Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
LTC 440-2015 SR I-195 Julia Tuttle Causeway Over the Intracoastal Waterway Rehab Project
MIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC# 440-2015 LETTER TO COMMISSION TO: Mayor Philip Levine and Members of a City Commi sion FROM: Jimmy L. Morales, City Manager DATE: November 10, 2015 SUBJECT: SR 1-195/JULIA TUTTLE CAUSEW OVER THE INTRACOASTAL WATERWAY REHABILITATION PROJECT The purpose of this Letter to Commission (LTC) is to provide information regarding the above referenced Florida Department of Transportation (FDOT) project and, in particular, upcoming nightly closures of up to two (2) eastbound and up to two (2) westbound lanes on the Julia Tuttle Causeway from Tuesday, November 10th through Tuesday, November 24th, between the hours of 11:00 PM and 5:00 AM. As part of this project, the FDOT contractor is scheduled to work on bridge joint repairs. During this time, the outside shoulders will remain open at all times to provide access for bicyclists. FDOT Construction Office will coordinate with SunGuide to display advance notification on overhead Dynamic Message Signs as well as with FDOT Public Information Office to provide updates via social media. The City will disseminate notifications via electronic distribution, social media, and all City's media channels. Please feel free to contact me if you have any questions. Attachment: FDOT Project Fact Sheet 1 0 J.F D. KGB/J RG/J FD/M M F:\TRAN\$ALL\Milos Majstorovic\LTC\LTC SR 1-195 Julia Tuttle Causeway Over The Intracoastal Waterway Rehabilitation Project Nightly Lane Closures I-195/Julia Tuttle Cswy: I-195/Julia Tuttle Cswy Page 1 of 2 Centennial FloldAlM659it of 1 SR 1121Airport Expressway/interstate 195 915 2015 Construction Mon 11-09-2015 to Tue 11-2tp gates I FL511 I Mobile I Site Map TRANSPORrATIOmastbound lanes 1 61A/,y;&�uttle Causeway ove trig Intraco; South Florida Roads Home About FDOT Contact Us Maps and Data Offices Performance Projects (Miami-Dade and Monroe Counties) SFL Roads/Projects/Current Projects-Expressways 1-195/Julia Tuttle Cswy FIN:431193-1-52-01 Project Resources Welcome The Florida Department of Transportation(FDOT)has begun a bridge rehabilitation project on the Documents and Publications 1--195/Julia Tuttle Causeway bridge over the Intracoastal Waterway in Miami-Dade County. E-Mail Updates WORT(TO BE PERFORMED: • Repairing the concrete and steel of the bridge Feedback Installing new pavement markings • Painting the bridqe Contact Us LANE CLOSURES AND DETOUR INFORMATION: To do this work safely,it will be necessary to close travel lanes at times.Lane closures will occur only Lane Closures during non-peak hours on non-event days,nights and weekends as scheduled below. Take Our Survey Non-peak hours for single-lane closures are: • 10 p.m.to 6 a.m.,Sunday through Thursday 12 a.m.to 9:30 a.m.,Fridays and Saturdays Non-peak hours for dual-lane closures are: • 11 p.m.to 6 a.m.,Sunday through Thursday • 1 a.m.to 7:30 a.m.,Fridays and Saturdays Project At-A-Glance Centennial Start Date smac February 2015 Est.Completion date February 2016 Construction Cost r $3,722,164 View onMap Lengths and Limits 1-195/Julia Tuttle Causeway bridge over the Intracoastal Waterway FDOT North Miami-Dade Resident Engineer Ivan Hay, P.E. FDOT Project Manager Joan M. Fabian,P.E Senior Project Engineer Jose E.Morales,P.E. Bolton Perez&Associates Contractor Monoko,LLC Public Information Sergies Duarte Quest Corporation of America, Inc. O:(305)640-7462 C:(305)216-3617 Sergies.Duarte @dot.state.fl.us http://www.fdotmiamidade.com/current-projects/expressways/i-195julia-tuttle-cswy-l.html 11/9/2015 I-195/Julia Tuttle Cswy: I-195/Julia Tuttle Cswy Page 2 of 2 Contact Us Emplovment MYRANEcObOSUREBance Statement of Aqencv Web Policies&Notices ........... ...... .. ......... .. _ _._. ........ 1 SR 112/Airport Expressway/interstate 195 �tion Florida Department of Transportation ©1996-2015 Florida Department of Transport Construction Mon 11-09-2015 to Tue 11-24-2015 consistent,Predictable,Repeatable Up to two westbound and eastbound lanes on 1-195/Julia Tuttle Causeway over the Intra= between 11 p.m.and 5 a.m. The outside`sh'oulder will'be av A 151e'to'btcyc tsts`at a times. ......... ._ ._....._ ......... _..._.. .. ..... . ........ ......._ _..........._...._._ ........._..... ................... .... http://www.fdotmiamidade.com/current-projects/expressways/i-195julia-tuttle-cswy-l.html 11/9/2015