Loading...
2015-3979 Ordinance LAND DEVELOPMENT AND PERMITTING FEES ORDINANCE NO 2015-3979 AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING THE CODE OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING APPENDIX A, "FEE SCHEDULE" TO REVISE BUILDING, FIRE, PLANNING, AND PUBLIC WORKS FEES CHARGED FOR SERVICES RELATED TO LAND DEVELOPMENT AND PERMITTING; PROVIDING FOR REPEALER, SEVERABILITY, CODIFICATION, AND AN EFFECTIVE DATE. WHEREAS, the City of Miami Beach has the authority to enact laws which promote the public health, safety and general welfare of its citizens; and WHEREAS, the City Code of Ordinances contains fees for development review, permitting, and other services to cover the costs of implementing the regulations contained therein; and WHEREAS, the City Administration has reviewed the structure of fees associated with land development and permit review and determined a more efficient, effective and transparent way to asses fees for these services is necessary; and WHEREAS, in an effort to align revenues to the incurred costs of review for land development and permitting services a modification to the fees assessed for such services is warranted; and WHEREAS, the amendments set forth below are necessary to accomplish the above objectives. NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA: SECTION 1. That Appendix A "Fee Schedule", is hereby amended as attached in "Exhibit A." SECTION 2. REPEALER. All ordinances or parts of ordinances and all section and parts of sections in conflict herewith be and the same are hereby repealed. SECTION 3. CODIFICATION. It is the intention of the City Commission, and it is hereby ordained that the provisions of this ordinance shall become and be made part of the Code of the City of Miami Beach as 1 amended; that the sections of this ordinance may be renumbered or relettered to accomplish such intention; and that the word "ordinance" may be changed to "section" or other appropriate word. SECTION 4. SEVERABILITY. If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 5. EFFECTIVE DATE. This Ordinance shall take effect on April 1, 2016 following adoption. I PASSED and ADOPTED this Cf day of Dec (4 ,be( , 21* . ,- 7 ATTEST: / Philip Levine a P ay f7 i2- 15 I _ 1 Bic '. J Rafa E. Grana•, City Clerk _��P••.••••"" ..'9 i0 A'PPROVED AS TO\i....4:• %' FORM AND LANGUAGE 3 : ...., ,,.0 & FOR EXECUTION g * : 1 :INCORP ORATED:- 9,4 :. ' r) City Attorney Date First Reading: October 14, 2015 41 -� = Second Reading: December 9, 2015 4,;r�'b 0 �'; '� " lier Underscore denotes new language Striketh-rough denotes deleted language [Sponsored by Commissioner Joy Malakoff] T:\AGENDA\2015\December\PLANNING\Land Development Fees-Appendix A-2nd Reading ORD.docx 2 "EXHIBIT A" APPENDIX A- FEE SCHEDULE FEE SCHEDULE This appendix includes all fees and charges established by the city commission that are referred to in the indicated sections of the Code of Ordinances: Section Description Amount this Code Subpart A.General Ordinances Chapter 2.Administration Article V. Finance 2-277 Fee for dishonored checks $20.00 Or 5%of face amount of check Article VII.Standards of Conduct Division 3. Lobbyists 2- 482(a) a Registration fee 25.00 2-482(f) Biennial registration 125.00 Chanter F_Alcoholic Bever+ges Article I. In General . 62(a) Chapter 14. Building Regulations Part I Article II.Construction Standards Page 1 - 1 Division 1.Generally 14- -Delinquency penalty for violation of article: 33(b) First month,1.0% Subsequent months, 5% Hearing requested by aggrieved owner/applicant for denial Of certificate of use, 14-37 F determination of fees/penalties due,and/or warning of-potential 75.00 suspension/revocation Amount Section (Effective this Code Description June 2, 2014) -Division 2. Permit Fees -Doubleiees=for starting work prior to issuance of permit, plus the following 14-61(b) penalty: ? 000 First offense 100.00 = 0 Second offense 250.00 59.7:00 Subsequent offenses 1-000.00 14-61(c)(1) --Reinspection fee: Incompliance with F.S§553.80(2)(c),any subsequent reinspection after the first reinspection shall be charged four times the cost of first inspection or first reinspection,whichever is greater.The cost of inspections is Page-2 calculated based on the actual time spent by the inspector multiplied by the inspection fee hourly rate,as specified in subsection 14-61-(g44).The actual time of inspection is rounded up to the hour. segment. First reinspection 0.00 Second and subsequent reinspection(s): Based on four times the cost of first inspection or first reinspection,whichever is greater at a rate pursuant to 14-61 (g) Reinspection of existing building to determine compliance with the applicable Building Code: Based on four times the cost of first inspection or first reinspection,whichever is greater.The cost of inspections is calculated based on the actual time spent by the inspector multiplied by the inspection fee hourly rate,as specified in subsection 14-61(g).The actual time of inspection is rounded up to the hour. 14-61(d) Lost plans fee: - Administrative processing fee 50.00 Plus the cost per page reproduced: • Letter(8%2 x 11), Legal (8%2 x 14), single sided,-per.page and Ledger(11 x 44 .15 • Letter(8%2 X 11)., LegaL(8%2 x 14),double sided,_per page .20 • Certified documents(letter or legal) 1.00 Documents on Compact Discs(CDs) 3.00 Reproduction of documents beyond legal At cost to City Other copies, up to levl-size 0016 14-61(e) Revised plans processing fee: Page 3 Commercial minor revisions 1 to 5_pages 200.00 -Commercial maior revisions 6 to 30-pages 500.00 S0%of Commercial total revision 31+_pages Original Permit Fee Residential minor revision 1 to-5_pages 100.00 Residential major revision 6 to 15.pages 200.00 _: _- 50%of Residential total revision 16+pages Original Permit Fee Administrative processing fee 50:00 78.00 14-61(f) Lost permit card. Fee:.per required signature 80.00 14-61(g) Inspection fee hourly rate The inspection fee hourly rate is calculated at the beginning of-each fiscal year based on the department's approved budget, overhead and indirect costs and the resources assigned to the inspection -program. . . - -- - - - - - . - - . _ •- _ _ •- addition-to the-regular permit fee.The fee for the dedicated inspector is 14-61(h) _. _ _ - . - •.. - . _ - •- _ •_ . .. - - - - . -- _-_• subsection 11-°61(g),whichever is.greater. 14,-61(hi) Plans re-review-fee: First and second re-review 0.00 Plans re-review fee. Pursuant to the Florida Building Commission, and in compliance with F.S.,§ 553.80(2.)_(b), when-extra-plans reviews are due to the failure to correct code violations specifically and Page 4 continuously noted in each rejection,-each time after the third such review that plans are reiected for the same code violation, a fee of four times the amount of the_proportion of the..permit fee shall be attributed to plans review. Expedited plan review and inspection fee: Upon request from the applicant,the department may schedule an expedited plans review or 14-61(E) 250.00 inspection on an overtime basis by department staff. Fee for each review or inspection requested. permit fee line item 14-61n($) Phase permits: Commercial new construction 2,000.00 Commercial alteration 1,500.00 Residential new construction 1,000.00 Up-front processing fee: Percent of estimated permit fee or the minimum 14-62(a) processing fee,whichever is greater. Percent of estimated permit fee rounded up to the nearest$5.00 20% increment Minimum up-front fee 50.00 14--62(b)(4) 2, Change of contractor 100.00 Page 5 14- 62(b.)(5){1)b.2.a Change of architect or engineer 100.00 14-62(b)(6) One time request for building permit extension (permit must not be 100:00 expired) ( )( ) 100%Additional request-for building permit extension (permit must not be 14-62b6 a expired): Percent of building permit fee line item 25%of New or renewed,permits for-expired, revoked and nullified or voided 14-62(b)_(7) original _permits ._permit fee 14-621b)(7) Processing fee 100.00 14-62(c) Building permit fees: Minimum-permit fee 100.00 Commercial Permit-Fees for Building Permits: Permit fee for a building whose estimated construction cost is equal to or less than$30 million is 2.0%of the cost of construction as approved by the Building Official or his designee, plus 1.0%of the construction-cost for any amount over$30 million as approved by the Building Official or his designee. Residential Permit Feesfor Building Permits Residential:Single-family,-.Duplex: Permit-fee for a building whose estimated construction cost is equal to or less than$1 million is-1.8%of the c-ost of construction as approved by the Building Official or his designee, plus 3:0%of the construction cost for any amount over$1 million as approved by the Building Official or his designee. Temporary and-Special Event Fees T-emporary platforms-for-public assembly,first approval 104.00 Temporary bleachers for public assembly,first approval 95.00 Page-6 Temporary platforms or bleachers for public assembly, re-approval 20.00 Tents excluding electric and plumbing, per tent • Up to 1,000 square feet 104.00 • Each additional 1,000 square feet over 1,000 28.00 Temporary structure/trusses/statues(no electrical or plumbing included) 104.00 Temporary chiller 462.00 Temporary-generator -237.00 Construction trailer, per trailer 568.00 Office trailer, per trailer 686.00 Temporary power for construction 225.00 Temporary power for test 189.00 Temporary multi-seat toilet trailer, per trailer 80.00 Temporary individual toilet, per event 17.00 Amusement rides 60.00 Temporary electric work on circuses,carnivals, per show 312.00 Temporary fencing 150.00 Electrical installation-Small events(1-10 tents, bleachers, stages and other structures) 250.00 Electrical installation-Large events(more than 10 tents, bleachers,stages and other structures) 500.00 Mechanical installation-Small events(1-10 tents, bleachers, stages and other structures) 250.00 Page 7 Mechanical installation-Large events(more than 10 tents, bleachers, 500.00 stages and other structures) Plumbing installation-Small-events(1-10 tents, bleachers,stages and other structures) - 250.00 Plumbing installation-Large events_.(more than 10 tents, bleachers,stages and other structures) 500:00 14-63 Plumbing permit-fees: Minimum plumbing permit fee 100.00 This minimum does not apply to permits issued as supplementary to current outstanding permits-for the same job. Commercial Permit Fees for--Plumbing Permits Permit fee for a building whose estimated construction cost is equal to or Sn less than$30 million is 2.0%of the cost of construction as approved by the Building Official or his designee, plus 1:0%of the construction cost for any amount over$30 million as approved by the Building-Official or his designee. Residential Permit Fees=for Plumbing Permits Residential: Single-family, Duplex: Permit fee for a building whose estimated construction cost is equal to or less than$1 million is 1.8%of the cost of construction as approved by the Building Official or his designee,plus 1.0%of the construction cost for any amount over$1 million as approved by the Building Official or his designee. 14-64 -Electrical permit fees: Minimum electrical permit fee:This minimum does not apply to permits issued as supplementary to current outstanding 100.00 pp ry g permits for the same job. Commercial Permit Fees for-Electrical Permits Permit fee for a building whose estimated construction cost is equal to or less than$30 million is 2.0%of the cost of construction as approved-by the Building Official or his designee, plus 1.0%of the construction cost for any Page 8 amount over$30 million as approved by the Building Official or his designee. Residential Permit Fees for Electrical Permits Residential:Single-family, Duplex: Permit fee for a building whose estimated construction cost is equal to or less than$1 million is 1.8%of the cost of construction as approved by the Building Official or his designee, plus 1.0%of the construction cost for any amount over$1 million as approved by the Building Official or his designee. 14-65 Mechanical permit fees: Minimum mechanical permit fee.This minimum does not apply to permits issued as supplementary to current outstanding 100.00 pp ry g permits for the same job. Commercial Permit Fees for Mechanical Permits Permit fee for a building whose estimated construction cost is equal to or less than$30 million is 2.0%of the cost of construction as approved by the Building Official or his designee, plus 1.0%of the construction cost for any amount over$30 million as approved by the Building Official or his designee. Residential Permit Fees for Mechanical Permits Residential: Single-family, Duplex: Permit fee for a building whose estimated construction cost is equal to or less than$1 million is 1.8%of the cost of construction as approved by the Building Official or his designee, plus 1.0%of the construction cost for any amount over$1 million as approved by the Building Official or his designee. Smoke control test 2.08410 ® Up to 10,000 square feet 200.00 .00 ® 10,000 to 50,000 square.feet 500.00 Page 9 _.. , .X). Over 50,000 square-feet 1;000.00 Elevators,escalators and other lifting apparatus: Permit for new installation or major revamping per ASM-E A17.1 Section 8.7 Building permit required-(includes initial inspection and certificate). Installation of traction elevators and escalators, per unit Up to three stories 2,218.00 3-10 stories . 2,705.00 Each additional story over 10 84.00 Installation of hydraulic•elevator,-per unit 0-Up to three stories 1,154.00 0 3-10 stories 1,468.00 Installation of escalator,-per unit 2,158.00 Installation of parking lifts,-per unit 200.00 Installation of robotic parking, per apparatus 3,000.00 Installation of residential elevator, per unit 1,213.00 Installation of wheelchair lift,chair stairs and dumbwaiter 976.00 Elevator Repair and Maintenance Annual maintenance repair permit(not to include major-revamping) 602:00 Repairs(value over$5,000.00) per ASM-E 17.1,Section 8.62 633.00 Repairs(jack/oil lines) up to$5,000.00 1 250.00 Page 10 Repairs(can interior/other) up to$5,000.00 250.00 Roof window cleaning machine, each machine 108.00 Permit for removal of elevator from service 570.00 Elevator tests,temporary use,variances and compliance inspections: Emergency power test 1,084.00 Elevator fire recall test, per unit 1,022.00 Temporary use permit_(must be renewed every 30 days) 1,317.00 Temporary use renewal 100.00 Application for variances from codes to install or modernize equipment 519.00 Annual fees for certificate of operation and inspection Certificate of operation for each unit(mandated) V 75.00 Renewal of delinquent certificate of operation 100.00 Duplicate certificate of operation (mandated) 25.00 Dumbwaiters, elevators and escalators —Certificate and inspection: Monitoring/jurisdictional fee 200.00 Reinspection fee,each reinspection 104.00 Witnessing of 1-year tests per ASME A17.1, part X,section 1000, rule 1000.1b 208.00 Witnessing of 5-year tests per ASME A17.1, Part X,section 1000, rule 1000.1b 260.00 Compliance inspection if witnessed test failed, per inspection 104.00 Any elevator,escalator,etc., owner who fails to comply with the order to Page 11 cmrrectev��ti»nbsuedvv�hin3O days, �sub�c1tmanodnnin�trmt�e . / --.-' subject fine up to$500.00 in addition to any other penalty provided by law Fines { ' ' can be f�revary�Q=�ayper�»dthat1haxk»�t��nrenlo|nmemt�e. | > imposed � ! 'These fines before or aker paid,can beappeated to the department ' | i director whose decision shall be final. No clearance-for the use of the - elevator shall be-given untilthese-fines have been paid--or waived. ^ ` Boilers and pressure vessels, installation permit fees, including initial ` . inspections and certificate; does not include installation or connection of ` | fuel and water lines: Boilers(as defined in the ASIV1EJBoiler andyressure Vesse| Code): ! / Annual inspection for boilers 260.00 .! 24^66(1) [ Certificate of occupancy fees: < ' � v / ` v ' - Residential units R-1, R-2,and R-3, per unit 110l0 All commercial occupancies except R-1 and R-2, per square foot O]]5 Minimum fee'for commercial rtificates of occupancy / 250.00 � ! �'----------�----------- ---- --'--'-----------------------------^------- � | � When a--temporary-certificate of occupancy or completion has been issued and the fee has been paid,-the fee for a final certificate of occupancy or 0.80 completion _-____` ���l) Temporary certificate of occupancy or completion fees: - . --` ' . 100 percent of final certificate of occupancy or completion'fee plus the cost of any additional required inspections.Additional required inspections will be charge based on actual time spent on in nrnukhp|iedbmthe hourly ra1e,as insect�nl4'61/h\. Extension of temporary c-ertificate Of occupancy or completion, per period ! � as set by the building official. Percent of final certificate of occupancy or 1-00Y6 � | completion fee: 14=66(1) Certificate of-completion fee's: ___'__'__--__-___-_________ _-______-__-_'-_-_________'___-_ Page 12 Certificate of completion fees for residential 100.00 Certificate of completion fees for commercial Minim fee for commercial ertifie +er of mr, re �e+ier� 250.00 c• 7 2-3-7,00 16.8780 .Doeksi-seawa-146 .23.7700 Certificate of use fees: - ,I 3-50 units 52.50 �-� 3 50 units 52750 3-.--50 • _ -- - Up to 5,000 square feet 52750 105-00 e - • - . -- _ - , --- - , - - - - - - - - , '- 0 Restaurants(bars, ungges): Page 13 -First 60 seats I -5250 15.00 - ._ •• • homes,etc.: Up to 50-beds ..60.00 4 Day-care centers;nursery schools, private schools 60:00 Tei-I res4 50 .50 Over-500 seats 485700 Church, synagogue,temple 547-50 ' 4 . -- - - - , - - • , - -, . - - - - - - - - . - -- , etc.,are_cxempt 3 to 15 boatslips X50 1649--5 75.00 30 •1 --67.1 - - - -- - _ -- _- - - - -- : - - - 'x - 6 {g} Forty-year recertification program fee: 14-67(a) Per building 600.00 Page-1-4 Building official approval of 6-month extension for building recertifications 600.00 v 14-67j{e} Late compliance fee, regular fee, plus 260.00 New inspection report fee if recertification not completed within 90 days 14-67(c) 312.00 of building's being declared unsafe. 14 67.2 Employee training,education,'safety,and technology procurement and implementation for service enhancement surcharge is 6 percent of each 14-69 and every permit fee 14-70 Other general fees Pursuant to Florida Statutes§553.721, in order for the department of business and professional regulation to administer the Florida Building 14-70(1) Code,there is created a surcharge to be assessed at the rate of 1.5 percent of the permit fee associated with enforcement of the Florida Building Code.The minimum amount collected on any permit issued shall be$2.00. Pursuant to Miami-Dade County Ordinance 8-12(e), a surcharge to building 14-70(2) permits for county code compliance program, per$1,000.00 of work 0.60 valuation Pursuant to Florida Statutes§468.631,the building code administrator's and inspector's fund shall be funded through a surcharge to be assessed at 14-70(3) the rate of 1.5 percent of all permit fees associated with enforcement of the Florida Building Code.The minimum amount collected on any permit issued shall be$2.00. 14 70(7) Sanitation surcharge for all-building, electrical, plumbing, mechanical 14-7015) demolition permits,0.30 percent of estimated cost of project: Minimum 15.00 Maximum 1,500.00 A separate fire safety, public works and/or zoning review fee associated 14-70(6) with the building.permit process shall be charged as outlined in appendix A. See applicable department fee sections. Page 15 14-72(1) 3 Interest and collection fees shall be charged for unpaid amountsjfe.es)due. Documents. Requests for copies of building department records, 14-7-2(2) inspection reports, logs,or similar documents maintained by the building department will be-charged a fee as specified in 14-61(d.)of appendix A Page 16 Planning Fees_Associated with the Building Permit Process 15-31(a) Planning review fee for a commercial building permit shall be assessed at .70%of the cost of construction. Planning review fee for a residential building permit shall be assessed at 15-31(a) .50%of the cost of construction. 15-31 (b) Double Fees for work prior to issuance of_permit,plus penalties shall be consistent with 14-61(b) 15-31(c)(1) Reinspection fees shall be consistent with 14-61(c)(1) Lost Plans fee shall be consistent with 14-61(d). Planning shall not assess 15-31(d) administrative processing fee 15-31(e) Revised Plans Review fee shall be consistent with 14-61(e) f 15-31(f) Lost Permit Card fee shall be consistent with 14-61(f) Inspection Fee hourly rate. As determined by the department at the 15-31(g) beginning of each fiscal year 15-31(h) Plans re-review fee shall be-consistent with 14-61.(h) 15-31(i) Expedited plans review and inspections in addition to all applicable fees Expedited plans reviewjnot to exceed 4 hours) . 500.00 Expedited inspection 150.00 Annual Adjustment of rates. The rates pertaining to this division will 15-31(I) administratively adjusted annually to reflect increase(s)or decrease(s) in the Consumer Price Index for all urban consumers, CPI-U Phased Permit 15-31(n) If department review of Phase Permit application is required, a fee consistent with 14-61(e)shall be assessed. 15-32(a).(1),(2) Upfront Fee shall be consistent with 14-62(a) Page 17 15-32(b) Refunds;time limitations,cancellations,change of contractors shall be processed and fees assessed consistent with 14-62(b)(4),(5),(6),(7) -. _ 15 32 - . - . - -- - . - , -as specified he.low: --U.p to 3,000 squar-c feet 4-577-4 --From 3,00.1 square feet-to-5;000 square-feet,above fe.c plus 743 - From 5,001 square-feet to°50,000 square feet,above fcc plus 4:54 A_9 •A ltera.tien�Dem de1ing --Up to 3;000 square-feet 39.00 - From 3,-001 square`feet to-5,000 square feet,above fee plus 3 - From 5;001 square-feet to 50,000 square feet, above fcc plus 8= 3 ._I In t„ 3650 sg pare.feet 101.25 _ - e __. _ - _ - - - - -- , - - - - - , 50.71 • From 1,751 square-feet to 3,500 square feet,above fcc plus 36.95 - From 3;501 square feet to 17,500 square-feet,above fee plus 85 - From 17;501 square feet to-50,000 square feet,above-fee plus 6-33 A 2 Alte.ratinn.�Rem doling , Page 18 - Up to 350 square feet 62.18 - From 1,751 square feet to 3,500 square feet,above fee plus 22.17 from 3,501 square feet to 17,500 square feet,above fcc plus - From 17,501 square feet to 50,000 square feet,above fee plus Up to 1;000 square feet 5- - From 1,001 square feet to 5,000 square feet,above fee plus 856 - - - -- . e - - - - A-3, n/AlteratioQemedeline* Up to 1,000 square feet 39.95 From 1,001 square feet to 5,000 square feet,above fee plush a From 5,001 square feet to 50,000 square feet, above fee plus 4 Q Que•inee•e• Up to 500 square feet 136;02 a From 501 square feet to 2,500 square feet,above fee plus - From 25,001 square feet to 50,000 square feet,above-fee plus 7A5 52.78 - From 501 square feet to 2,500 square feet,above fee plus 89 Page 19 . . = From 8L5O1 square feet tm25,00Qsquorcfcmt abmy_e fee plus | 3,54 Upto3;00K]square feet 54,04 — � From 3,001 square feet to ]5,]00 Square-feet,above fce plus ! 15.99 | ' ' ~ From 15,001 square feet to5�OOQ square�c�abo��e �us | '2�� . ~ Qpho3,0O0cquare~hcet �6-.-6A ' ( ~ From 3,001 square feet 15,000-squopc feet,above fee plus ' 10.34 _ � 'From 15,001 square feetto�O�]00 square feet,above fee plus � :85 ��i ! . i ~{Jpto1,5OOsquarefeat ' 6048 = From 1��Q1square feet 1o7�00�quarefeet above fee m�o | 25.95 u-Fr-ewn--7,50lsquarefeet to-50,000-square feet,above-fee plus i 3.32 _ ' . . . . � �-----'-------- ?- -- - ----- ----'---------------------- ----' -- ---- Upto1;5QO square feet 23'49 ~ From 2,501 oguam�� �to 7;500 square feet,above ferp|uu 9,�6 . ~ From i�501 square feet to f uor� cct above fee plus � 44 7 ' '' | ° Uptm'4,50]square feet ( 66-11 ' ' | _ From-4,501-square-feet to 22,500 squarefect,above fee pIus | 9,04 | � / Page 20 • From 22,501 square feet to 50,000 square feet,above fee plus 38 1 Alteration/Remodeling Up to 4,500 square feet 13.43 From 4,501 square feet to 22,500 square feet,above fee plus 476-5 From 22,501 square feet.to 50,000 square feet,above fee plus . 9 Up to 1,000 square feet .`-. 59.88 - .. .e - ... . - -- 39.22 • From 5,001 square feet to 50,000 square feet, above fee plus 4:33 Up to 1,000 square feet 59.88 From 1,001 square feet to 5,000 square feet,above fee plus 39.22 From 5,001 square feet.to 50,000 square feet,above fee plus 4 AA Mercantile /gar station) - 03.21 -- - -- -- 406,-94 - From 2,001 square feet to 20,000 square feet,above fee plus 10.47 . e - -- - -- -- 54 98.24 - -- ere - -- - -- 396794 Page 21 • From 2,001 square-feet-to 20,00-1 square feet,above-fec plus ' 10:47 - --From 20,-001 square-feet-to 50;000 square-feet, above-fee plus .51 _ - W �. A-A Mercantile/retail er whelerale) - , Up to 1,500 square-feet 43:67 From 1,501-.square-feet-to 7,500 square-fect,above-fee plus 40.41 From-7,501 square feet-to-50,000 square-feet,above fec plus -445 - • -Up to 1;500 square feet 43.67 From 1,501 square feet to-7,500 square feet,above fec plus 40 .,I I - From 7,501 square feet to-50,000-square-feet,above fee plus 445 n e - . . - - . - r -Up to 2;000-square-fect 73.93 From 2,001 square feet to 1-0,000 square feet,above-fec plus 19.77 - - From 1-0,001 square-feet to30 000-square feet,above fcc plus -2:52 R 1, A.1terati..ert-/Remodeling Up-to 2,000 square feet ° 21.28 --From 2,001 square feet to 10,000-square feet,above fee plus --From 10,001 square-feet-to 50,000-square feet,above fec plus 0: Up to-600 square feet 103.18 From 601 square feet to 3,000 square feet,above fec plus 101.68 Page 22 • .. - -- . ... - - -- 9 .. . .. - . ... - - - 5.84 R_') Alteration/Remeedeling 48,4 4;) .. - -- ..• -- -- 4 .• - -- . ... - - 9..54 .From30,001.square feet to,50,000 square feet,above fee plus 044 - Up to 1,500 square feet 8445 From 1,501 square feet to 2,500 square feet,above fee plus 90-88 •• - -- - -- - - - 40 - From 10,001 square feet to 50,000 square feet, above fee plus 19.15 R_3,-Alteration/Remodeling - Up to 1,500 square feet 15.78 From 1,501 square feet to 2,500 square feet,above fec plus 15.82 . - -- . ... _ 9-26 -. .. - - s,!!! - - - - Up to 1,500 square feet 79.75 From 1,501 square feet to 7,500 square feet,above fee plus 23.02 • From 7,501 square feet to 50,000 square feet,above fee plus 2.83 Page 23 i D_A Alter-tion•LDemodeling a Up to 1,500 square feet -24:38 From 1,501 square feet to-7,500-square feet,abovc•fee plus 3444 - • -from 7,501 square feet-to 50;000.square feet,above fcc plus , 0 Up-to500 squar..e feet i 94:94 • _.. _- . - - _ - ! -- -_ ; e,- -d , -e .- - - 4446 - -.: 3 from 2,501-square feet-to 5,000-square feet,above fec plus ` 17:55 From 5,001 square feet to 25,000 square feet,abovefee plus 44 From 25,001 square--feet to 50,000 square feet,above fee plus -147 4 s 1, Alteration/ m Deeeleling v , Up to 500-square feet - - From-501 square feet to 2,500 square-feet,above fcc plus 44.96 • - - -from 2;501 square feet to 5,000°square feet,above-fcc plus .,17.06 -.from 5,001 square feet-to-25,000-sluar-.c-feet,abovc-fcc plus 9 • • -. a From 25,001 square feet to 50;000-square feet, abovefec plus - 9 ., - - -- . _ .. . . - . _ . -: -- -: - - 3 - Up-to 1,000 square feet 9536 --From 1;001 square feet to--5,-000 square feet,abovcfe.e plus 37.30 From-5,001 square-feet to 50,000-squarc-feet,above-fee plus 4-;93 _ .- _ .. . . _ - , - - -: -- -_-_ , Page 24 From 1,001 -e•quare feet to 5,000 square feet,above fee plus 37.30 From 5,001 square feet to 50,000 square feet,above fee plus 4703 S 2, Storage Parking garage Up to 15,000 square feet 1849 _ _ - From-15,001square feet to 50,000 square feet, above fec plus 0.32 • 18.19 -• From 15,001 square feet to 50,000 square feet,above fee plus 0:34 • .. • ._ . - . . _. - • - - -- - - 8$5 store, drug store,gas station) Specialty permits • • - _ _ - - _ 56,00 Generatersirelar systems 49700 . Generators-Commercial up to 50,000 sq.ft. 4-76:00 Above 50,000 sq.ft. 176.00 Page 25 1 ° •• • ' ' '': : '" ' ': ' - -6:00\ ���� ��� � . . •' " - '': : : ' ' ' '~'' "� ~' '— : - - ' ~ ~ ' ' — 1-17*0 ' ' ' 1 �� ' � ^� ' ' ' :- ^ � ' ' GO / | l / --- --'- '--'- � - :' ' .' ; ' ' ''' : " ' '; ' ' '' ' ':_ ,e!e :' : ' 106.81 ^__..^ / . . .�_'/ -_ , - I ' ^ . . . � ,� ^ '^'^ ': ;;; ,_ _ ^, : _ ' _ ' : " ' . ., ' ' ' , ,e'e - ,eee : ' 169X03 ` . gations-insluding-equipment ` . . I , ' ` .- - '� ',: '' ' ', : ' ' ' •. . • ' ^ ^ ' � � . .: ' ' • ' ' : '` '��� ' ' | . 4-1D46 . / ___-_____-________-___ ___-___--�__' - \ ' ^ ^^ ^^'': v:: ' ': ' ': ' - ', ' - '' ': ' . —- '' ''''� ':''; -^- � 408:89 . . . . / ``' ^ : ' ' ' ' '^' _- ' ' ' '' .:-':' '-' ' I �___________�_______-__ _______� ' J � ^.' ' '^^ ^^''' �:: , ,^' ..- ' .,' e�e . : . ' . '' ,''. | } ' ' ' ' ' ^' ' ' ' ` � 382��5 �' 1 - ~`~'r'^^^ ^ / -________—________________________ ^ ' ^ ^'- -''^ ��" ' '' '' : ^^ —' '' , ,e�' ' �eee `' " ' - ' '^ 4���c� .... ~.,~^^r~' .^~� `' ^ _ ' _ 353.62 ' '1 ^ ' ^ ^• • -•': ;"" ' '' ' ^"` : ' ^ ''' .� , • -' '- : '' ,e*e :' , ^ i ----------- _1 �_ -_________- ___'_----� ________-_ _____-�_____-___ '^' -'.: '::- - ': '''' ^' : ^^ ^^' '~ ' ':- ' ' ' '' '°'': i 354.65 , equipment i |--- -- ---- -„, ---- - --- --- -- -------- --- - ---- ' --__ ___ _ Demolition i � . � / S6'�; , __�___ ______-_'-_-_ ______-____-____'______-�_ ~_ `64,96 Page 26 0 .. ..,. - -- .00 Partial rlemelitio T, 700 —5,000 seepare feet 51.85 5,800 square feet . 44.59 •- - _ ' _ - _ •_- , - - - - -- - - - - - - . - .2:96 1 8:88 .52 - - . - - - - . _ - --- 14.52 ti and 2 meerinns \ \e - -- 8400 \ • - - •. \• _ . . - -- - - 26.96 r 100 square feet S2796 • - .-- 'e .e - -- 8296 00 Seawalls• under 75 feet 23.85 Seawalls,75-150 feet 96 e .. Page 27 Each additional r yrtem ever 2 Up_ta 2 units 53.92 -1=�c�i_�rlrlition-�1 ding ever ) 10.37 V -Electric master requiring rubs _.. .-.- - Par kin g lot li g ti no 2 9 --, - AC uni t-new�• Derirefit-i-a14-ufn 31.11 - -• 46,.67 A!`unit new•Commercia.l per unit 50.81 51.85 Plumbing master requiring Albs `i'7 - . _ . _ - -- 549 -- - - - -- - - - - 25.93 Temporary 0 - . - . .. - - - - - 18.00 Page 28 - 008 Temnerary--fencing 28 00 Stand Alone Permit DeviewFeer: --- 107.85 - - - -- , • 221.92 - er part thereof - - - - - - '28.00 Shutters, 1 30 openings 44.59 - - • - - - - - ' - - - -_ - -- _ 38 Storefront, 101 1► J to 000 square fe 1.et 22992 _ _ ••11 - - -• - - - -- - - - . - - , .e' _ - .. •- - - - 112.00 Page 29 40.14 - - . ... - 21.78 -Signs -Signs(electric) 442,00 Cign /.n�nnles•+rir��.n_.inted 44.100 . 1037 13.48 - - - • - • - - - ... -- - 49.70 Cenrec./walls - - - Fencer anrl-ler walls;.Cemmercia1 130.66 -• - i - - 8400 Awnings /•+Fabric replacement ne-charge • - i _ _ - - - i - 00 Gar-pen-awning - s`8.00 16.59 Page 30 Painting 64:0 Painting-per-FnitResidential 27,00 7 Electrical Permit Review Fees - _ - _ - - - Z8.00 Mechanical Permit Review Fees 3 _ - _ -.•- . •• - - • • • • • - 1 1 - 26,96 - - - . -_ - - •• • _ -• - _ - • • •• - • _ .•. • - _ _ •- -- - - - - - - - - -- 127.55 - - - - - - . ... - - 3-3'8 - • _ •- " • - . _ . ... _ 738.31 Certificate of occupancy or completion shall be processed and fees 15-33 assessed consistent with 14-66(1) Up front processing fee Employee training,education,safety and technology enhancements and 15-35 other surcharge will be assessed consistent with 14-70(1),(2),(3),(5), as applicable Devised plans piecerr ee 25.93 10 Page 31 15-36..(a) Interest and collection fees shall be charged for unpaid amounts(fees)due. Documents. Requests for copies of department records, inspection 15-36flal reports, logs or other similar documents maintained by the department will be-charged a fee consistent with 14-61(d) Minimum Planning fee associated with a building permit 70.00 Other Planning & Zoning Department Fees . _ - - -Chapter 6.Alcoholic-Beverages - Article I. In General 6-5700 6-2(a) Service charge for review of application for license 400.00 Amount (-Effective Section this Code Description October 15, 2012) Chapter 42. Emergency Services Article II.Alarm Systems Division 3.Burglar Alarms 42-84(a) Renewal of alarm r-egistration fee 10.00 Page 32 Chapter 50. Fire Prevention and Protection Fire review fee for a commercial building permit shall be assessed at.70% 50-3(a) of the cost of construction. 50-3(a) Fire review fee for a residential building permit shall be assessed at.50%of the cost of construction. 50-3 (b) Double Fees for work prior to issuance of permit, plus_penalties shall be consistent with 14-61(b) 50 3(b) - - - - - - - -- - - - - - -- ..• -- _ - 238.51 596.28 50-3(c)(1) Reinspection fees shall be consistent with 14-61(c)(1) 50 3(c) Reinspection fee &A0 Lost plans fee shall be consistent with 14-61(d) Fire shall not assess 50-3td) administrative processing fee 50-3(e), Revised Plans Review fee shall be consistent with 14-61(e) 503{e} - - - - - _ . _• - - - - - - - ., 50-31f) Lost Permit Card Fee shall be consistent with 14-61(f) 50 3(f) Lost permit card fee 95.0A 50-3(g) Inspection Fee hourly rate. As determined by the department at the Page 33 beginning of each fiscal year 50 3(g) - '. - - _ • -, 340:80-or--9.-54W-1 Plans re-review fee shall be consistent with 14-61(h) 50-3(h) - - - -- . . _ - - - ' - - - - - •p - - - . yeac 50-3(i) Expedited_plans review and inspections in addition-to all applicable fees Expedited_plans review-(not to exceed 4 hours) 500.00 Expedited inspection 150.00 50 30) fiscal yeas 50 3(j) fans re_review fee —44irst and second re review 040 Annual Adjustment of rates. The rates.pertaining to this division will .50-3(1) administratively adjusted annually to reflect increase(s) or deer-eases) in the Consumer Price Index for all urban consumers, CPI-U 50 3(1) - - - - -- - - • - - - _ - _ - .. - - - - - -- , - - • 9700 -50 3.(1) AAA 50 3(m) Pe.rmit.extension 100 00 wv-vv • Page 34 Phased Permit 50-3(n), If department review of Phase Permit application is required,a fee consistent with 14-611e.)shall be assessed. 604(44 &ph 503(o) - - - _ _ - -- _- - -- - - - • -- - ._ - .. - - 503(p) . ... _ _ -- -- -- • -- - - - - - - - -- - -- - •- -- - - - •! - - - .. s - INCREMENTAL COST PER OCCUPANCY CLASS INCREMENTAL 100-SG I TARE FEET Amount Section Description (Effective thie Oct. 15, 2012) A ,6 sembly Fixed seating __.._ - Up to 3,000 square feet 52.09 -- - e e - 9 .. ... - -- . ... - - - - 46g (i( a Up to 350 square feet 42,66 _ - -- - -- - , ' - _. - -- , - -_ . - -- - - 24,69 . From 1,750 square fret to 3,500 square feet,above fee plus 21.93 Page 35 ° From 3,500 square feet to 17,500 square feet,above-fee plus 8,90 From 17,500 square-feet to 50,000 square feet,above-fee plus 6-64 Up to 1,000 square-feet 66 ... - - •.• _ 25.34 --from 5,000 square feet.to-50;000 square feet,above-fee plus d Up to 500 square feet 46.97 ° From 500 square feet to 2,500 square feet,above-fee plus 35.12 ° From 2,500 square feet to 25;000 square feet,above fec plus From 25,000 square feet to 50,000 square feet,above fc.c plus 6 Up to 3,000 square feet 64.18 ••• - - ••• - -- 21.72 _ _ _ - e,e - -- - -- 7.48 ° Up to 1,500 square feet 11.11 _- °from 1,500 square feet to 7,500-square feet,above fee plus _ . From 7,500 square-feet to-50,-000 square feet, above fee plus 6 to-4;500-s a e t 53x4)6 Page 36 _ -- - .. - -- 12.01 .. -- . ... - -- -- 648 Up to 1,000 square feet 32.02 -. ... - -- ... - _- _ 23,86 From 5,000 square feet to 50,000 square feet,above fec plus MI�Aerrartile (gae-station) Up to 100 square feet 4-3,39 -- ... -- -- - •- 55.80 From 2,000 square feet to 20,000 square feet,above fec plus From 20,000 square feet to 50,-000 square feet, above fcc plus • _ - Up to 1,500 square feet 1934 D-7 Deeidential transient T r 65,54 .. ... - - - - -- A-10443-600-semafe-feet 8646 Decientia-! permanent Y Try �rm�T�rrt Page 37 - � | - ''^ `!e : '' '`'' : -, -'''—' , ' :: ' -` 100.59 � � |----- -------�—�--- ----------�--------- ' ' ! °-From 3,0QQ square feet tm3Q,]0Q square feet,above fecplus 22.23 e,e ee , '' ' ''� : e ��e : ''~' -', ' '' `' _- : ' � 15.89 -r---------------------------------------------- --- - ---------'--- . ~ Uptm1,-5W]0 square feet 11'83 °'From ��0���f����0�um�������|uo | 14.55 . ` � | , '' ,, - ' = , ' �' ^ ' - - ' ' _ ~ ' � ! ~ Up-to-5[0 square feet 62.60 U ' � ~ From 6OO square feet tm2,6Og square feet,abmvefccp|us 4-7*04 From 2,5OO square feet tm5,00}squarefeet above fcc plus | 15.28 ^ � !� -- — --- ------- ---- ---- - -' -------- - ---- - --'------�'-- ---- - -' '- --- ° From 5,00O square feet tm25,00J square feet,obouefccxdus 6,9.7 ~ From 25/0QQ square feet to 50,000 square feet,above fccplus 5720 S 2,Storage,low hazard � = Qptm �OOQsquarefeet 13.15 / . -from 1,000 square feet to-5,000 square-feet,above fee plus / 20.31 =-Fronn5,0]O square feet to5Q,OQO:q abovc fee plus i 5.31 S 2, parking Storage, } ^ | = Up-to 15,0}Osquare-feet '2837 ~-From 1'5�%]0 square feettmS0/0[�]squarmfeet abovc �,4� ' . ' - "� '� '^^^ ^ � ' Page 38 26.32 •- ... --. . !e! - - 440 Shell building>75 feet Up to 15,000 square feet 28706 •• - -- !, !! - -- 4730 50 3(p) , _s 00guare feet 6: 4720 D Detirlential 890• , _- - - -- - , - - -: -- •-: _ _ 49 S,Storage occupancy, parking garage, shell .1 69-3p) •• _ - - •• - - - - - - •• - - - - .•- .. 77.78 -341p) permits• Specialty permits 9t�hen/bath -- - - - - - • ' - -- - 7052 - - - - - -: - - • ' - - 47,70 - - - - - - - - - - 6 - - - - 74.66 Page 39 ****n�s | | ~-Qtm10Q-fyet ` 7446 | � / _ - ~ 1-01to'5Q0fmet 74,66 , _______. _______'_______________.----___' ~ Gg1tm1;0OQ-feet 173.18 ' ! ' | ' r 1�� �@ � . } � � | ! ' . ` - - .~~~~ '- Under 10,000 square feet or nonlife safety-system-s ^ `- ������ , ] ` r----- --------------------------- 251.00 453.00 � �--------- --'------- -- -----------''---�'----__ ______-_ ______l_'_-� . ----. ,--- ` . � ! �' ---- ' ^-- --- ' ---- --------- - --- - -----'�-- - --'-' - --- - ` . . . . . . ~17.70 ! / ^ ' ^ ^''^ -'': ::: ;':` : - ^'' ' '' , ' ',' /eee ^ ' ^' : ' •^ '''' ! � ' ^ 169]]3 � . equipment - •-•--S-: . � | ^ ^ "2" 2.:- " - ^^- •' , `/e� ' ,ee� �' " - '213]81 � | � ' ^ ^'- -' : ;:: "': - '.-^ '' ' : `' �o�e':' : ' , 219]81 . . ^•- -•.• ;:: ' ^" ' *2 •~/ :'^ •• - ' ' 48,74 � . ' �2,44 / r ' ' / | . . •' 2- ^' •. : ' � ' ' ';' - e e ; '' '' '' . ` 300-1,000-square-feet 7-3,00 1 }O1-5� ]0 square feet 442-.46 } / | Page 40 1 64796 Inner 100 square feet 13748 1111 square feet and -+hove —24 9 .. .. .. _ • ••• - -- - - •.• - -- 92.29 Page 41 Specialty Permits 50-3(p) Building:Temporary/special events permits Temporary structure/trusses/statues(not including-tents, platforms or bleachers) 73.63 Temporary platforms for public assembly,first approval 181.48 Temporary bleachers for public assembly,first approval 165.92 Temporary platforms/bleachers for public assembly, re-approval 21.78 Tents up to 1,000 square feet per unit 137.92 Tents each additional 1,000 square feet over 1,000 per unit 38.37 Construction trailer, per trailer 140.00 Office-trailer, per trailer 140.00 Reinspection fee, pursuant to 14-61(c),(1) Rereview fee, pursuant to 14-61(c),(1) Page 42 50 3{p} Building trade permits -: -- - - - - -_ • - •- - - - ' -- , - 98.52 _ _ _ replacement 1 unit 23.85 ° 7—'10 unite 47,70 ° 11-30 units 6&44 31-50 units 13&96 Per additional 5 units over 50 23.85 ° Upto100 square feet 9 101 to 1000 square feet 89,18 9 Under 1,500 square-feet 32.15 ° D I 0 sg u eet 32.15 - - ... - -- 39.41 '- - ... - -- 12.44 Fences and/or w-+Ils Page 43 For first 75 linear fect 6448 ' • -- - - -- - - - ....._ -- • b X00 . Pcr each ad.ditienal 30 rreuare.feet -P44144m_bin.g trade permits - - _ - - - - - - - - , - - - - - - - 23.85 Clectri'caFtrade permits Access control/card acccr .,I--- er5 ees 12.52 s Up to 25 devices 116..14 Per additional 25 devices or part thereof 51.85 Mechanical trade permits Af snit new•.Geha.mercial per unit Under 2;000 CFM 22.81 Over 2,000 CFM 22.81 __ - -• - - - - - - _ 22.81 _ . . _ ••- - - _ '*- - - - - 2 • 32.15 Heeds 98.52 - .. _ _ . -- - • • 32.15 Page 44 - - - - - - - - 32.15 Smoke central test 344.28 542.35 Over 50,000 square feet 840,00 Trash chute, per unit 98.52 Cleyater trade permits Up to 3 stories 32.15 A-3-4-0-stecies 48,74 Per each additional story over 10 16.59 , - - - 2489 .Emergency power tart 22 3 Elevator recall a-Base 133.77 25.93 50-4(a) Upfront Fee shall be consistent with 14-62-(a) (1), (2) 50-4(b) Refunds,time limitations,cancellations, change of contractors shall be processed and fees assessed consistent with 14-62f b) (4), (5), (6),17) 50-5 (1) Certificate of occupancy or completion shall be.processed and fees assessed (a) (b) consistent with 14-66(1) Page 45 Employee training,education, safety and technology enhancements and other 50-7 surcharge will be assessed consistent with 14-70(1),A2),(3),(5).,as applicable 1 Documents. Requests for copies of department records, inspection reports, logs or 50-8(b) other similar documents maintained by the department will be charged a fee consistent with 14-61(d) 3 50-9 Interest and collection fees shall be charged for unpaid amounts(fees.)due Minimum Fire fee associated with a building permit 70.-00 Chapter 58. Housing Article III. Property Maintenance Standards Division 2.Administration , Subdivision II.City Managers Designee 50 3(q) Fire permits 50-10(a) Sprinkler/standpipe systems based on area of work • Up to 2,500 square feet 1 591.09 i l _r • 2,501 to 3,000 square-feet 642.94 • 3,001 to 5,000 square feet 741.96 • 5,001 to 10,-000 square feet 1,014.19 • 10,001 to 15,000 square feet 1,111.66 • 15,001 to 30,000 square feet 1,508.84 S • 30,001 to 75,000 square-feet 2,696.20 • 75,001 to 100,000 square feet 3,959.27 Page 46 • 100,001 to 150,000 square feet 5,641.28 • 150,001 to 500,000 square feet 16,778.66 • Over 500,001 square feet 19,773.52 Standpipe systems only(no sprinkler system) per 100 feet 249.92 Fire pump acceptance testing 295.55 Pressure reducing valve acceptance testing 829.60 Minor work on existing sprinkler.system.(1-5 components) - 66.37 Minor work on existing sprinkler system (6-15 components) 208.44 Replace sprinkler heads(more than 15) • Up to 2,500 square feet 173.18 • 2,501 to 3,000 square feet 198.07 • 3,001 to 5,000 square feet 247.84 • 5,001 to 10,000 square feet 296.58 • 10,001 to 15,000 square feet 346.36 • 15,001 to 30,000 square feet 494.65 • 30,001 to 75,000 square feet 1,088.85 • 75,001 to 100,000 square feet 1,583.50 • 100,001 square feet and up 2,325.99 50 3(q) Fire alarm system based on area of work 50-10(a) • Up to 2,500 square feet 311.10 Page 47 r. • 2,501 to 3,000 square-feet 368.14 • 3,001 to 5,000 square feet 419.99 • 5,001 to-10,000 square feet 565.17 • 10,001 to 15,000 square feet 615.98 • 15,001 to 30,,000 square-feet 765.31 • 30,001 to 75,000 square-feet 1,161.44 ,.. • 75,001_to..100,000.square.feet, 1,534.76 • 100,001 to 150,000 square feet 2,447.32 • 150,001 to 500,000 square`feet 7,201.97 • 500,001 to 1,000,000 square-feet 8,783.39 • Repair and replace fire alarm panel only • Up to 2,500 78.81 • 2,501 to 3,000 78.81 • 3,001-to 51000 94.37 • 5,001 to 1.0,000 108.89 50-10(a) • 10,001 to 15,000 108.89 • 15,001-to 30,000 438.96 • 30,001 to 75,000 198.07 • 75,001 to 100,000 405.47 • 100,001 to 150,000 474.95 • 150,001 to-500,000 1,474.61 Page 48 • Over 500,000 1,712.09 Installation of new single station smoke detectors • Under 5 devices, minimum 103.70 • Up to 25 devices 466.65 3 • Per additional 25 devices beyond the initial 25 or fraction thereof,above fee plus 311.10 Minor work on existing fire alarm system (1-5 components) 40.44 Minor work on existing fire alarm system (6-15 components) 201.18 Fire suppression system. Localized suppression system (cooking hood, paint booth, 50-10(a) ' etc.), per unit or system. Multiple systems in same area (i.e., kitchen)will be 246.81 charged at 50%of above fee for each additional system 50 3(q) Fire suppression system. Room suppression system (computer hood,electrical 642.94 50-101a) rooms,etc.), per unit or system Minor work on existing fire suppression system (1-5 components) 57.04 50 3(r) Hydrant flow test 244.00 50-10.(b) 50 3(t) Occupant content sign 244.00 50-10(c) 50 3(t) Pyrotechnic display permit 218.00 50-10(d) 50 3(u) Fireworks permit 322.00 50-10(e) 50-3(v) Open burning permit 218.00 50-10(f) Page 49 50 Bonfire permit 145.00 50-10(g) 50 3(x) Special events fees see 50-3 (:p.} ..2400 50-10(h) 50 3(y) Trade shows_(fee for event plans covering MBCC or-similar facility hall area or part 50-10(i) thereof) 150:00 50 3(z) Sidewalk cafes—Propane tank heaters per establishment 25.00 50 3(aa`) Special master cases 300.00 50-10(k) -- - - - - - - SO size)or-$1.00 per page-(larger than legal size). 50-10(I) Documents. Requests for conies of department records, inspection reports, logs or other similar documents maintained by the department will be charged a fee consistent with 14-61(d) Annual Adjustment of rates. The rates,per-taining to this division will 50-1-0(m) administratively adjusted annually to reflect increase(s) or decrease(s) in the Consumer Price Index for all urban consumers, CPI-1J Section this Code Description Amount 50 5(d} ` Fees for the issuance of the fire safety permit and the annual renewal thereof. I 50`5(d)(1} I Assembly occupancies: 50-12.(a.)-(e.) Class A—occupant load-greater than 1,000 persons $115:00 Page 50 Class B—occupant load greater than 300 but not greater than 1,000 persons 86.25 Class C—occupant load of 50 or more but not>300 persons 57.50 50 5(d)(2) Educational occupancies: Schools(private)—educational facilities inclusive of the first to the 12th grade: Buildings up to 10,000 square feet 57.50 Buildings greater than 10,000 square feet 57.50 Plus,for each additional 1,000 square feet 1.15 Nurseries,day care centers, kindergartens—educational facilities up to but not 57.50 including the first grade 50 5(d)(3)50 Health care occupancies: 12 (a)—le) Private hospitals, nursing homes, limited care facilities: Up to 100 beds 143.75 Over 100 beds 143.75 Plus, per bed over 100 1.44 �8 }{ Residential occupancies: Apartment buildings: 3-11 dwelling units j 57.50 12-50 dwelling units 80.50 Over 50 dwelling units 80.50 Plus, per unit over 50 2.30 Page 51 Hotel,motel, dormitories, lodging house or rooming house: { 3-50 rental sleeping units 80.50 Over 50 sleeping units 8030 Plus, per unit over 50 2.30 Board and care facilities: Small facilities—not more than 16 residents 80.50 - - - ••Lar-ge•facilities—more-than 16 residents 80.50. Plus, 2.30 50 5(d}(5} per Mercantile occupancies:unit over 16 50-12 (a)—(e.) Class A—all stores having an aggregate-gross area of more than 30,000 square feet or utilizing more than three levels,excluding mezzanines,for sales 86.25 purposes Plus, 1,000 square feet over 30,000 square feet 1.15 Class B—all stores of more than 3,000 square feet but not more than 30;000 square feet aggregate gross area,or 86.25 utilizing floors above or below the street floor level for sales 86.25 Class C—all stores of not more than 3,000 square feet gross area used for sales purposes on one story only 57.50 50-544464 Business occupancies: 50-12 (a)—.(e) General offices, including doctors', dentists',and outpatient clinics (ambulatory): Up to 5,000 square-feet 57.50 Page 52 Over 5,000 square feet 57.50 Plus,for each additional 1,000 square feet 1.15 Colleges and university instructional buildings,classrooms under 50 persons 57.50 and instructional laboratories Plus,for each classroom 1.15 50-544P) Industrial occupancies: 50-12 (a)–(e) General industrial occupancies—industrial operations conducted in buildings of conventional design suitable for various types of industrial processes; subject to possible use for types of industrial proc-esses with high density of employee population: Up to 5,000 square feet 57.50 Over 5,000 square feet 57:50 Plus,for each additional 1,000 square feet 1.15 Special purpose industrial occupancies-industrial operations in buildings designed for and suitable only for particular types of operations,characterizes by a relatively low density of employee population,with much of the area occupied by machinery or equipment Up to 5,000 square feet 86.25 Over 5,000 square feet 86.25 Plus,for each additional 1,000 square feet 1.44 High hazard industrial occupancies—buildings having high hazard materials, processes,or contents: Up to 5,000 square feet 115.00 Over 5,000 square feet 115.00 Page 53 Plus,for each additional 1,000 square-feet 1.73 50-5 )-50- Storage occupancies: 12 (a)–(e.) Low hazard contents -classified as those of such low combustibility that no 57.50 self-propagating fire therein can occur Ordinary hazard contents—classified as those that are likely to burn with moderate rapidity or to give off a considerable volume of smoke: Up to 1-0,000 square feet 86.25 Over 10,000 square feet 86.25 Plus,for each additional 2,000 square feet , 1.15 High hazard contents—classified as those-that are likely to burn with extreme rapidity or from which explosions are likely: Up to 5,000 square feet 115.00 Over 5,000 square feet 115.00 Plus,for each additional 1,000-square feet 1.15 50-5-(d)-(9j Marinas: 50-12 4a)–(e) 3 to 12 boat slips 57.50 13-to 50 boat slips 115.00 Over 50-boat slips -115.00 Plus,-per slip over-50 1.73 Hazardous material permit fee 150.00 50-12.(a)–(e) Page 54 Late permit.fee, after 30 days 250.00 Late permit fee,after 90 days 500.00 50 6(c)50-12 (a)—(e] Placard fee for hazardous materials 50.00 58-233 Appeals from actions or decisions of city manager's designee 250.00 Chapter 66. Marine Structures, Facilities and Vehicles Article III. Piers, Docks and Boat Ramps Wi Plans review fee shall be consistent with 98-93(a),(b). 66-114(a) Up-front processing fee shall be consistent with 14-62(a),the greater of Per 100 square feet of dock or fractional part 939 • ... .. - - - 9-59 m-fee— 2440 66-114(b) Reinspection fees shall be consistent with 14-61(c)11) New mrrarin strut re additions: .., - - -- - - - - - -170 9.59 Boat lifts, davits, boat hoists,each 640 - - x:99 Minimum fe a 3-5,00 66114-(c) - - •- - , - --• - _ - - Page 55 ...;.! - 47 - - ... .. 945 "" n -- 35.00 66414(44 Reinspeetion4-ee4 (?)'First reinspection -2600 _ - - _ _ . •_- - - °- . - - -- - X9:00 66111-(e) Special_projects fee,-Per hour Chapter 74. Peddlers and Solicitors Article II. Charitable Solicitations Division-2. Permit • 74-72 Permit fee 10.00 Chapter 82. Public Property Article Ill. Use of Public Property Division 2. Revocable Permit 82-92(9) Applic-ation fee 1,000.00 Mailing fee, per address within 375-feet of subject property 0.50 Involving use of city property 3,000.00 82-95(b) Nonwaterfront property for single-family use, per square foot subject to - 0.45 permit 3 v Maximum 7,500.00 Nonwaterfront property for multifamily or commercial use, per square foot subject to permit 0.90 Page 56 Waterfront property, regardless of use, per square foot subject to the permit 1.25 Article IV. Use in Public Rights-of-Way Division 2.Temporary Obstructions 82-151(c)(4) Base fee 30.00 Plus, per lineal foot of street obstructed, per day 0.25 82-151(e) Applications for hearing 75.00 Division 3. Newsracks Subdivision II.Administration and Enforcement 82-204(a)(1) - Release of stored newsrack 25.00 82-204(a)(2) Upon filing of a request for hearing = 25.00 82-204(b) Reinspection fee 7.80 Subdivision III. Registration 82-231(b)(3)a. Per publisher,for any number of newsracks 7.68 82- At initial registration, per newsrack 7.80 231(b)(3)b. Registration of at least 20 newsracks, per newsrack 3.90 Division 4. Pay Telephones Subdivision II. Permit Annual fee for pay telephones provided by local exchange companies for local 82-307(a) 370.00 service only Annual fee for all other pay telephones providers,for each pay telephone 82-307(b) 650.00 installed Page 57 Or, if a commission is paid to a private premises owner,an initial permit-fee shall bepaid of 250.00 Upon renewal,an additional permit fee shall be paid,equal to the difference between$650.00 and the-commission-paid-to-the private premises owner, plus$250.00. ............. 82-307(c) The first$250.00 of all annual permit fees shall be nonrefundable. 82-307(d) Late-payments, per month 25.00 Subdivision 111.-Regulations 82-341(j) Retroactive annual permit fee for-existing pay telephones: Minimum 100.00 Maximum 650.00 Division 5.Sidewalk Cafes Subdivision II. Permit 82-382(b) Base application fee 150.00 Annual fee, per square foot of usable sidewalk area, including the area 82-383(a) between the tables and chairs: Effective October 1, 2010 17.50 Effective October 1, 2011 20.00 Application to design review or historic preservation board pertaining to the 82-384(ff) size of food display cases associated with sidewalk cafes and related 200.,00 restaurants Chapter 86.Sales Article II. Garage Sales Division 2. Permit Page 58 86-56(b) Permit,.each (for non-online applications) 15.00 Article Ill. Nonprofit Vending and Distribution Division 2. Permit 86-173 Permit fee, per application, not less than 15.00 Chapter 90.Solid Waste Article Ill. Collection and Disposal 1 Division 3. Rates, Charges, Billing Procedures. - 90-137(a) Single-family residences,townhouses, per month 29.92 Duplex, per month per unit 29.92 • Apartments,condominiums with less than 9 dwelling units, per month per 25.94 dwelling unit . The rates will be adjusted annually to reflect the increases or decreases in the consumer price index for consumers in the southeast United States for all items, and in the Miami-Dade County tipping fees, unless otherwise directed by the city commission. Article IV. Private Waste-Collectors/Contractors Division 4.Specialty Contractors Subdivision II. Rolloff Waste Container Contractors 90-278-(1) When rolloff is located in parking meter spaces, per meter, per day 5.00 90-278(6) Failure to timely pay license fee 50.00 Subdivision IV. Hazardous, Biohazardous Waste Containers 90-332(b) Annual fee,each permit 25.00 Chapter 98.Streets and Sidewalks Page 59 -r------ Article Ill. Excavations Division 2. Penm� Amount Section Description (-Effective thisCode Oct 25, ' | 2012\ ' 98- �� -�` `" �^ -� (1)^ '' - �Street e*cavmt ' ~' ' -'- `�+' -� ' -' 9J{c ` ' / —' ,-- . . 50 lineal feet or less $362.95 Each additional lineal foot 3^05 r (2) / Sidewalk repair permit | � J_ 5OUnea|feet or�ss ' 298.65 ] - - _� - -- � | Each additional lineal1oot 3]]5 (3) � Sidewalk construction permit: - - '- - ( � 5O lineal feet mrleas 98.GS �� � ! � Each additiona lineal foot 3]05 . � , . -4U Paving or r.esurfacing of parkway or shoulder area permit: . . ' 25 lineal feetor less 298.65 _ Each additional lineal-foot 6.48 ` (5) Landscaping, per tree 103.70 | ' (6) ' Landscaping, bedding 103.70 ` . Page 60 (7) Building line and grade survey permit: 50 lineal feet or less 362.96 Each additional lineal foot 7.25 (8) Driveway construction permit,each-driveway 129.62 (9) Flume excavation permit,each excavation 3 298.65 Utility placement permit, poles,splice pits, manholes, hand holes,catch basins, (10) 298.65 pedestals,vaults and auger holes Plus,for each additional, per block on same permit 14.51 Underground utility service connection right-of-way excavation permit,each (11)` water,gas,electric,telephone,cable,television or sanitary sewer connection 298.65 from base building line to the utility located within the public right-of-way (12) Groundwater monitoring wells,each well 298.65 (13) Permit renewal fee:90-day extension of permit fee expiration date 129.62 After-the-fact permit fee. For any work described in (1)through (12), (16)and (14) (17) herein, performed without proper permits and inspections, quadruple the fees. Reinspection fees.When additional inspection is required for work previously (15) inspected and rejected by the department of public works,a reinspection fee 114.07 will be required,for each reinspection (16)` Dewatering permit fee 362.95 Blocking of right-of-way(Cranes only) (17) Note: For arterial roadways,full day permit is defined as six hours between 9:00 a.m.and 3:00 p.m. Standard review(full day permit) • Local road 1 320.43 Page 61 1 I •-Collector road 427.24 • Arterial road 534.05 Priority review-(same day permit review) • Local road 384.51 • Collector road 512:27 • Arterial road 640.86 = Consecutive multi-day additional fee (per.day) ..._ _.. , _ . .. 54.96. Partial day permit(4 hours or less) • Local road 159.69 • Collector road 213.62 Blocking right-of-way(all others):Thezreater of$0.-25 per L.F. per day or$0:03 per S.F. per day) (18) Revocable permit Application fee, involving city property 4,148.00 Mailing fee, per address within 375 feet 0.51 _u 3 (19) Coastal review 9.18.78 '420) Sewer-capacity certification letter application ` 155.55 ■- - - - - - •- .. - - - - -. - - - -. : a - -- - - 3 - 92(e) - - - - - - - - - - " - - - - - -- - - - - - - ardrdition to-the cenuir-ed permi#fees Deinspecti n Fee• Page 62 51.85 - - _ -•- _ _ - 403,70 Revised plans preressing fee 25.92 Railings I 2.6796 I andscapinR(residential) E� - _ - .. .. - • . . - . 64,18 .. .. ... ' - • ••• 68.44 - - •- .. • ••• 74.66 Ge-Fam-uftuc-ation-equipment-enelestire 2-6,96 ' s •• •• - • - - • ... - 4.4.51 _ --- -- - - - - - ,-- ,--- - - 22.81 .. .. .. - . � _ - - •,•• - .. _ --- - - - - - - - - , ,--- - - - - 29.03 -- -- -. --- - - - - - - - - - - - - _ - - - • - - 15.55 - - - .. 51.85 _ --- - - - - - - . - - - - ,--- _ - - 51.85 Page 63 ' ^ ^'- ^^''' :;' ''r ' ^^ '^' '' �e �e� '' . ' '' ^ '' ' ^ ' 52.88 equipment | | , � v": � 52.88 . . . - > | � .'---�__-�-------------------- --- -------------- -----------`--- --- . . . . . _ •, ' , - -' •_ ': ' •' ' '^ '' " - ' ' 5I��6 ' ' ' ' '' ; � ^ • / | '- -r' ' -------- ------ --'-- --' - - -- - - - - ------ --'--- - - | � Total-demolition Under 3 stor�� �=z` -� . � 26,96 _~ / � ! | --Over 3-stories 25.92 /. . . . ~.~.. ~^....~.. ' . ~ Under 3QO square feet AAA � � ! ~ 300- 1000squarefeet ' 24,00 i___ � ___l___ ___-__'_-_-_-_- --_---__-----------'--------------- --- � � � ! ~ 1J]O1--5,O0O square feet 2448 �-Per 1;00]m*er�,}00 square feet 21.77 � / � i— --'----------- ------- - -- - ' - - - -- --' --- ---------~ . . . ° . - / p' -: : ^ :� - ^- ' ' ' ' " " ` ' ' ' ' "" ' 24,�8 ' , . ' ' ' ' • � . Public Works review fee for a commercial buUd|ng_penmit shall be assessed 98-93(a) / . at.70%of the cost of construction. > � } Public Works review fee for a residential building_permit shall-be assessed 98-93Ja) � at.50V6 of the cost of construction. ____--. Double Fees for work,prior to issuance of.permit,,plus penalties shall be 98-92(b) ' consistent with 14-61(b) Page 64 98-93(c)(1) Reinspection fees shall be consistent+with 14-61.(c).(1) 98-93.(d) Lost Plans fee shall be consistent with 14-61(d). Planning shall not assess administrative processing fee 98-93-(e) Revised Plans Review fee shall be consistent with 14-61(e) 98-93.(f) Lost Permit Card fee shall be consistent with 14-61(fl Inspection Fee hourly rate. As determined by the department at the 98-93(g) beginning of each fiscal year -._ Plans re-review fee shall be consistent with 14-61(h) 98-93(i) Expedited plans review and inspections in addition to all applicable fees Expedited plans review(not to exceed 4 hours) 500.00 Expedited inspection 150.00 • Annual Adjustment of rates. The rates pertaining to this division will 98-93(1) administratively adjusted annually to reflect increase(s)or decrease(s) in the Consumer Price Index for all urban consumers, CPI-U Phased Permit 98-93(n) If department review of Phase Permit application is required,a fee consistent with 14-61(e) shall be assessed. • o Commercial 2-640 , ' - - -. - - - - - - -- -•' 25.92 Meving-lattildings-er-ether-structures 2.6,96 Page 65 0 12.44 • - .. - - - - - - 14.51 - -0---Single"family heme,_/ner unit) 26,96 All other occupancies 1-30 units 26,96 .. 26,96- - 25.92 Chargi.nn_e•tatienr.-(commercial) -240.58 - - - _ • - , - - 7876 _.First zone 9.33 Each addition-.! zone 21.77 17.62 iog ne� Stand lie e -25.92 Page 66 Welly tanks gar sewer• 25.92 - - _ - - - _ - . -, - - - - - - '. - - 25,92 25.92 . . - - -- - - - - - - - - 36.29 - - - - - - 25.92 feet e1 I lnit ncw• ResTUAnir 1 Unit 29.03 —5 I I n its 14.59 AC unit new:-Commercial, per unit /18.73 49:-78 _ __ - -- -- - - • - - -_ - - - -. - -- - - - _ •. - - . . - • I I • •• • • INCRE11 ENTAI COST PER OCCUPANCY TYPE INCREMENTAL Inn cnI IAnc -FEET Page 67 {Effective Oct. 15, 2012) A 1,Assembly:-Fixed seating(theater,concert hail) Up to 3,000 square-feet $6.-23 a From 3,001 square-feet to±5;000 square-feet,above fee plus 040 a From 15,001 square feet to 50,000 square-feet,above fee plus 040 A_1 .A Iteration/Dem_ deli.ng• - , Up to 350 square-feet -50.38 -from 351 square feet to 17,500 square=feet,above fec plus -from 17,501 square feet to 50,000 square-feet,above fee plus 072-13 . 2 Alteration_�Demedeling 58X10 � �'f7"?C1 . A _ .• • •• _.•- - •• •• Up to 1,000 square feet 2044 A-3 7A v Alteratie V-Remodeling 20.6 1 8, Business Up to 500-square feet 44:09 •-From-501 square feet to 25,000 square feet, above fee.plus From 25,001 square feet to 50,000 squarefeet, above fee plus 044 Up to 500 squa:refeet 12.37 Page 68 .. . - . ... - - - - -- 4 Up to 3,000 square feet 95 From 3,001 square feet to 50,000 square feet,above fee plus 046 DIE,AlteratioRARemodekng Up to 3,000 square feet 3.30 from 3,001 square feet to 50,000 square feet, above fee plus - 0,89 ® Up to 1,500 square feet 19.25 From 1,501 square feet to 50,000 square feet,above fee plus 0 I_1 Alteration/Remerleling Up to 1,500 square feet a From 1,501 square feet to 50,000 square feet,above fee plus 4 Up to 4,500 square feet 5--35 •. - - - . e - -- - - 0,34 I-2 A lteratien/Remodeling .. . - - - . •.• - -- - -- 447 Up to 1,000 square feet 20.34 Page 69 •• �� " '' �0,3-2' '` ' ': '' '' ; _ ` 0,3-2 - ' ' • " :' ' -' " : : ' " ^ • - ':' :' ''t; 20j81 . , ' 7'--------'- --------- = Uptm40Q square feet / -60,14 - . . - ^e , '' '' '' " • �ee , ' ' - ' ' -:: '�''� {�84 ^ ' ' ~ Fram 20,001 square feet tm60,00Qsquare feet,above koplus 049 51.54 - ^^' 14 . ^ ~ Up to 1,500 square feet ' 17.38 ' ^ ~from l,5O1 square feet tm50,-0QQ square feet,above-fee m|us � {��� ' _ 13.71 � !/-- - --- - ---- - -— -- ' -- - ------ ------ ---�--- - ---- ------- -` • ' ,' ." ' ' .-. ' .' ' ':' ;.': '; ' '' .: ' ' ^. : } ' ~ Up to 2,000 square feet 12.82 - ''` , ere ' ,' , ' -._' 0,26 � . _ ^ '_- 10.31 . , ' ,, .: ' ' "' '^ ' .' ^ ' :' ~ - ' . '�'' " ~. ",�' .~'' '- - - � | ~Wphm 600 square fact i 42,76 fromn6O1 square-feet to30,00O square feet,above-fee plus 0,87 w-Frmnm 30,001 square feet to 50,-000 squame feet,above-fee plus {�7-5 3446 • , " ' ': ' ^ ' "' -' '' ^ ' ' ^ ' ''r / ` :^' Page 70 Up to 1,500 square feet 46704 •• - - - . ... - - _ 4742 . .. _ __ . ... - -- - -- 07g0 R 3/ A Iteration/Remedelinn 13.74 Up to 1,500 square feet 44790 - -- e, - -- -- 0:2-3 13.71 Up to 500 square feet 29.38 From 501 square feet to 25,000 square feet,above fee plus 073-3 � - -- . ... -- 0: S_1 Alteration/Remodeling 46708 .. • - -- • !!! - -- - - 672.9 Up to 1/000 square feet 20784 from 1,001 square feet to 50,000 square feet,above fee plus 0 20.61 S 2,Storage: Parking garage Page 71 Up to 15,000.square-feet From 15,001 square feet to 50,000 square feet 0:85 - - • '- - -" �o Shell building<75 feet Up to 7,500 square feet From 7;501 square-feet to 5-0,000 square feet,above fee plus 0 Shell building>75 feet. ..:.;:. - Up to 15,000 square feet A-1400145,001 square feet to 50,000 square feet,above fee plus 0:86 sI - __ - ' - - DT-Residential 073-1 _ .. -: 0,24 ... ...... . ........ __.._. 3333.._ S 2,Storage:-Parking garage or shell-buildings 0706 - .. .. -- - - - - -•-- 0,34 store, drug store,gas station} 98-94(a).(1),.(2) Upfront Fee shall be consistent with 14:62(a) Page 72 98-94(b) Refunds,time limitations,cancellations,change of contractors shall be processed and fees assessed consistent with 14-62(b)(4),(5),(6);(7) Certificate of occupancy or completion shall be processed and fees 98-95 assessed consistent with 14-6611) Employee training,education,safety and technology enhancements 98-97 and other surcharge will be assessed consistent with 14- 70(1)A2),(3),(5), as applicable Documents. Requests for copies of department records, inspection 98-98(b) reports, logs or other similar documents maintained by the department will be charged a fee consistent with 14-61(d) Interest and collection fees shall be charged for unpaid amounts(fees) 98-99 due. Minimum Public Works fee associated with a building 70.00 .permit 98-101 Temporary and special event fees Temporary platforms for public assembly,first approval 26.96 Temporary bleachers for public assembly,first approval 24.88 Tents up to 1,000 square feet per unit•(excluding electric and plumbing) 26.96 Tents each additional 1,000 square feet over 1,000 per unit(excluding electric and plumbing) 17.62 Construction trailer, per trailer 26.96 Office trailer, per trailer 26.96 Temporary power for construction 26.96 Page 73 Temporary toilet/outhouse 14.51 Enforcement of City Code related to building trade permits Section Description Amount this Code - Chapter 102.Taxation Article IV. Resort Tax Division 4.Tax 102- - Resort tax registration fee: 310(b) At time of registration 25.00 If compelled to r-egist.er because of failure or refusal to pay 100.00 102- 311(h) Dishonored checks,The-greater of: The charge paid by the city-to the bank,plus 25%of the bask charge, minimum 5.00 5%of the amount of the check 102-314(f) Reporting fee: Initial late r-eporting fee . 50.00 Plus,for each 30-day late period . 25.00 Maximum 500.00 Page 74 ! � Article upational License Tax Fee for hearing when licensee orpenmittee fails tocmrno�vv�hnmt�mqfV�»|a�mn 102'304 � comply ' 75J00 or when requested by aggrieved applicant/licensee ! ' -Chapter 106.Traffic and Vehicles . . Article V. Police Vehicle Tow ng . � . Division 2. Permit | � 106-216 Per vehicle tow 1 20.00 ' �-� ' ~-=—l~=~�'~--` --------~ --^~~~��--`-^`-- '`-- ---------` ' -------`'— ` `' Article VI.Towing and Immobilization of Vehicles 8 � � 106- Fee for removal of immobilization device, not tmexceed 25.00 26gk)(l)o | `) � _ _-' —' - _ -_ _- __ '' � ' - -' - , Chapter 110. Ut|��s , ' ' . Article III.StonnvvmtarUtility 110-39(e) Meter test fees (if meter found to be working properly) , . Up to 1 inch ' 50]}0 _-____ __ ______'_`-___ -_ 1.5to2inches ! 100.00 _` 3 inches and greater . 275.00 2nd Request within a 12-month period � � | Up to 1 inch 75J00 �- - - - -_ - - _ _ -_ 1.5 to 2 inches 125]]0 3 inches and greater > 300.00 - - __-__ 110-39( ) Unauthorized use of city water/meter tampering 100.00 I �r- Page 75 Unauthorized use of city water/meter tampering(2nd occurrenc-e) 200.00 Unauthorized use of city water/meter tampering(3rd occurrence and each subsequent occurrence). (In addition,the owner and/or consumer shall pay all costs associated with keeping the service off, including, but not limited to,all 300.00 utility expenses, materials,cost of equipment,and reasonable attorney fees) 110-42(b) Unauthorized turn-on of service 100.00 Unauthorized turn-on of service42nd occurrence) 200.00 Unauthorized turn-on of service(3rd occurrence and each subsequent occurrence). (In addition,the owner and/or consumer shall_pay.all costs associated with keeping the service off, including, but not limited to,all utility expenses, 300.00 materials,cost of equipment,city labor costs,and reasonable attorney's fees and costs) 110-43(c) Turn-on-fee 25.00 s. Stormwater utility service charge effective with billings on or after the following 110-109(c) dates shall be as follows: October 1, 2000 3.25 October 1,-2001 4.00 O.c4ober 1, 2002 5.50 October 1, 2003 5.80 October 1, 2004 5.80 October 1,-2005 5.80 October 1, 2008 , 7.42 October 1, 2009 9.06 October 1, 2014 16.67 Article IV. Fees, Charges, Rates and Billing Procedure Page 76 Division 2. Rates, Fees and Charges 110-166(a) Minimum service charge: Minimum Monthly Gallons of Service Charge Size of (effective for Water Meter per Month billings on or after October 1, 2000) %" 5,000 $ 11.05 1". 7,000 15.47 11/2" 11,000 24.31 2" 17,000 37.57 3" 40,000 88.40 4" 80,000 176.80 6" 120,000 265.20 8" 200,000 442.00 Minimum Monthly Size of Gallons of Service Charge Meter Water (effective for per Month billings on or after Page 77 October 1, 2001) %" 5,000 $ 11.30 1" 7,000 15.82 1%2" 11,000 24.86 2" 17,000 38.42 3" 40,000 90.40 4" . .. 80x000 180.80 6" 120,000 271.20 8" 200,000 452.00 Minimum Monthly Service Charge Size of Gallons of Water (effective-for Meter per Month billings on or after October 1, 2002) %" 5,000 $ 11.55 1" 7,000 16.17 1%:" 11,000 25.41 2" 17,000 39.27 3" 40,000 92.40 Page 78 4" 80,000 184.80 6" 120,000 277.20 8" 200,000 462.00 • Minimum Monthly Service Charge Size of Gallons of Water (effective for Meter per Month billings on or after October 1, 2003 %" 5,000 $ 11.88 1" 7,000 16.60 1%2" 11,000 26.04 2" 17,000 40.20 3" 40,000 94.48 4" 80,000 188.88 6" 120,000 283.28 8" 200,000 472.08 Gallons of Minimum Size of Water Monthly Meter per Month Service Charge Page 79 (effective for billings on or after October 1, 2004) %" 5,000 $ 12.13 1" 7,000 16.95 11/2" 11,000 26:59 2"_._.._ 17,000 .. 41.05 3" 40,000 96.48 4" 80,000 .192.88 6" 120,000 289.28 8" 200,000 482.08 Minimum Monthly Service Charge Size of Gallons of Water (effective for Meter per Month billings on or after October 1, 2005) 5,000 $ 12.38 1" 7,000 17.30 1%2" 11,000 27;14 Page 80 2" 17,000 41.90 40,000 98.48 4" 80,000 196.88 6" 120,000 295.28 8" 200,000 492.08 Minimum Monthly Service Charge Size of Gallons of Water (effective for Meter per Month billings on or after - October 1, 2006) %°' 5,000 $ 13.95 1" 7,000 19.53 1%" 11,000 30.69 2" 17,000 47.43 3'° 40,000 111.60 4" 80,000 223.20 6" 120,000 334.80 8" 200,000 558.00 Page 81 Minimum Monthly Service Charge Gallons of Size of (effective for Water Meter per Month billings on or after October 1,2007) 3/411 5,000 $16.15 1" 7,000 22.61 _ - 1.05" 11,000 35.53 2" 17,000 54.91 3" 40,000 129.20 4" 80,000 -258.40 6" 120,000 387.60 8" 200,000 646.00 Minimum Monthly Service Charge Size of Gallons of (effective for Water Meter per Month billings on or after October 1, 2008) 5,000 $19.40 1" 7,000 27.16 Page 82 1.5" 11,000 42.68 2" 17,000 65.96 40,000 155.20 4" 80,000 310.40 6" 120,000 465.60 8" 200,000 776.00 Minimum Monthly Gallons of Service Charge Size of Water (effective for Meter per Month billings on or after October 1, 2009) 3/4" 5,000 $21.80 1" 7,000 30.52 1.5" 11,000 47.96 2" 17,000 74.12 3" 40,000 174.40 4" 80,000 348.80 6" 120,000 523.20 8" 200,000 872.00 Page 83 Minimum Monthly Gallons f Service Charge o Size of (effective for Water Meter per Month billings on or after - October 1,2014) %" 5,000 $22.15 1" 7,000 31.01 --- 1.5" 11,000 48.73 2" 17,000 75.31 3" 40,000 177.20 4" 80,000 354.40 6" 120,000 531.60 8" 200,000 886.00 Section this Code Description Amount Water in excess of subsection 11-0-166(a),-shall be as follows:$2.21 per 1000..gallons, effective with billings on or after October 1, 2000; $2.26 per.1,000-gallons,effective with billings on or after October 1, 2001;$2.31 per 1,000 gallons,effective with billings on or after October 1, 2002; $2.44 per 1,000 gallons,effective with billings on or after 110-166(b) October 1, 2003; $2.49 per 1,000 gallons,effective with-billings on or after October 1, 2004; and $2.54 per 1,000 gallons,effective with billings on or after October 1, 2.005; and $2.79 per 1,000 gallons, effective with billings on or after October 1,2006; $3.23 per 1,000 gallons, effective with billings on or after October 1,2007;$3.88 per 1,000 gallons, effective with billings on or after October 1, 2008; and $4.36 per 1,000 gallons, effective with billings on or after-October 1, 2009; and $4.43 per 1,000 gallons, Page 84 effective with billings on or after October 1,2014. 110-166(d) Tapping fee, per size of tap in inches: 4,726.00 1 4,665.00 1%: 5,106.00 2 5,116.00 _ . 3 _ 5,627.00 4 6,189.00 6 6.808.00 110-166(e) Guarantee of payment deposit, per service in inches: 40.00 1 50.00 11/2 60.00 2 100.00 3 500.00 4 600.00 6 1,000.00 8 1,500.00 110-166(f) Re-read fee (Charged if meter found to be working properly) 25.00 110-166(g) Special read fee 25.00 Page 85 Servicing a meter found damaged,destroyed or missing will require actual 110-166(h) Actual costs replacement cost plus all costs associated with replacement of meter 110-166(i) Field visit fee: Normal business hours 25.00 After normal business hours 50.00 -110-1.67(a) Water impact fee, per meter size in inches: 5/8 155.00 230.00 1 385.00 1%2 775.00 2 1,240:00 3 2,480.00 4 3,875.-00 6 7,7-50.00 8 12,400.00 • Larger than 8 inches, based on relative meter capacities Sanitary sewer service charge,shall be as follows:$3.73 per 1,000 gallons,effective with billings on or after October 1,2000; $3.81 per 1,000-gallons,effective with billings on or after October 1, 2001;$3.90 per 1,000-gallons,effective with billings on or after October 1, 2002; $4.03 per 1,000 gallons,effective with billings on or after October 1, 110-168(a) 2003; $4.12 per 1,000 gallons, effective with billings on or after October 1,2004;and $4.21 per 1,000.gallons,effective with billings on or after October 1, 2005; and $4.25 per 1,000 gallons,effective with billings on or after October 1,200634.93 per 1,000 gallons, effective with billings on or after October 1, 2007;$5.62 per 1,000 gallons, effective with billings on or after October 1, 2008; and$6.04 per 1,000 gallons, effective with billings on or after October 1, 2009; and$6.34 per 1,000 gallons, Page 86 effective with billings on or after October 1,2013; and $7.55 per 1,000-gallons, effective with billing on or after October 1,2014. 110-169(a) Sewer impact fee, per meter size in inches: 5/8 235.00 350.00 1 58'5.00 1%Z 1,175.00 2 1,880.00 3 3,760.00 4 5,875.00 6 11,750.00 8 18,800.00 Larger than 8 inches, based on relative meter capacities 110-170(a) Submeter service inspection 50.00 Division 3. Billing Procedure 110-191(f) Dishonored checks,the larger of: Base fee 20.00 5%of the amount of the check Disconnect charge (includes connecting after payment) (If disconnected for 110-192(b) nonpayment all future payments must be made by ACH bank transfers or by a city 40.00 accepted credit/debit card) 110-192{e) Unauthorized turn-on after disconnect 100.00 Page 87 Unauthorized turn-on after disconnect(2nd occurrence) 200.00 Unauthorized turn-on after disconnectfor cause(3rd occurrence and each subsequent occurrence) (In addition,the owner and/or consumer shall pay all costs associated 300.00 with keeping the service off including, but not limited to,all utility expenses, materials, cost of equipment,city labor-costs, and reasonable attorney's fees costs) -Subpart B.land Development Regulations Chapter.a 1 A Gener l Prevision 114-7(e) - . : --•-• . •- : - . - .- : : - : -- - . 114-7(e)(2) 1 Zoning compliance letters in single family districts 50.00 - - - - - - - - - - - - - - , _- -- - - - ' 160.00 letters - - _ - - - - - °- - - - 50.00 Article 1. In-General 1183 - - - - - • - - - - - • - - -., - _ - :,. 118-6 Cost recovery - -Review and Report-by outside source TBD 118-7 Fees for the administration of land development regulations General-fees for Public Hearing Application for preliminary evaluation before a board 500.00 Application for public hearing 2,500:00 Application for clarification of previously approved board order 1,500.00 Application for amendment to an approved board order 2,500.00 Application for extensions of time of a previously approved board order(non- 1,500.00 administrative) Application for after the fact approval 3 X Org.-Fee Advertisement(Additional fees may apply based on notice requirement 1,500.00 For LDR,Comp. Plan and corresponding map amendments) - Mail Notice (per address) I 4.00 - Posting(per site) 100.00 - Withdrawal or continuance prior to public hearing 500.00 - Deferral of a public hearing 1,500.00 Page 88 Amendment.of the Land Development Regulations,Zoning Map, Comprehensive Plan and Future Land Use Map 118-162(a)and (b) Amendment to the permitted, conditional or prohibited uses in a zoning category(per 2,500.00 use). Amendment to the permitted,conditional or prohibited uses in the comprehensive 2,500.00 plan (per use). Amendment to the zoning map designation (per square foot of lot area) up to 5,000 0.50 sq.ft. Amendment to the zoning map designation (per square foot of lot area) 5,001 sq.ft. 0.70 and greater Amendment of future land use map of the comprehensive plan (per square foot of lot 0.50 - .. area) up to 5,000 sq.ft. Amendment of future'land use map of the comprehensive plan (per square foot of lot 0.70 area)5,001 sq.ft.and greater. Amendment to the land development regulations(per section being amended 10,000.00 Amendment to the-comprehensive plan(per-goal, policy,or objective being 10,000.00 amended.) Conditional Use Permits 118-193 Application for Conditional Use Permit for an adult congregate living facility(per bed) 100.00 Design Review 118-253 Application for Design Review Board approval (per gross square foot of new construction) .50 Land/Lot Split 118-321 See applicable fees under General Fees Variances 118-353 '` - Per variance requested - 500.00 Certificate of Appropriateness 118-562/564 Application for COA(per gross square foot of new construction) 0.50 Historic Designation 118—591 Application for district designation (per platted lot) 100.00 Planning Director determination of architectural significance (142-108) 2,500.00 Staff Review and Miscellaneous Fees Preliminary zoning review(Dry Run) up to 5000 sq.ft. 2,500.00 Preliminary zoning review(Dry Run) per square foot fee beyond 5000 sq.ft. 0.50 1 Board Order Recording up to 10 pages. (11+ pages will be assessed a per page fee) 100.00 Status Reports 1,000.00 Page 89 Progress Reports 2,500.00 I 1Failure to appear before a board for Status or Progress Report 2,500.00 Zoning Verification letter(per address or folio—includes 1 hour of research) 250.00 Zoning Interpretation Letter 1,000.00 Research per hour fee (beyond four hours per submittal) 150.00 Excessive Review per hour fee (beyond four hours per submittal) 150.00 Review of Covenants or Easement 5,000.00 Modification or release of-Covenants or-Easement 2,500.00 Courier(P er package)P g ) 10.00 Recording fee(up to 10 pages) 1 100.00 1 Per page recording fee (beyond 10 pages) " 10.00 Paint-permit(non-online applications) 75.00 Signs(Not requiring a building permit) 75.00 Hard copy(paper)submittal conversion of documents to electronic format shall be charged at city's cost from vendor TAD Article I11. Amen.dmerat P.roced..re 4-4:$0 118 162(d)a _ .. _ - - - - '. _ . - - - - -- - - •• - - - 944 prohibited.uses,per square foot of lot area - _11-8 162(d)(1) - - - - - -- . . -. • _ -- - - - . - - - ••- - 944 - uses, per square foot of lot area for each request - - - . - _ . --- - - - - - -- - _ w -- . .. - _ .. - - - - - - - - - - - - - , - - - • - 1,915.00 b- - - - - - 118 162(d)(2} 118 196(1} - - - - - -, .. -- • . -- _ - - - . _ ' - - - - - ' ' - - 1,295.00 118 196(1)a Adult congregate living facility 1, 0 118 196(1)b Adult_congregate living facility, per bed 7-5.00 • - - - - - - - , : - - Page 90 ' conditions er an extension of time Z 118196(2) - - - - - - • - - • - - - - - - . - 8.60.00 118 196(3) - - •• - - - - - - - • - - - - - -- : - - - - - •_, - - - - - - .. - - -_ 420708 date 118 196(4) 6400 than 448 196(5) - - - - - - - • - -: . - _ - -. - - - ' . _ 860.00 118 196(6) _ - -- - - - 118 196(7) Article" s:gn-RevTew as d s 118 255(a) 118 255(3)(1) • - - • - - - •• - - -. - • - - - - 420440 118 255(a)(2) • - - • - - -• - - - . . . . _ . . , _. - -- 868:08 118 255(a)(3) - - - - - _ - - - - - - - - - - - - - - - 49-5,00 118255{a)(4) • - - • - - • - - • - , . .. - _ .. - _ . 600 118 255(3)(5) 2-5-00 118 255(3)(6) - - -- - - _ _ - -: _ .- 645480 118 255(3)(9) • - - - •- - - -••••• - - - - - - - •.. - 860:00 448- 255(3)(10) - _ - - 448- - - - - - - -- - - .. _ _ _ -• .' 80-00 44g. - - - - - - - - - - - . _ . - , - .•- .. - - - - - - '500 255(a)(11) - • - - •- - - - - - - - - . - - •- --- - 4 4 8^ - - - - - - - - - -. . - - - . -- --- -- -- - -- - - . 90 255(a)(12) 448- 86040 255(3)(13) 255(3)(14) fee Page 91 118 321(1) A -- • - _ - - .•- .. __ •--_ .' •_ _- _ • _ _ - 4729-540 118 321(2) _ _- ---- _ - - - - _ -- - 64571V 118 35711) •- • - - - - - - _ - . 118 357(1)a Filing for single family residences .00 118 357(1)b . _ .. - • - .. _ .. .. - : -- - •- - . . - _ _ -- - -- - - - 860,00 240,00 118 357(1)c _ _ .. . .. - - ° '- - i 118 357(1)d -Signs 860.00 Signs,additional fee per request ; -300 118357(1)c , - - - - - - , - - - - - - - : - - •• 0-68 ree•idences- r� 118 357(2) - - . - , • • - - - : , 118 357(2)a Single-family residences, per variance 1-50,00 I348 357(2)6 '`- 645.00 - , 118 357.(2)c A - - . - •• . . •• • 645.00 - - - - _ -, - - - _ - _ -•-, . - - . - • - - - - - - - - --- - - 118357(4) - - - _ . - - . - - . - - _ _ . . '. - - - - - - - - - • 86040 administrative.deers+9n — 118 357{8) - - - - - . _ _ - - .:_ _ - - -- - - - - - 43$80 =118399(1)c.1 _ _ - '.•-: - °• _ -• - _ • -:. •- - _ • -- - , - _ - - _ . ..-. - 8604X) legally nonconforming - - - - - - - - - _ - - - • - - ' - ,00 kitchens, per unit Article Y Hi- teri.c Prer rvation rtrtT�rrr�vr*�-r�z��rvtrrrvn !'.' _ --' _ . - - - --- - • - .. _ . _ 118537{a)(1) origina ee Page 92 118 537(b)�1� - - - - -- - - • .. - • _ _ _ ■ • ' - • - - - - A - -- - - • ■'- - _ _ - 44-8' • •- - _ .' _ ' _ - - - --- - - - - - , -- - 860,00 564(f)(7)a. 8.60.00 A - - • - - - - - -. _ - . . •- - - - - :•- 800 -- - . _ . . - . - - _ - - - _ - - - - - - - - 750.00 •_ _ .. _ . _ • • - - - - 645.00 - .•-•-. _ - - : •-- - 860.00 X89 • - - • . •_ _ . -•-- _ - _ • . .. • . . ..•- _ _ .. - _ . - •- - - x$50780 20:00 'Sf7JllC7. 56 (f`(7)a3 the board's agenda 1 144.8 591(3)(3} - - - - - - - - - ' - - - , - -: , - .: Request-fer ;+gflation 47980.00 448- Request for district designation, per platted lot 12.08 591(x)(3)6 Chapter 130.Off-Street Parking Page 93 Article V.'Parking Impact Fee Program 130-132 (a), Fee in Lieu of Parking 130-132(a),(b)(2) (b) 2 One Time Fee 40,000.00 Yearly Fee 800.00 330 132 � - - •-__ _ .. - - _ _ -_ _ -- 8�089:90 assessed in percentages as listed in-section 130 132 ' Article VII.Surplus and Under-Utilized Parking Spaces 130-192 Lease of under-utilized parking spaces,application fee 215.00 Additional fee regarding application for lease of under-utilized parking spaces, per 6.00 space Chapter-138.Signs Article IV:Temporary Signs 138-131(d) Maximum amount of bond for temporary signs 6 square feet or larger 300.00 Permit for real estate sign in single-family residential districts. Non-online applications. 138-135(e)(5) 10.00 per primary sign Permit fee for real estate signs for multifamily,c-ommercial, industrial,vacant land 138-136(e)(5) 25.00 (other than residential). Non-online applications. per sign 138-137-(e) Minimum bond amount for temporary-balloon signs 500.00 Chapter 142.Zoning Districts and Regulations Article II. District Regulations Division 18. PS Performance Standard District In-lieu-of payment for open space requirement, per square foot of open space not 142-704(4) 5.00 provided 1-:\AGENDA\2015\December\PLANNING\Land Development Fees\-Appendix A—2nd Reading-EXHIBIT A.docx Page 94