Loading...
Amendment No. 9 to the Agreement with Fentress Architects in the amount of $302,876 .A0/ - gC:Ser AMENDMENT NO. 9 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $302,876 This Amendment No. 9 to the Agreement made and entered this 1'-$day of August, 2015, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as "Consultant" or "Architect- Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project (the "Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 — Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015- 28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400; and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of$$3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation 1 and administration services required for the Project; and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for certain Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of $15,156,359.00; and WHEREAS, this Amendment No. 9, is for the provision of Commissioning Services, in the total amount of$302,876; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 9. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix "A-9", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 9. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 9 to be executed in their names by their duly authorized officials as of the date first set forth above. /, ATTE •F MIAMI '' AFf' f O� ate• ' e 44,•R. ael Gran. o �' P ip v• ►= '4e/ •ity Clerk jr, 1 y %, 'NCQRP n ATTEST : 2 ': •P4'6TD. • V'• � TRESVA-L;HITECT JAI 410,-1 • S'•nature: 1�% sm v AisDICSC• • %Ur 5 Print Name/Title MiAcifi441 Print Name/Title APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION 2 OgA— fr-5 - City Attorney ILcQ Date Appendix "A-9" 1. SCOPE OF SERVICES Refer to Exhibit "1" attached herein. 2. TIME OF COMPLETION Ten months post building occupancy. 3. PAYMENT AND COMPENSATION The total lump sum fee proposed for this Scope of Work is $302,876. Payment will be deducted from the Owner's Contingency Allowance. Summary These values need to be adjusted based on additional scope. Project Contingency Total Contract $10,967,200 $1,096,720 $12,063,920 Amendment 1 -Scope change 0 0 0 Amendment 2 -Civil 41,079 -41,079 0 Amendment 3 -BR change 179,982 -179,982 0 Amendment 4 - Stormwater/Web 76,605 -76,605 0 Amendment 5 -DD 2,442,400 0 2,442,400 Amendment 6—Wind/roof $117,200 -117,200 0 Amendment 7 -Deductive -3,129,259, 0 -3,129,259 Amendment 8 -CD/CA 15,253,079 -96,720 15,156,359 Amendment 9 -Commissioning 0 -302,876 0 $25,851,566 $282,258 $ 26,436,700 • • • • 1 EXHIBIT 1 FENTRESS feniress _,., July 20,2015 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 10—Commissioning Services Project 20140021.001 A09 Dear Mr.Morales: This proposal is for the Design Team to contract a commissioning consultant at the request of the City of Miami Beach for the above referenced project. We propose The Spinnaker Group to provide these services and the work is in addition to the scope outlined on our base contract and will include the following services: Scope of Services: Commissioning will be performed on the entire project including,but not limited to,the project's systems,which are defined as energy using systems by USGBC.The commissioning services will consist of the following,which are broken down between Fundamental Commissioning and Enhanced Commissioning. Systems required to be commissioned by USGBC for LEED Certification: • HVAC: o Fans; o Air handlers; o Pumps; o Drives; o Controls and control devices; o Ducting and components; o Piping and components; o A/C Units. • Lighting and Lighting Controls; • Hot Water Heating Systems; • Renewable Energy systems if applicable. Fundamental Commissioning Services: • The development of commissioning requirements for the project. • Meet with the Construction Manager,and the City to explain the commissioning process for the project, including: o Provide written answers to questions from the City and Construction Manager on commissioning questions prior to the City's execution of the contract of construction for the project; o Provide answers to questions from the City and Construction Manager after the execution of the contract of construction for the project. DEN _ - 3 . _ 12 ' 3 -2 31 w� , ? Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 10—Commissioning Services July 20,2015 Page 2 • Develop a Commissioning Plan for the project, which will incorporate comments from the City, the Design Team and the project Construction Manager; • Verify that Energy Consuming Systems(HVAC,lighting,domestic hot water)Installation of the project meet requirements of the USGBC,including: o Development of Pre-Functional Tests; o Development of Functional Tests; o Observation and acceptance of Pre-Functional Tests; o Observation and acceptance of Functional Tests; o Observation of Test and Balance. • Prepare Commissioning Management Report(Commissioning Final Report). The Report shall include an executive summary, list of participants and their roles,brief description of the project,and thorough text on each of the following sections: o Executive Summary; o Design Intent; o Basis of Design; o Pre-functional checklists are complete; o Functional checklists are complete; o Deficiency Log. Enhanced Commissioning Services: • Document the City's Project Requirements and Basis of Design; • Perform a focused design review which shall include the following: o Input regarding making the project easier to commission; o Analyze how building maintenance can be made easier(accessibility and system control,etc.); o Verify if systems consistent with design intent; o Understand how utility usage and Indoor Environmental Quality can be improved; • Meet with the Construction Manager,and the City to explain the commissioning process for the project, including: o Provide written answers to questions from the City, and Construction Manager on commissioning questions prior to the Owner's execution of the contract of construction for the project; o Provide answers to questions from the City, and Construction Manager after execution of the contract of construction for the project. • Review and recommend for approval, disapproval or conditional approval submittals by the project Construction Manager, applicable to systems being commissioned for compliance with commissioning needs; • Develop a Systems Manual and deliver it to the City: o Verify Training of Systems Operating Personnel; o Conduct a post occupancy review at 10-months post-occupancy. Completion of LEED Online Templates and GBCI Comment responses. • Measurement and Verification: o Develop Measurement and Verification plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2)as specified in the International Performance Measurement and Verification Protocol Volume III: Concepts and Options for Determining Energy Savings in New Construction,April 2003; Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 10—Commissioning Services July 20,2015 Page 3 o Provide a process for corrective action if the results of the M&V Plan indicate that energy savings are not being achieved. Coordination of Commissioning Services with the design documentation: • Introduction and orientation of commissioning agent to the project systems and design details for both portions of the project(Convention Center and Park Pavilion); • Coordinating commissioning agents'efforts with design production and deliverables; • Oversight of scheduling systems testing during and after construction; • Management of commissioning agent's efforts beyond the scope of the design team task time frame. Fees for this service will be a lump sum of Three Hundred Two Thousand Eight Hundred Seventy-six Dollars ($302,876)and paid based on percentage complete of the task.This fee includes and Add Alternate of Six Thousand Eight Hundred Dollars($6,800) for a Tenant Measurement and Verification Plan. Reimbursable costs for printing, telephone,delivery and travel are included in this fee. All billings for these services will be invoiced under the heading #20140021.001 A09. If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ohn.Kudrycki,AI ,L AP BD+C Associate Principal encl: Fee Summary dated July 16,2015 The Spinnaker Group proposal dated July 16,2015 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Anne McNeely Fentress Architects Annie Goodwin,Fentress Architects Project: Commissioning Agen Miami Beach Convention Center Renovation & Expansion 7/16/15 Meeting Room Revisions Discipline Firm Name Firm Fee Total Number Architecture Fentress Architects 1 $30,000 $30,000 Architecture Arquitectonica 4 $0 $0 Fire/Life Safety/Code Consulting Rolf Jensen 13 $0 $0 Civil/Utility Engineering Kimley-Horn 6 $0 $0 Landscape West 8 7 $0 $0 Structural Engineering Wallace Engineering ,, 8 $0 $0 Vertical Transportation Lerch Bates 12 $0 $0 Plumb, Mech, Elec, Lighting ME Engineers 14-18 $0 $0 IT, Security,AV, Acoustics DL Adams 20 $0 $0 Food Service Caruso 25 $0 $0 Traffic Corradino 27 $0 $0 Graphics and Signage TKD 28 $0 $0 Parking Consultation Walker Parking 29 $0 $0 _ Cost Estimate RLB 35 $0 $0 Hardware Consultation Assa Abloy 37 $0 $0 Commissioning The Spinnaker Group 40 $272,876 $272,876 Design Fees $302,876 $302,876 Expenses 0% $0 $0.00 ■ Total Total $302,876 $302,876 ESPINNAKERG 3236 r'" • ‘• THESPINNAKERGROUP C/341-21 7-3,5!4 ?ft- , ti Proposed Project Miami Beach Convention Center Proposed To Fentress Architects 421 Broadway Denver, CO 80203 USA July 16, 2015 \\7 THE 5PlitiNA,KERGROUP Our Passion. Our Focus. Our Only Business. - • GREEN BUILDINGS. LEED+Sustainability Consulting • Building Commissioning • Energy Modeling A,AtilvL 111,9 - , -_SP1NNAKERO O.JP THE•0 . 4 £11 H,cROuP TH ESPINNAKERG ROU P Project Certifications To-Date:,-.. YOUNG/if ART�usr a .' - Pte"'„ # ► .; HFiGWARD COMITY LIBRARY LEED-ND 2 57 28 6 2 • 1: THE LEADERS IN LEED • USGBC Preferred Provider icy .: _ ,_ ,�' `-� ” i • Fast Track LEED Certification Available ..,, •-=,;r; ` •Customized LEED Design Charettes '_ •AIA&GBCI Continuing Education Provider NSUS CORAL t{AESFdt- •Contractor Credit Facilitation - ' %- PROVEN LEED' PROVIDER 1 - .,..�. :.mot -F , SEASONED INDUSTRY EXPERTS -�.. 3�- '_-,,,, •Over 90 LEED Certified Projects To-Date • ' --- -j am =_ •Over 200 Projects In-Progress • Professional Engineers&Architects JOE DIMAG O • Licensed Building Commissioners CHILDREN'S FlosrTTAL •LEED APs:BD+C,ND,CI,O&M, •CSI,CDT,BEMP,PX,BN,CMC Certifications •LEED Fellow,LEED Faculty -`"'`:.,� . - _ .. r� VALUABLE, PROVEN RESULTS ...sue. � - -{-�r F•- *, �,,. ..- n LEED Certified Projects are proven to: - ,••",-, -,c '! "!it - 7: _= La , • Increase Productivity .. -- - _ •Lower Energy Costs _ • Increase Lease Rates and Leasing Velocity MIAMI DESIGN DISTRICT • Increase in Market Value •Competitive pricing for all Green Building and LEED - related services AWARD WINNING �'�":��. .,. USGBC South Florida Chapter,Gala Verde Project • "„`1 Award Winner ,,.-41_1•4,-01,1.1. -;A ,- .;,. •USGBC South Florida Chapter,Firm of the Year Award .i.e. . •ULI(Urban Land Institute)Project of the Year ' •2013 South Florida Business Journal"Business . . of the Year" •2013 AIA Palm Beach"Consulting Firm of the Year" •2013 Sustainable Florida'Best Practices"Award Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 2 I ' .i .1 e i-i_SPINNA ER ,O - THEspi`J i`GRGUP LEED CONSULTING PROPOSAL Proiect Understanding Two buildings within a campus, the Convention Center("1,500,000sf) and Park Pavilion ("6,000sf). Summary of major Mechanical equipment: 6 chillers 5 cooling towers 100 AHU's -300 VAV's Multiple lighting control systems Scope of Services Commissioning will be performed on the entire Project including, but not limited to,the Project's systems,which are defined as energy using systems by USGBC. The Commissioning Services will consist of the following,which are broken down between Fundamental Commissioning and Enhanced Commissioning. The Owner can elect whether it wishes to obtain Fundamental Commissioning or Enhanced Commissioning. Such election should be made by not later than Design Development. Systems required to be commissioned by USGBC for LEED Certification • HVAC o Fans o Air handlers o Pumps o Drives o Controls and control devices o Ducting and components o Piping and components o A/C Units • Lighting and Lighting Controls • Hot Water Heating Systems • Renewable Energy systems if applicable • The Fundamental Commissioning Services of the Commissioning Services consist of: o Develop Commissioning Requirements for the Project. It is not the responsibility of the Consultant to incorporate the Commissioning Requirements into the Project plans. o Meet with the Project general contractor, design Architect and Owner to explain the commissioning process far the Project, including: Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 3IPage TH'ESMINAMERGROUP • Provide written answers to questions from the Owner, design Architect and contractor on commissioning questions prior to Owner's execution of the contract of construction for the Project; and • Provide answers to questions from the Owner, design Architect and contractor after execution of the contract of construction for the Project. o Develop a Commissioning Plan for the Project,which will incorporate comments from the Owner,the design Architect and all other consultants involved in the design and development of the Project(the"Design Team") and the Project contractor. o Verify that Energy Consuming Systems (HVAC, lighting, domestic hot water) Installation of the Project meet requirements of the USGBC, including: • Development of Pre-Functional Tests; • Development of Functional Tests; • Observation and acceptance of Pre-Functional Tests; • Observation and acceptance of Functional Tests; and • Observation of Test and Balance. o' Prepare Commissioning Management Report(Commissioning Final Report).The Report shall include an executive summary, list of participants and their roles, brief description of the Project, and thorough text on each of the following sections: • Executive Summary • Design Intent; • Basis of design; • Pre-functional checklists is complete; • Functional checklists is complete; • Deficiency Log. • The Enhanced Commissioning Services of the Commissioning Services consist of: o Document Owner's Project Requirements and Basis of Design; o Perform a focused design review which shall include the following:a) input regarding making the Project easier to commission; b) how building maintenance can be made easier(accessibility and system control, etc.); c)are systems consistent with design intent and d) how utility usage and Indoor Environmental Quality can be improved; Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 4 I ' a g .r^ THESPUMAMERG Raj? THE Si, o Meet with the Project general contractor, design Architect and Owner to explain the commissioning process for the Project, including: • Provide written answers to questions from the Owner, design Architect and contractor on commissioning questions prior to Owner's execution of the contract of construction for the Project; and ▪ Provide answers to questions from the Owner, design Architect and contractor after execution of the contract of construction for the Project. o Review and recommend for approval, disapproval or conditional approval submittals by the Project general contractor, applicable to systems being commissioned for compliance with Commissioning needs; o Develop a Systems Manual and deliver it to Owner; o Verify Training of Systems Operating Personnel o Conduct a post occupancy review at 10 months post occupancy. Completion of LEED Online Templates and GBCI Comment responses • Measurement and Verification o Develop Measurement and Verification plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2) as specified in the International Performance Measurement and Verification Protocol Volume III: Concepts and Options for Determining Energy Savings in New Construction,April 2003 o Provide a process for corrective action if the results of the M&V Plan indicate that energy savings are not being achieved. Add Alternate • Tenant Measurement and Verification o Develop a tenant measurement and verification plan that documents and advises future tenants of the M&V opportunity and means of achievement o Provide a process for corrective action if the results of the M&V plan indicate energy savings are not being achieved. FEE The cost for the above services is: Convention Center Fundamental Commissioning $197,850.00 Enhanced Commissioning $26,950.00 Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 5 I P C ci HESP J NAHERGPOUP THE_P; .f1.-HSc:GROUP Pavilion Fundamental Commissioning $16,838.00 Enhanced Commissioning $5,938.00 Measurement and Verification $18,500.00 Add Alternate Tenant Measurement and Verification $6,800.00 BILLING - Billing monthly on a percent of completion basis.Schedule of Values is provided for Commissioning and LEED in attachment"A" - Payment terms-net 30 days. • Costs not included within this proposal: • Retesting if a system test fails more than twice. • Specialty testing equipment These fees are exclusive of reimbursable expenses at 1.1 times direct cost. Reimbursable expenses include plotting and printing(except as required for in-house coordination), photography, courier services, shipping and express mail. Note: No reimbursable fees are anticipated on this project. LIABILITY FOR LEED CERTIFICATION AND DESIGN To achieve certification under the LEED Green Building Rating System, the USGBC, an independent nonprofit organization of which Consultant and various of its subconsultants may be members or board members but over which Consultant and its subconsultants have no authority or control, must determine that the Project has met certain prerequisites, credits and/or performance benchmarks upon building or project completion. Such LEED certification processes and procedures are determined by the USGBC, are not within the Consultant's control, and may be subject to change and may not be uniformly applied. Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 6 :? f ESPI , I M'ERGP THE SPi`i',sii:r''1GROUP While Consultant desires that the Project achieve Client's LEED Objectives, actual certification by the independent, third-party USGBC occurs only after Project substantial completion. Therefore, Consultant cannot and does not make any assurance, representation or warranty that LEED certification under any program, or any particular level of LEED certification (Certified,Silver, Gold or Platinum), will be granted for all or any portion of the Project and nothing contained herein shall constitute a guarantee, representation, or warranty, express or implied, that any such certification will in fact be obtained. Consultant specifically disclaims any implied warranty or representation regarding achievement of LEED certification. According to the USGBC, buildings that obtain certification under the LEED Green Building Rating System1M offer the potential benefits of increased energy efficiency, decreased water consumption, and enhanced indoor air quality, among other benefits. While the Consultant hopes that Owner, occupants, guests and invitees of the Project will enjoy such benefits if LEED certification is in fact granted by the USGBC for all or a portion of the Project, Consultant cannot and does not make any guarantee, representation, or warranty, express or implied,that any such benefits will in fact accrue. The conferring of LEED certification by the USGBC is as of a date certain and may be predicated on certain assumptions, estimates, energy modeling and other studies conducted by the Consultant or subconsultants during the design and development process but nothing herein should be construed as a representation or warranty by Consultant that the Project will in fact perform at the levels indicated in any such assumptions, estimates, models or studies or that the levels of energy and water efficiency or indoor air quality that may in fact exist at the commencement of the operation of the Project will remain unchanged. Client should not rely upon any stated aspirational goals of the Consultant regarding LEED certification or performance or any marketing or promotional materials provided by the Consultant that may recite third party or anecdotal claims regarding the efficiencies or benefits that are purportedly accruing to the owners or occupants of LEED certified buildings. Any such promotional or third party materials provided by Consultant, including presentation materials by the USGBC, articles, reports and the like, are for general information purposes only and none of the materials or statements or claims therein are endorsed by Consultant. The Consultant shall not have any responsibility for the design of the Project, and shall only be responsible for consulting services in the effort to obtain LEED certification for the Project as specifically set forth herein. The Client has contracted, or will contract, with an architect and other design and engineering professionals for the overall design of the Project, and the Consultant has no liability for those designs, specifications and drawings. The Consultant shall not be responsible for any errors or omissions on the architect's or other design and engineering professionals' drawings, or any claims or disputes arising there from. INDEMNIFICATION The Client shall indemnify, defend and hold harmless the Consultant, its officers, agents, employees, representatives and any affiliated or related entities, against any and all suits, actions, proceedings, claims, losses, liabilities, damages, costs and expenses, including but not limited to court costs, litigation expenses and reasonable attorneys' fees, that are alleged to have occurred in whole or in part as a result of or due to the negligence or willful misconduct of the Client, its agents, Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 7 i Page '. 4-.`SMINNA E A„1:..,.. THES' r.'J. 5Ei?GROUP consultants, employees or representatives. The obligation of the Client to indemnify the Consultant shall survive the termination or full performance of this Agreement. The Consultant shall indemnify, defend and hold harmless the Client, its officers, agents, employees, representatives and any affiliated or related entities, against any and all suits, actions, proceedings, claims, losses, liabilities, damages, costs and expenses, including but not limited to court costs, litigation expenses and reasonable attorneys' fees, that are alleged to have occurred in whole or in part as a result of or due to the negligence or willful misconduct of the Consultant, its agents, consultants, employees or representatives. The obligation of the Consultant to indemnify the Client shall survive the termination or full performance of this Agreement. MISCELLANEOUS PROVISIONS No provision of the Agreement shall be deemed to have been waived by Consultant, either expressly, impliedly or by course of conduct, unless such waiver is in writing and signed by Consultant, which waiver will apply only to the matter described in the writing and not to any subsequent rights of Consultant. This Agreement represents the entire and integrated agreement between the Client and the Consultant and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both Client and Consultant. This Agreement shall be construed, interpreted, enforced and governed by the law of the State of Florida. Venue for disputes shall be a Court of proper jurisdiction in Broward County, Florida. Both - parties waive any argument that this forum is inconvenient. In the event any term or provision of the Agreement is determined by an applicable judicial authority to be illegal or otherwise invalid, such provision shall be given its nearest legal meaning or be construed as deleted as such authority determines,and the remainder of the Agreement stall be construed to be in full force and effect. The Client and Consultant, respectively, bind themselves, their agents, successors, assigns and legal representatives to this Agreement. Neither the Client nor the Consultant shall assign this Agreement without the written consent of the other. Unless otherwise required in this Agreement, the Consultant shall have no responsibility for the discovery, presence, handling, removal or disposal of, or exposure of persons to, hazardous materials or toxic substances in any form at the Project site. The Consultant shall have the right to include photographic or artistic representations of the design of the Project among the Consultant's promotional and professional materials. The Consultant shall be given reasonable access to the completed Project to make such representations. The Client shall provide professional credit for the Consultant in the Client's promotional materials for the Project. DISPUTE RESOLUTION Any claim, dispute or other matter in question arising out of or related to this Agreement shall be subject to mediation prior to arbitration or the institution of legal or equitable proceedings by either party. If such matter relates to or is the subject of a lien arising out of the Consultant's services, the Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 8 I t g a Jf� Consultant may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the matter by mediation or by arbitration. The Client and Consultant shall endeavor to resolve claims, disputes and other matters in question between them by mediation which, unless the parties mutually agree otherwise, shall be in accordance with the laws of the country or stat in which the Project is located. Request for mediation shall be filed in writing with the other party to this Agreement. The request may be made concurrently with the filing of a demand for arbitration but, in such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings, which shall be stayed pending mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order. The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. TERMINATION OR SUSPENSION If the Client fails to make payments to the Consultant in accordance with this Agreement, such failure shall be considered substantial nonperformance and cause for termination or, at the Consultant's option, cause for suspension of performance of services under this Agreement. If the Consultant elects to suspend services, the Consultant shall give seven days' written notice to the Client before suspending services. In the event of a suspension of services, the Consultant shall have no liability to the Client for delay or damage caused the Client because of such suspension of services. Before resuming services, the Consultant shall be paid all sums due prior to suspension and any expenses incurred in the interruption and resumption of the Consultant's services. The Consultant's fees for the remaining services and the time schedules shall be equitably adjusted. If the Client suspends the Project for more than 120 cumulative days for reasons other than the fault of the Consultant, the Consultant may terminate this Agreement by giving not less than seven days' written notice. If the Client suspends the Project, the Consultant shall be compensated for services performed prior to notice of such suspension. When the Project is resumed, the Consultant shall be compensated for expenses incurred. in the interruption and resumption of the Consultant's services. The Consultant's fees for the remaining services and the time schedules shall be equitably adjusted. In the event of termination not the fault of the Consultant,the Consultant shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due and all Termination Expenses. Termination Expenses are in addition to compensation for the Consultant's services and include expenses directly attributable to termination for which the Consultant is not otherwise compensated, plus an amount for the Consultant's anticipated profit on the value of the services not performed by the Consultant. Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 9 i I h ES I�; E C.RO, r E :-_nom , If our proposal is acceptable,your signature below will confirm our authorization to proceed. Retain one copy and return one copy to The Spinnaker Group, Inc. at the address on page 1 of this proposal.This authorization constitutes your commitment to pay the fee and reimbursable expenses, and represents that approval has been received by your firm from the client. We appreciate your consideration of TSG and the opportunity to assist your team for this and future projects. Please give us a call with any questions or comments. We look forward to your favorable selection of TSG and the opportunity to assist your team for this and future projects. Please give me a call with any questions or comments For The Spinnaker Group For Client Signature Signature Name (Print) Name (Print) Rob Hink LEED AP Title Title Vice President Date Date 7/16/2015 Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 10 F' a THE:::21!4 �'GROUP -S °I N SIGR3OU, Convention Center Attachment "A" Schedule of Values Fundamental Commissioning Develop Commissioning Specifications $1,750 Document Design Requirements and Basis of Design $1,800 Develop Commissioning Plan $2,500 Develop Pre-Functional Tests $21,875 Develop Functional Tests $21,875 Observe Prefunctional Tests $29,500 Observe Functional Performance Tests $112,300 Final Commissioning Report $6,250 Sub total $197,850 Enhanced Commissioning Design Review $7,500 Submittal and As-Built Review $6,500 Develop System Operation Manual $6,250 Verify Training $3,450 Post Occupancy Evaluation $3,250 Sub total $26,950 Pavilion Attachment"A" Schedule of Values Fundamental Commissioning Develop Commissioning Specifications $1,063 Document Design Requirements and Basis of Design $938 Develop Commissioning Plan $1,313 Develop Pre-Functional Tests $1,113 Develop Functional Tests $1,475 Observe Prefunctional Tests $4,750 Observe Functional Performance Tests $5,250 Final Commissioning Report $938 Sub total $16,838 Enhanced Commissioning Design Review $1,250 _ Submittal and As-Built Review $1,063 Develop System Operation Manual $1,188 Verify Training $1,188 Post Occupancy Evaluation $1,250 Sub total $5,938 Building Commissioning • Energy Modeling • LEED+Sustainability Consulting 1 1