Loading...
2015-28982 Reso RESOLUTION NO. 2015-28982 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO.2 TO THE CONTRACT WITH DAVID MANCINI & SONS, INC. (DMSI), DATED APRIL 1, 2015, FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT OF WAY IMPROVEMENTS PROJECT (THE PROJECT); SAID CHANGE ORDER, IN THE AMOUNT OF $325,000, FOR ADDITIONAL ENGINEERING SERVICES, SEAWALL REPLACEMENT, ENHANCEMENT LANDSCAPING, MILLING AND REPAVING, AND BRIDGE REPAIR. WHEREAS, on December 14, 2011, the Mayor and City Commission approved Resolution No. 2011-27809, which, in part, authorized the negotiation and execution of a Design-Build Agreement(the Agreement)with David Mancini and Sons, Inc. for the Project, in the approximate amount of$3,550,876; and WHEREAS, at its October 29, 2014 meeting,the City Commission approved Resolution No. 2014-28816, authorizing the execution of a Change Order No. 1 to the Agreement, in the amount of $3,550,876, for additional engineering services, drainage structure modification, drainage pipe, storm water pump station, pollution control structure, milling and repaving, and water main replacement for the Project, as part of a Flood Mitigation Project on Crespi Boulevard; and WHEREAS, one of the intents of the Project was to correct the storm water drainage within the neighborhood but, after further assessment, additional improvements needed to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 79th to 85tn Streets; and WHEREAS, in order to complete the pump station phase of the work approved under Change Order No. 1,the City's Public Works Department has determined that it is also necessary to replace the seawall and raise the elevation to 5.7 NAVD; and WHEREAS, an enhancement of the landscaping around the open space within the pump station site is also being proposed, to give the area more of a park-like appearance; and WHEREAS, other areas of the Project that are in need of immediate attention have also been added, including milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue, as well as 77th Street bridge repairs; and WHEREAS,the Public Works Department recommends that the Mayor and City Commission approve Change Order No. 2 of the Agreement, in the amount of $325,000, to include the aforestated additional work. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Change Order No. 2 to the contract with David Mancini & Sons, Inc. (DMSI), dated April 1, 2015, for the Biscayne Point Neighborhood Right of Way Improvement Project(the Project); said change order, in the amount of $325,000, for additional engineering services, seawall replacement, enhancement landscaping, milling and repaving, and bridge repair. PASSED AND ADOPTED this /s day of April , 2015. ,. ATTEST: f'' ., / ./ AAA -Aub,_ Philip Le .i`ne a or R fael Grana o, 1 8, 114444 fur City Attorney % " ��%a'-`''�_ • :INCORP ORATED' � AA TA AGENDA\2015\AprilT 31217 E2 " egpi Aftsa; c ,Z11 2 67.0. • COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida,Approving And Authorizing The Mayor And City Clerk To Execute Change Order No.2 To David Mancini&Sons, Inc. (DMSI), Dated April 1,2015;Said Change Order, For Additional Engineering Services, Seawall Replacement, Enhancement Landscaping, Milling And Repaving And Bridge Repair For The Biscayne Point Neighborhood Right-Of-Way Improvements Project,As Part Of A Flood Mitigation Project On Crespi Boulevard, For.A Total Cost Of$325,000. Key Intended Outcome Supported: Item Summary/Recommendation: The Biscayne Point Neighborhood Right of Way improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements needed to be made, including drainage on Crespi Boulevard,from 79th Street to 84th Streets, and a water main replacement, from 79th to 85th Streets. At its October 29,2014 meeting,the City Commission approved Resolution No.2014-28816 authorizing the execution of a change order to David Mancini & Sons, Inc. (DMSI), for additional engineering services, drainage structure modification,drainage pipe,storm water pump station, pollution control structure, milling and repaving and water main replacement for the Biscayne Point Neighborhood Right-Of-Way Improvements Project, as part of a Flood Mitigation Project on Crespi Boulevard, for a total construction cost of$3,550,876 that included a contingency of$500,000. The said contingency has been used up due to the modification of the original design resulting in upsizing of pipes from 36 inch to 72 inch and additional linear foot of pipes in some areas. In order to complete the pump station phase of the project, including the outfall, it is necessary to replace the seawall and raise the elevation to meet the current City approved standard of 5.7 NAVD.An enhancement of the landscaping is also being proposed,to give the area more of a park-like appearance. Other areas of the neighborhood improvement that are in need of immediate attention have also been added, including milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue, as well as 77th Street bridge repairs. Public Works staff has requested an additional scope of work from DMSI to include: The 81st Street end seawall replacement,enhanced landscaping for the pump station, milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue as well as 77th Street bridge repairs. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: Financial Information: Source of Amount Account Approved Funds: 1 15,000 302-2452-000356 8,000 302-2452-066)351 P 150,000 302-2452-069357 12,000 302-2452-061357 140,000 431-2321-069357 OBPI Total 325,000 Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric Carpenter, Public Works X6012 Sign-Offs: t Departme t Director Assistant City Manager City M na• r ETC MT JLM T:\AGENDA\2015\Apn\PUBLIC WORKS\Crespi change order No2.Sum.doc iff4 �.J ® AGENDA ITEM e 7 H IA I E C DATE MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members of the City Co ission FROM: Jimmy L. Morales, City Manager ■110111.11 DATE: April 15, 2015 SUBJECT: A RESOLUTION OF THE MAYO AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPRO ING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO.2 TO THE AGREEMENT WITH DAVID MANCINI & SONS, INC. (DMSI), DATED APRIL 1, 2015 (THE AGREEMENT); FOR ADDITIONAL ENGINEERING SERVICES, SEAWALL REPLACEMENT, ENHANCEMENT LANDSCAPING, MILLING AND REPAVING AND BRIDGE REPAIR FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT-OF- WAY IMPROVEMENTS PROJECT, AS PART OF THE FLOODING MITIGATION PROJECT ON CRESPI BOULEVARD, FOR A TOTAL COST OF $325,000. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution FUNDING $ 15,000 302-2452-000356 $ 8,000 302-2452-061351 $150,000 302-2452-069357 $ 12,000 302-2452-061357 $140,000 431-2321-069357 $325,000 TOTAL BACKGROUND The Biscayne Point Neighborhood Right of Way improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements needed to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 79th to 85th Streets. At its October 29, 2014 meeting, the City Commission approved Resolution No. 2014-28816 authorizing the execution of a change order to David Mancini & Sons, Inc. (DMSI), for additional engineering services, drainage structure modification, drainage pipe, storm water pump station, Commission Memorandum—Crespi Boulevard Neighborhood Improvements Page 2 of 2 pollution control structure, milling and repaving and water main replacement for the Biscayne Point Neighborhood Right-Of-Way Improvements Project, as part of a Flood Mitigation Project on Crespi Boulevard, for a total construction cost of $3,550,876 that included a contingency of $500,000. The said contingency has been used up due to the modification of the original design resulting in upsizing of pipes from 36 inch to 72 inch and additional linear foot of pipes in some areas. In order to complete the pump station phase of the project, including the outfall, it is necessary to replace the seawall and raise the elevation to meet the current City approved standard of 5.7 NAVD. An enhancement of the landscaping is also being proposed, to give the area more of a park-like appearance. Other areas of the neighborhood improvement that are in need of immediate attention have also been added, including milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue, as well as 77th Street bridge repairs. Public Works staff has requested an additional scope of work from DMSI to include: The 81st Street end seawall replacement, enhanced landscaping for the pump station, milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue as well as 77th Street bridge repairs. COST ANALYSIS Public Works has negotiated the additional scope of work with DMSI in the amount of$325,000. CONCLUSION The Administration recommends adopting the Resolution. Attachment— DMSI cost proposal JLM/MT/ETC/BAM/FRS GENERAL CONTRACTOR 1210 Washington Ave,Suite 250.Miami Beach,FL 33139 1939 NW loth Ct.Pompano Beach,FL 33064 PH:(305)532-8827 FAX:(305)532-8835 PH:(954)977-3556 FAX:(954)944-2040 April 2, 2015 Eugene Egemba, PE Civil Engineer III City of Miami Beach 1700 Convention Center Drive Miami Beach, Fl 33139 Re: Crespi Blvd Improvements - Breakdown of proposals for additional work to be performed Mr. Egemba, Please see below the breakdown for the proposals for additional work to be performed in the above referenced project: Scope A: Construction repairs to the 77th Street Bridge consisting in the restoration of delaminated concrete and repairing cracks on selected bridge substructure components including piles, pile caps, beams and slabs, as per CES, Inc. plans issued for bid (02-20-14)as amended. Proposed Lump Sum Cost: $ 65,000.00 Scope B: Mill and Resurface the intersection of Hawthorn Avenue and Crespi Blvd. including restoration of all traffic signal loops,and pavement markings. Proposed Lump Sum Cost: $ 55,000.00 Scope C: Design/Build of Enhanced landscape and Hardscape improvements to 81st Street Pedestrian Bridge approach. Proposed Lump Sum Cost: $ 23,000.00 rViel ;D9' \'1l ) ' ;' ( N 1 6 Pi GENERAL CONTRACTOR 1210 Washington Ave,Suite 250.Miami Beach,FL 33139 1939 NW 4oih Ct.Pompano Beach,FL 33064 PH:(305)532-8827 FAX:(305)532-8835 PH:(954)977-3556 FAX:(954)944-2040 Scope D: Design/Build of approximately 60 LF of Seawall at Street-end of 81st Street and Crespi Blvd.to and final elevation of 5.7 NAVD utilizing Tru-Line System or equal. Proposed Lump Sum Cost: $ 182,000.00 Respectfully, Fa 10 Ang.rital Project Manager