2014-28637 Reso RESOLUTION NO. 2014-28637 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN THE CITY AND SOUTHERN UNDERGROUND INDUSTRIES, INC., DATED JUNE 11, 2014 (THE AGREEMENT), RELATING TO THE CITYWIDE HIGH TIDE MITIGATION PROJECT (PROJECT), INCREASING THE SCOPE OF THE PROJECT TO INCLUDE ADDITIONAL ENGINEERING SERVICES, INSTALLATION OF TEMPORARY STORMWATER PUMP STATIONS, DRAINAGE STRUCTURES, AND ADDITIONAL CHECK VALVES FOR EXISTING OUTFALLS, AND THE REMOVAL OF EXFILTRATION TRENCHES FOR THE PROJECT; AND FURTHER INCREASING THE PROJECT COST TO INCLUDE THE ADDITIONAL COST OF $661,980.50, PLUS A PROJECT CONTINGENCY IN THE AMOUNT OF $88,019.50, FOR A TOTAL COST OF $750,000. WHEREAS, at its meeting of April 9, 2014, the City Commission approved the award of a contract for the Citywide High Tide Mitigation Project (the Project) to Southern Underground Industries, Inc. (Southern), pursuant to Invitation to Bid (ITB) No. 2014-094SR; and WHEREAS, the City entered into a contract with Southern (the Agreement), for the Project, in the amount of $516,650.00, plus a project allowance of $200,000.00 for expediting future additional work, and a base project contingency in the amount of$71,665.00, for a not-to- exceed grand total of$788,315.00; and WHEREAS, the Project's scope of work includes the installation of drainage pipes to be in conjunction with the installation of check valves in discharge pipes, temporary stormwater pump stations, existing drainage structure modifications, and the installation of check valves where tidal flooding has occurred or is predicted to occur; and WHEREAS, in order to protect residents, businesses, and properties from tidal flooding within the City of Miami Beach, the Public Works Department requires an additional scope of work to the existing Agreement (Change Order No. 1); and WHEREAS, under Change Order No. 1, Southern would provide all necessary labor and equipment for the additional scope of work including, additional engineering services, installation the additional check valves, drainage structures, the installation of temporary stormwater pump stations, and the removal of existing exfiltration trenches; and WHEREAS, the cost associated with Change Order No. 1 is $661,980.50, plus a total Project contingency in the amount of$88,019.50, for a total construction cost of$750,000. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission-hereby approve and authorize the Mayor and City Clerk to execute Change Order No. 1 to the Agreement between the City and Southern Underground Industries, Inc., dated June 11, 2014, relating to the Citywide High Tide Mitigation Project (Project), increasing the scope of the Project to include additional engineering services, installation of temporary stormwater pump stations, drainage structures, and additional check valves for existing outfalls, and the removal of exfiltration trenches for the Project; and further increasing the Project cost to include the additional cost of $661,980.50, plus a Project contingency in the amount of $88,019.50, for a total cost of$750,000. PASSED and ADOPTED this day of�,, 14n e , 2014. ATTEST: PHI ' P 11 MAYOR RA AEL E. GRANADO, C TY CLERK T:\AGENDA\2014\June\Citywide H' e.PVi*tigati ••.�ect•q rder No 1 RESO(2).doCx ti I INCORP ORATED . i" APPROVED AS TO Y . FORM & LANGUAGE `` ``l;( '�dap ;° •°• ,� � f & FOR EXECUTION �7— City Attorney- ate COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No. 1 To Southern Underground Industries, Inc., Dated June 11, 2014 (The Agreement); Said Change Order To Be In The Amount Of $661,980.50, Plus A Project Contingency In The Amount Of$88,019.50, For A Total Cost Of$750,000, For Additional Engineering Services, Temporary Pump Station Drainage Structures, Installation of Drainage Pipe, And Check Valves For Existing Outfalls, For The Citywide High Tide Mitigation Project. Key Intended Outcome Supported: Ensure value and timely delivery of quality Capital Projects. Supporting Data (Surveys, Environmental Scan,etc.): N/A Item Summa /Recommendation: At its April 9, 2014 meeting, pursuant to Invitation to Bid (ITB) 2014-086-SR for the Citywide High Tide Mitigation Project, the City Commission authorized an award for construction with Southern Underground Industries, Inc. in the amount of $516,650, in addition to a project -allowance of $200,000.00 for expediting future additional work, and a base project contingency in the amount of $71,665.00, for a not-to-exceed grand total of$788,315. The project's scope of work includes the installation of drainage pipes to be in conjunction with the installation of check valves in discharge pipes, temporary stormwater pump stations, existing drainage structure modifications, and the installation of check valves where tidal flooding has occurred or is predicted to occur. As a continuation of the initiative to protect residents, businesses, and properties from tidal flooding within the City of Miami Beach, the Public Works Department requests an additional scope of work to the existing ITB. An analysis was performed by the Engineering Division and identified areas that would be subjected to flooding during the anticipated high tides in October 2014. Southern Underground Industries, Inc. was approached and asked to submit a cost proposal to add the necessary work to their contract. Under the change order, Southern Underground Industries, Inc. would also provide all necessary labor and equipment for the installation of additional check valves, drainage structures, temporary stormwater pump stations, and removal of existing exfiltration trenches. Southern Underground Industries, Inc. submitted a cost proposal in the amount of $661,980.50 (ATTACHMENT) plus a project contingency in the amount of $88,019.50. This cost proposal was submitted to the City's Public Works Department for review and recommendation. City staff has found the amount to be fair and reasonable. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 750,000.00 429-2454-069357 Mancial BPI Total 750,000.00 Impact Summary: City Clerk's Office Legislative Tracking: Eric T. Carpenter, ext.6012 Sign-Offs: Department Director Assistant. a er City ager OR 01 ETC MT J LM T:\AGENDA\2014\May\Sunset Harbour Pump Stations Improvements Change Order No 1 SUMMARY.docx AGENDA ITEM Rim MIA/"\/A\l B DATE G-11 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members of e City Co mission FROM: Jimmy L. Morales, City Manager DATE: June 11, 2014 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND .AUTHORIZING THE MAYOR AND CITY CLERIC TO EXECUTE CHANGE ORDER NO. 1 TO SOUTHERN UNDERGROUND INDUSTRIES, INC., DATED JUNE 11, 2014 (THE AGREEMENT); SAID CHANGE ORDER TO BE IN THE AMOUNT OF $661,980.50, PLUS A PROJECT CONTINGENCY IN THE AMOUNT OF $88,019.50, FOR A TOTAL COST OF $750,000, FOR ADDITIONAL ENGINEERING SERVICES, TEMPORARY PUMP STATION DRAINAGE STRUCTURES, INSTALLATION OF DRAINAGE PIPE, AND CHECK VALVES FOR EXISTING OUTFALLS, FOR THE CITYWIDE HIGH TIDE MITIGATION PROJECT. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution. FUNDING Amount Account Number $750,000 429-2454-069357 BACKGROUND At its April 9, 2014 meeting, pursuant to Invitation to Bid (ITB) 2014-086-SR for the Citywide High Tide Mitigation Project, the City Commission authorized an award for construction with Southern Underground Industries, Inc. in the amount of $516,650.00, in addition to a project allowance of $200,000.00 for expediting future additional work, and a base project contingency in the amount of$71,665.00, for a not-to-exceed grand total of$788,315.00. The project's scope of work includes the installation of drainage pipes to be in conjunction with the installation of check valves in discharge pipes, temporary stormwater pump stations, existing drainage structure modifications, and the installation of check valves where tidal flooding has occurred or is predicted to occur. Commission Memorandum—Citywide Tidal Mitigation Improvements- Change Order No. 1 Page 2 of 2 As a continuation of the initiative to protect residents, businesses, and properties from tidal flooding within the City of Miami Beach, the Public Works Department requests an additional scope of work to the existing ITB. An analysis was performed by the Engineering Division and identified areas that would be subjected to flooding during the anticipated high tides in October 2014. Southern Underground Industries, Inc. was approached and asked,to submit a cost proposal to add the necessary work to their contract. Under the change order, Southern Underground Industries, Inc. would also provide all necessary labor and equipment for the installation of additional check valves, drainage structures, temporary stormwater pump stations, and removal of existing exfiltration trenches. -COST ANALYSIS Southern Underground Industries, Inc. submitted a cost proposal in the.amount of $661,980.50 plus a project contingency in the amount of $88,019.50 (ATTACHMENT). This cost proposal was submitted to the City's Public Works Department for review and recommendation. City staff has found the amount to be fair and reasonable. CONCLUSION The Administration recommends adopting the Resolution. Attachment: Southern Underground Industries, Inc. cost proposal JLM/MT/ /BAM/DS T:\AGENDA\2014\June\Citywide High Tide Mitigation Project Change Order No 1 Memo.doc ESTIMATE OF COST-Additional 8inch to 18inch Inline Check Valves City of Miami Beach Public Works Dept. Project: Citywide High Tide Mitigation Project, ITB#2014-086-SR Contractor: Southern Underground Industries,Inc. (Vendor ID:050260) A B C ITEM DESCRIPTION OF WORK BID BID NO. QUANTITY UNITS UNIT VALUE PRICE 1.00 8-Inch Inline Check Valve 8 EA $ 3,900.00 $ 31,200.00 1.01 Mobilization/Bond/Insurance/MOT 1 EA $ 550.00 $ 550.00 1.02 Preliminary Field Measurements 1 EA $ 200.00 $ 200.00 1.03 Dewatering and Minor Pipe Cleaning 1 EA $ 100.00 $ 100.00 1.04 8"Temporary Air Plug 1 EA $ 50.00 $ 50.00 1.05 Floating Turbidity Curtain at Outfall 1 LS $ 100.00 $ 100.00 1.06 8"Inline Check Valve(Tideflex-Material&Handling Only) 1 EA $ 1,700.00 $ 1,700.00 1.07 8"Inline Check Valve(Installation Cost) 1 EA $ 1,200.00 $ 1,200.00 2.00 10-Inch Inline Check Valve 14 LS $ 5,155.00 $ 72,170.00 2.01 Mobilization/Bond/Insurance/MOT 1 EA $ 580.00 $ 580.00 2.02 Preliminary Field Measurements 1 EA $ 200.00 $ 200.00 2.03 Dewatering and Minor Pipe Cleaning 1 EA $ 125.00 $ 125.00 2.04 10"Temporary Air Plug 1 EA $ 50.00 $ 50.00 2.05 Floating Turbidity Curtain at Outfall 1 LS $ 100.00 $ 100.00 2.06 10"Inline Check Valve(Tideflex-Material&Handling Only) 1 EA $ 2,300.00 $ 2,300.00 2.07 10"Inline Check Valve(Installation Cost) 1 EA $ 1,800.00 $ 1,800.00 3.00 11 2-Inch Inline Check Valve 25 LS $ 7,585.00 $ 189,625.00 3.01 Mobilization/Bond/Insurance/MOT 1 EA $ 910.00 $ 910.00 3.02 Preliminary Field Measurements 1 EA $ 200.00 $ 200.00 3.03 Dewatering and Minor Pipe Cleaning 1 EA $ 150.00 $ 150.00 3.04 12"Temporary Air Plug 1 EA $ 75.00 $ 75.00 3.05 Floating Turbidity Curtain at Outfall 1 LS $ 100.00 $ 100.00 3.06 12"Inline Check Valve(Tideflex-Material&Handling Only) 1 EA $ 2,950.00 $ 2,950.00 3.07 12"Inline Check Valve(Installation Cost) 1 EA $ 3,200.00 $ 3,200.00 4.00 15-Inch Inline Check Valve 6 LS $ 11,489.00 $ 68,934.00 4.01 Mobilization/Bond/Insurance/MOT 1 EA $ 1,300.00 $ 1,300.00 4.02 Preliminary Field Measurements 1 EA $ 200.00 $ 200.00 4.03 Dewatering and Minor Pipe Cleaning 1 EA $ 200.00 $ 200.00 4.04 15"Temporary Air Plug 1 EA $ 125.00 $ 125.00 4.05 Floating Turbidity Curtain at Outfall 1 LS $ 100.00 $ 100.00 4.06 15"Inline Check Valve(Tideflex-Material&Handling Only) 1 EA $ 5,564.00 $ 5,564.00 4.07 15"Inline Check Valve(Installation Cost) 1 EA $ 4,000.00 $ 4,000.00 5.00 18-Inch Inline Check Valve 3 LS $ 14,350.50 $ 43,051.50 5.01 Mobilization/Bond/Insurance/MOT 1 EA $ 1,550.00 $ 1,550.00 5.02 lPreliminary Field Measurements 1 EA $ 200.00 $ 200.00 5.03 Dewatering and Minor Pipe Cleaning 1 EA $ 200.00 $ 200.00 5.04 18"Temporary Air Plug 1 EA $ 150.00 $ 150.00 5.05 Floating Turbidity Curtain at Outfall 1 LS $ 100.00 $ 100.00 5.06 18"Inline Check Valve(Tideflex-Material&Handling Only) 1 EA $ 7,650.50 $ 7,650.50 5.07 18"Inline Check Valve(Installation Cost) 1 EA $ 4,500.00 $ 4,500.00 ADDITIONAL VALVE TOTAL ESTIMATE 1 LS $ 404,980.50 f/ Page 1 of 1 l F� THERN: -SOU U-'N:D E R. G R 0''V-N':D. / lVD U,S. TR / ES. May 23,2014 Mr. Douglas Seaman,P.E. City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach,FL 33139 Project:City-Wide High Tide Mitigation Project(ITB 2014-086SR) Ite:Proposal for Lake Pancoast 36-inch Checkmate Valve Option Mr. Seaman, Southern Underground Industries,Inc. (SUI) is pleased to present the following proposal to the City of Miami Beach Public Works'Department for the following scope of work. SCOPE OF WORK,All labor,equipment,and materials necessary for: ➢ Removal of Existing Top Slab(24"manhole opening too small for valve,see Note 2), ➢ Removal of Existing 36"Tideflex Valve inside of existing'structure(see pictures), ➢ Delivery of Existing 36"Tideflex to Miami Beach Public Works Yard, ➢ Furnish 36"Checkmate Valve(See attached Shop Drawing), ➢ Installation of 36"Checkmate Valve into existing pipe and structure,and ➢ Resetting of top slab and minor restoration as required. NOTES: 1. Assumes existing structure is large enough to fit the 36" Inline Valve(62.25 inches long) 2. Pictures depict a 24" manhole opening. Top Slab will need to be removed to install valve and then reset. Future maintenance will require top slab removal(Lifting hooks are not evident in the pictures provided). Our proposal does not include a new top slab. 3. Assumes line is clean. Excludes cleaning or videoing existing pipe. 4. No modifications to existing structure or pipe are included. g, PRICE PROPOSAL: SUI proposes to complete the scope of work as described above, for a lump sum amount of$52,000.00. Procurement of the materials may take 4-6 weeks. Installation can be completed in 1 week.Add$10,000 for F&I 60x60 Aluminum Hatch and Top Slab to allow future maintenance. Please let me know if you require any additional information to approve this proposal. Sincerely, Belseri Comerford, President of SUI 3453 NW 44 Street,Suite 205, 305-710-0470(Benny) Oakland Park,FL 33309 Belseri 1111,a�aol.coin ..k CITY OF MIAMI BEACH C.I.P.DEPARTMENT DAILY CONSTRUCTION REPORT-PICTURE SHEET Fi r 7 f 3 YYYY a' h,. r LIB ERT`I'AVEjNTrE STORM WA TER PURIP STATIC7N ° LANZO INSTALLING TIDEFLEX VALVE-FACING SOUI -INSIDE TKANHOLE IN LINE WITH 36"OVERFLOW r DISCHARGE PIPE SEE SKETCH BELOW k�o• ���G' �<�iii vJ 4'� �`f ��ss� ��.\`"@_Gb��"i.'�w�`y�� j� 5 A. *✓, � � � s.: ':fit ...� `+..:#sue �.�: x`�< „ "��<��� y,� y 3� x lcw y r OWA Js I I f,!'e ccmanitted iO prov?CJ0a C-,aX.:f?!:er"pubi-i:Ser lioa and C;?!,f''0 r i, s`X,;!( Pio J?rl t J r vr:ri.7?,h?';!rnri; {y'ef ri r•!,.•.('Yi;,:'Fa 3<<r(flUfSf=�. i Page 3 of 5 z �x h AM R d F � V F s �m fY "' v r r� d x a'F I P,IS i � -s �� 1F m< a 3<.