Amendment 4 to PSA with ZAHA HADID LTD ZAHA HADID Architects & ES AMENDMENT NO. 4 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A/E) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND A JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3RD, 2012, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE COLLINS PARK GARAGE PROJECT IN THE AMOUNT OF $249,448 This Amendment No. 4 to the Agreement made and entered this2day of �yhc� , 2014, by and between the CITY OF MIAMI BEACH,a municipal corporation existing under the laws of the State of Florida(hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and a Joint Venture of Zaha Hadid Limited t/a Zaha Hadid Architects, a company certified by the Registrar of Companies for England and Wales, having its principal office at 10 Bowling Green Lane, London, EC1 R OBQ,United Kingdom (hereinafter referred to as the "Prime Architect"; and Berenblum Busch Architecture, Inc., a Florida corporation, having its principal office at 2700 North Miami Avenue, Suite 601, Miami, Florida 33127(hereinafter referred to as the"Executive Architect"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 31-10/11, the Mayor and City Commission adopted Resolution No. 2012-27869 on March 21, 2012, approving a Professional Services Agreement(the Agreement) between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc., in the amount of$2,951,823, for the Planning,Architectural, Engineering, Design,Bid and Award,And Construction Administration Services for the Collins Park Garage Project; and WHEREAS, Amendment No.1 to the Agreement, for the provision of additional surveying services and extended representation during July City Commission meetings, was executed on September 30, 2013, in the amount of$8,935; and WHEREAS,Amendment No.2 to the Agreement,for the provision of a Phase I I Environmental Site Assessment,for the investigation of recognized environmental conditions(RECs)identified on the Phase I Environmental Site Assessment report,was executed on September 30,2013,in the amount of $12,114; and WHEREAS, Amendment No. 3 to the Agreement, for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation between two(2)and four(4)feet(Base Flood Elevation plus 2 or 3 feet),was executed on May 28, 2014, in the amount of$24,969; and WHEREAS,the following Amendment No.4 to the Agreement,in the amount of$249,448,is for construction documents revisions associated with raising the proposed finish floor elevation to Base Flood plus three(3) feet;for the design, permitting and construction administration services of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division; and for the design, permitting and construction administration for the replacement sanitary sewer line (and associated structures if required) along Liberty Avenue, requested by the City's Public Works Department; and WHEREAS, the new total amount of the agreement is $3,247,289; and Page 1 of 3 Collins Park Garage-Amendment No.4 '201 NOW,THEREFORE,the parties hereto,and in consideration of the mutual promises,covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 4. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-4", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 4. IN WITNESS WHEREOF,the parties hereto have caused this Amendment No.4 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY F MIAMI BEACH �T Rafa i Granado (� Ph', ne City Clerk -= ,. vu-Mayor 5+tIY%, ED- ATTEST : PRIME ARCHITECT (P.A.)/ZAHA HADID ''••.,. <0 LIMITED T/A ZAHA HADID ARCHITECTS Signature/Secretary: 45atuire/ Pr si nt y� Print Name Print Name ATTEST : EXE TIV A CHITECT (E.A.)/ BE B USCH ARCHITECTURE, IN (ILPfe-- Sig nna'ture%Secretary: Sign ur / Pr si ent &SC4 �0500 bq� �w Print Name Print Name APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION Page 2 of 3 ;;�J-04&``---1 (, 3 Collins Park Garage-Amendment No.4 City Attorney Date SCHEDULE "A-4" SCOPE OF SERVICES Schedule "A"entitled, "Scope of Services", is amended as follows: Add the following under Task 6 —ADDITIONAL SERVICES Task 6.5.1 — Design and Construction Documents Revisions — Finish Floor Elevation: Design and construction documents revisions associated with raising the proposed ground finish floor elevation to Base Flood plus three (3)feet, as recommended by the Flooding Mitigation Committee. Task 6.5.2—Right-of-Way Improvements required by Miami-Dade County Public Works Traffic Division: Design, permitting and construction administration of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division, during the January 31, 2014 meeting, as a condition for project approval. These include a roundabout on the corner of Park Avenue and 22nd Street, and a median along Park Avenue between 22nd and 23rd Streets, and bulb-out on Liberty Ave. Task 6.5.3—Sanitary sewer line replacement: Design, permitting and construction administration services for the replacement of the existing gravity sewer line along Liberty Avenue (including associated structures if required), as requested by the City's Public Works Department. PAYMENT AND COMPENSATION The total fee proposed for this Scope of Work is $249,448 (refer to Exhibit A-4 attached herein). COMPENSATION Zaha Hadid Berenblum Busch Total Limited Architecture Original Agreement Amount $1,276,000 $1,675,823 $2,951,823 Amendment No. 1 N/A $ 8,935 $ 8,935 Amendment No. 2 N/A $ 12,114 $ 12,114 Amendment No. 3 $ 17,509 $ 7,460 $ 24,969 Amendment No. 4 $ 109,981 $ 139,467 $ 249,448 Revised Agreement Amount $1,403,490 $1,843,799 $3,247,289 Page 3 of 3 Collins Park Garage—Amendment No.4 r EXHIBIT A-4 BEAE OLUM MACH"ICWMCTUW_INC 273014W?k WAMI AVENUE.SUME%l ct.J.?'2; . . P305 K;1 3A93'WwW tbnwrUse1w.G9ar AA May 22, 2014 [Revised June 02, 20141 Mr. Humberto Cabanas City of Miami Beach 1700 Convention Center Drive Miami Beach Fl. 33139 Re: Amendment No.4 Adjustments to the project as follows: 1-City's request to raise the ground floor finish floor 3 feet above the current Building Flood Elevation. 2-Sanitary line replacement and extension along Liberty Avenue from 23rd Street to 22nd Street. 3- Design of a roundabout and median on Park Avenue between 22nd and 23rd Street. Dear Mr.Cabanas: Berenblum Busch Architecture, Inc. (BBA) is pleased to present the enclosed proposal for additional services related to design revisions requested by the City of Miami Beach. The revisions include the request to raise the ground floor finish elevation as shown on Strategy 2 (BFE+3) dated May 14`h, 2014 presented and approved by the Flooding Committee (Amendment #3), for a previously approved amount of$25,000.This strategy includes creating a platform at the new elevation for the retail and sidewalk portions of the project, while slightly ramping the public plaza and Liberty Avenues to lessen the impact of the height increase. The revisions impact several disciplines including architecture, civil engineering, structural engineering, parking design and cost estimating. Time extension to the contract: approximately 1.5 months upon receiving approval. The following additional fees are being requested: ZAHA HADID ARCHITECTS: $109,981.00 BBA: $ 44,718.95 LANGAN ENGINEERING: $ 15,000.00 TIM HAAS&Assoc. $ 2.200.00 PACO GROUP: $ 600.00 DE SIMONE: $ 20.000.00 BBA Sub-Total $ 82,518.95 Total(Not-to-Exceed) $192,499.95 The sanitary line extension concerns civil engineering services for a gravity sanitary extension along Liberty Avenue to replace an existing 15"diameter line with a new DIP gravity sewer and cutting in a manhole on the existing system. (Refer to enclosed herewith proposal from Langan Engineering) Fee(Not-to-exceed) Langan Engineering$14,028.00 The roundabout and median design was requested by Miami-Dade County in relation to the Collins Park Place project, it entails the geometric design of the circle the curbing plan of the proposed roundabout and the traffic separator that will extend from 22-7 to 2V Street. per 1 r enclosed fee proposal. Fee(Not-to-exceed) Langan Engineering $42,920.00 We thank you for the opportunity to present this additional service request. Please let us know if you need any additional information. Submitted by, Berenblum Busch Prchitecture, Inc. Gut o Berenbl m,AIA. Pr si ent C: Thais Vieira,CMB; Chris Lepine, ZHA; project file. L ZAHA HADID ARCHITECTS, LTD. AMENDMENT NO.4. FEE SCHEDULE FOR PROFESSIONAL SERVICES AND BILLING BREAKDOWN Ground Elevation Change-add 3'to Base Flood Elevation and adjust design accordingly Date: May 28,2014 Professional Personnel Rates Task 1 Hrs Billable Principal $150.00 49 $7,350.00 Sr.Architect $115.00 230 $26,450.00 Sr. Designer $115.00 240 $27,600.00 Architect $101.00 240 $24,240.00 Architect 1 $101.00 241 $24,341.00 TOTAL $109,981.00 Task 1. Implementation of construction documents revision related to ground floor at new elevation of BFE+3' and coordination with consultants and Berenblum Busch Architects i BERENBLUM BUSCH ARCHITECTURE, INC. AMENDMENT NO. 4. FEE SCHEDULE FOR PROFESSIONAL SERVICES AND BILLING BREAKDOWN Ground Elevation Change-add 3'to Base Flood Elevation and adjust design accordingly Date: May 28, 2014 [Revised June 02,2014] Professional Personnel Rates Task 1 Hrs Billable Principal $150.00 21 $3,150.00 Sr. Architect $115.00 27.73 3,188.95 Architect $101.00 180 $18,180.00 Architect 1 $101.00 200 $20,200.00 TOTAL $44,718.95 Task 1. Implementation of construction documents revision related to ground floor at new elevation of BFE+3' and coordination with consultants and Zaha Hadid Architects LANGAN ENGINEERING & ENVIRONMENTAL SERVICES 15150 NW 79" Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX (215) 864-0671 CONTRACT CHANGE ORDER FOR ADDITIONAL SERVICES DATE: 8 April 2014 REVISED: 30 May 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO.: 300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OF WORK: This change order has been prepared to identify additional scope and fees associated with regrading the proposed site of the Collins Park Garage. Currently the proposed grading reflects finished floor elevations that are 4 inches above the highest adjacent road crown elevations. We have been advised by Berenblum Busch Architecture that the City of Miami Beach is in the process of passing an ordinance that will require all new buildings to have the minimum finished floor elevation a minimum of 36-inches above the FEMA Base Flood Elevation. To meet the requirement of the proposed ordinance, the site plan will have to be modified by Berenblum Busch Architecture which in turn will require redesigning the site grading. This additional service proposal is for redesigning the site grading and drainage plan. This proposal excludes design of retaining walls and design of structural elements. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL: 15,084 (See attached man-hour allocation table) LANGAN will proceed with the above described scope of services upon receipt of this form signed by you which authorizes Langan to begin work.. If notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification. All terms of the original agreement remain in effect. Agreement Authorized By : Gustavo Berenblum, AIA for Langan: Leonardo Rodriguez, P.E. cc: \\langan.com\data\MI\data8\300089801\Marketing Data\Proposals\2014-04-08 Revised Regrading Add Services\2014-04-08 Site Regrading Add Services.docx PROJECT NAME: COLLINS PARK GARAGE REGRADING ADD. SERVICES CLIENT: Berenblum Busch Architecture LOCATION: City of Miami Beach,Miami-Dade County,FL PRIN PM PES Cad Insp CLER TASK $150.00 $120.00 $101.00 $83.00 $83.00 $35.00 AMOUNT $0.00 Meetings with Design Team to coordinate revised grading.Three meetings at four hours each. 2 $240.00 Prepare conceptual grading plan. 2 8 16 $2,376.00 Redesign drainage structures at intersection of 23rd Street and Liberty Avenue. 2 8 16 $2,376.00 Prepare 25%of the 60%design development grading plan. 2 12 32 $4,108.00 Prepare 50%of the 60%design development grading plan. 2 24 40 $5,984.00 $0.00 Total 0 10 52 104 0 0 $15,084.00 rlmFkE*q4lb wwwAimhaahs.com TIMOTHY HAAHS&ASSOCIATES,INC. 40 NVV 3rd Street,Suite 1102 MIAMI,FL 33128 T.305-592-7123 F.305-592-7113 March 11, 2014 (revised May 22, 2014) Mr. Mario Menendez Project Designer Berenblum Busch Architecture 2700 North Miami Avenue Suite 601 Miami, FL 33127 RE: Miami Beach Collins Park Garage Finish Floor Elevation&Additional Services Miami Beach, FL Dear Mr. Mendez: Timothy Haahs &Associates, Inc. (TimHaahs) is pleased to provide you with our scope of services and fee to provide additional services related to the City of Miami Beach Public Works implementing a change in determining finish floor elevations for all new buildings and renovations, including the Collins Park parking facility. We understand that this new regulation will require the finish floor to be set at +3 feet above the base flood elevation. SCOPE OF SERVICES The following is an outline of our proposed additional services: • Calculation of slopelramp design to conform to the necessary clearances required for programming space under the ramp. • Study possible relocation of PARC equipment to conform to any changes to ramp. • Internal review of proposed design. • Coordination with ZHA and BBA. PROFESSIONAL FEE TimHaahs requests these additional services based on the scope of work outlined above for a Lump Sum Professional Fee of Two Thousand Two Hundred Dollars ($2,200.00). Our hours will be broken down by staff member as follows: Principal 2 hours $87.00 Senior Designer 26 hours $67.00 Project Manager 4 hours $71.00 PLANNING ARCHITECTURE ENGINEERING PAP.KING Mr. Mario Mendez Berenblum Busch Architecture Miami Beach Collins Park Garage Additional Services March 11, 2014 (revised May 22, 2014) Page 2 We appreciate the opportunity to provide you with our request for these additional services. We look forward to continuing to serve MDDA by providing these services in a prompt and professional manner. Sincerely, r 1 Timothy Haahs, PE, AIA President CC: Juan Ramos AUTHORIZATION Trusting the above is satisfactory, please sign and return one copy as our authorization to proceed. Signature: Name: Title: Date: VmHaahs pPACO Group 4il New York March 18,2014 110 William Street 12th Floor Berenblum Busch Architecture New York,NY 10038 2700 N.Miami Ave.,Ste.601 t:212.685.0578 Miami,FL 33127 f:212.685.1379 Attn:Mario Menendez,Project Designer Miami 7205 Corporate Center Drive RE:FEE PROPOSAL FOR CPP FINISH FLOOR ELEVATION Suite 504 ADDITIONAL SERVICES Miami,FL 33126 t:305.666.3456 Mario, f:305.666.8217 Below please find a fee proposal for developing a cost estimate related to raising floor elevations and associated activities as per City of Miami Beach requirements. Fee Proposal Task: Estimate cost related to raising ground floor elevation and associated activities in compliance with+2 feet above Base Flood Elevation(BFE). Proiected Hours: 5 Employee Category: Senior Estimator Hourly Rate(as per Master Contract):$175.00 Should you have any questions,please feel free to contact me at(212)685-0578 or lluaona,pacoeroup.com. Thank you. 444 , Luis Lugo,Jr. President&COO cc:C.Sanchez,H. An DESIMONE NEW YORK MIAMI Date: March 7,2014 SAN FRANCISCO NEW HAVEN LAS VEGAS Project Name: Collins Park Garage HONG KONG DESIMONE Project Number: 5684 ABU DHABI RE: Revised Ground Floor Elevation SHANGHAI Extended Service Request No.: 1 Description of Services: We received a request from Berenblum Busch Architecture to revise the ground floor retail space slab elevation. The slab will be raised above the base flood elevation and thus a structural slab tied down to the foundations will no longer be required.This will require us to revise our drawings as outlined below: • Coordinate foundations with new slab elevations. • Provide additional grade beams brace smaller column foundations. • Coordinate and revise storefront to ground floor slab interface details. • Provide additional slab on grade details to reflect changes in elevations. • Provide details for ramps and stairs details. • Provide framing to support ADA lifts. We will provide revised drawings for the above-mentioned items. We are requesting compensation for the engineering services required.Work on these revisions will commence up on acceptance of this proposal. Lump Sum Fee: $20,000 Terms and conditions shall be in accordance with our original proposal with Zaha-Hadid Architects dated 11/03/11. Ramiro R.Areas, P.E., Project Manager .+ Approved: Gustavo Berenblum, Berenblum Busch Architects P\Protects\5684\C orres\Proposoi\5684-2014 W p7-GaCPG_AdcawrvPmposa1.doc DESIMONE CONSULTING ENGINEERS 800 BRICKELL AVENUE 6TH FLOOR MIAMI,FLORIDA 33131 P.305.441.0755 F.305.447.9023 LANGAN ENGINEERING & ENVIRONMENTAL SERVICES 15150 NW 79" Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX(215) 864-0671 CONTRACT CHANGE ORDER FOR ADDITIONAL SERVICES DATE: 8 April 2014 REVISED: 30 May 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO.: 300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OF WORK: This change order has been prepared to identify additional scope and fees associated with civil engineering design of a gravity sanitary sewer extension along Liberty Avenue from 23rd Street to 22" Street. The design will entail replacing the existing 15-inch diameter gravity sanitary sewer and manholes with a new DIP gravity sewer and cutting in a sanitary sewer manhole on the existing gravity sewer that runs along 22nd Street and 23rd Street respectively. Our plans will show the proposed 15-inch gravity sewer in plan and profile view and will include notes and specifications on the plans. This proposal excludes surveying and design of sanitary sewer pumping stations. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL: $ 14,028.00 (See attached man-hour allocation table) LANGAN will proceed with the above described scope of services upon receipt of this form signed by you which authorizes Langan to begin work.. If notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification. All terms of the original agreement remain in effect. r? i' Agreement Authorized By : Gustavo Berenblum, AIA for Langan: Leonardo Rodriguez, P.E. cc: \\langan.com\data\MI\data8\300089801\Marketing Data\Proposals\2014-04-08 Sanitary Sewer Add Services\2014-04-08 Sanitary Sewer Add Services.docx PROJECT NAME: COLLINS PARK SANITARY SEWER DESIGN ADD. SERVICES CLIENT: Berenblum Busch Architecture LOCATION: City of Miami Beach,Miami-Dade County,FL PRIN PM PIES Cad Insp CLER TASK $150.00 $120.00 $101.00 $83.00 $83.00 $35.00 AMOUNT Task-2 Meetings: attend 1 meetings with City of Miami Beach Public Works Department. 3 $360.00 Task-3 Schematic Plans: Prepare schematic sanitaryr sewer alignment plans 4 12 $1,400.00 Task-4 Construction Plans: Prepare plan and profile views of the sanitary sewer extnsion along Liberty Avenue. 1 1 24 40 $6,014.00 Task-5 Permit Processing: Process permit plans through City of Miami Beach Utility Department and the Miami- Dade County Department of Regulatory and Economic Resources(RER). 8 20 $2,468.00 Task-6 Construction Phase Services: Conduct 3 site observations,review shop drawings,address contractor requests for information and review as- built plans. 1 10 32 $3,786.00 Total 1 5 46 72 32 0 $14,028.00 y g, LANGAN ENGINEERING & ENVIRONMENTAL SERVICES 15150 NW 79`h Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX (215) 864-0671 CONTRACT CHANGE ORDER FOR ADDITIONAL SERVICES DATE: 8 April 2014 REVISED: 30 May 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO.: 300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OF WORK: This change order has been prepared to identify additional scope and fees associated with civil engineering design of the roundabout requested by Miami-Dade County for the Collins Park Garage. This proposal is for the design of the roundabout as shown on the attached response memorandum prepared by Kimley-Horn and Associates, Inc., dated 27" March 2014 and entitled "Collins Park Garage Miami-Dade County Conceptual Roundabout Comment Response." Our plans will include the geometric design of the circle, the curbing plan for the proposed roundabout and the traffic separator that will extend from 22 d Street to 23rd Street. Also included in this proposal is the design of the bump outs requested by Miami-Dade County at the intersection of Liberty Avenue and 22 d Street. We will also show on the plans the proposed grading and the pavement marking and signage. This proposal excludes surveying, signalization plans and utility relocations. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL: $ 42,.920.00 (See attached man-hour allocation table) LANGAN will p r oceed with the above described scope of services upon receipt of this form signed by Y ou which authorizes Langan to begin work.. If notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification. All terms of the original agreement remain in effect. Agreement Authorized By : Gustavo Berenblum, AIA for Langan: Leonardo Rodriguez, P.E. cc: \\langan.com\data\Ml\data8\30008980IWarketing Data\Proposals\2014-03-7 Traffic Circle Add Services\2014-05-30 Revised Traffic Circle Proposal\2014-05-30 Revised Traffic Circle Add Services.docx PROJECT NAME: COLLINS PARK GARAGE ROUNDABOUT ADD.SERVICES CLIENT: Berenblum Busch Architecture LOCATION: City of Miami Beach,Miami-Dade County,FL PRIN PM PIES Cad Insp CLER TASK $150.00 $120.00 $101.00 $83.00 $83.00 $35.00 AMOUNT Task-1 Project Kick-Off: Attend kick- off meeting,conduct site visit,review as- built plans,prepare the required survey scope and review the survey provided. 4 16 8 2 $2,830.00 Task-2 Meetings: attend 2 meetings with Miami-Dade County and attend 3 meetings with the City of Miami Beach Public Works Department. 15 2 $1,870.00 Task-3 Schematic Plans: Prepare schematic geometry plans for the traffic seperators and the roundabout. 1 6 32 48 $8,086.00 Task-4 Construction Plans: Prepare final geometry plans,grading plans, temporary pavement marking and signage plans and final pavement markign and signage plans. 1 8 56 84 $13,738.00 Task-5 Permit Processing: Process permit plans through Miami-Dade County and the City of Miami Beach Public Works Department and address agency requests for information. 6 24 56 2 $7,862.00 Task-6 Construction Phase Services: attend 4 construction meetings,conduct 4 site observations,review shop drawings,address contractor requests for information and review as-built plans. 8 48 32 2 $8,534.00 Total 2 47 176 196 32 8 $42,920.00 ,. Is;, 1 Kimiey-Horn and Associates,Inc. Memorandum ■ To: Joan Shen,Ph.D, P.E., PTOE Suite N Pine Island Road Miami-Dade County Suite 450 Public Works and Waste Management Department Fort Lauderdale,Florida Traffic Engineering Division 33324 From: Adrian K. Dabkowski, P.E. TOE John J. McWilliams, P.E A CC: Jeff Cohen, P.E., Miami-Dade County Eva Tiedemann;Zaha Hadid Chris Lepine;Zaha Hadid Thais Vieira, R.A.;City of Miami Beach Gustavo Berenblum,AIA; Berenblum Busch Architecture Date: March 27,2014 Subject: Collins Park Garage Miami-Dade County Conceptual Roundabout Comment Response Based on the comments provided in the March 6, 2014 e-mail from the Miami- Dade County Public Works and Waste Management Department, Traffic Engineering Division, the conceptual roundabout at the intersection of Park Avenue and 22"d Street has been revised, see attached. The following modifications have been made: • At the intersection of Park Avenue and the parking garage driveway, a dedicated northbound right-turn lane and through lane are provided. • Parking guide signs were revised on the southbound approach to the roundabout with appropriate illustrations for vehicle movement • One-way direction of travel westbound along Washington Court confirmed. • The proposed Collins Canal Trail was drafted on the plan. We trust that these responses adequately address the comments provided. Please contact us if you have any questions. K:\FTL_TPT0\043439000-Co11ins Park Garage\Correspondence\memo\03 27 14 Shen-Park Avenue and 22nd Street Roundabout.docx 0 TEL 954 535 5100 �� �' o• --m- HOV39 r- w ' _ M� Poo- IMIMMM pue IMI 11'i��� hot.- • ` Alp Ab <.. r4 At1 + xCIUM Bj Fir •=9 a°* rya- \I.• - ! \ Y t c , w. .. " t. t• 4aq b - v