Loading...
GMP Amendment No. 1 with D. STEPHENSON CONSTRUCTION, INC. GMP AMENDMENT No.1 GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO.1 TO THE AGREEMENT FOR PRE- CONSTRUCTION SERVICES BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND D. STEPHENSON CONSTRUCTION INC., FOR CONSTRUCTION MANAGER AT RISK SERVICES PURSUANT TO RESOLUTION NO. 2011-27794 ENTITLED "CONSTRUCTION MANAGEMENT AT RISK PRE- CONSTRUCTION SERVICES FOR THE NORTH SHORE BANDSHELL PARK PROJECT. THIS GMP AMENDMENT NO.1, made and entered into as of this day of ("GMP Amendment No 1") amends that certain Agreement between Owner, the CITY OF MIAMI BEACH, FLORIDA (also, City) and Construction Manager, D. STEPHENSON CONSTRUCTION INC., (hereinafter Construction Manager or CM), made as of the 3 day of r1 201Z, for the following described Project: North Shore Bandshell Park 7251 Collins Avenue Miami Beach, FL, 33141 WHEREAS, the Owner and the CM have agreed to amend the Agreement in the manner set forth herein. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, in the Agreement and the other Contract Documents and for such other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner and the CM do hereby agree as follows: 1. This GMP Amendment No. 1 is executed in connection with, and is deemed to be part of the Agreement and the Contract Documents. Wherever the terms of this GMP Amendment No. 1 and the terms of the Contract Documents are in conflict, the terms of this GMP Amendment No. 1 shall govern and control. The terms used herein, unless otherwise defined in this GMP Amendment No. 1 shall have the meanings ascribed to them in the Contract Documents. 2. The following are hereby incorporated into the Contract Documents and made part thereof: a. The construction documents listed on Attachment I, GMP Amendment No.1, attached hereto, which are made a part of the Contract Documents by this reference (the "Construction Documents"); and b. The specifications listed on Attachment II, GMP Amendment No.1, attached hereto, which specifications are made a part of the Contract Documents by this reference (the "Specifications"); and C. Those documents listed on Attachment III, Additional Contract Documents, refer to the executed pre-construction services agreement, attached hereto, are made a part of the Contract Documents by this reference; and 1 d. Those documents listed on Attachment IV, GMP Amendment No.1,. GMP Book inclusive of CM's Proposal, Qualifications and Assumptions attached hereto, are made a part of the Contract Documents by this reference; and e. Those documents listed on Attachment V, GMP Amendment No.1, the CM's Salary and Wage Schedule attached hereto, are made part of the- contract Documents by this reference; and f. The Scope of the Work for the North Shore Bandshell Park Project, contemplated in this GMP Amendment No.1, and as described in Attachment I, GMP Amendment No.1, is hereby incorporated into the Work; and g. The Project Schedule will be provided for this Project and is set forth on Attachment VI- GMP Amendment No.1, attached hereto, are made a part hereof by this reference; and h. The CM's Onsite Management and Supervisory Personnel for this Project shall be set forth herein, and incorporated as Attachment VII to this Agreement. i. The date of Commencement for the construction of the North Shore Bandshell Park Project in this GMP Amendment No.1, shall commence upon the issuance of Notice To Proceed (NTP)#2, by the parties hereto(the"Date of Commencement"). j. The CM shall achieve Substantial Completion of the Work for the North Shore Bandshell Park project as contemplated in this GMP Amendment No.1, no later than ninety (90) calendar days from the issuance of NTP # 2, the Date of Commencement (the "Contract Time"), and Final Completion, not later than thirty- (30) calendar days from the date of Substantial ,Completion. Failure to meet either the Substantial Completion or Final Completion dates shall be a material breach of this Agreement and liquidated damages will be assessed thereinafter. k. Upon failure of the CM to substantially complete the Work contemplated in this GMP Amendment No.1, within the specified period of time, plus any approved time extensions, CM shall pay to the City the sum of $1,000 for each calendar day after the time specified in subsection 20) of this Amendment. I. The Guaranteed Maximum Price (GMP)for the Scope of Work contemplated in this GMP Amendment No.1, for the North Shore Bandshell Park project, is hereby guaranteed by the CM not to exceed the sum of $562,291. (GMP Amendment No.1), based upon the entire Scope of the Work as described in the Contract Documents, as amended herein, and including, but not limited to, the Construction Documents and the Specifications, subject only to additions and deductions by Contract Amendment(s) or Construction Change Directive, as provided in the Contract Documents. The GMP. for GMP Amendment No.1 is more particularly itemized in the Schedule of Values prepared in accordance with the terms of the Agreement, which Schedule of Values is attached hereto as Attachment VIII-GMP Amendment No.1, and made a part of the Contract 2 Documents by this reference. Included in the Schedule of Values and specifically identified herein, the Owners' Contingency as defined in Article 1.19 of the Pre- Construction Services Agreement is in the amount of$27,665. M. Should the CM realize any savings from the negotiated Schedule of Values, incorporated as Attachment VIII, the City shall receive 75% of said savings with no line item integrity. The City reserves the right to audit any and all contract related documents at any time during the Project and at the end of the Project. n. The CM shall provide Commercial General Liability Insurance, Automobile Liability Insurance, Worker's Compensation Insurance, and Builder's Risk Insurance, in compliance with the provisions of Article II, Insurance and Bonds of the General Conditions of the Contract for Construction. o. The CM shall provide the Public Construction Payment Bond and the Public Construction Performance and Guarantee Bond, in compliance with the provisions of Article II, Insurance and Bonds of the General Conditions of the Contract for Construction. p. By executing this GMP Amendment No.1, the CM acknowledges that it has ascertained and verified all existing underground utilities and has coordinated all correct locations for points of connection for all utilities, if any, required for this Project and has identified all clarifications and qualifications for this Project, if any. Utility Locations shall be identified by the CM and all existing utility connections will be capped as needed, as noted in the Qualification and Assumptions Statement. q. To the extent that the Owner has authorized the CM, in writing, to perform the Work contemplated in this GMP Amendment No.1, for this Project with the CM's own forces, the salary and wage schedule for the CM's personnel performing such portion of the Work, agreed upon by the City and the CM, shall be as set forth on Attachment V- GMP Amendment No.1, attached hereto, and is made a part of the Contract Documents by this reference. The CM warrants and represents that the salary and wage schedule includes the comparable market rates (including any and all benefits, contributions and insurance)charged by the CM for comparable contracts to other business and individuals for similar services, and that such rates are not higher than the standard paid for this Project(North Shore Bandshell Park) . r. Except as expressly provided herein above all of the terms, conditions, covenants, agreements and understandings contained in the Pre-Construction Contract Documents (and as may have been amended pursuant to GMP Amendment No.1), shall remain unchanged and in full force and effect, and the same hereby expressly ratified and confirmed by the City and CM. S. This GMP Amendment No.1 may be executed in several counterparts, each of which shall be deemed an original but all of which shall constitute one and the same instrument. 3 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH 41,4 Rafa Granado, City Clerk hilip , Mayor ATTEST: CONSTRUCTION MANAGER D. Stephenson Construction, Inc. 6241 N. Dixie Highway, Fort Lauderdale, FL, 33334 Florida Contractor License: CGC24733 1 By: __°By: Dinah Stephenson, Secretary Dwight Stephenson, President APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION C-V� aL - Q - t�' 14- City Attome �., Date 4 North Shore Bandshell Park 7251 Collins Ave Miami Beach, FL, 33141 GMP AMENDMENT NO.1 ATTACHMENT I CONTRACT DOCUMENTS: BID PACKAGE 1: DRAWINGS DATED FEBRUARY 21, 2014 BID PACKAGE 2: DRAWINGS DATED JULY 30, 2013 ATTACHMENT II CONTRACT DOCUMENTS: TECHNICAL SPECIFICATIONS DATED JULY 30, 2013 ATTACHMENT III CONTRACT DOCUMENTS: EXECUTED PRE-CONSTRUCTION SERVICES AGREEMENT DATED APRIL 3, 2012 (INCLUSIVE OF GENERAL CONDITIONS DATED MARCH 2011). ATTACHMENT IV CONTRACT DOCUMENTS: GMP PACKAGE DATED APRIL 11, 2014 ATTACHMENT V CONTRACT DOCUMENTS: CONSTRUCTION MANAGER'S SALARY AND WAGE SCHEDULE ATTACHMENT VI CONTRACT DOCUMENTS: PROJECT SCHEDULE TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) ATTACHMENT VII CONTRACT DOCUMENTS: ONSITE SITE MANAGEMENT AND SUPERVISORY PERSONNEL ATTACHMENT VIII CONTRACT DOCUMENTS: SCHEDULE OF VALUES (TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) 5 ATTACHMENT I DRAWINGS: BID PACKAGE 1 (PHASE 1): DRAWINGS DATED FEBRUARY 21, 2014 BID PACKAGE 2 (PHASE 2): DRAWINGS DATED JULY 30, 2013 ry I Ce51 - `.. C o re s it r aj c t i M DRAWING LIST Phase 1 G000 Cover Sheet 2/21/2014 Sheet 1 of 7 Topographic Survey 9/24/2012 Sheet 2 of 7 Topographic Survey 9/24/2012 Sheet 3 of 7 Topographic Survey 9/24/2012 Sheet 4 of 7 Topographic Survey 9/24/2012 Sheet 5 of 7 Topographic Survey 9/24/2012 Sheet 6 of 7 Topographic Survey 9/24/2012, Sheet 7 of 7 Topographic Survey 9/24/2012 C100 Specifications Sheet 2/21/2014 C200 Existing Conditions& Demolition Plan 2/21/2014 C300 Grading Plan 2/21/2014 C400 Storm Water Pollution Prevention Plan 2/21/2014 C401 Pollution Prevention & Erosion Control Details 2/21/2014 C500 Coastal Construction Control, Line Site Plan 2/21/2014 D100 Site Demo Plan 2/21/2014 A101 Hardscape Plan and Details 2/21/2014 4, Phase 2 G000 Cover Sheet 7/30/2013 Sheet 1 of 7 Topographic Survey 9/24/2012 Sheet 2 of 7 Topographic Survey 9/24/2012 Sheet 3 of 7 Topographic Survey 9/24/2012 Sheet 4 of 7 Topographic Survey 9/24/2012 Sheet 5 of 7 Topographic Survey 9/24/2012 Sheet 6 of 7 Topographic Survey 9/24/2012 Sheet 7 of 7 Topographic Survey 9/24/2012 C100 Specifications Sheet 7/26/2013 —"7—+. .�'Y^ i '"•-+-ra.-- r -- r _r-, 1 r .,�.-..r..-_ ,,$ } 7 -� f r c r _. i .., 0200 { �Existrng:Conditions& Demolition Plan �� °� u 3 7/26/2013 �C201�- �+ ,° `Existing Conditions& Demolition_Plan '�y 3 °; _ Ft `, .�7/26/2013; _.a_�_.r _e.- .;!`.:s.r.-.tir.rr._,_-�-.._�_�^�__-.s _.x.�_--_..ze.1:.: .�.-.._«^.,-.....(..i-LC�i _._...._a.._.._.i_....A.-x.i---=.��._......._.,..•r��.. _n.. _�—.....fit._.. C300 Paving, Grading, Pavement Marking&Signage Plan 7/26/2013 C400 Standard Details 7/26/2013 C401 Standard Details 7/26/2013 C601 Coastal Construction Control, Line Site Plan 7/26/2013 PPP-1 Storm Water Pollution Prevention Plan 7/26/2013 PPP-2 Pollution Prevention & Erosion Control Details 7/26/2013 L100 � rr Tree Disposition Plan r 3 r r �' '7/26/20.13° r L200 e Tree Reloation Plan - 1 9 l\. L301 Landscape Details 7/26/2013 L400 Irrigation an Pl L401 Irrigation Details 7/26/2013 L402 Irrigation Specifications 7/26/2013 b100 terDemo Plan 7/30/2013 A100 ArchitecturaL:Site Plan �' s�, 7/30/2013] ;- }, - x 1 `A101. Ha"rdscape Phan,and Details 7/30/2013 A102 r Hardscape Plan and Details _ j y f 3^� 1 7/30/2013 A103 Site Furniture Plan 7/30/2013 A104 Site Furniture Layout Plan 7/30/2013 A105 Site Furniture Layout Plan 7/30/2013 A50T _ T `Site Furniture,Seaa Wall and_Marquee Details S001 Structural General Notes 7/30/2013 5100 Foundation and Top Plan Section and Details 7/30/2013 ,E001. - Legend, General Notes; Details and Drawing Index 7/30/2013; E100 Site Plan Electrical 3 1Z/,30/20:13 ATTACHMENT II TECHNICAL SPECIFICATIONS DATED JULY 30, 2013 CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF MIAMI BEACH NORTH SHORE BANDSHELL PARK WALKWAY AND SITE IMPROVEMENTS 7251 Collins Avenue Miami .Beach, Florida 33141 100% Contract Specifications July 30, 2013 PREPARED BY: C.D BORR ELLI + PARTNERS ARCHITECTURE PLANNING LANDSCAPE INTERIORS AAC 000711 720 VASSAR STREET ORLANDO, FLORIDA 32804 Te1.407.4 1 8.1 338 :: Fax407.418.1 342 City of Miami Beach 100% Contract Specifications North Shore Bandshell Park Walkway and Site Improvements July 30, 2013 City of Miami Beach North Shore Bandshell Park Walkway and Site Improvements Table of Contents DIVISION 1 - GENERAL REQUIREMENTS 01010 Summary of Work 01025 Measurement and Payment 01031 General Project Procedures 01045 Cutting and Patching 01050 Field Engineering 01060 Regulatory Requirements and Permits 01070 Abbreviations 01090 Reference Standards 01152 Applications for Payment 01200 Project Meetings 01230 Alternates 01311 Schedules and Reports 01340 Shop Drawings, Product Data and Samples 01380 Construction Photography 01400 Quality Control 01410 Testing Laboratory Services 01505 Mobilization, Site-Preparation and Demobilization 01510 Temporary Utilities 01520 Construction Aids 01530 Protection of Existing Facilities 01540 The Emergency/Terrorism Response Plan 01545 Hurricane Plan 01550 Site Access and Storage 01560 Temporary Controls 01570 Traffic Regulations 01580 Project Identification Signs 01590 Contractor's Field Office 01600 Material and Equipment 01660 Equipment Testing and Startup 01700 Contract Closeout 01710 Cleaning 01720 Project Record Documents 01730 Operating and Maintenance Data 01740 Guarantees and Bonds TOC- 1 City of Miami Beach 100% Contract Specifications North Shore Bandshell Park Walkway and Site Improvements July 30, 2013 DIVISION 2 —SITE CONSTRUCTION 02010 Subsurface Investigation 02050 Demolition 02110 Clearing 02140 Dewatering 02200 Earthwork 02210 Site Grading 02212 Milling of Existing Asphalt Pavement 02222 Excavation and Backfill for Utilities 02260 Finish Grading 02284 Topsoil 02400 Storm Drainage Facilities 02500 Surface Restoration 02513 Asphaltic Concrete Pavings—General 02515 Portland Cement Concrete Paving 02577 Pavement Marking 02601 Manholes 02713 Water Distribution System 02782 Precast Concrete Unit Pavers 02810 Irrigation System 02870 Site Furnishings 02900 Planting DIVISION 3—CONCRETE 03100 Concrete Form Work 03200 Concrete Reinforcement 03250 Exposed Shell Aggregate Concrete Finish 03300 Cast-in-Place Concrete 03370 Concrete Curing DIVISION 4—MASONRY 04100 Masonry System DIVISIONS 5 -6— Not Used DIVISION 7—THERMAL AND MOISTURE PROTECTION 07420 Composite Wall Panels TOC-2 City of Miami Beach 100% Contract Specifications North Shore Bandshell Park Walkway and Site Improvements July 30, 2013 DIVISIONS 8 - 9— Not Used DIVISION 10—SPECIALTIES 10400 Signage DIVISIONS 11 - 14— Not Used DIVISION 15—MECHANICAL 15000 Piping, General 15100 Valves, General DIVISION 16— ELECTRICAL 16010 Basic Electrical Requirements 16020 Tests and Performance Verification 16030 Electrical Identification- 16110 Raceways and Conduit 16120 Wires and Cables(600V and Below) 16130 Outlet Boxes 16450 Grounding 16500 Lighting TOC-3 ATTACHMENT III EXECUTED PRE-CONSTRUCTION SERVICES AGREEMENT DATED APRIL 3, 2012 (INCLUSIVE OF GENERAL CONDITIONS DATED MARCH 2011) I ATTACHMENT IV GMP PACKAGE DATED APRIL 16, 2014 [30_ STEPHENS®iV C o rs t r u c t o r7 ■- e-e c_ Quality Work-Professionalism-Reliability-Teamwork-Integrity 4/16/2014 Thais Vieira; R.A., Capital Projects Coordinator City of Miami Beach Capital Improvements Projects Office 1700 Convention Center Drive Miami Beach, FL 33139 Reference: North Shore Bandshell Park Improvements Guaranteed Maximum Price (GMP) Dear Ms. Vieira: D. Stephenson Construction is pleased to submit our GMP for the North Shore Bandshell Park Improvements Project. We have reviewed all of the required documents to complete Phase 1, and Phase 2, scope of work. This scope of work will 'be completed for a cost of $589,956.00. We are_excited about this opportunity and working with your organization. Should you have any questions or concerns with the proposal please feel free to contact us. Sincerely, Roger Reyes Project Manager Bill Ellis, DSC Harry Darling, DSC 6241 North Dixie Highway Fort Lauderdale,FL 33334 Phone: 954.315.7020 1 Fax: 954.315.7030 D. STEPHENSON C.o!n-.is-..t r,u *.-t 1,6 r 1.n C. Date: 0411112014 Job Name:Miami Beach-North Shore Bandshell Brief Description:Reduced Scope Phase 1&2. CSI CODE DESCRIPTION _... -----BID AMOUNT_ ._ ._.- -SUB/VENDOR-- GENERAL CONDITIONS $ 63,922 DSC 02-0000-S SITEWORK 02-1000-S Site Work Package S 127,508 Stanford 02-1100=S Demolition-Site Demo with Site work above $' 13,483 Jampro 02=41 - Utilities Locates S' 4,500 Allowance .,02-7100--S Sand Fence at 72nd Walk&Temp Fence $: 17,800 DSC 02-7300-S Pavers $ 9,081 CSE ..02=80 O=S' Landscape/Irrigation Rework/Tree Relocate/Remove $: 37,754 Dixie 02=9000-S Tree Wells/Fertilizing system $ 19,248 America's Best Service 02-9100- . .-Site and Sidewalk Restoration 8,575 Allowance DIVISION 02 TOTAL -- _ $ 237,949 03-0000-S CONCRETE 03-3000-S ­Site Concrete $ 76,870 Homestead Paving 03-4000-S Marquee'Wall'Coricre .: _ $ -13.386 Consolidated DIVISION 03 TOTAL 3 90,258, 04-0000-S MASONRY 04-4000-S Coral Wall $ 15,500 Allowance DIVISION 04 TOTAL $ 15,500 07-0000-S THERMAL&MOISTURE PROTECTION 07-8100-S Composite Panels $ 19,500 5TCO 07-9100-S Caulking $ 500 Metro DIVISION 07 TOTAL $ 20,000 10-0000-S SPECIALTIES 10-4010-S Marquee SI4"n8Qe - - $ '55.125 BR'S*s DIVISION 10 TOTAL b 55025 16-0000-S ELECTRICAL 16-5400-S Site L#gtttlt4p and Elecvlcat $ 24:143 CEI DIVISION 15 TOTAL _24,143 SUBTOTAL $ - 506,894 01-9990-0 DSC CONTINGENCY --- 0.00% INSURANCE&BONDS 19-3000-0 Builders Risk Insu and Deductibles(EXCLUDED) $ 0.00% 19-4000-0 General Liability&Umbrella $ 3,039 0.55% 19-5000-0: Payment/Performance Bond $ 7,161 1.31% PERMIT&FEE 19-1000-C Permit Fees(EXCLUDED) $ - 0100% 19-2000-0 Builders Fee $ 36,197 7.00% TOTAL BASE ESTIMATE , 19-1000-0 Subcontractor Permit Fees Allowance $ 9,000 TOTAL w/Sub Permit Fees $ 562,291 01-9990-0 Owner Contingency $ 27,665 5.00% TOTAL w/Contingency S 589,956 DEDUCT Alternate-Provide 5'Sidewalk addition to existing Sidewalk 73rd St. $ 11,762 D. STEPHENSON i.o,n..a.t-r u.-c,: -o,n I n c_ GENERAL CONDITIONS Job Name:Miami Beach-North Shore Bandshell Job Size: 56,800 Brief Description:Reduced Scope Phase 1&2 Jab Duration: 12 % Total Code Description City Unit Adj... __ Labor _Sub Material Amount FIELD PERSONNEL O1-3210-0-PROJECT EXECUTIVE�. -12 -MWK --5% 3,466.20--____. -- y-- -_2,080.00., 01-3200-0 SUPERINTENDENT 12 _.. WK 100%1;841.,20 22,094:00' 01-3250-0 PROJECT MANAGER _ 12 _WK_.35% 2, - �- 195:05.. 9.219,00 01.3300-0 PROJECT ADMINISTRATOR 12 WK- ..25%.- 800.00 2.400:00 01-6500-0''FINAL CLEAN• - 56,800 SF 10% 0,25_ 1,420.00 01-6700-0 DAILY LABOR(LABOR'POOL).. "- - 12_ WK 10% �- 500.00, - 600.00 01-9950-0 VEHICLE EXPENSE 12 WK 140%. 0,00_, _0.00 TEMP FIELD OFFICE 01-5900-0 FIELD.OFFICE t2-OFFICE _ - - -- -«-�-3- MO 0%_. �- - -0.00 01-2000-0_ LARGE OFFICE SET UP I EA _0% __ L _ Dv00 01-5900-0 roFIELD OFFICE/OFFICE STORAGE - _3-�� MO 100% 300,00 900.00 .01-2000-0 SMALL OFFICE SET.UP. . _ 1;_ EA 100% _ 1,250.00 1.250:00 01-5910-0 STORAGE TRAILER 3 MO.. 0% ------- _ 0:00 .015020.-0 SANITARY FACILITIES 3 MO 200% 125.00 750.00. 01-5280-0...000RIERlSHIP/POSTAGE 3 NIO 100% 100:00 300.00 01-5290-0 OFFICE SUPPLIES/EXPENSE _3_ MO._ 100%._ _, 100:00-.- ., _ 300.00 - -- 01-5300-0 SITE,FURN/COPIER/FAX 3 _MO_ _0% __-_ _ 0,00 01-5300-0 SITE COMPUTERlCOMMS 3 MO- 100% T 150.00____ 450.00 1 01020-0 PLANS&BLUEPRINTS _. L$- .•. .25%, - - 1;500:00 375,00 01-3000-0 SCHEDULING 3 MO 100% 150.00. 450,00 01030-0 PROGRESS PHOTOS- 3 MO 100% �_ 90.00_ _ _ ,.. 270,00 01-4030-0 ARIEL PHOTOS 2 MO 100% 150,00 300.00 01.4400-0 CONSTRUCTION SIGN __ 1 -. EA 100% 650.00`-r_r___ 650.00 SAFETY 01-5930-0 OSHA SAFETY KIT_ ,. 1• -EA 100% 150100 150.00 01-5500-0 BARRICADES 12 WK 0% 0.00 01-5960-0 COMPOUND FENCE(150 LF) 1 EA 0% .. 0.00 01-5400-0 SITE SECURITY_ __. 12 W K 0/°° 0.00. 01-5410-0 SAFETY RAILS 12 WK 0% - -� 0.00 `01-0400-0 :DIRECTIONAL-SIGNAGE 1 EA 0% M 0.00 01-5930-0 REQ.SAFETY INSPECTIONS '3 MO 0% 0.00 SITE MANAGEMENT 01-5960-0 TEMP FENCING _ 1 LS 0% 13,750.00 0.00 01-5060-0 TEMP PARKIN G'(BY OWNER), 3 MO _-. .0%______. 2,500 06 0:00 01-5710-0 DUMPSTERS: _ ,-� 1 EA 100% 350.00 350.00, 01-5420-0TEIVI PR_O_TECTI_ON 3 MO 0% 0.00 -01-5050-0 TEMP.LIGHTING - ._.. . _.�. s`.- MO 0% _• .._..•-..___ .- 0.00 01-6300-0 SMALL TOOLS 3 MO 50%._ _ 150.00 225_00 01-6000-0 LULL RENTAL(RENTAL EQUIP. 3 MO _0% _0.00 .._ _ . - ....�...,_-m - 01-6760-0 PUNCH LIST MATER_IALS, .. 56,800 SF 10/0 - 0.15 852.00 01-6770-0 FIR PUNCH LIST _ 56,800. _. SF 10% 0.15 -__ a _ 852.00 TEMPORARY UTILITIES 01-5000-0 TEMPORARY UTILITIES HOOK-UP _ 1 EA- 0% 750:00' T+ �^ 0:00 01-5010-0 TEMPORARY ELECTRIC 500.00 0.00, 3 MO 0% --- --_-•- _-_-..-.� ..._-.------ .-_ o _---- --__-_ __----------._. 01-5020-0 TEMPORARY WATER' '3 MO 0% 150.00 w----0,00 01-5030-0 TEMPORARY PHONE 3 MO 0% 0.00 .w.�.�..� . .�r -.. _ O1 5040 O TEMPORARY PHONE PORTABLE 3_____-. MO_ 140%. 120.00.�` 504.00 01-5100-0 ICE/WATER 8.CUPS #_ 12� WK _0% 25.00 _ 0_00 ADJUSTMENTS 12 NA. 0 - 0.00 0.00 0.00 NOTES: %General Conditions of job 11.549' Subtotal> $ 46,741.00 01-5200-0 Labor Burden> $ 17,181.00 GRAND TOTAL> $ 63,922.00 ®. STEPHENSON C .o n• m t r. u c V,i o ,n 0, n .c.. Quality Work-Professionalism-Reliability-Teamwork—Integrity Miami Beach—North Shore Bandshell Park Walkway and Site Improvements 7251 Collins Avenue Miami Beach,Florida 33141 April 11,2014 Qualifications,Clarifications&Exclusions Note:for nearly any excluded item within this proposal,which the Owner prefers the Contractor to include,upon written request and definition,the Contractor will provide a price adjustment proposal for the stated item(s),upon such written request from the Owner. Division I—General Requirements • It is the intent to qualify this proposal to the following: Phase 1-100%Construction Drawings dated February 21,2014. Phase 2 — Highlighted scope related to 73`d St. Sidewalk widening, Marquee Sign and 72nd St. Walkway shown 100% Construction Drawings dated July 30, 2013. Note that a final revised drawings specific to the highlighted areas will be required to confirm final costs for this phase. City of Miami Beach, North Shore Bandshell Park Walkway and Site Improvements Construction Drawings received for the above mentioned project. Phase 1 and 2 Construction will run concurrent. • Any site monitoring or security during construction is excluded. • Construction Manager Payment and Performance Bond,and General Liability Insurance are included. • Builder's Risk insurance and'deductible is excluded but can be included upon Owner direction. • Subcontractor Payment and Performance Bonds are excluded. • Any costs associated with monitoring,testing,reporting,and/or mitigation of radon or methane gas, or any other environmental condition, should they be present during construction or after completion of construction,are excluded. • Any costs associated with the removal of unsuitable soils and dewatering at the site is excluded. • Where the products are not listed or qualified,the product option will be jointly agreed upon with the Owner and Contractor. • Impact fees,tap fees, water and irrigation meters, water meter deposits or setting of water meters are excluded.Fees and deposits to be paid by the Owner. • Master Building Permit by Owner. Allowance of $9,000 is included for any permits by subcontractors. All other costs such as County, City, Public Works, FPL,AT&T and Comcast Fees are excluded.Fees and deposits to be paid by the Owner. • All Special Permits and fees and costs of special inspections are excluded from the estimate. • All testing and inspections cost of materials is excluded.Testing/Inspections will be provided by the Owner. • Underground Utility Locate/survey fees are excluded. Fees and deposits to be paid by the Owner. • See cost summary for the allowance included for utility locates services by subcontractor for unknown underground utilities. • Davis Bacon rates,Section 3 HUD or local hiring outreach programming participation is excluded. • Estimate is based on working normal hours and shifts,Monday's through Fridays. e 6241 North Dixie Highway I Fort Lauderdale,FL 33334 Ph:954-315-7020 Fax:954-315-7030 e D: . STEPHENS®N C o. n-s t: r _u -c_t I o n 1 n c Quality Work-Professiona/ism-Reliability-Teamwork—Integrity • Temporary Fencing is included with vision fence and sand bags.s. • No Architectural or Engineering Fees are included. • As-Builts by Construction Manager will be red-line field set drawings provided to design team to incorporate into AutoCAD, Mylar, sepias or other form Owner prefers. No fees are included herein for such services. • HVAC Testing&Balancing is excluded(no HVAC work on this project) e Owner Direct Purchase Program for Tax Exempt Purchases and savings is not currently allocated for herein but can be upon Owner request. • Temporary electric for construction is by Owner-. • Temporary water for construction is by Owner. Division II—Sitework Sitework • Any repair of existing deficiencies is excluded. • No underground utilities such as water,sanitary or drainage are shown on the drawings and are excluded. • Phase 1 • All earthwork illustrated on the drawings is included. • All erosion control and maintenance illustrated on the drawings is included. • All necessary Maintenance of Traffic is included for this scope of work. • Phase 2 • Earthwork only within the highlighted areas is included. • All erosion control and maintenance is assumed only around the highlighted area. • Maintenance of Traffic is included for highlighted scope only. • Relocation of existing fire hydrant on 73rd street is included. • Off site sidewalk not shown on the drawings is excluded. • All work associated with asphalt paving as shown on the drawings for 73rd street is included. • All stripping,signage and car stops are included for 73rd Street scope only. Site Demolition • Phase 1-All site demolition illustrated on the drawing D 100 is included.Please note the foundations demo is limited to 4 foot below finished grade.If piles are present then the price will be increased accordingly. •. Phase 2—Demolition 73rd Street Sidewalk widening only within highlighted area. See Deduct Alternate for cost of removing existing sidewalks and replacing with new Miami Beach Red concrete. Sand Fence • All labor and material to install the sand fence is included. Brick Pavers, • Phase 2-Standard(grey cement)Brick Pavers of standard grade,color,shape/patterns are included at 73rd Street Sidewalk widening only.There will be an increase if the pavers are to be non standard colors or shapes. 6241 North Dixie Highway I Fort Lauderdale,FL 33334 Ph:954-315-7020 Fax:954-315-7030 D. STEPHENSON Quality Work-Professionalism-Reliability-Team work—Integrity landscaning/Irrigation • Phase 1 • Only sodding is included as shown on sheet A 101. • Allowance of Repair/Rework of existing irrigation is included.This allowance does not include any cost for design fees if needed. • Phase 2 • Tree barricades and protection are included for 15 palms. • Relocation of 9 palms is included.Relocations price is to relocate one time only. If need to move more than once then there will be a cost associated with the change. • On the highlighted areas,there are 5 palms shown as relocated but the new locations are not show in the highlighted areas,so only costs to remove those is included. • Cost to remove 3 palms is included. • Tree disposition logistics to not interfere or hinder construction progress,remains pending. • Allowance is included for Repair/Rework of existing irrigation.This allowance does not include any cost for design fees if needed. • Any decomposed granite is excluded. • Porous epoxy aggregate surface and healthy tree fertilizer system for 8 ea tree wells on 73rd street sidewalk is included. Site Amenities • Phase 1-Allowance of$675 is included for removal of benches,trash cans and bike rack to be collected by Owner from the site is included.Any relocation and re-installation of these are excluded as new locations not shown on drawing. Division III—Site Concrete • Phase 1 • Sidewalk at Collins Ave—6"Concrete with picture frame border and Miami red color. • Sidewalk within park—6"Concrete Miami red color. • Beatles Mandala concrete pad(Pad Only,Any art work and/or tile work or grout etc.is excluded)— 6"Concrete regular grey pad with 10.5"wide border,Miami red color. • Phase 2 • Base price includes Miami Beach Red concrete sidewalks at highlighted locations only. • Curbs and gutter provided only at 73rd Street highlighted area. • See cost summary for add alternates. • Concrete structure for Marquee Sign is included. Division IV—Masonry • Phase 1 —Allowance for approximate 10 ft of new seat wall is included. No demolition of existing portion shown on D-100 is included. Any patching/repair of existing is excluded. Note the appearance of the new portions of wall will vary from the existing wall. • Phase 2—Allowance for approximate 11 ft of existing wall demo and 22 ft of new wall is included. Any patching/repair of existing is excluded. Note the appearance of the new portions of wall will vary from the existing wall. 6241 North Dixie Highway I Fort Lauderdale,FL 33334 Ph:954-315-7020 Fax:954-315-7030 D. STE PHENSON A n s t /` V 6 ! 1 .Q. A s S A G. Quality Work-Professionalism-Reliability-Teamwork—Integrity Division VII—Thermal and Moisture Protection • Caulking of 200 LF of expansion joints in new sidewalks is included. • Phase 2—Aluminum composite panels included as 4 mm PE core ACM with standard 2 coat paint finish,fabricated in a Dry Joint system. Division X—Specialties • The marquee sign LED board and lettering is included. Division XV—Mechanical PI m in • All plumbing systems and components are excluded as none required in phase 1 and phase 2 highlighted areas. Division XVI Electrical • Any overhead lines removal or relocation is excluded. • No repair or upgrading of existing system and fixtures. • No electrical meggar testing or reporting is included. • No low voltage systems or raceways are included. • All electrical work,site and landscape lighting and fixtures are excluded except as noted in Phase 2 below. • Phase 1 • Allowance to safe off the light fixture to be removed at mosaic wall is included.This allowance does not assume any removal of conduits and wiring or any re-routing,wiring,home runs etc. • Phase 2 • Only wiring from the sign location to the panel for the marquee sign included. Conduit from the sign location to the panel is assumed as existing and any trenching is excluded. • All site and landscape lighting is excluded except 14 bollard fixtures(Type a-1) at the 72nd Walkway. Per the RFI response there is a 2" conduit available in the sand approximately 375 ft from the walkway to connect to the existing system. It is assumed that the existing electrical system is adequate to accommodate these new fixtures. This proposal is valid for 30 days. If the project cannot be commenced during this time frame,the contractor reserves the right to verify pricing prior to signing a contract for the work. END 6241 North Dixie Highway I Fort Lauderdale,FL 33334 Ph:954-315-7020 Fax:954-315-7030 STANFORD 1081 NW 121h Terrace Ibmpswo Beech,fL 33069 s CONSTRUCTION CO. TM:LDS4)783.6922•Fax:1954)783-6925 PAI)IIII,I111111"11N IIIRIL.e111Rll l 1.IlT111131$e1. 711111•.I A I II 11111111131114 IFII mot.. NMllu\RII I IIPNI 1 l KN 111 11-D IAIF ' rwrw:tww�+w=♦,t5.11N•ww.w..}n.n +Il++g.w 1al.alr.awnlwjlTH4A`.l�NR rurwrv;alvwnxlww wl�.•�+wwl BID PROPOSAL BID PACKAGE 2 To D STEPHENSCINOONSIRUCTION ING 6241 NORTH DIXIE HIGHWAY FT LAWE:RUALF,Fl 33324 3 31'2014 171 (9S4 1315.702U FAX 19541315 7030 ATTU ANKIT PATEL PRO&CI NORTHSHOREBANDSHELL PARK IVALKWAY-SITE IMPROVEMENTS LOCATiv•, 12SI COLE INS AVENUE..MIAMI BEACH,FL 33141 PLA16 a SPi.CW CA11ONi AS PER Pt ANS BY Al YtilwFiaSSUr♦<^s SAM 0 Mill" I NO GEUTE04&ZAL SOILS REPORT PRO•,'ICFB AT TWS TIME MOBILIZATION: S 3 500 00 INCLUDES MOBILIZATION AND UFMORILIZAIION OF CREWS ANDEOUIPk&NT rOR OUR SCOPE oFTHEPROJEGT EXCLUDES ANY ADDITKN/M.MOB"VATIONS NEU LISTED ABOVE rr7� EROSION CONTIROL• $ 1,333 00 et 111101.100" 1w OFSILTFENGE FILTER FABRIC ANO OR MAY BALE PROTECTION rCR EXISTING STORM INLETS to REMAIN MA INTENANGF AND REMOVAL Or THE SILT FENCE AROUND THE PR(MC IS PERIMETER MABNTENANCE OF TRAFFIC: b 3 4;0 00 MAINTENANCF OF TRAFFIC FOR STANFORD CONSTFIUCTI045 SCOPE OF WORK SURVEY LAYOUT&ASBUILTS-- $ 803000 SURVEY LAYOUT FOR S TANFORO CONS I HUC IION$SCOPE OF WORK ASGUILTS FOR STANFORD CONSTRUCTIONS SCOPE OF WC41K TREE CLEARING: EXCLUDED EXCLUDES ANY RE LOCATION OR PROTECTION OF ANY FXNIING IHF:I-S 101It MAIN ON THE 51 T ANY PROI'OPm LANDSCAPm OR IHFF3 GRUBBING: $ 4,070,(10 INCLIK*s SURPCIAL STRIPPING FOR UP TO C(1F Fx IS INiG VEGE 1ATION IN THE PAVEMENT SUBORADE AHL•.AS AND THE BUILAING PAD PULVAMIX TI IE EXISTING SURFICIAI.VEGE IATIC)L IN THE PAVE MEN T SUBGRADE AREAS AND THE GUIDING PAO DEMOLITION:... S 12142.DO INCLUDES 111E rOLLOWIND 267 LF DEMO!ISII THE EXISTMG'D'CURB 262 Lr DEL4(X LSH IMF FXISTING'F-CURB 357 SV DEMC LIS11 THE FNISTING ASPHALT PAVEMENT 1287 Sr DEMOLISH THE EXISTING CONCRETESS)FWAI.K 50 1 F 9;AW(:UT THE EXISTING ASPHALT AT THE PIIOK)3EU IIT,INS EX[Y.unrs ANY REMOVAL OF ANY EXISTING HTIt NITS NOT I ISIFn BEI.OIV ANY IIEMOVAL Or TIIC CxISTiNG I3GHTING ANY REMOVAL OF THE EXISTING CONI]TE IF MASONRY WALL ANY REMOVAL OF THE O(ISTING GALVANIZED FENCING ANY REMOVAL OF THE E)USIINC SUIT DINGS ANY RF.MOVAI.OF THE EXISTING DUMPSTER EMCLO.SOAE WALL; ANY REMOVAL:OF SCULPTUHE ANY REMOVAL OF PARKING METERS fIRELINE: $ 2.553.00 f HVDRAuT RELOCATION EMAUUE% ANY FIRE CLASS V KFI.VT ANY COORDINATION WITH FIRE DEPARTMENT INSPFC(C1(T ANY LAYOUT OR BACTERIOLOGICAL.TESTING FOR PIPING ALIER IIiF OOCV ANY TAMPER SWITCH OR WIRING rw THE DOGV ASSEMBLY TO SE SUPPLIED AND INSTALLED BY OFHERS NOTE: PORTION OF WORK MAY HAVE TO BE DONE UNDER BUILDING FIRE SPRINKLER C(N4THACTCx15 PERMIT BUILDING FSC TO SCHEDULE AND BE PRESENT FOH ALL FINK INE INSPECTIONS OURDmG FSC 10 PIIOVIDF A COMPF rEUT IN01VIDUAI TO DE PRESENT TOR NSTAII ATKW OF SCOPE OF W ORK r NFCESSARV S 9D.d9t bQ MttkL�I tUQt1M�Niitf- . W MAW OAOOU A%Df A.��uttx gyppAWriarta At£7ntic,7r�gilNiY[ Sft;swti+!,4 lfd tMtApCF M1�4�.YXf sll� AiC l4k�ENOP+tJl1YAl+M+E Etafls�lWiiWitMN QW4&*No" /1 IYiRtttiljosommif.i MWt4iy�9QflH#1t+lAif13�YM1+t1K4��M?�TF'f4[141Wi Lift IftM '.:.AMJVii..ANA'il�lilflll'MA F'tM";ViY1�,1� M1 lEMKii1 `dPf YRA�M+i.M/R044 1I' M htk :QUA NKAWS it�I\4�.- �OIiMC�rIIYRI��KAi16JFSSt20 AYi4rttnt'�'1U3'Ntip:A9#pKltiuV N710tA LAE wSE!X!w"k N(Agk:KglP M+tYtiMTi ICFS!.Ci'ft�ll�CxtfAitil�l�E111€#1►Rp W dleNiY'r17Wj ill+k�# NU+dii3 Ad�IPjltGkt#. �t �A3PFt+1►TttAtl�KtgSt !� OF i tt tli3OlltlQpE{/fM1 Ct1i'!ri AII"Va {!E SI?L IL�ylIk7kMM�"�ISM'i.litOtfiiA11': ... as CX F�FklYd7 t i E#Jf 1G915t�iRIEANk 6ES Cf IMU►f7�t�tItE7�ES$�iF.iAiti£tlfY 00%0% O*vPILdCdRSEp mom*an 1N@mRowP{..olm":4%Aw...tSfI tomono.V*'o ASPIUK I PAVEWW 21::aot00 tNCt i�0i6it!!G.lQttilllRi ft!#�tl�Ot�i't'4tt!E >f�litllt04i>r�8 , }90�._.ft�4YY1N/tY.ti`tttAS� . Zia v rmd'MU slpCMSI"ut 24 tv tEAVYtuffaspwavel'rtf WGi;t PNrt�ASf)NEWMRI[AtiffiA�f (1It1tYB14tUt lGMl�ia4lltt1lEtfAt+lNIG EXCLLOED k�CtbptA 1tPl1 171.iAA0S.€t1GtO9tMfEMIQGtttMN4ltLE l�, fFJ'�I�i QF1{f�tMG4C13iti Lfi�IRMt'1M71fE3tAilCJks S i:S37t.gp ext5 �YM�1►�E.q�CJVt1� +tSVVHtpltitis t�eotuixx +�Mt+twlt�lEE9Kat wCWC�E3�GiMSf�rYppi:tlE >�weikw�itl�1f�pt ��t.stiff�ettwol tnacdfoss AItY UtIStICts E!s1ltUtasffsti4lslsi0 e�ttra�one naat�l+r a+rll�tiN�a'+as ttlagpnwa f�lt�car rl�lt�[�seit�tAi�wt rrn�e+eiwtr+>�vr�lr a�ttuot�a�r ts�ror�o�t�►svoowa�wrnl��,�tp�AMltp r�i�� �octuatal�raaraRa�e a+o�ir +a RVWAWAW#OMQn tow rElrrx`i tiQIkEfitll/sY#EIFS1t .Arrrmn � #s�s�.ex�wtha,�i�.as tNUS�mnYar�� 'Sirx_G4 t rtl Z��►',�t,1.`4tt4F.!£tJ7itu•,,,���uvttersre �+cet_ �4tpi.s+ �w r►yitw!#.+er��*WF*l�++yy�,'�e'ftwarlMeseH•ww'w�Ftitr•+aaa .s u�dsw�tiMrllxHtdlza.. .i..'6.IM.�afiTiM rFmx.Mtwrasa+F.e1 MF+M�+M.tay.MAiR�IP!'e":hMI�N'Y +/.'�'.AiY.��MMt�'40i1!V1iW4in+fSM:. wNw++q+li4!'uA�+il r�f:JMo-3AM�tii:#it#A1...U>iQs MAis+.'�'[i.+..rMamw.!{M.si.MMM+.swe.�;�+M�mR.}da.-IkrF:#+scale E.w+.r yvlr:a/Fx+k,tu,«z.aa.A.y.#r.x.a++it!Mir±x4wq�;s)*.wcl+adswi e++;w+rmV/�,T.aarx+.Wi.+tma�d�..M.«r,!.. ' bASrw:.a.pilwiitur MlR..sw ',�TAf1R 'AJ�fIY -� ;MIC PAYIW*A-99ROMMAM im AM A@R-�FOtlMfI�PEBMM#�JRtM NIKE'Rt$�p7ltK3.T�lt�4'•�;A!'Ai4�Rtif9f�. # e!gae.rotary, Ankit Patel From: A.Abdul[a.abdul @stanfordcc.com] Sent: Friday,April 11, 201410:22 AM To: Ankit Patel Subject: Brandshell Ankit, To keep the sidewalk on 73 St and extend the sidewalk subgrade 5ft back would give you a total credit of$2175.15. Let me know if this is sufficient or do you need a revise proposal. Thanks, Andre Stanford Construction Co. 1081 NW 12th Ter, Pompano Beach,FL 33069 Office: (954)783-6922 Cell: 954 319-5151 PAGE 1 OF 3 One Unit Land Development 1571 West 13th Street Riviera Beach, FL 33404 SITE CONSTRUCTION &DEVELOPMENT OFFICE: (561)577-9126 DATE: 3/27/2014 PROPOSED TO: PROJECT: North Shore Bandshell-2nd Revised D.Stephenson Bid# BID NO.22 6241 N.Dire Highway location Miam i Beach,Florida Fort Lauderdale,FL 33334 Estimator Eugene Cooper Ph:954-449-4735 561-577-9126 THIS PROPOSAL TO PROVIDE ALL LABORI MATERIALS AND EQUIP,TO COMPLETE JOB AS OUTLINED BELOW Q1—Y UNITS Unit Price Unit jotal Price BID;PACKAGE #1 I. GENERAL CONDITIONS A. MOBILIZATION 1 LS $ 2,500.00 $ 2,500.00 B. Survey/Asbuilts 1 LS $ Pr)d 17 2-5L C. MOT 1 LS $ 1,000.00 $ 1,000.00 General Total: $ 3,500.00 II. Erosion Control A. Silt Fence-Bid Pkg. #1 750 LF $ 2.50 $ 1,875.00 Erosion Control Total: $ 1,875.00 Note. Tree removal and/or relocation by others III. Demolition A. Sidewalk demolition includes exportation 1 LS $ 5,600.00 $ 5,600.00 B. Wall demolition includes exportation 1 LS $ 1,500.00 $ -+;588.'OQ C. Vertical Structure removal 1 LS $ 3,200.00 $ Del 4700 Demolition Total: $ 10,300.00 IV. Earthwork A. Strip Sod 1 Ls $ 1,875.00 $ 1,875.00 Earthwork Total: $ 1,875.00 Note all concrete/brick pa vers installed by others VI. Sidewalk and Brick Pavers Pad Only A. Compacted Subgrade 2,900 SY $ 0.60 $ 1,740.00 B. 6"Limerock 322 SY $ 13.60 $ 4,382.22 Concrete Total: $ 6,122.22 I PAGE 2 OF 3 308 AS OUTLINED BELOW QjY UNITS Unit Price Unit Total Price Base Bid Total Package #1: $ 23,672.22 BID PACKAGE#2 JOB A5 OUTLINED BELOW QTY UNITS Unit Price Unit Total Prick I. GENERAL CONDITIONS A. MOBILIZATION 1 LS $ 2,500.00 $ 2,500.00 B. Survey/Asbuilts 1 LS $ g,05 o---' C. MOT 1 LS $ 2,500.00 $ L,500.00 General Total: $ 5,000.00 �F 4-)43 II. Erosion Control �F-IG°fl A. Silt Fence-Bid Pkg. #2 1,295' LF $ 2.50 $ 3,237.50 B. Protect Inlets 4 EA. $ 185.00 $ 740.00 Erosion Control Total: $ 3,977.50 Note: Tree removal and/or relocation by others III. Demolition A. Asphalt demolition includes baserock removal, and export 365 SY $ 6.00 $ 2,190.00 B. Sidewalk demolition includes exportation 10,053 SF $ 3.30 $ 33,174.90 C. 3'Valley Curb includes exportation 260 LF $ 7.00 $ 1,820.00 D. "D"Curb demolition includes exportation 300 LF $ 6.80 $ 2,040.00 E. Wall demolition includes exportation 100 LF $ 11.00 $ ,4"@7ft�/? F. Paver demolition and removal 377 SF $ 4.00 $ 1,508.00 G. Remove meter post only 7 EA $ 350.00 $ 2,450.00 I. Relocate fire hydrant 1 LS $ 4,600.00 $ 4,600,00 J. Sign Relocation 2 EA $ 600.00 $ 1,200.00 Demolition Total: $ 50,082.90 IV. Earthwork A. Excavation 1 LS $ 5,600.00 $ 5,600.00 B. Strip Sod 1 Ls $ 2,000.00 $ 2,000.00 Earthwork Total: $ 7,600.00 V. Pavement Work: A. Compacted Subgrade 230 SY $ 7.00 $ 1,610.00 B. 12" Limerock installed in 2(two)Lifts 230 SY $ 30.00 $ 6,900.00 C. Prime 230 SY $ 0.55 $ 126.50 D. 1"Asphalt Bottom Lift 230 SY $ 12.00 $ 2,760.00 E. Tack 230 SY $ 0.75 $ 172.50 F. 1"aphlalt Top Lift 230 SY $ 12.50 $ 2,875.00 G. Stripping 1 LS $ 4,600.00 $ 4,600.00 Pavement Work Total: $ 19,044.00 Note all concrete/brick pavers installed by others VI. Sidewalk and Brick Pavers Pad Only ��4 A. Com acted Sub rade S fb SY $ 6.50 $ 44 P 9 �(0� B. 6" Limerock 290 SY $ 13.60 $ Concrete Total: $ ' 83Q0 Base Bid Total Package#2: $ 209 52$." 0;r 1 PAGE 3 OF 3 70B AS OUTLINED BELOW QTY UNITS Unit Price Unit Total Price NOTES: I. Proposal taken from plans designed by Chen and Moore with no revisions. Z. Proposal exudes engineering,per n�3,si testin 5 3. Excludes an sodding. 2_!5,) JY�PAAk Z �G�1 4. One Unit will not be responsible for damage to existing irrigation lines/condtdts. S. One Unit will not be responsible for removing/replacing unsuitable material(ex.Muck) 6. Proposal excludes any tree removal and/or relocation. 7. Proposal does not include overlaying the existing asphalt. ACCEPTED: FOR: One Unit Land Development,Inc. FOR: Date: I A�,rm ob Name:UiwW Beach-North Shore Bandshell Date: 041112014 (VISION:02-1100 LOW 810 Jampro OPE:Demolition AMOUNT 13,483.00 PERCENT BELOW 2nd -45% 2nd LOW BIO Alpha AMOUNT BELOW 2nd LOW 11,017.00 AMOUNT 24,500.00 AMOUNT BELOW AVERAGE 5,508.50 Back to Summary,Sheet AVERAGE 18,991.50 PERCENT BELOW AVERAGE -29% SUBCONTRACTOR { 1 0.001 12.858.00 24,500.00 1 .OE.CONrrRETE'SLAB_ 0.00 ind REMOY.OF CONC.SHELTER&FOUND. 0.00 incl V.OF ART WALL&FOUNDATION 0.00. incl DEBRIS DISPOSAL 0.001 inoi '0.00 0.00 0.00 0.00= NITURE REMOVAL BY DSc -- 625.00 incl 0.00 0.00 0.00 BUY OUT 1 HEDGE Total 13.483.00 24,500.00 NOTES: Proposal #: 4360035-00 Page i of 2 1600 N.E. 205 Terr. North Miami Beach, FL 33179 Fr:u P: (305)652-3686 F: (305) 652-1010 CC#: 08BS00345 Fixed Price Proposal Tuesday, March 11, 2014 Ankit Patel D. Stephenson Construction, Inc. 6241 N Dixie Hwy Ft Lauderdale, Florida 33334 Re: Our Proposal 4360035 for North Shore Bandshell Park Walkway&Site Improvement Facility Name: D. Stephenson Construction,Inc. Service Location: North Shore Bandshell Park, 7251 Collins Avenue, Miami Beach,Florida 33141 This Proposal is for the Project referenced above and more particularly defined by the Scope of Work comprised of this Proposal, its Attachments, and other Contract Documents incorporated by reference. Therefore, we propose to furnish the following: Division: 02-SITEWORK 1. Sheet C200- Existing Condition&Demolition Plan 2. Remove existing vertical structure 3. Remove concrete half wall 4. Remove 13 light fixtures 5. Remove concrete sidewalk Price: $12,858.00 Twelve Thousand Eight Hundred Fifty Eight Dollars and Zero Cents �Z� CQjo�a �¢� � �• Time: The duration of the Work to achieve Substantial Completion is TBD. Terms. Upon Receipt, 10%Retainage Clarification(s): • Dumpster included • First Shift Work • Pricing for slab is based on slab being 6" thick or less. 03/11/2014 i • One Phase • Prevailing Wage • Proposal Price Based on Sheets noted ONLY. All unoted sheets is not included. • All MEP items to be Capped and Made Safe and dropped by MEP trades before demolition • No Protection included • Job Site visit Was Not Performed • Scope is Limited it items stated on Proposal Only • Price discounted base on whole scope listed being performed. Items deleted will cause price to raise i Proposal M 4360035-00 Page 2 of 2 • Proposal priced for one mobilization per phase unless otherwise noted on proposal • Concrete slab to be x-ray by GC prior to sawcutting. • Atleast 24 hour cancellation notice must be given if scheduled project demo start date changes. • Any Item not Listed Above or listed in Clarifications are to remain or by remove by other Trades. • Proposal Based on Plans dated on 2/21/2014 Expiration: This Proposal shall remain open for 90 calendar days. Please contact me at 305-652-3686 or via e-mail nikado @jamproinc.com if you have any questions or require additional information. Regards, Jampro Demolition Nikado Taylor President ACCEPTANCE OF PROPOSAL The Scope of Work described above supersedes any and all prior communication about this Work. By accepting this Proposal, Customer understands that changes to the scope for any reason not controlled by Jampro Demolition may result in additional charges. Invoices for Work completed shall be presented at least monthly and shall be due within 30 days. In the event Jampro Demolition is required to pursue any collection efforts to be paid, Customer shall be responsible for all of Jampro Demolition's attorney's fees and costs incurred pre-suit, in litigation, and any appeals which ensue, together with interest on all unpaid amounts at 1 1/2 % per month. Client Signature: D. Stephenson Construction, Inc. Date: ALPHAWRECKING GROUP DEMOLITION CONTRAaTOR.S 4720-K OAKES ROAD DAVIE, FL 33314 PHONE-954-587-3700 FAX-954-587-3999 'V1/E gR Ef}}C IT BETTER" DEMOLITION PROPOSAL 03/25/14 D STEPHENSON CONSTRUCTION 6241 N DIXIE HWY FT LAUDERDALE FL 33334 Office Phone: 954-449-4733 Office Fax: 954-315-7030 Attn: ANKIT PATEL E-mail: apatel @dstephenson.com RE: NORTH SHORE BANDSHELL PARK WALKWAY AND SITE IMPROVEMENT PERFORM DEMO AS NOTED ON CHEN MOORE PLANS DATED 02121/14,AS SET FORTH IN DEMO NOTES&AS GENERALLY DESCRIBED BELOW—Demolish&Remove INTO DUMPSTERS&/OR TRACTOR TRAILERS SUPPLIED BY ALPHA We will perform all of the following for the Lump Sum Amount of$24,500 INTERIOR t EXTERIOR SPACE: • SEPARATION AND REMOVAL OF EXISTING SHELTER STRUCTURE IN IT'S ENTIRETY INCLUDING FOUNDATIONS • SEPARATION AND REMOVAL OF SLAB/SIDEWALK ASSOCAITED WITH SHELTER STRUCTURE • SEPARATION AND REMOVAL OF EXISTING CMU ART WALL AND ASSOCIATED FOUNDATION • REMOVAL OF EXISTING BENCHES • EXISTING EAST SIDEWALK REMOVAL BY OTHERS REGARDING MPE DEMO BY THIS SUBCONTRACTOR: • MEP AFTER SAFE-OFF AT SOURCE BY MEP CONTRACTORS • MPE SERVICES SHALL BE CAPPED OFF&FULLY DISCONNECTED BY THE RESPECTIVE TRADES AND MARKED WITH RED SPRAY PAINT TO CLEARLY INDICATE WHERE THE CAPPING/DISCONNECTIONSIDRAINING OF THE EXISTING UTILITIES WAS DONE BY THOSE SUBCONTRACTORS DEMO GENERAL CONDtTIONSMAMFICATIONS- • .O SALVAGE RIGHTS FOR THE SCRAP METALS AT THIS PROJECT IN THE ITEMS THAT ARE TO BE DEMO'd co TO ALPHA WITHOUT EXCEPTION • PROJECT PRICED AT 1 PHASE • D STEPHENSON TO PROVIDE ALL LAYOUT • NO ASBESTOS I FREON/MERCURY OR LEAD PAINT REMOVAL OR ANY HAZARDOUS MATERIAL HANDLING WHATSOEVER • D STEPHENSON TO PROVIDE TEMP WATER/POWER/BARRICADES • DEMO PERMIT TO BE OBTAINED BY D STEPHENSON THIS PROPOSAL IS GOOD FOR 60 DAYS.We thank you for the opportunity to bid this work for you. Sincerely, Chris Willford President ALPHA WRECKING Alobil phone#:954-203-9304 Email:chi isy @aIphawiecking,cum d 1 i o 7 b Nanw:Miami Beach-North Shore Bandshell Date: 04/1112014 MS*N:02-4150 LOW BID Allowance OPE:Utility Locates AMOUNT 4,500.00 PERCENT BELOW 2nd #Dfv/0! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -4,500.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 BS to m AVERAGE 4.500.00 PERCENT BELOW AVERAGE (A SUBCONTRACTOR . 0.001 4.500.00 HAM:01GE3M D!?EICI PVC 0.00E 0.00` 0.00 0.00: 0.00 - I 0.00' 0 BUY OUT t HEDGE Total 4,500.00 o 4p� 7 Job Name:Miaml Beach-North Shore Bandshell Date: 04111/2014 (VISION:02-7100 LOW BID DSC SCOPE:Fencing AMOUNT 17,800.00 PERCENT BELOW 2nd #DIV/0! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -17,800.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Summary Sheet AVERAGE 17,800.00 PERCENT BELOW AVERAGE 0% SUSCONTRACTOR RAF EIM. AN0 FENCE M TERIAL 200 LF 0.00 400.00 D.FENCE LABOR 0.00 2,000.00 "X3"P0.ST MATERIAL 22 0.. i 220.00 "X3"POST LABOR q_ 550.00 CRETE MATERIAL 44 0.00; 22000 LABOR _" -p1 660.00 0.00 0.00` FENCE&SCREEN=1 uttoua CoCSWM 0.00: 13,750.00 p 0.00 o.00. BUY OUT I HEDGE Total 17,800.00 7 ob Nanw:Miami Beach-North Shore Bandshell Date: 0411112014 IV9NW-02-T300 LOW BD CSE -per AMOUNT 9,080.84 PERCENT BELOW 2nd -2% 2nd LOW BID Perfect Paver AMOUNT BELOW 2nd LOW 168.16 AMOUNT 9,249.00 AMOUNT BELOW AVERAGE 84.08 Back to S mm AVERAGE 9.164.92 PERCENT BELOW AVERAGE -1% SUBCONTRACTOR gn Um" Q� O� 9.249 AVERS SAND SET L 0.001w Ind .SHAPE... -NM PATTERN 0.00 ind bid 0.00 0.00= 0:00 0:001 I 0.00! BUYOUT/HEDGE Total 9.249.00 9,080.84 VNawMA..MAtli.a�.!+aMiaa.».+♦a.:x..r+r.M.wMYSrwaW^�..��vape.ew•wa. �`Mfam.;M.w aoPOSAE AND AGE'TANCE PERFECT -AVERS I 1 111 (WIN,I N(, BV It k VA\ i j(%I., «.�H.� .r>++.: -♦' E i tto.,•S.+y .F:,.1��� ,irY>.�i w+: -� e +�. ♦i 4.1 11, Lt t+.t;"-.t ✓{•.Vh F A"l- 4 • � e 1 FT. 1.AU'DE ,'s[e. Ft J i a•e �+it�:�•"s s {„ .t? c _ ���. to t:'FA .1,A?'1�. .� ; � ;JAf ;�t�;� # 3`�� .,A:#�isA�s:. # A a:� fi b; �" F :P ► VAi.ti : RIP !41)CAL 11AttC ACT',WJ, 'it,4 `7F "0.�-O F, SATE 55,,'10, 4 PF *Pi44GL t�-0 JLC'l V O#,t'.,N r:�,�°' �.4s t.�<a�St.:t-QL E f s+at1{# 3♦'t ..' >�;.�ti a;J F:kCViSAPYAT COST We Propose W11,10 T11,1,11 61r.4 1. ,-, tkala c d Ficw t Y 11 fr W x t. 010 ��{ ya. 4 9.h0 ,�'.:.,.._ �°ralsk•s.. .:, ._.�;.4. ,t:. s< �- - ;,y �:� ,.. :: �; .�. x - -. . �s` f,t3.p�{�� #yfw�[,�.'�; i�Y{Q,,' • S.M — v i.F• T r ' r}x}q'1..r:•?.•:iFts e"s fait s<zs -.a=:a ..,'�_`. ae.,# .; _. '1, a:. .. „. 11101•d•..sy-,i;r=CH i�4.i <As.rr�,,,:�,r -�.•.. ;�.:. ,x�.# #a��•.;n- _.¢ ,� _. °+,y{V2,.T»i9z Kxe,•t £'F+C?C.�"$'�r is^�.< f 11t.t v,%y i�.:.R f r.,x, x. .. • , if Ai'PUCAE#L `41PUFt; tt%t"F2 L1E its�'T •# E2ti "! Acceptance of Proposal TERMS AND CONDITIONS -!"w~ bomb U st v .7 X now A% Anausno.1. -xv o I u.- "n, i Jon 44, �-ry i. ".., , , r, Q Vj jw! mam*b,op.- to yu 0 All 40 My"W-- ;"AkLvrw r% &XnA, pop I W 10 _f" it to"-1 14 & ell W V1 t'r *r t• �V-!ROW.1 MAN WON W4 -41 A fl.v Ig4*, 1-.1 0, W"P445 9"Wh"! A,94 WORK ORDER/PROPOSAL C.S.E.Paving of Florida, Inc. 2201 W.Atlantic Avenue,Suite C License#CGC040254 Delray Beach,Florida 33445 800-559-6993 NO: 2688 561-279-9,200 Date: 4/8/14 Fax-279-8866 Nast: DANNY FUC'HS PROPOSAI,SUBMITTED TO: WORK PERFORMED AT: D. STEPHENSON CONSTRUCTION INC NORTH SHORE BAND SHELL 6241 N. DIXIE HIGHWAY 7251 COLLINS AVE. FT. LAUDERDALE,FL 33334 MIAMI BEACH,FL 954-315-7020 PHONE 954-315-7030, FAX WE I IEREBY PRUPOSE•'1'O 1=URNISH"I'HE LA[30R AND NIA I I'.I(IAL t'OI( fli):C ONIP[(:fIUN 01: WALKWAY(APPROX.1198 SO.ITT.) I) SUPPLY AND INSTALL I"'SAND LEVELING C01.11617 2) SUPPLY AND INSTALL PAVERS 3) PAVERS"1-0 BE HANOVER-4 X 8 X 2 318 4) COLOR TO BE RED. 5) PATTERN TO Bt;STANDARD. NOT ES: AI PERNIITS-L'O BE BV OIYNER/BUILDER(NOT INCLUDL•"D). B) BUILDER/OAVNERTO SUPPLY GRADE 3"BELOW FINISII GRADE. C) AN)CHANGE IN QUANTITIES 1YILL ALSO BE SUOMI TO FINAL PRICE CHANGE. HANGE. D) QUANTITIES BASED AND VERIFIEDBYSHIPPINGTICKEUS E) PRICE IS BASED UPON 5738 PER SQ.FT. F) PASTEL COLORS TO BEAN ADDITIONAL CHARGE OF$0.35 PER SQ.FT(NOT INCLUDED) C) N.TA.PROCESSING TO BE AN ADDITIONAL CHARGE OF S35 00.(INC LUDED) H) Srt1'SAND RISERS 10BEAN ADD)I'IONALS1-1,00'ERLN.FI (NOrINCLUVED) I) IF AN OR EQUAL IS AVAILABLE FOR THE SPEC.CSE RESERVES HIE RIGHT TO UTILIZE IT .1) CHI PS,SCRATHCES,BROKEN CORNERIEDCES ARE COMMON TRH 0UGOUT I"E AWrERIAL AND-ARE INCORPORATED INTO THE FINISHED PRODUCT BY DESIGN. THE ABOVE WORK TO BE PERFORMED IN ACCORDANCE NVI'l'I I THE DRAWING;AND SPECIFICATIONS SUBMITTED AND COMPLETED IN A SUBSTANTIAL,WORKNIANLIKE MANNER SUBJECT TO THE TERMS HERE OF FOR THE ESTIMATED PRICE OF: $9,080.84 PAYMEN-r DUE:70°0 DEPOSIT AND BALANCE DUE UPON NIONTHLI DRAINS BASED UPON COMPLETED AMOUNTS '11115 PROPO!SALONLV C01'ERS TIIE ABOVE ITENIN ANA Respectful])submitted b3': UNFOR,SEEN COST OVETOANA PERI111TrING REGULATIONS NN11.1. C.S.E.Paving of Florida,Inc. BE.ANADDITIONALCON7.THESE AI ILL BE ADDED TOFINAL P.1A NIENT..THERE%N ILL BE AN ADDITIONAL CHARGE FOR GRADING IF BUILDER FAIL%TO PROVIDE PROPER GRADE ANDIOR FOR.ADnITI ONAL NAND IF NEF.OED_ Stephen J.Warden President ACCEP'rANCE OF PROPOSAL The above prices,specifications and conditions along with the reverse side terms and conditions of sale are satiSfactory and :ire hereby accepted. You are authorized to do the v%ork as specified. Pa)mcnt will be made as outlined above. Signature_ Date Nance(print). Title 'IERMS AND CONDI`IIONS OF SALE: Section I The Work Order Proposal is only+alid for 30 days unless accepted in wvriling h%the buyer Section 3 hhe price dues not include building pernils The buyer is responsible for pad in_,all perurils costs plus C S F's processing lees. Section 3: The del-milion ofa conlractor section 489 105(1)Florida Sl;uulcs is one who"undertakes himselfor by other.-to du consliuclion work. I'hc buyer is contr cling directly with and only with licensed contractor Section 4: The cost of brick installation is to be computed on a SQ FT,and if LINEAL h f:basis, 'I he price is an estimmed cost, The final price is on the actual products that has been shipped Unless the finite price is outlined as a Irunp scum job prig Due to various building codes in the South Florida area.tine cost of construction will vary Our sales personnel will try to be as accurate as possible on any estimate You will be informed of any changes in the proposal as soon is possible Section 5: C.S.E.will not accept or be held liable lorany back charge unless we agree in writing ptior loan,,con-cctivc Measures taken by file builder or owner. WARRANTY DISCLAIMER AND LIM ITATION OF DAMAGES: The workmanship and materials installed pursuant to this Work Order Proposal are w•arrimed lia'uneyear from installation to be lice from defects TIIE FOREGOING WARRANTY IS IN LIEU OF AND EXCLUDES ALL.OTIIER WRITTEN OR ORAL WARRANTIES OR CONTRAC"fUAL AGREEMENTS NOT EXPRESSLY SET FORTH HEREIN,WIIETIIER EXPRESS OR MIPLIED.Lit`OPERATION OF LAZY OR urliER11'ISE,INCLUDING,BUT NO'f L1141TED TO,ANY IMPLIED WARRA,N11ES OF\IIiRCIIANTABILiTl'OR FITNESS FOR A PART ICUL.AR PURPOSE. BAYER'S RESPONSIBILITIES: A, The Buyer warrants[flat he owns the land upon which the bricks are lobe built.or that he has full authority liom the Owner thereof.ur all co-owners.to enter info Ibis contract.and the Buyer will indeinni fy,and hold harmless the C'onlractor in all millers arising ou this account= B: The Buyer agrees to supply the C•omraclor with a current and►acid surrey of Owner's property further,fhe Buyer agrees to verify the bricks location. dimensions and elevation alicr it is set by the con iracmrs personnel.and accepts full responsibility Ill sinle hlinorvarialions in dimensions or elcvatirnrs shall not affect the validity of this contract,nor the Buyer's responsibility under it C: Unless otherwise stated herein,site prepi rim ion including removal or protection of trees:shrubs,or of her vegetation.removal ofafly uudetwound sprinklers,pipe lines,septic tanks or any other improvements affected by this cunstruclionw,Itill be done by the Buyer D The Buyer shall granI(lie Contractor ample access arci for equipmem.personnel and materials delivered its the site.and shall furnish adequate water and electric power and shall trans the right to store material and debris during course of°construction The Buyer assumes all responsibility for clearance dimige to anything,ire file area of access whether it be on Owner{s property of that of a neighbor Tlnc contraclor is specifically held free ot'responsibilily o1` charna.,e to landscaping.sod,shrubs.trees,fences,wails_sprinklers.paving dri%eways_curbs.sidewalks-septic lanks,sewer lines,waterlines.or other items above or below ground in the area of access and of consimclion. E It is agreed that the contractor shall be permil led to perl"orn his work without Ill lerruptio11S or delays or any acts ofneglecl caused by the Buyer or the Buyer's representatives. F: Efflorescence may form oil the surface of the concrete pavers during the lied lwo years after installation. 11 is caused by the reaction ofearbon dioxide in the air and free calcium hydroxide within the paver and will form a while film tin the top sm[""ice Willi further exposure,the el"llorescence will be changed to a highly soluble calcium hydrogen carbonate which will be normally wished away by raitr, G: This is a concrete product and[here may be a sl.-hl variation in color which is beyond our control H: The Buyer is responsible f'or any sinking of pavers around pool area due to improper back filling by pool comiacfur or others. I: If Buyer is a Corporafiar.the individual sinning this Word:Order Proposal agrees to be personally responsible and pay for any amounts due by the coiponrlion pursuant to this Work Order,Proposal- 1: Irrlemst shall be due and payable at the rate of['h%per imnrlh for any amounts past due under this Work Order Proposal. K: The Buyer also agrees that in no client shall C.S;E.be liable for any other damages.including,but not himied lo,loss of profits.indirect.incidental. consequential,special.delay,or othersimilardamages that may arise out orally breach ol`this igreement of ally obligation under this agreement- L% The Buyer agrees that its exclusive remedy against C S E in the event Buyer contends gods,materials.or services supplied by C S E's maxiuunn liability for ally breach of the lixcgoing warranty shall not exceed the purchase price ofthe materials and SCI'VICe5 supplied by C S L. M: -1`hc Buyer agrees to carry fire,Tornado.[hell.and any other necessary insurance N: The Buyer agrees ill the evenl there becomes a dispute over completeness of"work and it comuactoi n;substanlially complete,tine Buyer will be obligated to make payment in file amount of"95%of the amount due within 5 days or will be in delauh of conlracl O: Any dissatisfaction with regards to quilily ol'woikmanslup.cornpleleness ofjob and any incidental porch out wok that may need to lie done most be submitted in writing within 7 days of invoicing the job or C•S E will regard fire job is 100%,complete PERSONAL PROPERTY:The Buyeragires that all equipment and materials placed on his her property fix use in construction will remain the personal property of the Contractor until file sums due to the C'onuactor under his Contract have been paid in full INSURANCE OF CONTRACTOR.Public liability,properly damage.and workman's compensation insurance is carried by Ilse Contractor C'ONTRACTOR'S REMEDIES IN THE EVENT OWNER DEFAULTS A:Buyer will be in default if. I:Any payment called fur under this contract is not made promptly when due 2:Any agreement made by file Buyer is not promptly performed 3:Any conditions warranted by[he Buyer prove to be untrue B:In[lie event of defaull by Buyer.Contractor may do any or all of the following: I-Suspend flee work and remove ifs Ri icks from the premises 2:Remove any or the equipment for use in the construction whellrerof itot it has been inslalled, In this regard,Buyer agrees that Contractor may enter upon Owner s properly For the purpose or repossessing,such equipment without liability to Owner for trespass or any other reason 3:Retain all Moneys paid hereunder,regardless of the stale of compleliorn of the work and in file event no money has been paid to couraclor the Buyer will be responsible for paying 50%of the lace value of the contract plus any and all change orders and materials ordered for fhe completion of lob,delivered or not as liquidated damages and may bring and ippropriale action in cowl to enfixce its rights The Buyer agrees to pay all costs ofC011cclion including reasonable attorney s fees whether incurred with respect to collection.trial_appeal,and entorcemcal of any judgment Conlraclor and Buyer agree that any claim or action by sillier party,arising from the existence ol` this Contract or any warranty provided hereunder.shall lie brouLhl in the appropriate slate court of.Palm Beach County.I-lorida C: Buyer agrees that no claims may be filed under warranty punch out unless and until the indeblcdness to Contractor is paid in Nil The contractor shall not be responsible for damages or delays resulting from acts of GOD.riots.civil crm motions or disorders.delays of delaults by carriers or inherent defects on premises in which work is to be done,sit ikes.fires.accidents.Storms.or outer causes beyond its reasonable control When referring to contractor orC S.E we refer to CS E- PAVING OF FLORIDA.INC_ CONSTRUCTION INDUSTRIES RECOVERY FUND Payment may be available from the Florida Homeowner`s C•onslruction Industries Recovery Fund if you lose money on a project performed under contract,where Ilne loss results from specified violations of Florida law by a Slate-Licensed Conlraclor For inlonnition about the Reco►•ety Fund and filing a claim,contact lfle Florida Construction Industry Recovery Fund al 1940 North Munroe Sireel.Suite 42.Tallahassee,FL 32399 (850)921-6593 r0 ob Name:Miami Beach-North Shore Bandsheli Date: 04/1112014 SIOW 02-8000 LOW BID DIXIE PE Landscapelirrigation AMOUNT 37,754A0 PERCENT BELOW 2nd -22% 2nd LOW BID Emerald AMOUNT BELOW 2nd LOW 10,791.00 AMOUNT 48,545.00 AMOUNT BELOW AVERAGE 5,395.50 Back to 1Jmrn AVERAGE 43149.lf0 PERCENT BELOW AVERAGE -13% SUBCONTRACTOR �a 0 19,879.00 19.5001110 0.00 incl incl ALMS 0.00, incl incl HRUSS 0.00 incl Intl OD 0.00 incl incl 0.00 E BARRI ` S 15 Palms ALLOII+/ANC t 2.221 1,875,00 1,878,00 LOCATEP.TREES TINE 1 9 Ea O 0 incl 6,300,00 TE:SHCWNffl8W Not Shown 5 Ea I 0.001 i ncl .3,500.00 EM E__ 5 Ea _ OAO incl 3,000100 D FOR 1 YEAR GUARANTEE FOR RELOCATE 0.00 4,000.00 4,000.00 0,.00 RRIGATI .N PHASE 2.ALL6WANC I O.w 8,500,00 6,870.00 0 RRIGATION PHASE 1 REWORK AT SODDED AREAS ALLOWANCE 0.00 3,500.00 3,500,00 I 0.00 NT BUY OUT I HEDGE Total 37,754.00 48,545.00 Revision 3 PROPOSAL L A N DIXIE DS C A P E Proposal Submitted To: Date: March 28, 2014 D. Stephenson Construction 6241 North Dixie Landscape Job Information: Ft. Lauderdale, Florida 33334 Miami Beach Bandshell Phone: 954-315-7020 7251 Collins Ave. Fax: 954-315-7030 Miami Beach, Florida 33141 We hereby submit specifications and estimations for the following: Labor and materials to install as per plan by Borrelli +Partners, 9 sheets labeled L100 through L402, A 10 1 & A102 dated 7/26/13 with no revisions and no addenda. Rev. 3 to reduce scope. Notes: • 4,500 sq ft of St. Augustine 'floratam' sod is included in bid price as an estimate only, limits of sod are not clear. If additional sod is required to be extra at$0.40 per square foot. • Mulch, fertilizer& planting soil are included in bid price. • Relocations are priced for one move on site and arc not guaranteed. See Alternate Add's if guarantee is required. • Tree barricades, aluminum edging &bound aggregate are not included in bid price. See Alternate Adds. • Irrigation proposal assumes tie in to existing system with extra wires from controller to be available at POC for new valves. • Cutting/patching of asphalt/concrete, if required, by others. • Right of way and consumption permits for irrigation, if required, to be an additional charge. 0 Compaction of fill and densities for sleeves, including under impervious areas, is not included. • After receipt of a contract a minimum of three working days are required for line locations prior to commencement of work. D o • All prices are valid for 90 days from date of proposal. q�ll 3 7, 75�- • Permits are not included in bid price. • Plant material is priced as p r plans. All plant material may not be available at time of installation. LANDSCAPE INSTALLATION: .`. j?.!? --............................... ................$19,878.50 lot IRRIGATION INSTALLATION -..PhAx..2..... ........................$8,500.00 -� �✓2 S°��II°j(Ji We propose to furnish labor and material in accordance with the above specifications for the sum of:$ 28,378.50 Twenty-eight thousand three hundred seventy-eight &50/100 Dollars Terms: If not paid within agreed payment terms, customer agrees to a late payment charge Current charge is 1 5% per month (18 5% per annum) Price is based on all areas to be graded by others to within two-tenths of one foot of finished grade,Plant material is subject to current market availability Dixie Landscape is not responsible for unidentified underground facilities and installations. We require 3 working days notice prior to commencement of work for under ground line locations.All plant material guaranteed for three months from date of installation.Not responsible for replacement due to acts of God,vandalism,theft, improper maintenance practices.or damage by others Acceptance of Proposal: Acceptance of this proposal shall constitute a contract between us. Beyond 90 Days,the above prices are subject to review Chris Catron March 28.2014 Customer Signature Date Dixie landscape Representali%e Date P.O.BOX 1603281 MIAMI,FLORIDA/33116-03281(305)884-57001(561)434-94001 FAX(305)884.8843 Created by Chris Catran 413?20140 Stephenson Miami Beach Bandshell Landscape Plant List: Miami Beach Bandshell Revision 3 Qty Botanical Name Specifications Unit Cost Total Cost 8 Conocarpus erectus 12'-14' x 4', 3"CAL, B&B $280.00 $2,240.00 4 Conocarpus erectus sericeus 8'x 4', Multi Trunk, B&B $200.00 $800.00 25 Ipomoea pes-caprae 5 gal, 6'oc, 36"HT $20.00 $500.00 57 Argusia gnaphalodes 3 gal, 30"oc, 24"x 24" $20.00 $1,140.00 20 Chrysobalanus icaco 'Horizontal' 3 gal, 36"oc, 24"x 24" $12.00 $240.00 121 Helianthus debilis 3 gal, 24"oc, MIN 12" FULL $8.00 $968.00 41 Rhaphiolepis indica 3 gal, 36"oc, 24"x 24" $8.00 $328.00 115 Spartina baked 3 gal, 36"oc, 24"x 24" $7.50 $862.50 5 Washin 9 tonia robusta 1.5' DBH, 40'CT, REMOVE $600.00 $3,000.00 6 Cocos nucifera 1' DBH, 30'CT, RELOCATE $700.00 $4,200.00 8 Cocos nucifera 1'DBH, 25'CT, RELOCATE $700.00 $5,600.00 4,500 St. augustine 'floratam' Sod Sq Ft. $0.40 $1,800.00 Total Landscape $19,878.50 Total-Irrigation $8,500.00 Total-Proposal $28,378.50 Alternate Add's: Not Included in Bid Price TBD as Tree Barricades linear foot �90 Required TBD as 3/16"X 5.5 Permaloc Cleanline linear foot $6.00 Required Aluminum Edging 280 Bound aggregate _ square foot $12.00 1 1 Year guarantee for relocations $4,000.00 4/3/2014 Miami Beach Bandshell email EMERALD TREE FARM & LANDSCAPING 4155 East Mowry Drive Homestead,Florida 33033 Telephone(786)417-5894/Fax(305)258-0809 SUBMITTED TO: D. Stephenson Costruction DATE: March 21, 2014 ATTN: Ankit Patel JOB: North Shore Bandshell Park and Walkway Bid Package 2 7251 Collins Avenue Highlighted area only Miami Beach, FI 33141 WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: Emerald Tree Farm agrees to provide and install the material as specified for the North Shore Bandshell Park and Wallw-,ay in Miami Beach,Florida,for Bid Package 2,for a total of: $19,500.00 (Nineteen thousand five hundred dollars). �,t g Tab Emerald Tree Farm also agrees to include as an additional fee an irrigation system per plans and specifications for Bid Package 2 for a total of AU $6,870.00 (Six thousand eight hundred and seventy dollars). 3 ��a �f l! /rata r irri a=Ira►^ > e o -1 �• a� Permit fees for the irrigation system are not included in the estimate. ,�- 3, o00 MD ar W 000 ALL MATERIAL IS GUARANTEED TO BE AS SPECIFIED. ALL WORK.TO BE COMPLETED IN A WORKMANLIKE MANNER ACCORDING TO STANDARD PRACTICES. ANY ALTERATION OR DEVIATION FROM ABOVE SPECIFICATIONS INVOLVING EXTRA COSTS WILL BE EXECUTED ONLY UPON WRITTEN ORDERS,AND WILL BECOME AN EXTRA CHARGE OVER AND ABOVE THE ESTIMATE. ALL AGREEMENTS CONTINGENT UPON STRIKES,ACCIDENTS OR DELAYS BEYOND OUR CONTROL. OWNER TO CARRY FIRE,TORNADO&OTHER NECESSARY INSURANCE. OUR WORKERS ARE FULLY COVERED BY WORKMEN'S COMPENSATION INSURANCE. AUTHORIZED SIGNATURE gW®ffell.. This proposal may be withdrawn by us if not accepted within 30 days. A600TAIICEOFFROF041-The above prices, specifications& conditions are satisfactory&are hereby accepted. You are authorized to do the work and payment will be made as outlined above. SIGNATURE SIGNATURE DATE: le 74t Job Name:Miami Beach-North Shore Bandshell Date: 0411112014 MSION:02-9000 LOW BID America's Best Service COPE:Tree WeiislFertllizing System AMOUNT 19,248.00 PERCENT BELOW 2nd #DIV/O! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -19,248.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Summary Sheet AVERAGE 19,248.00 PERCENT BELOW AVERAGE 0% SUBCONTRaTgR RJUX .b 0.00 AVE SYSTEM 0.00 13,104.00 0.00 0.� EE FERTILIZATION SYSTEM M 0.001 6.144.00 0.00" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BUY OUT 1 HEDGE Total 19.248.00 NOTES: tN y J7 0 xre � #mi P.O. Box 530250 MiAmi F433153 30S-345-6385 954-557-0774 Fax 36S-981-7637 QUOT www,naturalaureeatesurface.com Prepared for: D.Stephenson Construction Inc 6241:North Dixie Highway ; Fort Lauderdale,FL 33334 Re. Addapave TP + Preparing eight(8)6'x6'each tree beds for Installation of Addapave TP system. • Installation of 3"of N57 drain rock and geo-textile weed Control Fabric Liner • Installation of Addapave TP system(Silver Gray Granite)at a depth of 2 inches on 8 tree pits. This quote is based on a total area of 288sgf to receive the Addapave TP System, This price includes all labor,material and equipment necessary to install the Addapave TP to the tree pits. The area of the tree pit material'is based on the total area of the tree pit including the area taken up by the tree trunk and trench. Total Addapave TP: $13,104 Healthy Tree Fertilization System (HTFS) • Installation of eight(8)6`x6'each"Healthy Tree Fertilization System",Elastromeric Polyurethane Trench and grate.Set consists of 4 each 6"trench&grate corners,4 each trench&grate straight sections.Grates are ADA compliant. This price includes the purchase,delivery and labor and equipment required to install the`"Healthy Tree Fertilization System"to the prepared tree pit. HTFS Estimate: $6,144 This quote does NOT include the following: 1. Saw cutting sidewalk to enlarge the existing tree pit. 2. Excavate the tree pit.to the desired 6'depth. I Irrigation or Electrical work or repair. 4. Removal of Existing Metal Tree Grate Frame,if required. 2 All material is guaranteed to be as specified above.All work to be completed in a workmanlike manner according to standard practices.Quote is based on having access to all tree pits.Any modification will be discussed with contractor prior to installation ABS is not responsible for breakage of unmarked subterranean utilities. THIS QUOTATION IS PROVIDED TO ASSIST YOU IN YOUR ESTIMATING NEEDS. QUANTITY, MATERIAL AND SPECIFICATION REQUIREMENTS REGARDING OUR PRODUCTS WITH REFERENCE TO THIS INQUIRY ARE TO BE DETERMINED BY THE CONTRACTOR,OWNER,OR ENGINEER. PLANS AND SPECIFICATIONS HAVE NOT BEEN REVIEWED BY THIS FIRM. Quote is good for six months,estimate subject to change after six months. Material lead time 5-6 weeks. 25%on mobilization day. Remaining balance due upon completion. Quote prepared by David Lazar.03-31-2014 Thank you for the opportunity to serve your Addapave TP needs. Contractor: Subcontractor: D.Stephenson Construction Inc America's Best Service LLC By: David Lazar Name(print or type)Title Name(print or type) David Lazar 03/31/2014 Signature Date Signature Date 2 A? 7 Job Name:Mlaml Beach-Nonh Stwn Sandshell Date: 04111/2014 DIVISION: LOW BIO Allowance SCOPE: AMOUNT 8,575.00 PERCENT BELOW 2nd #DIV/01 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -8,575.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Sum_m_ary Shget AVERAGE 8.578:00 PERCENT BELOW AVERAGE 0% S-1 jSCONTRACTOR BID: ___ 0.00 RE&SIDEWALK RESTORATION 0.002 8,575.00 0.00 0.00 r O ppi 0.00 i BUYOUT I '- 7trtal 8.575:00 NOTE 7 fob Name:Miami Beach-North Shore Bandshell Date: 0411112014 DIVISION:02-9100 LOW BID Allowance SCOPE:Site&Sidewalk Restoration /MOUNT 8,575.00 PERCENT BELOW 2nd #DIV/0! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW •8,575.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 k to urnmam t AVERAGE 8.575.00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR CXTE BID: 0.00 [, 0.00 WE&NOUN STORkrm 0.00 8,575.00 ! 0.00 0.00 O .00I BUY OUT I HEDGE Total 8,575.120 i Off AQ 17P Job Mama:Miami Beach-North Sham BandsheN Data: 041i112014 03.3000 LOW BID Homestead Paving SCOPE:Site Concrete AMOUNT 76,870.00 PERCENT BELOW 2nd #DIV/O! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -76,87000 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Ba k to ggmMsa AVERAGE 76,870.00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR CITY �c Q� N i . MU1M1 RED_ ALK; IPICTINtL 4.322.50 SIDEWALK PARK AREA 7,24750 PAD'FOR AM V40W WM 10:5'h AA RED 80ROER 2,400A0 E2 TYPE-F CURB&gJTTER 479,00 "VALLEY GUTTER 4,725.00 1XIV TYPE D CURB 5,208 00 MW RED qQXK d6iWilIDEWALK 44,330.00 X12"CONIC.PAVER BAND 3,640.00 PRONAP RAMP W'IDETECTANX WAF04MG � 1,51800 REE GRATES INSTALLATION 3,00000 i BUY OUT I HEDGE Total 76.870.00 NOTES: �m Homestead Paving, Co. 14550 Mable Street,Naranja,FL 33032 Phone: 305-258-1972,Fax: 305-25 8-2267 Project: Bandshell Park Revised 3 7251 Collins Ave,Miami Beach Company: D.Stephenson Construction Attn:Ankit Date: April 9,2014 Phone: 954-315-7020 Fax: 954-776-2642 By: Mike Rhodes Bid Item Description Quantity Unit Unit Price Amount Bid Option 1 - 1 6"Concrete Sidewalk wl picture frame border 665 SF 6.50 4,322.50 Miami Beach Red color.Reinforced w/6x6 - 6/6 wwm and 245 bar at thickened edge - 2 6"Concrete Sidewalk w/Broom Finish 1115 SF 6,50 7,247.50: Miami Beach Red color.Reinforced w/ - 6x6 616 wwrn and 245 bar at thickened edge - 3 6"Concrete Pad at Tile Artwork(14'x 14')wl 1 LS 2400.00 2,400.00- 10.5"Miarni Beach Red Color.Reinforced w/6x6 6/6 wwm and 245 bar at - thickened edge. Total Bid 1 13,970.00 Bid Option 2 1 6"x 18"Type D Curb-Regular Gray color 240 LF 21.70 5.208.00 2 24"Type F Curb&Gutter-Regular Gray color 20 LF 23.95 479.00= 3 2'Valley Gutter-Regular Gray color 250 LF 18.90 4,725.00 4 6"x 12"Paver Band w/245 bars-Regular 160 LF 22.75 3,640.00 Gray color - TOTAL Included: Excluded: Materials: X Bond: X Labor: X Curb Pads: X Sales Tax: X Lane Closure: X Joint Sealant: X Night Work: X Comments: Unit Prices,Field Measures at Completion of Job Prices Good Til June,2014. 6%Increase Will Be Added To Proposed Pricing H P C.to furnish: Concrete,expansion,form,place,and finish. light compaction Prime to furnish: Engineering,Survey&Layout;Grades+/-1",all testing,sub-base compaction,utility locations,permits, Class V finishes,waterproofing,reflectors and maintenance of traffic.Excavation,Demolition,Backfill and Necessary police supervision Note: Payments are to be made within 45 days of billing date,thereafter a 1 5%interest rate will be charge to your account,on a monthly basis If payment is not received by 60 days after date billed,we will Lien/Notice of non-payment on that job Any Legal Fees will also be paid by Contractor APPROVED BY: DATE: " Please call if any questions. Quote Is valid for 30 days. Page 1 of 2 g ;3. k ci N . Homestead Paving, Co. 14550 Mable Street, Naranja,FL 33032 Phone: 305-258-1972,Fax: 305-258-2267 Project: Bandshell Park Revised 3 7251 Collins Ave,Miami Beach Company: D.Stephenson Construction Attn:Ankil Date: April 9,2014 Phone: 954-315-7020 Fax: 954-776-2642 By: Mike Rhodes Bid Item Description Quantity Unit Unit Price Amount 5 Detectable Warning on Walking Surface 46 SF 33.00 1,518.00 6 Installation of frames for tree grates 8 EA 37500 3,000,00 (frame arid grates by others,HPC will set) 7 6"Concrete Sidewalk w/Broom Finish 6820 SF 6.50 44,330.00 Miami Beach Red.Reinforced w/6x6 - 6/6 wwm and 245 bar at thickened edge Alt-1 6"Concrete Sidewalk,5'Wide next to existing 1475 SF 6.50 9,587.50 w/6x6 6/6 wwm.Miami Beach Red,Broom Finish Aproximalely 180 LF of expansion Total Bid 2 68,847.50 TOTAL Included: Exc ud d: Materials: X Bond: X Labor. X Curb Pads: X Sales Tax: X Lane Closure: X Joint Sealant: X Night Work: X Comments: Unit Prices,Field Measures at Completion of Job Prices Good Tit June,2014. 6%Increase Will Be Added To Proposed Pricing H.P.C.to furnish: Concrete,expansion,form,place,and finish, light compaction Prime to furnish: Engineering,Surrey&Lout;Grades+1-1",all testing,subbase compaction,utility klcations,permits, Class V finishes waterproofing,reflectors and maintenance of traffic.Excavation Demofjtion.Backfifl and Necessary police supervision Note: Payments are to be made within 45 days of billing date,thereafter a 1 5%interest rate will be charge to your account,on a monthly basis If payment is not received by 60 days after date billed,we will Lien/Notice of non-payment on that job Any Legal Fees will also be paid by Contractor APPROVED BY: DATE: "Please call if any questions. Quote is valid for 30 days. Page 2 of 2 h�� 7 ob Naar:Mhmi Beach-North Shore Bandshsll Dab: 0411112014 DIVISION:034000 LOW BID Consolidated SCOPE:Concrete AMOUNT 13,386.00 PERCENT BELOW 2nd #DIV/01 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -13.386.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 AVERAGE 13,366.00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR • 93X t UmTS SAM 0110 0.00 REI'E SIGN_WALL STRUCTURE 0.00 incl _. 0.00 0.00, 0.00' 0.00 0.00 BUY OUT/HEDGE Total 13.386.00 March 24, 2014 VIA FAX (954)776-2642 D. Stevenson Construction 6241 No Dixie Highway Fort Lauderdale, Fl.33332 RE: Sign Wall and Seatwall Benchs North Shore Bandshell Park Miami Beach, Florida Dear Ankit: CONSOLIDATED CONSTRUCTION AND DEVELOPMENT CORP. is pleased to submit the following quotations for the labor, material and equipment necessary to complete the concrete work on this project. Marquee Sign Footing and Walls $ 13,386.00 Seatwall $ 3,356.00 Each Wall Our quotation is based on plans prepared by Bornelli and Partners dated 7130/13 The following items are included in this proposal: A. Concrete—Marquee Sign 1. Excavation for footing 2. Footing 3. Sign Wall. This is done in two pours. The first pour is the straight wall at the bottom and the second pour is the high portion which is straight and curved. 4. Concrete pump 5. Concrete and reinforcing steel material B. Seatwall ( 12 lineal feet each ) 1. Excavation for footing 2. Poured concrete wall in the center to accept stone 3. Poured Concrete seat on top of poured wall 4. Stone to be installed by others after concrete work is complete 5. Concrete and reinforcing steel material including short load charges The following items are not included in this proposal: 1. Demolition and removal of any existing items 2. Stone 3. Davis Bacon or Dade County Responsible Wages March 24, 2014 -2- North Shore Bandshell Park The following are to be provided by others; 1. Temporary power,water and sanitary facilities 2. Rubbish containers 3. So it testing 4. Concrete testing 5. Site storage area 9. Barricades and safety railings Please call if you have any questions regarding this information. Very truly yours, Consolidated Construction&Development Corporation Henry R. Kesner President QA? 7 Job Name:Miami Beach-North Shore Bandshell Date: 0411112014 (VISION:04-4000 LOW BID Allowance SCOPE:Coral Wall AMOUNT 15,500.00 PERCENT BELOW 2nd #01V/0! 2nd LOW BID FALSE AMOUNT BELOW 2nd.LOW -15,500.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Surnrnaa Shgat AVERAGE 15,500.00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR NIT EXT 0.00! MO OF EM11NG 1 i CF" 0.00, 1,100.00 CORAL WALL 32 LF 6.00 14.400.00 0.00 0.001 BUY OUT 1 HEDGE Total 15.500.00 47, Job Name:Miami Beach-North Shore Bandsheli Date: 0411112014 I=N.07-8100 LOW BID 5TCO SCOPE-PANELS AMOUNT 19,500.00 PERCENT BELOW 2nd #DIV/0! 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -19,500.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Summary Sheet AVERAGE 19.500,00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR GQ E 19,500.00 0.00 UMIN.UM.CQMPOSITE PANELS 0.00 ind HOP DRAWINGS 0.00a ind 0.00 0.00 0.00 BUY OUT I HEDGE Total 19.500.00 N TES: 5tco CGC045443 CGC1517439 CCCO44031 15 Paradise Plaza,Suite 200 Sarasota,FL 34239 office 941-371-7500 1 fax 941-371-7550 Date: March 27, 2014 uotation To: Mr. Ankit Patel 954.449.4735 office D. Stephenson Construction, Inc. 6241 North Dixie Highway Ft. Lauderdale, FL 33334 Re: BID PROPOSAL: North Shore Bandshell Park-Sign Miami Beach, FL (5tco Quotation 140327—Rev.#0) Gentlemen: FIVE-T-CO proposes to furnish and install, including sales tax and delivery, the material requirements for the above referenced project. Our price includes and excludes the following: BASE Scope of work includes: • Aluminum Composite Panels with Shop Drawings and Engineering Calculations:utilizing 4mm PE Core ACM with standard 2-coat paint finish,fabricated in a Dry Joint system. PRICE- $19,500.00 DEDUCT TO BASE PRICE: • If you would like 5tco to provide ACM panel on lower area of structure only, (below the LED Sign.) DEDUCT----- ------------------------------ -$8,113.00 WE INCLUDE_: • Florida product approval for panel system. • Shop drawings.Protective film over panels. • Freight to site. • Sales tax. • All necessary fasteners,shims, and accessories for a complete panel system installation. • Warranties per specifications. • Monthly Payment Terms due and payable on the 10th of each month. • Retainage to be released within 60 days after we complete our scope of the work. • LEAD TIME FOR SHOP DRAWINGS 5-7 weeks from LOI and receipt of other trade details. • LEAD TIME FOR PANEL DELIVERY 5-7 weeks from Approved Shop Dwgs and F.M. • INSTALLATION 2-4 Days. Our crews work 4 10hr days with Fridays and Saturdays for make-up days caused by weather or other type on construction situations. a I 5teo CGC045443 CGC1517439 CCC044031 15 Paradise Plaza,Suite 200 Sarasota,FL 34239 office 941-371-7500 1 fax 941-371-7550 WE EXCLUSIONS:(Unless noted above) Engineering Structural Steel Misc. Steel Job Specific Testing(field or lab) Mock-ups Stud Framing Girts Sub-Girts Weather Barriers Bonds&Permit Fees Insulation Field Measurements Penetrations Copings Metal Roofing Scupper Boxes Louvers Windows Custom Color Gutters& Downspouts Glass&Glazing Sunshades Miami-Dade NOA All Substrate Mat'Is Embeds Curtainwall Fire Safing Caulking not part of System Wood Blocking Demolition Canopies Expansion Joints Overtime Demobilization Re-mobilization Liquated Damages NOTE:We will need to field measure structure once it is 100%, this will ensure all panels are fabricated to fit perfectly. Please advise when you will be ready for us to do so. We appreciate the opportunity to quote this project and if you have any question please email or call me anytime in our Sarasota office at 941-371-7500 office. Sincerely, Jud Tucker 5tco 5tco.com Office: 941.371.7500 Fax: 941.371.7550 Mobile: 941.650.7789 Email: jtucker(u5tco.Co1T1 Q,`Vp 7 ob Nmw:Mlaad Beach-North 8hon Bandshell Dab: 08111/2014 M1ON:07-9100 Low sm metro OPE:Caulking AMOUNT 500.00 PERCENT BELOW 2nd #DIV/01 2001LOWBID FALSE AMOUNT BELOW 2nd LOW -500.00 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 Back to Summary Sft2 i1VER 500.00 PVC11INTOLOWAVERAft 0% SUBCO;NTRACTOlk am UNITS G SIDEWALKS E WANSM:R(3&M 200 LF 0.00 500.00 0.00 0.00 Oa'10 0.00 0.00 0.00; BUY OUT 1 HEDGE Total 500.00 N T METRO CAUNG WATERPROARNG LLC. April 11, 2014 Ankit Patel D. Stephenson Construction 6241 North Dixie Highway , Fort Lauderdale, FI 33334 I Re: North Shore Bandshell Park 7261 Collins Avenue Miami Beach Dear Ankit, Metro Caulking &Waterproofing LLC Proposes to furnish all labor, materials, equipment and supervision to complete the following: 1. Caulk 1/2 inch slab on grade expansion joints per detail 61A101. 2. Scope: 200 lineal feet. i TOTAL PRICE: $ 500.00- Any alteration or deviation from above specification involving extra cost of material or labor will-only be executed upon written order for same, and will become and extra charge over the sum mentioned in this contract: All agreements to be made in writing. Metro Caulkin &Waterproofing, LLC. reserves the right to submit a new Caulking 9 proposal if this proposal is not accepted in writing within thirty.(30) days from date hereon. Respectfully submitted, METRO CAULKING & WATERPROOFING, LLC. JJe B. Snyder President /krnb 1100 S.W.30*Avenue • Pompano Beach,FL 33069 • (954)974-0770• Fax.(954)974-0799 s o,�,g► 7 Job Nonm M'aiml Bach-North Shoe Bandsheli Date: 04111/2014 $ION:10.4010 LOW BID BR Signs OPE•Marquee Sign age AMOUNT 55,124.60 PERCENT BELOW 2nd #DIV/0! 2nd LOW 810 FALSE AMOUNT BELOW 2nd LOW -55,124.60 AMOUNT 0.00 AMOUNT BELOW AVERAGE 0.00 AVERAGE 55,124.60 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR BASE BID. 0. ED EXTERIOR MESSAGE BOARD OE 42,780.00 ALES TAX ON LED BOARD 0.00 2.994.60 0.00 0.00 _ 0.00 INSTALL LED BOARD&LETTERING _. - 0.00 71900.00 S.S.ENGINEERED PLANS 0.00 500.00 PERMIT FEES 0.00 950.00 0.00 } 0.00 0.00 BUY OUT t HEDGE Total 55.124.60 Proposal with Signage Breakdown BR Signs;lnternationaE 7551 Wiles Rd'-Ste 204 Pro)ect Name North tWe 8arWell Pwk Cwaliprings fl-D067 DATE March 27.2014 954-SM1701•954-796-8990 fax win+w.brjWngftM tic)M&o Contractor-.03 Stephenson K DESCRIPTION � UNIT PstK,E LINE T+Qfu Miami Beach Marquee Sign,I-E10 exterior Message Board(top,of the;line} g LOOL 42,780.00 42.78D.00 T 00 Sates Tax on LED board Z."4.60 3 ttadcfi l't.00 6 # X11 of aluminum s cLaWin ,1.0f Ins, ,and LED Board g 9.900A 1.00 Signed and Seated Engineer Plans SWOO 1:00 Permit Fees 950,M 950.00 0} Sales Tax on Balance �.,...__.._._ SUBTOTAL' $ Jessica Vaughn SALES TM 8 t1 t?FS,. 1 t 1, Ft TOTAL Please lteep w in mfhd for any other;signage for this project.WO art a full Service, tutt�orrtrdJty mc� experienced sign company. Job Name:Miami Beach-North Shore IlwWshe0 Date: 0411112014 DIVISION:16.5100 LOW BID CEI SCOPE:Sits Ughting AMOUNT 24,143.00 PERCENT BELOW 2nd #DIV/0I 2nd LOW BID FALSE AMOUNT BELOW 2nd LOW -24,143.00 AMOUNT 0.00 AMOUNT t]ELOW AVERAGE 0.00 AVERAGE 24,143.00 PERCENT BELOW AVERAGE 0% SUBCONTRACTOR 4r V 16.843.00 TYPE&1 AT 7Znd WALKWAY ONLY Ind TO MARGU�SK,1N WEtfNGONLY incl ING AND BACKFILUNG IN SAND BEHIND THE PARK WALL APPROX3I5 FT ONLY 4,800.00 SAfE° ALLOWANCE FOR LIGHTS AT MOSAIMALL 2,500.00 BUY OUT 1 HEDGE Total ;4,1:43.00 NOTES: MMMM IBlllf 3E, Mi IND Proposal DATE' 4/11/2013 North Shore Bandshell D. Stephenson Construction Attn: Ankit Patel Scope of Work: As per Electrical Drawings and scope walk through Furnish&Install As per electrical drawings, E001, &E100. Fixture Allowance$6,890.00 • Misc./Material/Labor $9,953.00 Allowances: Included in base bid • Trenching $4,800.00 Cut/Cap and Safe-off$2,500.00 Exclusions: I The Owner agrees to pay any and all payments according to the payment schedule detailed below.Should said payment(s)not be made,or if satisfactory arrangements for payment have not been made,the Contractor reserves the right to stop all work until such time as payment is rendered or satisfactory payment arrangements have been made. TotalCost........................................................................................................ ...$24,143.00 Signed By: Date: Jub ert Lowe ______ __ Date . _ 4111114- ____------ --------- i ATTACHMENT V CONSTRUCTION MANAGER'S SALARY AND WAGE SCHEDULE ATTACHMENT VI PROJECT SCHEDULE (TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) r ATTACHMENT VII ONSITE SITE MANAGEMENT AND SUPERVISORY PERSONNEL f ATTACHMENT VIII SCHEDULE OF VALUES (TO BE SUBMITTED FOR APPROVAL UPON ISSUANCE OF NOTICE TO PROCEED NO. 1) i D_ STEPHENSON C o n s t r u c t o n n c - Quality Work-Professionalism-Reliability-Teamwork-Integrity City of Miami Beach North Shore Bandshell Park 7251 Collins Ave. Miami Beach, FL 33141 ATTACHMENT V SALARY AND WAGE SCHEDULE 1. Project Manager: $81.25/Hr. 2. Superintendent: $68.25/Hr. Page 1 of 1 D_ STE F10 C30 N t r u c t 1 0 " 1 " _ Quality Work-Professionalism-Reliability-Teamwork-Integrity City of Miami Beach North Shore Bandshell Park 7251 Collins Ave. Miami Beach, FL 33141 ATTACHMENT VII ONSITE MANAGEMENT AND SUPERVISORY PERSONNEL 1. PROJECT MANAGER: ROGER REYES 2. SUPERINTENDENT: JORGE CHOISEUL-PRASLIN Page 1 of 1