Loading...
2015-28953 Reso RESOLUTION NO. 2015-28953 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 5 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT WITH THE JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3, 2012, FOR THE COLLINS PARK PARKING GARAGE PROJECT (COLLINS PARK PLACE), FOR THE ADDITIONAL PROFESSIONAL SERVICES REQUIRED TO REDESIGN THE GROUND FLOOR OF THE BUILDING TO BASE FLOOD ELEVATION (BFE) WITH PROVISIONS TO HAVE ALL CRITICAL SYSTEMS ELEVATED UP TO 20 FEET OR AS HIGH AS REASONABLY POSSIBLE, AND BUILDING SLABS DESIGNED TO ACCOMMODATE A FUTURE INCREASE IN GROUND FLOOR ELEVATION, IN KEEPING WITH THE CITY OF MIAMI BEACH FLOOD MITIGATION EFFORTS AS IT RELATES TO SEA LEVEL RISE, IN THE LUMP SUM AMOUNT OF $250,870; AND FOR THE PROVISION OF A CONTAMINATION ASSESSMENT PLAN (CAP), SITE ASSESSMENT (SA) AND SITE ASSESSMENT REPORT (SAR) FOR THE PROJECT SITE IN ACCORDANCE WITH ENVIRONMENTAL REQUIREMENTS BY MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCES (RER) AND THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) TO ADDRESS THE SITE CONTAMINATION IDENTIFIED IN THE PHASE II ENVIRONMENTAL SITE ASSESSMENT REPORT, IN THE NEGOTIATED LUMP SUM AMOUNT OF $43,479; FOR A TOTAL COST OF $294,349 WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on March 21, 2012, the City Commission adopted Resolution No. 2012- 27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant), in the amount of $2,951,823, for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services, for the Collins Park Garage Project (Collins Park Place); and WHEREAS, the Basis of Design Report (BODR) was adopted by the City Commission on January 16, 2013; and WHEREAS, on September 30, 2013, Amendment No. 1 was executed in the amount of $8,935, for the provision of additional surveying services, and extended representation during the July City Commission Meeting; and WHEREAS, on December 9, 2013, Amendment No. 2 was executed in the amount of $12,114, for the provision of a Phase II Environmental Site Assessment, for the investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report; and WHEREAS, on May 28, 2014, Amendment No. 3 was executed in the amount of $24,969, for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation to two and three feet above Base Flood; and WHEREAS, on June 20, 2014, Amendment No. 4 was executed per Resolution 2014- 28615 adopted on June 11, 2014, in the amount of $249,448, for construction documents revisions associated with raising the proposed finish floor elevation to Base Flood Elevation plus three (3) feet; for the design, permitting and construction administration services of certain right- of-way improvements required by Miami-Dade County Public Works Traffic Division; and for the design, permitting and construction administration for the replacement of the sanitary sewer line along Liberty Avenue, requested by the City's Public Works Department; and WHEREAS, the following Amendment No. 5 to the Agreement, is for construction documents revisions required to redesign the ground floor of the building to Base Flood Elevation with provisions to have all critical systems elevated up to 20 feet or as high as reasonably possible, and building slabs designed to accommodate a future increase in ground floor elevation, in keeping with the City of Miami Beach flood mitigation efforts as it relates to sea level rise, in the negotiated not-to-exceed amount of $250,870; and for the provision of a contamination assessment plan, site assessments and site assessment report in accordance with environmental requirements by Miami-Dade County and the Florida Department of Environmental Protection to address the site contamination identified on the Phase II Site Assessment Report, in the negotiated fixed amount of $43,479; for a grand total cost of $294,349 with previously appropriated funding; and WHEREAS, the new total amount of the agreement is $3,541,638. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission of The City of Miami Beach, Florida, authorize the Mayor and City Clerk to Execute Amendment No. 5 to the Professional Architectural and Engineering (NE) Services Agreement with the Joint Venture of Zaha Hadid Limited T/A Zaha Hadid Architects and Berenblum Busch Architecture, Inc., dated May 3, 2012 for the Collins Park Garage Project (Collins Park Place), for the additional services required to redesign the ground floor of the building to Base Flood Elevation with provisions to have all critical systems elevated up to 20 feet or as high as reasonably possible, and building slabs designed to accommodate a future increase in ground floor elevation, in keeping with the City of Miami Beach flood mitigation efforts as it relates to sea level rise, in the negotiated not-to-exceed amount of $250,870; and for the provision of a contamination assessment plan, site assessments and site assessment report in accordance with environmental requirements by Miami-Dade County Regulatory and Economic Resources and the Florida Department Of Environmental Protection to address the site contamination identified on the Phase II Site Assessment Report, in the negotiated Lump Sum amount of $43,479; for a grand total cost of$294,349 with previously appropriated funding. PASSED AND ADOPTED this 11th day of March, 2015. ATTEST: r` f ji I � IMILIMok �� �� ili Le,,ine f Raf -I Granado, City Cl.- k .. ,&' 4. - Z .44, APPROVED AS TO APP APPROVED AS T� FORM, 6 A�.� : � E AND FOR EX UTION • ' '' '� � 0 FORM 8�LANGUAGE ORATED: G &FOR EXECUTION . City orney 4#'43‘ ma c abi06,\--_ 3- 5 c5 h���r + City Attorney Date T:\AGENDA\2015\March\Collins Park Plac-, -1'•nc�'B-1` '''-ndment No 5-Reso.doc Attachment A AMENDMENT NO. 5 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND A JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3RD, 2012, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE COLLINS PARK GARAGE PROJECT IN THE AMOUNT OF $294,349 This Amendment No. 5 to the Agreement made and entered this day of 2015, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida(hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and a Joint Venture of Zaha Hadid Limited t/a Zaha Hadid Architects,a company certified by the Registrar of Companies for England and Wales, having its principal office at 10 Bowling Green Lane, London, EC1 R OBQ, United Kingdom (hereinafter referred to as the "Prime Architect"); and Berenblum Busch Architecture, Inc., a Florida corporation, having its principal office at 2200 NW 2nd Avenue, Suite 203, Miami, Florida, 33127 (hereinafter referred to as the "Executive Architect"). RECITALS WHEREAS, pursuant to Request for Qualifications(RFQ)No.31-10/11,the Mayor and City Commission adopted Resolution No. 2012-27869 on March 21, 2012, approving a Professional Services Agreement(the Agreement)between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc.for the Planning,Architectural, Engineering, Design, Bid and Award, And Construction Administration Services for the Collins Park Garage Project; and WHEREAS,the Agreement was executed for a not-to-exceed amount of$2,951,823;and WHEREAS,Amendment No.1 to the Agreement, for the provision of additional surveying services and extended representation during July City Commission meetings, was executed on September 30, 2013, in the amount of$8,935; and WHEREAS, Amendment No. 2 to the Agreement, for the provision of a Phase II Environmental Site Assessment, for the investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report, was executed on December 9, 2013, in the amount of$12,114; and WHEREAS, Amendment No. 3 to the Agreement,for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation between two(2)and four(4)feet(Base Flood Elevation plus 2 or 3 feet),was executed on May 28, 2014, in the amount of$24,969; and Page 1 of 4 Collins Park Garage-Amendment No.5 WHEREAS,on June 11,2014, pursuant to Resolution No.2014-28615,the Mayor and City Commission approved Amendment No. 4 to the Agreement, in the amount of $249,448, for construction documents revisions associated with raising the proposed finish floor elevation to Base Flood plus three(3) feet;for the design, permitting and construction administration services of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division; and for the design, permitting and construction administration for the replacement of a sanitary sewer line(and associated structures if required)along Liberty Avenue, requested by the City's Public Works Department; and WHEREAS, the following Amendment No. 5 to the Agreement is for the additional professional services required to redesign the ground floor of the building to Base Flood Elevation with provisions to have all critical systems elevated up to 20 feet or as high as reasonably possible, and building slabs designed to accommodate a future increase in ground floor elevation, in keeping with the City of Miami Beach flood mitigation efforts as it relates to sea level rise, in the Lump Sum amount of$250,870; and for the provision of a contamination assessment plan(CAP), site assessment (SA) and site assessment report (SAR) for the project site in accordance with environmental requirements by Miami-Dade County Regulatory and Economic Resources(RER) and the Florida Department of Environmental Protection(FDEP)to address the site contamination identified on the Phase I I Site Assessment Report, in the negotiated fixed amount of$43,479;for a total cost of$294,349 with previously appropriated funding; and WHEREAS, the new total amount of the Agreement is $3,541,638; and NOW,THEREFORE,the parties hereto, and in consideration of the mutual promises,covenants, agreements,terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 5. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-5", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 5. Page 2 of 4 Collins Park Garage-Amendment No. 5 IN WITNESS WHEREOF,the parties hereto have caused this Amendment No. 5 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH Rafael Granado Phillip Levine City Clerk Mayor ATTEST: PRIME ARCHITECT (P.A.)/ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS Signature/ Secretary: Signature /President Print Name Print Name ATTEST: EXECUTIVE ARCHITECT (E.A.)/ BERENBLUM BUSCH ARCHITECTURE, INC. Signature / Secretary: Signature / President Print Name Print Name APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION ,C- 3 Li c5 City Attorney Date Page 3 of 4 Collins Park Garage-Amendment No. 5 SCHEDULE "A-5" SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: Add the following under Task 6—ADDITIONAL SERVICES Task 6.6.1 — Re-Design and Revise Construction Documents to Place the Ground Floor Elevation at Base Flood Elevation +0 Feet and Provide Design to Allow for Future Rise of Ground Floor Elevation, as Required: Re-design and revise the construction documents to place the ground floor elevation at Base Flood Elevation with provisions to have all critical systems elevated up to 20 feet or as high as reasonably possible and building slabs designed to accommodate a future increase in ground floor elevation, in keeping with the City of Miami Beach flood mitigation efforts as it relates to future sea level rise. Task 6.6.2 — Contamination Assessment Plan (CAP), Site Assessment (SA) and Site Assessment Report(SAR) as Part of Site Cleaning Remediation Efforts: Preparation of a Contamination Assessment Report (CAP) to be presented to DERM and DER. Following approval of CAP, Smart-Science, a Sub-Consultant to Berenblum Busch Architecture,will implement CAP tasks by installing monitoring wells and drilling borings to obtain samples for further laboratory analysis (SA) and complete a Site Assessment Report (SAR) summarizing the implemented tasks, which will be presented to DERM and DER for consideration. Following this review DERM and DER may close the case or require additional remediation tasks, including removal and disposal plan for the contaminated soil and water. PAYMENT AND COMPENSATION The total fee proposed for this Scope of Work is $294,349 (refer to Exhibit A-5 attached herein). COMPENSATION Zaha Hadid Berenblum Busch Total Limited Architecture Original Agreement Amount $1,276,000 $1,675,823 $2,951,823 Amendment No. 1 N/A $ 8,935 $ 8,935 Amendment No. 2 N/A $ 12,114 $ 12,114 Amendment No. 3 $ 17,509 $ 7,460 $ 24,969 Amendment No. 4 $ 109,981 $ 139,467 $ 249,448 Amendment No. 5 $ 144,714.25 $ 149,634.75 $ 294,349 Revised Agreement Amount $1,548,204.25 $ 1,993,433.75 $ 3,541,638 Page 4 of 4 Collins Park Garage—Amendment No.5 P Exhibit A-5 BBA BERENBLUM BUSCH ARCHITECTURE,INC February 13,2015 [Revised March 02, 2015] Ms. Sabrina Baglieri City of Miami Beach 1700 Convention Center Drive Miami Beach Fl. 33139 Re: Amendment No.5 Adjustments to the project as follows: 1-Design revisions per city's request to lower the ground finished floor elevations from [3] feet above the current Base Flood Elevation [BFE] to [0] feet above Base Flood Elevation, +6.45 NAVD. 2- Preparation of a Contamination Assessment Plan (CAP), Site Assessment(SA) and Site Assessment Report(SAR) Dear Ms. Baglieri: Berenblum Busch Architecture, Inc. (BBA) is pleased to present the enclosed proposal for additional services related to design revisions requested by the City of Miami Beach. The revisions include the request to lower the ground finished floor elevations to BFE +0 feet per city's directive on email dated January 29th, 2015. The scope of work includes adapting the geometry to meet existing sidewalk, adapt, redesign and detail the ground floor storefront including an addition to a knee wall at BFE+1 feet, adapt and implement changes to back-of- house area, all garage stairs, site stairs, elevator cores, site ramps, site grading and landscape design. The structure will have to be redesigned to account for the revisions, including the ground floor slab, columns, shear walls and foundations. The revisions impact several disciplines including architecture, civil engineering, landscape architecture and structural engineering. This amendment will bring the design package up to the full 60% Design Development Documents. Time extension to the contract: approximately 8 weeks upon receiving approval. The following additional fees are being requested: ZAHA HADID ARCHITECTS: $144,714.25 BBA: $40,847.75 LANGAN ENGINEERING: $20,508.00 KIM LEY-HORN AND ASSOCIATES $ 4,800.00 ROSS& BARUZZINI $ 8,000.00 DE SIMONE: $32,000.00 TOTAL(LUMP SUM) $250,870.00 A proposal for professional environmental services associated with the preparation of a Contamination Assessment Plan (CAP), Site Assessment(SA)and Site Assessment Report(SAR) for the Collins Park Place project in accordance with environmental requirements by the Miami-Dade County and the Florida Department of Environmental Protection. SMART-SCIENCES ENVIRONMENTAL CONSULTING: $43,479.00 AMENDMENT NO.5 GRAND TOTAL $294,349.00 1 1 We thank you for the opportunity to present this additional service request. Please let us know if you need any additional information. Submitted by, Berenblum Busch Architecture, Inc. 1; 1114—.. Gu to o Berenblim, AIA. Pr si ent Attachments: 1. Zaha Hadid Architects and Berenblum Busch Architecture Inc., fee schedule for professional services and billing breakdown. 2. Langan Engineering contract change order for additional services proposal. 3. Kimley-Horn and Associates sub-consultant additional services proposal. 4. Ross & Baruzzini proposal for additional HVAC, Plumbing, Electrical and Fire-Protection professional engineering design services for owner requested revisions to the site grading, sidewalks and ground floor elevation for the Collins Park parking structure in Miami Beach, Florida. 5. DeSimone ground floor revisions to BFE+O'Additional Services Proposal 2. 6. Smart-Sciences Environmental Consulting Proposal for Contamination Assessment Plan and Site Assessment at proposed Collins Park Garage property located at 340 23rd Street, Miami Beach, Florida. C: Humberto Cabanas, Fernando Paiva, CMB; Chris Lepine, Eva Tiedemann, ZHA; project file. 2 Zaha Hadid Architects Attachment 1 1737 COLLINS PARK PLACE MIAMI BEACH AMENDMENT NO.5 FEE SCHEDULE FOR PROFESSIONAL SERVICES AND BILLING BREAKDOWN Monday,March 02,2015 Ground Floor Slab Elevation Change to"BFE+0"(=6.45'NAVD]throughout;adapt TIME LINE Task 1 Task 2 Task 3 Task 4 Task 5 geometry to meet existing sidewalk;adapt,redesign&detail storefront[adding now Week 1 required knee wall]and adapt&implement changes to Week 2 back-of-house area. Week 3 Week 4 Submit Concept to CMB for Approval Task 1 Design Concept(ZHA] Week 5 Task 2 3D Modelling[ZHA] Week 6 Task 3 Coordination[ALL] Week 7 Task 4 Code Analysis[BBA] Week 8 Final Submittal to CMB Task 5 Implementation up to 60%Design Development Documents[ALL] BERENBLUM BUSCH ARCHITECTURE Professional Personnel Rates• Task 1 Task 2 Task 3 Task 4 Task 5 Hrs Billable Hrs Billable Firs Billable Hrs Billable Firs Billable Principal $159.65 0 $0.00 0 $0.00 0' $0.00 2 $319.30 20 $3,193.00 Sr.Architect $122.40 0 $0.00 0 $0.00 20 $2,448.00 10 $1,224.00 34 $4,161.60 Architect $107.50 0 $0.00 0 $0.00 69 $7,417.50 17 $1,827.50 102 $10,965.00 CAD $58.54 0 $0.00 0 $0.00 0 $0.00 0 $0.00 153 $8,956.62 Clerical $37.25 0 $0.00 0 $0.00 $0.00 0 $0.00 9 $335.23 Sub-total $0.00 $0.00 $9,865.50 $3,370.80 $27,611.45 TOTAL(Lump Sum) $40,847.751 ZAHA HADID ARCHITECTS Professional Personnel Rates' Task 1 Task 2 Task 3 Task 4 Task 5 Hrs Billable Hrs Billable Hrs Billable Hrs Billable Hrs Billable Principal $159.65 25 $3,991.25 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Sr.Architect $122.40 90 $11,016.00 0 $0.00 60 $7,344.00 0 $0.00 40 $4,896.00 Sr.Designer $122.40 110 $13,464.00 105 $12,852.00 60 $7,344.00 0 $0.00 50 $6,120.00 Sr.Designer $122.40 110 $13,464.00 110 $13,464.00 60 $7,344.00 0 $0.00 50 $6,120.00 Architect $107.50 110 $11,825.00 110 $11,825.00 60 $6,450.00 0 $0.00 60 $6,450.00 Clerical $37.25 4 $149.00 0 $0.00 10 $372.50 0 $0.00 6 $223.50 Sub-total $53,909.25 $38,141.00 $28,854.50 $0.00 $23,809.50 TOTAL(Lump Sum) $144,714.251 •Reflects hourly rate adjustments as per the Agreement,at a CPI average yearly increase of 2.1% Studio London Ms. Sabrina Baglieri 10 Bowling Green Lane London EC1R 080 City Of Miami Beach T+44 20 7253 5147 1700 Convention Center Drive F+44 20 7251 8322 Miami Beach;FL 33139 mail @zaha-hadid.com USA www.zaha-hadid.com London, 26 February 2015 RE: 1737 Collins Park Place- Fee Proposal Amendment No.5 Dear Ms. Baglieri, We can confirm that our fee proposed for Amendment No.5 is based on a thorough review of all items to be amended, adapted and revised following the City's directive to settle the ground floor elevation throughout the CPP project to BFE+0 - and subsequent conversations with the CMB and consultants. The work load is anticipated to be more comprehensive and extensive than Amendment 3 and 4 combined. While the latter 2 amendments entailed studies done during the 60% DDD Phase, this amendment will bring the design package up to the full 60% Design Development Documents. N It entails additional challenging design work, adapting to existing sidewalk conditions [as OJ per latest County directive] without losing an extensive amount of area, avoiding ramps within valuable retail space. OJ In addition, the design of the Feature Stair will need to be reviewed as the Public Plaza design may need to be adapted to revised landscape elevations. Finally, Amendment 5 now entails the redesign and detailing of the entire Ground Floor OJ Storefront due to a new directive from Public Works that does not allow the use of flood panels other than at doors and requires knee walls at BFE+1. This is reflected in our proposed fee schedule. List of tasks anticipated: • Review and Analyse impact • Prepare sketches • In house 3D studies • Sessions with Consultant team for preliminary design �m • Integrate BBA input into Design sketch • Adjust geometry and test • Implications at retail side • Implications at Urban plaza m7 • Design sketches to resolve elevation changes across site • Test and Coordinate alternatives[if required] • Research and test design suitability of new products required as result of the change • Distribute results to consultant team • Coordinate information with BBA to present to CMB • Prepare documentation • Adopt relevant feedback where possible • Refine design • Coordinate results with consultant team • Update 3D model Ll 4- • Rework Plans, Sections£t Elevations • Coordinate drawing set changes with BBA E • Coordinate drawing set changes with Consultant team I a • Update CD drawing set documentation PE. A4,9. We trust this clarifies. Please do not hesitate to call should you have any further questions. D aZ s Kind Regards, • o.d z 8 Nm ', Eva }iedemann Associate LANGAN ENGINEERING & ENVIRONMENTAL SERVICES Attachment 2 15150 NW 79th Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX(215) 864-0671 CONTRACT CHANGE ORDER FOR ADDITIONAL SERVICES DATE: 11 February 2015 REVISED: CHANGE ORDER NO: CONTRACT: PROJECT NO.: 300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OF WORK: This change order has been prepared to identify additional scope and fees associated with regrading the proposed site of the Collins Park Garage. Currently the proposed grading reflects finished floor elevations that are 3 feet above the FEMA base flood elevation. We have been asked by Berenblum Busch Architecture that the City of Miami Beach would like the finished floor elevation at a lower elevation that is compatible with the existing perimeter site elevations. This proposal has been prepared to address the revision of the site grading and drainage plan for the project. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL: $20,508 (See attached man-hour allocation table) LANGAN will proceed with the above described scope of services upon receipt of this form signed by you which authorizes Langan to begin work.. If notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification. All terms of the original agreement remain in effect. Agreement Authorized By : Gustavo Berenblum, AIA for Langan: Leonardo Rodriguez, P.E. cc: \\langan.com\data\MI\data8\300089801\Marketing Data\Proposals\2015-02-1 I Grading Add Services\2015-02-25 Revised Site Grading ADD Services\2015-02-1 I Site Regrading Add Services.docx PROJECT NAME: COLLINS PARK GARAGE REGRADING(ADD.SERVICES) CLIENT: Berenblum Busch Architecture 25 February 2015(Revised) LOCATION: City of Miami Beach,Miami-Dade County,FL PRIN PM PES Cad Insp CLER TASK $150.00 $120.00 $101.00 $83.00 $83.00 $35.00 AMOUNT Meetings with Design Team to coordinate revised grading. 12 12 $2,652.00 Prepare conceptual grading plan. 6 16 24 $4,328.00 Prepare 50%of the 60%design development grading plan. 6 24 40 $6,464.00 Prepare 100%of the 60%design development grading plan. 4 6 24 40 $7,064.00 $0.00 Total 4 30 76 104 0 0 $20,508.00 Attachment 3 AMENDMENT NUMBER 1 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY- HORN AND ASSOCIATES, INC. AMENDMENT NUMBER 1 DATED February 12, 2015 to the agreement between Berenblum Busch Architecture, Inc. ("BBA") ("Prime") and Kimley-Horn and Associates, Inc., ("Sub-Consultant") dated May 20th, 2012 ("the Agreement") concerning City of Miami Beach Collins Park Parking Garage Documents(the"Project"). The Sub-Consultant has entered into the Agreement with Prime for the furnishing of professional services, and the parties now desire to amend the Agreement. Therefore, it is mutually agreed that the Agreement is amended to include Additional Services to be performed by Sub-Consultant and provisions for additional compensation by the Prime to the Sub-Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference. PRIME: SUB-CONSULTANT: BERENBLUM BUSCH KIMLEY-HORN AND ASSOCIATES, INC. ARCHITECTURE, INC. By: By: Title: Title:Vice President Date: Date: February 12, 2015 • Rev.11-08 Exhibit A to Amendment Number 1, Dated February 12, 2015 Sub-Consultant will perform the following Additional Services: Ground Floor Elevation Revisions Ground Floor Elevation Revisions: This task consists of revisions to the landscape and irrigation plans and details based on the City of Miami Beach requiring the finish floor elevation be revised to BFE+ 6.45 NAVD. For the Additional Services set forth above, Prime shall pay Sub-Consultant the following additional compensation: FEE AND BILLING Kimley-Horn will perform the services described in this Scope of Services for the lump sum fees outlined below. Individual task amounts are informational only. In addition to the lump sum labor fee, direct reimbursable expenses such as express delivery services, large format reproductions (larger than 11" x 17"), air travel, and other direct expenses will be billed at cost. Expenses for the project such as in-house duplicating, facsimile, local mileage, telephone, postage, in-house blueprinting, and word-processing are included in the lump sum fees.Technical use of computers for design,analysis,GIS,and graphics,etc.,will be included in the labor fees. Fees and expenses will be invoiced monthly based, as applicable, upon the percentage of services completed or actual services performed and expenses incurred as of the invoice date. Payment will be due within 25 days of your receipt of the invoice. LUMP SUM LABOR TASK Description Lump Sum Ground Floor Elevation Revisions $4,800 TOTAL LUMP SUM LABOR FEE $4,800 ADDITIONAL SERVICES The following tasks are not part of the scope of services, but may be performed as additional services, if requested by the Prime. These services may include,but are not limited to: • Revisions to the plans due to substantial changes in project scope,budget,and/or concept. • Services required by additional governmental regulations which might be put into effect after the date of this agreement • Water feature design plans,details and documents • Architectural Design • Electrical Engineering plans,details and documents • Stormwater Pollution Prevention Plan(SWPPP) • Paving,Grading and Drainage Plans and Details • Erosion Control Plans, Notes and Details • Signing and Pavement Marking Plans and Details • Hardscape Plans Rev.11-08 Kimley >>Horn March 2,2015 RE: City of Miami Beach-Collins Park Parking Garage Additional services requested for the following tasks: • Coordination with the Project Architect regarding the building footprint, access points and architectural elevations to complete the revisions to the landscape and irrigation plans and details based on the City of Miami Beach requiring the finish floor elevation be revised to BFE+ 6.45 NAVD. • Bringing the design up to the full_60% Design Development Documents(60% Construction Documents) Please contact me at(305)673-2025 or george:puig u@,kimley-horn.corn should you have any questions. Sincerely, George Puig, PLA Associate • • kimley-horn.com 1221 Brickell Avenue, Suite 400, Miami, FL 33131 305 673 2025 Attach pent 4 Ross I3aruzzini February 25,2015 Mario Menendez/Project Architect Berenblum Busch Architecture 2200 NW 2nd Avenue,Suite 203 Miami, FL 33127 Re: PROPOSAL FOR ADDITIONAL HVAC, PLUMBING, ELECTRICAL AND FIRE-PROTECTION PROFESSIONAL ENGINEERING DESIGN SERVICES FOR OWNER REQUESTED REVISIONS TO THE SITE GRADING, SIDEWALKS AND GROUND FLOOR ELEVATION FOR THE COLLINS PARK PARKING STRUCTURE IN MIAMI BEACH, FLORIDA. Dear Mario: We are pleased to submit our Additional Services Proposal for the professional engineering services for the above-referenced project. PROJECT UNDERSTANDING We understand the project to include modifying the existing MEP-FP design intent documents to accommodate the Owner requested revisions for changes to the site grading,sidewalks and ground floor elevation for the future tenant retail spaces.This add-services proposal is based on assumptions and information conveyed to us during our weekly scheduled project coordination teleconferences, therefore we reserve to right to modify this proposal,as required,once we receive the actual revised Architectural floor plans and we can fully evaluate the impact on the existing design intent documents. SUMMARY OF SERVICES A. SCOPE OF WORK Scope includes design of required modifications to the existing MEP design-intent documents. B. DELIVERABLES 1. Revisions to existing 60% DD design documents addressing the required modifications. One (1)set of pdf format files for the 60% DD re-submittal. C.SCHEDULE We will work closely with the construction schedule established by the Architect. Our design should be completed within three (3) weeks of notice to proceed and having the required, complete information from the other project Consultants. D. EXCLUSIONS The following items are not included in R&B's cope of work: 7205 NW 19th Street,Suite 501 I Miami,FL 33126 I t 305.477.8338 I f: 305.477.3378 www.rossbar.com Ross&Baruzzini 1. Construction cost estimating is by others. E. FEES: Ross & Baruzzini proposes to provide the aforementioned additional services to be invoiced on an hourly basis with a "not-to-exceed"fee of: $ 8,000 (Eight Thousand Dollars) If this proposal is acceptable, we understand that you will issue an amendment to our Sub-Contract Agreement for our services. We appreciate the opportunity to continue to provide these services and look forward to our continued cooperation toward the successful completion of the project. Respectfully, Ross&Baruzzini,Inc. Raul S. Mastrapa, PE, CIPE, LEED AP Director of Operations, Miami Office • Cc: James M. Mindur Raul-Arnaldo Mastrapa Ross&I3aruzzini March 2,2015 Mario Menendez/Project Architect Berenblum Busch Architecture 2200 NW 2nd Avenue,Suite 203 Miami, FL 33127 Re: LETTER OF EXPLANATION FOR ADDITIONAL SERVICES FOR ADDENDA # 5: HVAC, PLUMBING, ELECTRICAL AND FIRE-PROTECTION PROFESSIONAL ENGINEERING DESIGN SERVICES FOR OWNER REQUESTED REVISIONS TO THE SITE GRADING, SIDEWALKS AND GROUND FLOOR ELEVATION FOR THE COLLINS PARK PARKING STRUCTURE IN MIAMI BEACH,FLORIDA. Dear Mario: We did not submit an add-services request for the previous Amendment#4 for setting the ground floor elevation at BFE+3.This had no impact on our design documents as the Mechanical and Electrical equipment could be mounted on the ground floor slab.We are now submitting an add-services proposal for Addenda#5 for modifying the existing MEP-FP design intent documents to accommodate the Owner requested revisions to lower the ground floor slab elevation to BFE+0. Code requires that any electrical driven equipment be mounted at one foot above flood elevation.Scope includes design of required modifications to the existing MEP design-intent documents,coordination with Architect and Civil Consultant for revising underground utilities services and ground floor Mechanical and Electrical equipment rooms per Architectural and Civil floor plans and issuing final revised 60%Construction Documents set. Our add-services proposal for Addenda#5 is based on assumptions and information conveyed to us during our weekly scheduled project coordination teleconferences,therefore we reserve to right to modify this proposal, as required, once we receive the actual revised Architectural floor plans and we can fully evaluate the impact on the existing design intent documents. Respectfully, Ross&Baruzzini,Inc. Raul S. Mastrapa, PE,CIPE, LEED AP Director of Operations, Miami Office Cc: James M. Mindur Raul-Arnaldo Mastrapa 7205 NW 19th Street,Suite 501 1 Miami,FL 33126 I t 305.477.8338 I f: 305.477.3378 www.rossbar.com Attachment 5 DESIMONE NEW YORK MIAMI SAN FRANCISCO Date: February 24, 2015 NEW HAVEN LAS VEGAS To: Gustavo Berenblum HONG ABU DH DHABI ABI BERENBLUM BUSCH ARCHITECTURE BOSTON 2200 NW 2nd Avenue, Suite 203 COLOMBIA Miami, Florida 33127 Project Name: Collins Park Place - Parking Garage DESIMONE Project No.: 5684 Re: Ground Floor Revisions to BFE+O' Additional Services Proposal 2-REVISED Dear Mr. Berenblum, We have received a request from Berenblum Busch Architecture to redesign our structure to account for the revisions associated with lowering the ground floor slab from elevation N.A.V.D. 9.45' to N.A.V.D. 6.45'. The top of slab elevation will therefore be at the base flood elevation requiring the slab to be redesigned to resist hydrostatic flood forces. The required revisions to our drawings are outlined below: 2X.1 - Coordinate ground floor changes in elevation and revise stair, ramp, and slab drop details. Provide soil retaining walls where required. 2X.2- Redesign ground floor slab as a structural slab to resist flood loads and provide grade beams to span between pile caps to support the slab. 2X.3- Lower foundations to clear new ground floor structure. 2X.4- Redesign columns for taller floor to floor height between Ground Floor and Level 2. 2X.5- Redesign shear walls to resist wind forces from taller building. 2X.6- Redesign feature stair for taller floor to floor height. 2X.7- Provide foundations for flood barriers beyond the building perimeter, or provide continuous knee walls and foundations around the building to resist flood loads at the ground floor. Fee: PROFESSIONAL PERSONNEL RATES TASK 2X.1 TASK 2X.2 TASK 2X.3 TASK 2X.4 TASK 2X.5 TASK 2X.6 TASK 2X.7 HOURS BILLABLE HOURS BILLABLE HOURS BILLABLE HOURS BILLABLE HOURS BILLABLE HOURS BILLABLE HOURS BILLABLE Principals $150.00 $0.00 6.5 $975.00 1.5 $225.00 2.5 $375.00 2.5 $375.00 $0.00 1.5 $225.00 Project Managers $120.00 6.5 $780.00 16 $1,920.00 6.5 $780.00 5 $600.00 7.5 $900.00 6.5 $780.00 5 $600.00 Project Engineers $101.00 13 $1,313.00 38 $3,838.00 11.5 $1,161.50 10 $1,010.00 38.5 $3,888.50 13 $1,313.00 10 $1,010.00 Engineering Computer Time No Charge Senior CAD Drafters $60.00 5.5 $330.00 6.5 $390.00 5 $300.00 4 $240.00 6.5 $390.00 5 $300.00 2 $120.00 CAD Drafters $55.00 21 $1,155.00 41.5 $2,282.50 14.5 $797.50 10 $550.00 30 $1,650.00 18 $990.00 8 $440.00 CAD/BIM Computer Time No Charge Clerical No Charge Total Fee in USD $3,578 $9,406 $3,264 $2,775 $7,204 $3,383 $2,395 $32,004 DESIMONE CONSULTING ENGINEERS 800 BRICKELL AVENUE 6TH FLOOR MIAMI,FLORIDA 33131 P.305.441.0755 F.786.383.2329 DESIMONE Page 2 of 2 The fee for the above-described structural engineering services shall be$32,000 as outlined in the fee schedule above. Terms and conditions shall be in accordance with our original proposal with Zaha Hadid Architect on November 03, 2011. If the above is acceptable, please sign on the Approved line below, returning the executed original to us and retaining a copy for your file. If you have any questions please feel free to contact me. Gregory Lewis P.E., Project Manager Approved: Berenblum Busch Architecture DESIMONE NEW YORK MIAMI SAN FRANCISCO March 2, 2015 NEW HAVEN LAS VEGAS Sabrina Baglieri HONG KONG Senior Capital Projects Coordinator ABU DHABI CAPITAL IMPROVEMENT PROJECTS OFFICE SHANGHAI 1700 Convention Center Drive Miami Beach, FL 33139 Re: Collins Parking Garage - Miami Beach, Florida BFE+O' (Amendment 5)-Additional Services Narrative DESIMONE Project No. 5684 Dear Ms. Baglieri, We are pleased to continue to provide design services on the Collins Park Place garage complex. We have received a request from Berenblum and Busch Architecture to perform a redesign of the structure to account for the change in elevation of the ground floor slab. In the previous Amendment 4 redesign, the structural changes were driven by raising the ground floor slab to above the base flood elevation. During this redesign, the entire building was raised and the main structural changes occurred at the ground floor. The structures required to resist flood loads were eliminated. A simplified ground floor slab on grade replaced a structural slab with tie downs. Grade beams around the perimeter of the structural slab were eliminated. Amendment 5 moves the ground floor slab to base flood elevation without reducing the height of the building,which was increased during Amendment 4. The ground floor slab is at a higher elevation than prior to Amendment 4 and as such the flood loads are lower. • The taller building will require the redesign of the building's shear walls to resist the higher wind loads and the taller columns will need to be redesigned due to the increase in their unbraced length. The foundation will need to be redesigned to account for the hydrostatic uplift loads and the taller building's higher overturning loads. As the hydrostatic forces will be less than prior to Amendment 4, the structural ground floor slab and perimeter grade beams will be optimized for these loads. The foundations will need to be lowered to avoid the lower ground floor slab. The revised feature stair layout will require a redesign for the larger span from ground floor to level 4. New retaining walls will be needed around the building at the revised ramp and stair locations. As the ground floor slab layout was changed during Amendment 4 there will need to be additional foundations for either flood barriers or knee walls around the building's perimeter to resist the flood loads. These structural changes will require coordination with the design team. The above covers the work necessary to issue Amendment 5 60% Design Development Documents [60% Construction Documents]. The completion of the drawings from 60% DESIMONE CONSULTING ENGINEERS 800 BRICKELL AVENUE 6TH FLOOR MIAMI,FLORIDA 33131 P.305.441.0755 F.212.481.6108 I DESIMONE Page 2 of 2 forward will be per our original design proposal. We hope this outline clarifies the extent of our scope in this redesign. Yours very truly, DESIMONE CONSULTING ENGINEERS gP/IIIM... Gregory Lewis, P.E. Project Manager 0(6a,, Attachment 6 11 SMART-SCIENCES Environmental Consulting ce is�a�J December 29,2014 Mr.Mario Menendez Berenblum Busch Architecture,Inc. 848 Brickell Avenue,Suite 625 Miami,Florida 33131 RE: REVISED PROPOSAL FOR CONTAMINATION ASSESSMENT PLAN AND SITE ASSESSMENT AT PROPOSED COLLINS PARK GARAGE PROPERTY LOCATED AT 340 23RD STREET,MIAMI BEACH,FLORIDA SMART-SCIENCES PROJECT NUMBER 2014-0065-PO1 Dear Mr.Menendez: Smart-Sciences is pleased to provide you with this proposal for the professional environmental services associated with the preparation of a Contamination Assessment Plan(CAP), Site Assessment(SA) and Site Assessment Report (SAR) for the above referenced property in accordance with environmental requirements by the Miami-Dade County and the Florida Department of Environmental Protection. The scope of work for this proposal is based on our review of previous environmental reports provided to Smart-Sciences and submittal requirements for petroleum contaminated sites as presented in Chapter 62-780 of the Florida Administrative Code. The proposal includes the scope of work and associated costs to prepare an approvable CAP which will be reviewed by the Miami-Dade County Department of Environmental Resources Management(DERM)prior to its implementation. Please note that this proposal conservatively estimates a certain number of locations for soil and groundwater analysis to determine the present subsurface conditions. Although we have included contingencies for some additional work that may be necessary and/or required by DERM, associated costs to delineate potential off-site contaminant plumes or plumes from other properties are not included. However, Smart-Sciences is confident that the scope of work to be presented in the CAP to DERM will meet the assessment requirements. SCOPE OF WORK • Smart-Sciences meet with Beren lum Busch Architecture (Client) to briefly Smart Sciences recommends to eet b discuss a course of action for the contamination assessment to be presented in the CAP. Further investigation by Smart-Sciences may result in a potential recommendation for a Limited Contamination Assessment on behalf of the Client and the City of Miami Beach. Upon further investigation of previous assessment activities and consensus on the appropriate regulatory course of action, a CAP will be prepared and presented to Miami-Dade County DERM. Following approval of the CAP, Smart-Sciences will implement the scope of work for the assessment. We will submit a draft CAP to the client within three weeks of authorization. We will submit the final CAP to DERM within one week of receiving the client's comments on the draft. DERM's review time is typically between 30 and 60 days. 329 Palermo Avenue I Suite 210 I Coral Gables,FL 33134 I P: 786-313-3977 I F: 305.356.4333 www.Smart-Sciences.com Proposal for Contamination Assessment Plan and Site Assessment December 29,2014 Proposed Collins Park Garage 340 23''Street,Miami Beach,Florida Page 2 of 4 Smart-Sciences Proposal No. 2014-0065-P01(Revised) • Smart-Sciences will schedule a utility clearance and notify DERM of scheduled activities including specific dates for subsurface drilling and sampling activities. The drilling activities will be conducted by a licensed environmental driller and supervised by Smart-Sciences personnel. It is estimated that fifteen (15) soil borings and eleven (11) groundwater monitoring wells will be advanced in areas including former underground storage tanks (UST), former dispenser islands, oil/water separator and used oil storage tank. Drilling will be performed using the direct-push methodology. Soil borings will be advanced in two-foot intervals to the water table(approximately 3 to 5 feet below land surface) and screened in the field for hydrocarbon vapors using an Organic Vapor Analyzer (OVA) equipped with a flame ionization detector. Soil samples with the highest OVA readings or from the soil/water interface will be further analyzed at a laboratory for parameters of concern. Ten (10) shallow groundwater monitoring wells will be advanced to approximately thirteen(13)feet below land surface(bls)for the purpose of sample collection and to determine groundwater conditions at the shallow aquifer. One (1) deep groundwater monitoring well will be advanced to approximately twenty-five feet bls for sample collection and to determine groundwater conditions at the intermediate aquifer and delineation of potential contamination. • Soil and groundwater samples will be either collected for laboratory analysis of the Gasoline/Kerosene Analytical Group or Used Oil Analytical Group as presented in Chapter 62-770 FAC. The first group includes a full range of volatile organic compounds and polynuclear aromatic hydrocarbons (EPA Methods 8260 and 8270),Total Recoverable Petroleum Hydrocarbons (TRPH) by FL-PRO, Ethylene dibromide(EPA Method 504) and Lead(EPA Method 6010). In addition to the described parameters and analytical methods, the Used Oil Group includes Polychlorinated biphenyls (EPA Method 8082) and metals; Arsenic, Cadmium and Chromium (EPA Methods 610 and 620). Ethylene dibromide is not included in the Used Oil Group. All sampling activities will be conducted by trained personnel following sampling operating procedures in accordance with the Florida Department of Environmental Protection (FDEP). The laboratory analysis will be performed at a NELAC accredited and State-certified environmental laboratory. • Following hydrogeological field activities to be performed by a State of Florida registered Professional Geologist, a SAR will be prepared. The SAR summarizes the implemented tasks pursuant to subsection 62-780 FAC. The SAR will include information such as the history of the facility, topography of the site and surrounding areas, details of preliminary assessments of source removal activities, a vicinity map showing features such as drainage, property boundaries, water supply wells, potential off-site sources of petroleum contamination, a scaled site map showing surface and subsurface features such as former and current tank farms, integral piping, dispensers, monitoring wells, buildings, streets, right-of-ways, utilities, sewers, floor drains, and subsurface drainage in the immediate vicinity. Technical information will include data and calculations used to determine the top of casing elevations, depth to water and water-level elevations to determine groundwater flow direction,a scaled site map showing groundwater flow direction,scaled site maps showing location of new and existing wells,soil borings and concentrations of contaminants, scaled site maps showing contour lines of the extent of contaminant plumes, figures showing well construction profiles, summary tables with OVA screening data, and soil and groundwater analytical data. Other important data that will be reported includes the description of the regional and site-specific geology, hydrogeology and site-specific lithology based on the soil and groundwater assessment drilling activities. The SAR will have recommendations in accordance with Chapter 62-780 and will be signed and sealed by a State of Florida Registered Geologist. Proposal for Contamination Assessment Plan and Site Assessment December 29,2014 Proposed Collins Park Garage 340 23'1 Street,Miami Beach,Florida Page 3 of 4 Smart-Sciences Proposal No.2014-0065-POl(Revised) PROGRAM COSTS The following are Smart-Sciences estimated consulting and subcontracting charges. Should additional work be necessary or required by site-specific conditions or additional requirements by permitting and regulatory agencies, the client will be informed of work and associated costs prior to the performance of the additional work and/or materials. Task Description and Estimated Labor Effort Fee Contamination Assessment Plan Research and review of past environmental conditions and data,tables of data, assessment strategy,meetings with DERM,Client and City officials,preparation of CAP for DERM review,revisions and final submittal Project Manager 25 hours @$120/hour Staff Scientist 10 hours @$82/hour GIS Specialist 3 hours @$75/hour $4,045.00 Drilling(Subcontractor) Advancement of 15 soil borings and 11 well locations Estimated time 2 days @$1,600/day Well completions (concrete, manhole, locking cap and covers)$350/well $7,600.00 Permitting$50/well Laboratory Analysis(Subcontractor) Thirteen samples for Gas/Kerosene Group @$540/sample Eleven samples for Used Oil Group @$590/sample $13,510.00 (includes quality assurance/control blank analysis) Contamination Assessment Activities Activities: Utility clearance,coordination of drilling, sampling and notifications to DERM,site activities supervision,OVA screening,soil and groundwater sampling,surveys,water table and casing elevation surveys, and hydrological evaluations. Project Manager 50 hours @$120/hour Staff Scientist 22 hours @$82/hour $8,779.00 Environmental Technician 15 hours @$65/hour Contamination Assessment Report Preparation Project Manager 40 hours @$120/hour GIS Specialist 15 hours @ 75/hour $6,245.00 Clerical 8 hours @$40/hour Miscellaneous Survey and sampling equipment rental$1,000 Travel mileage$300 Contingencies for additional drilling and analysis if required by DERM$2,000 $3,300.00 Total$43,479.00 Proposal for Contamination Assessment Plan and Site Assessment December 29,2014 Proposed Collins Park Garage 340 23'd Street,Miami Beach,Florida Page 4 of 4 Smart-Sciences Proposal No.2014-0065-P01(Revised) AUTHORIZATION Attached is a copy of our Standard General Conditions for Professional Services Agreement,which is a part of the proposal. If the above scope of services and fees are acceptable, please sign below and return a signed,fully executed copy of our proposal. The above proposal is hereby agreed to by: Signature: Date: Name: Title: Company: We appreciate the opportunity to offer our professional services on this project. If you have any questions concerning this proposal,please contact me at 786-313-3977. Sincerely, SMART-SCIENCES,INCORPORATED / e.....VAA)FE) for Gisele L. Colbert,LEP Isidro Duque,P.G. Principal Scientist Senior Geologist Attachments Professional Services Agreement M:IProposals12014 Proposals12014-0065-P01 Collins Parking Garage ESAISmart Sciences CAP and SAR Proposal for Collins Park Garage rev_updated.docx STANDARD GENERAL CONDITIONS 1.01 Basic Agreement: Smart-Sciences,Incorporated(Smart-Sciences)shall provide,or cause to be provided,the services set forth in this Agreement.If authorized by Client,or if otherwise required,Smart-Sciences shall furnish services in addition to those set forth in this Agreement.Client shall pay Smart-Sciences for its services as set forth in Paragraphs 7.01 and 8.01. 2.01 Payment Procedures: A. Invoices: Smart-Sciences shall prepare invoices in accordance with its standard invoicing practices and submit the invoices to the Client at least once per month.Invoices are due and payable upon receipt.If Client fails to make any payment due Smart-Sciences for services and expenses within 30 days after receipt of Smart-Sciences'invoice,then the amounts due Smart-Sciences will be increased at the rate of 1.0%per month(or the maximum rate of interest permitted by law,if less)from said thirtieth day.In addition Smart-Sciences may,after giving seven days written notice to Client,suspend services under this Agreement until Smart-Sciences has been paid in full all amounts due for services,expenses,and other related charges.Client waives any and all claims against Smart-Sciences for any such suspension and shall be responsible for any attorney's fees incurred in collecting past due amounts.Payments will be credited first to interest and then to principal.The Client warrants that payment is not dependent on third parties. 3.01 Termination:The obligation to provide services under this agreement may be terminated: A. By either party upon seven days written notice,in the event of substantial failure on the part of the other party to perform in accordance with the terms of this agreement,through no fault of the terminating party.Failure to pay Smart-Sciences for its services is a substantial failure to perform and a basis for termination. B. By Smart-Sciences,upon seven days written notice,if Client demands that Smart-Sciences furnish or perform services contrary to Smart-Sciences'responsibilities as a licensed professional;or upon seven days written notice if Smart- Sciences'services for the Project are delayed for more than 90 days for reasons beyond Smart-Sciences'control. Smart-Sciences shall have no liability to Client on account of a termination by Smart-Sciences under this section. C. In the event of any termination,Smart-Sciences will be paid for all services and reimbursable expenses rendered to the date of termination,in addition to termination expenses. 4.01 Successors,Assigns and Beneficiaries A. The Client and Smart-Sciences each binds themselves,and their partners,successors,executors,administrators, assigns and legal representatives to the other party of this agreement. Neither party may assign,sublet or transfer any rights under,or interest in,this agreement without the written consent of the other. Nothing contained in this paragraph shall prevent Smart-Sciences from employing such independent consultants,associates and subcontractors, as Smart-Sciences may deem appropriate. B. Unless expressly provided otherwise,nothing in this Agreement shall be construed to create,impose,or give rise to any duty owed by Client or Smart-Sciences to any contractor,subcontractor,supplier,other individual or entity,or to any surety for or employee of any of them.All duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Client and Smart-Sciences and not for the benefit of any other party. 5.01 General Considerations: A. Smart-Sciences will perform its services using that degree of skill and care ordinarily exercised under similar conditions by reputable members of Smart-Sciences'profession practicing in the same or similar locality at the time Services are performed.NO OTHER WARRANTY,EXPRESS OR IMPLIED,IS MADE OR INTENDED. B. Smart-Sciences shall not at any time supervise,direct,control,or have authority over any contractor's work,nor shall Smart-Sciences have authority over or be responsible for the means,methods,techniques,sequences,or procedures of construction selected or used by any contractor,or the safety precautions and programs incident thereto,for security or safety at the project site,nor for any failure of a contractor to comply with laws and regulations applicable to such contractor's furnishing and performing of its work. Smart-Sciences neither guarantees the performance of any contractor nor assumes responsibility for any contractor's failure to furnish and perform its work in accordance with the contract between Client and such contractor.Smart-Sciences is not responsible for variations between actual construction bids or costs and Smart-Sciences'opinions or estimates regarding construction costs. C. Smart-Sciences shall not be responsible for the acts or omissions of any contractor,subcontractor,or supplier,or of any of their agents or employees or of any other persons(except Smart-Sciences'own employees)at the Project site or otherwise furnishing or performing any construction work;or for any decision made regarding the construction contract requirements,or any application,interpretation,or clarification of the construction contract other than those made by Smart-Sciences. Excerpted from EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services D. All documents prepared or furnished by Smart-Sciences are instruments of service,and Smart-Sciences retains an ownership and property interest(including the copyright and the right of reuse)in such documents,whether or not the project is completed.Client shall have a limited license to use the documents on the project,subject to receipt by Smart-Sciences of full payment for all services relating to preparation of the documents and subject to the following limitations:(1)Client acknowledges that such documents are not intended or represented to be suitable for use on the project unless completed by Smart-Sciences,or for use or reuse by Client or others on extensions of the Project,on any other project,or for any other use or purpose,without written verification or adaptation by Smart-Sciences;(2) any such use or reuse,or any modification of the documents,without written verification,completion,or adaptation by Smart-Sciences,as appropriate for the specific purpose intended,will be at Client's sole risk and without liability or legal exposure to Smart-Sciences;(3)Client shall indemnify and hold harmless Smart-Sciences from all claims, damages,losses,and expenses,including attorneys'fees,arising out of or resulting from any use,reuse,or modification of the documents without written verification,completion,or adaptation by Smart-Sciences;and(4)such limited license to Client shall not create any rights in third parties. E. To the fullest extent permitted by law,Client and Smart-Sciences(1)waive against each other,and the other's employees,officers,directors,agents,insurers,partners,and consultants,any and all claims for or entitlement to special,incidental,indirect,or consequential damages arising out of resulting from,or in any way related to the project,and(2)agree that Smart-Sciences total liability to Client under this Agreement shall be limited to$50,000 or the total amount of compensation received by Smart-Sciences,whichever is greater. F. Client and Smart-Sciences agree to negotiate each dispute between them in good faith during the 30 days after notice of dispute.If negotiations are unsuccessful in resolving the dispute,then the dispute shall be mediated.If mediation is unsuccessful,then the parties may exercise their rights at law. G. This Agreement is to be governed by the law of the State of Florida and the local jurisdiction in which the project is located. H. PURSUANT TO FLORIDA STATUTE 558.0035, NO INDIVIDUAL EMPLOYEE OR AGENT OF SMART-SCIENCES MAY BE HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE ARISING FROM THE PERFORMANCE OF PROFESSIONAL SERVICES UNDER THIS CONTRACT. (Emphasis in accordance with the statute.) I. The proposal and fees are valid for thirty(30)days from the date at the top of the proposal. J. Notice to proceed must be within thirty(30)days of signed agreement, unless otherwise specified in the agreement. K. For purposes of statutes of limitations/repose,our contract services will be considered complete upon delivery of the last service or instrument described in our agreement. 6.01 Total Agreement: This Agreement(including any expressly incorporated attachments),constitutes the entire agreement between Client and Smart-Sciences and supersedes all prior written or oral understandings. 7.01 Basis of Payment A. Fixed price services are based on doing the work one time. Changes due to causes beyond the control of Smart- Sciences shall be compensated as Additional Services. B. Fixed fees do not include printing charges. Reimbursable expenses shall be compensated at cost times 1.15. C. All governmental fees and testing service charges,if any,shall be paid directly by the Client. D. Any VAT,excise,gross receipts,or sales taxes that may be imposed by government shall be added to the compensation otherwise due under the professional services agreement. E. All fees and rates are based on normal eight hour weekday work. Work performed,by request of the Client,on week nights,weekends,or holidays shall bear a 50%surcharge. F. All fees are subject to renegotiation one year from the date of the agreement. 8.01 Additional Services: A. Client shall pay Smart-Sciences an amount equal to the cumulative hours charged to the Project by each class of Smart-Sciences'employees,times standard hourly rates for each applicable billing class;plus reimbursable expenses and Smart-Sciences'consultants'charges,if any.Smart-Sciences'standard hourly rates are attached. B. The Client may wish to establish control procedures for pre-authorization of Additional Services. Any such procedures shall be communicated to the Smart-Sciences in writing. Excerpted from EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida,Authorizing The Mayor And City Clerk To Execute Amendment No. 5 To The Professional Architectural And Engineering (A/E) Services Agreement With The Joint Venture Of Zaha Hadid Limited T/A Zaha Hadid Architects And Berenblum Busch Architecture, Inc. Dated May 3, 2012, For The Collins Park Parking Garage Project (Collins Park Place), For The Additional Professional Services Required To Redesign The Ground Floor Of The Building To Base Flood Elevation (BFE)With Provisions To Have All Critical Systems Elevated Up To 20 Feet Or As High As Reasonably Possible, And Building Slabs Designed To Accommodate A Future Increase In Ground Floor Elevation; And For The Provision Of A Contamination Assessment Plan (CAP), Site Assessment(SA)And Site Assessment Report(SAR) For The Project Site To Address The Site Contamination Identified In The Phase II Environmental Site Assessment Report Key Intended Outcome Supported: Build and maintain priority infrastructure with full accountability. Supporting Data(Surveys,Environmental Scan,etc.): The 2012 Customer Satisfaction Survey indicated that over 81%of residents rated recently completed capital improvement projects as"excellent"or"good". Recently completed capital improvement projects(81%),storm drainage(37%),and condition of roads(44%). Item Summary/Recommendation: On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant)for the Planning, Architectural, Engineering, Design, Bid and Award, And Construction Administration Services for the Collins Park Place Project. The Agreement was executed in the amount of$2,951,823.There have been four previous Amendments approved for a total of$295,466. On December 11, 2014, CIP met with the Miami—Dade County Public Works.Department (County) to discuss the encroachment of the proposed elevated walkway of the garage building retail areas onto the County's right-of-way (ROW), as a result of having to design the building's ground floor at elevation of BFE+3 feet. The County rejected the plans as designed and did not allow for the encroachment on their right-of-way. On January 26, 2015 City Administrators met with the County in an attempt to negotiate a viable solution to the encroachment, but the County upheld its previous decision not to allow their right-of-way to be impacted. On January 27,2015, Administration and CIP presented to the Mayor's Blue Ribbon Panel on Flooding & Sea Rise with the conclusion of said meeting with the County Officials and the panel recommended to re-design the building to BFE with the condition that all critical equipment be designed to an elevation of 20 feet, or as high as reasonably possible and the structural provision to allow the building ground floor to be elevated in the future. On the same day, the City Commission upheld and approved the Mayor's Blue Ribbon Panel on Flooding and Sea Rise recommendation. As a result, several disciplines including architecture, civil engineering, landscape architecture, and structural engineering design will be impacted.The total negotiated fee requested for this additional effort is$250 870. Furthermore, additional environmental services are required to address the site contamination identified on the Phase II Environmental Site Assessment Report dated February 19, 2014. These efforts will include the installation of additional monitoring wells and borings to obtain samples for laboratory analysis, and submit the results to RER and FDEP for their review and evaluation to determine if additional measures are required for final clean up and closure.The cost for this additional scope for professional services is$43,479. Therefore, the total amount for the redesign of the project and the additional environmental services under Amendment No. 5 is$294,349.The Administration believes to be a fair and reasonable cost given the level of effort required THE ADMINISTRATION RECOMMENDS APPROVAL OF THIS RESOLUTION. Advisory Board Recommendation: Flooding Mitigation Committee Financial Information: Source of Amount Account Funds: 1 $294,349 Fund 365-City Center RDA 365-2801-061357 fr1 ' OBPI Total $294,349 Financial Impact Summary: City Clerk's Office Legislative Tracking: David Martinez, P.E., LEED AP ext.6972 Sign-Offs: De•artm it ctor Assista J3 4"r ager Cit Ma ager DM `riI M F .7iI I) JL 1' T:\AGENDA\2015\Mac Colli s Park Place-ZHA and BBA Amendm t No 11- mary MIAME AGENDA I R-1 F DATE 11- 1915 . 20"5 CAPITAL IMPROVEMENT PROJECTS OFFICE C)MMISSION MEMORANDUM TO: Mayor Philip Levine and Members •f the City ommission FROM: Jimmy L. Morales, City Manager DATE: March 11, 2015 SUBJECT: A RESOLUTION OF THE MAYOR A ND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZIN THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 5 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE)SERVICES AGREEMENT WITH THE JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3, 2012, FOR THE COLLINS PARK PARKING GARAGE PROJECT (COLLINS PARK PLACE), FOR THE ADDITIONAL PROFESSIONAL SERVICES REQUIRED TO REDESIGN THE GROUND FLOOR OF THE BUILDING TO BASE FLOOD ELEVATION (BFE) WITH PROVISIONS TO HAVE ALL CRITICAL SYSTEMS ELEVATED UP TO 20 FEET OR AS HIGH AS REASONABLY POSSIBLE, AND BUILDING SLABS DESIGNED TO ACCOMMODATE A FUTURE INCREASE IN GROUND FLOOR ELEVATION, IN KEEPING WITH THE CITY OF MIAMI BEACH FLOOD MITIGATION EFFORTS AS IT RELATES TO SEA LEVEL RISE, IN THE LUMP SUM AMOUNT OF $250,870; AND FOR THE PROVISION OF A CONTAMINATION ASSESSMENT PLAN (CAP), SITE ASSESSMENT (SA) AND SITE ASSESSMENT REPORT(SAR)FOR THE PROJECT SITE IN ACCORDANCE WITH ENVIRONMENTAL REQUIREMENTS BY MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCES (RER) AND THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP)TO ADDRESS THE SITE CONTAMINATION IDENTIFIED IN THE PHASE II ENVIRONMENTAL SITE ASSESSMENT REPORT, IN THE NEGOTIATED LUMP SUM AMOUNT OF $43,479; FOR A TOTAL COST OF $294,349 WITH PREVIOUSLY APPROPRIATED FUNDING. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Build and maintain priority infrastructure with full accountability. FUNDING Previously appropriated funds for this project will be allocated as follows: $294,349 Fund 365 -City Center RDA 365-2801-061357 Commission Memorandum —Collins Park Place—ZHA and BBA Amendment No. 5 March 11, 2015 Page 2 of 3 BACKGROUND On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant) for the Planning, Architectural, Engineering, Design, Bid and Award, And Construction Administration Services for the Collins Park Place Project. The Agreement was executed in the amount of$2,951,823. On September 30,2013,Amendment No. 1 was executed in the amount of$8,935,for the provision of additional surveying services, and extended representation during the July City Commission Meeting. On December 9, 2013,Amendment No. 2 was executed in the amount of$12,114,for the provision of a Phase I I Environmental Site Assessment,for the investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report. On May 28, 2014, Amendment No. 3 was executed in the amount of $24,969, for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation two (2)and three (3)feet above Base Flood Elevation. On June 20, 2014,Amendment No. 4 was executed per Resolution 2014-28615 adopted on June 11, 2014, in the amount of $249,448, for construction documents revisions associated with raising the proposed finish floor elevation to Base Flood plus three (3) feet; for the design, permitting and construction administration services of certain right-of-way improvements required by Miami-Dade County Public Works (County); and for the design, permitting and construction administration for the replacement sanitary sewer line(and associated structures if required)along Liberty Avenue,requested by the City's Public Works Department. ANALYSIS On November 28, 2014 the office of Capital Improvement Projects (CIP) received 60% Construction Documents for the Collins Park Place Parking Garage. On December 11, 2014, as part of the review process, CIP met with the County to discuss the encroachment of the proposed elevated walkway of the garage building retail areas onto the County's right-of-way(ROW), as a result of having to design the building's ground floor at the higher elevation of Base Flood Elevation plus three (3) feet, as requested by the Mayor's Blue Ribbon Panel on Flooding and Sea Rise and approved by City Commission Resolution 2014-28615 adopted on June 11, 2014. The County rejected the plans as designed and did not allow for the elevated pedestrian walkway to encroach on the right-of-way.After a number of additional studies by the design Consultant, it became clear that in order to keep the County's sidewalk untouched,the retail space would be significantly reduced and the elevated(upper) walkway along the retail area will create a narrow and un-inviting path for pedestrian traffic and prospective shoppers. On January 26, 2015, following the direction of the Mayor's Blue Ribbon Panel on Flooding and Sea Rise, City Administrators met with the County in an attempt to negotiate a viable solution to the encroachment. At said meeting, the County upheld its previous decision not to allow their right-of-way to be impacted by the construction of the elevated walkway onto a portion of their sidewalk. On January 27, 2015,Administration and CIP presented to the Mayor's Blue Ribbon Panel on Flooding • &Sea Rise with the conclusion of said meeting with the County Officials and the panel recommended to re-design the building to Base Flood Elevation(BFE)with the condition that all critical equipment be designed to an elevation of 20 feet, or as high as reasonably possible and the structural provision to We are committed to providing excellent public service and safety to all who live, work,and play in our vibrant, tropical, historic community. Commission Memorandum—Collins Park Place—ZHA and BBA Amendment No. 5 March 11, 2015 Page 3 of 3 allow the building ground floor to be elevated in the future. On the same day, the City Commission upheld and approved the Mayor's Blue Ribbon Panel on Flooding and Sea Rise recommendation. As a result of the mandated redesign, the scope of work includes adapting the geometry to meet existing sidewalk, adapt, redesign and detail the ground floor storefront including an addition of a knee wall, adapt and implement changes to back-of-house area,all garage stairs,elevator cores,site ramps, site grading and landscape design. The structure will have to be redesigned to account for the revisions, including the ground floor slab, columns, shear walls and foundations.The revisions impact several disciplines including architecture, civil engineering, landscape architecture and structural engineering. The total negotiated fee requested by the design team (Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc.) for this redesign of the documents is $250,870. Furthermore, additional environmental services are required to address the site contamination identified on the Phase II Environmental Site Assessment Report dated February 19, 2014. Once a contamination is found, further assessment is necessary to address the limits and extent of such contamination and ultimately develop a Contamination Assessment Plan(CAP),in full accordance with requirements by the Miami-Dade County Regulatory and Economic Resources Department(RER)and the Florida Department of Environmental Protection(FDEP).These efforts will include the installation of additional monitoring wells and borings to obtain samples for laboratory analysis,and submit the results to RER and FDEP for their review and evaluation to determine if additional measures are required for final clean up and closure. The cost for this additional scope for professional services is $43,479. The total amount to be approved for the redesign of the project and the additional environmental services under Amendment No. 5 is $294,349 (See Attachment A). The Administration believes the cost to be fair and reasonable given the level of effort required. It is also worth mentioning that due to this redesign of the project, an additional constructability review of the revised 60% construction documents will be required by the Construction Manager at Risk, Facchina Construction of Florida, LLC. However, Facchina Construction of Florida has advised CIP that there would be no additional charges to the City by Facchina for this additional effort. CONCLUSION The Administration recommends approval of the attached Resolution. Attachment A-Amendment No. 5 JLM/MT/DM We are committed to providing excellent public service and safety to all who live, work,and play in our vibrant,tropical, historic community.