Loading...
Amendment No. 10 to the Agreement with Fentress Architects in the amount of $15,000 C9 tilli—c2YS-3g AMENDMENT NO. 10 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$15,000 • This Amendment No. 10 to the Agreement made and entered thisd7 day of - ►_ 2015, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 — Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom,junior ballrooms, and meeting rooms, in the amount of$179,982; and • WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400; and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of$ $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project; and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for certain Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; 1 , WHEREAS, on May 28, 2015., Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of$15,156,359.00; and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, this Amendment No. 10, is for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the total amount of$15,000; and NOW, THEREFORE the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and,correct and are incorporated as a part of this Amendment No. 10. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-10", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 10. • IN WITNESS WHEREOF;the partie. hereto have caused this Amendment No. 10 to be executed in their names by their duly authoriz-, P=' a s % e date first set forth above. I . ATTEST: 4; 1 OF MIAMI '`��� CH `777 Granado INCORP QRATED. �"•i " y L. ,ra1 s r/ City Clerk 'a C r,' anagz ATTEST : Qi 2� )7dCON\' ULTANT: j .. F ARCHITEC S S i ,gair,Signa •re: , Signature /04-1bJ t 0,X-I CATS W•R,N1'rtSS, Pr `druE a-Ce0 Print Name/Title Print Name/Title 5PWE QIf APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION gP i 2 ---surhm..L _. City Att•drr p Date Appendix"A-10" 1. SCOPE OF SERVICES Refer to Exhibit"1"attached herein. 2. TIME OF COMPLETION Concurrent with completion of construction documents phase. 3. PAYMENT AND COMPENSATION Parapet Analysis: $10,000 (lump sum fee) Consultation Services: $ 5,000 (hourly not to exceed) Total: $15,000 Payment will be deducted from the Owner's Contingency Allowance. Summary Project Contingency Total Contract $10,967,200 $1,096,720 $12,063,920 Amendment 1 -Scope change 0 0 Amendment 2 -Civil 41,079 -41,079 0 Amendment 3 -BR change 179,982 -179,982 0 Amendment 4-Stormwater/Website/Animation 76,605 -76,605 0 Amendment 5—DD/Partial CD 2,442,400 0 2,442,400 Amendment 6—Wind/roof 117,200 -117,200 0 Amendment 7-Deductive -3,129,259 -96,720 -3,225,979 Amendment 8 -CD/CA 15,156,359 15,156,359 Amendment 9-Commissioning -302,876 0 Amendment 10—Parapet Analysis -15,000 0 $25,851,566 $267,258 $26,436,700 1 EXHIBIT 1 FENTR�ESy�S fi ?r fentressarchitects.com September 4,2015 September 21,2014 rev 01 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 11 —Parapet Study&Wind Consultation Project 20140021.001 A10,All. Dear Mr.Morales: This proposal is for the Design Team to conduct a parapet study for the above referenced project. Front and back surfaces of the parapets for the Miami Beach Convention Center are independent assemblies. With this study, the cladding pressures presented in the RWDI cladding report will be modified to independent positive and negative wind pressures acting on each face. This additional study should reduce the applicable wind pressures on the curtain wall and reduce project costs.The work proposed is in addition to the scope outlined on Amendment#7 and will include the following services: Scope of Services: • Parapet Analysis(Lump Sum$10,000): o Refine analysis to find the wind pressures on the front side of the parapet removing the net Y p p p removing pressures; o Refine assessment of incoming profiles to reduce final pressures; o Review internal pressures in order to reduce the pressure for the hot spots; o Present an additional set of parapet loads for the glazing design; o Back structural surface of the parapet will use the current pressures from the report with the corresponding sign. • Consultation Services(Hourly Not To Exceed$5000): o Conference calls with subcontractors; o Respond to questions for clarifications; o Additional analysis to refine results based on requests from the construction team; o Perform checks of the results using alternate methodology if requested. These services are anticipated to take two to three weeks after the City's approval and notice to proceed. Reimbursable costs for printing,telephone,delivery and travel are included in the Lump Sum fee. Billings for parapet study services will be invoiced under the heading #20140021.001 Parapet Wind Study. Billings for consultation services will be invoiced under the heading#20140021.001 Wind Loading Consultation. DEN > = 1 2 ? .'S! J : I J? C 1 i 3 22 5 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 11 —Parapet Study&Wind Consultation September 4,2015 September 21,2015 rev0l Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Cohn Kud ry cki,AI. ,L • AP BD+C Associate Principal encl: Fee Summary dated September 4,2015 RWDI proposal RWDI Schedule of Fees c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Anne McNeely Fentress Architects Annie Goodwin,Fentress Architects Recommend approval: c707?4) f_/C)-L1-) • Project: Parapet Wind Study Miami Beach Convention Center 9/4/1 5 Discipline Firm Name Firm Fee Number Project Management Fentress Architects 1 $800 00 Architecture Fentress Architects 1 $0.00 Interior Design Fentress Architects 1 $0.00 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0.00 Civil/Utility Engineering Kimley-Horn 6 $0.00 Landscape West 8 7 $0.00 Structural Engineering Wallace Engineering 8 $0.00 Vertical Transportation Lerch Bates 12 $0.00 Fire Protection Jensen Hughes 13 $0.00 Plumbing Engineering ME Engineers 14 $0.00 Mechanical Engineering ME Engineers 15 $0.00 Electrical Engineering ME Engineers 16 $0.00 Lighting Design ME Engineers Illume 18 $0.00 Info Technology DL Adams 19 $0.00 Security Systems DL Adams 20 $0.00 AV Systems DL Adams 21 $0.00 Acoustics DL Adams 22 $0.00 Commissioning Spinnaker 24 $0.00 Food Service Caruso 25 $0.00 Traffic Corradino 27 $0.00 Graphics and Signage TKD 28 $0.00 Parking Consultation Walker Parking 29 $0.00 Cost Estimate RLB 35 $0.00 Hardware Consultation Allegion 37 $0.00 Wind Engineer RWDI (Parapet Study) $9,200.00 Wind Engineer RWDI (Consultation NTE) $5,000.00 Subconsultants Subtotal $14,200.00 Expenses $0.00 Fentress Fees Subtotal $800.00 Design Consultant Fees Total $15,000.00 Parapet Wind Study Fentress Project No. 20140021 09/04/15 i�' :``W i' John Kudrycki AIA,LEED AP BD+C [� "�•:-- 6; *4 Associate Principal E. Fentress Architects r-l-R 6 ,, ;° 421 Broadway w " Denver,CO 80203 h :-'�,`1 Aki,`.-:A- Direct: 303.282.6099 ; i: $ ` - Mobile: 303.378 4450 Tel: 303.722.5000 CONSULTING ENGINEERS fentressarchitects.com $SCIENTISTS Miami Beach Convention Centre — Additional Services RWDI Reference No. 1501796P2C2 As requested on RFI 43, since the front and back surfaces of the parapets for the Miami Beach Convention Center are independent assemblies, the cladding pressures presented in our cladding report need to be modified to independent positive and negative wind pressures acting on each face. After a conference call with the architect and cladding contractor where we discussed the cladding report dated July 25th, this is the reanalysis we would hate to follow in order to provide the cladding pressures as requested: ,•`. - Refine analysis to find the wind pressures on the1front side ,;he parapet removing the net pressures y.,_ - Refine assessment of incoming profiles to re-k. e,,fl: pressures - Review internal pressures in order t®r-.ey ce the '. sure for the hot spots - Present an additional set of parapet loan s ®. 'fe4lazing design, - Back structural surface oft= e pa a et wt!', se the current pressures from the report with the corresponding sign. "� �� v�,: ,x,.,)::„. With this document, weau# riz �`'Tkowan Williams Davies & Irwin Inc. (RWDI) to do the additional analysis men ed `"=',ore`f' he Miami Beach Convention Center. The schedule and feets•ab,complet°1:his work is as follows: Base Studies Firm Price Schedule (USD) Approved Additional Analysis and Blocks update of the cladding Pressures on the Parapets $9,200 2 to 3 weeks ❑ This letter of agreement constitutes the entire agreement. No other agreement shall take precedence unless agreed to by both parties in writing. Reputation Resources Results Canada I. USA I UK I India I China I Hong Kong I Singapore www.rwdi.com Tel: 519.823.1311 4.; Fax: 519.823-1316 Rowan Williams Davies&Irwin Inc. 650 Woodlawn Road West Guelph,Ontario,Canada N 1 K 1B8 CONSULTING ENGINEERS &SCIENTISTS SCHEDULE OF FEES Hourly Rate Principal/Project Director $300.00 Senior Project Manager $225.00 , Project Manager $150.00 Engineering Specialist $225.00 Senior Engineer $150.00 Project Engineer $125.00 Technologist $110.00 Modeller $110.00 Administrative Assistant $75.00 Wind Tunnel $400.00 Water Flume $150.00 • Expenses cost plus 10 percent Taxes not included This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or confidential.If you have received this in error,please notify us immediately. ®RWDI name and logo are registered trademarks in Canada and the United States of America Reputation Resources Results Canada I USA I UK I India I China I Hong Kong I Singapore www.rwdi.com I