September 10, 2014 PowerPoint Presentation Beach Corridor Transit Connection_Page_01Direct Connection (DC)
iwlaSOTNUxTEA el DC
FLY I Metrorail
Metromover
1 I lsous■
201jMid
Eat - ,,. .... , ri ri, ,
-1..,_imurir
WEinfr 'IMO
VENETIAN OWN
NW 6 NE 54111 STREET
p,, INANE 13TH STREET
IIW✓ME 12TN STREET 'O
Y
NW 11 STREET
NN16 ST �I
NE ST
71 aT
X
0 I
/0109
1T NT
La1CO-N RD
1NNT 16 1 Q W
N CT
goir
TSET
Taal
NESET
NET
NE S
NWa
We
76ST
sr
14 sr
1Y
BST B
tar ...
IlivocillemommiN ,
MUM
NOUN POINTE uR
Direct Connection (DC) + Hybrid
• A tern
DC
I Metrorail
Metromover
21 St
Eter
TRIrt
O
YENEntli clan,
1S ST
}rya 1 NE WIN STREET
47426* pQ,�,,� IIREC 13111 STREET
NAME 12TN STREET 'O
Y
NW 11 STREET of
NN18 ST
RE ST
NESST
NET
NES
NWN
NWS
$ 15 5T
k sr
• %
0%
Wireless Modern
• Streetcars
It
' -
MIllgirPr-
111111111sow
Bordeaux,
Dallas, Texas
C Recommendations
Streetcar to operate on exclusive right -of -way
Wireless vehicle technology to be studied along with
overhead wire if it reduces costs
Will not pursue federal New Starts funding
Will prepare a NEPA environmental document
Will continue to examine countywide and corridor
specific funding sources
Will not use tolling the causeways as a funding source
Will pursue a P3 alternative delivery method
Will study the circulator scenario in Miami Beach
• P C Recomme dations cont)
Option 2 satisfactory, but City of Miami asked that funds be
requested from the CRAs or the DDA to cover their portion
TIGER $1,500,000 $0
FDOT $750,000 $1,500,000
MDT $250,000 $500,000
MIAMI $250,000 $500,000
MIAMI BEACH $250,000 $500,000
$3,000,000 $3,000,000_
FDOT expressed ability to provide additional funding if
needed
•
Complete Current Study Report and Executive
Summary in October
• Continue with Technical Steering Committee and
Policy Executive Committee Meetings
• Procurement of Consultant for Next Phase of
Project Development (DEIS /FEIS)
•