BACKGROUND
The City's Public Works Department is working on a project with Florida International
University's (FIU) School of Architecture (SOA) to beautify the Alton Road flyover bridge on the
eastern end of 1-395. Currently, the fly-over concrete is in need of painting, it is dark and
foreboding at night, and has under-utilized space beneath it.
We obtained a proposal from FIU in the amount of $7,000 that would include the following
scope of service:
1. A three (3) day, eight (8) hour per day charrette, with three (3) SOA faculty members
and (4-6) SOA graduate students.
2. Verbal and visual presentation of charrette findings and submittal of pdf files containing
research, sketches, and drawings.
Public Works is also working with Miami-Dade County to come up with a conceptual design of
what the flyover should look like, and the Florida Department of Transportation to extend the
painting of the railing to include the structural columns. The City's Planning Department is
weighing in on the color scheme provided by FIU. The painting phase of the FDOT Alton Road
project is scheduled to take place in the July-August time frame.
CURRENT STATUS
The charrette started today with an onsite meeting, site photos, measurements and initial
discussions with stakeholders. The charrette will resume tomorrow with the development of 2D
and 3D renderings. There will also be a public forum tomorrow afternoon to discuss sketches
and consider options. The charrette will conclude on Friday with the completion of drawings
and renderings and placed into a Power Point presentation for public review.
Attachment: Charrette schedule
�;1,�
C/ RS
F:\WORK\$ALL\(1)EMPLOYEE FOLDERS\FIORELLA SARMIENTO\LTCs-ALL\LTC-Flyover charettee.docx
Detailed Schedule:
Please note that any stakeholders are invited to attend and participate in any and all parts of this
schedule.
Day 01: May 06,2015
9AM-12 noon: Meet at the Alton Road Fly-over to review site,gather site photos,take basic
measurements,discuss project with stakeholders.
12-1 PM: Lunch at the Miami Beach Urban Studios.
1PM-4 PM:The teams return to the Miami Beach Urban Studios to work. Any necessary base
drawings for the renderings are located and put together in a common file folder. As a group
we consider and sketch as many options as possible. (Teams are not yet formed at this point.)
4-6 PM: Review of photos,base drawings,and sketch ideas. Three building ideas are selected
to be pursued. Three teams are formed.
Day 02: May 07,2015
9AM-12 noon: Each of the three teams develops the project through 2D and 3D renderings. The
stakeholders are invited to this and any other meeting.
12-1 PM: Lunch at the Miami Beach Urban Studios
1-3 PM: Public forum to discuss the sketches,consider options,etc.
4-8 PM: Each team incorporates input from the public discussions into the schemes and final
renderings are begun.
8 PM: Pizza dinner at the Miami Beach Urban Studios
Day 03:May 08,2015
9-2 PM: Final drawings and renderings are completed and placed into a single PowerPoint
presentation.
12 noon:Working lunch at the Miami Beach Urban Studios
3-5 PM: Public presentation of the design schemes,research,and renderings. The City of Miami
Beach will receive a complete digital set of everything produced. Up to five (5) hard copies of
the final presentations may be produced at no extra charge at a later date(if desired). Note:
Request for additional copies to be received no later than two weeks from the noted 'end date'
of the charrette.
FluBy Design
C;oI.LEGr or ARCHif EC° THE ARTS Page 5