Loading...
2015-29053 Reso RESOLUTION NO. 2015-29053 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 3 TO THE CONSTRUCTION CONTRACT WITH SOUTHERN UNDERGROUND INDUSTRIES, INC., DATED MAY 26, 2015 (THE AGREEMENT); SAID CHANGE ORDER, IN THE AMOUNT OF $417,309, PLUS A PROJECT CONTINGENCY IN THE AMOUNT OF $41,731, FOR A TOTAL COST OF $459,040, FOR INSTALLATION OF ADDITIONAL CHECK VALVES ON OUTFALLS IN VARIOUS LOCATIONS REQUIRING PROTECTION FROM TIDAL FLOODING, INCLUDING INDIAN CREEK DRIVE, FROM 24TH STREET TO 41ST STREET. WHEREAS, at its April 9,2014 meeting,the City Commission authorized an award of a construction contract(the Agreement)with Southern Underground Industries, in the amount of$788,315.00, pursuant to Invitation to Bid (ITB) No. 2014-087-SR for the Citywide Tidal Flooding Mitigation Project; and WHEREAS, at its August 28, 2014 meeting, the City Commission approved Change Order No. 1 to the Agreement, in the amount of$661,980, plus a project contingency in the amount of$88,019.50,for a total cost of $750,000, for additional scope of work, including engineering services, temporary pump station drainage structures, the installation of drainage pipe, and check valves for existing outfalls Citywide; and WHEREAS,at its February 12,2015 meeting,the City Commission approved Change Order No.2 to the Agreement, in the amount of$180,000,to extend the services Citywide, plus a project contingency in the amount of$30,000, for a total cost of$210,000; and WHEREAS,continuing with the initiative to protect residents from tidal flooding within the City of Miami Beach, the Public Works Department is requesting an additional scope of work from Southern Underground Industries, Inc., (Southern Underground)for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding, including Indian Creek Drive,from 26th Street to 41st Street, and trial installation on 3 drainage wells around the City; and WHEREAS, Southern Underground has submitted a cost proposal in the amount of $417,309; a project contingency of 10%, in the amount of $41,731, has also been added, totaling $459,040 for the additional scope of work. NOW,THEREFORE,BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA,that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Change Order No. 3 to the construction contract with Southern Underground Industries, Inc., dated May 26, 2015 (the Agreement); said change order, in the amount of $417,309, plus a project contingency, in the amount of$41,731,for a total cost of$459,040,for installation of additional check valves on outfalls in various locations requiring protection from tidal flooding, including Indian Creek Drive, from 24th Street to 41st Street. PASSED AND ADOPTED this 10 day of June, 2015. ATTEST: A� `r' iii ��, ";Mayor Ag(A1 INCORP °RAT•I f Rafael Granado, City Clerk '4g� • 4,,,,L,1-1 26 ,/,/ . APPROVED AS TO °"""`„., FORM & LANGUAGE T:\AGENDA\2015\June\PUBLIC WORKS\Citywide High Tide Mitigation.Reso.doc & FOR EXECUTION 7 /c5 City Attorney Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No. 3 To Southern Underground Industries, Inc., Dated May 26, 2015(The Agreement); Said Change Order In The Amount Of$417,309, Plus A Project Contingency In The Amount Of$41,731; For A Total Cost Of$459,040; For Installation Of Additional Check Valves On Outfalls In Various Locations Requiring Protection From Tidal Flooding Including: Indian Creek Drive, From 26th Street To 41st Street. Key Intended Outcome Supported: Item Summary/Recommendation: Pursuant to Invitation to Bid(ITB)2014-087-SR for the Citywide Tidal Flooding Mitigation Project,the City Commission authorized an award for construction contract with Southern Underground Industries in the amount of$788,315, at its April 9, 2014 meeting. At the August 28,2014 meeting,the City Commission approved Amendment No. 1 to the Agreement,in the amount of$661,980, plus a project contingency in the amount of$88,019.50,for a total cost of$750,000, for additional scope of work including: engineering services,temporary pump station drainage structures, the installation of drainage pipe, and check valves for existing outfalls citywide. At the February 12, 2015 meeting,the City Commission approved Amendment No.2 to the Agreement,in the amount of$180,000 to extend the services citywide, plus a project contingency in the amount of $30,000, for a total cost of $210,000. Continuing with the initiative to protect residents from tidal flooding within the City of Miami Beach, the Public Works Department is requesting an additional scope of work from Southern Underground Industries, Inc., (Southern Underground)for the installation of additional check valves on ouffalls in various locations requiring protection from tidal flooding including: Indian Creek Drive,from 26th Street to 41st Street and trial installation on 3 drainage wells around the City. Southern Underground Industries, Inc. shall provide all necessary labor and equipment for the installation. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: Financial Information: Source of Amount Account Approved Funds: 1 $180,962 429-2730-069357 MOM 2 $251,968 429-2454-061357 3 $ 26-110 431-2730-061357 OBPI Total $459,040 Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric Carpenter, Public Works X6012 Sign-Offs: Department Director Assistant - ,Ac'nager City ETC g . M llf: .'� JLM T:\AGENDA\2015\June\PUBLIC WORKS\Citywide High Tide Mitigation Project Change Order No3.Summary.doc � MIAMIBEACH AGENDA ITEM �1I DATE 6— o -( s CA MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members of the Cit Commi ion FROM: Jimmy L. Morales, City Manager DATE: June 10, 2015 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER No. 3 TO SOUTHERN UNDERGROUND INDUSTRIES, INC., DATED MAY 26, 2015 (THE AGREEMENT); SAID CHANGE ORDER IN THE AMOUNT OF $417,309, PLUS A PROJECT CONTINGENCY IN THE AMOUNT OF $41,731; FOR A TOTAL COST OF $459,040; FOR INSTALLATION OF ADDITIONAL CHECK VALVES ON OUTFALLS IN VARIOUS LOCATIONS REQUIRING PROTECTION FROM TIDAL FLOODING INCLUDING: INDIAN CREEK DRIVE, FROM 261H STREET TO 41ST STREET. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution FUNDING $180,962 429-2730-069357 $251,968 429-2454-061357 $ 26,110 431-2730-061357 $459,040 Total BACKGROUND Pursuant to Invitation to Bid (ITB) 2014-087-SR for the Citywide Tidal Flooding Mitigation Project, at its April 9, 2014 meeting, the City Commission authorized an award for construction contract with Southern Underground Industries in the amount of$788,315.00. At the August 28, 2014 meeting, the City Commission approved Amendment No. 1 to the Agreement, in the amount of $661,980, plus a project contingency in the amount of$88,019.50, for a total cost of $750,000, for additional scope of work including: engineering services, temporary pump station drainage structures, the installation of drainage pipe, and check valves for existing outfalls citywide. At the February 12, 2015 meeting, the City Commission approved Amendment No. 2 to the Agreement, in the amount of $180,000 to extend the services citywide, plus a project contingency in the amount of$30,000, for a total cost of$210,000. Commission Memorandum—Citywide Tidal Mitigation Improvements- Change Order No. 1 Page 2 of 2 Continuing with the initiative to protect residents from tidal flooding within the City of Miami Beach, the Public Works Department is requesting an additional scope of work from Southern Underground Industries, Inc., (Southern Underground) for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding including: Indian Creek Drive, from 26th Street to 41st Street and trial installation on 3 drainage wells around the City. Southern Underground Industries, Inc. shall provide all necessary labor and equipment for the installation. COST ANALYSIS Southern Underground has submitted a cost proposal in the amount of $417,309 (ATTACHMENT) for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding. A base project contingency of 10% in the amount of $41,731 has been added, totaling a construction cost of$459,040. This cost proposal has been submitted to the City's Public Works Department for further review and recommendation. City staff reviewed the proposal and found that the amount was fair and reasonable. CONCLUSION The Administration recommends adopting the Resolution Attachments—Southern Underground Industries. Cost Proposal dated 05/27/2015 JLM/MT/ C/BAM/EA T:WGENDA\2015\June\PUBLIC WORKS\Citywide High Tide Mitigation Project Change Order No 3 Memo.docx • • Ira SOUTHERN UNDERGROUND I N D U S T R E S May 27, 2015 Mr. Eugene Egemba, P.E. City of Miami Beach Public Works Department 1700 Convention Center Dr. Miami Beach, FL 33139 Project: City Wide High Tide Mitigation Project Re: Change Order#3 Proposal,Vertical Well Valve Trial on Meridian Ave, Additional Backflow Valves on Belle Isle and Along Indian Creek Dr from 24 ST to 41 ST Mr. Egemba, As per your request, Southern Underground Industries has reviewed the field conditions and made some preliminary assessments of required scope of work in the following areas and we have prepared the following proposal. Additional measures are necessary to protect the following areas from Tidal Flooding conditions. As per the attached breakdown, we propose that the following scope of work be added to the City Wide High Tide Mitigation Project. ➢ Installation of 3 trial vertical well backflow valves along Meridian Ave between 8th Street and 14th Street. As per our previous discussions it is evident that tidal•upflow from existing gravity drainage wells is contributing to flooding conditions and we propose to reduce this added backflow by installing a drainage backflow valve and grate in the vertical position on the existing casings as per the attached detail. ➢ Installation of additional backflow protection on Belle Isle. Upon further investigation we found that there are 2 existing outfalls which are contributing to the tidal flooding conditions on Belle Isle. These can be resolved via installation of backflow valves. One location will require installation of a structure within the easement to facilitate valve installation. ➢ Installation of additional backflow on Indian Creek Drive from 24th Street to 41 Street. Although more permanent solutions are in planning by FDOT, we propose to install approximately 19 valves along the Indian Creek outfalls to temporarily mitigate the tidal flooding conditions in this area until a more permanent solution is reached. 3075 NW South River Drive, Miami, FL 33142 (954)650-4699 Page 1 of 2 ta SOUTHERN NO/ UNDERGROUND INDUSTRIES ➢ Additional valves in various locations. In addition to these main scope areas, additional funds are required to supplement backflow installation efforts in several areas including Monad Terrace, 59 Street on East side of Alton Road,and additional of top slab modification for 24"valve installation on 48 ST. Based on this scope of work and as per the attached detailed breakdown, Southern Underground Industries proposes to complete this work for a lump sum price of $417,308.83 and we would recommend that a 10%contingency be added to this change order for unforeseen changes which would require resolution, bringing the total proposal amount to$459,093.71 and will need 3-4 weeks to procure the necessary materials to begin work which should take approximately 30-45 days to complete. Feel free to call me with any questions regarding this proposal. Thank you for the opportunity. Sincerely, Juan B rreneche, P.E., Vice President Southern Underground Industries, Inc. 3075 NW South River Drive,Miami,FL 33142 (954)650-4699 Page 2 of 2 1 r SOUTHERN 1 UNDERGROUND CO#3-Well Backflow Valves Test,Belle Isle&Indian Creek Backflow Valves f 1 INDUSTRIES City Wide High-Tide Mitigation Project,City of Miami Beach Description I QTY. I UNIT I UNIT PRICE I TOTAL PRICE SCOPE#3.a-938 W 48 ST(Miami Heart) F&I Top Slab w/USF 667(Remove from CO2 Scope) 1.0 LS $ 8,500.00 $ 8,500.00 Subtotal $ 8,500.00 SCOPE#3.b-Belle Isle-Farrey Lane-Valve&Structure Mobilization 1.0 LS $ 5,000.00 $ 5,000.00 MOT 1.0 LS $ 500.00 $ 500.00 Preliminary Field Measurements 1.0 EA $ 700.00 $ 700.00 15"Inline Check Valve(Material Only) 1.0 EA $ 5,564.00 $ 5,564.00 15"Inline Check Valve(Installation Cost) 1.0 EA $ 4,000.00 $ 4,000.00 F&I Precast Structure,48"dia.w/USF 385 1.0 EA $ 7,000.00 $ 7,000.00 Restoration 1.0 LS $ 5,000.00 $ 5,000.00 Subtotal $ 27,764.00 SCOPE#3.c-Belle Isle-West Side of Venetian Cswy . MOT 1.0 LS $ 1,000.00 $ 1,000.00 Preliminary Field Measurements 1.0 EA $ 700.00 $ 700.00 18"Inline Check Valve(Material Only) 1.0 EA $ 7,650.50 $ 7,650.50 18"Inline Check Valve(Installation Cost) 1.0 EA $ 6,700.50 $ 6,700.50 Subtotal $ 16,051.00 SCOPE#3.d-59 ST and Alton Road(East Pipe) MOT 1.0 LS $ 500.00 $ 500.00 Preliminary Field Measurements 1.0 EA $ 700.00 $ 700.00 18"Inline Check Valve(Material Only) 1.0 EA $ 7,650.50 $ 7,650.50 18"Inline Check Valve(Installation Cost) 1.0 EA $ 6,700.50 $ 6,700.50 Subtotal $ 15,551.00 SCOPE#3.e-Monad Terrace MOT 1.0 LS $ 500.00 $ 500.00 Preliminary Field Measurements 1.0 EA $ 700.00 $ 700.00 12"Inline Check Valve(Material Only) 1.0 EA $ 2,950.00 $ 2,950.00 12"Inline Check Valve(Installation Cost) 1.0 EA $ 4,635.00 $ 4,635.00 Subtotal $ 8,785.00 SCOPE#3.f-Backflow at 303 E San Marino MOT 1.0 LS $ 500.00 $ 500.00 Preliminary Field Measurements 1.0 EA $ 700.00 $ 700.00 15"Inline Check Valve(Material Only) 1.0 EA $ 5,564.00 $ 5,564.00 15"Inline Check Valve(Installation Cost) 1.0 EA $ 5,925.00 $ 5,925.00 Subtotal $ 12,689.00 SCOPE#3.g-Vertical Well Backflow Valves Mobilization 3.0 LS $ 1,500.00 $ 4,500.00 MOT 3.0 LS $ 1,250.00 $ 3,750.00 Preliminary Field Measurements 3.0 EA $ 700.00 $ 2,100.00 24"Inline Check Valve w/Cone Grate(Material) 3.0 EA $ 19,950.00 $ 59,850.00 24"Inline Check Valve(Installation Cost) 3.0 EA $ 9,500.00 $ 28,500.00 Cleaning of Structure 3.0 LS $ 1,200.00 $ 3,600.00 Subtotal $ 102,300.00 SCOPE#3.h-Indian Creek Backflow Valves(Assumes No New Structures) MOT(for Lane Closure where needed) 14.0 EA $ 800.00 $ 11,200.00 Preliminary Field Measurements 19.0 EA $ 700.00 $ 13,300.00 12"Inline Check Valve(Furnish&Install), @ 29 ST-N,30 ST-N,31 ST,32 ST,34 ST,35 ST,38 ST-N, 38 ST-S,&39 ST 9.0 EA $ 7,585.00 $ 68,265.00 15"Inline Check Valve(Furnish&Install) @ 24 ST,25 ST,26 ST,29 ST-N,41 ST 5.0 EA _$ 11,489.00 $ 57,445.00 18"Inline Check Valve(Furnish&Install) @ 27 ST,28 ST,30 ST-N,36 ST(Inside 1/2 full 27") 4.0 EA $ 14,350.50 $ 57,402.00 21"Inline Check Valve(Furnish&Install)@ 40 ST 1.0 EA $ 18,056.83 $ 18,056.83 Subtotal $ 225,668.83 SUBTOTAL $ 417,308.83 CONTINGENCY(10%) $ 41,730.88 GRAND TOTAL $ 459,039.71 I 2 3 4 5 6 7 8 No Charge Dab Ager By A 4X Brackets,8esble seal 2015-04-24 PM B Angle on grate,flange and angle brackets.Round ben distance 2015-04-27 PM C Material 2015-0428 PM A D Conical grate 2015-0430 PM A A E Stetted hobs for talerance 2015-05-05 PM _ r".--- I •I D B C 4 B Round bar [24,00] 11111 Wastop housing cti A 0 609,60 ` Grate flange A-A Wastop flange \ F(1/2) Gasket 441411A C Existing I e C 9 P�P �2 6\ 65 , \_ A— a — �\ 4 (�mrc�� j 0 / `V D(1/5) B(1/20) D / I 1 D c-c --it G(1/2) _ NOTE: E 1. 6 pieces of angle brackets attached on existing pipe.Welded or E bolted on existing pipe. 8 s a 2. EPDM gasket seal between thickness of pipe and wastop flange. I a 3. Botts secures wastop to angle brackets. 2y 4. Conical grate with hinge E t oes..sr Marwee h oe•bea Date Units Geri rdesnce xa. • PM PM 2015-04-23 SS-ISO 2768-1 v 1:50 P, N 1,30] PU,AISI 316 Wastop 590/ 24" 33 o. 1.'1 F o well grate at inlet side F li5 www.wapro.se 150423-1 E 1(1) 1 2 3 4 5 6 7 8