2014-28545 Reso RESOLUTION NO. 2014-28545 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING THE ADOPTED MASTER PLAN FOR NORTH SHORE BANDSHELL PARK AND APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1, TO THE PRE-CONSTRUCTION SERVICES AGREEMENT WITH D. STEPHENSON CONSTRUCTION, INC., DATED APRIL 3, 2012, FOR THE CONSTRUCTION OF THE NORTH SHORE BANDSHELL PARK PROJECT, IN THE AMOUNT OF $562,291, PLUS AN OWNER'S PROJECT CONTINGENCY IN THE AMOUNT OF $27,665, FOR A TOTAL OF $ 589,956; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on February 11, 2011, the Mayor and City Commission adopted Resolution No. 2011-27591 adopting the Master Plan for the North Shore Bandshell Park Project; and WHEREAS, upon further review and a cost/benefit analysis of the adopted Master Plan, the Administration has determined to be in the City's best interest to amend it to maintain the existing walkways and associated lighting; and WHEREAS, on July 13, 2011, the Mayor and City Commission adopted Resolution No. 2011-27794, accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ) No. 42-10/11, for a Construction Manager at Risk firm to provide pre-construction Services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the Bandshell Park Project and authorizing the administration to enter into negotiations with the top-ranked firm, D. Stephenson Construction, Inc. (D. Stephenson); and WHEREAS, the City Administration and D. Stephenson have negotiated a GMP in the amount of $562,291, plus an owner's contingency of$27,665, for a total of $589,956 and accordingly, the City Manager requests that the Mayor and City Commission accept and approve the GMP, following which he will proceed to execute the GMP Amendment with D. Stephenson. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve the Guaranteed Maximum Price (GMP) submitted D. Stephenson Construction, Inc., as required pursuant to the Pre-Construction Services Agreement, dated April 3, 2012, for the construction of the North Shore Bandshell Park Project; said GMP in the amount of $562,291, plus an owner's contingency of $27,665; for a total of$589,956; with previously appropriated funding. PASSED AND ADOPTED THIS a �= OF Aer 17 2014. •A ATTEST: _ � Rafa Granado, CI CLE _ r'`% o���V Le ' e, /APPROVED AS TO JLM\MT\DM ;�, •••\`` ��,�9g '� F,� FORM &LANGUAGE ` �• &FOR EXECUTION Y T:\AGENDA\2014\April\Property Managem •pl ( MPJ� dment No 1\Property Management Facility Pirtle GMP Amendment 1 -RESO.doc Citv Altome DilltG­' GMP AMENDMENT No.1 GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO.1 TO THE AGREEMENT FOR PRE- CONSTRUCTION SERVICES BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND D. STEPHENSON CONSTRUCTION INC., FOR CONSTRUCTION MANAGER AT RISK SERVICES PURSUANT TO RESOLUTION NO. 2011-27794 ENTITLED "CONSTRUCTION MANAGEMENT AT RISK PRE- CONSTRUCTION SERVICES FOR THE NORTH SHORE BANDSHELL PARK PROJECT. THIS GMP AMENDMENT NO.1, made and entered into as of this day of ("GMP Amendment No 1") amends that certain Agreement between Owner, the CITY OF MIAMI BEACH, FLORIDA (also, City) and Construction Manager, D. STEPHENSON CONSTRUCTION INC., (hereinafter Construction Manager or CM), made as of the day of , for the following described Project: North Shore Bandshell Park 7251 Collins Avenue Miami Beach, FL, 33141 WHEREAS, the Owner and the CM have agreed to amend the Agreement in the manner set forth herein. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, in the Agreement and the other Contract Documents and for such other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner and the CM do hereby agree as follows: 1. This GMP Amendment No. 1 is executed in connection with, and is deemed to be part of the Agreement and the Contract Documents. Wherever the terms of this GMP Amendment No. 1 and the terms of the Contract Documents are in conflict, the terms of this GMP Amendment No. 1 shall govern and control. The terms used herein, unless otherwise defined in this GMP Amendment No. 1 shall have the meanings ascribed to them in the Contract Documents. 2. The following are hereby incorporated into the Contract Documents and made part thereof: a. The construction documents listed on Attachment I, GMP Amendment No.1, attached hereto, which are made a part of the Contract Documents by this reference (the "Construction Documents"); and b. The specifications listed on Attachment II, GMP Amendment No.1, attached hereto, which specifications are made a part of the Contract Documents by this reference (the "Specifications"); and C. Those documents listed on Attachment III, Additional Contract Documents, refer to the executed pre-construction services agreement, attached hereto, are made a part of the Contract Documents by this reference; and 1 d. Those documents listed on Attachment IV, GMP Amendment No.1, GMP Book inclusive of CM's Proposal, Qualifications and Assumptions attached hereto, are made a part of the Contract Documents by this reference; and e. Those documents listed on Attachment V, GMP Amendment No.1, the CM's Salary and Wage Schedule attached hereto, are made part of the contract Documents by this reference; and f. The Scope of the Work for the North Shore Bandshell Park Project, contemplated in this GMP Amendment No.1, and as described in Attachment I, GMP Amendment No.1, is hereby incorporated into the Work; and g. The Project Schedule will be provided for this Project and is set forth on Attachment VI- GMP Amendment No.1, attached hereto, are made a part hereof by this reference; and h. The CM's Onsite Management and Supervisory Personnel for this Project shall be set forth herein, and incorporated as Attachment VII to this Agreement. i. The date of Commencement for the construction of the North Shore Bandshell Park Project in this GMP Amendment No.1, shall commence upon the issuance of Notice To Proceed (NTP)#2, by the parties hereto (the"Date of Commencement"). j. The CM shall achieve Substantial Completion of the Work for the North Shore Bandshell Park project as contemplated in this GMP Amendment No.1, no later than ninety (90) calendar days from the issuance of NTP # 2, the Date of Commencement (the "Contract Time"), and Final Completion, not later than thirty (30) calendar days from the date of Substantial _Completion. Failure to meet either the Substantial Completion or Final Completion dates shall be a material breach of this Agreement and liquidated damages will be assessed thereinafter. k. Upon failure of the CM to substantially complete the Work contemplated in this GMP Amendment No.1, within the specified period of time, plus any approved time extensions, CM shall pay to the City the sum of $1,000 for each calendar day after the time specified in subsection 20) of this Amendment. I. The Guaranteed Maximum Price (GMP) for the Scope of Work contemplated in this GMP Amendment No.1, for the North Shore Bandshell Park project, is hereby guaranteed by the CM not to exceed the sum of $562,291. (GMP Amendment No.1), based upon the entire Scope of the Work as described in the Contract Documents, as amended herein, and including, but not limited to, the Construction Documents and the Specifications, subject only to additions and deductions by Contract Amendment(s) or Construction Change Directive, as provided in the Contract Documents. The GMP for GMP Amendment No.1 is more particularly itemized in the Schedule of Values prepared in accordance with the terms of the Agreement, which Schedule of Values is attached hereto as Attachment VIII-GMP Amendment No.1, and made a part of the Contract i 2 Documents by this reference. Included in the Schedule of Values and specifically identified herein, the Owners' Contingency as defined in Article 1.19 of the Pre- Construction Services Agreement is in the amount of$27,665. M. Should the CM realize any savings from the negotiated Schedule of Values, incorporated as Attachment VIII, the City shall receive 75% of said savings with no line item integrity. The City reserves the right to audit any and all contract related documents at any time during the Project and at the end of the Project. n. The CM shall provide Commercial General Liability Insurance, Automobile Liability Insurance, Worker's Compensation Insurance, and Builder's Risk Insurance, in compliance with the provisions of Article II, Insurance and Bonds of the General Conditions of the Contract for Construction. o. The CM shall provide the Public Construction Payment Bond and the Public Construction Performance and Guarantee Bond, in compliance with the provisions of Article II, Insurance and Bonds of the General Conditions of the Contract for Construction. P. By executing this GMP Amendment No.1, the CM acknowledges that it has ascertained and verified all existing underground utilities and has coordinated all correct locations for points of connection for all utilities, if any, required for this Project and has identified all clarifications and qualifications for this Project, if any. Utility Locations shall be identified by the CM and all existing utility connections will be capped as needed, as noted in the Qualification and Assumptions Statement. q. To the extent that the Owner has authorized the CM, in writing, to perform the Work contemplated in this GMP Amendment No.1, for this Project with the CM's own forces, the salary and wage schedule for the CM's personnel performing such portion of the Work, agreed upon by the City and the CM, shall be as set forth on Attachment V- GMP Amendment No.1, attached hereto, and is made a part of the Contract Documents by this reference. The CM warrants and represents that the salary and wage schedule includes the comparable market rates (including any and all benefits, contributions and insurance) charged by the CM for comparable contracts to other business and individuals for similar services, and that such rates are not higher than the standard paid for this Project(North Shore Bandshell Park) . r. Except as expressly provided herein above all of the terms, conditions, covenants, agreements and understandings contained in the Pre-Construction Contract Documents (and as may have been amended pursuant to GMP Amendment No.1), shall remain unchanged and in full force and effect, and the same hereby expressly ratified and confirmed by the City and CM. S. This GMP Amendment No.1 may be executed in several counterparts, each of which shall be deemed an original but all of which shall constitute one and the same instrument. 3 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH Rafael Granado, City Clerk Philip Levine, Mayor ATTEST: CONSTRUCTION MANAGER D. Stephenson Construction, Inc. 6241 N. Dixie Highway, Fort Lauderdale, FL, 33334 Florida Contractor License: CGC24733 By: By: Dinah Stephenson, Secretary Dwight Stephenson, President APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION City Attorney , Date 4 North Shore Bandshell Park 7251 Collins Ave Miami Beach, FL, 33141 GMP AMENDMENT NO.1 ATTACHMENT I CONTRACT DOCUMENTS: BID PACKAGE 1: DRAWINGS DATED FEBRUARY 21, 2014 BID PACKAGE 2: DRAWINGS DATED JULY 30, 2013 ATTACHMENT II CONTRACT DOCUMENTS: TECHNICAL SPECIFICATIONS DATED JULY 30, 2013 ATTACHMENT III CONTRACT DOCUMENTS: EXECUTED PRE-CONSTRUCTION SERVICES AGREEMENT DATED APRIL 3, 2012 (INCLUSIVE OF GENERAL CONDITIONS DATED MARCH 2011). ATTACHMENT IV CONTRACT DOCUMENTS: GMP PACKAGE DATED APRIL 11, 2014 ATTACHMENT V CONTRACT DOCUMENTS: CONSTRUCTION MANAGER'S SALARY AND WAGE SCHEDULE ATTACHMENT VI CONTRACT DOCUMENTS: PROJECT SCHEDULE TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) ATTACHMENT VII CONTRACT DOCUMENTS: ONSITE SITE MANAGEMENT AND SUPERVISORY PERSONNEL ATTACHMENT VIII CONTRACT DOCUMENTS: SCHEDULE OF VALUES (TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) 5 COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Amending The Approved Master Plan For North Shore Bandshell Park And Approving And Authorizing The Mayor And City Clerk To Execute A Guaranteed Maximum Price(GMP)Amendment No. 1, To The Pre-Construction Services Agreement With D. Stephenson Construction, Inc., Dated April 3, 2012, For The Construction Of The North Shore Bandshell Park Project, In The Amount Of $562,291, Plus An Owner's Project Contingency In The Amount Of$27,665, For A Total Of$589,956, With Previously Appropriated Fundin . Key Intended Outcome Supported: Build and maintain priority infrastructure with full accountability. Supporting Data (Surveys, Environmental Scan, etc.): The 2012 Community Satisfaction Survey noted 81% of residents rated recent capital projects completed as"excellent" or"good". Issue: Shall the Mayor and City Commission adopt the Resolution? Item Sum mar /Recommendation: On February 11, 2011, the Mayor and City Commission adopted Resolution No. 2011-27591 adopting the Master Plan for the North Shore Bandshell Park Project. On July 13, 2011, the Mayor and City Commission adopted Resolution No. 2011-27794, accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ) No. 42-10/11, for a Construction Manager at Risk firm to provide Pre-construction Services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the Bandshell Park Project; and authorizing the administration to enter into negotiations with the top-ranked firm, D. Stephenson Construction, Inc. (D. Stephenson). The Project scope of work originally included: 1. Reconfiguration of existing walkways(and associated lighting and site furniture) 2. Demolition of existing mosaic tile wall and canopy 3. Installation of an electronic marquee for the Bandshell Facility 4. Installation of the Art in Public Places piece-"Beatles Mandala" 5. Widening of the south sidewalk along 73rd Street to improve connectivity to Ocean Terrace 6. New walkway connecting the park to the beachwalk at 72nd Street with new lighting Upon further review of the proposed master plan, and a cost/benefit analysis, the Administration has determined to be in the City's best interest to amend the Master Plan to maintain the existing walkways and associated lighting, and proceed only with items 2 through 6 above. The Administration is of the opinion that the final GMP is competitive, fair and a reasonable price for the construction of the proposed improvements for Bandshell Park. With the approval of this Resolution it is anticipated that construction will commence in June 2014, and will be substantially completed in September 2014. THE ADMINISTRATION RECOMMENDS APPROVAL OF THIS RESOLUTION. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 $589,956 Fund 390 390-2538-069357 2 3 OBPI Total $589,956 Financial Impact Summary: City Clerk's Office Legislative Tracking: David Martinez, P.E. ext 6972 Sign-Offs: De artm i ctor Assistant City Manager Cit M r DM J, MT JL T:\AGENDA\ it\Property Management Facility - Pirtle GMP Amendment No 1\Property Manage nt acility Pirtle GMP Amendment 1 -SU MARY.docx AGENDA ITEM G7 D /OIAMIBEACH -a3 �� DATE m MIAMI BEACH City of Miami Beath, 1700 Convention Center Drive, Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members the Cit ommission FROM: Jimmy L. Morales, City Manager DATE: April 23, 2014 SUBJECT: A RESOLUTION OF THE MAYO AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AME DING THE APPROVED MASTER PLAN FOR NORTH SHORE BANDSHELL PARK AND APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1, TO THE PRE-CONSTRUCTION SERVICES AGREEMENT WITH D. STEPHENSON CONSTRUCTION, INC., DATED APRIL 3, 2012, FOR THE CONSTRUCTION OF THE NORTH SHORE BANDSHELL PARK PROJECT, IN THE AMOUNT OF $562,291, PLUS AN OWNER'S PROJECT CONTINGENCY IN THE AMOUNT OF $27,665, FOR A TOTAL OF $ 589,956; WITH PREVIOUSLY APPROPRIATED FUNDING. ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure a quality, well constructed capital project. FUNDING Previously appropriated funds for this project will be allocated as follows: $589,956 Fund 390—2004 Miami-Dade County G.O. Bond 390-2538-069357 ANALYSIS On February 11 2011 the Mayor and City Commission adopted Resolution No. 2011-27591 adopting the Master Plan for the North Shore Bandshell Park Project. On July 13, 2011, the Mayor and City Commission adopted Resolution No. 2011-27794, accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ) No. 42-10/11, for a Construction Manager at Risk firm to provide Pre-construction Services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the Bandshell Park Project; and authorizing the administration to enter into negotiations with the top-ranked firm, D. Stephenson Construction, Inc. (D. Stephenson). The Project scope of work as per adopted Master Plan included: 1. Reconfiguration of existing walkways (and associated lighting and site furniture) 2. Demolition of existing mosaic the wall and canopy 3. Installation of an electronic marquee for the Bandshell Facility 4. Installation of the Art in Public Places piece - "Beatles Mandala" 5. Widening of the south sidewalk along 73rd Street to improve connectivity to Ocean Terrace 6. New walkway connecting the park to the beachwalk at 72nd Street with new lighting Commission Memorandum—Bandshell Park—Master Plan Amendment and D. Stephenson GMP April 23, 2014 Page 2 of 2 The Master Plan also included the construction of an elevated platform along the west side of the park, a new promenade leading up to it from 73rd Street, and a service driveway, which were all completed by Unidad of Miami Beach, Inc., under a Professional Services Agreement (Resolution No. 2011-27573). Upon further review of the Master Plan (Attachment A), and a cost/benefit analysis, the Administration has determined to be in the City's best interest to amend the Master Plan to maintain the existing walkways and associated lighting, and proceed only with items 2 through 6 above. A sketch of the proposed scope of work is included as Attachment B. On March 31, 2014, D. Stephenson submitted the first draft of the GMP proposal for review by the City and Borrelli and Partners (the Consultant), in the amount of $622,034 (excluding owner's contingency). Following negotiation meetings, discussions, and evaluation of value-engineering options, the final negotiated GMP is $562,291, plus an owner's contingency of $27,665 for a total of $589,956. It is important to note that D. Stephenson obtained competitive bids from sub-contractors in order to reach the best possible GMP. The Schedule of Values per discipline is included as Attachment C. The final negotiated GMP is in line with the $580,644 construction estimate from Carlsson Inc., dated April 11, 2014 (Attachment D). The Administration is of the opinion that the final GMP is competitive, fair and a reasonable price for the construction of the Bandshell Park Project. Upon City Commission's approval of the GMP, and as contemplated in any GMP Amendment, D. Stephenson will deliver all of the Construction Services required to complete the Work in strict accordance with the Contract Documents, and deliver the Project to the City at or below the GMP and within the Contract time of three (3) months through Substantial Completion. The anticipated Project Schedule for the construction of the Bandshell Park is as follows: Commission GMP Awarded: April 23, 2014 Notice to Proceed Number One: May 2014 Notice to Proceed Number Two: June 2014 Substantial Completion: September 2014 CONCLUSION The Administration recommends approval of the attached Resolution, amending the approved Master Plan for Bandshell Park and further authorizing the Mayor and City Clerk to execute a Guaranteed Maximum Price (GMP) Amendment No.1 to the Pre-Construction Services Agreement with D. Stephenson Construction, Inc., for the Bandshell Park Project, in the amount of $562,291, plus an owner's contingency in the amount of $27,665, for a total of $589,956; with previously appropriated funding. JLM\MT\DM Attachments: A. Approved Master Plan B. Sketch of Proposed Scope of Work C. Schedule of Values D. Carlsson Inc. Cost Estimate E. GMP Amendment No. 1 T:\AGENDA\2014\April\Bandshell Park - DStephenson GMP Amendment No 1\13andshell Park - DStephenson GMP.docx Attachment A l� 1y •, .. ' s M a Y R� D t3 s , .mwa•rn a ISO, 01 om ,1A 107,11 s — 2 Ir it I IIII SS w-V ROM, ,40 ONol- 1, slows ML -mwpm"Ng� toam! ".MLI jr ARIAL A& 'JONI AM p4h a m ■EM■ mum 142 PL WA 1.9�0--lwj M-I i 101��j STRUCTURE AND RESTORATION FO THE AREA INCLUDING EXTENDING WALKWAY •COLLINS AVE a� SIDEWALK WIDENING OF 73RD STREET SIDEWALK Attachment C D. STEPHENSON C o n s t r u c t i o n . I n c. Date: 04/11/2014 Job Name:Miami Beach-North Shore Bandshell Brief Description:Reduced Scope Phase 1 &2 CSI CODE DESCRIPTION BID AMOUNT SUB/VENDOR GENERAL CONDITIONS $ 63,922 DSC 02-0000-S SITEWORK 02-1000-S Site Work Package $ 127,508 Stanford 02-1100-S Demolition-Site Demo with Site work above $ 13,483 Jampro 02-4150-S Utilities Locates $ 4,500 Allowance 02-7100-S Sand Fence at 72nd Walk&Temp Fence $ 17,800 DSC 02-7300-S Pavers $ 9,081 CSE 02-8000-S Landscape/Irrigation Rework/Tree Relocate/Remove $ 37,754 Dixie 02-9000-S Tree Wells/Fertilizing system $ 19,248 America's Best Service 02-9100-S Site and Sidewalk Restoration $ 8,575 Allowance DIVISION 02 TOTAL $ 237,949 03-0000-S CONCRETE 03-3000-S Site Concrete $ 76,870 Homestead Paving 03-4000-S Marquee Wall Concrete $ 13,386 Consolidated DIVISION 03 TOTAL $ 90,256 04-0000-S MASONRY 04-4000-S Coral Wall $ 15,500 Allowance DIVISION 04 TOTAL $ 15,500 07-0000-S THERMAL&MOISTURE PROTECTION 07-8100-S Composite Panels $ 19,500 5TCO 07-9100-S Caulking $ 500 Metro DIVISION 07 TOTAL $ 20,000 10-0000-S SPECIALTIES 10-4010-S Marquee Signage $ 55,125 BR Signs DIVISION 10 TOTAL $ 55,125 16-0000-S ELECTRICAL 16-5400-S Site LiQhting and Electrical $ 24,143 CEI DIVISION 16 TOTAL 24,143 SUBTOTAL $ 506,894 01-9990-0 DSC CONTINGENCY $ - 0.00% INSURANCE&BONDS 19-3000-0 Builder's Risk Insu and Deductibles(EXCLUDED) $ - 0.00% 19-4000-0 General Liability&Umbrella $ 3,039 0.55% 19-5000-0 Payment/Performance Bond $ 7,161 1.31% PERMIT&FEE 19-1000-0 Permit Fees(EXCLUDED) $ - 0.00% 19-2000-0 Builder's Fee $ 36,197 7.00% TOTAL BASE ESTIMATE $ 553,291 19-1000-0 Subcontractor Permit Fees Allowance $ 9,000 TOTAL w/Sub Permit Fees $ 562,291 01-9990-0 Owner Contingency $ 27,665 5.00% TOTAL w/Contingency $ 589,956 DEDUCT Alternate-Provide 5'Sidewalk addition to existing Sidewalk 73rd St. $ 11,762 Attachment D cn *' v L N � M oo 'I- � O OD M O N N U) M + IL j CD 'IT cc O (U M ti p O O O E O � U CL E O U U) � Z W a_ LLU W W O �_ U � a_ F-- Q W E m m ~ (� O O O Ln N d7 O CV N � OO � O �! �p O w O O M M 01) U-1) I` N In � M In 1* a W (n Un M O I` --zj- M U-) UD r` O N CD CO to Q W OO LO O r` N O ti U) N O O N ti O O ¢ O O7 LO N I` CO N MM CO LO O U') N Co 2 < ° Q O J z Q CO F— F U) z z w C/) iE z LU W O [if > o w � CO O LO -j � D U W o z Q Z N J � _O Z Q 0 l_J ~ +�+ LO of - U W O Z � Z W0:� P J ~ .� w CD M W X O Z Q X F-- O C 7 W 3 W W = U Z ~ . o w O IL o J Z W z � -0 a) Lij Z Z N CO ti N M (7 Co U OU Cu 0 0 O O O O M M M U a J qt � vaov O co c 00 C') O .L.. N N N M C0 LO O � O c) U-) N O O c 0 � CM r- O a N + LL- CD 00 O O r- 00 O Nr M M M d CO N Lo M O N r� NT 00 N r` 0') M_ N CO CO T ti O N LCD ti C.O O ti O U-) tc co c0 N N Co CM7 LO M <V4 N m � 0 L _0 E 0 � U 69 69 69 69 69 EJ4 Ef? Et? C!} 64 d9 69 [f3 b4 a E 0 U U) Z W W 2i w O W U > U F- O U J — V Z n Q W~ tv v +a 0 W _ O F— W O •+ S2 0 Z W X O = Q X F- Cn ) o CO FO w m U W F- W W Z cn O \ L LI W H F— w u J > J Q L Z 2 2 w m cc cc O Z U cn N E J o (w� LiJ W QQ Z W Z N m Q H Z d w � 0) p LLI CO M W m U U V O O O O M M M 20 Q --cl a = Q Om ooOOOO o r- 1`- M r O O O O LO O C`M Ict N 00 LO 00 M O CO Lo co t7 r-- O O M N CC M Co O J t` 00 -q ti N O Lr CO N 0 r- C.O V' Z Q M N O N M r r W 64 69 64 64 69 d4 69 6A tit 69 ul ts9 Ef} t 9 C/) C() ~ F — Z F w W W � Z W w O W l i � F � O LO F- ..t p u7 LU cry U Z V Z < W co O r w M 0 U CN i a W W' F- W J Z Z �" 0 — W of F- — V w X 2 Q X F- O 3 � c Z M ! m U W F- W W NUr N a°\p W N J �} U- co Co W z Z W F- LO 0 W W Z m x 0 rn V N Z V) O CN CM (D m U A 0 O O O M M M m M O O O O O O O O O O O O O O O O = !" O O O O O O O O LO LO O O O O O O pb O C> Lc) LO O O cD N I- E N O t0 to Ln O d r M N fl C 7 N N N N M N + ti O m i O w a tv O. E a us 6A, 6C3. 69). 61)- 4olk 40D. 609. 6ok eo:�- eo� 60:� 4s er). CA, 401� C) °o °o o o o O O O O Un L r� vi N 7 E N_ i c O O cr r E ea O � N w d t 69 69 69 a O O O O O O O R O O O r. 0 0 uj 0 0 w. O r.. 1 ' O N O O O O O L O N O r U) M N OC Z Q w aLU w w J > Q LU 2 2 a w W Z w `') o N m m ~ 0 Q d � w N N a OZ C3 0 2 Q o m N r o Q = a J J J J W J U) U) C/) J a YS O Z O o 0 N C O N C O •C G) to C - H a rn U w r 3 U) t y d o Z �' cn axi w E Q O N Q a> N n c x E > N CD E co C14 -J CO N V Y �O C (n w �n Q m o d y 40 Y m c (n m N a p p ti� O C a LL LU LU (D E O O O O p E Z E E E E N y O O CD U H cn O O O O La Cw � M O O O co co MI) O O O U') Ul) c r' CD LO to O ti co O O U') I` N t10 to N N CD CO IT tC) Cn CV) d r Lf) L['>t W f-. P` t ti d L L MO W V O Ate. tt1 CL to L a vb 441� tol� 40). (A. ess 64* 69. is 0 0 0 0 0 0 Uci c\i Sri — c E c =a to N O ots _ >'a 0 v, m o Lb U ea. 6 (� 601.1 W 6F> 69, W o V) L o o o U-� o ti o .., LO o ., CD H H N H N Y � � Z Q W LU W W Wo a aam " C W Z W o co FW- W N N d a O Z Q D N o F=- 3 c U U U OG YY5 � O Z 0 0 0 0 0 C) LO M 0 0 LO Ch M O c O U w c _ d E N O CO M cc co I > Y c = v COti � N C ap _ _N O U O p O ea cu M _ H d C� Ur v Cl. O N Y Z m O c 0 O C7 �j W W � W_ C), N � � N_ Q N Q. � � C _ M M U M a U- M E M H Cn M F3 LO Lf) r- c!' 1- m M O LCD LO O O O O pp aY I- CD to O r LO N 1` O O LC> MI) fL r 1� O Qf C7 M + Nt ry r O M0 W V m V R CL d V a 401� 69 69 69 4a 69 u% 69 69 Aa 69 is 64 40D- C) O O O o 0 O LO N O N O O O Ci N LC) C i O U) O O O O N U) 01 C_ � N t C to V cc d LCD C 7 L +� LL C cc cc _m d 69 69 69 69 Cq 69 69 m 69 .t 69 m O O O LC) R O O R O O li O LC) LO -I.- O O }. O w. O t. O F-- H O L H O O H N Y � GC Z Q W a LU w w w O Q W Z W UQ `O o m Q w Z Y °' N co CD U aW 0 W d 69 69 69 69 69 69 69 69 d O Z 0 m = a WE - Q = a CDP m J Cn J J J J W O -j Z O O m O Ln CD° L N U') c� N ,a O cu CD C L O 2 cn y `~ 3 co 3 H E cv 0 W `O c cL L L O y W >+ (n x O O N CA N O N $ N cD CL Y_ O O f0 Ch co CO U) m N — m O C) LL M C14 M 0 CU'G Cn c v -° -Y cv c ti a m 3 t` LL Cll O O N O R C O N U L O C O I LL- v CZ 0 � - N L m O co co u EL V a °' c r5 c e+� °° °" a� N N O X O N O N O O N O N Y M M U W U Ch N M a U eh Cn m M m M C T- �� O � a ono N N N + m in m O L C O w .0 m R Q. m a 40- 69. 4000. O O 0 O N N 6 C'tS R V V _d bc} W O O O O � LO N Y � Z a w LLI -J w I--J 9 Q w U) IL f- w m Q H Z U (D Lo � w N v� a a OZ LU z a o O Z C.� i mirr�w N LO ti CD M . ` v N J co V C Cn X G m W a m rno^ O = W N V a LL1 M M J La 00 N M ca co CL IT O O O O O O le O O O O � O O O O O V* + � O O O O O O 00 U') o U") 0 0 00 O O O O 00 = � Lr) O O O U. L!') M O O CO 00 CO LO CO r O M N -T-r Ln M O M rz O CM L() N 1- co O N N m O w 78 16 a) C. E O U vb- 609- E09- 6r-. 69- ub. 60:jl 603- V9- eq. 6F). to�69� 69. V9� 69- vb. 0 0 0 CD o 0 0 0 0 C:) C:) N L O �I) � � C d E i c o c w o E d o aci °r O O R O O O O O O O 0 0 0 O O F. 0 0 0 0 0 0 0 0 LO O w. O 1 O O o O o 0 co 0 0 O o O O LL7 LO LO N O LC) O H O Lf) CO O) M O N CV) ri o i Y H Z Q W CL LLU W W N co co W Z W ^ o W a) N m H (Z m QU) W N d Q 60:11 e09- 6 � � �� � � �a W a SO Q cl m 0 Q J J J J W W W J N U) W W U J O 2 r LM 000 � � M C M CM C_ C - V) z cQ (D 0 co 0 N W � 3 N _ O z E cn CD h c c x ai CO 0 C- a) -v o o L a) cu a) 2 cu O' O d LU E Z Q a , U :p Y (D N CU r� O O co ., O" U')vJ J rn V E o C6 CD �n 3 c cc co N a) v Z x C cu in c Lm o .- ci o -J 0000 L W c w a) co CO 0 a co co cn N rn N = LO o rn Z 0 " c � N > > > > > > > > > c x ° cv LL! O (D c Q. a) O O O O O O O O O O o 0 3 m c co E Z E E E E E E E E E m v,'?le r r N a) N N a) a) a) a) a) () () a) a) z O c ti La co cc a — + r- k: . O O o O O o LO O O O o LO CD Le) _ Co O O O r` O O O O N O N — O O O N N N r• O o0 � M O � t• gS _ L IVZ N N N co O M M N N O L m L W Q C C O U fs> fio�. v%. fss 69- 40)- 4CA 6013- 64- 601)- vW 6F) 60)- 401% O O O O ui o ' M O O � L N_ d O m CL �a rn Q € c E t a' La « U H U 6a. 0 O o 0 0 0 li V) ea O O U.) O O .. O r- `r' H CD °o °n H ca � N r- N N Y ~ Z W d LLU W 2 LU w m N a.Z U) O W W ao c m m z V m LU CD Q W W d a s M p p 50 Q p m 2 Q C N CL/L) W U U r O J OD Z O O O O �t O LO d N N O E N � N � N O Q L uj Q� V 2 N aa) ~ c"n O CD cc N � Y U ' ad 0 a Q Y c a`ni c cr co-BCD Mao LL- co N LU a2 9 O O U L Vm X Q 3 N EQ E E° N m to w O ti %- CD a) o p O O U O O M mi Cni U a 0 mot° 00 a� m M f0 00 + O O O O O O N O U) O O U7 O O O O U7 U) LO U') O O co U7 ti O U) 1` O C) 'a = V- (N N 1- � M U7 lw ti Lo N Ul) M C CV CM V-: � N N c � ti O m O 79 N Q O U 60} is Cory 69 69 fss 4a 69 64? 69 69 vw 69 69 V3- ors O O O O O O O O O O O O O O O O U7 N U7 O O O CV O O N O N M O O N O O N N N M N r C LL � E eca m vn 0 06 > c 0 H Lb •y 61.1 W 69 649� EIal W 69 69 69 69 69 69 69 V O R O O O O O O O O O O O yr U) O O O O U-) O O O r O 0 Lo O 0 0 0 m m O 0 0 O O O r � N Y ~ Z Q W CL LLU LLI LLI_ N _ N le W Z LLI CD m Q Z m V m c!) a LO Q � p W d 69 cis 69 69 �s «s c1s � 69 64 « O Z a o m QC) �- LL Cr) C/) >- LL LL. LL U- LL LL C) U J J J CO CO J Cn J J J O Z LO O C� O O LO 'Or it CO LO N ti O LO r ti L m CV C _ O L U H v E _ W — °o ca L a) > L � E w cu a O N �, _ _ a se_ LO cc co M VJ fOC 0 V 0 O d -0 -0 y J _ _ fl V CL •y C/) L � u C N C N LL co O Y W O a) U �C o1S cm 7 u) 0 c� U tq V LL 0 0 0 c� M O U7 N L C� M L O CC U tC CU N O H m 3 N C2 N C2 T— C2 > a- C r [1 C1 z 0 r r >+ N N U) m X O N CU T >+ tm M M F- LL CO M M Q d W U M > F- F- U CL J I I 00 M M c4 00 Ch + O co O O O O O M O O O O O � O I` O O O O "zi- CD It U') O c0 LO 00 M O = M M LO mt N N N O Cl) O O_ N O LC7 L6 r O m L O © O C.� N Q O U b9 63 ep� esk 6p3 69 ER 6031- 64 to « bp3 <G s 69 6H 0 0 0 0 0 0 0 O O O O O M O O O O O N O O O O N 6 6 O LC) M O LC) O Cl) N N O U-) LC) O N N N r- LO rL M � N L a] N m O LL 6o, by 6- 69 69 69 6-k a bp� N v). 6-, m leo� .rn 0 0 0 0 0 0 0 Lo 0 0 O O O O O O o tr O O ., O .. O N Lo Lo O LC) O 0 O 6 6 O 6 O N Y ~ � Z Q W a w W LLI N _ M: w J v cC/) a F- N O W Q m a)w a U o Co -cn — Q Q w W d � 619, � &9- � � � p O Z p p = Q G W w W W W J J J J J J O Z v M M O O OIZI- N O CO LO N r _T I U) (L) C ._. Y R C13 Cf) L) a N LO V) N _� Cd — O CO M 1/J E � U a) Ca w C N J 00 U) m _J2 3: O � U O � � E a U N Q Q C o U) N 0 3 M V _o C LI z U °'N C) ° m o 0 a) N c N o N p c� °M n M Q 0- vr� La co N M = M cc ob CL+ IT O 0o OO LO Ln Q) U') 14- O O m _ p V U') O) N N O) m CD O O m N N N OO m lf) V) V) co N t~O r t[) 07 N O m L O W w CL C O U E09� fss 6pt 4011� fss 6ok e9- 619� 40b. 0 0 0 0 0 0 0 0 0 0 0 0 0 Cf) ui o m o v N tD N O N N M LC) ti ti LO fA d H L Im U ( t N N _ u 7 V r+ U- A rte+ d 6eeq- d 6-, N cfl 64). 6q v), w Un o o O o 0 0 to U-) O w. o 0 0 0 �. ° 0 CD ti 0 o 00 o Cl (n O N Y ~ a, Z W IL w W > w w m N N W z G LV W Y m V LO Q LV 0 W d e09- 6A. � � � � a v 50 Q Q 0 m = Q O (n J Cl) W W J J O J Z ' O U") M O co m r- O ,> U-) � m x J m CD CU c H cr 3 U E N C `) J U c N CN O U) C V cn C O V N kvoo CO M Q 7 � V � R C U W � U W V E U �.. U O co°O L !C E °) d N � V C LO M a m �_ w J w o' ;5 oeti = x ° cm N w o m 0 E 4) rn eC i H ¢ eN 0 chi c a ins U ccc a � ° v