Loading...
2014-28648 Reso RESOLUTION NO: 2014-28648 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS, PURSUANT TO REQUEST FOR PROPOSALS NO. 2014-206-SR (THE RFP), FOR DESIGN/BUILD SERVICES FOR THE LONDON HOUSE REHABILITATION & RESTORATION PROJECT; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH THE TOP RANKED PROPOSER, TEAM CONTRACTING, INC; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION. WHEREAS, Request for Proposals No. 2014-206-SR (the RFP) was issued on April 17, 2014, with an opening date of June 12, 2014; and -. WHEREAS, a mandatory site visit was held on Tuesday April 29, 2014; and WHEREAS, two (2) additional site visits were scheduled, one on June 2, 2014 and another one on June 5, 2014; and WHEREAS, the City received a total of two (2) proposals; and WHEREAS, on June 20, 2014, the City Manager via Letter to Commission (LTC) No. 212-2014, appointed an Evaluation Committee (the "Committee"), consisting of the following individuals: • Alejandro Ballina, Community Development Specialist, Housing/Community Development, City of Miami Beach • Edward Baldie, Capital Projects Coordinator, Capital Improvement Projects (CIP), City of Miami Beach • Linda Blanco, Assistant Director, Building Department, City of Miami Beach The following individual was appointed as an alternate: • Humberto Cabanas, Division Director, Capital Improvement Projects (CIP), City of Miami Beach WHEREAS, the Committee convened on June 30, 2014 to consider the proposals received; and WHEREAS, the Committee was provided an overview of the project; information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law; general information on the scope of services, references, and a copy of each proposal; and engaged in a question and answer session after the presentation of each proposer; and WHEREAS, the Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ; and WHEREAS, the Committee's ranking was as follows: Team Contracting, Inc., top ranked; and ABC Construction, second highest ranked; and WHEREAS, after reviewing all the submissions and the Evaluation Committee's and rankings, the City Manager exercised his due diligence and is recommending that the Administration be authorized to enter into negotiations with the top-ranked firm, Team Contracting, Inc; and NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager pertaining to the ranking of proposals, pursuant to Request for Proposals No. 2014-206-SR (the RFP), for Design/Build Services for the London House -Rehabilitation & Restoration Project; authorize the Administration to enter into negotiations with the top ranked proposer, Team Contracting, Inc; and further authorize the Mayor and City Clerk to execute an Agreement upon conclusion of successful negotiations by the Administration. - PASSED AND ADOPTED this day of Zne!L-� 2014. ATTEST: R ael E. Gran o, City Clerk Philip Levi e . r APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION ov Ll ..r, •.,• G" e•..�A .{.... ! City A r y Dote COMMISSION ITEM SUMMARY Condensed Title: A resolution of the Mayor and City Commission of the City of Miami Beach, Florida, accepting the recommendation of the City Manager pertaining to the ranking of proposals, pursuant to Request for Proposal No. 2014-206-SR (The RFP), for Design/Build Services for the London House Rehabilitation & Restoration Project. Key Intended Outcome Supported: Build and Maintain Priority Infrastructure With Full Accountability. Supporting Data(Surveys, Environmental Scan,etc: N/A Item Summary/Recommendation: On April 23, 2014, the City Commission, via Resolution 2014-28550, authorized the allocation of funds toward the rehabilitation costs of the City's London House Apartments Project. As a result, the subject Request for Proposal(RFP)was issued April 17,2014,with an opening date of June 12,2014.A mandatory site visit was held on Tuesday April 29, 2014.Two(2)additional site visits were scheduled, one on June 2, 2014 and another one on June 5, 2014. The City received a total of two (2) proposals. On June 20,2014,the City Manager via Letter to Commission(LTC)No. 184-2014,appointed an Evaluation Committee(the"Committee"). The Committee was provided an overview of the project,information relative to the City's Cone of Silence Ordinance and the Government in the Sunshine Law. The Committee also provided general information on the scope of services, references, and a copy of each proposal. Additionally, the Committee engaged in a question and answer session after the presentation of each proposer. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ.The results of the evaluation committee process were presented to the City Manager for his recommendation to the City Commission. RECOMMENDATION After reviewing all the submissions and the Evaluation Committee's rankings of proposals received,the City Manager exercised his due diligence and is recommending that the Mayor and the City Commission accept the recommendation of the City Manager pertaining to the ranking of proposals, pursuant to Request for Proposal (RFP) No. 2014-206-SR, for Design/Build Services for the London House Rehabilitation & Restoration Project,and authorize the Administration to enter into negotiations with Team Contracting, Inc.; and further authorize the City Manager to execute an Agreement upon conclusion of successful negotiations by the Administration. ADOPT THE RESOLUTION. Advisory Board Recommendation: N/A N/A Financial Information: Source of Amount Account Funds: 1 $567,923 130-2881-069357 2 $50,265 135-2881-069357 3 $831,412 138-2881-069357 4 $774,515 179-2881-069357 5 $634,999 180-2881-069357 6 $193,905 181-2881-069357 7 $672,514.35 Miami Dade County Surtax—Future Funding OBPI Total $3,725,533.35 Financial Impact Summary: City Clerk's Office Legislative Tracking: Alex Denis, Extension 6641 Sign-Offs: Departmeni i ctor Assistant City Manager Cit anager DM MT KGB 4 JL AGE'ND TEM C 7C MIAMI DATE 7 a 3-11-4Z MIAMI BEACH City of Miami Beath, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSI N MEMORANDUM TO: Mayor Philip Levine and Members o the City C mission FROM: Jimmy L. Morales, City Manager DATE: July 23, 2014 SUBJECT: A RESOLUTION OF THE MAYO AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS, PURSUANT TO REQUEST FOR PROPOSAL NO. 2014-206-SR (THE RFP), FOR DESIGN/BUILD SERVICES, FOR ,THE. LONDON HOUSE REHABILITATION, & RESTORATION-,-...-. ..-" PROJECT. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME SUPPORTED Build and Maintain Priority Infrastructure With Full Accountability. FUNDING Funding for this project will be as follows: 130-2881-069357 $567,923 135-2881-069357 $50,265 138-2881-069357 $831,412 179-2881-069357 $774,515 180-2881-069357 $634,999 181-2881-069357 $193,905 Miami Dade County Surtax— Future Funding $672,514.35 Total: $3,725,533.35 BACKGROUND The Design Build Firm (DBF) Scope of Services shall include, without limitation, designing, permitting, construction, and the construction management associated with the rehabilitation and restoration of the historic 1965 & 1975 London House apartment buildings, using those necessary construction activities that include, but are not limited to, work on the exterior Architectural Features, Structural Shell (including sheathing), Site Construction, 'Concrete, Masonry, Rough and Finish Carpentry, Thermal and Moisture Protection, Doors and Windows, Interior Finishes, Equipment; Conveying Systems, Plumbing, Mechanical, and Electrical. The DBF will also prepare and obtain all the necessary and required permits required by permitting entities having jurisdiction as needed by the updated and new design. The work to be performed under this Contract shall also consist of providing all tools. equipment, materials, and supplies, and manufactured articles and furnishing all labor, transportation, services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict Commission Memorandum — RFQ#2014-206-SR Design/Build Services for the London House Rehabilitation & Restoration Project July 23, 2014 Page 2 accordance with the Contract Documents. The work shall be completed, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the completion and proper design and construction of the work shall be provided by the DBF. RFP PROCESS On April 23, 2014, the City Commission, via Resolution 2014-28506, authorized the allocation of funds toward the rehabilitation costs of the City's London House Apartments Project. As a result, the subject Request for Proposal (RFP) was issued. On April 17, 2014, the RFP was issued with an opening date of June 12, 2014. A mandatory site visit was held on Tuesday April 29, 2014. Two (2) additional site visits were scheduled, one on June 2, 2014 and another one on June 5, 2014. The City received proposals from the following firms: ABC Constructions Team Contracting, Inc. On June 20, 2014, the City Manager via Letter to Commission (LTC) No. 184-2014, appointed an Evaluation Committee (the "Committee") consisting of the following individuals: • Alejandro Ballina, Community Development Specialist, Housing/Community Development, City of Miami Beach • Edward Baldie, Capital Projects Coordinator, Capital Improvement Projects (CIP), City of Miami Beach • Linda Blanco, Assistant Director, Building Department, City of Miami Beach The following individual was appointed as an alternate: • Humberto Cabanas, Division Director, Capital Improvement Projects (CIP), City of Miami Beach The Committee convened on June 30, 2014 to consider proposals received and interview the proposers. The Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law. The Committee also provided general information on the scope of services, references, and a copy of each proposal. Additionally, the Committee engaged in a question and answer session after the presentation of each proposer. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFP. The evaluation process resulted in the following ranking of proposers: RFQ#2014-206-SR LOW London House Alejandro Edward Linda RANKING Rehabilitation& Ballina Baldie Blanco AGGREGATE ORDER Restoration Project. TOTALS Team Contracting, Inc. 1 1 1 3 1 ABC Construction 2 t 2 2 6 2 Commission Memorandum —RFQ#2014-206-SR Design/Build Services for the London House Rehabilitation & Restoration Project July 23, 2014 Page 3 MANAGER'S DUE DILIGENCE & RECOMMENDATION After reviewing all the submissions and the results of the evaluation process, the City Manager recommends that the Mayor and City Commission authorize the administration to enter into negotiations with the top ranked proposer, Team Contracting, Inc. Team Contracting, Inc., is a State of Florida Certified General Contractor and State of Florida Certified Underground Utility & Excavation Contractor. The company was established in April 2000. The company's staff has successfully completed over eight (8) design/build projects varying in size and scope. Various projects were also completed by Team Contracting which involved historical -restoration. They have been providing the City of Miami Beach with construction services since 2003. It is important to note that both proposals received are within the estimated budget for probable design-build cost; however,, the. cost,comparison between the..two proposals.differs by approximately 19%. Staff attributes this price difference to a number of possible factors, which are: • Familiarity with the jobsite is one attributing factor, as the Design Build team of Team Contracting and RVL Architecture exhibited more in depth knowledge and familiarity with the existing jobsite conditions. This was made apparent during their presentation and by their answers to the questions presented by the Evaluation Committee. • The Structural System that was proposed by both firms differed and may have been another attributing factor in the price difference. The Design Build firm of ABC Constructions and KVH Architects approached the design for the Structural System for Building 1975 by proposing to utilize a conventional wooden floor joist system. The Design building firm of Team Contracting and RVL Architecture, approached the design by proposing to use the Epicore Structural Flooring System. This system is a metal decking system with a poured concrete slab that allows for increased durability, better fire resistance, and longer life span than a typical wooden floor joist system which adds value but comes at a cost premium to this Project. Additionally, the City procured the services of Atkins North America, to provide a detailed probable construction cost estimate for the London House Project. This Estimate yielded a probable construction cost ranging from 3.7 to 4.1 million dollars. This estimate along with the aforementioned factors support the fact that both these bids are competitive, fair, and reasonably priced. CONCLUSION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida: accept the recommendation of the City Manager pertaining to the ranking of proposals, pursuant to Request for Proposal (RFP) No. 2014-206-SR for Design/Build Services for the London House Rehabilitation & Restoration Project; and, authorize the administration to enter into negotiations with the top ranked proposer, Team Contracting, Inc.; and further authorize the City Manager to execute an Agreement upon conclusion of successful negotiations by the Administration. Commission Memorandum — RFQ#2014-206-SR Design/Build Services for the London House Rehabilitation & Restoration Project July 23, 2014 Page 4 JLM/MT/DM/AD/YG T:\AGENDA\2014\June\June 11 Procurement\RFQ-2014-199-SR Flooding Mitigation Consulting Services-Memo.doc i