2015-3979 Ordinance LAND DEVELOPMENT AND PERMITTING FEES
ORDINANCE NO 2015-3979
AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AMENDING THE CODE OF THE
CITY OF MIAMI BEACH, FLORIDA, AMENDING APPENDIX A, "FEE
SCHEDULE" TO REVISE BUILDING, FIRE, PLANNING, AND PUBLIC
WORKS FEES CHARGED FOR SERVICES RELATED TO LAND
DEVELOPMENT AND PERMITTING; PROVIDING FOR REPEALER,
SEVERABILITY, CODIFICATION, AND AN EFFECTIVE DATE.
WHEREAS, the City of Miami Beach has the authority to enact laws which promote the
public health, safety and general welfare of its citizens; and
WHEREAS, the City Code of Ordinances contains fees for development review,
permitting, and other services to cover the costs of implementing the regulations
contained therein; and
WHEREAS, the City Administration has reviewed the structure of fees
associated with land development and permit review and determined a more efficient,
effective and transparent way to asses fees for these services is necessary; and
WHEREAS, in an effort to align revenues to the incurred costs of review for land
development and permitting services a modification to the fees assessed for such
services is warranted; and
WHEREAS, the amendments set forth below are necessary to accomplish the above
objectives.
NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA:
SECTION 1.
That Appendix A "Fee Schedule", is hereby amended as attached in "Exhibit A."
SECTION 2. REPEALER.
All ordinances or parts of ordinances and all section and parts of sections in conflict
herewith be and the same are hereby repealed.
SECTION 3. CODIFICATION.
It is the intention of the City Commission, and it is hereby ordained that the provisions of
this ordinance shall become and be made part of the Code of the City of Miami Beach as
1
amended; that the sections of this ordinance may be renumbered or relettered to accomplish
such intention; and that the word "ordinance" may be changed to "section" or other appropriate
word.
SECTION 4. SEVERABILITY.
If any section, subsection, clause or provision of this Ordinance is held invalid, the
remainder shall not be affected by such invalidity.
SECTION 5. EFFECTIVE DATE.
This Ordinance shall take effect on April 1, 2016 following adoption.
I
PASSED and ADOPTED this Cf day of Dec (4 ,be( , 21* .
,- 7
ATTEST:
/
Philip Levine a
P ay f7
i2- 15 I _ 1 Bic '. J
Rafa E. Grana•, City Clerk _��P••.••••"" ..'9 i0 A'PPROVED AS TO\i....4:• %' FORM AND LANGUAGE
3 : ...., ,,.0 & FOR EXECUTION
g * :
1 :INCORP ORATED:-
9,4 :. ' r) City Attorney Date
First Reading: October 14, 2015 41 -� =
Second Reading: December 9, 2015 4,;r�'b 0 �'; '� "
lier
Underscore denotes new language
Striketh-rough denotes deleted language
[Sponsored by Commissioner Joy Malakoff]
T:\AGENDA\2015\December\PLANNING\Land Development Fees-Appendix A-2nd Reading ORD.docx
2
"EXHIBIT A"
APPENDIX A- FEE SCHEDULE
FEE SCHEDULE
This appendix includes all fees and charges established by the city commission that are referred to
in the indicated sections of the Code of Ordinances:
Section
Description Amount
this
Code
Subpart A.General Ordinances
Chapter 2.Administration
Article V. Finance
2-277 Fee for dishonored checks $20.00
Or 5%of face amount of check
Article VII.Standards of Conduct
Division 3. Lobbyists
2-
482(a) a Registration fee 25.00
2-482(f) Biennial registration 125.00
Chanter F_Alcoholic Bever+ges
Article I. In General
.
62(a)
Chapter 14. Building Regulations Part I
Article II.Construction Standards
Page 1
- 1
Division 1.Generally
14-
-Delinquency penalty for violation of article:
33(b)
First month,1.0%
Subsequent months, 5%
Hearing requested by aggrieved owner/applicant for denial Of certificate of use,
14-37 F determination of fees/penalties due,and/or warning of-potential 75.00
suspension/revocation
Amount
Section (Effective
this Code Description June 2,
2014)
-Division 2. Permit Fees
-Doubleiees=for starting work prior to issuance of permit, plus the following
14-61(b)
penalty:
? 000
First offense
100.00
= 0
Second offense
250.00
59.7:00
Subsequent offenses
1-000.00
14-61(c)(1) --Reinspection fee:
Incompliance with F.S§553.80(2)(c),any subsequent reinspection after
the first reinspection shall be charged four times the cost of first inspection
or first reinspection,whichever is greater.The cost of inspections is
Page-2
calculated based on the actual time spent by the inspector multiplied by
the inspection fee hourly rate,as specified in subsection 14-61-(g44).The
actual time of inspection is rounded up to the hour. segment.
First reinspection 0.00
Second and subsequent reinspection(s): Based on four times the cost of
first inspection or first reinspection,whichever is greater at a rate pursuant
to 14-61 (g)
Reinspection of existing building to determine compliance with the
applicable Building Code: Based on four times the cost of first inspection or
first reinspection,whichever is greater.The cost of inspections is calculated
based on the actual time spent by the inspector multiplied by the
inspection fee hourly rate,as specified in subsection 14-61(g).The actual
time of inspection is rounded up to the hour.
14-61(d) Lost plans fee: -
Administrative processing fee 50.00
Plus the cost per page reproduced:
• Letter(8%2 x 11), Legal (8%2 x 14), single sided,-per.page and Ledger(11 x 44
.15
• Letter(8%2 X 11)., LegaL(8%2 x 14),double sided,_per page .20
• Certified documents(letter or legal) 1.00
Documents on Compact Discs(CDs) 3.00
Reproduction of documents beyond legal At cost to
City
Other copies, up to levl-size 0016
14-61(e) Revised plans processing fee:
Page 3
Commercial minor revisions 1 to 5_pages 200.00
-Commercial maior revisions 6 to 30-pages 500.00
S0%of
Commercial total revision 31+_pages Original
Permit Fee
Residential minor revision 1 to-5_pages 100.00
Residential major revision 6 to 15.pages 200.00
_: _- 50%of
Residential total revision 16+pages Original
Permit Fee
Administrative processing fee 50:00
78.00
14-61(f) Lost permit card. Fee:.per required signature
80.00
14-61(g) Inspection fee hourly rate
The inspection fee hourly rate is calculated at the
beginning of-each fiscal year based on the department's approved budget,
overhead and indirect costs and the resources assigned to the inspection
-program.
. . - -- - - - - - . - - . _ •- _ _ •-
addition-to the-regular permit fee.The fee for the dedicated inspector is
14-61(h) _. _ _ - . - •.. - . _ - •- _ •_ . .. - - - - . -- _-_•
subsection 11-°61(g),whichever is.greater.
14,-61(hi) Plans re-review-fee:
First and second re-review 0.00
Plans re-review fee. Pursuant to the Florida Building Commission, and in
compliance with F.S.,§ 553.80(2.)_(b), when-extra-plans reviews are
due to the failure to correct code violations specifically and
Page 4
continuously noted in each rejection,-each time after the third such
review that plans are reiected for the same code violation, a fee of four
times the amount of the_proportion of the..permit fee shall be attributed
to plans review.
Expedited plan review and inspection fee: Upon request from the
applicant,the department may schedule an expedited plans review or
14-61(E) 250.00
inspection on an overtime basis by department staff. Fee for each review
or inspection requested.
permit fee line item
14-61n($) Phase permits:
Commercial new construction 2,000.00
Commercial alteration 1,500.00
Residential new construction 1,000.00
Up-front processing fee: Percent of estimated permit fee or the minimum
14-62(a)
processing fee,whichever is greater.
Percent of estimated permit fee rounded up to the nearest$5.00
20%
increment
Minimum up-front fee 50.00
14--62(b)(4) 2, Change of contractor 100.00
Page 5
14-
62(b.)(5){1)b.2.a
Change of architect or engineer 100.00
14-62(b)(6) One time request for building permit extension (permit must not be 100:00
expired)
( )( ) 100%Additional request-for building permit extension (permit must not be
14-62b6 a
expired): Percent of building permit fee line item
25%of
New or renewed,permits for-expired, revoked and nullified or voided
14-62(b)_(7) original
_permits
._permit fee
14-621b)(7) Processing fee 100.00
14-62(c) Building permit fees:
Minimum-permit fee 100.00
Commercial Permit-Fees for Building Permits:
Permit fee for a building whose estimated construction cost is equal to or
less than$30 million is 2.0%of the cost of construction as approved by the
Building Official or his designee, plus 1.0%of the construction-cost for any
amount over$30 million as approved by the Building Official or his
designee.
Residential Permit Feesfor Building Permits
Residential:Single-family,-.Duplex:
Permit-fee for a building whose estimated construction cost is equal to or
less than$1 million is-1.8%of the c-ost of construction as approved by the
Building Official or his designee, plus 3:0%of the construction cost for any
amount over$1 million as approved by the Building Official or his designee.
Temporary and-Special Event Fees
T-emporary platforms-for-public assembly,first approval 104.00
Temporary bleachers for public assembly,first approval 95.00
Page-6
Temporary platforms or bleachers for public assembly, re-approval 20.00
Tents excluding electric and plumbing, per tent
• Up to 1,000 square feet 104.00
• Each additional 1,000 square feet over 1,000 28.00
Temporary structure/trusses/statues(no electrical or plumbing included) 104.00
Temporary chiller 462.00
Temporary-generator -237.00
Construction trailer, per trailer 568.00
Office trailer, per trailer 686.00
Temporary power for construction 225.00
Temporary power for test 189.00
Temporary multi-seat toilet trailer, per trailer 80.00
Temporary individual toilet, per event 17.00
Amusement rides 60.00
Temporary electric work on circuses,carnivals, per show 312.00
Temporary fencing 150.00
Electrical installation-Small events(1-10 tents, bleachers, stages and
other structures) 250.00
Electrical installation-Large events(more than 10 tents, bleachers,stages
and other structures) 500.00
Mechanical installation-Small events(1-10 tents, bleachers, stages and
other structures) 250.00
Page 7
Mechanical installation-Large events(more than 10 tents, bleachers, 500.00
stages and other structures)
Plumbing installation-Small-events(1-10 tents, bleachers,stages and
other structures) -
250.00
Plumbing installation-Large events_.(more than 10 tents, bleachers,stages
and other structures)
500:00
14-63 Plumbing permit-fees:
Minimum plumbing permit fee 100.00
This minimum does not apply to permits issued as supplementary to
current outstanding permits-for the same job.
Commercial Permit Fees for--Plumbing Permits
Permit fee for a building whose estimated construction cost is equal to or
Sn
less than$30 million is 2.0%of the cost of construction as approved by the
Building Official or his designee, plus 1:0%of the construction cost for any
amount over$30 million as approved by the Building-Official or his
designee.
Residential Permit Fees=for Plumbing Permits
Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or
less than$1 million is 1.8%of the cost of construction as approved by the
Building Official or his designee,plus 1.0%of the construction cost for any
amount over$1 million as approved by the Building Official or his designee.
14-64 -Electrical permit fees:
Minimum electrical permit fee:This minimum does not apply to permits
issued as supplementary to current outstanding 100.00
pp ry g permits for the same job.
Commercial Permit Fees for-Electrical Permits
Permit fee for a building whose estimated construction cost is equal to or
less than$30 million is 2.0%of the cost of construction as approved-by the
Building Official or his designee, plus 1.0%of the construction cost for any
Page 8
amount over$30 million as approved by the Building Official or his
designee.
Residential Permit Fees for Electrical Permits
Residential:Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or
less than$1 million is 1.8%of the cost of construction as approved by the
Building Official or his designee, plus 1.0%of the construction cost for any
amount over$1 million as approved by the Building Official or his designee.
14-65 Mechanical permit fees:
Minimum mechanical permit fee.This minimum does not apply to permits
issued as supplementary to current outstanding 100.00
pp ry g permits for the same job.
Commercial Permit Fees for Mechanical Permits
Permit fee for a building whose estimated construction cost is equal to or
less than$30 million is 2.0%of the cost of construction as approved by the
Building Official or his designee, plus 1.0%of the construction cost for any
amount over$30 million as approved by the Building Official or his
designee.
Residential Permit Fees for Mechanical Permits
Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or
less than$1 million is 1.8%of the cost of construction as approved by the
Building Official or his designee, plus 1.0%of the construction cost for any
amount over$1 million as approved by the Building Official or his designee.
Smoke control test
2.08410
® Up to 10,000 square feet
200.00
.00
® 10,000 to 50,000 square.feet
500.00
Page 9
_.. , .X).
Over 50,000 square-feet
1;000.00
Elevators,escalators and other lifting apparatus:
Permit for new installation or major revamping per ASM-E A17.1 Section 8.7
Building permit required-(includes initial inspection and certificate).
Installation of traction elevators and escalators, per unit
Up to three stories 2,218.00
3-10 stories . 2,705.00
Each additional story over 10 84.00
Installation of hydraulic•elevator,-per unit
0-Up to three stories 1,154.00
0 3-10 stories 1,468.00
Installation of escalator,-per unit 2,158.00
Installation of parking lifts,-per unit 200.00
Installation of robotic parking, per apparatus 3,000.00
Installation of residential elevator, per unit 1,213.00
Installation of wheelchair lift,chair stairs and dumbwaiter 976.00
Elevator Repair and Maintenance
Annual maintenance repair permit(not to include major-revamping) 602:00
Repairs(value over$5,000.00) per ASM-E 17.1,Section 8.62 633.00
Repairs(jack/oil lines) up to$5,000.00 1 250.00
Page 10
Repairs(can interior/other) up to$5,000.00 250.00
Roof window cleaning machine, each machine 108.00
Permit for removal of elevator from service 570.00
Elevator tests,temporary use,variances and compliance inspections:
Emergency power test 1,084.00
Elevator fire recall test, per unit 1,022.00
Temporary use permit_(must be renewed every 30 days) 1,317.00
Temporary use renewal 100.00
Application for variances from codes to install or modernize equipment 519.00
Annual fees for certificate of operation and inspection
Certificate of operation for each unit(mandated) V 75.00
Renewal of delinquent certificate of operation 100.00
Duplicate certificate of operation (mandated) 25.00
Dumbwaiters, elevators and escalators —Certificate and inspection:
Monitoring/jurisdictional fee 200.00
Reinspection fee,each reinspection 104.00
Witnessing of 1-year tests per ASME A17.1, part X,section 1000, rule
1000.1b 208.00
Witnessing of 5-year tests per ASME A17.1, Part X,section 1000, rule
1000.1b 260.00
Compliance inspection if witnessed test failed, per inspection 104.00
Any elevator,escalator,etc., owner who fails to comply with the order to
Page 11
cmrrectev��ti»nbsuedvv�hin3O days, �sub�c1tmanodnnin�trmt�e
. / --.-' subject
fine up to$500.00 in addition to any other penalty provided by law Fines
{ ' '
can be f�revary�Q=�ayper�»dthat1haxk»�t��nrenlo|nmemt�e.
| > imposed
� !
'These fines before or aker paid,can beappeated to the department
' | i
director whose decision shall be final. No clearance-for the use of the -
elevator shall be-given untilthese-fines have been paid--or waived.
^ `
Boilers and pressure vessels, installation permit fees, including initial
` .
inspections and certificate; does not include installation or connection of
` |
fuel and water lines:
Boilers(as defined in the ASIV1EJBoiler andyressure Vesse| Code):
! /
Annual inspection for boilers 260.00 .!
24^66(1) [ Certificate of occupancy fees:
< ' �
v / `
v ' -
Residential units R-1, R-2,and R-3, per unit 110l0
All commercial occupancies except R-1 and R-2, per square foot O]]5
Minimum fee'for commercial rtificates of occupancy / 250.00
� ! �'----------�----------- ---- --'--'-----------------------------^------- �
| �
When a--temporary-certificate of occupancy or completion has been issued
and the fee has been paid,-the fee for a final certificate of occupancy or 0.80
completion
_-____`
���l) Temporary certificate of occupancy or completion fees:
- . --` ' .
100 percent of final certificate of occupancy or completion'fee plus the
cost of any additional required inspections.Additional required inspections
will be charge based on actual time spent on in nrnukhp|iedbmthe
hourly ra1e,as insect�nl4'61/h\.
Extension of temporary c-ertificate Of occupancy or completion, per period
! �
as set by the building official. Percent of final certificate of occupancy or 1-00Y6
� |
completion fee:
14=66(1) Certificate of-completion fee's:
___'__'__--__-___-_________ _-______-__-_'-_-_________'___-_
Page 12
Certificate of completion fees for residential
100.00
Certificate of completion fees for commercial Minim fee for commercial
ertifie +er of mr,
re �e+ier� 250.00
c•
7 2-3-7,00
16.8780
.Doeksi-seawa-146 .23.7700
Certificate of use fees:
- ,I
3-50 units 52.50
�-�
3 50 units 52750
3-.--50
• _ -- -
Up to 5,000 square feet 52750
105-00
e - • - . -- _ - , --- - , - - - - - - - - , '- 0
Restaurants(bars, ungges):
Page 13
-First 60 seats I -5250
15.00
- ._ •• •
homes,etc.:
Up to 50-beds ..60.00
4
Day-care centers;nursery schools, private schools 60:00
Tei-I res4
50 .50
Over-500 seats 485700
Church, synagogue,temple 547-50
' 4 . -- - - - , - - • , - -, . - - - - - - - - . - -- ,
etc.,are_cxempt
3 to 15 boatslips X50
1649--5 75.00
30
•1 --67.1 - - - -- - _ -- _- - - - -- : - - -
'x -
6 {g}
Forty-year recertification program fee:
14-67(a) Per building 600.00
Page-1-4
Building official approval of 6-month extension for building recertifications 600.00
v
14-67j{e} Late compliance fee, regular fee, plus 260.00
New inspection report fee if recertification not completed within 90 days
14-67(c) 312.00
of building's being declared unsafe.
14 67.2 Employee training,education,'safety,and technology procurement and
implementation for service enhancement surcharge is 6 percent of each
14-69 and every permit fee
14-70 Other general fees
Pursuant to Florida Statutes§553.721, in order for the department of
business and professional regulation to administer the Florida Building
14-70(1) Code,there is created a surcharge to be assessed at the rate of 1.5 percent
of the permit fee associated with enforcement of the Florida Building
Code.The minimum amount collected on any permit issued shall be$2.00.
Pursuant to Miami-Dade County Ordinance 8-12(e), a surcharge to building
14-70(2) permits for county code compliance program, per$1,000.00 of work 0.60
valuation
Pursuant to Florida Statutes§468.631,the building code administrator's
and inspector's fund shall be funded through a surcharge to be assessed at
14-70(3) the rate of 1.5 percent of all permit fees associated with enforcement of
the Florida Building Code.The minimum amount collected on any permit
issued shall be$2.00.
14 70(7) Sanitation surcharge for all-building, electrical, plumbing, mechanical
14-7015) demolition permits,0.30 percent of estimated cost of project:
Minimum 15.00
Maximum 1,500.00
A separate fire safety, public works and/or zoning review fee associated
14-70(6) with the building.permit process shall be charged as outlined in appendix
A. See applicable department fee sections.
Page 15
14-72(1) 3 Interest and collection fees shall be charged for unpaid amountsjfe.es)due.
Documents. Requests for copies of building department records,
14-7-2(2) inspection reports, logs,or similar documents maintained by the building
department will be-charged a fee as specified in 14-61(d.)of appendix A
Page 16
Planning Fees_Associated with the Building Permit Process
15-31(a) Planning review fee for a commercial building permit shall be assessed at
.70%of the cost of construction.
Planning review fee for a residential building permit shall be assessed at
15-31(a)
.50%of the cost of construction.
15-31 (b) Double Fees for work prior to issuance of_permit,plus penalties shall be
consistent with 14-61(b)
15-31(c)(1) Reinspection fees shall be consistent with 14-61(c)(1)
Lost Plans fee shall be consistent with 14-61(d). Planning shall not assess
15-31(d) administrative processing fee
15-31(e) Revised Plans Review fee shall be consistent with 14-61(e)
f
15-31(f) Lost Permit Card fee shall be consistent with 14-61(f)
Inspection Fee hourly rate. As determined by the department at the
15-31(g)
beginning of each fiscal year
15-31(h) Plans re-review fee shall be-consistent with 14-61.(h)
15-31(i) Expedited plans review and inspections in addition to all applicable fees
Expedited plans reviewjnot to exceed 4 hours) . 500.00
Expedited inspection 150.00
Annual Adjustment of rates. The rates pertaining to this division will
15-31(I) administratively adjusted annually to reflect increase(s)or decrease(s) in
the Consumer Price Index for all urban consumers, CPI-U
Phased Permit
15-31(n) If department review of Phase Permit application is required, a fee
consistent with 14-61(e)shall be assessed.
15-32(a).(1),(2) Upfront Fee shall be consistent with 14-62(a)
Page 17
15-32(b) Refunds;time limitations,cancellations,change of contractors shall be
processed and fees assessed consistent with 14-62(b)(4),(5),(6),(7)
-. _
15 32 - . - . - -- - . - , -as specified he.low:
--U.p to 3,000 squar-c feet 4-577-4
--From 3,00.1 square feet-to-5;000 square-feet,above fe.c plus 743
- From 5,001 square-feet to°50,000 square feet,above fcc plus 4:54
A_9 •A ltera.tien�Dem de1ing
--Up to 3;000 square-feet 39.00
- From 3,-001 square`feet to-5,000 square feet,above fee plus 3
- From 5;001 square-feet to 50,000 square feet, above fcc plus 8=
3
._I In t„ 3650 sg pare.feet 101.25
_ - e __. _ - _ - - - - -- , - - - - - , 50.71
• From 1,751 square-feet to 3,500 square feet,above fcc plus 36.95
- From 3;501 square feet to 17,500 square-feet,above fee plus 85
- From 17;501 square feet to-50,000 square feet,above-fee plus 6-33
A 2 Alte.ratinn.�Rem doling
,
Page 18
- Up to 350 square feet 62.18
- From 1,751 square feet to 3,500 square feet,above fee plus 22.17
from 3,501 square feet to 17,500 square feet,above fcc plus
- From 17,501 square feet to 50,000 square feet,above fee plus
Up to 1;000 square feet 5-
- From 1,001 square feet to 5,000 square feet,above fee plus 856
- - - -- . e - - - -
A-3, n/AlteratioQemedeline*
Up to 1,000 square feet 39.95
From 1,001 square feet to 5,000 square feet,above fee plush
a From 5,001 square feet to 50,000 square feet, above fee plus 4
Q Que•inee•e•
Up to 500 square feet 136;02
a From 501 square feet to 2,500 square feet,above fee plus
- From 25,001 square feet to 50,000 square feet,above-fee plus 7A5
52.78
- From 501 square feet to 2,500 square feet,above fee plus 89
Page 19
. .
= From 8L5O1 square feet tm25,00Qsquorcfcmt abmy_e fee plus | 3,54
Upto3;00K]square feet 54,04
— �
From 3,001 square feet to ]5,]00 Square-feet,above fce plus ! 15.99
| ' '
~ From 15,001 square feet to5�OOQ square�c�abo��e �us | '2��
.
~ Qpho3,0O0cquare~hcet �6-.-6A
' (
~ From 3,001 square feet 15,000-squopc feet,above fee plus ' 10.34
_ � 'From 15,001 square feetto�O�]00 square feet,above fee plus � :85
��i
! . i
~{Jpto1,5OOsquarefeat ' 6048
= From 1��Q1square feet 1o7�00�quarefeet above fee m�o | 25.95
u-Fr-ewn--7,50lsquarefeet to-50,000-square feet,above-fee plus i 3.32
_
' . . . .
� �-----'-------- ?- -- - ----- ----'---------------------- ----' -- ----
Upto1;5QO square feet 23'49
~ From 2,501 oguam�� �to 7;500 square feet,above ferp|uu 9,�6
.
~ From i�501 square feet to f
uor� cct above fee plus � 44
7
' '' |
° Uptm'4,50]square feet ( 66-11
' ' |
_
From-4,501-square-feet to 22,500 squarefect,above fee pIus | 9,04
| � /
Page 20
•
From 22,501 square feet to 50,000 square feet,above fee plus 38
1 Alteration/Remodeling
Up to 4,500 square feet 13.43
From 4,501 square feet to 22,500 square feet,above fee plus 476-5
From 22,501 square feet.to 50,000 square feet,above fee plus . 9
Up to 1,000 square feet .`-. 59.88
- .. .e - ... . - -- 39.22
•
From 5,001 square feet to 50,000 square feet, above fee plus 4:33
Up to 1,000 square feet 59.88
From 1,001 square feet to 5,000 square feet,above fee plus 39.22
From 5,001 square feet.to 50,000 square feet,above fee plus 4
AA Mercantile /gar station)
- 03.21
-- - -- -- 406,-94
- From 2,001 square feet to 20,000 square feet,above fee plus 10.47
. e - -- - -- -- 54
98.24
- -- ere - -- - -- 396794
Page 21
•
From 2,001 square-feet-to 20,00-1 square feet,above-fec plus ' 10:47
- --From 20,-001 square-feet-to 50;000 square-feet, above-fee plus .51
_ - W �.
A-A Mercantile/retail er whelerale)
- ,
Up to 1,500 square-feet 43:67
From 1,501-.square-feet-to 7,500 square-fect,above-fee plus 40.41
From-7,501 square feet-to-50,000 square-feet,above fec plus -445
- •
-Up to 1;500 square feet 43.67
From 1,501 square feet to-7,500 square feet,above fec plus 40
.,I
I - From 7,501 square feet to-50,000-square-feet,above fee plus 445
n
e - . . - - . -
r
-Up to 2;000-square-fect 73.93
From 2,001 square feet to 1-0,000 square feet,above-fec plus 19.77
- - From 1-0,001 square-feet to30 000-square feet,above fcc plus -2:52
R 1, A.1terati..ert-/Remodeling
Up-to 2,000 square feet ° 21.28
--From 2,001 square feet to 10,000-square feet,above fee plus
--From 10,001 square-feet-to 50,000-square feet,above fec plus 0:
Up to-600 square feet 103.18
From 601 square feet to 3,000 square feet,above fec plus 101.68
Page 22
• .. - -- . ... - - -- 9
.. . .. - . ... - - - 5.84
R_') Alteration/Remeedeling
48,4 4;)
.. - -- ..• -- -- 4
.• - -- . ... - - 9..54
.From30,001.square feet to,50,000 square feet,above fee plus 044
- Up to 1,500 square feet 8445
From 1,501 square feet to 2,500 square feet,above fee plus 90-88
•• - -- - -- - - - 40
- From 10,001 square feet to 50,000 square feet, above fee plus 19.15
R_3,-Alteration/Remodeling
- Up to 1,500 square feet 15.78
From 1,501 square feet to 2,500 square feet,above fec plus 15.82
. - -- . ... _ 9-26
-. .. - - s,!!! - - -
- Up to 1,500 square feet 79.75
From 1,501 square feet to 7,500 square feet,above fee plus 23.02
• From 7,501 square feet to 50,000 square feet,above fee plus 2.83
Page 23
i
D_A Alter-tion•LDemodeling
a
Up to 1,500 square feet -24:38
From 1,501 square feet to-7,500-square feet,abovc•fee plus 3444
- • -from 7,501 square feet-to 50;000.square feet,above fcc plus , 0
Up-to500 squar..e feet i 94:94 •
_.. _- . - - _ - ! -- -_ ; e,- -d , -e .- - - 4446 - -.:
3
from 2,501-square feet-to 5,000-square feet,above fec plus ` 17:55
From 5,001 square feet to 25,000 square feet,abovefee plus 44
From 25,001 square--feet to 50,000 square feet,above fee plus -147
4
s 1, Alteration/ m
Deeeleling
v ,
Up to 500-square feet
- - From-501 square feet to 2,500 square-feet,above fcc plus 44.96
• - - -from 2;501 square feet to 5,000°square feet,above-fcc plus .,17.06
-.from 5,001 square feet-to-25,000-sluar-.c-feet,abovc-fcc plus 9
• • -. a From 25,001 square feet to 50;000-square feet, abovefec plus - 9
., - - -- . _ .. . . - . _ . -: -- -: - -
3 - Up-to 1,000 square feet 9536
--From 1;001 square feet to--5,-000 square feet,abovcfe.e plus 37.30
From-5,001 square-feet to 50,000-squarc-feet,above-fee plus 4-;93
_ .- _ .. . . _ - , - - -: -- -_-_ ,
Page 24
From 1,001 -e•quare feet to 5,000 square feet,above fee plus 37.30
From 5,001 square feet to 50,000 square feet,above fee plus 4703
S 2, Storage Parking garage
Up to 15,000 square feet 1849
_ _ - From-15,001square feet to 50,000 square feet, above fec plus 0.32
•
18.19
-• From 15,001 square feet to 50,000 square feet,above fee plus 0:34
• .. •
._ . - . . _. - • - - -- - - 8$5
store, drug store,gas station)
Specialty permits
•
• - _ _ - - _
56,00
Generatersirelar systems
49700
. Generators-Commercial
up to 50,000 sq.ft. 4-76:00
Above 50,000 sq.ft. 176.00
Page 25
1
° •• •
' ' '': : '" ' ': ' - -6:00\
���� ���
� . . •' " - '': : : ' ' ' '~'' "� ~' '— : - - ' ~ ~ ' ' — 1-17*0
' ' '
1 ��
' � ^� ' ' ' :- ^ � ' ' GO
/ |
l
/
--- --'- '--'-
� -
:' ' .' ; ' ' ''' : " ' '; ' ' '' ' ':_ ,e!e :' : '
106.81
^__..^
/ . .
.�_'/ -_ , -
I '
^ . . .
� ,� ^ '^'^ ': ;;; ,_ _ ^, : _ ' _ ' : " ' . ., ' ' ' , ,e'e - ,eee : '
169X03
` . gations-insluding-equipment
` . .
I , '
` .- - '� ',: '' ' ', : ' ' ' •. . • '
^ ^ ' � � . .: ' ' •
' ' : '` '��� ' '
| . 4-1D46
. /
___-_____-________-___ ___-___--�__'
-
\ ' ^ ^^ ^^'': v:: ' ': ' ': ' - ', ' - '' ': ' . —- '' ''''� ':''; -^- � 408:89
. . . .
/ ``' ^ : ' ' ' ' '^' _- ' ' ' '' .:-':' '-' '
I
�___________�_______-__ _______�
' J � ^.' ' '^^ ^^''' �:: , ,^' ..- ' .,' e�e . : . ' . '' ,''. |
} ' ' ' ' ' ^' ' ' ' `
� 382��5
�' 1 -
~`~'r'^^^ ^
/
-________—________________________
^ ' ^ ^'- -''^ ��" ' '' '' : ^^ —' '' , ,e�' ' �eee `' " '
- ' '^ 4���c�
.... ~.,~^^r~' .^~�
`' ^ _ ' _
353.62
' '1 ^ ' ^ ^• • -•': ;"" ' '' ' ^"` : ' ^ ''' .� , • -' '- : '' ,e*e :' , ^
i
----------- _1
�_ -_________- ___'_----� ________-_ _____-�_____-___
'^' -'.: '::- - ': '''' ^' : ^^ ^^' '~ ' ':- ' ' ' '' '°'': i
354.65
, equipment
i |--- -- ---- -„, ---- - --- --- -- -------- --- - ---- ' --__ ___ _
Demolition
i
� .
� / S6'�;
,
__�___ ______-_'-_-_ ______-____-____'______-�_
~_
`64,96
Page 26
0
.. ..,. - -- .00
Partial rlemelitio T, 700 —5,000 seepare feet 51.85
5,800 square feet . 44.59
•- - _ ' _ - _ •_- , - - - - -- - - - - - - . - .2:96
1
8:88
.52
- - . - - - - . _ - --- 14.52
ti
and 2 meerinns
\ \e - -- 8400
\ • - - •. \• _ . . - -- - - 26.96
r 100 square feet S2796
• - .-- 'e .e - -- 8296
00
Seawalls• under 75 feet 23.85
Seawalls,75-150 feet 96
e ..
Page 27
Each additional r yrtem ever 2
Up_ta 2 units 53.92
-1=�c�i_�rlrlition-�1 ding ever ) 10.37
V
-Electric master requiring rubs
_.. .-.- - Par kin g lot li g ti no 2 9
--, - AC uni t-new�• Derirefit-i-a14-ufn 31.11
- -• 46,.67
A!`unit new•Commercia.l per unit 50.81
51.85
Plumbing master requiring Albs
`i'7
- . _ . _ - -- 549
-- - - - -- - - - - 25.93
Temporary 0
- . - . .. - - - - - 18.00
Page 28
-
008
Temnerary--fencing 28 00
Stand Alone Permit DeviewFeer:
--- 107.85
- - - -- , • 221.92
-
er part thereof - - - - - - '28.00
Shutters, 1 30 openings 44.59
- - • - - - - - ' - - - -_ - -- _
38
Storefront, 101 1► J to 000 square fe 1.et 22992
_ _ ••11 - - -• - - - -- - - - . - - , .e' _ - ..
•- - - - 112.00
Page 29
40.14
- - . ... - 21.78
-Signs
-Signs(electric) 442,00
Cign /.n�nnles•+rir��.n_.inted 44.100
. 1037
13.48
- - - • - • - - - ... -- - 49.70
Cenrec./walls
- - -
Fencer anrl-ler walls;.Cemmercia1 130.66
-• - i - - 8400
Awnings
/•+Fabric replacement ne-charge
• - i _ _ - - - i - 00
Gar-pen-awning
- s`8.00
16.59
Page 30
Painting
64:0
Painting-per-FnitResidential 27,00
7
Electrical Permit Review Fees
-
_ - _ - - - Z8.00
Mechanical Permit Review Fees
3
_ - _ -.•- . •• - - • • • • • - 1 1 - 26,96
- - - . -_ - - •• • _ -• - _ - • • •• - • _ .•.
• - _ _ •- -- - - - - - - - - -- 127.55
- - - - - - . ... - - 3-3'8
- • _ •- " • - . _ . ... _ 738.31
Certificate of occupancy or completion shall be processed and fees
15-33 assessed consistent with 14-66(1)
Up front processing fee
Employee training,education,safety and technology enhancements and
15-35 other surcharge will be assessed consistent with 14-70(1),(2),(3),(5), as
applicable
Devised plans piecerr ee
25.93
10
Page 31
15-36..(a) Interest and collection fees shall be charged for unpaid amounts(fees)due.
Documents. Requests for copies of department records, inspection
15-36flal reports, logs or other similar documents maintained by the department
will be-charged a fee consistent with 14-61(d)
Minimum Planning fee associated with a building permit 70.00
Other Planning & Zoning Department Fees
. _ - - -Chapter 6.Alcoholic-Beverages -
Article I. In General
6-5700
6-2(a) Service charge for review of application for license 400.00
Amount
(-Effective
Section this Code Description
October
15, 2012)
Chapter 42. Emergency Services
Article II.Alarm Systems
Division 3.Burglar Alarms
42-84(a) Renewal of alarm r-egistration fee 10.00
Page 32
Chapter 50. Fire Prevention and Protection
Fire review fee for a commercial building permit shall be assessed at.70%
50-3(a)
of the cost of construction.
50-3(a) Fire review fee for a residential building permit shall be assessed at.50%of
the cost of construction.
50-3 (b) Double Fees for work prior to issuance of permit, plus_penalties shall be
consistent with 14-61(b)
50 3(b)
- - - - - - - -- - - - - - -- ..• -- _ - 238.51
596.28
50-3(c)(1) Reinspection fees shall be consistent with 14-61(c)(1)
50 3(c) Reinspection fee
&A0
Lost plans fee shall be consistent with 14-61(d) Fire shall not assess
50-3td)
administrative processing fee
50-3(e), Revised Plans Review fee shall be consistent with 14-61(e)
503{e} - - - - - _ . _• - - - - - - - .,
50-31f) Lost Permit Card Fee shall be consistent with 14-61(f)
50 3(f) Lost permit card fee 95.0A
50-3(g) Inspection Fee hourly rate. As determined by the department at the
Page 33
beginning of each fiscal year
50 3(g) - '. - - _ • -, 340:80-or--9.-54W-1
Plans re-review fee shall be consistent with 14-61(h)
50-3(h) - - - -- . . _
- - - ' - - - - - •p - - -
.
yeac
50-3(i) Expedited_plans review and inspections in addition-to all applicable fees
Expedited_plans review-(not to exceed 4 hours) 500.00
Expedited inspection 150.00
50 30)
fiscal yeas
50 3(j) fans re_review fee
—44irst and second re review 040
Annual Adjustment of rates. The rates.pertaining to this division will
.50-3(1) administratively adjusted annually to reflect increase(s) or deer-eases) in
the Consumer Price Index for all urban consumers, CPI-U
50 3(1) - - - - -- - - • - - - _ - _ - .. - - - - - -- , - - • 9700
-50 3.(1) AAA
50 3(m) Pe.rmit.extension 100 00
wv-vv
•
Page 34
Phased Permit
50-3(n), If department review of Phase Permit application is required,a fee
consistent with 14-611e.)shall be assessed.
604(44 &ph
503(o) - - - _ _ - -- _- - -- - - - • -- - ._ - .. - -
503(p) . ... _ _ -- -- -- • -- - - - - - - - -- - -- - •-
-- - - - •! - - -
.. s -
INCREMENTAL
COST PER
OCCUPANCY CLASS
INCREMENTAL
100-SG I TARE FEET
Amount
Section
Description (Effective
thie
Oct. 15, 2012)
A ,6 sembly Fixed seating
__.._ - Up to 3,000 square feet 52.09
-- - e e - 9
.. ... - -- . ... - - - - 46g
(i(
a Up to 350 square feet 42,66
_ - -- - -- - , ' - _. - -- , - -_ . - -- - - 24,69
. From 1,750 square fret to 3,500 square feet,above fee plus 21.93
Page 35
° From 3,500 square feet to 17,500 square feet,above-fee plus 8,90
From 17,500 square-feet to 50,000 square feet,above-fee plus 6-64
Up to 1,000 square-feet 66
... - - •.• _ 25.34
--from 5,000 square feet.to-50;000 square feet,above-fee plus d
Up to 500 square feet 46.97
° From 500 square feet to 2,500 square feet,above-fee plus 35.12
° From 2,500 square feet to 25;000 square feet,above fec plus
From 25,000 square feet to 50,000 square feet,above fc.c plus 6
Up to 3,000 square feet 64.18
••• - - ••• - -- 21.72
_ _ _ - e,e - -- - -- 7.48
° Up to 1,500 square feet 11.11
_- °from 1,500 square feet to 7,500-square feet,above fee plus
_ . From 7,500 square-feet to-50,-000 square feet, above fee plus 6
to-4;500-s a e t 53x4)6
Page 36
_ -- - .. - -- 12.01
.. -- . ... - -- -- 648
Up to 1,000 square feet 32.02
-. ... - -- ... - _- _ 23,86
From 5,000 square feet to 50,000 square feet,above fec plus
MI�Aerrartile (gae-station)
Up to 100 square feet 4-3,39
-- ... -- -- - •- 55.80
From 2,000 square feet to 20,000 square feet,above fec plus
From 20,000 square feet to 50,-000 square feet, above fcc plus
• _ - Up to 1,500 square feet 1934
D-7 Deeidential transient
T r
65,54
.. ... - - - - --
A-10443-600-semafe-feet 8646
Decientia-! permanent
Y Try �rm�T�rrt
Page 37
- � | - ''^ `!e : '' '`'' : -, -'''—' , ' :: ' -` 100.59
� � |----- -------�—�--- ----------�---------
' ' ! °-From 3,0QQ square feet tm3Q,]0Q square feet,above fecplus 22.23
e,e ee , '' ' ''� : e ��e : ''~' -', ' '' `' _- : ' � 15.89
-r---------------------------------------------- --- - ---------'--- .
~ Uptm1,-5W]0 square feet 11'83
°'From ��0���f����0�um�������|uo | 14.55
.
` � |
, '' ,, - ' = , ' �'
^ ' - - ' ' _ ~ '
� !
~ Up-to-5[0 square feet 62.60
U ' �
~ From 6OO square feet tm2,6Og square feet,abmvefccp|us 4-7*04
From 2,5OO square feet tm5,00}squarefeet above fcc plus | 15.28
^ � !� -- — --- ------- ---- ---- - -' -------- - ---- - --'------�'-- ---- - -' '- ---
° From 5,00O square feet tm25,00J square feet,obouefccxdus 6,9.7
~ From 25/0QQ square feet to 50,000 square feet,above fccplus 5720
S 2,Storage,low hazard
�
= Qptm �OOQsquarefeet 13.15
/ .
-from 1,000 square feet to-5,000 square-feet,above fee plus / 20.31
=-Fronn5,0]O square feet to5Q,OQO:q abovc fee plus i 5.31
S 2, parking
Storage,
} ^ |
= Up-to 15,0}Osquare-feet '2837
~-From 1'5�%]0 square feettmS0/0[�]squarmfeet abovc �,4�
'
. '
- "� '� '^^^
^ � '
Page 38
26.32
•- ... --. . !e! - - 440
Shell building>75 feet
Up to 15,000 square feet 28706
•• - -- !, !! - -- 4730
50 3(p)
, _s
00guare feet
6:
4720
D Detirlential 890•
, _- - - -- - , - - -: -- •-: _ _ 49
S,Storage occupancy, parking garage, shell .1
69-3p) •• _ - - •• - - - - - - •• - - - - .•- .. 77.78
-341p) permits• Specialty permits
9t�hen/bath
-- - - - - - • ' - -- - 7052
- - - - - -: - - • ' - - 47,70
- - - - - - - - - - 6
- - - - 74.66
Page 39
****n�s
| |
~-Qtm10Q-fyet ` 7446
| � /
_ -
~ 1-01to'5Q0fmet 74,66
, _______. _______'_______________.----___'
~ Gg1tm1;0OQ-feet 173.18
' ! '
| '
r
1�� �@
� .
} � �
| ! '
. `
- - .~~~~ '- Under 10,000 square feet or nonlife safety-system-s ^ `- ������
, ] `
r----- ---------------------------
251.00
453.00
� �--------- --'------- -- -----------''---�'----__ ______-_ ______l_'_-� .
----. ,--- ` .
� ! �' ---- ' ^-- --- ' ---- --------- - --- - -----'�-- - --'-' - --- -
` . . . . . .
~17.70
! / ^ ' ^ ^''^ -'': ::: ;':` : - ^'' ' '' , ' ',' /eee ^
'
^' : ' •^ ''''
! � ' ^ 169]]3
� .
equipment
-
•-•--S-: .
� | ^ ^ "2" 2.:- " - ^^- •' , `/e� ' ,ee� �' " - '213]81
�
| � ' ^ ^'- -' : ;:: "': - '.-^ '' ' : `' �o�e':' : ' , 219]81
.
. ^•- -•.• ;:: ' ^" ' *2 •~/ :'^ •• - ' ' 48,74
� .
' �2,44
/ r ' '
/ |
. .
•' 2- ^' •.
: ' � ' ' ';' - e e ; '' '' ''
. `
300-1,000-square-feet 7-3,00
1 }O1-5� ]0 square feet 442-.46
} / |
Page 40
1 64796
Inner 100 square feet 13748
1111 square feet and -+hove —24 9
.. .. .. _ • ••• - --
- - •.• - -- 92.29
Page 41
Specialty Permits
50-3(p)
Building:Temporary/special events permits
Temporary structure/trusses/statues(not including-tents, platforms or
bleachers) 73.63
Temporary platforms for public assembly,first approval 181.48
Temporary bleachers for public assembly,first approval 165.92
Temporary platforms/bleachers for public assembly, re-approval 21.78
Tents up to 1,000 square feet per unit 137.92
Tents each additional 1,000 square feet over 1,000 per unit 38.37
Construction trailer, per trailer 140.00
Office-trailer, per trailer 140.00
Reinspection fee, pursuant to 14-61(c),(1)
Rereview fee, pursuant to 14-61(c),(1)
Page 42
50 3{p} Building trade permits
-: -- - - - - -_ • - •- - - - ' -- , - 98.52
_ _ _
replacement
1 unit 23.85
° 7—'10 unite 47,70
° 11-30 units 6&44
31-50 units 13&96
Per additional 5 units over 50 23.85
° Upto100 square feet 9
101 to 1000 square feet 89,18
9
Under 1,500 square-feet 32.15
° D I 0 sg u eet 32.15
- - ... - -- 39.41
'- - ... - -- 12.44
Fences and/or w-+Ils
Page 43
For first 75 linear fect 6448
' • -- - - -- - - - ....._ -- •
b
X00
. Pcr each ad.ditienal 30 rreuare.feet
-P44144m_bin.g trade permits
- - _ - - - - - - - - , - - - - - - - 23.85
Clectri'caFtrade permits
Access control/card acccr
.,I--- er5 ees 12.52
s Up to 25 devices 116..14
Per additional 25 devices or part thereof 51.85
Mechanical trade permits
Af snit new•.Geha.mercial per unit
Under 2;000 CFM 22.81
Over 2,000 CFM 22.81
__ - -• - - - - - - _ 22.81
_ . . _ ••- - - _ '*- - - - - 2
• 32.15
Heeds 98.52
- .. _ _ . -- - • • 32.15
Page 44
- - - - - - - - 32.15
Smoke central test
344.28
542.35
Over 50,000 square feet 840,00
Trash chute, per unit 98.52
Cleyater trade permits
Up to 3 stories 32.15
A-3-4-0-stecies 48,74
Per each additional story over 10 16.59
, - - - 2489
.Emergency power tart 22
3
Elevator recall
a-Base 133.77
25.93
50-4(a)
Upfront Fee shall be consistent with 14-62-(a)
(1), (2)
50-4(b) Refunds,time limitations,cancellations, change of contractors shall be
processed and fees assessed consistent with 14-62f b) (4), (5), (6),17)
50-5 (1) Certificate of occupancy or completion shall be.processed and fees assessed
(a) (b) consistent with 14-66(1)
Page 45
Employee training,education, safety and technology enhancements and other
50-7
surcharge will be assessed consistent with 14-70(1),A2),(3),(5).,as applicable
1
Documents. Requests for copies of department records, inspection reports, logs or
50-8(b) other similar documents maintained by the department will be charged a fee
consistent with 14-61(d)
3
50-9 Interest and collection fees shall be charged for unpaid amounts(fees.)due
Minimum Fire fee associated with a building permit 70.-00
Chapter 58. Housing
Article III. Property Maintenance Standards
Division 2.Administration
,
Subdivision II.City Managers Designee
50 3(q)
Fire permits
50-10(a)
Sprinkler/standpipe systems based on area of work
• Up to 2,500 square feet 1 591.09
i l
_r • 2,501 to 3,000 square-feet 642.94
• 3,001 to 5,000 square feet 741.96
• 5,001 to 10,-000 square feet 1,014.19
• 10,001 to 15,000 square feet 1,111.66
• 15,001 to 30,000 square feet 1,508.84
S
• 30,001 to 75,000 square-feet 2,696.20
• 75,001 to 100,000 square feet 3,959.27
Page 46
• 100,001 to 150,000 square feet 5,641.28
• 150,001 to 500,000 square feet 16,778.66
• Over 500,001 square feet 19,773.52
Standpipe systems only(no sprinkler system) per 100 feet 249.92
Fire pump acceptance testing 295.55
Pressure reducing valve acceptance testing 829.60
Minor work on existing sprinkler.system.(1-5 components) - 66.37
Minor work on existing sprinkler system (6-15 components) 208.44
Replace sprinkler heads(more than 15)
• Up to 2,500 square feet 173.18
• 2,501 to 3,000 square feet 198.07
• 3,001 to 5,000 square feet 247.84
• 5,001 to 10,000 square feet 296.58
• 10,001 to 15,000 square feet 346.36
• 15,001 to 30,000 square feet 494.65
• 30,001 to 75,000 square feet 1,088.85
• 75,001 to 100,000 square feet 1,583.50
• 100,001 square feet and up 2,325.99
50 3(q)
Fire alarm system based on area of work
50-10(a)
• Up to 2,500 square feet 311.10
Page 47
r.
• 2,501 to 3,000 square-feet 368.14
• 3,001 to 5,000 square feet 419.99
• 5,001 to-10,000 square feet 565.17
• 10,001 to 15,000 square feet 615.98
• 15,001 to 30,,000 square-feet 765.31
• 30,001 to 75,000 square-feet 1,161.44
,.. • 75,001_to..100,000.square.feet, 1,534.76
• 100,001 to 150,000 square feet 2,447.32
• 150,001 to 500,000 square`feet 7,201.97
• 500,001 to 1,000,000 square-feet 8,783.39
• Repair and replace fire alarm panel only
• Up to 2,500 78.81
• 2,501 to 3,000 78.81
• 3,001-to 51000 94.37
• 5,001 to 1.0,000 108.89
50-10(a) • 10,001 to 15,000 108.89
• 15,001-to 30,000 438.96
• 30,001 to 75,000 198.07
• 75,001 to 100,000 405.47
• 100,001 to 150,000 474.95
• 150,001 to-500,000 1,474.61
Page 48
• Over 500,000 1,712.09
Installation of new single station smoke detectors
• Under 5 devices, minimum 103.70
• Up to 25 devices 466.65
3
• Per additional 25 devices beyond the initial 25 or fraction thereof,above fee plus 311.10
Minor work on existing fire alarm system (1-5 components) 40.44
Minor work on existing fire alarm system (6-15 components) 201.18
Fire suppression system. Localized suppression system (cooking hood, paint booth,
50-10(a) ' etc.), per unit or system. Multiple systems in same area (i.e., kitchen)will be 246.81
charged at 50%of above fee for each additional system
50 3(q) Fire suppression system. Room suppression system (computer hood,electrical
642.94
50-101a) rooms,etc.), per unit or system
Minor work on existing fire suppression system (1-5 components) 57.04
50 3(r)
Hydrant flow test 244.00
50-10.(b)
50 3(t)
Occupant content sign 244.00
50-10(c)
50 3(t)
Pyrotechnic display permit 218.00
50-10(d)
50 3(u)
Fireworks permit 322.00
50-10(e)
50-3(v)
Open burning permit 218.00
50-10(f)
Page 49
50
Bonfire permit 145.00
50-10(g)
50 3(x)
Special events fees see 50-3 (:p.} ..2400
50-10(h)
50 3(y) Trade shows_(fee for event plans covering MBCC or-similar facility hall area or part
50-10(i)
thereof)
150:00
50 3(z)
Sidewalk cafes—Propane tank heaters per establishment 25.00
50 3(aa`)
Special master cases 300.00
50-10(k)
-- - - - - - -
SO size)or-$1.00 per page-(larger than legal size).
50-10(I) Documents. Requests for conies of department records, inspection reports, logs or
other similar documents maintained by the department will be charged a fee
consistent with 14-61(d)
Annual Adjustment of rates. The rates,per-taining to this division will
50-1-0(m) administratively adjusted annually to reflect increase(s) or decrease(s) in the
Consumer Price Index for all urban consumers, CPI-1J
Section
this Code Description Amount
50 5(d} ` Fees for the issuance of the fire safety permit and the annual renewal thereof. I
50`5(d)(1} I
Assembly occupancies:
50-12.(a.)-(e.)
Class A—occupant load-greater than 1,000 persons $115:00
Page 50
Class B—occupant load greater than 300 but not greater than 1,000 persons
86.25
Class C—occupant load of 50 or more but not>300 persons 57.50
50 5(d)(2) Educational occupancies:
Schools(private)—educational facilities inclusive of the first to the 12th grade:
Buildings up to 10,000 square feet 57.50
Buildings greater than 10,000 square feet 57.50
Plus,for each additional 1,000 square feet 1.15
Nurseries,day care centers, kindergartens—educational facilities up to but not
57.50
including the first grade
50 5(d)(3)50
Health care occupancies:
12 (a)—le)
Private hospitals, nursing homes, limited care facilities:
Up to 100 beds 143.75
Over 100 beds 143.75
Plus, per bed over 100 1.44
�8 }{ Residential occupancies:
Apartment buildings:
3-11 dwelling units j 57.50
12-50 dwelling units 80.50
Over 50 dwelling units 80.50
Plus, per unit over 50 2.30
Page 51
Hotel,motel, dormitories, lodging house or rooming house:
{ 3-50 rental sleeping units 80.50
Over 50 sleeping units 8030
Plus, per unit over 50 2.30
Board and care facilities:
Small facilities—not more than 16 residents 80.50
- - - ••Lar-ge•facilities—more-than 16 residents 80.50.
Plus, 2.30
50 5(d}(5}
per
Mercantile occupancies:unit over 16
50-12 (a)—(e.)
Class A—all stores having an aggregate-gross area of more than 30,000 square
feet or utilizing more than three levels,excluding mezzanines,for sales 86.25
purposes
Plus, 1,000 square feet over 30,000 square feet 1.15
Class B—all stores of more than 3,000 square feet but not more than 30;000
square feet aggregate gross area,or
86.25
utilizing floors above or below the street floor level for sales 86.25
Class C—all stores of not more than 3,000 square feet gross area used for sales
purposes on one story only
57.50
50-544464
Business occupancies:
50-12 (a)—.(e)
General offices, including doctors', dentists',and outpatient clinics
(ambulatory):
Up to 5,000 square-feet 57.50
Page 52
Over 5,000 square feet 57.50
Plus,for each additional 1,000 square feet 1.15
Colleges and university instructional buildings,classrooms under 50 persons
57.50
and instructional laboratories
Plus,for each classroom 1.15
50-544P)
Industrial occupancies:
50-12 (a)–(e)
General industrial occupancies—industrial operations conducted in buildings
of conventional design suitable for various types of industrial processes;
subject to possible use for types of industrial proc-esses with high density of
employee population:
Up to 5,000 square feet 57.50
Over 5,000 square feet 57:50
Plus,for each additional 1,000 square feet 1.15
Special purpose industrial occupancies-industrial operations in buildings
designed for and suitable only for particular types of operations,characterizes
by a relatively low density of employee population,with much of the area
occupied by machinery or equipment
Up to 5,000 square feet 86.25
Over 5,000 square feet 86.25
Plus,for each additional 1,000 square feet 1.44
High hazard industrial occupancies—buildings having high hazard materials,
processes,or contents:
Up to 5,000 square feet 115.00
Over 5,000 square feet 115.00
Page 53
Plus,for each additional 1,000 square-feet 1.73
50-5 )-50-
Storage occupancies:
12 (a)–(e.)
Low hazard contents -classified as those of such low combustibility that no
57.50
self-propagating fire therein can occur
Ordinary hazard contents—classified as those that are likely to burn with
moderate rapidity or to give off a considerable volume of smoke:
Up to 1-0,000 square feet 86.25
Over 10,000 square feet 86.25
Plus,for each additional 2,000 square feet , 1.15
High hazard contents—classified as those-that are likely to burn with extreme
rapidity or from which explosions are likely:
Up to 5,000 square feet 115.00
Over 5,000 square feet 115.00
Plus,for each additional 1,000-square feet 1.15
50-5-(d)-(9j
Marinas:
50-12 4a)–(e)
3 to 12 boat slips 57.50
13-to 50 boat slips 115.00
Over 50-boat slips -115.00
Plus,-per slip over-50 1.73
Hazardous material permit fee 150.00
50-12.(a)–(e)
Page 54
Late permit.fee, after 30 days 250.00
Late permit fee,after 90 days 500.00
50 6(c)50-12
(a)—(e] Placard fee for hazardous materials 50.00
58-233 Appeals from actions or decisions of city manager's designee 250.00
Chapter 66. Marine Structures, Facilities and Vehicles
Article III. Piers, Docks and Boat Ramps
Wi
Plans review fee shall be consistent with 98-93(a),(b).
66-114(a)
Up-front processing fee shall be consistent with 14-62(a),the greater of
Per 100 square feet of dock or fractional part 939
•
... .. - - - 9-59
m-fee— 2440
66-114(b) Reinspection fees shall be consistent with 14-61(c)11)
New mrrarin strut re additions:
.., - - -- - - - - - -170
9.59
Boat lifts, davits, boat hoists,each 640
- - x:99
Minimum fe a 3-5,00
66114-(c) - - •- - , - --• - _ - -
Page 55
...;.! - 47
- - ... .. 945
"" n -- 35.00
66414(44 Reinspeetion4-ee4
(?)'First reinspection -2600
_ - - _ _ . •_- - - °- . - - -- - X9:00
66111-(e) Special_projects fee,-Per hour
Chapter 74. Peddlers and Solicitors
Article II. Charitable Solicitations
Division-2. Permit
• 74-72 Permit fee 10.00
Chapter 82. Public Property
Article Ill. Use of Public Property
Division 2. Revocable Permit
82-92(9) Applic-ation fee 1,000.00
Mailing fee, per address within 375-feet of subject property 0.50
Involving use of city property 3,000.00
82-95(b) Nonwaterfront property for single-family use, per square foot subject to - 0.45
permit
3 v
Maximum 7,500.00
Nonwaterfront property for multifamily or commercial use, per square foot
subject to permit
0.90
Page 56
Waterfront property, regardless of use, per square foot subject to the permit
1.25
Article IV. Use in Public Rights-of-Way
Division 2.Temporary Obstructions
82-151(c)(4) Base fee 30.00
Plus, per lineal foot of street obstructed, per day 0.25
82-151(e) Applications for hearing 75.00
Division 3. Newsracks
Subdivision II.Administration and Enforcement
82-204(a)(1) - Release of stored newsrack 25.00
82-204(a)(2) Upon filing of a request for hearing = 25.00
82-204(b) Reinspection fee 7.80
Subdivision III. Registration
82-231(b)(3)a. Per publisher,for any number of newsracks 7.68
82-
At initial registration, per newsrack 7.80
231(b)(3)b.
Registration of at least 20 newsracks, per newsrack 3.90
Division 4. Pay Telephones
Subdivision II. Permit
Annual fee for pay telephones provided by local exchange companies for local
82-307(a) 370.00
service only
Annual fee for all other pay telephones providers,for each pay telephone
82-307(b) 650.00
installed
Page 57
Or, if a commission is paid to a private premises owner,an initial permit-fee
shall bepaid of
250.00
Upon renewal,an additional permit fee shall be paid,equal to the difference
between$650.00 and the-commission-paid-to-the private premises owner,
plus$250.00.
.............
82-307(c) The first$250.00 of all annual permit fees shall be nonrefundable.
82-307(d) Late-payments, per month 25.00
Subdivision 111.-Regulations
82-341(j) Retroactive annual permit fee for-existing pay telephones:
Minimum 100.00
Maximum 650.00
Division 5.Sidewalk Cafes
Subdivision II. Permit
82-382(b) Base application fee 150.00
Annual fee, per square foot of usable sidewalk area, including the area
82-383(a)
between the tables and chairs:
Effective October 1, 2010 17.50
Effective October 1, 2011 20.00
Application to design review or historic preservation board pertaining to the
82-384(ff) size of food display cases associated with sidewalk cafes and related 200.,00
restaurants
Chapter 86.Sales
Article II. Garage Sales
Division 2. Permit
Page 58
86-56(b) Permit,.each (for non-online applications) 15.00
Article Ill. Nonprofit Vending and Distribution
Division 2. Permit
86-173 Permit fee, per application, not less than 15.00
Chapter 90.Solid Waste
Article Ill. Collection and Disposal
1 Division 3. Rates, Charges, Billing Procedures. -
90-137(a) Single-family residences,townhouses, per month 29.92
Duplex, per month per unit 29.92
• Apartments,condominiums with less than 9 dwelling units, per month per
25.94
dwelling unit .
The rates will be adjusted annually to reflect the increases or decreases in the
consumer price index for consumers in the southeast United States for all
items, and in the Miami-Dade County tipping fees, unless otherwise directed
by the city commission.
Article IV. Private Waste-Collectors/Contractors
Division 4.Specialty Contractors
Subdivision II. Rolloff Waste Container Contractors
90-278-(1) When rolloff is located in parking meter spaces, per meter, per day 5.00
90-278(6) Failure to timely pay license fee 50.00
Subdivision IV. Hazardous, Biohazardous Waste Containers
90-332(b) Annual fee,each permit 25.00
Chapter 98.Streets and Sidewalks
Page 59
-r------
Article Ill. Excavations
Division 2. Penm�
Amount
Section
Description
(-Effective
thisCode Oct 25,
' |
2012\
'
98-
�� -�` `" �^ -� (1)^ '' - �Street e*cavmt ' ~' ' -'- `�+' -� ' -'
9J{c ` ' / —' ,--
. .
50 lineal feet or less $362.95
Each additional lineal foot 3^05 r
(2) / Sidewalk repair permit
| �
J_ 5OUnea|feet or�ss ' 298.65
]
- - _� - --
� |
Each additional lineal1oot 3]]5
(3) � Sidewalk construction permit:
- - '- -
( � 5O lineal feet mrleas 98.GS
��
� ! �
Each additiona lineal foot 3]05
. �
, .
-4U Paving or r.esurfacing of parkway or shoulder area permit:
. . '
25 lineal feetor less 298.65
_
Each additional lineal-foot 6.48
`
(5) Landscaping, per tree 103.70
| '
(6) ' Landscaping, bedding 103.70
` .
Page 60
(7) Building line and grade survey permit:
50 lineal feet or less 362.96
Each additional lineal foot 7.25
(8) Driveway construction permit,each-driveway 129.62
(9) Flume excavation permit,each excavation 3 298.65
Utility placement permit, poles,splice pits, manholes, hand holes,catch basins,
(10) 298.65
pedestals,vaults and auger holes
Plus,for each additional, per block on same permit 14.51
Underground utility service connection right-of-way excavation permit,each
(11)` water,gas,electric,telephone,cable,television or sanitary sewer connection 298.65
from base building line to the utility located within the public right-of-way
(12) Groundwater monitoring wells,each well 298.65
(13) Permit renewal fee:90-day extension of permit fee expiration date 129.62
After-the-fact permit fee. For any work described in (1)through (12), (16)and
(14) (17) herein, performed without proper permits and inspections, quadruple the
fees.
Reinspection fees.When additional inspection is required for work previously
(15) inspected and rejected by the department of public works,a reinspection fee 114.07
will be required,for each reinspection
(16)` Dewatering permit fee 362.95
Blocking of right-of-way(Cranes only)
(17) Note: For arterial roadways,full day permit is defined as six hours between 9:00
a.m.and 3:00 p.m.
Standard review(full day permit)
• Local road 1 320.43
Page 61
1
I
•-Collector road 427.24
• Arterial road 534.05
Priority review-(same day permit review)
• Local road 384.51
• Collector road 512:27
• Arterial road 640.86
= Consecutive multi-day additional fee (per.day) ..._ _.. , _ . .. 54.96.
Partial day permit(4 hours or less)
• Local road 159.69
• Collector road 213.62
Blocking right-of-way(all others):Thezreater of$0.-25 per L.F. per day or$0:03
per S.F. per day)
(18) Revocable permit
Application fee, involving city property 4,148.00
Mailing fee, per address within 375 feet 0.51
_u
3
(19) Coastal review 9.18.78
'420) Sewer-capacity certification letter application ` 155.55
■- - - - - - •- .. - - - - -. - - - -. : a - -- - -
3 -
92(e)
- - - - - - - - - - " - - - - - -- - - - - - -
ardrdition to-the cenuir-ed permi#fees
Deinspecti n Fee•
Page 62
51.85
- - _ -•- _ _ - 403,70
Revised plans preressing fee 25.92
Railings I 2.6796
I andscapinR(residential) E�
- _ - .. .. - •
. . - . 64,18
.. .. ... ' - • ••• 68.44
- - •- .. • ••• 74.66
Ge-Fam-uftuc-ation-equipment-enelestire 2-6,96
' s
•• •• - • - - • ... - 4.4.51
_ --- -- - - - - - ,-- ,---
- - 22.81
.. .. .. - . � _ - - •,•• -
.. _ --- - - - - - - - - , ,--- - - - - 29.03
-- -- -. --- - - - - - - - - - - - - _ - - - • - - 15.55
- - - .. 51.85
_ --- - - - - - - . - - - - ,--- _ - - 51.85
Page 63
' ^ ^'- ^^''' :;' ''r ' ^^ '^' '' �e �e� '' . ' '' ^ ''
' ^ ' 52.88
equipment
| | ,
� v":
� 52.88
. . .
-
> | � .'---�__-�-------------------- --- -------------- -----------`--- ---
. . . . .
_ •, ' , - -' •_ ': ' •' ' '^ '' " - ' ' 5I��6
' ' ' ' ''
; � ^
• / |
'- -r' ' -------- ------ --'-- --' - - -- - - - - ------ --'--- - -
| � Total-demolition
Under 3 stor�� �=z` -� . � 26,96 _~
/ � ! |
--Over 3-stories 25.92
/.
. . . ~.~.. ~^....~..
' . ~ Under 3QO square feet AAA
� � ! ~ 300- 1000squarefeet ' 24,00
i___ � ___l___ ___-__'_-_-_-_- --_---__-----------'--------------- --- �
� � ! ~ 1J]O1--5,O0O square feet 2448
�-Per 1;00]m*er�,}00 square feet 21.77
� / � i— --'----------- ------- - -- - ' - - - -- --' --- ---------~
. . . ° .
- / p' -: : ^ :� - ^- ' ' ' ' " " ` ' ' ' ' "" ' 24,�8
' , . ' ' ' '
•
� .
Public Works review fee for a commercial buUd|ng_penmit shall be assessed
98-93(a)
/ . at.70%of the cost of construction.
> �
}
Public Works review fee for a residential building_permit shall-be assessed
98-93Ja) �
at.50V6 of the cost of construction.
____--.
Double Fees for work,prior to issuance of.permit,,plus penalties shall be
98-92(b) '
consistent with 14-61(b)
Page 64
98-93(c)(1) Reinspection fees shall be consistent+with 14-61.(c).(1)
98-93.(d) Lost Plans fee shall be consistent with 14-61(d). Planning shall not assess
administrative processing fee
98-93-(e) Revised Plans Review fee shall be consistent with 14-61(e)
98-93.(f) Lost Permit Card fee shall be consistent with 14-61(fl
Inspection Fee hourly rate. As determined by the department at the
98-93(g) beginning of each fiscal year
-._ Plans re-review fee shall be consistent with 14-61(h)
98-93(i) Expedited plans review and inspections in addition to all applicable fees
Expedited plans review(not to exceed 4 hours) 500.00
Expedited inspection 150.00
•
Annual Adjustment of rates. The rates pertaining to this division will
98-93(1) administratively adjusted annually to reflect increase(s)or decrease(s) in
the Consumer Price Index for all urban consumers, CPI-U
Phased Permit
98-93(n) If department review of Phase Permit application is required,a fee
consistent with 14-61(e) shall be assessed.
•
o Commercial 2-640
,
' - - -. - - - - - - -- -•' 25.92
Meving-lattildings-er-ether-structures 2.6,96
Page 65
0 12.44
• - .. - - - - - - 14.51
- -0---Single"family heme,_/ner unit) 26,96
All other occupancies 1-30 units 26,96
.. 26,96- -
25.92
Chargi.nn_e•tatienr.-(commercial) -240.58
- - - _ • - , - - 7876
_.First zone 9.33
Each addition-.! zone 21.77
17.62
iog ne� Stand lie e
-25.92
Page 66
Welly tanks gar sewer•
25.92
- - _ - - - _ - . -, - - - - - - '. - - 25,92
25.92
. . - - -- - - - - - - - - 36.29
- - - - - - 25.92
feet
e1 I lnit ncw• ResTUAnir
1 Unit 29.03
—5 I I n its 14.59
AC unit new:-Commercial, per unit /18.73
49:-78
_ __ - -- -- - - • - - -_ - - - -. - -- - - - _ •. - - . . -
• I I • •• • •
INCRE11 ENTAI COST PER
OCCUPANCY TYPE INCREMENTAL Inn cnI IAnc
-FEET
Page 67
{Effective Oct. 15, 2012)
A 1,Assembly:-Fixed seating(theater,concert hail)
Up to 3,000 square-feet $6.-23
a From 3,001 square-feet to±5;000 square-feet,above fee plus 040
a From 15,001 square feet to 50,000 square-feet,above fee plus 040
A_1 .A Iteration/Dem_ deli.ng•
- ,
Up to 350 square-feet -50.38
-from 351 square feet to 17,500 square=feet,above fec plus
-from 17,501 square feet to 50,000 square-feet,above fee plus 072-13 .
2 Alteration_�Demedeling 58X10
� �'f7"?C1
. A _ .• • •• _.•- - •• ••
Up to 1,000 square feet 2044
A-3 7A v Alteratie V-Remodeling 20.6
1
8, Business
Up to 500-square feet 44:09
•-From-501 square feet to 25,000 square feet, above fee.plus
From 25,001 square feet to 50,000 squarefeet, above fee plus 044
Up to 500 squa:refeet 12.37
Page 68
.. . - . ... - - - - -- 4
Up to 3,000 square feet 95
From 3,001 square feet to 50,000 square feet,above fee plus 046
DIE,AlteratioRARemodekng
Up to 3,000 square feet 3.30
from 3,001 square feet to 50,000 square feet, above fee plus - 0,89
® Up to 1,500 square feet 19.25
From 1,501 square feet to 50,000 square feet,above fee plus 0
I_1 Alteration/Remerleling
Up to 1,500 square feet
a From 1,501 square feet to 50,000 square feet,above fee plus 4
Up to 4,500 square feet 5--35
•. - - - . e - -- - - 0,34
I-2 A lteratien/Remodeling
.. . - - - . •.• - -- - -- 447
Up to 1,000 square feet
20.34
Page 69
•• �� " '' �0,3-2' '` ' ': '' '' ; _ ` 0,3-2
- ' ' • " :' ' -' " : : ' " ^ • - ':' :' ''t; 20j81
. ,
' 7'--------'- ---------
= Uptm40Q square feet / -60,14
- . .
- ^e , '' '' '' " • �ee , ' ' - ' ' -:: '�''� {�84
^ ' '
~ Fram 20,001 square feet tm60,00Qsquare feet,above koplus 049
51.54 -
^^' 14 .
^ ~
Up to 1,500 square feet ' 17.38
' ^
~from l,5O1 square feet tm50,-0QQ square feet,above-fee m|us � {���
'
_
13.71
� !/-- - --- - ---- - -— -- ' -- - ------ ------ ---�--- - ---- ------- -`
• ' ,' ." ' ' .-. ' .' ' ':' ;.': '; ' '' .: ' ' ^. :
} '
~ Up to 2,000 square feet 12.82
- ''` , ere ' ,' , ' -._' 0,26
� .
_ ^ '_-
10.31
. , ' ,, .: ' ' "' '^ ' .' ^ ' :' ~ - ' . '�'' " ~. ",�' .~'' '-
- -
� | ~Wphm 600 square fact i 42,76
fromn6O1 square-feet to30,00O square feet,above-fee plus 0,87
w-Frmnm 30,001 square feet to 50,-000 squame feet,above-fee plus {�7-5
3446
• , " ' ': ' ^ ' "' -' '' ^ ' ' ^ ' ''r / ` :^'
Page 70
Up to 1,500 square feet 46704
•• - - - . ... - - _ 4742
. .. _ __ . ... - -- - -- 07g0
R 3/ A Iteration/Remedelinn 13.74
Up to 1,500 square feet
44790
- -- e, - -- -- 0:2-3
13.71
Up to 500 square feet 29.38
From 501 square feet to 25,000 square feet,above fee plus 073-3
� - -- . ... -- 0:
S_1 Alteration/Remodeling
46708
.. • - -- • !!! - -- - - 672.9
Up to 1/000 square feet 20784
from 1,001 square feet to 50,000 square feet,above fee plus 0
20.61
S 2,Storage: Parking garage
Page 71
Up to 15,000.square-feet
From 15,001 square feet to 50,000 square feet 0:85
- - • '- - -" �o
Shell building<75 feet
Up to 7,500 square feet
From 7;501 square-feet to 5-0,000 square feet,above fee plus 0
Shell building>75 feet. ..:.;:. -
Up to 15,000 square feet
A-1400145,001 square feet to 50,000 square feet,above fee plus 0:86
sI - __ - '
- -
DT-Residential 073-1
_ .. -: 0,24
... ...... . ........ __.._. 3333.._
S 2,Storage:-Parking garage or shell-buildings 0706
- .. ..
-- - - - - -•-- 0,34
store, drug store,gas station}
98-94(a).(1),.(2) Upfront Fee shall be consistent with 14:62(a)
Page 72
98-94(b) Refunds,time limitations,cancellations,change of contractors shall be
processed and fees assessed consistent with 14-62(b)(4),(5),(6);(7)
Certificate of occupancy or completion shall be processed and fees
98-95 assessed consistent with 14-6611)
Employee training,education,safety and technology enhancements
98-97 and other surcharge will be assessed consistent with 14-
70(1)A2),(3),(5), as applicable
Documents. Requests for copies of department records, inspection
98-98(b) reports, logs or other similar documents maintained by the department
will be charged a fee consistent with 14-61(d)
Interest and collection fees shall be charged for unpaid amounts(fees)
98-99
due.
Minimum Public Works fee associated with a building
70.00
.permit
98-101 Temporary and special event fees
Temporary platforms for public assembly,first approval 26.96
Temporary bleachers for public assembly,first approval 24.88
Tents up to 1,000 square feet per unit•(excluding electric and
plumbing) 26.96
Tents each additional 1,000 square feet over 1,000 per unit(excluding
electric and plumbing) 17.62
Construction trailer, per trailer 26.96
Office trailer, per trailer 26.96
Temporary power for construction 26.96
Page 73
Temporary toilet/outhouse 14.51
Enforcement of City Code related to building trade permits
Section
Description Amount
this Code -
Chapter 102.Taxation
Article IV. Resort Tax
Division 4.Tax
102- -
Resort tax registration fee:
310(b)
At time of registration 25.00
If compelled to r-egist.er because of failure or refusal to pay 100.00
102-
311(h) Dishonored checks,The-greater of:
The charge paid by the city-to the bank,plus 25%of the bask charge, minimum 5.00
5%of the amount of the check
102-314(f) Reporting fee:
Initial late r-eporting fee . 50.00
Plus,for each 30-day late period . 25.00
Maximum 500.00
Page 74
! � Article upational License Tax
Fee for hearing when licensee orpenmittee fails tocmrno�vv�hnmt�mqfV�»|a�mn
102'304 � comply ' 75J00
or when requested by aggrieved applicant/licensee
! '
-Chapter 106.Traffic and Vehicles
. .
Article V. Police Vehicle Tow ng
.
� . Division 2. Permit
| �
106-216 Per vehicle tow 1 20.00
' �-� ' ~-=—l~=~�'~--` --------~ --^~~~��--`-^`-- '`-- ---------` ' -------`'— ` `'
Article VI.Towing and Immobilization of Vehicles
8 � �
106-
Fee for removal of immobilization device, not tmexceed 25.00
26gk)(l)o | `) �
_ _-' —' - _ -_ _- __ '' � ' - -' - ,
Chapter 110. Ut|��s ,
'
' .
Article III.StonnvvmtarUtility
110-39(e) Meter test fees (if meter found to be working properly)
, .
Up to 1 inch ' 50]}0
_-____ __ ______'_`-___ -_
1.5to2inches ! 100.00
_`
3 inches and greater . 275.00
2nd Request within a 12-month period
� � |
Up to 1 inch 75J00
�- - - - -_ - - _ _ -_
1.5 to 2 inches 125]]0
3 inches and greater > 300.00
- -
__-__
110-39( ) Unauthorized use of city water/meter tampering 100.00
I �r-
Page 75
Unauthorized use of city water/meter tampering(2nd occurrenc-e) 200.00
Unauthorized use of city water/meter tampering(3rd occurrence and each
subsequent occurrence). (In addition,the owner and/or consumer shall pay all
costs associated with keeping the service off, including, but not limited to,all
300.00
utility expenses, materials,cost of equipment,and reasonable attorney fees)
110-42(b) Unauthorized turn-on of service 100.00
Unauthorized turn-on of service42nd occurrence) 200.00
Unauthorized turn-on of service(3rd occurrence and each subsequent
occurrence). (In addition,the owner and/or consumer shall_pay.all costs associated
with keeping the service off, including, but not limited to,all utility expenses, 300.00
materials,cost of equipment,city labor costs,and reasonable attorney's fees and
costs)
110-43(c) Turn-on-fee 25.00
s.
Stormwater utility service charge effective with billings on or after the following
110-109(c)
dates shall be as follows:
October 1, 2000 3.25
October 1,-2001 4.00
O.c4ober 1, 2002 5.50
October 1, 2003 5.80
October 1, 2004 5.80
October 1,-2005 5.80
October 1, 2008 , 7.42
October 1, 2009 9.06
October 1, 2014 16.67
Article IV. Fees, Charges, Rates and Billing Procedure
Page 76
Division 2. Rates, Fees and Charges
110-166(a) Minimum service charge:
Minimum
Monthly
Gallons of Service Charge
Size of (effective for
Water
Meter
per Month
billings on or after
October 1, 2000)
%" 5,000 $ 11.05
1". 7,000 15.47
11/2" 11,000 24.31
2" 17,000 37.57
3" 40,000 88.40
4" 80,000 176.80
6" 120,000 265.20
8" 200,000 442.00
Minimum
Monthly
Size of Gallons of Service Charge
Meter Water (effective for
per Month
billings on or after
Page 77
October 1, 2001)
%" 5,000 $ 11.30
1" 7,000 15.82
1%2" 11,000 24.86
2" 17,000 38.42
3" 40,000 90.40
4" . .. 80x000 180.80
6" 120,000 271.20
8" 200,000 452.00
Minimum
Monthly
Service Charge
Size of
Gallons of
Water (effective-for
Meter
per Month
billings on or after
October 1, 2002)
%" 5,000 $ 11.55
1" 7,000 16.17
1%:" 11,000 25.41
2" 17,000 39.27
3" 40,000 92.40
Page 78
4" 80,000 184.80
6" 120,000 277.20
8" 200,000 462.00 •
Minimum
Monthly
Service Charge
Size of
Gallons of
Water (effective for
Meter
per Month
billings on or after
October 1, 2003
%" 5,000 $ 11.88
1" 7,000 16.60
1%2" 11,000 26.04
2" 17,000 40.20
3" 40,000 94.48
4" 80,000 188.88
6" 120,000 283.28
8" 200,000 472.08
Gallons of Minimum
Size of Water Monthly
Meter per Month Service Charge
Page 79
(effective for
billings on or after
October 1, 2004)
%" 5,000 $ 12.13
1" 7,000 16.95
11/2" 11,000 26:59
2"_._.._ 17,000 .. 41.05
3" 40,000 96.48
4" 80,000 .192.88
6" 120,000 289.28
8" 200,000 482.08
Minimum
Monthly
Service Charge
Size of
Gallons of
Water (effective for
Meter
per Month
billings on or after
October 1, 2005)
5,000 $ 12.38
1" 7,000 17.30
1%2" 11,000 27;14
Page 80
2" 17,000 41.90
40,000 98.48
4" 80,000 196.88
6" 120,000 295.28
8" 200,000 492.08
Minimum
Monthly
Service Charge
Size of
Gallons of
Water (effective for
Meter
per Month
billings on or after -
October 1, 2006)
%°' 5,000 $ 13.95
1" 7,000 19.53
1%" 11,000 30.69
2" 17,000 47.43
3'° 40,000 111.60
4" 80,000 223.20
6" 120,000 334.80
8" 200,000 558.00
Page 81
Minimum
Monthly
Service Charge
Gallons of
Size of (effective for
Water
Meter per Month
billings on or after
October 1,2007)
3/411 5,000 $16.15
1" 7,000 22.61
_ -
1.05" 11,000 35.53
2" 17,000 54.91
3" 40,000 129.20
4" 80,000 -258.40
6" 120,000 387.60
8" 200,000 646.00
Minimum
Monthly
Service Charge
Size of Gallons of
(effective for
Water
Meter per Month
billings on or after
October 1, 2008)
5,000 $19.40
1" 7,000 27.16
Page 82
1.5" 11,000 42.68
2" 17,000 65.96
40,000 155.20
4" 80,000 310.40
6" 120,000 465.60
8" 200,000 776.00
Minimum
Monthly
Gallons of Service Charge
Size of Water (effective for
Meter
per Month
billings on or after
October 1, 2009)
3/4" 5,000 $21.80
1" 7,000 30.52
1.5" 11,000 47.96
2" 17,000 74.12
3" 40,000 174.40
4" 80,000 348.80
6" 120,000 523.20
8" 200,000 872.00
Page 83
Minimum
Monthly
Gallons f
Service Charge
o
Size of (effective for
Water
Meter
per Month
billings on or after -
October 1,2014)
%" 5,000 $22.15
1" 7,000 31.01
---
1.5" 11,000 48.73
2" 17,000 75.31
3" 40,000 177.20
4" 80,000 354.40
6" 120,000 531.60
8" 200,000 886.00
Section
this Code Description Amount
Water in excess of subsection 11-0-166(a),-shall be as follows:$2.21 per 1000..gallons,
effective with billings on or after October 1, 2000; $2.26 per.1,000-gallons,effective
with billings on or after October 1, 2001;$2.31 per 1,000 gallons,effective with billings
on or after October 1, 2002; $2.44 per 1,000 gallons,effective with billings on or after
110-166(b) October 1, 2003; $2.49 per 1,000 gallons,effective with-billings on or after October 1,
2004; and $2.54 per 1,000 gallons,effective with billings on or after October 1, 2.005;
and $2.79 per 1,000 gallons, effective with billings on or after October 1,2006; $3.23
per 1,000 gallons, effective with billings on or after October 1,2007;$3.88 per 1,000
gallons, effective with billings on or after October 1, 2008; and $4.36 per 1,000 gallons,
effective with billings on or after-October 1, 2009; and $4.43 per 1,000 gallons,
Page 84
effective with billings on or after October 1,2014.
110-166(d) Tapping fee, per size of tap in inches:
4,726.00
1 4,665.00
1%: 5,106.00
2 5,116.00
_ . 3 _ 5,627.00
4 6,189.00
6 6.808.00
110-166(e) Guarantee of payment deposit, per service in inches:
40.00
1 50.00
11/2 60.00
2 100.00
3 500.00
4 600.00
6 1,000.00
8 1,500.00
110-166(f) Re-read fee (Charged if meter found to be working properly) 25.00
110-166(g) Special read fee 25.00
Page 85
Servicing a meter found damaged,destroyed or missing will require actual
110-166(h) Actual costs
replacement cost plus all costs associated with replacement of meter
110-166(i) Field visit fee:
Normal business hours 25.00
After normal business hours 50.00
-110-1.67(a) Water impact fee, per meter size in inches:
5/8 155.00
230.00
1 385.00
1%2 775.00
2 1,240:00
3 2,480.00
4 3,875.-00
6 7,7-50.00
8 12,400.00
•
Larger than 8 inches, based on relative meter capacities
Sanitary sewer service charge,shall be as follows:$3.73 per 1,000 gallons,effective
with billings on or after October 1,2000; $3.81 per 1,000-gallons,effective with billings
on or after October 1, 2001;$3.90 per 1,000-gallons,effective with billings on or after
October 1, 2002; $4.03 per 1,000 gallons,effective with billings on or after October 1,
110-168(a) 2003; $4.12 per 1,000 gallons, effective with billings on or after October 1,2004;and
$4.21 per 1,000.gallons,effective with billings on or after October 1, 2005; and $4.25
per 1,000 gallons,effective with billings on or after October 1,200634.93 per 1,000
gallons, effective with billings on or after October 1, 2007;$5.62 per 1,000 gallons,
effective with billings on or after October 1, 2008; and$6.04 per 1,000 gallons,
effective with billings on or after October 1, 2009; and$6.34 per 1,000 gallons,
Page 86
effective with billings on or after October 1,2013; and $7.55 per 1,000-gallons,
effective with billing on or after October 1,2014.
110-169(a) Sewer impact fee, per meter size in inches:
5/8 235.00
350.00
1 58'5.00
1%Z 1,175.00
2 1,880.00
3 3,760.00
4 5,875.00
6 11,750.00
8 18,800.00
Larger than 8 inches, based on relative meter capacities
110-170(a) Submeter service inspection 50.00
Division 3. Billing Procedure
110-191(f) Dishonored checks,the larger of:
Base fee 20.00
5%of the amount of the check
Disconnect charge (includes connecting after payment) (If disconnected for
110-192(b) nonpayment all future payments must be made by ACH bank transfers or by a city 40.00
accepted credit/debit card)
110-192{e) Unauthorized turn-on after disconnect 100.00
Page 87
Unauthorized turn-on after disconnect(2nd occurrence) 200.00
Unauthorized turn-on after disconnectfor cause(3rd occurrence and each subsequent
occurrence) (In addition,the owner and/or consumer shall pay all costs associated
300.00
with keeping the service off including, but not limited to,all utility expenses, materials,
cost of equipment,city labor-costs, and reasonable attorney's fees costs)
-Subpart B.land Development Regulations
Chapter.a 1 A Gener l Prevision
114-7(e) - . : --•-• . •- : - . - .- : : - : -- - .
114-7(e)(2) 1 Zoning compliance letters in single family districts 50.00
- - - - - - - - - - - - - - , _- -- - - - ' 160.00
letters
- - _ - - - - - °- - - - 50.00
Article 1. In-General
1183 - - - - - • - - - - - • - - -., - _ - :,.
118-6 Cost recovery
- -Review and Report-by outside source TBD
118-7 Fees for the administration of land development regulations
General-fees for Public Hearing
Application for preliminary evaluation before a board 500.00
Application for public hearing 2,500:00
Application for clarification of previously approved board order 1,500.00
Application for amendment to an approved board order 2,500.00
Application for extensions of time of a previously approved board order(non-
1,500.00
administrative)
Application for after the fact approval 3 X Org.-Fee
Advertisement(Additional fees may apply based on notice requirement 1,500.00
For LDR,Comp. Plan and corresponding map amendments)
- Mail Notice (per address) I 4.00
- Posting(per site) 100.00
- Withdrawal or continuance prior to public hearing 500.00
- Deferral of a public hearing 1,500.00
Page 88
Amendment.of the Land Development Regulations,Zoning Map,
Comprehensive Plan and Future Land Use Map 118-162(a)and (b)
Amendment to the permitted, conditional or prohibited uses in a zoning category(per 2,500.00
use).
Amendment to the permitted,conditional or prohibited uses in the comprehensive 2,500.00
plan (per use).
Amendment to the zoning map designation (per square foot of lot area) up to 5,000 0.50
sq.ft.
Amendment to the zoning map designation (per square foot of lot area) 5,001 sq.ft.
0.70
and greater
Amendment of future land use map of the comprehensive plan (per square foot of lot 0.50
- .. area) up to 5,000 sq.ft.
Amendment of future'land use map of the comprehensive plan (per square foot of lot 0.70
area)5,001 sq.ft.and greater.
Amendment to the land development regulations(per section being amended 10,000.00
Amendment to the-comprehensive plan(per-goal, policy,or objective being 10,000.00
amended.)
Conditional Use Permits 118-193
Application for Conditional Use Permit for an adult congregate living facility(per bed) 100.00
Design Review 118-253
Application for Design Review Board approval (per gross square foot of new
construction) .50
Land/Lot Split 118-321
See applicable fees under General Fees
Variances 118-353
'` - Per variance requested - 500.00
Certificate of Appropriateness 118-562/564
Application for COA(per gross square foot of new construction) 0.50
Historic Designation 118—591
Application for district designation (per platted lot) 100.00
Planning Director determination of architectural significance (142-108) 2,500.00
Staff Review and Miscellaneous Fees
Preliminary zoning review(Dry Run) up to 5000 sq.ft. 2,500.00
Preliminary zoning review(Dry Run) per square foot fee beyond 5000 sq.ft. 0.50
1 Board Order Recording up to 10 pages. (11+ pages will be assessed a per page fee) 100.00
Status Reports 1,000.00
Page 89
Progress Reports 2,500.00
I 1Failure to appear before a board for Status or Progress Report 2,500.00
Zoning Verification letter(per address or folio—includes 1 hour of research) 250.00
Zoning Interpretation Letter 1,000.00
Research per hour fee (beyond four hours per submittal) 150.00
Excessive Review per hour fee (beyond four hours per submittal) 150.00
Review of Covenants or Easement 5,000.00
Modification or release of-Covenants or-Easement 2,500.00
Courier(P er package)P g ) 10.00
Recording fee(up to 10 pages) 1 100.00
1 Per page recording fee (beyond 10 pages) " 10.00
Paint-permit(non-online applications) 75.00
Signs(Not requiring a building permit) 75.00
Hard copy(paper)submittal conversion of documents to electronic format shall be
charged at city's cost from vendor TAD
Article I11. Amen.dmerat P.roced..re 4-4:$0
118 162(d)a _ .. _ - - - - '. _ . - - - - -- - - •• - - - 944
prohibited.uses,per square foot of lot area
- _11-8 162(d)(1) - - - - - -- . . -. • _ -- - - - . - - - ••- - 944
- uses, per square foot of lot area for each request
- - - . - _ . --- - - - - - -- - _ w
-- . .. - _ .. - - - - - - - - - - - - - , - - - • - 1,915.00
b- - - - - -
118 162(d)(2}
118 196(1} - - - - - -, .. -- • . -- _ - - - . _ ' - - - - - ' ' - - 1,295.00
118 196(1)a Adult congregate living facility 1, 0
118 196(1)b Adult_congregate living facility, per bed 7-5.00
• - - - - - - - , : - -
Page 90
' conditions er an extension of time
Z
118196(2) - - - - - - • - - • - - - - - - . - 8.60.00
118 196(3) - - •• - - - - - - - • - - - - - -- : - - - - - •_, - - - - - - .. - - -_ 420708
date
118 196(4) 6400
than
448 196(5) - - - - - - - • - -: . - _ - -. - - - ' . _ 860.00
118 196(6) _ - -- - - -
118 196(7) Article" s:gn-RevTew as d s
118 255(a)
118 255(3)(1) • - - • - - - •• - - -. - • - - - - 420440
118 255(a)(2) • - - • - - -• - - - . . . . _ . . , _. - -- 868:08
118 255(a)(3) - - - - - _ - - - - - - - - - - - - - - - 49-5,00
118255{a)(4) • - - • - - • - - • - , . .. - _ .. - _ . 600
118 255(3)(5) 2-5-00
118 255(3)(6) - - -- - - _ _ - -: _ .- 645480
118 255(3)(9) • - - - •- - - -••••• - - - - - - - •.. - 860:00
448-
255(3)(10) - _ - -
448- - - - - - - -- - - .. _ _ _ -• .' 80-00
44g. - - - - - - - - - - - . _ . - , - .•- .. - - - - - - '500
255(a)(11) - • - - •- - - - - - - - - . - - •- --- -
4 4 8^ - - - - - - - - - -. . - - - . -- --- -- -- - -- - - . 90
255(a)(12)
448- 86040
255(3)(13)
255(3)(14) fee
Page 91
118 321(1) A -- • - _ - - .•- .. __ •--_ .' •_ _- _ • _ _ - 4729-540
118 321(2) _ _- ---- _ - - - - _ -- - 64571V
118 35711) •- • - - - - - - _ - .
118 357(1)a Filing for single family residences .00
118 357(1)b . _ .. - • - .. _ .. .. - : -- - •- - . . - _ _ -- - -- - - - 860,00
240,00
118 357(1)c _ _ .. . .. - - ° '- -
i
118 357(1)d -Signs 860.00
Signs,additional fee per request ; -300
118357(1)c , - - - - - - , - - - - - - - : - - •• 0-68
ree•idences-
r�
118 357(2) - - . - , • • - - - : ,
118 357(2)a Single-family residences, per variance 1-50,00
I348 357(2)6 '`- 645.00
- , 118 357.(2)c A - - . - •• . . •• • 645.00
- - - - _ -, - - - _ - _ -•-, . - - . - • - - - - - - - - --- - -
118357(4) - - - _ . - - . - - . - - _ _ . . '. - - - - - - - - - • 86040
administrative.deers+9n
—
118 357{8) - - - - - . _ _ - - .:_ _ - - -- - - - - - 43$80
=118399(1)c.1 _ _ - '.•-: - °• _ -• - _ • -:. •- - _ • -- - , - _ - - _ . ..-. - 8604X)
legally nonconforming
- - - - - - - - - _ - - - • - - ' - ,00
kitchens, per unit
Article Y Hi- teri.c Prer rvation
rtrtT�rrr�vr*�-r�z��rvtrrrvn
!'.' _ --' _ . - - - --- - • - .. _ . _
118537{a)(1)
origina ee
Page 92
118 537(b)�1� - - - - -- - - • .. - • _ _ _
■
• ' - • - - - - A - -- - - • ■'- - _ _ -
44-8'
• •- - _ .' _ ' _ - - - --- - - - - - , -- - 860,00
564(f)(7)a.
8.60.00
A - - • - - - - - -. _ - . . •- - - - - :•- 800
-- - . _ . . - . - - _ - - - _ - - - - - - - - 750.00
•_ _ .. _ . _ • •
- - - - 645.00
- .•-•-. _ - - : •-- - 860.00
X89
•
- - • . •_ _ . -•-- _ - _ • . .. • . . ..•- _ _ .. - _ . - •- - - x$50780
20:00
'Sf7JllC7.
56 (f`(7)a3 the board's agenda
1
144.8 591(3)(3} - - - - - - - - - ' - - - , - -: , - .:
Request-fer ;+gflation 47980.00
448- Request for district designation, per platted lot 12.08
591(x)(3)6
Chapter 130.Off-Street Parking
Page 93
Article V.'Parking Impact Fee Program
130-132 (a), Fee in Lieu of Parking 130-132(a),(b)(2)
(b) 2
One Time Fee 40,000.00
Yearly Fee 800.00
330 132 � - - •-__ _ .. - - _ _ -_ _ -- 8�089:90
assessed in percentages as listed in-section 130 132 '
Article VII.Surplus and Under-Utilized Parking Spaces
130-192 Lease of under-utilized parking spaces,application fee 215.00
Additional fee regarding application for lease of under-utilized parking spaces, per 6.00
space
Chapter-138.Signs
Article IV:Temporary Signs
138-131(d) Maximum amount of bond for temporary signs 6 square feet or larger 300.00
Permit for real estate sign in single-family residential districts. Non-online applications.
138-135(e)(5) 10.00
per primary sign
Permit fee for real estate signs for multifamily,c-ommercial, industrial,vacant land
138-136(e)(5) 25.00
(other than residential). Non-online applications. per sign
138-137-(e) Minimum bond amount for temporary-balloon signs 500.00
Chapter 142.Zoning Districts and Regulations
Article II. District Regulations
Division 18. PS Performance Standard District
In-lieu-of payment for open space requirement, per square foot of open space not
142-704(4) 5.00
provided
1-:\AGENDA\2015\December\PLANNING\Land Development Fees\-Appendix A—2nd Reading-EXHIBIT A.docx
Page 94