Amendment No. 2 Zaha Hadid Ltd $12,114 a M
AMENDMENT NO. 2
TO THE PROFESSIONAL ARCHITECTURAL
AND ENGINEERING (A/E) SERVICES AGREEMENT
BETWEEN
THE CITY OF MIAMI BEACH, FLORIDA
AND
A JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID.ARCHITECTS AND
BERENBLUM BUSCH ARCHITECTURE, INC.
DATED MAY 3RD, 2012,
FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND
ENGINEERING SERVICES FOR THE COLLINS PARK GARAGE PROJECT IN THE
AMOUNT OF $12,114
This Amendment No. 2 to the Agreement made and entered this #A--day of
� tijw2013, by and between the CITY OF MIAMI BEACH,a municipal corporation existing under
the laws of the State of Florida(hereinafter referred to as City), having its principal offices at 1700
Convention Center Drive, Miami Beach, Florida 33139,and a Joint Venture of Zaha Hadid Limited
t/a Zaha Hadid Architects, a company certified by the Registrar of Companies for England and
Wales, having its principal office at 10 Bowling Green Lane, London, EC1 R.OBQ,United Kingdom
(hereinafter referred to as the"Prime Architect";and Berenblum Busch Architecture, Inc.,a Florida
corporation, having its principal office at 848 Brickell Avenue, Suite 625, Miami, Florida, 33131
(hereinafter referred to as the "Executive Architect").
RECITALS
WHEREAS,pursuant to Request for Qualifications(RFQ)No.31-10/11,the Mayor and City
Commission adopted Resolution No. 2012-27869 on March 21, 2012, approving a Professional
Services Agreement(the Agreement)between the City and a joint venture of Zaha Hadid Limited
t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc.for the Planning,Architectural,
Engineering, Design, Bid and Award, And Construction Administration Services for the Collins
Park Garage Project; and
WHEREAS,the Agreement was executed for a not-to-exceed amount of$2,951,823;and
WHEREAS,Amendment No.1 to the Agreement,for the provision of additional surveying
services and extended representation during July City Commission meetings, was executed on
September 30, 2013, in the amount of$8,935; and
WHEREAS, the following Amendment No. 2 to the Agreement is for the provision of a
Phase II Environmental Site Assessment, for the investigation of recognized environmental
conditions(RECs)identified on the Phase I Environmental Site Assessment report, completed on
December 11, 2012; and
NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises,
covenants, agreements, terms, and conditions herein contained, and other good and valuable
consideration, the respect and adequacy are hereby acknowledged, do agree as follows:
Page 1 of 3
Collins Park Garage-Amendment No.2
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this Amendment
No. 1.
2. MODIFICATIONS
The Agreement is amended as defined in Schedule "A-2", attached herein.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION.
The City and Consultant ratify the terms of the Agreement, as amended by this
Amendment No. 2.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be executed
in their names by their duly authorized officials as of the date first set forth above.
ATTEST: CITY OF MIAMI EACH
Rafa Grana Ji my L. orales
City Clerk Ci Manager
ATTEST : PR ME ARCHITECT(P.A.)/ZAHA HADID
LIMITED T/A ZAHA HADID ARCHITECTS
Signature/Secretary: ignature/ President-
OVA- 71 G
Print Name Print Name
ATTEST : EXECUTIVE ARC TECT (E.A.)/
BE RE L B CH ARCHITECTURE,
INC.
Signa ure/ ecretary: Signa / President
Prim a Print Name APPROVED AS TO
FORM & LANGUAGE
&FOR EXECUTION
Page 2 of 3
Collins Park Garage-Amendment No. 2 Attorn Date
SCHEDULE "A-2"
SCOPE OF SERVICES
Schedule "A" entitled, "Scope of Services", is amended as follows:
Add the following under Task 6—ADDITIONAL SERVICES
Task 6.3— Phase II Environmental Site Assessment
PAYMENT AND COMPENSATION
The total fee proposed for this Scope of Work is $12,114 (refer to Exhibit A-2 attached herein),
paid in a lump sum after the services are completed.
COMPENSATION
Zaha Hadid Berenblum Busch Total
Limited Architecture
Original Agreement Amount $1,276,000 $1,675,823 $2,951,823
Amendment No. 1 N/A $ 8,935 $ 8,935
Amendment No. 2 N/A $ 12,114 $ 12,114
Revised Agreement Amount $1,276,000 $1,696,872 $2,972,872
Page 3 of 3
Collins Park Garage—Amendment No.2
BERENBLUM BUSCH ARCHITECTURE,inc
Er• 848 BRICKELL AVENUE/SUITE 625//MIAMI,FL 33131
P:305.331.8076/bbamiami.com//AA26002109
November 25, 2013
Mr, Humberto Cabanas
City of Miami Beach
1700 Convention Center Drive
Miami Beach Fl. 33139
Re: Additional Service Request.
Dear Mr. Cabanas:
Berenblum Busch Architecture, Inc. (BBA) is delighted to present the enclosed additional service
proposals to perform Phase II Environmental Services on the above referenced project.
Fee for Services:
Langan Engineering: $12,114.00
Please refer to the enclosed and incorporated herewith, additional services proposal for specific
scope of work and details.
We thank you for the opportunity to present the proposals. Please let us know if you need any
additional information.
Submitted by,
Berenblum Busch rchitecture, Inc.
fsient Berenbl , AIA.
.._.......
_.........
LANGAN
ENGINEERING&ENb7RONMEN'AL SERVICES
25 October 2013
Revised 6 November 2013
By email to gb @berenblumbusch.com
Gustavo Berenblum
1
Berenblum Busch Architecture
848 Brickell Avenue, Suite 625
Miami, Florida 33131
S
t 1
Re: Proposal for a Phase II Environmental Site Assessment
Proposed Collins Park Garage
300 23rd Street
Miami Beach, Florida 33139 j
Langan Project No.:300089801
Dear Mr. Berenblum:
Langan Engineering and Environmental Services is pleased to present herein our proposal to
Berenblum Busch Architecture (Client) complete a Phase II Environmental Site Assessment
(ESA) for the proposed Collins Park Garage at 340 23rd Street, Miami Beach, Florida (Property).
This proposal was revised at the request of the City of Miami Beach to 'incorporate our contract
p p q Y P
rates for Geotechnical Services and Materials Testing, not our ZHA/BBA contract rates.
l
BACKGROUND
The Property consists of three parcels of land and the northern portion of a fourth parcel.
According to the Miami-Dade Property Appraiser, the parcels are owned by the City of Miami
Beach. Parcel No. 02-3226-001-0400 (340 23rd Street) comprises approximately 11,500 sq. ft.
of land. Parcel No. 02-3226-001-0405 (340 23rd Street) comprises approximately 5,750 sq. ft. of
land. These two parcels contain a 1,764-sq.-ft. former auto service station building that was
built in 1964. The northern portion of Parcel No. 02-3226-001-0391 (2200 Liberty Avenue)
consists of an approximately 13,700-sq.-ft. parking lot. Parcel No. 02-3226-001-0460 (224 23rd
Street) consists of an approximately 19,750-sq.-ft. parking lot.
s
The adjoining properties consist of an auto service station, a lounge, and an apartment and office
building to the north, commercial properties to the east and west, and the Miami City Ballet and
Miami Beach Library to the south.
Langan completed a Phase I ESA for this Project on 11 December 2012, in conformance with
ASTM E 1527-05 and standard industry practice. The purpose of the Phase I ESA was to identify
recognized environmental conditions (RECs) in accordance with ASTM E 1527-05. The Phase I ESA
consisted of reviewing historical and environmental records, conducting a site reconnaissance,
and interviewing owner representatives.
_._�50 1t.u'1. 79,,-M E.i?l!`,. 20 r_ -::`J:C 1: e vC.,��u.r?•�:1 F: .,^.+�.c"i-•.1__i iii4ll..?jl�u, .:ii17
Proposal for a Phase l/Environmental Site Assessment 25 October 2013
Proposed Collins Park Garage Revised 6 November 2013
340 23rd Street Page 2 of 6
Miami Beach, Florida 33139
Langan Project No.:300089801
Langan's findings with respect to known and suspect RECs, de minimis conditions, and other
environmental concerns, and our opinion of these findings were as follows:
• Historical records indicate that a gasoline station and automotive repair shop operated
on the west side of the Property at 340 23rd Street (Folio No 02-3226-001-0400 and 02-
3226-001-0405) between 1936 and 1991. The regulatory database documents
discharges from the facility's operations. The site is in the State of Florida petroleum
preapproval cleanup program and is ranked with a score of 10. Environmental
investigations in 2011 confirmed the presence of petroleum-impacted soil and
groundwater, which constitute'a REC in connection with the Property.
• Records indicate that two historical cleaners (Miami Laundry and Lenox Tailors and
Cleaners) were located on the Property. These constitute a historical REC in connection
with the Property. There is also a historical drycleaners on the adjacent property across
the street.
• The former gasoline station located at 300 23rd Street, in the center of the Property, is a
historical REC in connection with the Property with a moderate to high likelihood of
impacting the Property.
In a 26 December 2012 email, Mr. Berenblum asked Langan to submit a Phase II ESA proposal
to investigate these RECs. Langan submitted a proposal for these services on 8 January 2013.
This proposal was revised to reflect the rates and terms and conditions of our contract dated 6
June 2012.
SCOPE OF WORK
Langan will contact Sunshine State One-Call to identify subsurface utilities. Langan requires the
Client to provide drawings of private subsurface utilities that might be present. Langan and its
subcontractors will not be responsible for damage to utilities that are not disclosed to us on
drawings or in the field.
Langan will conduct field work according to the Florida Department of Environmental Protection
(FDEP) Standard Operating Procedures (rev. March 2008). We will subcontract a licensed
direct-push driller to provide direct-push soil and groundwater sampling services, and a National
Environmental Laboratory Accreditation Program-certified environmental laboratory to provide
analytical services.
Langan proposes advancing eight borings on Folios 02-3226-001-0400 and 02-3226-001-0405
(340 23rd Street) and 02-3226-001-0391 (300 23rd Street). Figure 1 shows the proposed
sample locations. We propose these locations for the following reasons:
• Locations LMW-1 through LMW-5 are in the area of a former gasoline station (340 23rd
Street) — LMW-1 and LMW-2 are in the area of the former dispenser islands, LMW-3 is
in the area of the former UST farm, LMW-4 is in the area of the former auto repair shop,
and LMW-5 is in the area of the former waste oil UST.
• Locations LMW-6, -7, and -8 are in the area of the former gasoline station (300 23rd
Street) and the former drycleaners.
L A NGA N
Proposal for a Phase l/Environmental Site Assessment 25 October 2013
Proposed Collins Park Garage Revised 6 November 2013
340 23rd Street Page 3 of 6
Miami Beach, Florida 33139
Langan Project No.:300089801
• LMW-2 is across 23rd Street from a former drycleaners and an operating gasoline
station and could provide information on whether contaminated groundwater has
migrated from those sites.
Under Langan's supervision, the driller will push a four-foot-long stainless steel rod into the
ground, retrieve the rod, and remove and cut open the plastic inner sleeve. We will screen each
soil boring for petroleum hydrocarbon vapors at two-foot intervals to the water table with an
organic vapor analyzer (OVA), according to Chapter 62-770.200(19), Florida Administrative Code
(FAC). We will describe the lithology and note the depth at which the fill material ends and the
native material begins. We will submit the eight samples with the highest net OVA readings for
laboratory analysis of total recoverable petroleum hydrocarbons (TRPH) by the FL-PRO Method,
volatile organic aromatics (VOAs) by EPA Method 8260, and polynuclear aromatic hydrocarbons
(PAHs) by EPA Method 8270. VOAs, PAHs, and TRPH are standard analyses for petroleum
constituents.
To collect the groundwater samples, the driller will push a five-foot-long well screen into the
ground until it intersects the water table. Langan will purge the well screen with a low-flow
peristaltic pump and polyethylene tubing. We will monitor water quality parameters (dissolved
oxygen, turbidity, pH, temperature, and conductivity) until values stabilize within FDEP-
acceptable ranges. We will place the samples in a cooler on ice and submit the samples to the
laboratory under proper chain of custody procedures for laboratory analysis of VOAs, PAHs,
TRPH. We will also analyze samples LMW-2, -6, -7, and -8 for volatile organic halocarbons
(VOHs) by EPA Method 8260, which will indicate whether drycleaning solvents are present in
the aquifer.
Langan
will return drill cuttings to the boreholes and allow the purge water to evaporate on an
impervious surface. We will not drum material for off-site disposal unless we notice free product,
stained soil, petroleum odors, or other indications of contamination. The cost of drumming and
disposing of soil or groundwater is not included in this estimate. Langan will discuss those costs
with the Client.
Data Evaluation and Reporting
Langan will evaluate the findings and discuss them with the Client. We will prepare a letter report
describing the assessment procedures and field and analytical data. The report will compare the
analytical results to Groundwater and Soil Cleanup Target Levels (GCTLs and SCTLs, Chapter 62-
777, FAC). The report will include copies of laboratory reports, tables summarizing the analytical
data, and figures showing the sample locations and analytical data, as appropriate.
LANGAN
Proposal for a Phase//Environmental Site Assessment 25 October 2013
Proposed Collins Park Garage Revised 6 November 2013
340 23rd Street Page 4 of 6
Miami Beach, Florida 33139
Langan Project No.:300089801
FEES
Our estimated fee to complete this scope of work is $12,114, which includes $4,680 in
subcontracted drilling and laboratory costs. The following table summarizes the estimated costs:
Estimated
Activity Fee
Soil and groundwater sampling and utility clearance $3,326
Laboratory analysis (subcontracted) —8 soil and groundwater samples $3,380
Geoprobe drilling(subcontracted) $1,300
Sampling equipment and reimbursable expenses 391
Subtotal $8,397
Data evaluation and reporting $3,717
Total $12,114
We will invoice monthly only for costs incurred, according to the attached Schedule of Fees and
General Terms and Conditions. We will not exceed the budget without the Client's
authorization. Payment terms are 30 days.
SCHEDULE
We will begin the utility clearance upon authorization and complete the field work within two
weeks thereafter. We will complete the report within one week after we receive the laboratory
data. Standard turnaround time for laboratory analysis is two weeks. This schedule assumes
timely access is granted to the Property.
LIMITATIONS
Langan's services will be provided according to generally accepted environmental science,
geosciences, and engineering practices at the time the work is performed. Even the most
comprehensive scope of services may fail to detect environmental liabilities. Therefore, Langan
cannot act as insurer and cannot certify that a property is free of contamination. Langan's
services and recommendations cannot be construed as endorsement of the proposed land use..
No expressed or implied representation or warranty is included or intended in our reports,
except that our services were performed within the limits prescribed by the Client and with
customary thoroughness and competence of our profession. The scope of work is limited to
the locations discussed herein and is not a comprehensive investigation of soil and
groundwater on the property. This scope of work does not include the cost of preparing an
estimate of remedial costs in the event contaminants are discovered.
LANGAN
Proposal for a Phase 11 Environmental Site Assessment 25 October 2093
Proposed Collins Park Garage Revised 6 November 2093
340 23rd Street Page 5 of 6
Miami Beach, Florida 33139
Langan Project No.:300089809
CLOSURE
Thank you for the opportunity to continue to work with you on this project. If this proposal is
acceptable, please sign below as your authorization to proceed and return a copy to us for our
files. If you have questions, please call us at (786) 264-7200.
Sincerely,
Langan Engineering and Environmental Services, Inc.
Q:�u.-
Daniel Spector, P.G.
Senior Project Manager
U' cent D. Yarin , P.G.
Senior Associate/Vice President
DS:vdy
Enclosures: Figure 1 -Proposed Sample Locations
LANGAN
Proposal for a Phase l/Environmental Site Assessment 25 October 2013
Proposed Collins Park Garage Revised 6 November 2013
340 23rd Street Page 6 of 6
Miami Beach, Florida 33139
Langan Project No.:300089801
AUTHORIZATION
Receipt of this Proposal, including the Schedule of Fees and the General Terms and Conditions
in our Citywide Geotechnical and Laboratory Testing Services on an "As Needed Basis"
Agreement Resolution No. 2012-27879, dated 1 August 2013, is hereby acknowledged and all
of the terms and conditions contained therein are accepted.
Gustavo Berenblum
Berenblum Busch Architecture
848 Brickell Ave, Suite 625
Miami, FL 33131
Re: Langan Engineering and Environmental Services, Inc.
25 October 2013 Proposal for a Phase II Environmental Site Assessment
Proposed Collins Park Garage
340 23rd Street
Miami Beach, Florida 33139
Langan Project No. 300089801
Company: (Client)
By/Title:
(Authorized representative)
Signature:
Date:
FL Certificate of Authorization No.6601
\\langan.com\data\MI\data8\300089801\Marketing Data\Proposals\Proposal for a Phase II ESA rev 110613.docx
L A/VGA/V
ue6un Y,oz
't-. ""'Y--ri - t I - Y -$' 1 Tt`F ti`' ..t' .F'' "Y^-^� +v,-� vr^ �-xy.t-�u°r_.��.�Z Yom, A �x
3. y y �, �`7� .`- c ._,-r, r n� a�r `t-'a ,.�- ,pZ i.k� _ y,c. -*t- E
s "'' t Sy u�a ; ate ` A a ^�sY�* � a o
r L.] ;'�?= sY z - '_"' � °'F 1 4 i ,.� s 'v 7r rte^- z�x '��k� 4. ���» �.1 c`^? O rp CD
':.y3;.0 :.r J:7- t`'�-7'g':.0 -s. r :r t 7' "'.'z" g."' �53^'�.�-s sab °k+ £y��r� `r+�;'o. G o
d - .A_ -'fy X .s -�.� `F iT - J- ,y. 1v>d "?r$ �M1 C
LO t� _ >..:. a - - .''',#a- r ^laR.-9." &' ,.xr L x' ri, � ",� a4'h��f ' •y.�f y IL
-. -h .._.M: .; -- � -.!',4 r_ j ,a S. � J� +�,1�1�y.�il��9yp�: 'p
t ,Icd C V;, `v;+�." _•y h„S',Y�bY.. � FKJ Jy,n1Q'_,_,.i• El
,r r °„ A ,n �' '�"` `''tfs ``y '.s.F '4,<'`' _"�''r'^o-�`S'r�C„2" r- Cl) CO p ca
VL 5 Ta S� s � * a � � e�a-L- N -� �N c
1. '� -11 'N y �, - J 'a`�rr-�•r ---•w•�_ -max _2-`mot �`°dkya.ys,.. 00 It c m
Y .o �,-�a�r� r n oe--f &'tea C O _ >'M •°p
I +`, 1�- �. `- ro -.<=. -,� s,.'a" c 'i'�x.`•' 7 _- �,�_i- V�..I- _ .�`••R�e i�i�:c�1:. U a r r m .N r ,11-� ay Y "a �K t$ t r -3' `$,.° is rases a ';,4 `.°" -.v" Q 19 U L_ r9
,.q e - ,u - r,- f F'` � � �'a �. '�''"_ - * •^,,. v.' � Xa.r d O L� Q N f
'Ai r� I'll{haw r_ ,< , J rf y tea. �yF W 9;I '.� 7�ti.#I��y�..c `�^ ¢�y�. 'p(
,.+ _ - OF- „% �., fig`" ' r _., -c'„.`- '
k- �#'" ?. "'',�,�,r �e�-'rS�3":?.�r; y.3'>` F y : ., _,.- '-'C�>^t�c ]r F e-J � �4- �S ® 1,, e0�
�� ,I , 3' aC ry p�� i x'' "�t��z 3, '- ar{' _ Sa..� Y'"� ¢ ��/� �f G�
_a, 4�' . '*"'u f. $ �.,ya h.'. '...Y'• {- �3 g??; ate- by ..' f V J .e.� ® o-Re
_ 1 t ✓`, - '` ' zit`.. c.C' r_'"¢ Yy �_�`�: 2,.y= �.•. ' C]
-D I 11 z-t t s£z * -ru, _ -_.� ' �+'' ' Sy-,,c a a is J•-'i!' m
' JM 3 4 C �4 fc �:°'�XLb'..-Le- _�aQ. yf �'..'a 9
-1 7�71-��
Wa
�0'�;��5';`�""z, —�-",F- "5: X., - i Y- n F . —.:
S� 11 , � � ,- - ,,.."-:z�',1,71 �� , �..h� (C
"> m
paic, „Y^''c. .nE-y -. nw _ -v" Ya'�-C•-b-� h trxTt'" _ <..: -D'f � O In F. yA. ,,,xa', }a ..1,'�,x.� '' i .�aE '.,r 'r�ec'"'-'.y ., ,$
�s� ^�., ^y.✓' r` '4�..Ln Y a-: vv,`��rr 't: � may„ y� rsa0 �; Q C
c�, .ra h- �°-..e�e ;i '� .r ^f' v'"tivt Lr.`'s^ - �,,,.i a�. ''•' Jam,�•O• 0
3 - 4�+'
v+Jo€c. �ry,,. x`.. '�' r` s i3' "''-,y. �^e.: ., „''a�C,- G17�:.. u LL
. ' .'•r-'may '3 r# ,� .X",. -. ` .' -' . 1.A Q ua C'
" 4 rq �,tA
,nom t.,.,, ,�Y'„`�..#r =r .+ y- t - .. .1 . aoc•_ x,- - - i W C�, \d
1.('7 p.. T4 i ^-� f '�' 'Y`'.` '�°--.. t•f4 .;e- ;`� '-<- r'3',Cr^ - ° Q
`�� Kt K Z. �'>i - - g' -.] --- + h -c.�* ,fir x_ `�i '` 7 w � V
11 P-11t-z''� r°•` .,te r -"�'> : E ,`'-$ ., '9 .� _” � ,- ��=t... :^ nA,yr , '.'x ( 1 0
`� -�_ '.R; '� a s r 1 .air-zrr•, p a7^;t 3'', -,x�`-$,:,,x - - -. -T" .^a- .e),. = `/
`sY p r...r ^_ �..,�. .�"'°l s '� N N-. 4 i _ X +t, 'ms`s '' ' ..,,� --c_ U M cG 11,, t < van - �-���5 { } z o Q L.
.:tea x-'��r'' - �''' ' '� gC �*` '�'`- '3„�_�-� �+w. a g
s 4�= ��yf
4.}- ,,S� F?N +S,�' f '.'.__C.ss'S3%ie���.V'.• �." 1: -�" Y .', }L'4y G
rh. a_ �"'_°,r'Jkt 3i s' •T�.�i�� ,-k3-`, r � •tom :�'r - IT 3r,FY• A 'Ft _ n
gg
L �t�i t -ax -.i. s' e -1"jy -'Tic, ..'" e.� =ec �� 4 r+' Fw,n:••= o -g 3 L 2
1�.-, '^•x W '°",x. ``t'fi a_{ Y�J' ..l., °.' - ,,,,- I .L`�r;..--a-�-i- ter^ A r y``+C+ +� (% �_
r.. _ T ,� "``��".^` �v%} '44-,. xvr --^`. g�"er ^�`7 .., �_y`2 1 1 a m> u)C
^nc " " r 1 "+..s:.: s ,r e'z ot,'` -ry Sys fig..,_ .3 m '� _C U C ft-
r �xi �`� °#�-..., ^: ...�,.,� =a�'`,s - ;: .r.�,. ,_sue , -• ' - '?�.. $�.� o N E a m N I. 5 t
c'''�z'Y __ "`~. ti 3'"-n�' '3NC" i�.- ,LCD?' .''-.3, - 'r t.7r P1 +-,� +. =tai n c e-�, c �c
J.r` ;-e. ,n. c_r 3". '-y `C� e .'--a r '•'f s,_ 4 tg a� s° a. 10 3 O jj
}"sue'ti i-�... ! 1 ' 'FG t 'i'�. �.4 �4 s a"ydx-•�; ,7 yy�e.. •`f %'fie y �� "0 S_c u a I.•�+Z N�,. - x.' 2 4.%a- J I"{'� -2 �i'�k� � �GiCj ?J�y m m.^ U.
CV t r z✓ - a � g �t S a� z _ ? o
' -_ -
x�.F -u A.1"-' ;- fir`^` `.".... a 4r ! >fI' .`era' , :' q 1, ''s' G� X� � ^ m� U U Tj
�, --;r` "? r""S-y .}s L yS��¢ � '' .i �e-t'�.' '�? %yam•,�+��t � m er a ,¢JQ
- 10-�k,'Ay* y - •h y_ ,�- - �,r, Wiz, x'{•'' r cT`x. F a
-mot .c•- ir., `� 'c'-'rJy�yU" c� _ .,.y," :''z''ei'y. ' 4"r« :r. r
-.. :'tt ,7.. y fir.... may-,-�X.r W- _ - _ - x - _t ",f ' � ,:k�k� L 11
- 7 •'-'f .-.,,3A, sue,,,,, p�-�,., d- _ -c. +�`_ �E•
''XS•�Sav '.Y�S co
} }
y t�da -� .t S b I "'3-1 �' - ,�„+r r,,,> 4,r '�"L a c.+ "-; ,. tx"'r'Yv' g U
:s^ v'a-. J a y r- v -". `a ; :ti� -� r[,,-yam,- _;'IE.= '"T �!
r-- {�-.TY r�YT. -Gf - di.�' i.- :-' +.+ G "`1+ Y --. "'ate d- r'� �$. `
_ ��1�-5- ,ki8 _-�� 'S K x`":I•''u'Y' "'��'' '-R� �.-4tg,s`r �y�1-.,� (j(
rt #_ �E ..y,. ,y,' .k 'it's-'Y s� -c - " , a"d T j1 ,v
- „rr LE=.-f ,.��.a:.� -:+ z S Y r"'�s�;_---'t-. F ,i`�-rag`-J� t r -: .x `EL c W ui
1.7 '�' ' „^3 s y ^c '` � ,ti F J "fi '" R-.s.� A .7 d..r•. Cl)� Ly
f a is. b w 4 'i 's ;5 0 Z
N�p_- I � o Ul f �`"+af'-b"x 5, 'y w,M Xa �S ar .�w•-L l •, ''`^ ti'i 'iY .; J
y h' :+�kTctr 9-` Yr - .r e-• a'�i.-� -r4 - rl°`'` .a _ L; w.' U
'' - ', ° ,�,,,.'R F Y,r^'r, r- 4 '+--,q �,• .. ,r-E �'^'_,°.` ,�t'4 ,"r",.v Q a
kuy h- -��' '� I a'- 'j'• f; ter` _ fit. r } r -9#. may,,,?c�G r-� s�� Q 0
�a.. s#,y ,sue': -'2° `}�' -is i'_,r m+. .f �. % ..z.� e.4._. ,�. f _ T *U'-' V /1i /r�`
" i-J �'� y, '�" ,'" 5S £ �-h ° r �a f��".v`�"�?-t t��,�,. `'s�.y���. .,x'y- '`c r.%'-1��._ /C� L.L.. L.L
" .."rti7 T ty�{� A�"U'" #s""A',' - '3 z r'� , ,C .A - "n,r--x ,r 1-�`:�.C ^f � `' M i.. W
3 , `ter - �: . x t% w �-
1 - �` •, 'n ��' �'r;S 47£r :,• ° '" •+5 �i.."Y „a .�+?n „�---k µ ,.a r,+ss_ V�31�i.,r.C..`s.
1.
< I m C) o
Collins Park Garage-Phase II ESA-Cost Estimate
Field Prep and Utility Clearance
Spector(Principal) 1 $ 151.00 $ 151.00
Zhang(PM 1) 2 $ 120.00 $ 240.00
Sandoval(Eng or Scientist) 4 $ 90.00 $ 360.00
Mason(CADD) 2 $ 72.00 $ 144.00
Field Activities
Spector(Principal) 1 $ 151.00 $ 151.00
Zhang(PM 1) 4 $ 120.00 $ 480.00
Sandoval(Eng or Scientist) 20 $ 90.00 $ 1,800.00
$ 3,326.00
Subcontractors and Expenses
Drilling(Wombat) $ 1,300.00 $ 1,300.00 1 day geoprobe,0%markup per contract
Lab(PBEL) $ 3,380.00 $ 3,380.00 8 soil&8 GW-TPH($65),PAH($90),VOA($45),4 GW-VOH($45)
Expenses $ 391.00 $ 391.00 Field Equipment
$ 5,071.00 GW setup $ 160.00
Purge setup $ 85.00
Data Evaluation Meters $ 38.00
Spector(Principal) 1 $ 151.00 $ 151.00 Peristaltic pump $ 15.00
Zhang(PM 1) 2 $ 120.00 $ 240.00 Turbidity meter $ 10.00
Sandoval(Eng or Scientist) 8 $ 90.00 $ 720.00 Mileage $ 33.00
Expendables $ 50.00
Report Preparation $ 391.00
Spector(Principal) 2 $ 151.00 $ 302.00
Zhang(PM 1) 4 $ 120.00 $ 480.00
Sandoval(Eng or Scientist) 16 $ 90.00 $ 1,440.00
Mason(CADD) 4 $ 72.00 $ 288.00
Calvo(Admin) 2 $ 48.00 $ 96.00
$ 3,717.00
Total $ 12,114.00
\\langan.com\data\MI\data8\300089801\Marketing Data\Proposals\Phase II ESA Cost Estimate MB Geo Contract Rates 110613
i
Palm Beach Environmental Laboratories, Inc.
1550 Latham Road, Suite 2 Estimate
West Palm Beach, FL 33409
561-689-6701
Date Estimate#
10/24/2013 756
Name/Address
Langan Engineering
Vincent Yarina
15150 NW 79th Court,Suite 200
Miami Lakes,FL 33016'
Project
Miami Beach
Item Description Qty Cost Total
VOA_S VOA's in soil by Method.8260B 8 45.00 360.00
PAH_S PAH is Soil by EPA Method 8270C 8 90.00 720.00
VOA-W 'VOA in Water by Method 8260 8 45.00 360.00
PAH_W PAH in water by EPA Method 8270C 8 90.00 720.00
VOH-W VOH in Water by Method 8260 4 45.00 180.00
FL-PROw FL-PRO(same price for waters&soils) 16 65.00 1,040.00
Thanks for giving us the opportunity to bid this project for you.
Total $3,380.00
y Y
Wombat Environmental LLC
1025 SE Salerno Road
Stuart,FL 34997
Paul Poor.baugh-President
772-215-3395 mobile
772-219-3842 office/fax
Proposal for Miami Beach job site
The scope includes:
Full day geoprobe services
Installation of 8 soil borings
8 grab water samples
The total cost for this scope is$1300.00