Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Amendment No. 4 to the Agreement with Fentress Architects in the amount of $76,605
020i AS 38 DUPLICATE ORIGINAL 1 of_3 AMENDMENT NO. 4 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $76,605 This Amendment No. 4 to the Agreement made and entered this 7/ day of January, 2015, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as Consultant). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project (the Agreement); and WHEREAS,the Agreement was executed for a lump sum amount of$10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 — Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 for supplemental civil engineering services was executed in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 for additional services to revise the quantity, sizes and configurations of the main ballroom,junior ballrooms, and meeting rooms, was executed in the amount of$179,982; and WHEREAS, the following Amendment No. 4 to the Agreement is for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project; and Page 1 of 3 WHEREAS, the aforestated work as set forth in the following Amendment No. 4 is for the lump sum amount of$76,605; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 4. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-4", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 4. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 4 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: ; �''+y, CITY OF MIAM . =EACH ( INCORPI ORATED: j — — , Raf.'el Granado y L. ' • ales, City Manager City Clerk 4 . o / 141,, H ATTEST : C u NSULTANT: FENTRESS ARCHITECTS rr I ... igna re: Signature L. g,5 Goi • F'eAriw ceo Tint Name / Title f Print Name / Title Page 2 of 3 APPROVED AS TO FORM & LANGUAGE &FO EXECUTION .(, -(5 , City Attorney Dote • SCHEDULE "A-4" 1. SCOPE OF SERVICES A-4.1: Regional Stormwater Pump Station Location Analysis Refer to Exhibit "1" for detailed scope of work. Lump Sum fee: $16,105. A-4.2: Computer generated project animation (3 minutes) and Website Refer to Exhibit "2" for detailed scope of work. Lump Sum fee: $60,500 2. TIME OF COMPLETION Eight (8) weeks 3. PAYMENT AND COMPENSATION The total lump sum fee proposed for this Scope of Work is $76,605. Payment will be deducted from the Owner's Contingency Allowance. Compensation: • Original Owner's Contingency Amount: $1,096,200 • Amendment No. 1: N/A • Amendment No. 2: $41,079 • Amendment No. 3: $179,982 • Amendment No. 4: $76,605 • Owner's Contingency Balance: $798,534 Page 3 of 3 EXHIBIT 1 FENTRESS fentressarch=tests corn November 26,2014 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 05—Pump Station Analysis Project 20140021.001 A06 Dear Mr.Morales: The City requested supplemental civil engineering services by the Fentress Architects' Design Team. The City is developing improvements of the overall drainage concept. Based on direction at the meeting the City of Miami Beach Public Works Department on November 12, 2014, the team developed the scope of this work based on these understandings: Task 1: Regional Stormwater Pump Station Location Analysis The City asked that the Design Team to include provisions and provide DCP level plans for three (3) proposed stormwater pump stations to receive stormwater run-off from drainage basins that extend beyond the project limits. The regional pump stations will also include allocation for the Convention Center as defined by Kimley-Horn as part of a previous proposal(Stormwater Design Revisions dated November 20,2014.) The locations for the pump stations and associated storm utility corridors will be established by the design team and coordinated with the City. The team will analyze the feasibility of several locations with response to potential impacts to existing utilities,proposal utilities and the overall goals of the project. As part of this analysis,the design team will coordinate the City and the City's stormwater master planner,as well as DRER staff, for stormwater and coastal considerations. The design team assumes the City will provide the desired information and specifications to make the required assumptions for the location of proposed regional lift station and associated utility corridors. The intent of this analysis is to allocate space and utility corridors for the proposed regional stormwater pump stations and associated culverts and force mains. These components will not be included in the MBCC DCP,nor constructed as part of the MBCC Expansion&Renovation project. Fees for this Task will be a lump sum of Sixteen Thousand and One Hundred Five Dollars($16,105), and paid based on percentage complete of the task. Reimbursable costs for printing,telephone,delivery and travel are included in this fee. All billings for this work will be invoiced under the heading#20140021.001 A06. If the foregoing correctly states your understanding,please execute in the place and manner provided below and return to this office whereupon this letter shall become a binding agreement between us. Sincerely, Fentress Architects ,AIA John Kudry )BD±C Associate Principal Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 05—Pump Station Analysis November 26,2014 Page 2 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Holly Carson,Neil Suhr,Anne McNeely Fentress Architects Encl: Hours worksheet dated November 26,2014 Approved and Authorized: City of Miami Beach By: Date: Mr.Jimmy Morales Project: Pump Station Drainage Revisions Miami Beach Convention Center Renovation & Expansion 11/26/14 Meeting Room Revisions , Discipline Firm Name Firm Fee Total Number Architecture Fentress Architects 1 $2,900 $2,900 Architecture Arquitectonica 4 $0 $0 Fire/Life Safety/Code Consulting Rolf Jensen 13 $0 $0 Civil/Utility Engineering Kimley-Horn 6 $13,205 $13,205 Landscape West 8 7 $0 $0 Structural Engineering Martin/Martin 8 $0 $0 Vertical Transportation Lerch Bates 12 $0 $0 Plumb, Mech, Elec, Lighting ME Engineers 14-18 $0 $0 IT,Security,AV,Acoustics DL Adams 20 $0 $0 Food Service Caruso 25 $0 $0 Traffic Corradino 27 $0 $0 Graphics and Signage TKD 28 $0 $0 Parking Consultation Walker Parking 29 $0 $0 Cost Estimate RLB 35 $0 $0 Hardware Consultation Allegion 37 $0 $0 Design Fees $16,105 $16,105 Expenses 0% $0 $0.00 Total Total $16,105 $16,105 J, Storm Drainage Revisions Fentress Architects Hours Job Title Hourly Rate Hours Extension Task Management and Oversight Architect III $200.00 10 $2,000.00 John Kudrycki $225.00 4 $900.00 Totals this activity: Hours 14.0 $2,900.00 Total,Sub 1 14.0 $2,900.00 Hours Total 14.0 $2,900.00 Pump Station Revisons Miami Beach Convention Center Fentress Project No:20140021 November 19,2014 rev02 Page 2 of 3 Storm Drainage Revisions Kimley-Horn & Associates Hours Job Title Hourly Rate Hours Extension Civil Engineering Principal $280.00 0.0 $0.00 Senior Professional $200.00 13.0 $2,600.00 Professional $120.00 38.0 $4,560.00 Analyst/Junior Professional $105.00 24.0 $2,520.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 32.0 $3,360.00 Support Staff $82.50 2.0 $165.00 Totals this activity: Hours 109.0 $13,205.00 Total,Sub 1 109.0 $13,205.00 Hours Total 109.0 $13,205.00 Pump Station Revisions Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 November 26,2014 EXHIBIT 2 FENTRESS fentressarchitects.com December 30,2014 Revised January 6,2015 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 06—Animation and Web Site Development Project 20140021.001 A06 Dear Mr.Morales: The City has requested website design and additional computer animation services by the Fentress Architects'Design Team. This work is in addition to the scope outlined on our base contract. Below is listed our understanding of the scope of this work: Task 1: Development of Project Animation The City asked that the Design Team to provide a computer generated project animation that highlights project amenities in its completed condition. Fentress will engage an animation specialist, Agency 3D to produce this animation. Fentress will create a"story board" for approval by the City that will depict the views and movement of the animation.This animation will be a maximum of three minutes. Fees for this Task will be a lump sum of Thirty Thousand Dollars($30,000),and paid based on percentage complete of the task. Reimbursable costs for printing,telephone,delivery and travel are included in this fee. Task 2: Development of Project Public Relations Website The City asked that the Design Team to provide a public relations website that highlights project design and construction progress.Fentress will engage a web site design specialist,Deepsleep Studio to produce the website.The scope of this work is described in the attached proposal from Deepsleep Studio. Fees for this Task will be a lump sum of Thirty Thousand Five Hundred Dollars ($30,500), and paid based on percentage complete of the task. Reimbursable costs for printing,telephone,delivery and travel are included in this fee. All billings for Tasks 1 and 2 be invoiced under the heading#20140021.001 A06. If the foregoing correctly states your understanding,please execute in the place and manner provided below and return to this office whereupon this letter shall become a binding agreement between us. Sincerely, Fentress Architects John Kudrycki,AIA, EE BD C Associate Principal DEN DC LA SJ SF LON SH 1 421 Broadway 1 Denver CO 80203 1 303.722.5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 06—Animation and Web Site Development December 30,2014 Revised January 6,2015 Page 2 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Holly Carson,Neil Suhr,Anne McNeely Fentress Architects Encl: Animation Fee Summary dated December 29,2014 Agency 3D Proposal dated November 29,2014 Website Design Fee Summary dated December 29,2014 Deepsleep Studio proposal dated December 16,2014 Approved and Authorized: City of Miami Beach By: Date: Mr.Jimmy Morales Project: Animation Miami Beach Convention Center 12/29/14 Discipline Firm Name Firm Fee Number Project Management Fentress Architects 1 $0.00 Architecture Fentress Architects 1 $0.00 Architecture Arquitectonica 4 $0.00 Interior Design Fentress Architects 1 $0.00 Fire/Life Safety/Code Consulting Rolf Jensen 13 $0.00 Civil/Utility Engineering Kimley-Horn 6 $0.00 Landscape West 8 7 $0.00 Structural Engineering Martin/Martin 8 $0.00 Vertical Transportation Lerch Bates 12 $0.00 Fire Protection Rolf Jensen 13 $0.00 Plumbing Engineering ME Engineers 14 $0.00 Mechanical Engineering ME Engineers 15 $0.00 Electrical Engineering ME Engineers 16 $0.00 Lighting Design ME Engineers Illume 18 $0.00 Info Technology DL Adams 19 $0.00 Security Systems DL Adams 20 $0.00 AV Systems DL Adams 21 $0.00 Acoustics DL Adams 22 $0.00 Food Service Caruso 25 $0.00 _ Traffic Corradino 27 $0.00 Graphics and Signage TKD 28 $0.00 Parking Consultation Walker Parking 29 $0.00 Cost Estimate RLB 35 $0.00 Hardware Consultation Allegion 37 $0.00 Animator Agency 3D $30,000.00 Subconsultants Subtotal $30,000.00 Expenses $0.00 Fentress Fees Subtotal $0.00 Design Consultant Fees Total $30,000.00 Animation and Website Development Fentress Project No.20140021 December 29,2014 r AGENCY3D E ESTIMATE AGENCY3D studio 42 Bangna-Trad Soi 14 #Quote-178_Animation project Bangna-Trad Rd. Bangna Bangkok 10260 Thailand Bill To Mr.Daniel Mills 421 Broadway Denver Estimate Date: 29 Nov 2014 80203 CO USA Expiry Date: 29 Jan 2015 Item&Description Qty Rate Amount 3D animation_3 minutes 1.00 30,000.00 30,000.00 ���w,�� Sub Total 30,000.00 1 h 4 AGENCY3p) Total $30,000.00 h .S Notes Looking forward for your business. Terms&Conditions If you have any question.Please feel free to contact us 24/7 *Please sign to approve this estimate then send back to AGENCY3D before start project. Quotation approved by / / Quotation prepared by Mr.Paworn Hanboontrong Technical director AGENCY3D AGENCY3D STUDIO OFFICE Tel. +66 94 484 8172 Mobile +66 99 286 0976 E-mail info @agency3dbudget.com Website www.agency3dbudget.com Address 42 Bangna-Trad Soi 14,Bangna-Trad Rd.,Bangna,Bangkok 10260,THAILAND Project: Web Site Design Miami Beach Convention Center 12/29/14 Discipline Firm Name Firm Fee Number Project Management Fentress Architects 1 $4,500.00 Architecture Fentress Architects 1 $0.00 Architecture Arquitectonica 4 $0.00 Interior Design Fentress Architects 1 $0.00 Fire/Life Safety/Code Consulting Rolf Jensen 13 $0.00 Civil/Utility Engineering Kimley-Horn 6 $0.00 Landscape West 8 7 $0.00 Structural Engineering Martin/Martin 8 _ $0.00 Vertical Transportation Lerch Bates 12 $0.00 Fire Protection Rolf Jensen 13 $0.00 Plumbing Engineering ME Engineers 14 $0.00 Mechanical Engineering ME Engineers 15 $0.00 Electrical Engineering ME Engineers 16 $0.00 Lighting Design ME Engineers Illume 18 $0.00 Info Technology DL Adams 19 $0.00 Security Systems DL Adams 20 $0.00 AV Systems DL Adams 21 $0.00 Acoustics DL Adams 22 $0.00 Food Service Caruso 25 $0.00 Traffic Corradino 27 $0.00 Graphics and Signage TKD 28 $0.00 Parking Consultation Walker Parking 29 $0.00 Cost Estimate RLB 35 $0.00 Hardware Consultation Allegion 37 $0.00 Web Site Designer Deepsleep Studio $25,000.00 Subconsultants Subtotal $25,000.00 Expenses $1,000.00 Fentress Fees Subtotal $4,500.00 Design Consultant Fees Total $30,500.00 Meeting Room Revisions Fentress Project No.20140021 November 7,2014 Web Site Develpoment Fentress Architects Hours Job Title Hourly Rate Hours Extension Architect I $110.00 0 $0.00 Architect II $140.00 0 $0.00 Architect III $200.00 0 $0.00 Intern Architect I $90.00 0 $0.00 Intern Architect II $110.00 0 $0.00 Intern Architect III $130.00 0 $0.00 Interior Designer I $100.00 0 $0.00 Interior Designer II $140.00 0 $0.00 Interior Designer III $180.00 0 $0.00 Project Architect $225.00 0 $0.00 John Kudrycki $225.00 20 $4,500.00 Mike Winters $300.00 0 $0.00 Curt Fentress $450.00 0 $0.00 Hours Total Hours 0.0 $4,500.00 Total,Sub 1 0.0 $4,500.00 Hours Total 0.0 $4,500.00 Animation and Website Development Fentress Project No.20140021 December 29,2014 Page 1 of 1 PREPARED FOR DATE ISSUED FENTRESS ARCHITECTS FRIDAY I JANUARY 9, 2014 DEVELOPED BY ALEX MARTINEZ FOUNDER I CCO DEEPSLEEP STUDIO 1 P 305 720 2990 1 605 LINCOLN ROAD SUITE 230 I MIAMI BEACH, FL 33139 E INFO4DEEPSLEEPSTUDIO.COM I DEEPSLEEPSTUDIO.COM I f b Be A V in © /DEEPSLEEPSTUDIO Cle/4#0Sle,' STUDIO 0 Statement of Confidentiality This proposal and supporting materials contain confidential and proprietary business information of DeepSleep Studio. These materials may be printed or photocopied for use in evaluating the proposed project,but are not to be shared with other parties 0 Cie le/' - T I(• ( '1 f t Be V in 0 r STUDIO ABOUT US Formed in 2001 by Alex Martinez, DeepSleep Studio is a multi-disciplinary graphic design and digital communications studio with over 10 years experience working closely with local, national, and international clients. Based out of South Beach Miami, DeepSleep has built a reputation for producing relevant, memorable, and effective creative solutions. DeepSleep Studio helps companies build great brands by creating engaging experiences for consumers. Our design capabilities rooted in digital, combine consumer insight, technology & creativity. The result? Consumer experiences that are dynamic, elegant and targeted to the audience using them. We're passionate about the collision of technology, creativity and audience engagement. DeepSleep Studio take's responsibility for entire projects from strategy to design, development, integration, launch and on-going support. The result? Beautifully built and high performing systems that deliver on business objectives today while creating new opportunities for tomorrow. DeepSleep Studio does not only replenish what our clients desire but we renovate innovation P P Y P itself. We are known to create work that surpasses one's greatest expectations. We partner with our clients 3 and obsess over the creative journey, in turn making the final product creatively untouchable. CAPABILITIES BRAND IDENTITY MESSAGING PHOTOGRAPHY RESPONSIVE WEBSITE DESIGN IMPLEMENTATION CONTENT STRATEGY ©WRITING CONCEPT ? CONTENT DEVELOPMENT BRAND MARKETING& DESTINATION SITES ADVERTISING DESIGN CORPORATE WEBSITES VISUAL DESIGN SELF-SERVICE, SUPPORT& E-COMMERCE SITES PRINT, PACKAGING POS PRODUCT LAUNCH & CAMPAIGN MICRO-SITES AUDIO CONTENT MANAGEMENT SYSTEM DESIGN&IMPLEMENTATION MOTION GRAPHICS, VIDEO FILM-BASED CONTENT EMAIL DELIVERY CREATION 2D 3D ILLUSTRATION ANIMATION CONTRARY TO THE NAME DEEPSLEEP IS WIDE AWAKE ! Mi • mom it I 0 de4✓ZIWZ cTU IC f t Be r. V in O STUDIO QUOTATION ESTIMATE In regards to your recently requested price quote from DeepSleep Studio, we present you with the following estimate. The estimate below is exclusively for the items that are described and listed below. Any additional items requested will be reflected in a higher estimate. 1 I CUSTOM WEBSITE SOLUTION DeepSleep Studio will provide Fentress Architects with a custom website solution for the Miami Beach Convention Center. The website will be developed in HTML 5, CSS 2 & 3, and JQuery 1.9. The site will be responsive and will adapt to fit on smaller screens, tablets, and mobile phones. The site structure will be based on a one-page parallax layout. Using various JQuery plugins, as well as custom tailored JQuery functions, the User Interface will contain various interactive and animated (parallax) elements that will create an enticing and user-friendly experience for the viewer. 2 WEBSITE BREAKDOWN HOME PAGE Viewers landing on the website will be greeted by a large, eye-catching top image, as well as links to a newsletter sign-up, construction progress, a gallery, and brochure and floor plan PDFs. A site-map in the website footer will contain links to the Convention Center's partners and other pertinent information. EVENTS The events section of the website will list upcoming shows, conventions and happenings at the Miami Beach Convention Center. A link to purchase tickets can also be included in this section. IMAGE GALLERY The gallery section will host pictures collected from various Miami Beach Convention Center events, as well as images of the architecture and new structure plans and renderings provided by architects. TEASER VIDEO A section of the website will house the video created by DeepSleep Studio based on the build-out of the new convention center. This section can also include facts on the size and structural layout of the new convention center. MEDIA KIT & NEWS The media kit and news section will contain links to a downloadable press kit, as well as links to recent news pieces and press coverage related to the Miami Beach Convention Center. CONTACT The contact page will host links to related press and google maps integration (if needed), as well as the contact information for key Convention Center personnel. Social media handles can also be showcased in this section. SOCIAL MEDIA This section will showcase a live feed of posts from designated Miami Beach Convention Center social media accounts. 0 de psl �� DEEPSLEEPSTUDIO.COM I f t Be a V in ©/DEEPSLEEPSTUDIO 3 I BACKEND DeepSleep Studio will customize a responsive backend solution supported by Wordpress's open source content management system (CMS) based on PHP and MySQL. The backend will allow the user to update news, content, and images easily and instantly. 4 I HD VIDEO SOLUTION DeepSleep Studio will storyboard and develop a teaser video for the new Miami Beach Convention Center. The video will combine existing footage of Miami Beach and digital renders provided by the architectural team to showcase the contrast between the current and future Miami Beach Convention Center. The video will be between 45 and 6 seconds in length. It will be narrated with a voiceover and accompanied by music. DeepSleep Studio will hold auditions for the voiceover and will provide client with voice and music samples to choose from. The video is an additional service and is not reflected in pricing of this proposal. TIMELINE PHASE WEEKS 1 2 3 4 5 6 7 8 • 1 WEBSITE DESIGN 2 WEBSITE FRONT END DEVELOPMENT 3 WEBSITE RESPONSIVE MOBILE INTEGRATION WEBSITE BACK-END DEVELOPMENT 2 VIDEO PRE-PRODUCTION 2 VIDEO EDITING 0 dePSW DEEPSLEEPSTUDIO.COM I f t Be ® V in ©/DEEPSLEEPSTUDIO STUDIO ESTIMATED FEES In exchange for the goods and services to be provided by DeepSleep Studio as described in this agreement, Fentress Architects agrees to make payments as listed below. Please note: the rate offered below reflects the project as a whole. Adding or removing items will reflect in a revised estimate. WEBSITE BREAKDOWN • Website Design - $6.000 • Website Front End Development - $10,500 • Responsive/ Mobile Integration - included • Backend Solution (CMS) - $8,500 Total: $25,000 VIDEO BREAKDOWN • Video (pre-production and editing) - $8,000 • Video Voiceover (auditions & recording) - $500 Total: $8,500 (not included in the total price below) PAYMENT BREAKDOWN • 50% of the total balance ($12,500) is due upon approval of the proof (January). • 40% of the total balance ($10,000) is due upon completion of the vvebsite front end development (February). • The remaining balance ($2,500) is due the day the website goes live (March). - The figure expressed represents the website portion of this project as a whole. The video total expressed above is not included in this figure. $25,000 0 de 9slce DEEPSLEEPSTUDIO.COM I f t Be 6 V in ©/DEEPSLEEPSTUDIO STUDIO 5 I AGREED AND ACCEPTED By signing this Agreement, I indicate that I understand, agree to and accept the terms and conditions as contained herein, dated and signed on DEEPSLEEP STUDIO Contact Name Alex Martinez. Creative Director Phone Number 305 720 2990 Email Address alex adeepsleepstudio.com Address 605 Lincoln Rd Suite 230 City, State Zip Code Miami Beach, FL 33139 e°171°119: Contact Name John Kudrycki AIA, LEED AP BD + C I Associate Principal Fentress Architects Phone Number 303 282 6099 Email Address Address 421 Broadway City, State Zip Code Denver, CO 80203