2015-29155 Reso RESOLUTION NO. 2015-29155 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH SHIFF CONSTRUCTION & DEVELOPMENT, INC., UTILIZING THE EXISTING NATIONAL JOINT POWERS ALLIANCE(NJPA)CONTRACT, FOR THE RENOVATION OF THE EXISTING SOCCER FIELD AT FLAMINGO PARK (THE PROJECT), INCLUDING DRAINAGE, GRADING, ARTIFICIAL TURF, ELECTRICAL CONDUITS AND RESTORATION OF SURROUNDING SOD AND LANDSCAPED AREAS; SAID PROJECT HAVING A BUDGETED COST OF $686,080, PLUS A TEN PERCENT OWNER'S CONTINGENCY, IN THE AMOUNT OF $68,608, FOR A TOTAL PROJECT COST OF $754,688, WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on September 5, 2007, the Mayor and City Commission adopted Resolution No. 2007-26609 approving the execution of an agreement with Wolfberg/Alvarez and Partners, Inc. (Consultant) for Professional Architecture and Engineering Services for the Flamingo Park Project (the Agreement); and WHEREAS, on March 27, 2008,the Consultant was retained to prepare a master plan and provide for the detailed planning, design, permitting, bidding / award and construction administration for the Project; and WHEREAS, in January 15, 2014, the City Commission adopted Resolution No. 2014- 28449 amending the professional services agreement with the Consultant to provide professional services associated with the design of the remaining Park improvements, which consist of a community garden, baseball field renovation, the Lodge building renovation, new park entrance features, enhanced pedestrian / bike paths, a new interactive water feature, teenage activity, lighting enhancements, signage, drainage, landscaping and irrigation; and WHEREAS, at the July 25, 2014 Neighborhoods/Community Affairs Committee meeting,the Administration discussed the Flamingo Park Master Plan and, among other things, the Committee agreed with the Administration's recommendation, to include artificial turf, in connection with the renovation of the soccer and softball fields; and WHEREAS, the City of Miami Beach Parks and Recreation Department carries out an intramural and a travel soccer program for children ages 5 through 16,who practice and play their home games at City Parks, resulting in a constant use of the soccer field, which makes the City unable to properly maintain the sod and requiring annual sod replacement; and WHEREAS, the use of synthetic turf will allow use of the field year round with minimum maintenance; and WHEREAS, the Indefinite quality contract (IQC) process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects; and WHEREAS, at its regular meeting on February 21,2014,the Finance and City-Wide Projects Commission Committee (the "Committee") endorsed a recommendation by the Administration to utilize the IQC process for construction services to expedite the delivery of construction projects under$250,000, or for emergency projects as approved by the City Manager; and WHEREAS, the Committee's endorsement of the IQC process for small and emergency projects was approved by the City Commission on April 23, 2014; and WHEREAS, in an effort to meet the proposed completion goal of April 2016,to coincide with the commencement of the Spring Soccer Season, staff identified Shiff Construction Development, Inc. (Shim as a qualified contractor; and WHEREAS, on September 30, 2015, Shiff submitted a bid proposal utilizing the NJPA cooperative contract system, to include installation of drainage, grading, artificial turf, electrical conduits and restoration of surrounding sod and landscape areas; and WHEREAS,the total contract amount for the proposal submitted by Shiff was for$686,080, plus an owner's contingency, in the amount of$68,608, for a total of$754,688; and WHEREAS, staff analyzed the proposal submitted by Shiff and found it to be consistent with the cost of the recently completed Flamingo Park Football Field; and WHEREAS, the IQC proposal received exceeds the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award, requiring the approval of the City Commission to move forward with the completion of this project; and WHEREAS, the Administration recommends authorizing the City Manager to execute an agreement with Shiff for the Flamingo Park soccer field renovation, in the amount of$754,688. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby authorize the City Manager to execute an Agreement with Shiff Construction & Development, Inc., utilizing the existing National Joint Powers Alliance (NJPA) contract, for the renovation of the existing soccer field at Flamingo Park(the project), including drainage, grading, artificial turf, electrical conduits and restoration of surrounding sod and landscaped areas; said project having a budgeted cost of$686,080, plus a ten percent owner's contingency, in the amount of $68,608, for a total project cost of $754,688, with previously appropriated funding. PASSED AND ADOPTED this /y day of DG 64Y 2015. ATTEST: `� { r /div b /1 �, ......B F��/ .; AWE. GRANAD•, CITY CLE •.� ' .., 7RIP LE I , •YOR T:\A ENDA\2 15\October\CIP\Flamin o Park Sick F rl o .� � - APPROVED AS TO FORM & LANGUAGE r' ,&FOR EXE TION ofi H '7 'tuft-. volg0- r/L‘. ity Attor t, A; Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida,Authorizing The City Manager To Approve And Execute The Renovation Of The Existing Soccer Field With Artificial Turf For The Flamingo Park Master Plan Project Utilizing The Existing National Joint Powers Alliance(Njpa)Contract In The Amount Of$686,080 Plus Ten Percent Owner's Contigency In The Amount Of$68,608 For A Total Of$754,688 With Previously Appropriated Funding Key Intended Outcome Supported: Build and maintain priority infrastructure with full accountability. Supporting Data (Surveys, Environmental Scan, etc.): The 2014 Customer Satisfaction Survey indicated that over 77% of residents rated recently completed capital improvement projects as"excellent"or"good". Item Summary/Recommendation: On September 05, 2007, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg/Alvarez and Partners, Inc. (Consultant),for Professional Architecture and Engineering Services for the Flamingo Park Project. On March 27,2008 the Consultant was retained to prepare a master plan and provide for the detailed planning,design, permitting, bidding/ award and construction administration for the Project. The City Commission approved the Master Plan at its September 09,2009 meeting and the Basis of Design Report(BODR)was issued November 2009. The design and construction of the new tennis center was completed in June 2012 and the Football/Track and Field was completed in September 2013. In December 2013, the City Commission adopted Resolution No. 2014-28449 amending the professional services agreement with the Consultant to provide professional services associated with the design of the remaining Park improvements, which consist of a community garden, baseball field renovation, the Lodge building renovation, new park entrance features, enhanced pedestrian/ bike paths, a new interactive water feature, teenage activity, lighting enhancements, signage,drainage,landscaping and irrigation. The City of Miami Beach Parks and Recreation Department (Parks) carries out an intramural and a travel soccer program for children ages 5 through 16. These teams practice and play their home games at City Parks.The Flamingo Park Soccer Field is currently closed due to the poor condition of the field. Since there are no other regulation sized fields, the players are currently having to use the baseball outfield, the softball outfield and the football field at Flamingo Park when available. The loss of the soccer field at Flamingo Park has resulted in the team practices and games being displaced. The teams have also been utilizing the fields at Fairway Park and Normandy Isle Park but neither one of these fields is regulation size so they cannot be used to hold home games. The lack of capacity to carry out these programs has presented a hardship on the players,coaches and other park users as the use of the fields limits the use by other park patrons. On July 14,2015,Amendment No. 7 to the Agreement between Wolfberg/Alvarez and Partners, Inc.and the City of Miami Beach was executed for additional architectural and engineering services associated with the renovation of the existing soccer field, including replacement of sod with synthetic turf and site drainage in and around the field. As a result of the constant use of the soccer field, the City is unable to properly maintain the sod requiring annual sod replacement. The use of synthetic turf will allow use of the field year round with minor maintenance. The synthetic turf being specified is fabricated by the same manufacturer as the one recently installed at the Flamingo Football Field.Parks is very pleased with the characteristics of the synthetic turf material,the performance of the football field and its maintenance process. Through the NJPA process, two Contractors were identified to have the qualifications and experience in performing the required scope. Shiff Construction Development, Inc. (contractor) was responsive and on September 17, 2015, the City met with the contractor at the Flamingo Park soccer field site to identify the necessary scope for the project. On September 29, 2015, the Contractor submitted a bid proposal utilizing the NJPA cooperative contract system in the amount of$697,047 to include drainage, grading, artificial turf, electrical conduits and restoration of surrounding sod and landscape areas. Further discussions were held with the Contractor and on September 30,2015,a revised proposal was submitted in the amount of$686,080. The IQC proposal received exceeds the$250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award.Accordingly,approval is required to exceed the$250,000 project threshold limit in order to move forward with the completion of this project, and in an effort to meet the proposed completion goal of April 2016, to coincide with the commencement of the Spring Soccer Season.The total contract amount to be approved is$686,080, plus owner's contingency in the amount of$68,608,for a total of$754,688. The cost proposal submitted by the Contractor was analyzed and was found to be consistent with the cost of the recently completed Flamingo Park Football Field. The Administration recommends approval of the resolution. Advisory Board Recommendation: Financial Amount Account Information: Funds: 1 $754,688 305-2963-069357 SB Quality of Life Resort Tax Fund OBPI Total $754,688 Financial Impact Summary: N/A City Clerk's Office Legislative Tracking: David Martinez,Ext.6972 Sign-Offs: I �, Depart.jr nt Di law Assistant City Manager City M 19n DM me JR 1� ETC JLM A. T:AGENDA\2015\i�c••- \( '\FI-mango Park Soccer Field\FLPKMP-SUMMARY.docx trA 111 AGENaAO M � 7a MIAMI � to/ -1 DATE �/ I BE H City of Miami Beach, 1700 Convention Center Drive,Miami Beach,Florida 33139,www.miamibeachfl.gov COMMISSI• MEMORANDUM TO: Mayor Philip Levine and Members ;.f the City Co mission FROM: Jimmy Morales, City Manager DATE: October 14, 2015 SUBJECT: A RESOLUTION OF THE MAY•R AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPROVE AND EXECUTE THE RENOVATION OF THE EXISTING SOCCER FIELD WITH ARTIFICIAL TURF FOR THE FLAMINGO PARK MASTER PLAN PROJECT UTILIZING THE EXISTING NATIONAL JOINT POWERS ALLIANCE (NJ PA)CONTRACT IN THE AMOUNT OF$686,080 PLUS TEN PERCENT OWNER'S CONTIGENCY IN THE AMOUNT OF $68,608 FOR A TOTAL OF $754,688 WITH PREVIOUSLY APPROPRIATED FUNDING FUNDING $754,688 305-2963-069357 SB Quality of Life Resort Tax Fund ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution. BACKGROUND On September 05,2007, pursuant to Request for Qualifications(RFQ)No. 15-06/07,the Mayor and City Commission adopted Resolution No.2007-26609 approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg/Alvarez and Partners, Inc. (Consultant), for Professional Architecture and Engineering Services for the Flamingo Park Project. On March 27, 2008 the Consultant was retained to prepare a master plan and provide for the detailed planning, design, permitting, bidding /award and construction administration for the Project. The City Commission approved the Master Plan at its September 09,2009 meeting and the Basis of Design Report(BODR)was issued November 2009. The design and construction of the new tennis center was completed in June 2012 and the Football/Track and Field was completed in September 2013. In December 2013, the City Commission adopted Resolution No. 2014-28449 amending the professional services agreement with the Consultant to provide professional services associated with the design of the remaining Park improvements, which consist of a community garden, baseball field renovation, the Lodge City Commission Memorandum-Authorization To Use Existing NJPA Contract for Flamingo Park Soccer Field Renovation October 14, 2015 Page 2 of 3 building renovation, new park entrance features,enhanced pedestrian/bike paths,a new interactive water feature, teenage activity, lighting enhancements, signage, drainage, landscaping and irrigation. At the July 25,2014 Neighborhoods/Community Affairs Committee,Administration approached the committee with the opportunity to discuss the Flamingo Park Master Plan and presented options to continue as planned or revise the plan in order to incorporate elements that satisfy the current needs of the community.The Committee agreed with the Administration's recommendation for the Master Plan to include the renovation of the soccer and softball fields with artificial turf,among other things. ANALYSIS The City of Miami Beach Parks and Recreation Department(Parks)carries out an intramural and a travel soccer program for children ages 5 through 16. These teams practice and play their home games at City Parks. The Flamingo Park Soccer Field is currently closed due to the poor condition of the field. Since there are no other regulation sized fields, the players are currently having to use the baseball outfield,the softball outfield and the football field at Flamingo Park when available. The loss of the soccer field at Flamingo Park has resulted in the team practices and games being displaced. The teams have also been utilizing the fields at Fairway Park and Normandy Isle Park but neither one of these fields is regulation size so they cannot be used to hold home games. The lack of capacity to carry out these programs has presented a hardship on the players, coaches and other park users as the use of the fields limits the use by other park patrons. On July 14,2015,Amendment No. 7 to the Agreement between Wolfberg/Alvarez and Partners, Inc. and the City of Miami Beach was executed for additional architectural and engineering services associated with the renovation of the existing soccer field, including replacement of sod with synthetic turf and site drainage in and around the field. As a result of the constant use of the soccer field, the City is unable to properly maintain the sod requiring annual sod replacement.The use of synthetic turf will allow use of the field year round with minor maintenance.The synthetic turf being specified is fabricated by the same manufacturer as the one recently installed at the Flamingo Football Field. Parks is very pleased with the characteristics of the synthetic turf material, the performance of the football field and its maintenance process. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA)to the Gordian Group. Through the NJPA process, two Contractors were identified to have the qualifications and experience in performing the required scope. Shiff Construction Development, Inc.(contractor)was responsive and on September 17, 2015, the City met with the contractor at the Flamingo Park soccer field site to identify the necessary scope for the project. On September 29, 2015, the Contractor submitted a bid proposal utilizing the NJPA cooperative contract system in the amount of $697,047 to include drainage, grading, artificial turf, electrical conduits and restoration of surrounding sod and landscape areas. Further discussions were held with the Contractor and on September 30, 2015, a revised proposal was submitted in the amount of$686,080. The IQC proposal received exceeds the$250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award.Accordingly, approval is required to exceed the City Commission Memorandum-Authorization To Use Existing NJPA Contract for Flamingo Park Soccer Field Renovation October 14, 2015 Page 3 of 3 $250,000 project threshold limit in order to move forward with the completion of this project, and in an effort to meet the proposed completion goal of April 2016,to coincide with the commencement of the Spring Soccer Season. The total contract amount to be approved is $686,080, plus owner's contingency in the amount of$68,608, for a total of$754,688. The cost proposal submitted by the Contractor was analyzed and was found to be consistent with the cost of the recently completed Flamingo Park Football Field. CONCLUSION The Administration recommends the approval of the resolution. Attachment P Shiff Cons , ctr%!Development Inc. Proposal JM/ETC/J F:\T Drive\AGENDA\2015\October\CIP\Flamingo Park Soccer Field\Commission Memo_FLPKMP Soccer.doc Job Order Contract Proposal Review Summary - CSI Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Contractor: FLO6-022912-SCD-Shiff Construction&Development,Inc. Proposal Value: $686,079.50 Proposal Name: Flamingo Park Soccer Field Proposal Submitted: 09/30/2015 01 -General Requirements: $60,996.27 03-Concrete: $1,776.77 06-Wood,Plastic,and Composites: $2,737.76 22-Plumbing: $1,523.60 23-Heating,Ventilating,And Air-Conditioning(HVAC): $27,918.40 26-Electrical: $20,845.17 31 -Earthwork: $77,639.95 32-Exterior Improvements: $388,691.09 33-Utilities: , $103,950.49 Proposal Total $686,079.50 This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the or000sal total is due to roundina of the line totals and sub-totals The Percent of NPP on this Proposal: 0.00% Proposal Review Summary-CSI Page 1 of 1 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.pdffactory.com Job Order Contract Proposal Review Detail - CSI Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Contractor: FLO6-022912-SCD-Shiff Construction&Development,Inc. Proposal Value: $686,079.50 Proposal Name: Flamingo Park Soccer Field Proposal Submitted: 09/30/2015 Rec# CSI Number Mod. UOM Description Line Total 101 -General Requirements • 1 01 22 16 00-0002 EA Reimbursable Fees Reimbursable Fees will be paid to the contractor for the $14,242.93 actual cost of all permits,without mark-up,for which a receipt or bill is received.The Adjustment Factor applied to Reimbursable Fees will be 1.0000.The labor cost involved in obtaining all permits is in the Adjustment Factor.The base cost of the Reimbursable Fee is$1.00.The quantity used ' will adjust the base cost to the actual Reimbursable Fee(e.g.quantity of 125 =$125.00 Reimbursable Fee).If there are multiple Reimbursable Fees,each one shall be listed separately with a comment in the"note"block to identify the Reimbursable Fees(e.g.sidewalk closure,road cut,various permits, extended warrantee,expedited shipping costs,etc.).A copy of each receipt shall be included with the Proposal. Quantity Unit Price Factor Total Installation 13,436.73 x 1.00 x 1.0600 = $14,242.93 Contractors Note: Bond Fee on 671,836.57 Categoryl: Bond Fee 2 01 22 20 00-0010 HR Electrician Tasks in the CTC include appropriate costs to cover labor.These $4,082.90 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 80.00 x 42.41 x 1.2034 = $4,082.90 Contractors Note: (2)electrician from Musco Lighting 1 week for work required on plan. Categoryl: Electrical 3 01 22 23 00-0372 MO 1-3/4 CY,30"Bucket,18'-0"Deep,112 HP,Loader-Backhoe With Full-Time $13,855.07 Operator Quantity Unit Price Factor Total Installation 1.00 x 11,513.27 x 1.2034 = $13,855.07 Contractors Note: Loader to facilitate all work on-site. Categoryl: Drainage&Base Work 4 01 71 13 00-0003 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Tractor $518.42 Trailer With Up To 53'Bed For equipment such as bulldozers,motor scrapers,hydraulic excavators,gradalls,road graders,loader-backhoes, heavy duty construction loaders,tractors,pavers,rollers,bridge finishers, straight mast construction forklifts,telescoping boom rough terrain construction forklifts,telescoping and articulating boom manlifts with>40' boom lengths,etc. Quantity 'Unit Price Factor Total Installation 1.00 x 430.80 x 1.2034 = $518.42 Categoryl: Drainage&Base Work Proposal Review Detail -CSI Page 1 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.pdffactorv.com Proposal Review Detail-CSI Continued.. Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Rec# CSI Number Mod. UOM Description Line Total 101 -General Requirements I 5 01 71 23 16-0006 HR 3 Person Survey Crew(Unit Of Measure Is Per Crew Hour Worked)Includes $3,390.31 surveyor,rodman,chainman,equipment and instruments. Quantity Unit Price Factor Total Installation 16.00 x 176.08 x 1.2034 = $3,390.31 Contractors Note: For layout and laser grading. Categoryl: Drainage&Base Work 6 01 74 19 00-0025 CY Excavated Dirt Landfill Dump Fee $19,095.54 Quantity Unit Price Factor Total Installation 1,123.00 x 14.13 x 1.2034 = $19,095.54 Contractors Note: 1021 cy excavated fill+10%swell factor removed and disposed. Categoryl: Drainage&Base Work 7 01 74 19 00-0029 CYM Hauling On Paved Roads,First 15 Miles $5,811.10 Quantity Unit Price Factor Total Installation 11,230.00 x 0.43 x 1.2034 = $5,811.10 Contractors Note: 1,123*10 miles Categoryl: Drainage&Base Work Subtotal for 01 -General Requirements: $60,996.27 103-Concrete 8 03 21 11 00-0006 TON Grade 60 Reinforcing Steel,Footings And Slabs,#346 $1,776.77 Quantity Unit Price Factor Total Installation 0.79 x 1,868.93 x 1.2034 = $1,776.77 Contractors Note: (2)#5 rebar continuous.766'2=1,532LF,1.043lbs/ft=1,597 Ibs/2000=.79 tons Categoryl: Drainage&Base Work Subtotal for 03-Concrete: $1,776.77 06-Wood, Plastic,and Composites 9 06 11 16 00-0147 LF 2"x 4"Pressure Treated Wood Blocking To Concrete $2,737.76 Quantity Unit Price Factor Total Installation 766.00 x 2.97 x 1.2034 = $2,737.76 Contractors Note: PT 2x4 nailed to concrete curb at perimeter.766LF Categoryl: Drainage&Base Work Subtotal for 06-Wood,Plastic,and Composites: $2,737.76 [22-Plumbing 10 22 13 29 33-0011 EA 24"Diameter x 30"High Fiberglass Basin And Lid With Inlet And Hub $1,523.60 Quantity Unit Price Factor Total Installation • 4.00 x 316.52 x 1.2034 = $1,523.60 Contractors Note: Used at the corners.Volume is same as on plans as 12"diam,4'7"height basin. Categoryl: Drainage&Base Work Subtotal for 22-Plumbing: $1,523.60 [23-Heating,Ventilating,And Air-Conditioning(HVAC) Proposal Review Detail -CSI Page 2 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.pdffactory.com • Proposal Review Detail-CSI Continued.. Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Rec# CSI Number Mod. UOM Description Line Total 23-Heating,Ventilating,And Air-Conditioning(HVAC) 11 23 13 23 13-0211 EA 200%Containment Double Wall Sealed Top Basin For 1000 Gallon Tank $27,918.40 Quantity Unit Price Factor Total Installation 2.00 x 11,599.80 x 1.2034 = $27,918.40 Contractors Note: (2)1,000 gallon capacity drainage structures at wells. Categoryl: Drainage&Base Work Subtotal for 23-Heating,Ventilating,And Air-Conditionir $27,918.40 [26-Electrical 12 26 05 33 13-1368 EA 2"PVC Schedule 40 Adapter,Direct Burial,Glued Coupling $10,409.41 Quantity Unit Price Factor Total Installation 1,250.00 x 6.92 x 1.2034 = $10,409.41 Contractors Note: New 2"Sched 40 conduit installed underground. Categoryl: Electrical • 13 26 05 33 16-0292 EA \ 24"x 24"x 10"Cast Iron Pull Box With Cover $10,435.76 Quantity Unit Price Factor Total Installation 10.00 x 828.76 x 1.2034 = $9,973.30 Demolition 6.00 x 64.05 x 1.2034 = $462.47 Contractors Note: Install(10)13"x24"pull boxes.Demo(6)existing Categoryl: Electrical r - Subtotal for 26-Electrical: $20,845.17 131 -Earthwork 14 31 05 16 00-0003 CY #4 Stone Aggregate Fill(3/4"To 1-1/2"Clean) $21,060.22 Quantity Unit Price Factor Total Installation 530.00 x 33.02 x 1.2034 = $21,060.22 Contractors Note: 4"Base rock-43,344sf*.33=530cy Categoryl: Drainage&Base Work 15 31 05 16 00-0005 CY #6 Stone Aggregate Fill(3/8"To 3/4"Clean) $11,337.98 Quantity Unit Price Factor Total Installation 257.00 x 36.66 x 1.2034 = $11,337.98 Contractors Note: 2"finish stone,43,344sf*2"=257cy Categoryl: Drainage&Base Work 16 31 05 16 00-0007 CY #57 Stone Aggregate Fill(#4 To 1") $12,182.84 Quantity Unit Price Factor Total Installation 262.00 x 38.64 x 1.2034 = $12,182.84 Contractors Note: #57 stone used in exfiltration trench.766LF,3'wide,3'deep;255CY+3%for compaction Categoryl: Drainage&Base Work 17 31 05 16 00-0026 CY Aggregate Placement Includes Spreading,Grading,Compaction Rolling $23,671.80 Quantity Unit Price Factor Total Installation 1,057.00 x 18.61 x 1.2034 = $23,671.80 Contractors Note: Placement and compaction of 6"of stone at field(43,344sf*6"=802sy),and 3'of#57 stone at trench (7661f*3'x3'=255cy)-Total-1,057cy Categoryl: Drainage&Base Work Proposal Review Detail -CSI Page 3 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.Ddffactory.com Proposal Review Detail-CSI Continued.. Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Rec# CSI Number Mod. UOM Description Line Total 31 -Earthwork 18 31 23 16 33-0018 SY Compaction of Fill or Subbase for Bulk Excavation by Machine Per Lift $1,738.67 Quantity Unit Price Factor Total Installation 4,816.00 x 0.30 x 1.2034 = $1,738.67 Contractors Note: Compact subgrade once 6"of fill removed.43,344/9=4816;compaction of aggregate in aggregate placement line item. Categoryl: Drainage&Base Work 19 31 23 16 36-0007 CY Excavation For Building Foundations And Other Structures By Hydraulic $5,086.70 Excavator,Backhoe,Loader in Loose Rock Quantity Unit Price Factor Total Installation 1,021.00 x 4.14 x 1.2034 = $5,086.70 Contractors Note: Excavate 6"for whole field.43,344SF=802cy;excavate for trench drain-766LF*3'wide x 3'deep=255 cy Categoryl: Drainage&Base Work 20 31 23 23 23-0002 MGL Compaction Water,Water Truck And Operator Use this task in situations $2,561.74 where fill,base material,etc.requires additional moisture to comply with the compaction specification.Includes delivery up to 15 miles.(Per 1000 Gallons)See CSI section 01 22 23 00-1163 for water truck when water is available on site. Excludes Quantity Unit Price Factor Total Material Installation 25.00 x 85.15 x 1.2034 = $2,561.74 Contractors Note: Water to clean#57 stone-Labor only Categoryl: Drainage&Base Work Subtotal for 31 -Earthwork: $77,639.95 32-Exterior Improvements 21 32 16 13 13-0002 LF 6"X 12"Cast In Place Concrete Curb $6,295.92 Quantity Unit Price Factor Total Installation 766.00 x 6.83 x 1.2034 = $6,295.92 Contractors Note: Curbing around field Categoryl: Drainage&Base Work 22 32 16 13 13-0002 Mod LF For>500 To 1000,Deduct $-801.97 Quantity Unit Price Factor Total Installation 766.00 x -0.87 x 1.2034 = $-801.97 Contractors Note: Categoryl: Drainage&Base Work 23 32 18 23 29-0008 EA Soccer,Lacrosse,Softball Or Field Hockey Markings For AstroTurf® $8,070.67 GameDay Grass M MT 38 Fields Per sport. Quantity Unit Price Factor Total Installation 2.00 x 3,353.28 x 1.2034 = $8,070.67 Contractors Note: Striping for 6v6 and 8v8 on Field Turf. Categoryl: Turf Field 24 32 18 23 29-0117 SF Drainage Layer For G9 Synthetic Turf Used for drainage over asphalt or on $125,184.41 roof tops. Quantity Unit Price Factor Total Installation 43,344.00 x 2.40 x 1.2034 = $125,184.41 Contractors Note: Task used for 2,000 LF of 12"ADS Advanedge drainage piping installed in middle of base rock.See plan sheet C.2. Categoryl: Drainage&Base Work Proposal Review Detail -CSI Page 4 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.Ddffactory.com Proposal Review Detail-CSI Continued.. Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Rec# CSI Number Mod. UOM Description Line Total 132-Exterior Improvements 25 32 18 23 29-0135 SF 2.5"Height,Concave And Rigid Monofilament Fiber,Polyethylene Synthetic $244,109.59 Turf With Rubber/Sand Infill(FieldTurf Revolution)Excludes preparation of sub-base,grooming,sports lines and logos. Quantity Unit Price Factor Total Installation 43,344.00 x 4.68 x 1.2034 = $244,109.59 Contractors Note: FieldTurf field as specified.New version is Revolution 360. Categoryl: Turf Field 26 32 91 13 26-0023 SY Filter Fabric Weed Barrier $5,832.47 Quantity Unit Price Factor Total Installation 5,326.00 x 0.91 x 1.2034 = $5,832.47 Contractors Note: Turf field 43,344SF+perimeter at both sides of trench-766LF*3'x2=4,596SF;Total=47,940SF/9=5,326 Categoryl: Drainage&Base Work Subtotal for 32-Exterior Improvements: $388,691.09 133-Utilities 27 33 01 30 72-0057 LF 12.75"O.D.HDPE Culvert Liner DR 32.5 $28,354.70 Quantity Unit Price Factor Total Installation 766.00 x 30.76 x 1.2034 = $28,354.70 Contractors Note: 12"HDPE pipe around field Categoryl: Drainage&Base Work 28 33 21 00 00-0005 EA Well Drilling Mobilization And Demobilization,>12"To 24"Diameter Wells $719.06 Quantity Unit Price Factor Total Installation 1.00 x 597.52 x 1.2034 = $719.06 Categoryl: Well 29 33 21 00 00-0017 LF 24"Water Well Hole Drilled In Normal Soil,Sand,Gravel,O.B. $24,898.35 Quantity Unit Price Factor Total Installation 200.00 x 103.45 x 1.2034 = $24,898.35 Contractors Note: (2)Wells drilled 100'total each.Soil estimated at sand.If found to be rock,shall be additional to contract. Categoryl: Well For>100 To 250 Add $311.68 30 33 21 00 00-0017 Mod LF $ Quantity Unit Price Factor Total Installation 100.00 x 2.59 x 1.2034 = $311.68 Contractors Note: Categoryl: Well 31 33 21 00 00-0058 LF 24"Diameter,Steel Well Casing,Flush $36,465.43 Quantity Unit Price Factor Total Installation 200.00 x 151.51 x 1.2034 = $36,465.43 Contractors Note: (2)wells drilled 100'per well Categoryl: Well 32 33 21 00 00-0058 Mod LF For>100 To 250,Deduct $-984.38 Quantity Unit Price Factor Total Installation 200.00 x -4.09 x 1.2034 = $-984.38 Contractors Note: 2 wells,100'deep each. Categoryl: Well Proposal Review Detail -CSI Page 5 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.pdffactory.com Proposal Review Detail-CSI Continued.. Date: September 30,2015 Work Order#: 035487.00 Title: Flamingo Park Soccer Field Rec# CSI Number Mod. UOM Description Line Total 33-Utilities , 33 33 21 00 00-0092 LF 24"Stainless Steel Well Screen $835.30 Quantity Unit Price Factor Total Installation 4.00 x 173.53 x 1.2034 = $835.30 Contractors Note: Well screen on 24"diam well steel casing 2'per each. Categoryl: Well 34 33 21 00 00-0118 HR Develop Well $8,269.76 Quantity Unit Price Factor Total Installation 32.00 x 214.75 x 1.2034 = $8,269.76 Contractors Note: 2 days(16 hours each)per well to remove spoils. Categoryl: Well 35 33 39 13 00-0156 EA 24"Diameter x 350 LB Watertight Manhole Cover With Frame $1,974.71 Quantity Unit Price Factor Total Installation 2.00 x 820.47 x 1.2034 = $1,974.71 Contractors Note: (2)24"USF 3177-5640 ring and grate at drainage structure. Categoryl: Well 36 33 39 13 00-0159 EA 32"Diameter x 575 LB Watertight Manhole Cover With Frame $2,578.55 Quantity Unit Price Factor Total Installation 2.00 x 1,071.36 x 1.2034 = $2,578.55 Contractors Note: (2)34"USF 120 U Ring and cover at drainage structure. Categoryl: Well 37 33 41 13 00-0324 LF 12"Coupled,Single Wall,Corrugated HDPE Pipe $277.65 Quantity Unit Price Factor Total Installation 28.00 x 8.24 x 1.2034 = $277.65 Contractors Note: 12"non perforated pipe at 4 corners.from grate down and to drain basin at 2 locations.estimated at 2' down.2'x4=8'.+10'to each drain structure.2 each Categoryl: Drainage&Base Work 38 33 41 13 00-0433 EA 12"Coupling,Corrugated HDPE Pipe $249.68 Quantity Unit Price Factor Total Installation 38.00 x 5.46 x 1.2034 = $249.68 Contractors Note: Every 20'-766/20' Categoryl: Drainage&Base Work Subtotal for 33-Utilities: $103,950.49 Proposal Total $686,079.50 This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the or000sal total is due to roundina of the line totals and sub-totals • The Percent of NPP on this Proposal: 0.00% Proposal Review Detail -CSI Page 6 of 6 9/30/2015 The Gordian Group Official Webs Feedback on this Report by Email PDF created with pdfFactory trial version www.odffactory.com