2014-28565 Reso RESOLUTION NO. 2014-28565 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FOURTH AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR 2013/14. WHEREAS, the Miami Beach Capital Budget for FY 2013/14 was approved and appropriated via Resolution No. 2013-28354 on September 30, 2013; and WHEREAS, the First Amendment to the Miami Beach Capital Budget for FY 2013/14 was approved and appropriated via Resolution No. 2013-28442 on December 11, 2013; and WHEREAS, the Second Amendment to the Miami Beach Capital Budget for FY 2013/14 was approved and appropriated via Resolution No. 2014-28470 on February 12, 2014; and WHEREAS, the Third Amendment to the Capital Budget for FY 2013/14 was approved on March 5, 2014, with the adoption of Resolution No. 2014-28524; and WHEREAS, it is recommended the FY 2013/14 Capital Budget be amended to add appropriations totaling $1,695,000 and re-appropriate $1,224,000 between existing projects as outlined in "Attachment C—Project"; and WHEREAS, the proposed Fourth Amendment to the FY 2013/14 Capital Budget is included in "Attachment A—Source of Funds" and "Attachment B— Program". NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, that the Mayor and City Commission hereby adopt the Fourth Amendment to the Capital Budget for Fiscal Year 2013/14 as shown in Attachment A (Source of Funds), Attachment B (Programs) and Attachment C (Projects). PASSED AND ADOPTED this 23rd day of April, 2014. IV XI hilip vi yor Attest: ' ., Rafa Granado, City Cler ' .. .` `J City Attorney Date ATTACHMENT A FY 2013/14 CAPITAL BUDGET SOURCE OF FUNDS Amended 04/23/14 Funding Source Amended 3/5/14 Amended 4/23/14 Revised 1997 Parking Sys.Rev.Bonds $ 217,000 $ 217,000 2003 GO Bonds-Neighborhood Improvement 148,000 148,000 2003 GO Bonds-Parks&Beaches 553,000 553,000 2010 Parking Bonds Reso.2010-27491 160,000 160,000 7th Street Garage 1,900,000 1,900,000 Capital Projects Not Financed by Bonds 89,000 89,000 City Center RDA Capital Fund 15,073,000 15,073,000 Capital Reserve 691,355 691,355 Communications Fund 40,000 40,000 Convention Center 3,701,000 3,701,000 Equipment Loan/Lease 4,644,000 4,644,000 Fleet Management Fund 160,000 160,000 Gulf Breeze 2006 (83,759) (83,759) Half Cent Transit Surtax-County 1,569,000 1,569,000 Info&Communications Technology Fund 486,000 486,000 Local Option Gas Tax 544,000 544,000 Lowes Royal Palm Proceeds 14,000,000 14,000,000 MB Quality of Life Resort Tax Fund-1% 1,024,000 300,000 1,324,000 MDC CDT Intedocal-CDT/Resort Tax Eligib 4,000,000 4,000,000 Miami-Dade County Bond 2,933,581 2,933,581 NB Quality of Life Resort Tax Fund-1% 678,000 925,000 1,603,000 Parking Operations Fund 1,109,000 1,109,000 Pay-As-You-Go 1,726,000 170,000 1,896,000 RDA-Anchor Garage Fund 485,000 485,000 Renewal&Replacement Fund 2,746,000 2,746,000 SB Quality of Life Resort Tax Fund-1% 980,000 980,000 South Pointe Capital 8,033,000 300,000 8,333,000 South Pointe RDA 1,636,000 1,636,000 Storm Water Bnd Fund 431 RESO#2011-27782 529,000 529,000 Stormwater Bonds 2000S (256,000) (256,000) Stormwater LOC Reso.No 2009-27076 9,507,419 9,507,419 W&S GBL Series 2010 CMB Reso 2009-27243 81,759 81,759 HUD Section 108 Loans 17,391 17,391 Water and Sewer Bonds 2000s 34,000 34,000 People's Transportation Fund 13,000 13,000 Total Appropration as of 3/5/14 $ 79,168,746 1 $ 1,695,0001 $ 80,863,746 NOTE:The improvements to the South Pointe Park will be funded by funds previously appropriated for the South Pointe Park Playground Fence. The increase to the Alton Road Utilities project from 5th Street to Michigan will be funded by funds previously appropriated for the Collins Avenue Utility from 5th to 15th Street project. The Bass Museum HVAC Rehab will be funded by funds previously appropriated for the Collins Park Garage project. The Lifeguard Stands Replacement project will be funded in part by funds previously appropriated for the Restorative Tree Wells-Washington Avenue project. ATTACHMENT B FY 2013/14 CAPITAL BUDGET PROGRAMS Amended 04/23/14 Program Area Amended 3/5/14 Amended 4/23/14 Revised Art in Public Places $381,000 $381,000 Bridges 185,000 185,000 Convention Center 17,700,000 17,700,000 Environmental 2,275,000 2,275,000 Equipment 8,626,000 8,626,000 General Public Buildings 3,750,000 170,000 3,920,000 Golf Courses 967,000 967,000 Information Technology 493,000 493,000 Monuments 189,000 300,000 489,000 Parking 204,000 204,000 Parking Garages 12,525,000 12,525,000 Parking Lots 459,000 459,000 Parks 4,450,000 1,225,000 5,675,000 Renewal&Replacement 6,003,000 6,003,000 Seawalls 121,000 121,000 Streets/Sidewalk Imps 5,295,746 5,295,746 Transit/Transportation 3,432,000 3,432,000 Utilities 12,113,000 12,113,000 Total Appropration as of 3/5/14 $ 79,168,746 1 $ 1,695,000 $ 80,863,746 NOTE: The improvements to the South Pointe Park will be funded by funds previously appropriated for the South Pointe Park Playground Fence. The increase to the Alton Road Utilities project from 5th Street to Michigan will be funded by funds previously appropriated for the Collins Avenue Utility from 5th to 15th Street project. The Bass Museum HVAC Rehab will be funded by funds previously appropriated for the Collins Park Garage project. The Lifeguard Stands Replacement project will be funded in part by funds previously appropriated for the Restorative Tree Wells-Washington Avenue project. ATTACHMENT C CAPITAL BUDGET PROJECT Amended 04/23/14 Capital Project Name Current Capital Amended Revised Capital Budget 04/23/14 Budget 71st Street Fountain Renovation $0 300,000 $300,000 North Beach Open Space Park Security Improvements 0 225,000 225,000 Temporary Tent for the North Shore Bandshell 0 100,000 100,000 South Pointe Park Improvements - 184,000 184,000 South Pointe Park-Playground Fence 184,000 (184,000) - Bass Museum HVAC Rehab 0 200,000 200,000 Collins Park ( 271, 721 25 Garage 200,000) 25,521,271 City Hall Space Plan Implementation 0 170,000 170,000 Alton Road Utilities from 5th to Michigan 3,955,407 240,000 4,195,407 Collins Avenue Utility 5th to 15th Street 982,986 (240,000) 742,986 Lifeguard.Stands Replacement 0 1,500,000 1,500,000 Restorative Tree Well-Washington Ave 683,911 (600,000) 83,911 Totall 31,527,575 1 1,695,000 1 33,222,575 COMMISSION ITEM SUMMARY Condensed Title: A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, Adopting the Fourth Amendment to the Capital Budget for Fiscal Year 2013/14. Key Intended Outcome Supported: Ensure Value and Timely Delivery of Quality Capital Projects, Improve Storm Drainage Citywide, and Maintain City's Infrastructure Supporting Data (Surveys, Environmental Scan, etc. : N/A Item Summa /Recommendation: Planning for capital improvements is an ongoing process; as needs change within the City, capital programs and priorities must be adjusted. The Capital Improvement Plan ("CIP") serves as the primary planning tool for systematically identifying, prioritizing and assigning funds to critical City capital development, improvements and associated needs. The City's capital improvement plan process begins in the spring when all departments are asked to prepare capital improvement updates and requests on the department's ongoing and proposed capital projects. Individual departments prepare submittals identifying potential funding sources and requesting commitment of funds for their respective projects. The CIP is updated annually and submitted to the City Commission for adoption. The 2013/14—2017/18 Capital Improvement Plan and FY 2013/14 Capital Budget were adopted on September 30, 2013, by resolution 2013- 28354. The First Amendment to the FY 2013/14 Capital Budget was approved on December 11, 2013, by / resolution 2013-28442. The Second Amendment to the FY 2013/14 Capital Budget was approved on January 15, 2014 by resolution 2014-28470. The Third Amendment to the FY 2013/14 Capital Budget was approved on March 5,2014,by resolution 2014-28524. Section 166.241(4)(c.), Florida Statutes, requires that a municipality's budget amendment must be adopted in the same manner as the original budget. Administration recommends adopting the resolution for the fourth Amendment to the FY 2013/14 Capital Budget. The fourth amendment to the FY 2013/14 Capital Budget totals an increase of$1,695,000 and a re-appropriation of$1,524,000 in order to provide additional funding to the following nine capital projects. 1. 71"Street Fountain Renovation 2. North Beach Open Space Park Security Improvements 3. Temporary Tent for the North Shore Bandshell 4. Miami Beach Teen Center at the Log Cabin Park 5. South Pointe Park Improvements 6. Bass Museum HVAC Rehab 7. City Hall Space Plan Implementation 8. Alton Road Utilities from 5th to Michigan 9. Lifeguard Stands Replacement Advisory Board Recommendation: Financial Information: Source of Amount Account Funds: 1 $170,000 302-Pay-As-You-Go Fund 2 $300,000 306-Mid Beach Quality of Life Fund 3 $925,000 307-North Beach Quality of Life Fund 4 $300,000 389-South Pointe Capital Fund O PI Total $1,695,000 Financial Impact Summary: City Clerk's Office legislative Tracking: Sign-Offs: Department Director Assistant City Manager City Manager NNDA ITEM RIB MIAMIBEACH DATE ;�r IT MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov I COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members f the City C mmission FROM: Jimmy L. Morales, City Manager DATE: April 23, 2014 SUBJECT: A RESOLUTION OF THE MAYOR ND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FOURTH AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR 2013/14. ADMINISTRATION RECOMMENDATION Adopt the Resolution for the Fourth Amendment to the Fiscal Year(FY) 2013/14 Capital Budget. BACKGROUND Planning for capital improvements is an ongoing process; as needs change within the City, capital programs and priorities must be adjusted. The Capital Improvement Plan ("CIP") serves as the primary planning tool for systematically identifying, prioritizing and assigning funds to critical City capital development, improvements and associated needs. The City's capital improvement plan process begins in the spring when all departments are asked to prepare capital improvement updates and requests on the department's ongoing and proposed capital projects. Individual departments prepare submittals identifying potential funding sources and requesting commitment of funds for their respective projects. The CIP is updated annually and submitted to the City Commission for adoption. The 2013/14— 2017/18 Capital Improvement Plan and FY 2013/14 Capital Budget were adopted on September 30, 2013, by resolution 2013-28354. The First Amendment to the FY 2013/14 Capital Budget was approved on December 11, 2013, by resolution 2013-28442. The Second Amendment to the FY 2013/14 Capital Budget was approved on January 15, 2014 by resolution 2014-28470. The Third Amendment to the FY 2013/14 Capital Budget was approved on March 5, 2014, by resolution 2014-28524. Section 166.241(4)(c.), Florida Statutes, requires that a municipality's budget amendment must be adopted in the same manner as the original budget. Administration recommends adopting the resolution for the Fourth Amendment to the FY 2013/14 Capital Budget. Resolution Adopting the Fourth Amendment to the Capital Budget for FY 2013/14 April 23, 2014 Page 2 of 5 FOURTH AMENDMENT TO.THE FY 2013/14 CAPITAL BUDGET The fourth amendment to the FY 2013/14 Capital Budget totals an increase of $1,695,000 and re-appropriation of$1,524,000 in order to provide funding to the following nine capital projects. 1. 71st Street Fountain Renovation - This new project is a result of the North Beach revitalization initiative. The project would include refurbishment of the fountain, including plumbing and electrical infrastructure as well as painting and sealing of the concrete structure. The estimated cost of the project is under development. Funding for the project is anticipated to come from 307- North Beach Quality of Life funds. Prior Years'Appropriations $0 Aril 23, 2014 Budget Amendment $300,000 Proposed Total Appropriations $300,000 2. North Beach Open Space Park Security Improvements — This new project is a result of the North Beach revitalization initiative and will include the installation of security cameras throughout the park. The aim of the project is to improve the overall safety in the park based on Community Policing through Environmental Design (CEPTD) principles, with an aim to reduce criminal activities within the park. Project funding will come from 307 - North Beach Quality of Life funds. Prior Years' Appropriations $0 April 23, 2014 Budget Amendment $225,000 Proposed Total Appropriations $225,000 3. Temporary Tent for the North Shore Bandshell -This new project is a result of the North Beach revitalization initiative. The North Shore Bandshell is a City staple that is used to hold both public and private events such as movies in the park, concerts and performances throughout the year. Being an open air facility, events held at the site are subject to inclement weather which adversely affects the success of these events. This amendment would allow for funding for the City to purchase a tent to be utilized to cover the spectator area during events. Project funding will come from 307- North Beach Quality of Life funds. Prior Years'Appropriations $0 Aril 23, 2014 Budget Amendment $100,000 Proposed Total Appropriations $100,000 Resolution Adopting the Fourth Amendment to the Capital Budget for FY 2013/14 April 23, 2014 Page 3of5 4. Miami Beach Teen Center at the Log Cabin Park - This project is located off 81 street and Collins Avenue, and would provide for site improvements such as providing ADA access and restrooms and installing a basketball court for approximately 100 teens that would attend the center. Funding for the project is proposed to be re-appropriated from the City of Miami Beach Skate Park project. The Skate Park project is not expected to commence before October 1, 2014. To date, a location has not been designated nor have plans been finalized. Funding for the Skate Park project will be replenished during the FY 2014/15 capital budget process. Prior Years'Appropriations $0 Aril 23, 2014 Budget Amendment $300,000 Proposed Total Appropriations $3009000 5. South Pointe Park Improvements - The FY 2013/14 Capital Budget includes a project with an allocation of $184,000 to install a fence around the playground at South Pointe Park. During the planning process, the item was presented to the Neighborhoods/Community Affairs Committee on February 28, 2014. The discussion resulted in the Committee determining that the fence was not wanted by the community. The committee instructed the Parks and Recreation Department to re-allocate the intended funding to perform other improvements at the park. Prior Years' Appropriations $0 April 23, 2014 Budget Amendment $184,000 Proposed Total Appropriations $1849000 C. Bass Museum HVAC Rehab — The condenser water air conditioning lines at the Bass Museum are leaking and at the end of their useful life. Completion of this project is time sensitive to protect the art from hot and humid temperatures. The air conditioning lines are buried approximately 4 feet underneath existing concrete slabs/pavers. Property Management has been unable to identify the source of the leak so the existing lines are being abandoned in place and new lines and associated valves, pumps and electrical work will be executed to bring the system back on-line. Funding for the project will be re-appropriated from the Collins Park Garage project, which was scheduled to begin construction in the current fiscal year, but is currently redesigning the finish floor elevation to address anticipated recommendations from the Mayor's Blue Ribbon Plan on Flood Mitigation. This will delay construction on the project during FY 2013/14 and funding will be restored through the FY 2014/15 capital budget process. Prior Years'Appropriations $0 Aril 23, 2014 Budget Amendment $200,000 Proposed Total Appropriations $2009000 Resolution Adopting the Fourth Amendment to the Capital Budget for FY 2013/14 April 23, 2014 Page 4 of 5 7. City Hall Space Plan Implementation — This project will allow for a new media/press room on the first floor as well initial funding for various office relocations, build-out, furniture, fixtures and equipment associated with space plan implementation for City departments in City Hall. Funding for the project will come from 302-Pay-As-You-Go funds that have been freed up from completed projects. The second phase of the project is anticipated to be funded as part of the FY 2014/15 capital budget process. Prior Years'Appropriations $0 April 23, 2014 Budget Amendment $170,000 Proposed Total Appropriations $170,000 8. Alton Road Utilities-5th to Michigan Avenue — Additional funding is required for the Alton Road Utilities from 5th to Michigan Avenue capital project to address utilities adjustments, replacement of existing water mains, and to cover the cost of unknown utilities in conflict with the proposed FDOT construction. As part of the FDOT project, relocation of the City-owned water main system along Alton Road is required. Considering the age and condition of the existing City utility infrastructure, staff determined that it would be advantageous to the City to upgrade the existing water main system as part of the FDOT project. This amendment will add to the existing escrow account established by FDOT with a deposit in the amount of $240,000 funded by the City for the purpose of water, sewer and stormwater system improvements on Alton Road Avenue from 5th Street to Michigan Avenue. Funding for the project is proposed to be re-appropriated from the Collins Avenue Utility - 5th to 15th project as it can be completed with the remaining appropriation. Prior Years' Appropriations $3,705,407 April 23, 2014 Budget Amendment $240,000 Proposed Total Appropriations $3,945,407 Resolution Adopting the Fourth Amendment to the Capital Budget for FY 2013/14 April 23, 2014 Page 5of5 9. Lifeguard Stands Replacement — Miami Beach is known internationally for its unique and iconic lifeguard tower designs. This project replaces the existing 29 lifeguard towers located citywide on the beachfront, from Government Cut to 87th Street. The new lifeguard towers will feature functionally and aesthetically upgraded designs recently approved by the Design Review Board. The project is proposed to be funded mid-year so that the new lifeguard towers will be in place for the next high season. Funding for the project will be from the following sources: $300,000 from the 306-Mid-Beach Quality of Life Fund; $300,000 from the 307-North Beach Quality of Life Fund, $300,000 from the 389-South Pointe Capital Fund; and $600,000 will be re-appropriated from the Restorative Tree Well — Phase 3 — Washington Avenue project, which is funded from the 305-South Beach Quality of Life Fund. The Restorative Tree Well project funding is available as the project is not anticipated to begin until after the end of this fiscal year. Project funding will be restored through the FY 2014/15 capital budget process. Prior Years' Appropriations $0 Aril 23, 2014 Budget Amendment $1,500,000 Proposed Total Appropriations $1,500,000 LU CM 0i ti 7@ rE 0 c o 4) 0 c 'o CS E� 0 UL C4 c 0 > 10 0 tty V 0 0 o c 10 r x; U (U U. 0 g 0 E: 4) > c 0 > m 0 0 0 0 cn -a (D E >CD CD m w >, 0 C E C 0 0 C: -r- m Q +... M I 0 .: > :3 ca CL u 0 c Z z co X a c CC CL c o CL 0 0 70 E m 0 Cl 3 0 0 :3 CL 0 0 -0 Cl S2 E m w CL 0 c (n t: 0 0 .. 3 -.C— 0 4) 0 m o- > C U_ r 0 0 CL C'i ch cL E 0 Z An CD E in 0 0 E in c m 0 >4 0 G C U) - V) 0 (o V) > CL 0) 0" w 4-0 0 CL 4) CL !t= 0 CL 0 M E 4) U_ 0 O p. E (D -c U > 0 w CL w 0 c > G E LL 0 a 0 0 0 L> C 4.4 2 CL 4) M 0. 0 .0 :3 CL 0 o 0 9 .2 Z T (n .0 C CD 4- c 0 rn r 0 > E 0 m 0 0 w L_ 4- >, Cc c c X 0 E 0 3: r- c -e- v > C LL 4) LL z 0 M < -0 .0 :3 0 (D 4) -0 M 4) LL o C (D C) C4) 0 10 cn CL -C 0 03 4) !Z 0 w co C 03 �3 -.r a� 8 :�, 0 c CL 4) C.) C: CL (a 3: 0 0 0 4) T) 0 E m om m j 0 0 0 c r- m Z" u 0 43 = U_ M 0 (D o = 0 0 .0 0 E 0 0 'a = .4.- +- %- E -0 E u m 14) 0 :3 0 (D 0 .5 4- 0 = E a 0 m z E 0 .0 a LU crj o Z% 0 o E 05 t..! '02 o (D 401 > V) CD M W 0 0 — ce) C: V LO LL E -5 CD (U (D 4" o 8 ca c 0 cx O c 3: cl CL co m — W L_ 0 0 (n (d 2? E C L_ .— 0 co co 0 0 c LU b 0 C4 0 46 = E c W CL CC 0 CD Co M 0 C 0 c E c 0 C C w 0 0 c 0 0 C 0 -2 E E o 0 "0 U) *6 E Cf) U-) w S= &_ 0 w 0 0 a o E t, o c cc CL C 4) E (0 co 0 0 o LO 40) 8 cc I w !a C) +.o Cr Z 0 :3 W O Z o ce) < C: m < 0. 0 10 m 2 (a I_w ACC z 3,