Loading...
2015-28946 Reso RESOLUTION NO. 2015-28946 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING ADDITIONAL FUNDING TO THE EXISTING JOINT PARTICIPATION AGREEMENT (JPA) BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), IN THE AMOUNT OF $500,000, FOR UTILITY WORK TO INCLUDE: CONSTRUCTION OF WATER, SEWER AND STORMWATER DRAINAGE IMPROVEMENTS WITHIN THE PROJECT AREA, AS PART OF THE STATE ROAD 907/ALTON ROAD PROJECT, FROM 5TH STREET TO MICHIGAN AVENUE. WHEREAS,the Florida Department of Transportation(FDOT)and the City executed a Joint Participation Agreement(JPA), approval pursuant to Resolution No. 2012-27970 for utility work by an FDOT highway contractor, dated July 18, 2012, for utility improvements on Alton Road/State Road (S.R.) 907, from 5th Street to Michigan Avenue (Project), whereby the City agreed to use the services of an FDOT highway contractor for the Project; and WHEREAS, simultaneously with the execution of the JPA, FDOT, the City, and the Department of Financial Services, Division of Treasury, executed a Memorandum of Agreement, which established an escrow account for the deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of$2,680,670.52;and WHEREAS, the Alton Road construction revealed that the City utilities were in worse condition than originally anticipated, and that additional utility work was required due to the fragile nature of the aged pipes, as well as additional improvements; and WHEREAS, at its April 23, 2014 and July 23, 2014 meetings,the City Commission approved Resolution No. 2014-28557 and Resolution No. 2014-28658 adding additional funds, in the respective amounts of$240,000 and $500,000, to the JPA, for utility work to be performed by the FDOT highway contractor as part of the Project; and WHEREAS, in order for FDOT to include a City owned drainage and water main construction improvements, as well as additional replacement of storm drain pipes, additional water meters and water lines, the City is requesting an additional $500,000 to be added to the JPA to cover this additional scope. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,that the Mayor and City Commission hereby approve additional funding to the existing Joint Participation Agreement(JPA) between the City and the Florida Department of Transportation (FDOT), in the amount of $500,000, for utility work to include: construction of water, sewer and stormwater drainage improvements within the Project area, as part of the State Road 907/Alton Road Project,from 5th Street to Michigan Avenue. PASSED AND ADOPTED this 11th day of March, 2015. ATTEST: '• ='� -, - - ! for Raf -I r n City •'�; r - a G a ado, C ty Clerk ,,r� APPROVED AS TO ' *' RP ORATED LANGUAGE :INCO FORM & �..�'•. �'�401 &FOR EXECUTION City Attorney ►�f�, -, ' = % H6� T:WGENDA\2015\March\PUBLIC WORKS\FDOT Re'hyi;v`;"`n` ������ City Attorney DOte COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Add Additional Funds To The Existing Joint Participation Agreement (JPA) Between The City And The Florida Department Of Transportation (FDOT) In The Amount Of $500,000, For Utility Work To Include: Construction Of Water, Sewer And Stormwater Drainage Improvements Within The Project Area,As Part Of The State Road 907/Alton Road Project From 5th Street To Michigan Avenue. Key Intended Outcome Supported: . Item Summary/Recommendation: The Florida Department of Transportation (FDOT)and the City executed a Joint Participation Agreement (JPA)for utility work by an FDOT highway contractor, dated October 2, 2012, for utility improvements on Alton Road/State Road(S.R.)907,from 5th Street to Michigan Avenue(Project),whereby the City agreed to use the services of an FDOT highway contractor for the Project. Simultaneously with the execution of the JPA, FDOT,the City, and the Department of Financial Services, Division of Treasury,executed a Memorandum of Agreement,which established an escrow account for the deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of$2,680,670.52. The Alton Road construction revealed that the City utilities were in worse condition than originally anticipated, and that additional utility work was required due to the fragile nature of the aged pipes,as well as additional improvements. At its April 23, 2014 and July 23, 2014 meetings, the City Commission approved additional funds in the amounts of$240,000 and$500,000 to be added to the existing JPA between the City and FDOT,for utility work to be performed by the FDOT highway contractor,as part of the State Road 907/Alton Road from 5th Street to Michigan Avenue project. The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction and significant drainage improvements, including construction of three (3) stormwater pump stations at 5th, 10th, and 14th Streets, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. In order for FDOT to include a City owned drainage and water main construction improvements, as well as additional replacement of storm drain pipes, additional water meters and water lines, the City is requesting an additional $500,000. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: Financial Information: Source of Amount Account Approved Funds: 1 $193,397.00 420-2592-069357 Collins Ave. main. SP Drive to 72"d St 2 $100,093.00 424-2949-061357 Upsizing Under Capacity Water Mains 3 $106,510.00 423-2948-069357 Misc. Wastewater&Water upgrades 4. $100,000.00 427-2764-069357 Collins Ave Utilities 5th to Lincoln OBPI Total $500,000.00 Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric Carpenter, Public Works X6012 Sign-Offs: / Department Director Assistant I//, J' •i,•er City M�nager ETC M ► Gi.'! JLM ),, T:\AGENDA\2014\De mber\PUBLIC WORKS\1700 W 25 ST: as- e- S .doc . ,=_ V�ItiDA i •:i� 1■'A 1 MIAMI..�. 11 DATE 2-1115- f.-P- MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members of ' e City Cor ission FROM: Jimmy L. Morales, City Manager DATE: March 11, 2015 SUBJECT: A RESOLUTION OF THE MAYOR\AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO ADD ADDITIONAL FUNDS TO THE EXISTING JOINT PARTICIPATION AGREEMENT (JPA) BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) IN THE AMOUNT OF $500,000, FOR UTILITY WORK TO INCLUDE: CONSTRUCTION OF WATER, SEWER AND STORMWATER DRAINAGE IMPROVEMENTS WITHIN THE PROJECT AREA, AS PART OF THE STATE ROAD 907/ALTON ROAD PROJECT FROM 5TH STREET TO MICHIGAN AVENUE. ADMINISTRATION RECOMMENDATION The Administration recommends approving the Resolution. FUNDING $193,397.00 -420-2592-069357 Collins Ave. main. SP Drive to 72nd St. $100,093.00 -424-2949-061357 Upsizing Under Capacity Water Mains $106,510.00 -423-2948-069357 Misc. Wastewater&Water Upgrades $100,000.00 -427-2764-069357 Collins Ave Utilities 5th to Lincoln $500,000.00 Total BACKGROUND The Florida Department of Transportation (FDOT) and the City executed a Joint Participation Agreement (JPA) for utility work by an FDOT highway contractor, dated October 2, 2012, for utility improvements on Alton Road/State Road (S.R.) 907, from 5th Street to Michigan Avenue (Project), whereby the City agreed to use the services of an FDOT highway contractor for the Project. Simultaneously with the execution of the JPA, FDOT, the City, and the Department of Financial Services, Division of Treasury, executed a Memorandum of Agreement, which established an escrow account for the deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of$2,680,670.52. Commission Memorandum—FDOT JPA-Alton Road from 5th Street to Michigan Avenue March 11, 2015 Page 2 of 2 The Alton Road construction revealed that the City utilities were in worse condition than originally anticipated, and that additional utility work was required due to the fragile nature of the aged pipes, as well as additional improvements: At its April 23, 2014 and July 23, 2014 meetings, the City Commission approved additional funds in the amounts of $240,000 and $500,000 to be added to the existing JPA between the City and FDOT, for utility work to be performed by the FDOT highway contractor, as part of the State Road 907/Alton Road from 5th Street to Michigan Avenue project. The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction and significant drainage improvements, including construction of three (3) stormwater pump stations at 5th, 10th, and 14th Streets, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. In order for FDOT to include a City owned drainage and water main construction improvements, as well as additional replacement of storm drain pipes, additional water meters and water lines, the City is requesting an additional $500,000. ANALYSIS Utility Work by Highway Contractor Agreement As part of the FDOT project, a relocation of the City-owned water main system along Alton Road was required. Considering the age and condition of the City utility infrastructure in this area, staff determined that it would be advantageous to the City to upgrade the existing water main system as part of the FDOT project. In addition, the Project will also include upgrading the water main laterals that service the side streets along the Project corridor. During construction, it was determined that the connecting water, sewer and stormwater infrastructure required upgrading, otherwise failure could occur in the next few years. These funds will be utilized to make these improvements. Utility Work by Highway Contractor Memorandum of Agreement This Agreement will add to the existing escrow account established by FDOT with a deposit in the amount of $500,000 funded by the City for the purpose of the construction of a new water main system on Alton Road, from 5th Street to Michigan Avenue as part of the Project. CONCLUSION The Administration recommends that the proposed stormwater drainage and water main improvements be constructed with the Alton Road improvements in order to reduce the risk of failure of the water, sewer and stormwater system, as well as the potential need to perform repairs in the new roadway shortly after completion. The Administration recommends approving the Resolution authorizing these funds. JLM/ETC/JJF/BAM T:\AGENDA\2015\March\PUBLIC WORKS\FDOT additional funding Alton Road from 5th Street to Michigan Avenue-Memo March 2015(2).docx