2014-28817 Reso RESOLUTION NO. 2014-28817 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 1 TO THE DESIGN- BUILD AGREEMENT WITH LANZO CONSTRUCTION CO. (AS SUCH AGREEMENT WAS APPROVED PURSUANT TO RESOLUTION NO. 2014- 28865), IN THE AMOUNT OF $5,090,718, PLUS A $500,000 CONTINGENCY, TOTALING $5,590,718; SAID CHANGE ORDER PROVIDING FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, AND WATER MAIN REPLACEMENT FOR THE SUNSET HARBOUR PUMP STATION'S RETROFIT AND DRAINAGE IMPROVEMENTS PROJECT (THE PROJECT), TO REPLACE FAILING WATER SUPPLY DISTRIBUTION AND IMPROVE DRAINAGE ON WEST AVENUE AND BAY ROAD, AND EMERGENCY LINING OF SEWER FORCE MAINS ON SUNSET ISLANDS 2 & 3. WHEREAS, at its September 30, 2014 meeting, the City Commission approved Resolution No. 2014-28765, authorizing the City manager to negotiate and, if successful, execute a design-build agreement with Lanzo Construction Co. (the Agreement) for the Project; and WHEREAS, recently, in preparation for the October 9th King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during these events; and WHEREAS, in response to initial flooding observed at Sunset Harbour, West Avenue, and Bay Road, staff utilized pumps and installed temporary plugs; however, a more permanent solution is required; and WHEREAS, the water distribution system at Sunset Harbour is approximately 80 years old and in need of replacement; and WHEREAS, an upgrade is being proposed to complete the water system at the same time the drainage system is scheduled to be installed; and WHEREAS, as a result, the Public Works Director recommends that the Mayor and City Commission approve a Change Order to the Agreement which will include the following: additional engineering services, drainage structure modification, drainage pipe, and water main replacement for the Sunset Harbour Pump Station's Retrofit and Drainage Improvements Project (the Project), to replace failing water supply distribution and improve drainage on West Avenue and Bay Road, and emergency lining of sewer force mains on Sunset Islands 2 & 3. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Change Order No. 1 to the Design- Build Agreement with Lanzo Construction Co., (as such Agreement was approved pursuant to Resolution No. 2014-28865), in the amount of $5,090,718, plus a $500,000 contingency, totaling $5,590,718; said Change Order providing for additional engineering services, drainage structure modification, drainage pipe, and water main replacement for the Sunset Harbour Pump Station's Retrofit and Drainage Improvements Project (the Project), to replace failing water supply distribution and improve drainage on West Avenue and Bay Road, and emergency lining of sewer force mains on Sunset Islands 2 & 3. PASSED and ADOPTED this day of 4G/6er_ , 2014. ATTEST: ' PHI N MAYOR �r INCORP ORATED: RALPH GRANADO CITY CLE APPROVED AS TO FORM AND LANGUAGE & FOR EXECUTION City Attorney Date T:\AGENDA\2014\October\October 29\PUBLIC WORKS\Sunset Harbour Pump Stations Improvements Change Order No 2 RESO.doc COMMISSION ITEM SUMMARY Condensed Title: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO LANZO CONSTRUCTION CO., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, AND WATER MAIN REPLACEMENT FOR THE SUNSET HARBOUR PUMP STATIONS RETROFIT AND DRAINAGE IMPROVEMENTS PROJECT, TO REPLACE FAILING WATER SUPPLY DISTRIBUTION AND IMPROVE DRAINAGE ON WEST AVENUE AND BAY ROAD IN SUNSET HARBOUR, AND EMERGENCY LINING OF SEWER FORCE MAINS ON SUNSET ISLANDS, FOR A TOTAL CONSTRUCTION COST OF$5,090,718, PLUS $500,000 CONTINGENCY. Key Intended Outcome Supported: Ensure value and timely delivery of quality Capital Projects. Supporting Data (Surveys, Environmental Scan, etc.): N/A Item Summa /Recommendation: In preparation for the October 9 King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during these events. Initial flooding was observed at Sunset Harbour, West Avenue and Bay Road. To alleviate the flooding, staff utilized pumps and installed temporary plugs; however, a more permanent solution is required. Previous change orders processed by the City are addressing drainage concerns on 18th and 20th Streets and the proposed work will complete the drainage system at Sunset Harbour. However, the water distribution system at Sunset Harbour is approximately 80 years old and in need of replacement. An upgrade is being proposed to complete the water system at the same time the drainage system is scheduled to be installed. The cost proposed will achieve this water system upgrade to also include an Automated Meter Reading System consistent with all new water projects in the City. The completion of the sanitary sewer system lining would be performed under a separate project. Additional areas of concern were referenced at the October 14, 2014, Mayor's Blue Ribbon Panel on Flood Mitigation Committee meeting, while reviewing the effects of the October 9th King Tides. As a result, an additional scope of work is being proposed to Lanzo, which will include the following: 1. Water main for sunset harbor neighborhood 2. Drainage for Sunset Harbour neighborhood 3. 20th Street water main replacement(credit) 4. 18th Street drainage (Credit) COST ANALYSIS Lanzo Construction Co. has submitted a cost proposal in the amount of$4,532,200.00 (Attachment) for services stated above. Additionally, Lanzo has submitted a cost proposal in the amount of$558,518.00 to rehabilitate an eight(8") sewer force main in the Sunset Islands that has experienced multiple failures in the past couple of months causing interruption of service. The City's Public Works Department has reviewed the proposal and the cost breakdowns and deems the cost to be fair and reasonable..We are also recommending a project contingency of$500,000 which is approximately 10%. . THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1. 2 OBPI Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric T. Carpenter,ext.6012 Sign-Offs: DepartmerApirecto r Assistant City Manager. City M a er ETC MT J LM T:\AGENDA\2014 October\October 29\PUBLIC WORKS\Sunset Harbour Pump Stations Improvements Change Or pri N o 2 . Summary.docx _ Agenda Item 7r- ® MIAMIRFACH Date 10-0 - MIAMI'BEACH City of Miami Beath, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov Pthe SION MEMORANDUM TO: Mayor Philip Levine and MemberCommission FROM: Jimmy L. Morales, City Manager DATE: October 29, 2014 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO LANZO CONSTRUCTION CO., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, AND WATER MAIN REPLACEMENT FOR THE SUNSET HARBOUR PUMP STATIONS RETROFIT AND DRAINAGE IMPROVEMENTS PROJECT, TO REPLACE FAILING WATER SUPPLY DISTRIBUTION AND IMPROVE DRAINAGE ON WEST AVENUE AND BAY ROAD IN SUNSET HARBOUR, AND EMERGENCY LINING OF SEWER FORCE MAINS ON SUNSET ISLANDS, FOR A TOTAL CONSTRUCTION COST OF $5,090,718, PLUS $500,000 CONTINGENCY. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution FUNDING BACKGROUND At its May 8th, 2014 meeting, pursuant to Invitation to Bid (ITB) 060-2013TC for the Sunset Harbour Pump Station Retrofit and Drainage Improvements Project (Project), the City Commission awarded a contract to Lanzo Construction Co. (Lanzo). The project's scope of work included drainage improvements within the Sunset Harbour Neighborhood, consisting of new retrofit pumps, connections for direct discharge to Biscayne Bay, control panel modifications at Pump Stations No. 1 and No. 2, and the complete reconstruction of Pump Station No. 3, including associated drainage pipes. At its September 30, 2014 meeting, the City Commission approved a Resolution pertaining to the Project, accepting the findings and recommendation of the City Manager in declaring an emergency pursuant to Subsection 287.055(9xc)(6), Florida Statutes; and, as permitted pursuant to Section 2-367(e) of the City Code, waiving, by 5/7th vote, the competitive bidding requirements, finding such waiver to be in the best interest of the City; and authorizing the City Manager to take the following actions to procure the necessary emergency design and construction services for the project, pursuant to a negotiated design-build contract for the amount negotiated as part of the settlement, the existing contract shall not exceed Commission Memorandum—Sunset Harbour Pump Stations Improvements Page 2 of 2 $6,836,940.74 which included the $2,586,940.74 construction award value of the current Lanzo construction contract and the proposed design/build amount of$4,250,000. The Contractor is currently finalizing drainage installation within 20th Street and is closing out punch list items. The Contractor is also moving forward with the Stormwater improvements for the 18th Street area, which will address most of the remaining deficiencies in this neighborhood. CURRENT STATUS In preparation for the October 91h King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during these events. Initial flooding was observed at Sunset Harbour, West Avenue and Bay Road. To alleviate the flooding, staff utilized pumps and installed temporary plugs; however, a more permanent solution is required. Previous change orders processed by the City are addressing drainage concerns on 18th and 201h Streets and the proposed work will complete the drainage system at Sunset Harbour. However, the water distribution system at Sunset Harbour is approximately 80 years old and in need of replacement. An upgrade is being proposed to complete the water system at the same time the drainage system is scheduled to be installed. The cost proposed will achieve this water system upgrade to also include an Automated Meter Reading System consistent with all new water projects in the City. The completion of the sanitary sewer system lining would be performed under a separate project. Additional areas of concern were referenced at the October 14, 2014, Mayor's Blue Ribbon Panel on Flood Mitigation Committee meeting, while reviewing the effects of the October 9th King Tides. As a result, an additional scope of work is being proposed to Lanzo, which will include the following: 1. Water main for sunset harbor neighborhood 2. Drainage for Sunset Harbour neighborhood 3. 20th Street water main replacement (credit) 4. 18th Street drainage (Credit) COST ANALYSIS Lanzo Construction Co. has submitted a cost proposal in the amount of $4,532,200.00 (Attachment) for services stated above. Additionally, Lanzo has submitted a cost proposal in the amount of $558,518.00 to rehabilitate an eight (8") sewer force main in the Sunset Islands that has experienced multiple failures in the past couple of months causing interruption of service. The City's Public Works Department has reviewed the proposal and the cost breakdowns and deems the cost to be fair and reasonable. We are also recommending a project contingency of $500,000 which is approximately 10%. Commission Memorandum—Sunset Harbour Pump Stations Improvements Page 3 of 2 CONCLUSION The Administration recommends adopting the Resolution Attachment- Lanzo cost proposals dated October 20, 2014 #AA JLM/MT/ C/BAIVI/FRS T:\AGENDA\2014\October\October 29\PUBLIC WORKS\Sunset Harbour Pump Stations Improvements Change Order No 2. Memo.doc a }_ . LAimzu CONSIRumoN COMPANY Dwyeft susbbbsals hlftd xkns act AT mamwt�tnmtlUss October 20,2014 Bruce Mowry,Ph.D,,P.E. City Engineer City of Miami Beach,Florida Public Works Department-Engineering Division 1700 Convention Center Drive Miami Beach,FL 33139 Reference: Sunset Harbour Pump Station Retrofit—ITB No.60-2013TC Sunset Harbour Re-Design Proposal Design and Construction of Sunset Drainage Improvement Change Summary Entire Sunset Harbour Drainage and Water Main Installation Dear Bruce, Please find below and as attached a summary of the proposals you have requested for additional improvements to Sunset Harbour. Item Activity Total 1 Water Main for Sunset Harbour Neighborhood $ 4,074,876.00 2 Drainage for Sunset Harbour Neighborhood $ 2,240,924.00 3 20th Street Water Main Replacement(Credit) $-1,119,344.00 4 18th Street Drainage (Credit) $ -664,256.00 Total $ 4,532,200.00 We have included all of the separate proposals,applicable scopes,drawings and quantity take-offs.I am available to meet with you to answer any further questions you may have. Sincerely, James Tilli Lanzo Construction Company Attachment(s) CC: LCC/File 125 SE 5TH Court Deerfield Beach FL 334414749 Phone(954)979-0802 Fax(954)979-9897 www.lanzo.net H 3 .. CONSTRUCTION COMPANY ram" Itrr em�mm�'k October 20,2014 Bruce Mowry,Ph.D,P.E. City Engineer City of Miami Beach,Florida Public Works Department.-Engineering Division 1700 Convention Center Drive Miami Beach,FL 33139 Reference: Sunset Harbour Pump Station Retrofit—TTB No.60-2013TC Sunset Harbour Re-Design Proposal Remove and Replace Water Main in Sunset Harbour Dear Bruce, Lanzo Construction Co., FL., proposes to design, permit and construct the water main replacement, in Sunset Harbour.The scope of work is as agreed upon by the City and Lanzo,and is reflected in the attached drawing and unit breakdown sheet.All work per City Standard Details and as summarized below. 1. Install 20"DIP from Alton Road to Purdy Avenue along 20th Street and tie into Existing Mains. 2. Install 20"DIP from 20th Street to Dade Blvd along Purdy Ave and tie into Existing Mains. 3. Install 12"DIP from 20a'Street to Dade Blvd along N.Bay Rd and tie into Existing Mains. 4. Install 12"DIP from 20a`Street to Dade Blvd along West Ave and tie into Existing Mains. 5. Install 12"DIP from Alton Rd to Purdy Ave along 18''Street and tie into Existing Mains. 6. Remove all trees. 7. Maintenance of Traffic and Allowance for Police. 8. Remove and Replace All Unsuitable Material per City Standards. 9. Remove all Abandoned DI Water Main,Replaced by the New DI Water Main. 10. Reconnect All Services including New Boxes and Digital Meters(2"Meters,90 each). The Design and Construction duration is(335)days from NTP. Total Lump Suns Price$4,074,876.00 Sincesely,� i '*�'James Tilli Lanzo Construction Company Attachment(s) CC: LCC/File 125 SE 5TH Court Deerfield Beach FL 334414749 Phone(954)979-0802 Fax(954)979-9897 www.lanzo.net ;z :mss. ��-��::•••- � �� ' �•�.i=rte.' 'r.;, � �6 Oil x.'f` IL fr�`rs''��'yiy.!'" /�.'t�.i �t! .I� �L� L.in ?;::III ;\'..1, i•�.' � 1/ �✓' 4�,� �\� _ — _. •lip— / '�r�`—o — ._�'��,�� tl:. I ttI � \.. .a._—_s ..._ ..r � 1 - R'���i}m•�J IaT�Y brr = Y 3 00.88 �' '- _ I i I i, -- l= �_ ��,:_ ,/'�_=----'-- '111 � I h ! �I ��I�(' 1 'i' 1; • •� q V. � � log v I. 1 Z' .I W m Ix 0 Oco Lu .`; _ .. I.. ,:�� •.z:, I old. I�' ;1r' '11 =� •,psk. ao Ibp t ':.L IOD 9Lk�- r '0Yx,l�.. _ I9SLI .• 4 � F 3� ;� 06 y t LANZO CONSTRUCTION COMPANY ofialft mbbaw h*W&Ud=MAfil= Ibr tarmnow'B carrmunlefes October 20,2014 Bruce Mowry,Ph.D,P.E. City of Miami Beach,Florida Public Works Department-Engineering Division 1700 Convention Center Drive Miami Beach,FL 33139 Reference: Sunset Harbour Pump Station Retrofit—ITB No.60-2013TC Sunset Harbour Re-Design Proposal Design and Installation of Sunset Harbour Drainage Dear Bruce, Lanzo Construction Co., FL., proposes to design, permit and construct the drainage, on 18m Street, West Avenue, N. Bay Rd, & Purdy Avenue. Please note that the hydraulics of the attached drainage design is based on the gravity outfalls on Dade Blvd remaining in service. The scope of work is as agreed upon by the City and Lanzo, and is reflected in the attached drawing and unit breakdown sheet. All work per City Standard Details and as summarized below. 1. Install New 42"RCP,36",30",24"& 18"A2000 Drainage Pipe&Tie-In to Existing. 2. Install(4)84"x 84"Junction Boxes. 3. Install(4)84"x 84"Large Junction Boxes. 4. Install(15)48"Round Catch Basin. 5. Install(12)60"Round Catch Basin. 6. Replace Damaged Curbing and Sidewalk with Gray Concrete Hardscape 7. Patch Pave Damaged Asphalt. 8. Remove and Replace all Unsuitable Material per City Standards. 9. Maintenance of Traffic and Allowance for Police. The Design and Construction duration is(255)days from NTP. Total Lump Sum Price $29240,924.00 Sincerely, Y James Tilli Lanzo Construction Company Attachment(s) CC: LCC/File 125 SE 5'H Court Deerfield Beach FL 334414749 Phone(954)979-0802 Fax(954)979-9897 www.lanzo.net ;d t •'' ,:o'.. Oil' �.. . 0 � 1 e' ' a w - 1' "•-�— +t _ ,�.a ry �§I� g�;'�6 ��.++rar .ca�Y �. s � —i 4 �� `.1��. � � i lit; k 1 1 .. :, � s r;.. ::1. �.` � s a a l a ,1 a � a ;b'.� �• I. a 1•. - PIC a t t'33 .�1 1° m r { 1 t Q. w 1. o { b o 1 �1 �'' � �,•. iz cu— o I, t k �+ezt! iw� �ez�+ +oo++czi+' t 1p�y+9tt+ Its i �dci#ah=_J?-18oi � tzia:'i t=,o;uia- ' a� •W3 d O y ; ;g LANZO CONSTRUCTION COMPANY Ddhwft SUMINNO l/1 W 80hOns hfframumDt c0flunuffiffm Proposal October 17,2014 City of Miami Beach Mike Alvarez,CGC,PWLF Public Works Department mikealvarez @miamibeachfl.gov 1700 Convention Center Drive 305-673-4620 Miami Beach,FL 33139 F786-3944698 Sunset Island Quote Request, From PS 13, (Excludes Subaqueous Crossing) to W 25 St. Emergency 8''Force Main Repair utilizing CIPP(Option 2) Plan Date Sewer Atlas 9/3114 File Path UACMB Sanitary Force Main Network.mxd / Email Attached dated 9/5/14 from Hasan Rizvi Lanzo Estimate Number U-14-47—Revised 10-17-2014 Lanzo is p1 'ed to offer the following'P icin 1 Mobilization, Insurance& General Conditions 1 L,S. $651'000 $65.000 2 Prep Work for Lining Operation 1. LS $68;2.00' $68,2-00 3 Cured In Place Line of Existing 8" FM (905)LF I _LS �'$3461818 $346;0:1-8 4 Restoration and Reconnection of Lined Main I LS $78;13'00 -$781510 Total551 ,51$: Ancillary Products and Services Provided • Cleaning Pre& Post CCTV Inspection and Pipe Logs-Included • End Seals at all pipe terminations,transitions and Tee Junctions-Included • Testing of Liner Shots By Hydrostatic Head During Inversion-Included 125 SE 5T"Court Deerfield Beach FL 33441-4749 Phone(954)979-0902 Fax(954)979-9897 www.lanzo.net Page 1 of 3 10/17/2014 • Third Party Testing of Liner Pipe Samples to validate Fully Deteriorated Design basis- Included • State of Florida P.E.sealed calculations for liner—Included • Asphalt disturbed by our work will be repaired in kind-Included • Sod disturbed by our work will be repaired in kind—Included • Upon completion of work the existing easements will be graded and sodded—Included • Erosion control items included—Included r We hereby propose to furnish materials, equipment and labor in accordance with the plans referenced above as follows: Cleaning, CCTV Pre&Post Video inspections, CIPP Lining per ASTM F 1216, 100 psi Proof Testing, Third Party Testing of materials&Warranty. Qualifications and Exclusions o Insurance shall be furnished naming the City of Miami Beach as "additionally insured" o Testing to 100 psi per AWWA specifications o A Five(5)Year warranty on all materials and workmanship for the CIPP portion and one (1)year for all other work shall be made part of this agreement o We will require access to a suitable water source as needed o This proposal is submitted, based on the incomplete plans provided, and is subject to change upon receipt and review of final plans o This proposal may be withdrawn if not accepted within 21 days o Final Payment will be made based on the actual units installed in accordance with the unit prices contained herein o All invoices submitted by the 25th are due and payable within 30 days o Exclusions noted shall supersede the notes in the plans dated as noted above o Payment and Performance Bonds are excluded but can be provided at an additional cost of 2% o Owner to furnish temporary easement for installation 5' beyond the noted 10' wide easements o Excludes replacing home owner improvement such landscaping and hardscaping like walkways, fence and walls which have encroached upon the 10' or the 5' temporary easement that will be removed and disposed of as a part of this work o This proposal is submitted,based on plans and correspondence as noted above. o Any other items that are not shown above should not be considered. 125 SE 5"H Court Deerfield Beach FL 33441-4749 Phone(954)979-0802 Fax(954)979-9897 www.lanzo.net Page 2 of 3 10/17/2014 • No posted bridge weight restrictions are available and this proposal assumes none that will hinder our operations • Permits,engineering layout, certified as-builts, utility adjustments and density testing are excluded from this proposal. • Proposal excludes temporary drainage of any kind. • Police Officer(If needed)not included • Unsuitable material removal and replacement is excluded • Bypass operations for(10)days with Vac Trucks,by others • Subaqueous portion excluded Respectfully Submitted. A" Michael Bone, Vice President Acceptance of Proposal The above prices,specification and conditions are satisfactory and are herby accepted. You are authorized to do work as specified. By: 125 SE 5T"Court Deerfield Beach FL 33441^4749 Phone(954)979-0802 Fax(954)979-9897 www.lanzo.net Page 3 of 3