Sign-Offs:
De` rt nt Di for Ass' t:Cit Ma er Ci M er
DM AD M KGB JLM
TAAGEN 0 3\July \P ocurement\Consent to Assignment S to Stantec ummary.doc 6
MIAMIBEACH AGE'NDA.IT'EM c7
DATE
{; R A f. :N B Eobk C 'u
City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Matti Herrera Bower and M bers of the ity Commission
FROM: Jimmy L. Morales, City Manager
DATE: Jul 17 2013
Y
SUBJECT: APPROVE ASSIGNMENT TO E ISTING AGREEMENTS BETWEEN THE CITY
AND CORZO CASTELLA CAR ALLO THOMPSON SALMAN, P.A. ("C3TS99)
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE):
1. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
AGREEMENT FOR THE ESTABLISHMENT OF A PRE-APPROVED LIST
OF PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION
(CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS
NEEDED" BASIS (NO. 01-07/08) BETWEEN THE CITY AND CORZO
CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99) (AS
ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013.
2. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA
PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR
THE PALM AND HIBISCUS NEIGHBORHOOD RIGHT-OF-WAY
IMPROVEMENT PROJECT (RFQ 35-10/11) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99)
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013.
3. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA
PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR
THE SUNSET ISLANDS 3 & 4 NEIGHBORHOOD RIGHT-OF-WAY
IMPROVEMENT PROJECT (NO. 04-11/12) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS9 )
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30, 2013.
4. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
AGREEMENT FOR PROFESSIONAL CONSTRUCTION ENGINEERING
AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES
ON AN "AS NEEDED" BASIS (NO. 52-11/12) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS99)
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
I
Commission Memorandum— Consent to Assignment C3TS to Stantec
July 17, 2013
Page 2 of 2
KEY INTENDED OUTCOME SUPPORTED
Ensure Well-Designed, Quality Capital Projects.
ANALYSIS
The City of Miami Beach entered into Professional Services Agreements with Corzo Castella
Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3)
solicitations:
• Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-
approved list of Professional Construction Engineering And Inspection (CEI) Firms to
provide various CEI services on an "as-needed" basis;
• RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria
package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement
Project, and
• RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria
package for the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement
Project.
The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for
Professional Construction Engineering And Inspection (CEI) firms to provide various CEI
services on an "as-needed" basis.
In a letter dated November 30, 2012, Mr. Ramon Castella, Vice-President of C3TS, notified
the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result
that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see
Attachment A).
On June 27, 2013, the City requested from Stantec to provide information on how the firm
meets the minimum requirements for each of the agreements to be assigned (see
Attachment B). In addition, Stantec was asked to confirm whether it would agree to all terms
and conditions for each agreement. On July 8, 2013, Stantec confirmed that the same
project team members proposed and approved by the City for each agreement are still in
place (for the exception of one individual) and that their qualifications are the same as those
evaluated at the time of award by the City. Stantec also affirmed that it will comply with all
terms and conditions presented in each agreement (see Attachment C).
CITY MANAGER'S DUE DILIGENCE & RECOMMENDATION
Based on Stantec's confirmation letter, due diligence review by the Procurement Division
and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS / Stantec
performance has been acceptable, the City Manager recommends to the Mayor and City
Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the
agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11,
04-11/12, and RFQ 52-11/12 upon successful negotiations.
CONCLUSION
The Administration recommends that the Mayor and City Commission adopt resolutions
assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to
Requests for Qualifications Nos. 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon
successful negotiations.
JLM/MT/KGB/DM/AD
T:\AGENDA\2013\Ju1y 13\Procurement\Consent to Assignment-C3TS to Stantec-MEMO.doc
C31S November 30, 2012
City of Miami Beach
Capital Improvement Projects
777—17'"Street
Miami Beach,Florida 33139
Engineers Attention: Ms.Kathie O.Brooks,AICP,City Manager
Accihltects
Planners
Reference: Contract:P01BPO 014004—53 d Street Restrooms
POIBPO 016974--Wh Street&Ocean Drive Restirooms
PO1BPO 018213—Flamingo Park Football Fief&Tract Project
PO1BP0 0119515—Neighborhood 13—Paltry&Hibiscus Islands
V74 Resolution—Sunset Islands 3&4 Improvements
P01BP0 018998 4 Review Contractor's Claim South Pointe Ph II
PAfBPO 0+18610—Overview punch list Fire Station#2
C3TS Project'Nos.01317-011,014;016;017;018;019,021
Dear Ms_ Brooks:
'lease be informed that on November 30, 2012, Stantec Consulting Services Inc. (OStantec") purchased
ED0005022 certain of the assets of Corzo Castella Carballo Thompson Salman, P.A. ('C3TS")with the result that the
AAC002142 ongoing business and affairs of C3TS is now wholly owned by Stantec. Stantec will maintain the present
office locations of C3TS with no interruption in operations or client services, and all future projects and
operations will be under the Stantec name. Stantec provides professional consulting services in planning,
engineering, architecture, interior design, landscape architecture, surveying, environmental sciences,
project management, and project economics for infrastructure and facilities projects. We support public
and private sector clients in a diverse range of markets at every stage, from the initial conceptualization
and financial feasibility study to project completion and beyond. Our services are provided on projects
around the world through approximately 12,000 employees operating out of more than 190 locations In
North America and 4 locations internationally.
' vision 1
Stantec's vi s o includes working ith the best clients on the best projects and providing the best
9 1� J P 9
services. Accordingly, please be assured that the continuity of your current project will be unaffected by
this new arrangement.The caliber of the personnel currently working on your project will not change and,
except for the assignment requested herein, no other aspect will be affected.
In this regard, we request your approval to assign all existing contracts in the name of C3TS to Stantec.
Kindly indicate your consent to the request for assignment by returning a duplicate copy of this letter;
executed on behalf of City of Miami Beach to Stantec Consulting Services,Inc..
Sincerely,
CORZO CASTELLA CARBALLO TH MPSON SALMAN,PA
Ramon astella, P.E.
Vice-President
The undersigned hereby consents to the assignment of the Contract noted above to Stantec Consulting
Services Inc.effective , 2012.
City of Miami Beach
d �a} tat04 iee1 3F Sea+b�t G f sgrurar�letw C4,0 Miami ftwhd cx
901 Forwe de Leon Blvd.,Suite 900,Cpl Gables,Floddo 33134 305.44$.2904 1.800-448.0227 Fo"irnile 305.445.3366
Web Site:www.c3ts.com Equal Opporlunity Employer
I
I
MIAMIBEACH
City of Miami Beach,1700 Convention Center Drive,Miami Beach,Florida 33139,www.miamibeachfl.gov j
PROCUREMENT DIVISION a
Tel: 305-673-7490,Fax;786-394-4624
June 27, 2013
VIA E-MAIL: ramon.castellaa-stantec.com
Ramon Castella, P.E.
Stantec Consulting Services, Inc.
901 Ponce de Leon Boulevard, Suite 900
Coral Gables, FL 33134-3070
i
RE: ASSIGNMENT OF CONTRACTS FROM CORZO CASTELLA CARBALLO THOMPSON
SALMAN, P.A. (C3TS) TO STANTEC CONSULTING SERVICES, INC.
Dear Mr. Castella,
Due to Stantec Consulting Services, Inc.'s (Stantec) acquisition of Corzo Castella Carballo
Thompson Salman, P.A. (C3TS), the contracts for the following solicitations must be assigned,
through City Commission approval, from C3TS to Stantec:
• RFQ 01-07/08 -- For the Establishment of a Pre-Approved List of Professional
Construction Engineering and Inspection Services (CEI) Firms to Provide Various CEI
I
Services on an "As Needed" Basis
• RFQ 35-10/11 — For a Design Criteria Professional to Prepare the Design Criteria
Package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project,
which Is Intended to Be a Design-Build Contract; and to Serve as the City's
Rep-r esentative During the Selection of the Design-Build Firm for the Project, Concerning
the Evaluation of the Responses Submitted by the Design-Build Firms; Review and
Approve for Compliance of the Detailed Working Drawings for the Project; and for
Evaluation of the Compliance of the Project Construction with the Design Criteria
Package
• RFQ 04-11/12 — For a Design Criteria Professional to Prepare the Design Criteria
Package for the Sunset Islands 3 & 4 Neighborhood Right-of-Way Improvement Project,
which Is Intended to Be a Design-Build Contract; and to Serve as the City's
Representative During the Selection of the Design-Build Firm for the Project, Concerning
the Evaluation of the Responses Submitted by the Design-Build Firms; Review and
Approve for Compliance of the Detailed Working Drawings for the Project; and for
Evaluation of the Compliance of the Project Construction with the Design Criteria
Package {
• RFQ 52-11/12 — For Professional Construction Engineering and Inspection (CEI) Firms
to Provide Various CEI Services on an "As Needed" Basis i
As part of the City's responsiveness review, Stantec must provide the following information
confirming that it meets the minimum requirements/documentation set in the solicitations noted 1
above:
• RFQ 01-07/08
• Organizational Chart
• Project Team licenses, certifications, resumes
We are committed to providing excellent public service and safety to all who live, work,and play in our vibrant,tropical,historic community.
• Florida Department of Professional Regulation License
• List of all projects in the past five (5)years-SF 254 or 330 would suffice
• List of all legal claims in the past five (5)years
• Minimum of five (5)similar projects- please provide scope of work, client contact
information, project cost, and project start and completion dates
• Minimum experience and qualifications (see Attachment A)
• RFQ 35-10/11 and RFQ 04-11/12
• Firm's number of years providing similar service
• Project Team licenses, certifications, resumes for each project
o Ten (10) client references
• List of similar projects in the past ten (10)years
• List all legal claims in the past five (5)years
• Demonstrate prior experience in serving as the Design Criteria Professional for
public facilities and in the preparation of Design Criteria Packages for public and
municipal facilities in particular in horizontal right-of-way construction
• Project Teams must include a professional civil engineer licensed in Florida
• Project Managers must have a minimum of five (5) years of experience
developing Design Criteria Packages for horizontal right-of-way construction and
-- -- -- - — -- --three-(3) projects valued-at-$5 million-or-greater-- -- - -- - - - --
o Minimum of five (5) completed similar projects - please provide scope of work,
client contact information, project cost, and project start and completion dates
o Narrative descriptions for each project
o Methodologies and approaches for each project
o Organizational Chart
• RFQ 52-11/12
o Ten (10) client references
• Project Team licenses, certifications, resumes
• Florida Department of Professional Regulation License
• List of all projects in the past five (5)years-SF 254 or 330 would suffice
-- -
• List ofall-Ie-gal claims-in-the p-ast-five-(57)-years --- --
o Project Manager must have a minimum of five (5) years of experience and have
completed three (3) similar projects
• Minimum of five (5) similar projects-please provide scope of work, client contact
information, project cost, and project start and completion dates
• Minimum experience and qualifications (see Attachment A)
• Organizational Chart
• Project methodology and approach
In addition, Stantec must also confirm that it agrees to the contract terms and conditions for
each project; as well as, the conditions provided in the RFQ proposal responses submitted by
C3TS at the time of the RFQ solicitations, which were provided to your courier today.
Please submit the required information by Wednesday, July 3, 2013. Should you need
additional information, please contact me at 305-673-7000 ext. 6230 or e-mail:
theocarrasco@miamibeachfi.gov.
ha.n -
Theo Carrasco, Ph.D., CPPO, CPPB
Senior Procurement Specialist
6
We are committed to providing excellent public service and safety to all who live,work,and play in our vibrant,tropical,historic community.
A40&w" C
Stantec Consulting Services Inc.
_ 901 Ponce de Leon Blvd.,Suite 900
Coral Gables,Florida 33134
Ph(305_445-2900
Fax:(305)445-3366
Stantec
July 8, 2013
City of Miami Beach
Procurement Division
1700 Convention Center Drive
Miami Beach, Florida 33139
Attention: Theo Carrasco, Ph.D., CPPO, CPPB
Senior Procurement Specialist
Reference: Assignment of Contracts from Corzo Castella Carballo Thompson Salman,P.A.
(C3TS) to Stantec Consulting Services Inc.
RFQ 01-07/089 RFQ 35-10/119 RFQ 04-11/129 RFQ 52-11/12
Dear Mr. Carrasco:
In response to your recent request for additional information and confirmation concerning this matter,
please note that the C3TS local staff, offices, management, organization and resources are now all part
of Stantec. In response to the specific items,please note the following:
• RFQ 01-07/08
• Organizational Chart
All project personnel and roles are as detailed in our original Statement of Qualifications,
except for Mr. William Francis—who is no longer with the firm.
• Project Team licenses, certifications, resumes
All project team licenses, certifications and resumes are as contained in our original
Statement of Qualifications, except for Mr. William Francis—who is no longer with the firm.
• Florida Department of Professional Regulation License
Please see Florida Department of Professional Regulation licenses, as well as FDOT &
Miami-Dade County Pre-qualification certificates for Stantec, included in Attachments.
• List of all projects in the past five(5) years—SF 254 or 330 would suffice
The list of local projects in the past five years — 254, are as included in our original
Statement of Qualifications.
• List of all legal claims in the past five(5)years
List of local claims in the past five years is as included in our original Statement of
Qualifications.
r
Stantec
July 8,2013
City of Miami Bead
Procurement Division
Page 2 of 4
o Alininiu,m of five (5) similar projects — please provide scope of word, client contact
Information,prvjeet cost,and project start and completion dues
Similar 10cal projects are as included in our original Statement rrf Qualifications.
o Minimum experience and qualifications(see Attachment A)
Minimum local experience and qualifications are as included in our original Statement of
Qualifications.
RFQ 35-10/11 and rRFQ -1€!i2
o Firm's number of years providing similar service
The firm's number oj`year..s providing similar services locally is as detailed an our original
Statement f'o, ualifi Lions.
o Project Teams licenses,certifications,resumes for each project
A-11 pro,jeer team licenses, -certifications and resunies are as contained in our ofginal
Statement of Qualijications, except for Mfr, William Francis —who is no longer with the firm.
o 'fen(10)client references
The client references are as contained in our original Statement of Qualifications.
o List of similar projects in the past ten(10)years
List ofvimilar local projects are as detailed in our original Statement of Qualifications.
o List all legal claims in the past five(5)years
List of local claims in the past five years is as included in our original Statement of
Qualifications.
o Demonstrate prior experience in serving as the Design Criteria Professional for public
facilities and in the preparation of Design Criteria Packages for public and municipal
facilities in particular in horizontal right-of-way construction
Prior local experience in serving as DCP for public facilities is its detailed in our original
Statement of Qualifications.
o Project Teams must include a professional civil engineer licensed in Florida
Project tears includes several professional civil engineers licenses in Florida, a.s detailed in
our original Statement of Qualifications,
o Project Managers roust have a minimum of five ( gears of experience developing
Design Criteria Packages for horizontal right-of-way construction and three (3)
projects valued at$5 million or greater
Project Managers are as detailed its our original Statement of Qualijicafions,
o Minimum of five (5) completed similar projects— lease provide scope of wr�r:�, client
contact information,project cost,and project start and completion dates
Similar local projects are as included in our original Statement of Qualifications.
o Narrative descriptions for each project
The narrative de-eription for each project are as detailed in our original Statement of
Qualifications.
stantec
July 8,2013
City of Miami Beach
Procurement Division
Page 3 of 4
0 Methodologies and approaches for each project
The methodologies and approaches are as detailed in our original Statement of
Qualificationv.
* Organizational Chart
All protect personnel and roles are as detailed in our original Statement of Qualifia:alions,
except,for.Mr. llr'illiam Francis—who is no longer with the firm.
RFQ 52-11/12
o Ten (10)client references
The client references are as contained in our original Statement of Qualifications.
o Project Team licenses, certifications,resumes
All project team licenses, certifications and resumes are as contained in our original
Statement of Qualifications, exceptfor Mr. William Francis—who is no longer with the firm.
o Florida Department of Professional Regulation License
Please see Florida Department of Professional Regulation- license, as well as FDOT &
Miami-Dade Count, Pre-qualification certificates,for starntec, included in Attachments.
o List of all projects in the past five(5)years—SF 254 or 330 would suffice.
The list of local projects in the past five years — 254, are as included in our original
Statement of Qualifications.
o List of all legal claims in the past five(5)years
List of local claims in the past five years is as included in our original Statement of
Qualiyicatiom.
o Project Manager must .Dave a minimum of five (5) years of experience and have
completed three(3)similar projects
j
Proect Manager with requisite experience is as detailed in our original Statement of
Qualifications.
0 Minimum of five (5) similar projects -- please provide scope of work, client contact
information,.project cost,and project start and completion.dates
Similar local project s are as included in our original Statement of Qual fications.
o Minimum experience and qualifications(see Attachment A)
Minimum local experience and qualifications are as included in our original Statement of
Qualifications.
o Project Methodologies and approach
The methodologies and approach are as detailed in our original Statement of Qualifications.
5tantee agrees,to the contract tennis and conditions of the current contracts being assigned for RFQ 01-
07,'08, RFQ 35-10/11 & RlrQ 04-11/12. .Regarding RFQ 52-11112, roc have a few minor issues as
previously detailed to you by Mr. Sean Compel.
ATTACHMENTS
a
h'
St - Mu a Y "
�A K
�Elhf�rre� rh Ol c p rovis on w ry
tat meed
s r}nc s
_
a tie urrflu oe � I� ''
p ► +�Chhcipter X71,:Ftiridc�Satu .
iz
MM IS.
da
Acr�d�r= f ;22820 150 9 S
STATE'O FLORID
DE PA 'CMFlk T C} .�U&lNE�S AND PI FESSI NAL EGULATtO'N . .
800 kRDIOF ARCH ITECTURE&INTERIOR°DESIGN,
1 1
-The, CHITEC'9':CORPORATIO
Undefft, -Chaot0w,4 i FS x
�=Exper�tl�n tee fE®�8 215 ��
` TAPTEG CONILIRICt `IES INC
QN::ia�R'* �Sy ,e. ,` '��', .
� �Y Yli\./�iY/ •'' IIV � �J > - • �7°,� �g -
JF
el
w� 'VIVA. RUN 58 Po.
Via+
^x�..
'r
PQ Certificate No.: 200X112167170434
Approval Dane. 41312013
Expiration Cato: 4,€1201
Miami-Cede County, Florida
Internal Servioss Departrrlent
•CNr w� r�ia6 E;r'r +;'a r..'h „ +..' .. �^ `elf-P f'� s: ,�. - c.. c
M'd 1-.ff e �t�'�'-• . e ' x Y r f 1 _ v. : _ .. . y r7 L} �x i
r•e:1, fElr, b
Sttec Consulting Services Inc.
Thif ffiwk `irmed 1: 9 0! Ponce de peon Bird,Suite 900
Cora[Gables,FL 33134
The above name applicant Is pre-q�aiified to provide professional A/E services for Miami-ode qty for the period indicated
above. The eppi cant has=nMitted its firm to comply with the spy conditions fisted below,
1. Pre-Qualified to offer professional services oniy in the Miami-Bade County technical categories shown in the
attached"Statement of Technical Qualifications."All technical category restrictions must be strictly adhered to,
2, Pre-Qualification Certificaton(PQC)consolidates the technical certification.affirmative action plan,and vendor
registration into one streamlined certification process resulting in the issuance of a Pre-Qualifcatton Certificate,
3. Deport any significant changes, such as contact person,qualifier,ownership,, firm address,etc.,.to Professional
Services Certfcation located at 111 NW 1 Stet, Suite 1350, Miami, Fl 33125, with In-30 days of such a
change_ 1-allure to.report said changes to the County may result in the Immediste suspension or termination of
your firm's Pro ualifiration Certification,
4. Firms are responsible for observing and adhering to Miami-[fade County's Administrative Order 3-39"Standard
process for construction of capital improvements,acquisition of professional services, construction contracting,
charge orders and reporting
5. Failure to renew your firm's PQC at feast thirty(30)days prior to your firm's current expirafon date may result in
the suspensk)n and/or termination from County programs and current or future contracts until your fan's Pre-
Qualif€cation Certification has been properly renewed.Any lapses in the cer ificafion of any of the rewired PQC
areas (vendor registration, affirmative action plan, or technical certification)grill result in a.lapse in your POO,
Firms are remponsibte for observing and adhering to all submission deadlines,
S. Any renewal applications and/or supporting documents submitted after the application deadUrve might delay the
review of your firm's PQC certification to the next available Technical Certification Committee meeting_ The
PQC application, submission deacflirtes. and the Techniicat Certification Cornmittee tweting calendar can be
found on Proourement //Management web -site located at:l�rtc`Ilww+w�iamfda8e eov,�internalservi slcre-
o. �ifificat�t�n�rttficatfan.as�
7, Pe ft Miami-Cade County representatives to have access during normal business hours to audit bonds and
records to verify information submitted with this application. This rtght of access shall commence on the
approval date of this certifitate and shall terminate on its expiration date.
Please rote that if at any time Miami-Cade County's has reason to elleve that any person or firm has willfully and
knowingly provided incorrect information or made false statements.,the County may refer the matter to the State
Attorney's Oflaoe and/or other investigative agencies, initiate debarment procedures, and/or pursue sanctions or
othe.r legal remedies in accordance with Miami-[lade County policy andlor applicable federal,state and local laws.
Nubia,lar�uiri� . ..
11 t 1 Professional Services CerUflication
306-375-5637
,i
MIAMI- E Miami-Dam County
Intema 1 Set-vices Department
Statement of Technical Certifleation Categories
Firm: STANTEC CONSULTING SERVICES INC.
901 Ponce de Leon Blvd Sale 940
Oral Gables, Fl. 33134
CATEGORY APPROVAL EXPIRATION
iCATEGORY DESCI P'Tlt N QATE ' ATE
1 01 TRANSPORTATION PLANNING•URBAN AREA AND REGIONAL 4132013 4130/2015
TRANSPORTATION PLANNING
2.02 MASS TRANSIT SYSTEMS-MASS TRANSIT FEASIBILITY&TECHNICAL 413/2013 4/3012015
STUDIES
2.06 MASS TRANSIT SYSTEMS-MASS TRANSIT SAFETY CERTIFICA116N FOR 41312013 413€/2015
SYSTEM ELEMENTS
3.01 HIGHWAY SYSTEMS-SITE DEVELOPMENT AND PARKING LOT DESIGN 41312013 413012015
3.02 HIGHWAY SYSTEMS-HIGHWAY DESIGN 4/312013 4/30/2015
"
3.03 HIGHWAY SYSTEMS-BRIDGE DESIGN 4/3/2013 4/3012015
3.44 HIGHWAY,SYSTEMS-TRAFFIC ENGINEERING STUDIES 413/2013 4/3012015
3,06 HIGHWAY SYSTEMS-TRAFFIC CALMING 4/3/2013 413012415
3.09 HIGHWAY SYSTEMS-SIGNING, PAVEMENT MARKING,AND 413/2013 413(12015
CHANNELIZATION
3.10 HIGHWAY SYSTEMS-LIGHTING 41312013 4/30/2015
3.11 HIGHWAY SYSTEMS-SIGNALIZATICN 41312013 4130 015
5.01
. ..... .PORT AND WATERWAY SYSTEMS-ENGINEERING DESIGN 41312013 4I3012015
5.02 PORT AND WATERWAY SYSTEMS-ARCHITECTURAL DESIGN 41312013 413012015
5.09 PbRT AND WATERWAY SYSTEMS-ENVIRONMENTAL DESIGN 4=013 4130/2015
6.01 'WATER AND SANITARY SEINER SYSTEMS-WATER DISTRIBUTION AND 4/3/2013 4130)2015
SANITARY SEWAGE COLLECTION AND-TRANSMISSION SYSTEMS
6.02 WATER AND SANITARY SEWER SYSTEMS-MAJOR WATER AND 41312013 4/30/2015
SANITARY SEWAGE PUMPING FACILITIES
" 3
Lug M.Millan, R.A., Chairperson
Chief, Professional Services Division
Internal Servlm Department
fi
tf
MIAMI DAIDE Miami-Dade County
I'ntcrnal Services Department
Statement of Technical Cep ti Categories
Fitt: STANTEC CONSULTING SERVICES INC.
901 Ponce de Leon Blvd Suite 900
Coral Gebfes, FL 33134
CATEGORY APPROVAL EXPIRATION
NO; CATEGORY DESCR.IP ON
5.03 WATER AND SANITARY SEWER SYSTEMS-WATER AND SANITARY 41312013 4]3012015
SEWAGE TREATMENT PLANTS
10.01 ENVIRONMENTAL ENGINEERING-STORM WATER DRAINAGE DESIGN 413/2013 413012015
ENGINEERING SERVICES
10.03 ENVIRONMENTAL.ENGINEERING-BIOLOGY SERVICES "4/312013 4130]2015
10,05 ENVIRONMENTAL ENGINEERING-CONTAMINATION ASSESSMENT AND 4/312013 4130/2015
MONITORING
10.10 ENVIRONMENTAL ENGINEERING-COASTAL PROCESSES AND OCEAN 413/2013 413012015
ENGINEERJNG
11.00 GENERAL STRUCTURAL ENGINEERING 4/312013 4/3=015
12.00 GENERAL..MECHANICAL ENGINEERING 4/312013 4/3012015
13.00 GENERAL"ELECTRICAL ENGINEERING 413/201.3 4130/2015
14.00 ARCHITECTURE 4!312013 41 !2015
16,00 GENERAL CIVIL ENGINEERING 4!3!2013 413012.015
17.00 ENGINEERING CONSTRUCTION MANAGEMENT 4/3120/3 413012015
16.00 ARCHITECTURAL CONSTRUCTION MANAGEMENT 41312013 4/30/2015
22.00 ADA TITLE Il CONSULTANT 41=013 413012015
Luisa M.Mipen, R.A., Cheoemon
Chief,Pt fessional Smvbn Division
Internal"Sergi s Department I
Florida Department t?f Transportation
605 Sumatinct:Street A."SANN-1 1 PR VS N 1),1,
(ION 1-NNOR 321349-0450 SLOWTA10
April 15, 2013
Robert Carballo, PE, Vice President
STANTEC, CONSULTING SERVICES, INC.
901 Ponce DeLeon Boulevard, Suite 900
Coral Gables. Florida 3313'4
Dear Mr, Carballo:
The Florida Department of Transportation has reviewed your application for qualification package and
determined that the data submitted is adequate to qualify your firm for the following types of work:
Group 2 Project Development and Environmental (PD&E) Studies
Group 3 Highway Design- Roadway
31 Minor Highway Design
3.2 Major Highway Design
3,3 Controlled Access Highway Design
Group 4 Highway Design - Bridges
4.11 - Miscellaneous Structures
4.1.2 -Minor Bridge Design
4.21 - Major Bridge Design -Concrete
4.2.2 - Major Bridge Design-Steel
4-2.3 - Major Bridge Design- Segmental
Group 5 - Bridge Inspection
5,1 Conventional Bridge Inspection
5.2 Movable Bridge Inspection
5.3 Complex Bridge Inspection
5.4 Bridge Load Rating
Group 6 Traffic Engineering:and Operations Stud-
ies
6.1 - Traffic Engineering Studies
6.2 -Traffic Signal Timing
6.3.1 Intelligent Transportation Systems Analysis and Design
6.3,2 Intelligent Transportation Systems Implementation
6.3.3 Intelligent Transportation Traffic Engineering Systems Communications
Group 7 Traffic Operations Design
71 Signing, Pavement Marking and Channelization
7.2 Lighting
T3 Signalization
wm
Group 8 Survey and Mapping
8,1 Control Surveying
842 Design, Right of Way& Construction Surveying
83 Photogrammetric Mapping
8.4 light of Way Mapping
Group 9 Soil Exploration, Material Testing and Foundations
9A Soil Exploration
9-4-1 Standard Foundation Studies
Group 10 Construction Engineering Inspection
10,1 Roadway Construction Engineering Inspection
10-3 Construction Materials Inspection
1.0.4 Minor Badge & Miscellaneous Structures CEI
110.5,11 - Major Bridge CEI -Concrete
10,52 - Major Bridge CEI -Steel
Group 11 - Engineering Contract Administration and Management
Group. 13 - Planning
13.3 - Policy Planning
13.4 Systems Planning
13.5 SubarealCorridor Planning
13.6 Land Planning/Engineering
13.7 Transportation Statistics
Group 14 Architect
Group 15 Landscape Architect
Your Unlimited Notice of Qualification shall be valid until June 30. 2014 at such time as your December
31, 2013 overhead:audit will be due to comply with the Departments requirement on overhead audits.We will
automatically notify your firm 45 to 60 days prior to your update deadline.
On the basis of data submitted the Department has approved your accounting system and considers
the rates listed below as acceptable rates for qualification purposes.
Facilities
Horne/Branch Field Capital Cost Overtime
Office Office of mongy Premium Direct Expense
Overhead Rate 171,97%* 123.29%* 0.494%* Reimbursed 09-91%(Home)'
-*Interim 14.60%(Fieid)*O
"Rent and utilities excluded from field office rate- These costs will be directly reimbursed on contracts that
require the consultant to provide field office.
Should you have any questions, please feel free to contact me at.8501414-4485,
Sincerely,
e1%
i�mkft&RQ 8
Lorraine E. Odom
Professional Services
Qualification Administrator
LEO/cbhk
Terrance N. Glunt PE
Senior Project Manager, Civil Stantec
Mr. Glunt has over 36 years of experience in the management and administration of engineering divisions responsible for
all aspects of design and construction of government and agency related facilities including marina and boating access
facilities, recreation complexes, urban and Interstate roadways and bridges, utility corridors, municipal public works and
administration facilities, nuclear power plants, landfills and aviation facilities throughout Florida and the United States. His
specific experience includes engineering design and coordination of multiple projects, construction engineering and
inspection, quality control/constructability review, rigid and flexible pavement design and analysis, hydrologic
evaluations, geotechnical and environmental studies, DRI and PD&E involvement, environmental and drainage permitting,
preparation of grant applications and coordination of numerous miscellaneous civil and structural contracts with State,
County and Municipal entities.Mr. Glunt has been responsible for the start-up of numerous offices for his current firm, as
well as for his previous employers; involving research and development, establishment of budgets and procurement of all
facilities, equipment,vehicles and staff. He has been a Resident Engineer on FDOT construction projects in numerous
Districts and the Engineering Manager and Director of both Geotechnical and Construction Divisions for a medium-sized
engineering firm.
EDUCATION PROJECT EXPERIENCE
Bachelor of Science in Civil Engineering, Florida Bridges
International University, Miami Beach, Florida, 1985 10th Avenue North Bridges Over the Keller Canal*,
Palm Beach County, Florida
Bachelor of Science in Environmental Sciences,Juniata Engineer of Record responsible for the design and permitting of
College, Huntington, Pennsylvania, 1976 a bridge rehabilitation of an existing 5 lane pretsressed,post-
tensioned traffic bridge along with two new 125'steel
Certification,Threshold Inspector, No. 0950, 2012 pedestrian bridges. Bridge modifications included the removal
of the sidewalks and outside prestressed slabs, modification to
the pier bents, installation of new prestressed slabs and traffic
Certification, ACI, Level 1 Field Technician, 2012 railing barriers, wingwalls and drainage upgrades. Roadway
work included 500'transitions on each approach to the bridge,
OSHA, 40-hour Hazardous Materials Technician, new curb and gutter,drainage modifications to the adjacent
HAZMAT, 2012 structures,guardrailand handrail installation, sidewalk
adjustments, articulating block revetment on the canal banks for
REGISTRATIONS slope protection and pavement markings and signage.Permits
were procured from Lake Worth Drainage District for inclusion
in their canal R/W.
Professional Engineer#40130, State of Florida
Lugo Avenue Bridge Abutment Remediation /
Rehabilitation*, Coral Gables, Florida
Senior Engineer for the development of erosion
remediation/rehabilitation plans for the bridge abutments.
CEI Construction Services, Non-Interstate Safety Barrier
Terminal Replacement*
Senior Project Engineer for removal and replacement of
guardrail terminals and bridge anchorages at more than 375
locations throughout Miami-Dade and Monroe Counties.
*denotes projects completed with other firms One Team. Infinite Solutions.
Terrence N. Glum PE
Senior Project Manager, Civil
Nicodemus Slough* Design Review of Facilities & Processes
Senior Geotechnical Engineer responsible for design of earthen Constructability Reviews for Various FDOT or County
dike and bridge approaches for SFWMD field station access. Projects*
Evaluation included flow net analysis,slope stability analysis, Constructobility Reviews for various FDOT or County projects,
permeability considerations and revetment protection at bridge including:SR IOA over Bayou Texor Bridge, Escombia County,
approaches. 4-Lane bridge with temporary by-pass bridge over navigable
waterway,SR 482(Sandlake Road)/SR 435(Kirkman Road)
St. Lucie Boulevard Bridges*, Florida Interchange, Orange County, five bridge widening including
Senior Forensic Engineer responsible for the determination of C.I.P.decks on DOT beams, drilled shafts and MSE walls;195
the cause of failure of three revetments during construction. The /US 17 Interchange, Volusia County, three bridge widenings
investigation resulted in rehabilitation of 1000 linear feet of including C.I.P.decks on DOT beams,driven piles and MSE
failed sheet pile wall. The repair scheme developed included a walls;195/SR 40 interchange, Volusia County, two bridge
combination of tie-backs and rubble rip-rap revetment in an widening including DOT beams, driven piles and MSE walls;
environmentally sensitive wetland. Broward County Wastewater Transmission System,Countywide
wastewater collection lines to main treatment plant at Copan's
Park East Trailhead*, Plantation, Florida Road,Prima Vista Boulevard Bridges(major),St.Lucie County
This Design-Build project features a pedestrian bridge to provide over St. Lucie River, Two 4-Lane Bridges:(C.1.P. deck on DOT
access for city residents,a walking trail,a 100 square-foot beams,one bridge with six bents(driven piles);one bridge with
shelter, a 1200 square-foot tot lot area, benches, bike racks, four bents, over navigable waterway,Evan's Crary Bridge
interpretive signage,drinking fountains, neighborhood signs, a (major),Martin County over St. Lucie River,4-Lane Bridge:
decorative fence along the east side to separate this site from (1300'driven pile foundations)over navigable waterway,Port
the neighboring commercial site,a central turf area surrounded St. Lucie Boulevard Bridges over St. Lucie River(major),4-Lane
by a turf knoll, and on-street parking. This park allows for Bridges:(C.1.P. deck on DOT beams, four bents each on driven
access to a future C-12 Canal Multi Use Recreational Trail piles)over navigable waterway;SR 7 Flyover over Sample
(MURT). Road(major),Broward County, 6-Lane Bridge: (C.I.P. deck with
stay-in-place forms supported on steel girders, 232'simply
supported);Lyon's Road Bridge(minor),Broward County over
Hillsboro Canal, 4-Lane Bridge: (C.1.P.deck on DOT beams,
' driven piles with four bents,rip rap revetments);Military Trail
Bridge(minor),Broward
Drainage and Stormwater Planning &Design
Port Everglades Container Terminal Stormwater Well*,
Fort Lauderdale, Florida
Senior Geotechnical Engineer for the design of a 24 inch
diameter Stormwater well in cargo container terminal. Weli was
placed in pavement area with all components placed below
grade.Designed and permitted through Broward County EPD
and FDEP. Full scale flow testing was applied in field to adjust
depth and eventually verify capacities.
*denotes projects completed with other firms
Terrance N. Glum PE
Senior Project Manager, Civil
Woodside Drive Drainage Study&Master Plan*, Coral Basin D-8 Drainage Basin Improvements*, Palm Beach,
Springs, Florida Florida
Principal in Charge for this project which involved an initial Principal in Charge for this project to evaluate the existing D-8
master plan to determine potential roadway and drainage drainage basin in the Town of Palm Beach comprising 250+
improvements needed to eliminate standing water problems in acres of residential neighborhood and roadways. Specific tasks
the corridor. The design involved the replacement of the included evaluation of existing basin utilizing iCPR modeling
roadway,curbing,drainage system and landscaping techniques,and full design plans for basin-wide drainage
components of the project. Three residential sub-divisions improvements.Additional duties included surveying,
bordered the project and each had special requirements for underground soft-dig utility locates,utility relocation,
borders and entrance features. The roadway was widened at geotechnical investigation,and permitting through the South
various locations to accommodate turn lanes into these Florida Water Management District(SFWMD).
communities. Two separate drainage districts bordered the
corridor and involved permitting through both agencies for Plantation Midtown Drainage Study*, Plantation, Florida
storm water collection and eventual outfall into their facilities. QA/QC officer for this study to analyze the drainage system of
Project required phasing to accommodate access to resident a 760 Acre area known as Plantation Midtown, a mixed use
driveways. area with Residential, Commercial and Institutional Zoning. The
purpose of the study was to provide a backbone drainage
Sanford Avenue Drainage&Utility Improvements*, Palm system that would allow future development and redevelopment
Beach, Florida in accordance with the Master Plan. The existing system was
Principal in Charge for this project which included the full re- modeled using iCPR with information from available records
design of a two-block section of Sanford Avenue in the Town of and survey of the existing drainage system. Future development
Palm Beach. The design included replacement of the roadway, was also modeled in accordance to the maximum development
curbing,drainage system, water,sewer and street lighting potential of the area. The study recommends drainage
components of the project. Town of Palm Beach required special improvements that would allow the future development and
low profile curb elements and new design had to conform to creates an integrated system to be easily maintained by the
existing driveway profiles while still improving drainage City. These recommendations were coordinated into current
characteristics. Design of the sanitary and water systems had to Roadway/Landscaping improvements Projects and future C1P
tie in to existing facilities at each end of the project, while projects in order to minimize construction in the area. The
upgrading piping and MAS structures.Project also included drainage master plan developed in the study and construction
conduit for cable television,BellSouth and FP&L to eliminate plans for specific drainage improvements were permitted
overhead service lines. Project required phasing to through Old Plantation Water Control District,SFWMD and the
accommodate access to resident driveways. City of Plantation.
Basins"A" and "B" Stormwater Pump Stations*, Basin D-2 Stormwater Pump Station*, Palm Beach
Lauderhill, Florida County, Florida
Senior engineer for these projects which both required two Senior design engineer of a municipal stormwater pump station
40,000 gpm line shaft axial flow pumps with 145 hp natural for the Town of Palm Beach in Palm Beach County, Florida. The
gas caterpillar engines with a third pump for back-up. Pumps project included preparation of the Engineering Design Report,
operate in an automatic mode and start when storm stage levels Drawings and Specifications. The station has a discharge
rise. The facility includes a reinforced masonry structure that capacity of 55,500 gpm(124 cfm)into Lake Worth(Atlantic
houses the engines, controls generator and communications ICWW). The Station included three(3) 18,500 gpm electric
equipment. The projects were constructed within a combined submersible mixed-flow 200 hp propeller driven pumps within a
budget of$3.5 million. large reinforced concrete below-ground wet well. The station
discharges thru three(3)large diameter pipes to a discharge
structure and then via a spillway into Lake Worth. The control
building houses an 800 kW diesel emergency generator,Motor
Control Center, the Automatic Transfer Switch(ATS),and the
Station Control Panel.
*denotes projects completed with other firms
Terrance N. Glum PE
Senior Project Manager, Civil
Environmental Engineering Broward County Traffic Engineering Maintenance
Environmental/PD&E Studies*, Florida Facility*, Fort Lauderdale, Florida
Environmental/PD&E Studies for the following projects:PD&E Project Director for the engineering design,permitting and utility
study for Key Deer Mitigation project on US i in Big Pine Key; coordination for this 2.1 million dollar public works facility for
PD&E study for University Drive from Sample Rd. to the the County Traffic Operations Center. The project included tilt
Sawgrass Expressway in Broward County;PD&E study for wall construction,on-site drainage retention, major underground
Hallandale Beach Boulevard from 195 to West of SR 7 in utility and communication corridors,environmentally sensitive
Broward County,PD&E study for Okeechobee Road west of Le areas and hazardous materials storage considerations.
Jeune Road in Dade County;PD&E study for NW 36th Street
from NW 27th Avenue to Biscayne Boulevard in Dade County, Marine/Waterfront Engineering
PD&E study for Powerline road form Palm Beach County Line to Matheson Hammock Marina Pier Replacements*, Miami-
Sample Road in Broward County,PD&E study for Roosevelt Dade County, Florida
Boulevard in Key West,Monroe County,Trash Transfer Project manager forproject which included replacement of al!
Facilities on Key Largo, Long Key, and Cudjoe Key in Monroe
County. six of the existing concrete fixed piers with concrete floating
docks. New utility services, including water, sanitary,cable and
telephone, electrical and fire protection were provided for these
Geotechnical Investigations piers and for future replacement of four other piers. The existing
Geotechnical Investigations*, Florida bulkheads were rehabilitated or replaced as needed due to
Geotechnical investigation for pavement,drainage systems, corrosion.Maintenance dredging was performed through a
foundations and retaining wall design for various FDOT and dredge and fill permit for the main channel as well as the
County projects, including: Turnpike Interchange for Dolphin individual boating channels for each pier. Six boat ramp finger
Stadium;195 interchange at 22nd Avenue in Boynton Beach; piers were replaced with new precast concrete piers and piling.
Turnpike Widening of 12 bridges in Palm Beach and Martin
County;Turnpike Interchange at Atlantic Avenue in Delray Crandon Park Marina Pier Replacements*, Key
Beach;Federal Highway in Boca Raton;Broward County
Biscayne, Florida
Wastewater Transmission System;Racetrack Road, Broward Project manager for project that included replacement of four of
County;Lyons Road with Bridge, Broward County;Military Trail the existing concrete fixed piers with concrete floating docks.
with Bridge,Broward and Palm Beach Counties;Atlantic New utility services, including water,sanitary,cable and
Avenue extension with Bridge, Broward County,Lantana Road, telephone, electrical and fire protection were provided for these
Palm Beach County, Prima Vista Boulevard with bridges,St. piers and for future replacement of four other piers. The existing
Lucie County;Martin Grade Road,Martin County;Geotechnical bulkheads were rehabilitated or replaced as needed due to
Investigation for$250 million solid waste facility at Central
Disposal Sanitary Landfill in Broward County. corrosion.Maintenance dredging was performed through a
dredge and fill permit for the main channel as well as the
individual boating channels for each pier.Eight boat ramp
Maintenance Facilities finger piers were replaced with new precast concrete piers and
Pine Island Maintenance Facility*, Davie, Florida piling.
Project Director for the engineering and architecture design,
permitting and utility coordination for this 50+acre park Old Man River Diversion Project, Army Corps.of
specific public works facility. The project included masonry Engineers,Atchafalaya River Basin*, Louisiana
construction,on-site drainage retention and septic systems, Inspector responsible for installation of concrete piles for
major earthwork and foundation improvements and hazardous dolphins and rip-rap diversion structures along the Mississippi
materials storage considerations. River. Duties also included inspection of sheet pile coffer dams,
mass excavation and backfilling operations and tremie
concrete.
*denotes projects completed with other firms
Terrance N. Glum PE
Senior Project Manager, Civil
Cap's Restaurant*, Lighthouse Point, Florida Alsdorf Park Boat Ramps*, Pompano, Florida
Expert witness in litigation over construction of seawall and rip- Project Engineer in charge of design,permitting and
rap revetment adjacent to mitigation and private dock and construction administration for the rehabilitation of a three slip
marina. boat ramp facility. The project included reconstruction of ramps
and approaches,boat trailer parking lot resurfacing for 90
Lauderdale Yacht Basin*, Fort Lauderdale, Florida space parking lot,pedestrian walkways, landscaping and
Senior Engineer responsible for analysis and feasibility studies irrigation upgrades, drainage improvements, boat wash down
for DRI for major commercial marina facility. Duties included area,fighting upgrades and signage for heavily used boat
scour analysis, turning basin design, seawall, ramp and slope ramp complex on FIND leased property to City of Pompano
design, as well as overall permitting for dredge and fill for Beach. Project required phased construction to maintain boat
entire complex on New River. and trailer access to ramps during reconstruction.
Commercial and Residential Dredge and Fill Permitting* Deerfield Island Boardwalk and Docks*, Deerfield
Senior Engineer for the permitting of commercial and residential Beach, Florida
dredge and fill projects in Ft. Lauderdale, Pompano Beach, Project Manager for the design and construction management
Lighthouse Point, Deerfiled Beach, Boca Raton, Delray Beach, of a 2000 LF boardwalk replacement project that included
Boynton Beach,Monolopon, Rivera Beach,Jupiter,Juno Beach 1200 LF of new boardwalk, 800 LF of railing replacement,
and Jensen Beach. three new floating docks for visitor access,ADA walkways from
docks to boardwalk,and minor restroom upgrades. Boardwalks
Palm Beach Seawall Repairs*,Town of Palm Beach, utilized recycled plastic lumber, and floating docks were
Florida aluminum with wooden decking and wailers. Phase 1 of the
Senior Engineer for the rehabilitation of 2.5 miles of seawall rebuilding effort included upgrading the structural integrity of
along the Atlantic Ocean. The design included the evaluation of the aging boardwalk system and installing recycled plastic
e docking material. Since the park is only accessible by boat or
existing failed sections. The development of repairs included
the County's ferry service, ail construction materials had to be
various repair types. These included deadmen and tie-back,
brought in on barges. Phase!I included marina upgrades,ADA-
placement of rubble rip-rap to prevent kick out and toe failure,
as well as lull replacement utilizing soldier T-piles and precast accessible docks,and additions!recycled plastic boardwalks to
panels. all the park amenities, restrooms,picnic areas and educational
kiosk.
Tamarac Canal Bulkhead Improvements*,.Tamarac, Burt Reynolds Park Boat Ramp Staging Docks*,Jupiter,
Florida Florida
Principal in Charge responsible for the design,permitting and
c Project Manager for the design and permitting of 285 LF of new
construction administration for the replacement of four canal
staging docks in the ICWW for access to the new boat ramps.
end bulkhead and culvert crossings for the City of Tamarac at
different locations throughout the City as part of the first phase Design incorporated ACOE design guidelines for seagrass
of a citywide upgrade. Tamarac maintains and controls the mitigation and mangrove protection. Permitting included
pg SFWMD, FDEP and ACOE permits along with a variance
canal system within the city limits and due to age and erosion granted by letter of permission from NOAH/NMFS.
along city street crossings,decided to repair the seawalls and Construction used wood timber design with fiberglass deck
bulkheads at their crossings. The firm was selected to perform a grating to allow sunlight to pass through for seagrass
study and subsequently design and permit the replacements.
propagation.
*denotes projects completed with other firms
Terrance N. Glunt PE
Senior Project Manager, Civil
Waterway Park*,Jupiter, Florida Mixed-Use
Project manager for development of new boat ramp facility in Country Lakes*, Miramar, Florida
northern Palm Beach County. Duties included site plan Senior Geotechnical Engineer responsible for development of
development,design,permitting and construction administration Master Excavation Plan for 1200 acre residential and
for this 30 acre natural park along Indiantown Road and the commercial tract. Design included development of earthwork
1CWW. Permitting issues included development of a gopher specification,on site limerock production from excavated
tortoise reserve, mangrove and seogross mitigation,compliance material,blasting regulations,design of littoral shelves for
with county manatee protection program,stormwater runoff and mitigation areas,slope stability analysis and volume
an FDOT permit for the entrance off of indiantown Road.. The computations for 150+areas of lakes along 1-75.
project included 4 boat ramps,concrete floating dock finger
piers and staging docks,concrete seawall protection,education Sawgrass Mills Development*, Sunrise, Florida
kiosks,picnic pavilions, restroom facilities,parking for 50 boat Senior Geotechnical Engineer responsible for development of
trailers and on site roadway and parking systems. Master Excavation Plan for 1 100 acre residential,commercial,
business and mall site. Design included development of
Materials Testing earthwork specifications,on site limerock production from
Material Investigations* excavated material, blasting regulations,design of littoral
Material investigation for pavement analysis and design, shelves for mitigation areas,slope stability analysis and volume
utilities, drainage systems, foundations and retaining wall computations for 180+areas of interconnected lakes.
design for various FDOT and County projects, including:
Turnpike Interchange for Dolphin Stadium;195 Interchange at Plantation Midtown Improvements and Greenway Transit
22nd Avenue in Boynton Beach;Turnpike Widening of 12 Route Phase I*, Plantation, Florida
bridges in Palm Beach and Martin County;Turnpike Interchange Project Manager for the master plan,engineering design,and
at Atlantic Avenue in Delray Beach;Federal Highway in Boca construction administration of this project that consisted of
Raton;Broward County Wastewater Transmission System revitalizing the entire central business district of the City and
Corridor Study. creating a mixed use area conducive to pedestrian friendly use
and access. The project included the reconstruction of 2.5 miles
Military Infrastructure of mixed use walkways, textured crosswalks,parallel parking,
Key West Naval Air Station, U.S. Department of the landscaped medians,and a roundabout at a key intersection of
Navy* the City. The firm'design will be the template for all
Resident Engineer for quality assurance/quality control improvements to follow in the City's midtown area. We have
inspection and testing of$14 million construction improvements worked with the City in designing the route that the first phase
at an active military airfield. Responsibilities included of the bus transit will operate as well as helped them research
supervision of all construction inspection, testing, surveying and the different type of transit vehicles available to them. in
engineering functions. Duties included shop drawing review, working hand in hand with the City on this issue,we are
product approval, mix design approval, os-built plan ensuring that the design we deliver meets the needs and
production,contractor manpower projections and pay expectations for the entire scope of their greenway project.
estimates. Received commendation from the U.S.Department of
the Navy. Project also included installation of new storm drain Municipal
system with pollution control devices and retention areas. North Miami Beach Public Works Facility*, North Miami
Beach, Florida
Key West Naval Air Station for U.S. Department of the Project Manager for construction administration of this 1.5
Navy* million dollar facility including coordination of all inspection,
Forensic Pavement Engineer responsible for pavement testing,pay applications,claims analysis,schedule review and
evaluation of Runway 7-25. Study included destructive testing certification of completion.
program along with historical research and comparison to
proposed resurfacing plan. Study resulted in potential cost
savings of over$500,000.
*denotes projects completed with other firms
Terrance N. Glum PE
Senior Project Manager, Civil
Parking Waterway Park*,Jupiter, Florida
David Williams Forensic Study*,Coral Gables, Florida Project manager for development of new boat ramp facility in
Forensic Engineer responsible for study of structural integrity of northern Palm Beach County.Duties included site plan
underground parking at luxury hotel in downtown Coral development, design,permitting and construction administration
Gables. Study included determination of damage to existing for this 30 acre natural park along Indiontown Road and the
facilities with recommendations for repairs. ICWW. Permitting issues included development of a gopher
tortoise reserve, mangrove and seagrass mitigation,compliance
Parks,Open Spaces &Cemeteries with county manatee protection program,stormwater runoff and
Shenandoah Park*, Davie, Florida on FOOT permit for.the entrance off of Indiontown Road.. The
Project Manager for this Design/Build project, including master project included 4 boat ramps,concrete floating dock finger
planning,design and construction management. This active piers and staging docks,concrete seawall protection,education
park included tennis and basketball courts, in line skating rink kiosks,picnic pavilions,restroom facilities,parking for 50 boat
trailers and an site roadway and parking systems.
and drainage.
Firefighters Park*, Margate, Florida Doral Park*, Doral, Florida
Project Manager for this Design/Build project which included This new 15-acre complex includes two synthetic turf FIFA
master plan,construction management for active and passive soccer fields;tennis courts;basketball courts;bocce and other
park construction including architectural, drainage,parking, lawn sports venues;tournament sand volleyball courts;a
utilities and construction inspection services. community center,picnic pavilions;ADA playgrounds;paths
with fitness stations;lighting;asphalt parking areas;and a
covered drop off for students accessing the adjacent school
Deerfield Beach Middle School Park*, Deerfield Beach, property. The firm had to develop a program to facilitate the
Florida removal of trash and debris from the site which had been
Project Manager for the planning, design, and construction established as a class III landfill prior to development as a park.
management of a 15-acre recreational facility with four new The covered student drop off was provided by tensile fabric
baseball/multi-use fields, a football/soccer field,a competition structures designed to meet current South Florida wind loading
aquatics complex and associated buildings with parking for criteria. The synthetic turf soccer fields involved the installation
over 300 vehicles. Duties include master planning, utility and of geogrid tensile fabric as well as on underdrain system that
drainage design,architectural and structural design,permitting would allow the fields to be played on in less than on hour after
and construction administration. a major rain event.Also included were bleachers established on
both sides of each field for tournament play.
North Community Park*, Coral Springs, Florida
Principal in Charge for the planning, design and construction Roadways
management of a 36-acre recreational facility with a new SR 71 Sample Road Interchange*
baseball/multi-use field, two soccer fields,athletic courts for Resident Engineer for the construction of a new$12 million
basketball and tennis and associated building with parking for interchange incorporating steel girders,MSE walls,
over 500 vehicles. Duties include utility design, structural environmentally sensitive drainage construction, utility
design,drainage modifications and permitting. relocations, lighting, signalization and landscaping. Project
involved the longest simply supported steel beam construction in
the state of Florida.
CEI Construction Services, Sample Road/SR 7
Interchange Project*
Resident Engineer on project involving construction of$ 8.3
million structural steel flyover with associated roadway,
reinforced earth walls,drainage, lighting and signalization.
Bridge was classified as major.
*denotes projects completed with other firms
Terrance N. Glum PE
Senior Project Manager, Civil
CEI Construction Services, Sunset Drive Bridge Woodside Drive Drainage Study*, Coral Springs,
Replacement between Sunset Island No. 1 &2* Florida
Resident Engineer for the replacement of an existing bridge Project Manager for this drainage study,covering a one-mile-
which included a new 246 foot,seven-span, two-lane long roadway corridor in the City of Coral Springs. The project
continuous cast-in-place concrete slab bridge. This project included the assessment of the drainage system,as well as
included roadway approach work,phased construction, and improvement recommendations.
extensive public involvement. Bridge was classified as minor.
Project also included relocation of city water,storm water, and CEI Construction Services, SR 834 (Sample Road) &*
sewer lines,as well as installation of new storm water lines and Resident Engineer responsible for supervision of all construction
deep drainage injection wells. activities on a major roadway reconstruction project that
involved widening to 6 lanes,concrete pavement, resurfacing,
CEI Construction Services Resurfacing of Beeline signalization,roadway lighting, landscaping, and utility
Expressway from MP 0.0 to MP 8.4* relocation for approximately 2 miles of major urban roadway.
Resident Engineer on resurfacing of approximately 8 miles of
Beeline Expressway including all interchange ramps. Work was CEI Construction Services SR 834 (Sample Road) &*
performed at night with major MOT implications,ramp closures, Resident Engineer responsible for supervision of all construction
notification to the traveling public and constant coordination activities including widening,placement of concrete pavement,
effort with FHP,the Contractor and the PIO. resurfacing,signalization,roadway lighting, landscaping and
utilities for approximately 3 miles of major roadway.
CEI Construction Services Resurfacing of Florida's
Turnpike from MP 217 to MP 242* Prima Vista Boulevard*, St. Lucie County, Florida
Resident Engineer on resurfacing of approximately 20 miles of Senior Geotechnical Engineer for the design of 1.2 miles of
Florida's Turnpike. Project had major MOT implications with four-lane roadway through on environmentally protected coastal
serious impact to traveling public in tourist area. mitigation area. The project involved the use of synthetic
geogrid for stabilization of muck,design of rubble rip-rap
CEI Construction Services Resurfacing of Florida's revetment along a 0.7 mile section of causeway.A flow net
Turnpike from MP 217 to MP 242*, Osceola County, evaluation was performed along with the design of channel
Florida slope protection for two AASHTO Girder bridge structures.
Resident Engineer on resurfacing of approximately 20 miles of
Florida's Turnpike. Project had major MOT implications with St. Lucie County Beach Access Projects*, St. Lucie
serious impact to traveling public in tourist area. County, Florida
Project Manager for the design and construction management
CEI Construction Services, SR 5 (Dixie Highway) of five beach access projects for St. Lucie County. Projects
Resurfacing, Widening and Lighting* involved parking lots on beach side, fencing and/orgates,
Senior Project Engineer responsible for all phases of roadway wooden boardwalks at dune crossover points and information
construction of a 2-mile section of US i that involved milling and gazebos as needed at various locations.Some of the parks
resurfacing, Superpave asphalt,retaining and barrier wall were pre-existing but with no previously defined access walks
construction,lighting,signalization,striping,signage,curb and and others were completely new locations with no former
gutter, sidewalks, and landscaping. access.
CEI Construction Services, SR 994 (Quail Roost Drive) Sports, Recreation & Leisure
Roadway Resurfacing* Coral Springs Gun Range*, Coral Springs, Florida
Senior Project Engineer responsible for all phases of roadway Project Manager for the master planning, design,and
resurfacing of a 5-mile section of SR 994 involving striping, construction management for new police rifle and pistol range
signage,Superpave asphalt, embankment, bridge joint repairs, including gun ranges,enclosed firing area, restroom/changing
building, utilities, lighting and landscaping.
MOT supervision, and railroad crossings.
*denotes projects completed with other firms
Terrance N. Glunt PE
Senior Project Manager, Civil
Palm Beach Gardens Tennis Complex*, Palm Beach Structural Engineering
Gardens, Florida Various Forensic Roofing Studies*
Project Manager for this Design/Build project which Project Manager responsible for investigation of roof integrity
encompassed the design and construction management of a 10- for numerous building structures for purposes of refinancing
acre tennis complex.Additional services included permitting, operations. Duties included inspection,analysis,evaluation and
on-site visits and inspections. recommendations to lenders.
Wellington Tennis Center Reconstruction*, Wellington, Water
Florida Municipal Well No.B*, Lauderhill, Florida
Project Manager for this project that included the rehabilitation Senior Hydrology Engineer for the analysis and development of
of a 12-court hard-court tennis complex for the Town of a 2600 gpm water supply well in Lauderhill, Florida. Evaluated
Wellington. The asphalt courts were resurfaced and the soil profile and developed construction methodologies for
remainder of the facility was upgraded with new fencing, installation of the 120 foot deep well. Coordinated with well
netting,and shade structures. head and treatment plant designers to incorporate design into
overall project. Oversaw field testing of well flows during
Coconut Creek Recreational Center Expansion*, installation to insure capacity.
Coconut Creek, Florida
Principal in Charge for this Recreational Center in the City of Ferndale 20"Watermain/24" Force Main*, Delray
Coconut Creek. The firm provided the master plan,design and Beach, Florida
construction management services for this active park,which This project included the design and permitting of a new 20-
included three tot lots,exercise stations,shelters and a inch diameter ductile iron water main approximately 4,000 feet
volleyball court, in addition to the construction of 168 linear feet long,along with 200 LF of 24"Force Main. Project included
of boardwalk through an environmental wooded area. The two aerial canal crossings of the Lake Worth Drainage District
boardwalk floor is constructed of a plastic lumber manufactured canals and direct burial piping along Lake Ida Road.
from recycled materials,and the railings are made of pressure Coordination with three other projects was needed for tie-ins at
treated timber. those locations.Additionally, the project included detailed
investigations of utilities and possible conflicts along route of the
TY Park Castaway Island*, Hollywood, Florida main. The project construction cost was$800,000.00. The firm
Project Manager for this Design/Build project which included also performed construction administration during construction
design and construction management of interactive woterplay phase and provided final certification to FDEP and PBCHD.
theme park including utilities,drainage and concession area.
Doral Meadows Baseball &Soccer Field*, Doral, Florida
Principal in Charge for the renovations to an existing six-acre
park including the complete reconfiguration of two baseball
fields,two football fields and all associated pathways and
plazas. The football fields were replaced with synthetic turf
complete with an underdrain system that allows the fields to be
played on within an hour after a major rain event. in addition,
the project included an ADA accessible playground with shade
structures, a picnic shelter,paths with fitness stations, lighting
and installation of a drainage system to upgrade the property.
included in the design was the removal of a substantial quantity
of muck which covered the entire site to a depth of about five
feet. Permitting also included an approval by South Florida
Water Management to allow installation of some park elements
within an existing easement located on the property.
*denotes projects completed with other firms