Applicant-Installed Facilities Agreement for Underground Conversions2015 ,. 2q 22.1
APPLICANT -INSTALLED FACILITIES AGREEMENT FOR UNDERGROUND
CONVERSIONS (WR# 3085435 & 3085439)
This Agreement, made and entered into this i2_ day of Der..evis 2015 , by and
between CITY OF MIAMI BEACH (the "Applicant"), a Florida municipal corporation or county
with an address of 1700 Convention Center Dr., Miami Beach, FL 33139 and FLORIDA
POWER & LIGHT COMPANY ("FPL"), a Florida corporation organized under the laws of the
State of Florida, with an address of P.O. Box 14000, 700 Universe Boulevard, Juno Beach, FL
33408-0429.
WITNESSETH:
WHEREAS, the Applicant has executed the appropriate underground facilities conversion
agreement ("Conversion Agreement") with FPL to convert certain overhead electric distribution
facilities (collectively the "Existing Overhead Facilities") to underground distribution facilities
(collectively the "Underground Facilities"), as described in the aforementioned Conversion
Agreement (hereinafter the "Conversion");
WHEREAS, the Applicant desires to perform itself, or through its Contractors, certain Work as
such term is described in Exhibit A associated with the Conversion;
WHEREAS, FPL is willing, subject to all the terms and conditions set forth below in this
Agreement, to allow the Applicant to perform the Work based on Applicant's assurance that such
Work will be in accordance with FPL's designs, instructions, standards and specifications, and
such Work will not adversQly impact FPL or its electric customers;
NOW, THEREFORE, in recognition of the foregoing premises, and in consideration of the
covenants and promises set forth herein below, FPL and Applicant do hereby agree as follows:
1. Compliance with Tariff. Applicant shall comply with and abide by the requirements, terms,
and conditions of this Agreement, the Conversion Agreement, and FPL's electric tariff (the
"T")
2. Conditions for Work to be Performed. Applicant shall, at its own cost and expense,
perform or cause to be performed, all Work, as described in Exhibit A, in accordance with
the terms and conditions of this Agreement and the standards and specifications shown in
Exhibit B. The Applicant shall provide all survey and staking to ensure that all Underground
Facilities are installed as shown in the Conversion Agreement and provide As -Built prints to
FPL within two (2) weeks of installation, signed and certified by a Florida registered
surveyor along with a FPL "Redline" document.
3. Commencement of Work. Applicant shall perform. the Work, or any portion of the Work,
only upon receipt of a notice to proceed containing the approved drawings, specifications and
instructions from FPL ("Notice to Proceed"). After receipt of the Notice to Proceed,.
Page 1 of 7 (Rev. 10123/06)
Applicant shall provide written notice of intent to commence work to FPL at least five (5)
days prior to commencement of such Work. Applicant shall not perform any excavation
work without first notifying Sunshine State One Call for identification and marking of
existing underground utilities and complying with the excavation requirements set forth in
Florida Statute Chapter 556.
4. Materials. All Materials are to be supplied by FPL and shall be picked up by Applicant at
the following address at a mutually agreed upon time, typically with 5 business days
minirnurn notice, but no more than 15 business days notice, unless mutually agreed upon.
Alternatively, FPL will, at Applicant's expense, have the material delivered to a mutually
agreed upon location. Applicant assumes liability for any materials lost, stolen or damaged
once these materials are picked up by, or delivered to, the Applicant.
5. Contractors. Applicant may enter into a contract with a contractor for the performance of the
Work, or any portion thereof, provided that the contractor has been approved by FPL in
writing prior to execution of such contract. Applicant shall not make any substitution of any
contractor for the performance of Work unless the substitution is approved by FPL in writing.
The Applicant's contractor(s) shall perform ALL work as outlined within Exhibit A &
Exhibit B. No contract or purchase order between Applicant and its contractor(s) shall bind
or purport to bind FPL, but each contractor entering into a contract with Applicant with
respect to the Work shall name FPL as an intended third -party beneficiary and include a
provision permitting its assignment to FPL upon HIV s written request, following default by
Applicant or termination or expiration of this Agreement. Applicant shall provide FPL with
written certification from each of its , contractors performing Work that all warranties,
guarantees and obligations of such contractors are equivalent or better than those granted by
such contractor to FPL for similar work and shall require that each such contractor name FPL
as an intended third party beneficiary of such warranties, guarantees and obligations with the
same rights of enforcement as Applicant. Applicant shall assign all representations,
warranties, guaranties, and obligations of all contractors at the request and direction of FPL,
and without recourse to Applicant, to FPL upon default by Applicant or termination or
expiration of this Agreement; provided, however, that, notwithstanding such assignment,
Applicant shall be entitled to enforce each such representation, warranty, guaranty, and
obligation so long as Applicant has any liability under this Agreement. Applicant hereby
assigns to FPL, effective as of the termination or expiration of' this Agreement, all
representations, warranties, guaranties and obligations of all Contractors.
6. Richt of Entry. FPL reserves the right, together with its agents or designees to enter the
Jobsite as it may elect for the purpose of inspecting the Work, or constructing or installing
such collateral work as it may desire, or testing, boring or surveying, or any other purpose.
7. Inspection and Correction of Deficiencies.
7.1. All Work shall be properly inspected and tested, if appropriate, by Applicant and
shall at all times be subject to additional inspection by FPL and its designee(s).
Page 2 of 7 (Rev, 10/23/06)
7.2. Neither the failure to make such inspection, nor the failure to discover defective
workmanship, materials, or equipment, nor approval of or payment to Applicant
for such Work shall prejudice the rights of FPL thereafter to correct or reject the
same.
7.3. Applicant shall correct any deficiencies found with the Work, including but not
limited to discrepancies that are inconsistent with FPL's design, instructions,
standards or specifications within two (2) business days. If Applicant does not
adequately rectify the identified deficiencies in the required timeframe, FPL may, at
its sole discretion, perform, or have performed by its contractor the required repairs
and Applicant shall pay FPL for any costs incurred. These requirements apply
whether the discovery of deficiencies occurs while Applicant is performing its
Work or while FPL, or its contractor, is performing its portion of the work.
7.4. If any Work or part thereof is covered over contrary to the requirements of this
Agreement or the written request of FPL, it must, if required by FPL, be uncovered
for observation and inspection and covered again at Applicant's sole expense.
7.5. If any Work that FPL has not specifically requested to observe and inspect prior to
being covered has been covered, FPL may request to see such Work or part thereof
and it shall be uncovered by Applicant. If such Work or part thereof is found to be
in accordance with this Agreement, the cost of uncovering and covering again shall
be paid by FPL. If such Work or part thereof fails to meet the requirements of this
Agreement, Applicant shall pay all costs of uncovering, correcting, and covering
again.
7.6. Applicant shall pay FPL for all tirne spent reviewing acid inspecting Applicant's
Work.
7.7. No electric customers shall be connected to the Underground. Facilities prior to all
deficiencies being rectified.
8. Indemnity / Liability of Applicant.
8.1. "To the extent allowed under Florida law and including, without limitation, subject
to the provisions of Section 768.28, Florida Statues, as applicable," Applicant shall
protect, defend, indemnify and hold FPL free and unharmed from and against any
liabilities whatsoever resulting from or in connection with this Agreement, the
Conversion or in connection with the performance of the Work by the Applicant, its
employees, Contractors or Contractor employees, whether or not such liabilities are
due to or caused in whole or in part by negligence of FPL; including but not limited
to payment disputes between Applicant and its contractor, and/or payment disputes
with subcontractors, suppliers or other potential vendors that may file liens that
arise out of the Work. However, the provisions of Section 768.28, Florida
Page 3 or 7 (Rev. 10/23/06)
Statutes shall not be applicable to any Contractor retained by the Applicant to
perform the Work.
8.2. Applicant shall assume full responsibility for all damages and all restoration arising
in connection with the Work.
9. Desien Work. FPL shall provide all design, instruction, standards and spec:frcations
necessary to perform the Conversion.
10. Com s letion of Work and Ownership. Applicant shall complete the Work by
20 rc and notify FPL when said Work is complete. Upon FPL's final written approval
of the completion of the Work ("Acceptance"), Applicant acknowledges that all rights, title
and interest, free and clear of all liens, in and to the Work shall vest in FPL. If requested by
FPL, Applicant shall provide FPL, in a form acceptable to FPL, an affidavit of Applicant
certifying payment of all indebtedness to all Contractors and a written release of liens from
Applicant and each Contractor.
11. No Liability by FPL. FPL assumes no liability due to any damage, misunderstanding of
installation drawings or specifications, or any actions due to Applicant or its Contractor.
12. Susnension for Cause:
12.1. FPL may at its sole discretion, by Notice, temporarily suspend the Work, or any
portion thereof, under this Agreement when the performance by Applicant or its
contractor is deemed unsatisfactory by FPL to obtain the results required by this
Agreement.
12.2. The methods by which Applicant performs its Work are entirely the responsibility
of Applicant. FPL's right to suspend Work is intended solely to verify that the
Work being performed by Applicant and its Contractor conforms to the design,
instruction, standards and specifications and shall not obligate FPL to review the
efficiency, adequacy or safety of Applicant's or its Contractors methods or means
of operation or construction.
12.3. Any additional costs incurred by Applicant resulting from such suspension shall be
borne solely by Applicant.
12.4. If Applicant immediately corrects the unsatisfactory condition FPL shall authorize
resumption of the Work. Applicant's failure to immediately effect correction of
the unsatisfactory conditions shall be cause for termination of this Agreement.
13. Termination for Cause:
13.1. FPL may, upon Notice to Applicant, and without prejudice to any remedy
available to FPL under law, in equity or under this Agreement, terminate the whole
or any part of this Agreement for cause and take possession of the Work without
termination charge, penalty or obligation in the event Applicant fails to perform a
Page 4 0! 7 (Rev. 10/23/06)
material obligation under this Agreement and fails to cure such material obligation
default within a reasonable period of time, but in no event more than ten (10)
business days, after Notice from FPL specifying the nature of such default (any
such termination referred to as a "Termination for Cause").
13.2. In the event of Termination for Cause by FPL, Applicant shall:
• a. Unless instructed otherwise in the Notice, 'immediately stop all Work
hereunder;
b. Issue no further contracts except with the prior written consent of FPL;
c. Assign to FPL, to the extent requested by FPL, all rights of Applicant
under contracts outstanding;
d. Terminate, to the extent requested by FPL, outstanding contracts;
e. Fully cooperate and refrain from hindering or interfering in any manner
with any other persons or parties currently or prospectively performing
the Work; and
f. Take any other action toward termination, or toward preservation of the
Work, that FPL may direct.
13.3. Upon a Termination for Cause, all obligations of FPL hereunder shall terminate
effective immediately. Upon such Termination for Cause, FPL may either rework
or take over the terminated Work and proceed to provide such materials, supplies,
equipment and labor of both FPL and FPL contractors, as may be reasonably
• necessary to complete said Work. FPL may have any partially fabricated portion
of the Work removed from Applicant's or contractor's facilities upon Notice to
Applicant. Applicant shall be liable for any increase of FPL's costs, including
rework costs, incurred by FPL as a result of FPL's termination of the contract for
cause,
13.4. In the event of Termination for Cause, FPL shall have no liability to Applicant for
costs incurred by Applicant as a result of such termination.
14. Termination Prior to Construction. Applicant may terminate this Agreement at any time
prior to the start of construction. If Applicant elects to still complete the Conversion, then
the Contribution -In -Aid -of Construction (CIRC) amount provided in the Conversion
Agreement shall be revised accordingly. The revised Conversion Agreement must be
executed and any additional CIAC due received by FPL prior to the start of construction.
15. Assignment. This Agreement is not assignable.
Page 5 of 7 (Rov, 10/23/06)
16. Applicant's Payments to FPL. Any monies that axe owed by Applicant to FPL under this
Agreement shall be paid to FPL within thirty (30) days of FPL producing an invoice.
17. Notice. As used herein, the term "Notice" shall mean any formal written correspondence
providing notice of action, purpose, intent or the like given under the provisions of this
Agreement. Unless otherwise provided in this Agreement, Notice shall be delivered in
person, by courier or by certified mail and shall be effective when received. General
correspondence is not categorized as Notice.
Page 6 of 7 (Rev, 10/23/0G)
C7,
IN WITNESS WHEREOF, FPL and Applicant have executed this Agreement for the provision
of Applicant -Installed facilities to be effective as of the date first above written.
For CITY OF MIAMI BE
By:
Name:
(.,'fit or type)
Title: ONOV"
(print or type)
By:
(signature)
Nazne: 12 fia� c, Cetaa-r�-+- c�
(print or type)
l�,
Title: r? -7 CLcitAt
(print or type)
\Approved as to Terms and Conditions:
(signa ure/title)
Approved as to Form and Legal Sufficiency: Oqe k 101 Agnri (124115
(signature/title) �r
For FLORIDA POWER & LIGHT COMPANY
By: 1L-arn�► f_�
(signature)
Name: 1,0,0, i /4 1(ai
(print` or type)
Title: 6 M C 1 -✓al M4 n l r nC Nc'e
(print or type)
Page 7 a 7 (Rev. 10/23/06)
Exhibit A
WR 4 3085435 & 3085439
Work to be Performed:
Applicant shall:
• Install all conduit and concrete products based on the attached
specifications and in the locations as indicated on the attached
drawings.
Exhibit B
WR # 123456
Standards and Specifications
n
,,,:g ,,,,,,
lvl
❑
sat � j { 9er 3!!r, yy"Q A
�� Y "�Y In
9 os a'a�M
�r�
1 I W
it/, I l l i w �'il i g�+ LI 4 EI
111i II',11 I -Q qy ;N 1N p
0
I
:..ffi?
II I im VIIIII,I1�I eCf I j L� yr�tl lDbp� iii iiiiI il I I M �` q I W jluil 11
li;i�
I1 Y -L-2229 sma 335 �1! I C P
IF £-L-9399 0129 335 ,�\ I I 5.@'� ; e kj 9 K 01ia
Ittt �,� 441.11 kye�(ERpp�� ❑ti, _—
1 III t3 ''\.. 9-L^9309 ems 339 :5;:iiii II t F S e p: a R il,q'—:1
CI la 1 a
1, I N 9-L-1109 92,0 33S �' g p b �' Y�f pd Y+fRPi1xP3f pF;1a�g�
Ili !!!:::
aygy k.k5dld x�{�{gg�e ❑o g❑
as I1 ;E l-11 111 ii5illi9l ®p _ ®
.'i I 7 P R g
d
l &I:1gal
II' onki
11 I P 11 P
611 I i1 -k
17. 'II 1 idg I
g Ill I� i7s`
Ti 1
ti
AI 11 t 1 e egg§EU R fr41g
`
111
In
Ii- YY. ._.1`�
Iri
i11tr
9-2-t2,39Mr333
l I� L -L-2209 SPAS 335
1111
11111
ITT!.
11111
1114
1 i I ser r11vsaa 3nv V1J.W a _ 'I
II I
I IP
illyIf°i
lyl,
HI I, I`
lilt
iili
I
111
11,14
I lilt
1 1111,-,„
i 'lel
1 !Iii
1 111
1 11-i
a I I"II,
t---' =+—Pi LL
pi
�t
� 1111
I 111
1 +
2-L-9319 OW 33S }�-% DIII
I
Z—L�YZg9 OW 335
�`H" 1
_ ger 3844E i " Ser 3x39907 _ I H
Ind 11 Iti
11 1
I(IIK I
Illly ..
t'
114 I IN
rHI, fill
H
111 111 `
LJ11L jII 1
t-9-2209 1121 332 3Nr1H91vH 1 1t�11
Ali ,
11
11
ro
Egi;
g
2
oi
1111
1q rnrp wo old vane au uv .wgay4 4+41m.
0
Z -S -Y09 DMO 1.7 3NflH31tlW
I \
`
II
/,i, 3 1
1 ,
1♦
Nw
III I
111
i11 ,
I�� I
ci
iI
i!! I
Pig
,3 e
TUBI1 a $rktliL3141
_Et
REFERENCE DWG's
I
fcri
nwmn
88213
V11,41
p1iply:i Ito
� 4:1$g
1q10111141
L i
Z -L -1Z00 DU 33S
l-L-YZOD aka 335
tift
LC CpYN ML Ild O254x 9LL laid
F�A5.-
4r, 2124,n
fn
a1-4 hh
go
13
fi
e
a'
°4 V g g'
❑
OA
014
10 I
°uo-_
99P
(1)
lit
� a
21. /. Il9 Al!
!uganmak
h �q
j4o
011
•
IVNVO
'Iry am•em.wrmwplr I
m.a•, a,a j •ii`ii,i.
1,SqrI oe; ,r
ma mrvN uw YU roma *Aura Yltai x/• raJ� o,d
i
eJt
V
7arevn t aa=•:
•r
,0
LJ
w
0
e
Nig
•
7 7 7 7 7 1 T i T i I Y
Rat MN rrt.3 114,1,08 4014 ir,. ULM d
S 11
� 3$
Z -A -4z09 DX) 33S 3NnHDlary
1i a
3 3
❑
51
s
_Ifol CH MOM GILL N1!
1
REFERENCE DWG
t—G-1Z09 9M0 11R 3NIlNO1VN
S
Is
k 01
ro
191
3.—L—YZ09 9M0 335 3Nt7H01VN
999 WIN QYJ RV 090191 ri1Y1.10.1 9999/12%, PWC 01d
4
Lai
a.� 4on,m ,
02
O
1 A 0
1
Q
0
°al
11,
13
•
j.;._:.„,..0_04.11...
y i.
(d ,e8.
!Y r ,2611..gii-
'
- i .. f '4(7
i---'" 001 �!i Ix
A z
Ag-.-+-aud-.a-aru-+_olia..+-d.,.l.-.oru..+-ave-..ava•'+'"4YE„=y -1i'.. Ix--
:, gh 8 L
gl
S -L i' O WO 33S 3NiiH91YW
.n
I1
{
am are/4 Ma
oa*IM/ WC Abu
ga41*
*
00 o
p R s
' R
ijijJ
g018 8
is
51
71714"9
guRiNv
RERENCE DWG's
a
^`_ `
'1 9-L-YSO9 ima 333 3Hf1HOJV l
aIa O&M ar,
•
11
M m*l»I 0+1l01d glanzfl viva M
a;d
laga
Y ;
5?
_1M ° -
L-1.-1208 'JMU 33s 3HfHOIYW
A
bw
REFERENCE F
OA WON M.1
I lal
0ce
0
9-L-YGO' DM 335 3NI1H31VNY
d
iii
.i 11W
1-3A1MN3a.
0 .�, � jig
!
REM/FACE DWG's
0.:----;4;
j�.
Ll
•
w LL
env amt RNs^ „ .
g
wa
' � i
s�
irtaZo
wrt
3&V VllVtW
9�Y LLitNti
g\Y
B -L -1,i09 9Md 335 3N11HOLYYV
h E
to
110. OAYII CAM 121 20212: 10111.122d
0
❑
r
jr
i
w
a it'd
L -L-1,222 AMC 33S �T- uruioLVY1 J _r /
REFERENCE DWG's
j
.W' PCM M➢
EF3 0
9 4
0 Q9
A R
3
1 aimom•-
1 ifillIpm
fg ,
. .
11401446
:, 1 ,t1 Fillg,411
li IL1111111 114,1
a6S
et La
. ,
..“
•• ..
...
... .... ,
.......
........
....
... • ..
...
...
a 5.
H..
...
...
-WNW -'2!41
NN
...
i.... ...
...... ..
.........
.. .. 7! ....
....
. „
. . ..
. i
.. ..
....
• .. ... • ....
. ..
.......... ...
...
....
.....
. .
...
:7:.477
I
avt arm+ CS ittatu we& JOld ottni), wodiam
- 4
FITr
iile
L' i111:
2d:. I4.
I 1
lit
II
E. I d-- Til
I
ii
I
I
t11� -3Av a'NN3O.07 3AY 3N113O/17 i i t l
1111 ; TVIII I lit
I111 ¢ I
III i II" q"
ilk q V i
1 I 1 -at gl O'
'F
c�ms�
Z-6-4ZO13 OMa 335A17Halrw
REFERENCE DWG's
r� s
Ilii 06 ' R
" a it
Sin 111 I
bl� II<I ^q ;xta g
SIA til I i gj °a ° 6 i t�
Iw 11 VI y4
11 I -- —�7 P D , R
II I LI 1
iMI 1, g
SII
111 iN ❑oLi
0.1ma
S 9 9
0O¢
Z-9^4ZO9 OMO 33S .�.
ill L-9--4ZO9 OMO 332
IIT
III..
y Ills �
N1 111 .
• 1111
Ili
_1Th
TI
Iz
ge
SJ9.-YZU9 ONO 332 I e I,
ng
CS
Mt WW1 00 M 06112x1 Ltd .111Y
910Z/31/2 2121.
6
! 1� F�
n ..2.L.9'..3)07 I -__.l1 _. _ my viii _ {11 t
//
I
1II r
}III /P
III r ,4
iiTVr/,i
jl($ {
111 b �` I 11N / ��
(I`j
111
Ill r•
IilIIS ▪ 44'
l e°/ II / r/ F- ,1 NI
1 ��r
1 / / j t-9-:209 flMq 335
I / P I I 9-9-:209 'JMO 93S
I , /{
I IIIA //VI
' —2:7—
I
` I(
i 11
' I If i
// I Iij
■
) &
m» )�
A;
&
31.011
0104121/..10,44
x 1
N
W l
1 5 --- 1
Iz '� 17$7$3yyL�Lyiy�t���
N Q z iiiiB11 e
2-9-4498 Oha 333 4311301M
§$
PC
�I v
,11
1r7FAi7 YLLYJ3?l {
ROW AGREEMENT
HI
�Ilu t l
•w
u1
403120o -1.,
WIB MN ttl° mAral,AVI 101d IlWZ'L C47U.Olo
o
I
I 87
14
14
cea
A
�
I:woo
giE3a
*ti
IE— -
- A
f111—!
Itgr4ga EI El
si
.64!
.�a
55
Q
4'
gag
Pt
Z -9-'4Z08 DMO 334 3NnHoivri
1
oqqii
yu 1014tH IN mx.i{ 3xi 11111 0I2/I1/Ltl1Va 41
d
.
.
.
G
|(
_ arc . WPM __ _+_�
AMMON
ROW AGREEMENT
Brtip
Zg
PASSE
Ugiig
p
9-9—tZ09 OMO 93S 3N11H01V19
r
N
5
z
4c 0)
6mfri'4
-- 3nv'riirr�3a-
7
11,7
A
g31, es
rl
�X �9
Lgto
Gy WA.,
J6
op
zt
IV) 00
g0
g1
3
S & N
:®
B
1;1;141
ilvaa
g 2X1❑
13 0
11
g 2a PI
IL . -'j.r
g-2—tZO9 OW 345 3N1lHO1VW 11
44-1
x0 vmx ave
fp usa444 aau
21 El 0
0 133
a
Y
|
0
!2
532211112 2.1 00221 Wu Ind
,
��.
lied bends. (Figure 1)
x -I
O
U
0
2. Use only YYL s°
r-,
r1
0
ers must be placed at all conduit ends_
genQ+
ipcvl
0
N
PI U�
U
m
o •
0 0
0
4841
Q
m
.
0 ,trl
m
ct
O '~
F+
F
P
�z O
U
0
`'Cj0
ri
4. 0
o
H
4
arfL
g
fi
•
tOtyy
.A d1
tI
cid y
N
o
U O
0
PIa
Q
rb
o
U
0 U
N U o
IIi
CCS
b
O U
N
N
O cq
U �+
O o
U •
a) 4
0
U
O W
151• 1
pt a • m
U o
rri
r
23
1�1p
• .0
d v
8• 01.
o J
4'
U de
•
cdo
v
v "8
Til
o
L1--1
O
Cr:174
r{1l
o
al
rp
N0r0
4-i
A N
8N
0 0
A Pi
0 adg
A
g
ted
U tti
O ,d
w
o
O
U
N
a
0
U
c`5'
0
8
0
0
U
U
. 0
6-4
n
0
t‘t
41, <
•IJ
°iI
El
8
p.(
p
i I
—11'---+--. 4-9
in WR NQ
I : NN 4 1E14,
t IL.4.
A gq=4 - ila
N ..1
: .
1 07 -
NN •
X •,-. • - 4 1061M
g '11‘11 .0--.- tv g P46.4i
la 5- g
,P-110.91im
2
.FIGURE 2
TYPICAL SERVICE IIANDEIPLE INSTALLATION
CAI'S "Pr oft,
FINAL GRADE
3.viriv
ECU IVI & S # 590-61610-4
1 FUT I TA PEP To ev c
; EH
!! •
ALL comuns
INSTALLED Oil
ONE MD OF RH
2" - 90 DEG ( 24" R YTYPE) M S #164-23803-6
FIGURE 2A
48" PRIMARY SPLICE HANDHOLE
&S# 161-12100-4
II
FIGURE .3 PAT) & CONDUIT DET S
;wan PeAsE LOW STYLE
PAUMOUNT TRANSFORMER
CONCRETE TRANSFORMER PAD
#16244800-4
`"`. WO 6" MAX
0" 3"
S w, SERVICE OR
OcoNDARY
P = PRIMARY
PAD CONDUIT OPENING
SAL GRAM
.. 3"
"m TOP W-
ALL
CONDUITS
FRONT ELEVATION OF PAA
FIGURE 3A
ONE LOW STYLE & ONE REGULAR STYLE TRANSFORMER
6r
80H
SINGLE PHASE
LOW STYLE
POWER TX
SECONDARY CABLE TO LIGHTING TX
•
SINGLE PHASE
REGULAR STYLE
LIGHTING TX
CUSTOMER CONDUIT AREA
iq 281 /2" Md 11 28 112"
PRIMARY 18.5" 10"
PRIMARY SECONDARY
"
" SECONDARY
7 9"
00
3" MAX
CC.
81
3 1/2"
(FRONT OF PAD)
3" MAX
7"
FIGURE 3B
SINGLE PHASE LOW STYLE TRANSFORMER
55"
6)"
13"
48"
SECONDARY PRIMARY
CON9UITS CONDUITS
h - i 29'" ' 1-101
0000 17MAX
0000
CP
3" MAX
(FRONT OF PAD)
+91/2" •
9"
FIGURE 3C
TWO LOW STYLE TRANSFORMERS
80"
SINGLE PHASE
LOW STYLE
POWER TX
SINGLE PHASE
LOW STYLE
LIGHTING TX
FPC SECONDARY CABLE TO -MOWING -TX TX, SISCICU$T. CONDUITS -
28 9/2"
PRIMARY
13" SECONDARY
9"
28 1/2" YI
0888 822'___.-+
9t,_+. SECONDARY PRIMARY •
a��MAX ¢8 a°MAX 7"�
C.
(FRONT OP PAD)
TO F115EH
FIGURE.4
1 .#126 INSTALLATION
When installing conduit only (cable td be putted later), a single *12 copper
Insulated wire is td be direct buried In every trench at the same depth as the
conduits, The ends of the wire are to be terminated above ground ate conduit
ends as shown. This wire will allow empty plastic conduits to be located with
electronic equipment.
This method Is not intended for cases where conduit Is installed strictly for
road crossings only, In these cases ECM markers should be used to mark the
conduit ends.
CAP
NYLON TIE
GRADE
PVC CONDUIT
'^�.. 1- a 12C
INSULATED WIRE
NAS 115-M2024
WI -ERE TO INSTALL #12C WtAE
FUT PR! (YES1 Fur NH P(JT SEC (NO) f=ur aye (YES)
{ C C.Y.Y.....<..• ''";'" C...... ...... C ECM
ASKEA Sr
FUT HH a•..[��} @p••cC
1...Y .- 1•14u f PHI
°-( : t�Ftdt Si~C
f.FtrrVC:
a..... ..... :X1'1 C,rfac-
PRI & 2 FUT SVC (NO) ECM
PNC— TO NEXT TX
GM
DRAWING SYMBOLS
CUSTOMER INSTALLED
CAP
3" MAX
PL POLE
4,74 PAD MOUNTED
SWITCH
CUSTOMER INSTALLED
2" PVC BEND SC',
36" RADIUS
3"
FPL INSTALLED
I� GRADE
CUSTOMER INSTALLED ' FPL INSTALLED
t PVC BEND 45', 35" 6"' CONDUIT
RADIUS CAP END.
TYPICAL PVC CONDUIT BEND TYPICAL CONDUIT ENTRANCES
AT RISER POLE INSTALLATION TO PAD MOUNTED SWITCH
SYMDOLS
CONDUCTORS ^ PRIMAL =kg PROPOSED
FPL OWNED, IN CONDUIT, WITH CONDUCTOR SIZE, METAL, --1—PNC--P--F--PNCM-I-
RATED VOLTAGE INSULATION AND NEUTRAL INDICATED.
,QQNDUCTORS - SECONDARY - STREET LIGHT
FPL OWNED, IN CONDUIT, WITH CONDUCTOR SIZE, METAL
AND INSULATION INDICATED (HM/HD TPX SHOWN),
SERVICE LATERAL
THREE -WIRE SECONDARY SERVICE, FPL AWNED IN CONDUIT
WITH CONDUCTOR SIZE, METAL, INSULATION AND JACKET
INDICATED,
EMPTY CONINIT
:'SN, Z. i
PADMOUNTED TRANSF'DRMER, 10, WITH kVA RATING
(FRONT, OR TERMINAL CHAMBER, IS SMALL RECUNGLE
AT RIGHT END or, SYMBOL.. PRIMARY PHASE INDICATED
TRANSFORMER STYLE SHOWN AS FOLLOWS; (RS)' - REC IAR
SIZE - 42" + HIGH, (DE) . DEAD FRONT - 32 " a•
HIGH, - (LS) -. LOW • STYLE -- 24" • + • HIGH. - -
STRUCTQRES ,
ELECTRONIC CABLE MARKER AND DR SLICE PIT (BURIED)
SERVICE HANDHOLE
1/0A 4/0A
VI III -N1- —
3--2C RN
1/0A TPX
÷
—0_... --C--
B15 EW 815
d
P L
UN -27.0.0
APPENDIX A
ECOMMENDED PRACTICES ,FOR FIELD JOINING I UN -27,0.0
OF PVC CONDUIT (USING 'CLEAR SOLVENT J
CEMENT) AND EVC CONDUIT INSTALLATION
FIELD JOINING
1. EXAMINE EACH LENGTH OF CONDUIT AND ENSURE THERE ARE NO INTERIOR OR EXTERIOR IMPERFECTIONS,
CRACKS, ETC, REMOVE ALL FOREIGN MATERIAL FROM INSIDE CONDUIT.
2. USING A HACKSAW, EINE TOOTH WOOD SAW, OR NYLON STRING, CUT PIPE SQUARE (IF REQUIRED),
REMOVE ANY BURRS AND BEVEL ANY SHARP EDGES, WIPE DRY WITH A CLEAN, DRY CLOTH.
3. APPLY CEMENT (M & S #522-14100-7) UNIFORMLY ON INSIDE OF BELL OR FITTING. APPLY UNIFORM COAT
OF CEMENT ONTO CONDUIT END, DO NOT POUR, SPLASH, OR GLOB GEMENT ON!
4. IMMEDIATELY INSERT THE CONDUIT INTO THE BELL END OF FITTING ALL THE WAY TO THE INSIDE
SHOULDER, ENSURE SNUG FIT AND TURN CONDUIT 1/4 TURN TO DISTRIBUTE DEMENT EVENLY.
5, HOLD JDINT FOR APPROXIMATELY ONE MINUTE TO ALLOW CEMENT TO UEGIN SETTING, WIPE OFF
EXCESS CEMENT,
(hUrEI MANUFACTURER RECOMMENDATIONS ARE TO ALLOW FOR A .084.0_M OF 10 MINUTES
OF DRYING TIME PRIOR TO ANY BACKFILLING, WEATHER CONDITIONS MAY VARY THIS SETTING TIME.)
,MELD INSTALLATION
1, LAY CONDUIT RUN INTO TRENCH. DO NOT KICK, THROW OR SLAM IT IN!
2. SURROUNDING TRENCH BACKFILL MUST DE FREE OF LARGE OR SHARP ROCKS, CINDERS OR OTHER DEBRIS
WHICH WILL DAMAGE CONDUITS DURING BACKFILL OPERATION OR SUBSEQUENT COMPACTION.
3. IN CORAL POCK AREAS, IT Is RECOMMENDED THAT HAND BACKFILLING FOR THE FIRST 3 TO $ INCHES BE
PERFORMED,
4. INSTALL PLUGS OR END HELLS ON ALL VACANT DUCTS. AS REQUIRED.
5.. THE FINISHED CONDUIT RUN SHALL BE RODDED IN AN APPROVED MANNER CLE. WINCH LINE, MANDREL, ETC.)
TO VERIFY CONTINUITY AND CLEANLINESS. (NOTE: NO CONDUIT RUN SHALL DE ACCEPTED As
PROPERLY INSTALLED UNLESS. FREE PASSAOE 15 OBTAINED AND VERIFIED BY FPL SUPERVISION.)
NO, DATE REVISION
FPL
OlX & UG DISTRIBUTION SYSTEM STANDARDS
ORIOINATQRt OM DRAWN BY: BQ
UTE! 9-30-94 APPROVED: R. SALESK
SUPERVISOR, dtl//uo PRObuOT
ORIG, DRAWN APPR, • SUPPORT SEtTtIOES
1,40 SCALE
APPENDIX B
UV -12.0.0 IDENTIFICATION OF. ]JNDERGROUND
CABLES AND VACANT. CONDUITS
UV -12.0,0
GENERAL Al.t UNDERGROUND CIRCUITS SHCIJLD BE IDENTIFIED WHERE APpUCABLE AS FOLLOWS:
TEF DER NUMBER
SWITCH NUMBER
PHASE
CONDUCTOR SIZE, METAL, TYPE INSULATION AND VOLTAGE RATE or NOT SAME AS OPERATING VOLTAGE)
SOURCE OR DIRECTION OF FEED
OWNERSHIP
ADDRESS OF BUILDING SERVED
TIM NUMBER
DATE OF FAILURE ON SECTION OF CABLE (DIRECT BURIED ONLY)
ANY UNUSUAL CONDITIONS, LE. CABLE IN CONDUIT, PARTIALLY IN CONDUIT, OIRECT BURIED, ETC.
ALL CIRCUITS AND VACANT CONDUITS SHOULD BE APPROPRIATELY IDENTIFIED AT EACH TERMINAL OR SWITCHING
.POINT AND ALI. INTERMEDIATE LOCATIONS SUCH AS VAULTS, MANHOLES, PAD MOUNTED TRANSFORMERS, OR
HANDHOLES. WHEN THE CIRCUIT OR VACANT CONDUIT 15 OWNED DY OTHER THAN FLORIDA POWER & LIGHT
COMPANY, SHOW "OUST" ON APPROPRIATE TAG. IF NECESSARY INFORMATION CANNOT BE SHOWN ON ONE TAG,
USE ADDITIONAL TAGS.
INFORMATION WILL BE PLACED ON APPROVED TAGS SHOWN BELLOW IN THE MANNER DESCRIBED FOR THE PARTICULAR
CONDITION, 3/16" HOLES-
ROUND
OLE
ROUND
M&S #549-34000-1
ALUMINUM TAGS
(USE STEEL STENCIL)
SERVICE OWNERSHIP TAGS
PLACE INSIDE METER CAN, USE TIE WRAP TO ATTACH TAG TO CONDUCTORS.
0
0
3"
1/4" HOLES,JMPORfANj
p - WHITE USE INDELIBLE
2" "-, MARKIIN Y PEN
O
I_ PLASTIC TAG (M&S 54 -'
(M&S X649-37800-8) 50 4
USE MARKING PEN
(M&S {W40-56100-4)
RECTANGULAR
M&S {549-34100-7
0
FPL OWNED
AD DRESS
'---21/2'1, -•
UNDERGROUND DUCT k MANHOLE SYSTEMS
USE ALUMINUM TAGS, AFELXED TO CABLES WITH #12O -TW ON ALL CIRCUITS 114 UNDERGROUND SYSTEMS, SUCH AS SUBWAY VAULTS, MAN-
HOLES, RISER POLES, ETC. ROUND ALUMINUM TAGS ARE FOR FEEDER NUMBER AND PHASE IDENTIFICATION, RECTANGULAR ALUMINUM TAGS
ARE USED FOR ALL 0THBR IDENTIFICATION PURPOSES FOR EXAMPLE, ON ISOLATED NEUTRAL CONDUCTORS OF PILO CABLES, ETC.
DIRECT BURIED AND CABLE IN CONDUIT SYSTEMS
'USE ALUMINUM TAGS FOR ¢USTOMER I.D. AS INDICATED ABOVE FOR LOCATIONS THAT WILL BE SUBJECTED TO SUNLIGHT. USE PLASTIC TAGS
FOR URD CABLE TERMINATION TAGGING AND AT ,OTHER LOCATIONS SUCH AS PADMOUNTED TRANSFORMERS AND HANDHOLES, ALLOW 10
SECONDS MINIMUM DRYING TIME TO PREVENT SMEARING. FASTEN PLASTIC TAG TO CABLE WITH TY -RAP (M&S #534-28000-1),
EXAMPLE OF MARKIN1 SECONDARY CIA I,'TO # £S3UZ$ ow FUTURE S
ST. 'LT. (STREET ADDRESS) `/
'5T. LT. To N&W !,, 380p _IS/ 461
inn
A. n — —
1'
1
2„
1
PRINT AD RES5 USING MARKING PEN (M&S #549-50100-4)
1/4" HOLES -,b ' 1,,
CUSTOMER
PLASTIC TAG OWNED 2
(M&5 #549-3"7800-8) ADDRESS, .
2-1/2t-24-
TO
0 METE
UN RON
TO TX
WEST
TEAST
TO NIH
EAST
PARALLEL
TO HH
EAST-
* STREET ADDRESS
NUMBER ON EACH
SERVICE
TO HH
WEST
TO JUNCTION
BOX WEST
3988"
MULTITAP ONNECTORS
TH EAS
g*YXtH'USE ADDRESS NUMBER
ON EACH SY INSIDE TX.
HOUSE ADDRESS NUMBER
ro
WEST
SUPERSEDES UV -12,0.0 LAST REVISED ON 3-15-91
0x & UG DLSTRIBTJ LGN SYSTEM STANDARDS I
ORIGINATIR; 100
DRAWN lTC IILO
CHANGED PAGE FORMAT AND TE S-30•-94 APPROVED; RJ "�y
4 9-30.94 REVISED N011;S AND DIMENSIONS RJO MLG RJ8 DASUPERVISOR_� p�. f�RODUGT
NO, DATE REVISION ORIG, DRAWN APPR. SUPPORT SEIM6E6
NO SCALD:
C--32,0.2
TYPICAL INSTALLATION OF 16 OR 25 ICV
S & C TYPE PME DEAD FRONT
THREE PHASE PAD MOUNTED SWITCHGEAR
w
r-
FPL GND ROD`
ALTERNATE
LOCATION
SEE NOTE 9
1L
GROUNDING
BAR — FURNISHED
IN SWITOHG&AR.
PLUG HOLES
• —WITH CONCRETE
36" MIN. AFTER INSTALLATION,
C-32.0.2
22 9/2' 722 1/2'
SWEEP SWEEP
INSTALL DUCT SEAL
PER UN -29,0.0,
600 AMP FEEDER SIDE
SECTION A—A
W
DIMENSIONS(INCHES) 1 WEIGHT
TYPE 0 1 IN LOS,*
15 XVIPMC--9 75 87 50 2300
I PME-11 76 73 60 2550 j
„IA10 76 73 60 2100
25 KV M —9 84 82 56 2000
PME-11 84 88 10 66 28
I PME-10 84 88 1/2 56 30 0 I
ADD 150 LBS. FOR STAINLESS STEEL,
GROUNDING •
RINGS — FURNISHED
IN SWITCHGEAR.
- . 2' PVC' -
FUSE SIDE (PME--9 SI•IOWN)
SECTION •8-6
UPDATE DRAWING ADDED PME-10
2 7/21/01 AND CHANGED SOME TEXT
ADDEO ARROW TO INCLUDE
1 9/30/94 TOP CHAMBER S5CTI0N Q
NO BATE • - REVISION
RAP JES JJIJ
RJO BAQ RJS bATE': SZ_N[sS
060, DRAWN I APPR.
INSTALL DUCT SEAL ON ALL DUCTS PER UN --29,00.
•FPL
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: 560 DIv1WN BY; JRo
APPROVED: Rd. SASSKY
bJRAND ENGINEERING
OPERATIONS SERVICES
NO SCALE
C--32.0.3
TYPICAL INSTALLATION OF 16 OR 26KV 1 C 3 2.0.3
s TYPE PME DEAD FRONT
THREE PHASE PAD MOUNTED SWITCHGEAR •
D
CONCENTRIC
NEUTRAL
WIRES
SIDE VIEW • ,N•h
NOTES: SECTION C-.0
1. WHEN °HANGING OUT A LIVE FRONT PAD MOUNTED SWITCH TO A DEAD FRONT PAD MOUNTED SWITCH, IT IS
IMPORTANT TO ENSURE THAT THE REPLACEMENT DEAD FRONT sWItCH HAS THE SIX INCH ADAPTER BASE SPACER.
THE NEW SWITCH MUST BE INSTALLED WITH THE SAME ORIENTATION AS THE OLD SWITCH IN ORDER TO ENSURE
THAT THE ADAPTER SASE SPACER MATCHES THE NEW SWITCH CORRECTLY TO THE ORDER, SMALLER SIZED PAD,
FlOrE: IT 1S NO LONGER REQUIRED TO CHANGEOTHEur - AMP REPLACEMENT ELBOWS (M &S # 183 50256R PAD P ), ASSN R
SHOWN N OF THE ADOS
USE 600UH-40.0.0,
FOR THE FEEDER CABLES AND 200 AMP REPAIR ELBOWS (VARIOUS M & 3 NUMBERS), AS SHOWN N
UN -78.0.0 FOR THE LOOP SIDE PRIMARY CABLES.
CABLES MUST NOT BE IN CONTACT WITH THE EDGE OF CHAMBER FOOTING. TOP VIEW SHOWS CORRECT ROUTING FOR
FEEDER CABLES THAT IS NECESSARY TO PROVIDE FOR CABLE MOVEMENT.
3. PRIMARY CABLES MUST BE ABLE To REACH PARKING LOOATIONS.
4, ALLOW SUFFICIENT LENGTH OF CONOENTRIC NEUTRAL TO REACH GROUNDING BARS AND PERMIT FREE MOVEMENT OF
ELBOWS.
5, BRASS STUDS FURNISHED WITH THE 600 AMP ELBOW KITS MUST BE INSTALLED AND TIGHTENED SECURELY (55 FT. LBS.)
IN THE 600 AMP BUSHINGS, THE SHORT THREADED END OF THE STUD 00E5 INTO THE BUSHING, SEE UH -41.0,1 AND
UH -41.0.2 FOR 600 AMP ELBOW DETAII$.
6. INSTALL BOO AMP 30 FAULT INDIOATORS ON EA0-I SET OF FEEDER CABLES. SEE UV -14.0,0, UV -14.0.1, UV -14.0.2.
7, LOOP SIDE PRIMARY CABLES (#1/0A) MUST Go THRU CABLE GUIDES TO AVOID CONFLICT WITH FUSE DOOR WHEN
IT IS ROTATED TO OPEN.
8, CABLE SPOOLS (2 1/2") SHOULD BE USED ON THE FEEDER CABLE TO CORRECTLY POSITION THE CABLES FOR EASIER
INSTALLATION OF THE BOLT ON ELBOW TERMINATORS ON TO THE 600 AMP BUSHINGS. THE 600 AMP ELBOWS MUST BE
BE INSTALLED PERFEOTLY STRAIGHT (VERTICALLY AND HORIZONTALLY) ONTO THE 600 AMP BUSHINGS TO PROPERLY
ENGAGE THE THREADS. THE SPOOLS ARE TO 84 BOLTED TO THE BOTTOM FLANGE OF TFIE SWITCH COMPARTMENT WALL
WITH 3/8" X 1 1/2" BOLTS THRU EXISTING HOLES PROVIDED BY TH0 SWITCH MANUFAOTURER. .
9. MARE CERTAIN OF CABLE LOOATIONS BEFORE DRIVING GROUND RODS, WHEN INSTALLING GROUND RODS IN ALTERNATE
LOCATION, INSURE THAT DOTH THE TOP OF THE Roo AND THE #40 WIRE ARE AT LEAST 3" BELOW GRADE AND ARE
COVERED. EXISTING 3/4" HOLES SHOULD 6E USED IF AT LEAS 3" BELOW GRADE.
10. APPLY -BAULKING COMPOUND To SEAM BETWEEN PAD MOUNTED SWITCH AND PAD CHAMBER.
11. UNUSED FUSE POSTRONS MUST HAVE BU5HIN0s & PROTECTIVE GAPS INSTALLED, UNUSED FEEDER POSITIONS MUST HAVE
600 ANP PROTECTIVE CAPS (M&S #163-64500-7),
12: AFTER THE PAOMOU.TTED SWITCH 15 INSTALLED, THE LIFTING BRACKETS MUST BE REMOVED AND STORED INSIDE THE
CAB8JET DR TURNED DOWN SO THAT'fHEY DO NOT PROTRUDE ADOVE THE TOP OF THE CABINET.
13. ENSURE THAT,THE "CAUTION" LABEL (M&S x!845-56010-4) IS INSTALLED ON EACH SIDE OF THE SWITCH HAVING
ACCESS TO THE. HIGH VOLTAGE SWITCH AND/OR THE HIGH VOLTAGE FUSE COMPARTMENTS PER, DOS Z-35.0.0.
14. SEAL DUCT'S PER UN -29.0,0,
SUPERSEDES C-32.0.6 LAST REVISED ON 8-30-94
OF P L
OR & •CYC DISTRIBUTION SYSTEM STANDARDS
8/20/02! UPDATE DWG (NOTE 1) I CFA JE8 JJM oRIGIRA7018 PMG BRAWN I3,'; RAS
2 8/13/01 I UPDATE DWG. (NOTES 10, 12, 13, 6 14) I CEA JE8 MA
1 6/09/96 ADDFI1QN TG NoTE 11 I PM0 RAS JJM Tat 9/30/94 APPROVED: J,J, MOEVOY NO SCAt6
SUPERVISOR OH//UO PRODUCT
N0. DATE REMBION °RIG,�ORAWN PPR. SUPPORT Sw0Es ,
C-32.0.4
'ITEM
TYPICAL INSTALLATION OF 16 OR 25107
S&C TYPE .PME DEAD FRONT
THREE PHASE PAD MOUNTED SWITCHGEAR
MATERIAL LIST
DESCRIPTION 'QUANTITY M&S NO,
2 -THREE PHASE EpER STANDARD 270-87400-7
C-32.0.4
P0E-9 FFE Ds p I 1
05 yy AND 6 51ri0NS
18KV PME..11 a Ilei p�SE
SWITCHGEAR 05 TIO 5 3 FUSE POSITIONS 1
PME-10 OSITI0N5 A DS NU FUSE POSITIONS
1 PME-.9 (2 -THREE PHASE FEEDER I
001110NS AND 6 FUSE 0061)1086
25KV PME-11 3 -THREE PHASE FEEDER
SWITCIIGEAR 05111005 AND -3. FUSE POSITIONS
IP.'40..1C) (4-TIIREC 0810E FE DER
• 0001TlON5 PAR019 FREER 00011IONS
2 LF (600FSECTION ONLY) FOR REPLACING FFOR 2510/ 1
3 PAD 60491E CHAMBER (TOP & BOTTOM SECT.) FOR 16KV 1
FCR 25"4 DEAD N2oNT TERMINATOR, 1000 140141 AL 28 VARIES
5 LOADBREAK BUSHING, 200 AMP 16KV
25KV
5 IELBOW TERMINATOR, 170 AL 25KV FII"'PROTECTIVE OAP 200 AMP (16KV SWITCHES ONLY)
7 IEL60W SURGE ARRESTER (2.50V SWITCHES ONLY)
8 600-42 FUSE HOLDERS 25KV
FUSES; REFILL UNITS FOR 513E-42,
20 AMP 53138700-5
30 AMP 531-38500•-1
5D AMP 5391-38900-13
0AMP 03
80 AMP 531-39501'-B
9 15KV 100 AMP 621-36000-4
125 AMP 031-39000-7
160 AMP 631-40200-4
175 AMP 031-40300-1
200 AMP 83130000-6
VARIES
VARIES
OTfppAFINN10r�NSSO M21
8.77s9�U`0-91
STANbnRD sTE'- ir02 3— —070
STAINLESS STEEL 270-863-050
STANDARD STAINLESS STEEL 270-872010:2
STANDARD 270-88100-3�
STAINLESS STEEL 97
61ANDAR0 270-684-000
0741141-055 STEEL 273-684-050
162-12203-8
162-122651
162..12201..9
162.-12202-7
163-83900-7
163-'66100••4
163-86400-1
9663-33-50780200-100-7
1
VARIES
VARIES
JVARIES
SM-42&SML-4S FUSE HOLDERS
10 AMP 531-32730-2
15 AMP 831-332800-9
20 AMP 53132000-8
30 AMP 631-33000-3
250,/ 40 AMP 63133100--0
50 AMP 531-33200-6
O6 AMP 631-33300-2
80 AMP531-33400-9
100 AMP 621-33500-5
125 AMP 52133709-8
160 AMP 631-33800•-4
175 AMP 631-333000-1
200 AMP 53134000-9
10 IMRE pc SOB
11 I00NICTOR, GROUND ROC, CLAMP TYPE
12 ft GROUND RODS AS REQUIRED
Iowan D
13d/4/00 SABLE. 600V
14 'CONNECTOR 04/0 COPPER CABLE 70 FLAT
15 CONNECTOR, COPPER TO COPPER, 0OLTED PME-rtW9
PME
080-10
PME-9
PME-11
PME-10
17 CABLE SPOOL, 21/2" P Fye
P E-10
16
LOCK STANDARD PADLOCK, SMALL
18 BOLT, 3/6' 14 1 1/2" (POR SPOOLS)
19 NUT, 3/6" (FDR 50001.8)
20 WASHER FLAT 3/8" (FOR SPOOLS)
21 LOCKWASHEi1, 3/9" (FOR SPOOLS)
FAULT INDICATOR, 800 -AMP, 3 PHASE
22
•.1 ' •1 1: . 5.
800 AMP BUSHINGS 15100 24-.00200.4
26100 274-^00300--0
200 AMP BUSHING WELLS 1510/ 274-00220-8
25100 274-003204
2 00/06/01
1 19/06/96
N0. ' 0ATE
AOOEO PME-10 SWITCH
ADDITION TO ITEM 12
6
VARIES
27
6
19
22
25
4
6
6
6
12
163-02200-0
334-01600-6
831-55150-1
831-56310-5
NOTE: THE FUSE REFILLS
TTHOSTHE EUSEDMIN E AS
LIVEFRONT SWITCHES
0130-9_
PME-11
PME-10
SAME A5
SPOOLS
SAME AS
SPOOLS
`WAM8 AS
1600,14
SAM6 As
SPOOLS
2
3
4
SUPERSEO
112-30900-0
120-63610-8
130-61400-6
130..105)0..4
110A0105•••1
120-87100-5
102-80000-2
646-24001^1
160-30800-7
161-47900-2
161-45000-4
145-35900-8
161-62400-8
163-20700-0
0-310.4 4 VST REVISED ON 9.40.-.64
FPL
OII & UG DISTRIBUTION SYSTBM STANDARDS
ORIGINATOR: PMG
DRAWN BY: RA5
CEA NS 841
PMD RAS JJM 0/'10 9/30/94 APPROVED: J.J, MCEVOY
SUPERVISOR, 0H UG PRODUCT
REV15104 ORIS, PRAWN 40016. SUPPORT SERVICES
NO SOALE
J-4.0,2 ITYPICAL INSTALLATION OF 25 KV I' J--4.0,2
S & CDEAD FRONT .SWITCHGEAR AND
THREE PHASE PAD -MOUNTED CAPACITOR BANK
NOTES'
1. INSTALL 92' X 92' PRECAST PAD (M & S 162-25100-5)
2, DRIVE GROUND RADS & ATTACH JOS CU GROUND TO GRRCUNDTNG LUGS,
3, INSTALL URD CAPACITOR BANK <N & S 223--300o0-1> ON PAD,
4. INSTALL ROTATABLE FEED—THRU BUSHING 25KV <M & S 163-25000-27 ON EACH BUSHING,
5. INSTALL 200 AMP ELBOWS ON ROTATABLE FEED-THRU BUSHINGS,
6, INSTALL 180V ELBOW ARRESTERS (M & S 334-01500-0) ON ROTATABLE FEED—THRU BUSHINGS.
IJ'
CAPACXTOR CABINET
SWITCH CABINET
30/0 AL XPE 25KV CABLES
IN 1-4' CONDUIT
MAXIMUM OF 100 FEET r �w
P L
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: LEV DRAWN BY: J. SHOUP
DATE: D7/26/01 APPROVED: J,A MCEVOY
SUPERVSOR, OH/UO PRODUCT
NO.; DATE REVISION ORIG. DRAWN APPR. SUPPORT SEIMCES
NO SOLE
**** NOTICEx***
CALL SUNSHINE 1-800-432-4770 48HOURS BEFORE YOU DIG FOR UNDERGROUND LOCATIONS.
NOTIFY FPL REP. FOR INSPECTION OF TRENCH DEPTH & PVC INSTALLATION PRIOR TO
BACKFILLING TRENCH.
POLE
(CONC. / WOOD)
//,
IF REQUIRED:
BENDS AT RISER POLE TO BE
ENCASED IN CONCRETE WITH
4.80LB. BAGS OF SAKRETE.
FORM CONCRETE ADJACENT
TO POLE AND AT SURFACE.
• 3" MAX.
,
FOREIGN UTILITY
OR OBSTRUCTION
36" MIN,
1
FPL CONCRETE--
FINAL GRADE TRANSFORMER PAD
,AgaM0110,7 ,pear///7 1477/71
36" MIN, COVER
FROM FINAL
GRADE TO TOP
OF CONDUIT
90° BEND
36" RADIUS
FPL 5" PVC
CONDUIT
r
t12" MIN, SEPARATION
FROM FPL CONDUIT TO
'FOREIGN UTILITY WITH
WELL TAMPED EARTH
USE 5° BEND SEGMENT TO
PASS UNDER
OBSTRUCTION IF
REQUIRED,
12" MIN, SEPARATION OF WELL TAMPED EARTH
FPL CONDUIT CROSSING UNDER'A FOREIGN UTILITY
NOTES:
• BACK -FILL WITHIN 4" OF THE CONDUIT TO BE FREE
OF MATERIAL THAT MAY DAMAGE CONDUIT
SYSTEM (BOARDS, ROCKS LARGER THAN 1" IN
DIAMETER, DEBRIS, ETC.)
+ IF COMPACTION OF TRENCH ROUTE IS REQUIRED
FOR PAVING', ETC. BEGIN MACHINE COMPACTION
6" MINIMUM ABOVE CONDUIT.
+ WHERE 36" OF COVER CANNOT BE MAINTAINED,
30" OF COVER WILL BE ALLOWED WITH 3" OF
CONCRETE ENCASEMENT AROUND THE CONDUIT,
• (N.E.S.C. -RULE FOR PRIMARY VOLTAGES) - -
+ INSTALL A CONTINUOUS LENGTH OF PULL STRING
IN ALL CONDUIT RUNS.
MATERIAL LIST 5" PVC SCH 40 CONDUIT
20' LENGTH (BELLED END) 164-33800-1
90° BEND 36" RADIUS 164-25250-5
90° BEND 48" RADIUS
450 BEND 48" RADIUS
5° BEND SEGMENT
22.5° SWEEP 12'-6" RADIUS
STRAIGHT COUPLING
REPAIR SLEEVE 6' LONG
END PLUG
ELECTRONIC MARKER
164-25200-9
164-61400-8
164-56100-1
164-13000-1
164-44900-7
164-475300
164-53500-1
590-61601-5
GRADE
2i„Qu
ELECTRONIC MAX.
MARKER
0
M
FPL
CONDUIT
AS REQUIRED
'IF --END PLUG
DUCT END MARKING
(IF REQUIRED)
-r
12” MINIMUM
HORIZONTAL
SEPARATION
OR
FOREIGN
UTILITY
INSTALLATION OF FPL CONDUIT
PARALLEL WITH - OR - IN A SHARED TRENCH
WITH A•FOREIGN UTILITY.
FPL SUPPLIED 5" PVC CONDUIT
TYPICAL CUSTOMER INSTALLATION DETAILS
(PORTIONS OF UN -6, UN-15,CONC. & PAD DETAILS)
kxlu NOTICE kh
CALL SUNSHINE 1-800-432-4770 4BHOURS BEFORE YOU DIG FOR UNDERGROUND LOCATIONS.
- NOTIFY FPL REP. FPR INSPECTION OF TRENCH DEPTH & PVC INSTALLATION PRIOR TO
BACKFILLING TRENCH.
POLE
(CONC. / WOOD)
3" MAX.
IF REQUIRED:
BENDS AT RISER POLE TO BE
ENCASED IN CONCRETE WITH
4-80LB. BAGS OF SAKRETE.
FORM CONCRETE ADJACENT
TO POLE AND AT SURFACE.
FOREIGN UTILITY
OR OBSTRUCTION
FINAL GRADE
36" MIN, COVER
FROM FINAL
36" MIN. GRADE TO TOP
OF CONDUIT
tri
FPL CONCRETE
TRANSFORMER PAD
FPL 2"" PVC
CONDUIT
12" MIN. SEPARATION
FROM FPL CONDUIT TO
FOREIGN UTILITY WITH
WELL TAMPED EARTH
FLEX PIPE TO PASS UNDER
(,--
OBSTRUCTION IF REQUIRED,
12" MIN. SEPARATION OF WELL TAMPED EARTH
FPL CONDUIT CROSSING UNDER A FOREIGN UTILITY.
NOTES:
+ BACK -FILL WITHIN 4" OF THE CONDUIT TO BE FREE
OF MATERIAL THAT MAY DAMAGE CONDUIT
SYSTEM (BOARDS, ROCKS LARGER THAN 1" IN
DIAMETER, DEBRIS, ETC.)
+ IF COMPACTION OF TRENCH ROUTE IS REQUIRED
FOR PAVING, ETC. BEGIN MACHINE COMPACTION
6" MINIMUM ABOVE CONDUIT.
+ WHERE 36" OF COVER CANNOT BE MAINTAINED,
30" OF COVER WILL BE ALLOWED WITH 3" OF
. CONCRETE ENCASEMENT AROUND THE CONDUIT.
(N.E.S.C, RULE FOR PRIMARY VOLTAGES)
+ INSTALL A CONTINUOUS LENGTH OF PULL STRING,
IN ALL CONDUIT RUNS.
MATERIAL LIST 2" PVC SCH 40 CONDUIT •
20' LENGTH (BELLED END) 164-33100-6
90° BEND 24" RADIUS 164-23800-6
45° BEND 36" RADIUS 164-23945-2
45° BEND 24" RADIUS 164-23900-2
STRAIGHT COUPLING 164-47000-6
REPAIR SLEEVE 4" LONG 164-47520-2
END PLUG 164-54800-5
ELECTRONIC MARKER 590-61601-5
2-45° BENDS_
36" RADIUS
GRADE 7/r,�
ELECTRONIC M
AX.
MARKER
AS REQUIRED --
L__11
°I,---END
EQUIRED'-
-,`I,---END PLUG
DUCT END MARKING
OF REQUIRED)
FPL
CONDUIT
12" MINIMUM
HORIZONTAL.
SEPARATION
OR
UTILITY
INSTALLATION OF FPL CONDUIT
PARALLEL WITH - OR - IN A SHARED TRENCH
WITH A FOREIGN UTILITY,
FPL SUPPLIED 2" PVC CONDUIT
TYPICAL CUSTOMER INSTALLATION DETAILS
(PORTIONS OF UN -6, UN -15, CONC.& PAD DETAILS)
UN -18.0.0
EYE BOLT FOR LIFTIN
FOR
SPLICING 190.05
NATURAL GRADE
FEEDER SPLICE BOX
UN 18,.0.0
1" DIA
D FOR ALTERNATE WRENIN US EOPLACE
LIDS SEE NOTE TOS BRN. PLUG IN
POSITION,
`Y m
--. .,
tpli
6" ID PVC I�
END BELLS
ALTERNATE METHOD
OF CONSTRUCTION
I #,.„ 1 ' / �'' Olt
STEP RACK WITH 8" STEP
AND 2-4" INSULATORS
r -
I
10'
8'
TOP VIEW
(
6" ID PVC
END BELLS
4U PERIBOXONS
TYPE I GROUNDING
�' INSTALL COPPERWELD GROUND ROD
SEE G--17.0.0 FOR GROUNDING SPLICES.
TYPICAL WALL SECTION
1 1
1
10 01
END VIEW
TYPICAL FEEDER SPLICE EOX
M&S NUMBER DESCRIPTION
152-240-003 CONCRETE FEEDER SPLICE BOX & LIDS.
162-241--000 CONCRETE FEEDER SPLICE 90X & LIDS COMES WITH SPECIAL BRUSHED
SIDEWALK FINISH LIOS AND FLUSH INSERTS SUITABLE FOR PEDESTRIAN TRAFFIC.
POLYMER CONCRETE FEEDER SPLICE BOX. TO BE INSTALLED ONLY IN NON ACCESSIBLE AREAS, NOT TO BE
SUBJECTED TO ANY VEHICULAR TRAFFIC SUCH AS STREETS, PARKING, LOTS OR DRIVEWAYS.
162.242-203
SIDE VIEW
4
NOTES;.
1. LEAVE SUFFICIENT EXPOSED GROUND ROD To INSTALL 6 EACH #4/0-•,2 CONNECTORS MrkS #120-118--008.
2. GROUND ALL SPLICES PER DISTRIBUTION STANDARD 0-17,0.0,
3. GROUND CABLE RACKS,
4, EACH SPLICE 50X I5 SUPPLIED WITH 2-1" DIA HOLE FOR ALTERNATE GROUND ROD LOCATION. MAKE ALL GROUNDING CONNECTIONS INSIDE THE BOX. RUN
SUFFICIENT AMOUNT OF 4/0 TO MAKE 00NNECTION TO ALT. GROUND ROD LOCATION. RESEAL 1" DIA HOLE WITH AUUASEAL.
8 DISRIIDUTION SPLICE 908 AND LIDS ARE DESIGNED FOR 1-1-20 VEHICLE LOADING. (FULL TRAFFIC LOADING)
8. WEIGHT OF SPUOE BOX (W/0 UDS) -6700 LOS, DIMENSIONS ARE 10' X 5' X 41" DEEP
7. WEIGHT OF EACH LI0=14100"L05: TWO -UDS 'REQUIRED,- M & S ' FOR 1:10 ONLY 162-240-011. -
8, URD FEEDER CABLE SPLICES MUST 6E BONDED TO DRIVEN GROUNDS.
9. REFER 1O UE -19,1,1 do UE -10.1,2 FOR SPLICE ASSEMBLY, A WATER 116HT SEAL MUST 9E MADE WHERE INSULATED
10. CONDUCTORS 008820T TO SYSTEM NEUTRAL. SEE 0-17,0.0
11. THE MAXIMUM PERMISSIBLE IMPEDENCE TO SYSTEM NEUTRAL FOR A DRIVEN GROUND IS 25 OHMS.
12. AS SHOWN ABOVE, THE PVC MAY ENTER UNDERNEATH THE SPLICE 808 0Y USING A'45 DEGREE SWEEP. SEAL CONOUIT WI1N DUCT SEAL,
13. IN AREAS SUBJECT TO WATER INTRUSION, INSTALL A SUFFICIENT AMOUNT OF PEARO8IC'1/4"--3/4" SIZE ROOK TO ALLOW FOR THE PER00LATI0N OF THE WATER,
14. IF FEEDER SPLICE BOX IS TO BE INSTALLED IN A SIDEWALK. A SEPERATION WILL 88 NEEDED
BETWEEN THE CONCRETE ANO THE LIDS.
15. REFER TO UX -233.0,1
ail & U'G DI:STRTBDTION SYSTEM STANDARDS
0 B/16/C5 ORIGINAL DRAWING
N0. DATE REVISION
ORIGINATOR: RAP DRAWN Sr) J. SHOUP
RJO ELS ""—dM AP"'"" 6/27/99 PROVED; J. MCEVOY
SUPERVISOR, 01-1/UG PRODUCT
SUPPORT SERVICES
ORIG, DRAWN APPR.
NO SCALE
UX -10 8
7 8"
3.2.,
23"
L2, I .
O
1'10" . 1 ..
#4 RE--BAR(TYP.)
C ONCRETE,_FOUNDATION
URD_CAPACXTOR_BAN'K
7'5"
3'-B" I 2'
LFIINO INSERTS 14)
SEE DETAIL A"
0
0
1,3"
8"
1" CHAMFER •-^y --" I ^'t)
SF411ON "A -A"
5" TO 6'
84010(4)
NO. DATE REVISION ORIG, DRAWN APP
UX -108
MANUFAOTURERS IOENTfI0ATION,
M &N 90 162'2010P-6 EL
11
MUM
PySURFACE SHALL BE A SMOOTH PLANE. THE
MAX. ALLOWABLE VARIATION IN HEIGHT BETWEEN
ANY TWO P01NTS ON TI -66 SURFACE IS 0,126",
2. 5000 PS1 TEST CONCRETE.
3, MANUFACTURERS IDENTIFICATION, YEAR QF MANU-
FACTURE & FPL CO, M&S N0. 162-25100-5 TO BE
CAST IN TOP SURFACE OE PAD NEAR CENTER (RE-
QUIRED WHEN PRECAST).
4. SUPERIOR THREADED INSERT, 6/8" WITH PLUG,
ELECTRO-GALVANI7ED, 4 REQUIRED.
6„ REINFORCING R005 TO 6F. WELDED AT
ALL INTERSECTIONS
WEIGHT 5230 LB
CU. FT. 26.9
CU, TES. 1.0
MAX LOAD 2000 03
54074 14X7 -4"
94058 3X5'-8"
84010 4X1' -O"
AETAILA
° F P L
011 & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR:BOB SENN PRAWN EMO.OKONEWSKI
DATE:12/29/97 APPROVED: J.J. MCEVQ'(
SUPERVISOR, OH/UG PRODUCT
SUPPORT SERVICES
NO SCALE
7,- s"
3L
CONCRETE FOUNDATION FOR •
S81C 30 PADMOUNTED', SWITCH •
SEE NOTE -,q2
art ,'i'N , 1;1.
,
ioP-.54oto
v2t:ACH Ca R t3E R (2 )
WITH *G WtT3'G s
lux-nz
Nivel, NAM n
Me% Nn, tG2-214
BOTT4M•21g072(?1
TOP -s405d. (4)
Sect" etiws400G(2.)
WIRE MESH
(Su- 74 rec-3)
MSERTS (L1)
(SEE I441E"
s•T Att. - A)
Top -54072(4) --�
WIRe Missw EiELOW MID*
rPLAN VIEW
� ,qN
.SECTION "241,
1, fait Om MU% Lo Ila snort nal teYat.•surTaas IrreLtttarltlea ere gat aeoeptabla,
2. 4 x 4 Np.4 Welded .1I re Mash Rai Mooing to atop 2" from Sides and 0pen14 of
Foundation.
3. Superior 7hraddad Inserts, 1/2" with Plug, Rlaotee-2e1y„4 Required.(See Detail d)
4. t!4 Reloteroing Rod as shown.
2, '4000 Lb, Teat ponerota.
2. For use with 5 EC Switches, H 2 S Nos. 270.563,270054,270.326 w 270.000.
7. ManufeotUrers IdsntlflostIon, Year ai Manutaoturs and RPL 0o, M L S Number to he
cast In top eurtn*e ar pad Haar non -es f prd, Tlrl: rsessl rod 911en precast.)
no. DA v0 ee4laton
10 00! r!
'r
Wa,1g141' '2145 1.0. f
cu,T. w ts,a
CU. Yt). - d,as
1,240 - KM.PARAM3.
r” fel .. LITER'?"
0.619 - CU. Mk-CEFCS
STANDARDS
UNDERGROUND DISTRIBUTION SYSTEM
FLORIDA POWER. & LIGHT COMPANY
DA7M 12. 2E-71 Na $CALK
ON Hp 04 11114, OM
rri
z
46 Co 9r)
x
'
h
NMp+
XcA
m
1,4
N
Q
N
C-46.0.0
TANK BOLT
DOWN (4))
TYPICAL INSTALLATION OF 25KV S&C VISTA
THREE PHASE SWITCH FOR USE IN 13KV OR 23KV
BELOW GRADE AND PAD MOUNTED APPLICATIONS
TYPICAL BUSHING POSITION ON VISTA SWITCH MODEL 422 SHOWN
F. --FEEDER L. -LATERAL
--2-3/4"
37
7-1/2"
2-6" FEEDER CONDUIT
22-1/2 DEGREE SWEEP
PREFERRED LOCATION
SEE NOTE 16
GROUND ROD
PREFERRED LOCATION
B
34 1/2"
PAD/EXTENSION BOLT
DOWN INSERT
LOCATION (4X)
SEE NOTE 17
L4 L4 L4 L3 L3 L3 F2 F2 F2 F1 F1 F1
PAD BOLT DOWN
SEE NOTE 17
Ln tt
1/2-13 NC
INSERT W/ LIFTING
EYEBOLT (4X)
34-1/2"
77"
7-1/4"
23-1/2"
!r2 1/_"
\-8-1/4"
79"
LOP VIEW OF .DAD AND CHAMBER
LOOP
CABLES
B
LOOP
CABLES
70-1%2L _.
62"
17-1/4
I
CHAMBER
EXTENSION
OUTLINE
FEEDER FEEDER
CABLES CABLES
FROM F2 FROM F1
SEE NOTE 6 '
TO NEUTRAL BOND
#4/0 CU M&S #112-338-000•'•
2-6" FEEDER CONDUIT -
22 -1/2 DEGREE SWEEP
INSTALL DUCT SEAL PER
UN -29.0.0
SEE NOTE 3
GROUND ROD
PREFERRED
LOCATION
6.2" LOOP CONDUIT-
45 DEGREE BEND
68"' '
SECTION A -A: FRONT VFW OF PID
AND CHAMBER
CABLE TERMINATIONS SWITCH SIDE
1 11/14/12 LOOP CABLE IDENTIFICATION JGV ELS WM
NO. DATE REVISION ORIG. DRAWN APPR.
C-46.0.0
`----ADJUSTABLE BRACKET
FOR RACKING CABLES
--PAD BOLT DOWN
SEE NOTE 17
FPL
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: A. PANTOURIS DRAWN BY: E. SCHILLING
DATE: 5/29/0S APPROVED: ARI LIMA NO SCALE
LEAD SUPERVISOR, UG SERVICES
C--46.0.1 I TYPICAL INSTALLATION OF 25KV S&C VISTA C-46.0.1
THREE PHASE SWITCH FOR USE IN I3KV OR 23KV
BELOW GRADE AND PAD MOUNTED APPLICATIONS
TYPICAL VISTA SWITCH MODEL 422 SHOWN
TOP VIEW OPERATION SIDE
TOP VIEW TERMINATION SIDE
I.
FRONT VIEW TERMINATION SIDEI
34-5/16 28.3/4
A-4-- —I
SECTION A—A: FEEDER SWITCH
FEATURES IN THIS ASSEMBLY
A. OVERCURRENT CONTROL
B. GAS FILL PORT
C. PRESSURE GAUGE
D. WINDOW FOR VIEWING OPEN GAP AND
GROUNDED POSITION OF LOAD—INTERRUPTER
SWITCH OR FAULT INTERRUPTER
E. 200—AMPERE BUSHING—WELLS FOR
FAULT --INTERRUPTER
F. 600—AMPERE BUSHINGS FOR
LOAD—INTERRUPTER SWITCH
G. TWO—HOLE GROUND PAD
H. 600—AMPERE THREE—POLE
LOAD—INTERRUPTER SWITCH WITH GROUND
POSITION
I, OPERATING MECHANISM
J. MANUAL OPERATING HANDLE
K. NAMEPLATE
L. SUBMERSIBLE SF6—INSULATED TANK
M. 600—AMPERE ALUMINUM BUS
N. BASE BRACKET
TERMINATION SIDEyrr
OPERATION SIDE
CONNECTION DIAGRAM
SEE NOTE 19 Se 20
•'FPL
OII �c UG DISTRIBUTION SYSTEM STANDARDS
ORIOINATOR: A. PAN1OURIS DRAWN BY: E. SCHILLING
1 11/14/12 CHANGE C-46,0,2 TO C-46.0.1 JGV ELS WM DATE:7/27/09 APPROVED: ARI LIMA
NO. DATE REVISION ORIG. DRAWN NO SCALE
APPR.
_,.T._ LEAD SUPERVISOR, UG SERVICES
46.0.2
TANK BOLT
DOWN (4X)
TYPICAL INSTALLATION OF 25KV S&C VISTA
THREE PHASE SWITCH FOR USE IN 13KVV OR 23KV
BELOW GRADE AND PAD MOUNTED APPLICATIONS
TYPICAL BUSHING POSITION ON VISTA SWITCH MODEL 431 SHOWN
F»FEEDER L=LATERAL
t
_4"
-2-3/4"
37
-5"
Pg
UI
/I
B-
34 1/2"
epi
4 L4 L4 F3 F3 F3
3-6" FEEDER CONDUIT
22-1/2 DEGREE SWEEP
PREFERRED LOCATION
SEE NOTE 16
Cr -
GROUND ROD
PREFERRED LOCATION
\-8-1/4"
PAD BOLT DOWN
SEE NOTE 17
SEE NOTE 6- -
LOOP
CABLES
PAD/EXTENSION BOLT
DOWN INSERT
LOCATION (4X)
SEE NOTE 17
F2 F2 F2 E1 F1 F1
1/2-13 NC
INSERT W/ LIFTING
EYEBOLT (4X)
34-1/2"
Q 77"
7-1/4"
23-1/2"
41
-62 1/2"
79"
DP VIEW (IF PAD AND CHAMBER
B
FEEDER
CABLES
FROM F7
70-1/2
62"
FEEDER FEEDER
CABLES CABLES
FROM F2 FROM F1
17-1/4",
CHAMBER
EXTENSION
OUTLINE
TO NEUTRAL BOND••"
#4/0 CU M&S #112•-336-000
3.6" FEEDER CONDUIT
22-1/2 DEGREE SWEEP
INSTALL DUCT SEAL PER
UN -29.0.0
SEE NOTE 3
GROUND ROD
PREFERRED
LOCATION
3-2' LOOP CONDUIT- '
45 DEGREE BEND
68"
SECTION A� .,. imiEw of P&Q,
CABLE TERMINATIONS SWUCH SIDE
C-46.0.2
-ADJUSTABLE BRACKET
FOR RACKING CABLES
F P
OH & UG DISTRIBUTION SYSTEM STANDARDS
PAD BOLT DOWN
SEE NOTE 17
ORIGINATOR: J, VALDES DRAWN BY: E, SCHILLING
1 11/14/12 NEW PAGE OF C-46 JGV ELS WM DATE. 3/16/2012 APPROVED: WILLIAM MONZON NO SCALE
NO. DATE REVISION ORIG, DRAWN APPR. LEAD SUPERVISOR, 110 SERVICES
C-46.0.3
43
TYPICAL INSTALLATION OF 25KV S&C VISTA
THREE PHASE SWITCH FOR USE IN 13KV OR 23KV
BELOW GRADE AND PAD MOUNTED APPLICATIONS
23 --
77-1/2
PAD BOL
DOWN
e=�
SECTION OF
PAD AND CHAMBER
rff:
.5
73
SWITCH ENCLOSURE SIDE VIEW
(4)1/2" SS BOLT ANCHOR
& WASHER \ BRACKET
BY S&C ENCLOSURE
L
1.5' MIN J
GASKET
s
POLYMER-CONCRETE
PAD
ENCLOSURE ANCHOR DETAIL
1/2" DIA,
BOLT TO
RETAIN LIFT
SLING , (4x)
.0
C -•-46.0.3
ii.+�r,14---,-!
•
7`
SWITCH ENCLOSURE TOP VIEW
cir4i
FPL
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: A PAN'ICURIS DRAWN BY: E. SCHILLING
1 11/14/12 CHANGE 0-46,0.1 TO 0-46.0.3 JGV ELS WM DATE: 7/27/09 APPROVED: ARI LIMA NO SCALE
NO, DATE REVISION ORIG. DRAWN APPR, LEAD SUPERVISOR, UC SERVICES
`C,_46.0.4 TYPICAL INSTALLATION OF 25KV S&C VISTA THREE
PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW
GRADE AND PAD MOUNTED APPLICATIONS
1 ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
MATERIAL LIST
DESCRIPTION QUANTITYI
VISTA 422 (4 "WAYS', 2 -THREE PHASE FEEDER GANG
SWITCHES AND TWO -THREE PHASE, INDIVIDUALLY
PROTECTED LOAD TAPS, WITH A STAINLESS STEEL
ENCLOSURE
VISTA 431 (4 "WAYS', 3 -THREE PHASE FEEDER GANG
SWITCHES AND ONE -THREE PHASE, INDIVIDUALLY
PROTECTED LOAD TAPS, WITH A STAINLESS STEEL
ENCLOSURE
PAD AND CHAMBER FOR PM DF VISTA SWITCH
(77"X 79"X 40" DEEP)
600 AMP T- BODY ELBOWS (25KV) VARIES
200 AMP BUSHINGS (25KV) VARIES
200 AMP LOADBREAK ELBOWS (25KV) VARIES
PROTECTIVE CAP (15KV ONLY) VARIES
ELBOW SURGE ARRESTERS (25KV ONLY) VARIES
GROUND ROD CONNECTOR, CLAMP TYPE 1
GROUND RODS, AS NEEDED VARIES
GROUND ROD COUPLINGS VARIES
4 COPPER WIRE, SDB 6
4/0 CU CABLE, 600V 27
#4/0 CABLE CONNECTORS 6
COPPER TO COPPER BOLTED CONNECTORS 22
STANDARD LOCKS 2
CABLE MOUNTING BRACKET, STAINLESS
BOLTS, SS, 1/2"X 1-1/2" FOR CABLE BRACKET
SPRING. NUTS. SS, FOR 1/2" BOLT FOR CABLE BRACKET
LOCK WASHER, 1/2", FOR CABLE BRACKET
800 AMP FAULT INDICATOR
C--46.0.4
M&S NUMBER WMS CU
279-209-050 SW -VISTA -422 -PAD
279-211-050 SW -VISTA -431 -PAD
1 162-690-790 PD-SW-W/CC-VISTA
1
21 ROTATABLE FEEDTHRU DEVICE, 200AMP, 25KV
12
VARIES
6
3•
163-639-007
163-864-001
163--502-001
163-022-000
334-015-005
120-035-106
130-614-005
130-405-104
112-309-00011
110-101. 169 1
120-871-0051
102-800-002
546-246-011
160-310-0001
140-515-5571
161-463-0001
145-294-0101
163-297-009
163-250-002
163-250-002
TM -PDF -600-11<
SW-PD-BSH
TM -PDF -1/0
TM -PDF -GC
TM -PDF -LA
DG -CLP -5/8
DG-PKG-5/8
DG -C-5/8
SW -PMD -GC
(Qty - 1)
SW -PMD -LOCK
SW-VISTA-MT-HDW
P-CL-FCI-800
SW -VISTA -422 -PAD
SWVISTA-431 •-PAD
NOTES:
1. THE INTERRUPTERS MUST DE PRE-SET BY THE ERC PRIOR TO BEING ISSUED TO THE JOB. CALL 863-4921 OR 863-4900 TO MAKE
ARRANGEMENTS.
2.. THE PAD MOUNTED VISTA SWITCH MAY BE INSTALLED IN AREAS SUBJECT TO FLOODING.
3. SEAL THE INCOMING DUCTS PER UN -29,0.0.
4. THE SWITCH AND ITS ENCLOSURE MUST BE BOLTED TO THE PAD.
5. REFER TO DCS UH -41.0.1 FOR PROPER INSTALLATION OF 600 AMP T -BODY ELBOWS.
6. BOTH THE FEEDER CABLES AND LOOP SIDE' CABLES ARE TO BE RACKED THROUGH THE CABLE SUPPORT BRACKETS INSTALLED ON THE
UNISTRUT IN THE CABLE CHAMBER.
7. CABLES MUST NOT BE IN CONTACT WITH THE CABLE CHAMBER OR PAD TOP.
8. ALLOW SUFFICIENT LENGTH OF CONCENTRIC NEUTRAL TO REACH GROUNDING BARS AND PERMIT THE FREE MOVEMENT OF THE ELBOWS.
9. MAKE CERTAIN OF CABLES LOCATIONS BEFORE DRIVING GROUND RODS.
10. APPLY CAULKING COMPOUND TO THE SEAM BETWEEN THE ENCLOSURE AND THE PAD TOP.
11. DUST CAPS USED FOR COVERING BUSHINGS AND BUSHING WELLS DURING SHIPMENT MUST BE REMOVED PRIOR TO ENERGIZING THE
SWITCH.
12. UNUSED LOAD TAPS MUST HAVE BUSHINGS AND PROTECTIVE CAPS INSTALLED,
13. UNUSED FEEDER POSITIONS MUST HAVE 600 AMP PROTECTIVE CAPS INSTALLED (M&S #163-645-007),
-14. AFTER THE SWITCH ENCLOSURE HAS BEEN INSTALLED, THE LIFTING BRACKETS MUST BE REMOVED AND STORED INSIDE THE ENCLOSURE
FOR FUTURE USE.
15. ENSURE THAT THE WARNING LABEL (M&S #548-560-104) IS INSTALLED ON BOTH THE CABLE COMPARTMENT AND THE OPERATOR SIDES
OF THE ENCLOSURE.
16. INSTALL FEEDER CONDUITS 'AS SHOWN IN C-46.0.0 AND C-46,0.2 ON LEFT AND/OR' REAR SIDE OF CABLE CHAMBER TO ALLOW FOR
BENDING RADIUS OF CABLE.
17. BOLTS FOR SECURING PAD TO CHAMBER ARE INCLUDED FROM VENDOR. THERE ARE 4 BOLTING LOCATIONS AS SHOWN ON DRAWINGS,
18. INSTALL 800 AMP• 30 FAULT INDICATORS ON EACH SET OF FEEDER CABLES. SEE UV -14.0.0, UV -14.0.1, & UV -14.0.2.
19. FOR PAD MOUNTED APPLICATIONS, THE BASE BRACKETS ("FEET"). "N" AS SHOWN IN C-46.0.1 ARE REQUIRED.
20. THE BASE BRACKETS ARE NOT REQUIRED FOR BELOW GRADE ("UNDER -COVER") APPLICATIONS, BUT SHOULD BE KEPT WFFH THE SWITCH
IN THE POSSIBLE EVENT OF FUTURE RE -USE IN A PAD MOUNTED APPLICATION.
21. INSTALL ROTATABLE FEED-THRU DEVICE ON THE LOAD SIDE OF THE VISTA SWITCH (M&S #163-250-002)
2 11‘14/12
1 /2/10
NO. DATE
UPDATE NOTES 16 AND 19 ADD
NOTE 21 AND ITEM 21
UPDATE ITEM 16
REVISION
JGV ELS WM
GAP ELS BXN DATE:9/1/03 APPROVED: ARI LIMA
ORIG. DRAWN APPR. LEAD SUPERVISOR, UG SERVICES
°F P L
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: A. PANTOURIS DRAWN 8?: E. SCHILLING
NO SCALE