2014-28816 Reso RESOLUTION NO. 2014-28816 A RESOLUTION APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 1 TO THE DESIGN-BUILD AGREEMENT WITH DAVID MANCINI & SONS, INC., DATED OCTOBER 22, 2014, FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT (THE PROJECT); SAID CHANGE ORDER, IN THE NOT TO EXCEED AMOUNT OF 31550,876, FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, STORM WATER PUMP STATION, POLLUTION CONTROL STRUCTURE, MILLING AND REPAVING, AND WATER MAIN REPLACEMENT; ALL AS PART OF A FLOOD MITIGATION PROJECT ON CRESPI BOULEVARD. WHEREAS, on December 14, 2011, the Mayor and City Commission approved Resolution No. 2011-27809, which, in part, authorized the negotiation and execution of a Design-Build Agreement with David Mancini and Sons for the Project, in the approximate amount of 3,550,876 (the Agreement); and WHEREAS, recently, in preparation for the October 9th King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during this event; and WHEREAS, in response to initial flooding observed on Crespi Boulevard, from 80th to 84th Streets, staff utilized water pumps and installed temporary plugs; and WHEREAS, one of the intents of the Project was to correct the storm water drainage within the neighborhood but, after further assessment, additional improvements need to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 801h to 85th Streets; and WHEREAS, the Public Works Director recommends that the Manager and City Commission approve a Change Order to the Agreement, in the amount of 3,536,376, providing for the additional scope of work that would include: (1) the replacement of a water main in Crespi Boulevard; (2) the installation of a new storm water collection system in Crespi Boulevard; and (3) the construction of a pump station at the 81St street end. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Change Order No. 1 to the Design- Build Agreement with David Mancini & Sons, Inc., dated October 22, 2014, for the Biscayne Point Neighborhood Right-of-Way Improvement Project (the Project); said Change Order, in the. not to exceed amount of 3,550,876, for additional engineering services, drainage structure modification, drainage pipe, storm water pump station, pollution control structure, milling and repaving, and water main replacement; all as part of a Flood Mitigation Project on Crespi Boulevard. PASSED and ADOPTED this o?9day of ac�� rl ' 2014. ATTEST: I N E, MAYOR INCORP ORATED: ` RALPH GRANADO, CITY CLER ?' ` ��'`✓' APPROVE AS TO FORM AND NGUAGE & FO EXECUTION City Attor y Date TAAGENDA\2014\October\October 29\PUBLIC WORKS\Crespi Change Order No 1 RESO.doc APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION (7--CIly 7"TA—ftorAey e COMMISSION ITEM SUMMARY Condensed Title: A Resolution Approving And Authorizing The Mayor And City Clerk To Execute A Change Order To David Mancini & Sons, Inc., For Additional Engineering Services, Drainage Structure Modification, Drainage Pipe, Storm Water Pump Station, Pollution Control Structure, Milling And Repaving And Water Main Replacement For The Biscayne Point Neighborhood Right-Of-Way Improvements Project, As Part Of A Flood Mitigation Project On Crespi Boulevard, For A Total Construction Cost Of$3,550,876. Key Intended Outcome Supported: Ensure value and timely delivery of quality Capital Projects. Supporting Data (Surveys, Environmental Scan, etc.): N/A Item Summa /Recommendation: In preparation for the October 9 King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during this event. Initial flooding was observed on Crespi Boulevard, from 80" to 84" Streets. To alleviate the flooding, staff utilized water pumps and installed temporary plugs; however, a more permanent solution is required. CURRENT STATUS The Biscayne Point Neighborhood Right of Way Improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements need to be made, includin drainage on Crespi Boulevard, from 79" Street to 84" Streets, and a water main replacement, from 80 to 85th Streets. The Public Works staff has requested an additional scope of work from David Mancini & Sons, Inc. (DMSI) that would include: the replacement of a water main in Crespi Boulevard, the installation of a new storm water collection system in Crespi Boulevard and construction of a pump station at the 81St Street End. The proposed pump station would be designed to fit the City's criteria and would include a pollution control system and outfall that meets permit requirements. At the completion of this underground work on Crespi Boulevard, the road sections impacted by this work would be milled and a new asphalt would be overlaid. The storm water pump system would be functionally complete by April 2015,just in time to address the expected flooding during the Spring High Tides. COST ANALYSIS DMSI has submitted a cost proposal in the approximate amount of $3,000,000 (Attachment) for drainage and $536,376 for water mains. The City's Public Works Department has reviewed the proposal and deems the amounts to be reasonable. During review there were deficiencies noted that would make the work inconsistent with the latest drainage criteria. We have discussed the deficiencies with DMSI and increased the contract for a total of$3,550,876, which includes a 10% contingency. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 2 OBPI Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric T. Carpenter,ext. 6012 Sign-Offs: Departmpfi a rector Assistant:Cit Mana er City M64ger ETC MT JLM TAAGENDA\2014\October\October 29\PUBLIC WORKS\Crespi Change Order No 1 .Summary.dou Agenda Item � Date /0 dl-& m MIAMIBFAC'H MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members of the City ommission FROM: Jimmy L. Morales, City Manager DATE: October 29, 2014 SUBJECT: A RESOLUTION APPROVING AN AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER TO DAVID MANCINI & SONS, INC., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, STORM WATER PUMP STATION, POLLUTION CONTROL STRUCTURE, MILLING AND REPAVING AND WATER MAIN REPLACEMENT FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENTS PROJECT, AS PART OF A FLOOD MITIGATION PROJECT ON CRESPI BOULEVARD, FOR A TOTAL CONSTRUCTION COST OF $3,550,876. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution FUNDING BACKGROUND In preparation for the October 9th King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during this event. Initial flooding was observed on Crespi Boulevard, from 80th to 84th Streets. To alleviate the flooding, staff utilized water pumps and installed temporary plugs; however, a more permanent solution is required. CURRENT STATUS The Biscayne Point Neighborhood Right of Way Improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements need to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 801h to 851h Streets. Commission Memorandum—Crespi Boulevard Neighborhood Improvements Page 2 of 2 The Public Works staff has requested an additional scope of work from David Mancini & Sons, Inc. (DMSI) that would include: the replacement of a water main in Crespi Boulevard, the installation of a new storm water collection system in Crespi Boulevard and construction of a pump station at the 81 st Street End. The proposed pump station would be designed to fit the City's criteria and would include a pollution control system and outfall that meets permit requirements. At the completion of this underground work on Crespi Boulevard, the road sections impacted by this work would be milled and a new asphalt would be overlaid. The storm water pump system would be functionally complete by April 2015, just in time to address the expected flooding during the Spring High Tides. COST ANALYSIS DMSI has submitted a cost proposal in the approximate amount of $3,000,000 (Attachment) for drainage and $536,376 for water mains. The City's Public Works Department has reviewed the proposal and deems the amounts to be reasonable. During review there were deficiencies noted that would make the work inconsistent with the latest drainage criteria. We have discussed the deficiencies with DMSI and increased the contract for a total of$3,550,876, which includes a 10% contingency. CONCLUSION The Administration recommends adopting the Resolution Attachment— DMSI cost proposal JLM/MT/ /BAM/FRS TAAGENDA\2014\October\October 29\PUBLIC WORKS\Crespi Change Order No 1.Memo.doc I i DAVID MANCINI ■ &SONS, INC. - Crespi Drainage Emergency Improvement 1 LS General Conditions $ 145,000.00 $ 145,000.00 1 LS Mob/Demob/Stagging $ 32,000.00 $ 32,000.00 1 LS Engineering Design $ 105,000.00 $ -105,000.00 1 LS Permitting $ 14,800.00 $ 14,800.00 1 LS Const. Eng.Inspection $ 120,000.00 $ 120,000.00 20 EA Man-Hole/Inlets $ 8,200.00 $ 164,000.00 Pollution Control 5 EA Structure/Weir $ 24,000.00 $ 120,000.00 80 LF 18" Drainage Pipe $ 240.00 $ 19,200.00 600 LF 24" Drainage Pipe $ 260.00 $ 156,000.00 700 LF 30" Drainage Pipe $ 320.00 $ 224,000.00 30 48" Drainage Pipe $ 380.00 $ 11,400.00 1 EA Centrifugal Storm Treatment $ 67,000.00 $ 67,000.00 1 EA Duplex Pump Station $ 1,545,000.00 $ 1,545,000.00 1 LS Outfall upsize 24"-48 $ 165,000.00 $ 165,000.00 1 LS MOT $ 26,500.00 $ 26,500.00 3000 SF Crosswalk Restoration $ 20.00 $ 60,000.00 2700 SF Sidewalk Restoration $ 10.00 $ 27,000.00 600 LfF Concrete Curb $ 21.00 $ 12,600.00 $ 3,014,500.00 1 LS Water Main Replacement $ 536,376.00 $ 536,376.00 85th Street-80th Street Total $ 3,550,876.00 Excludes: Permit fees,off-duty police,nigh twork,Public Information 1939 NW 40th Ct.Pompano Beach,FL 33064 1210 Washington Ave.#250 Miami Beach,FL 33139 Ph:954-977-3556 Fax:954-977-2040 Ph:305-532-8827 Fax:305-532-8835