Loading...
Amendment No. 1 to the Design/Build Agreement with Ric-Man International, Inc. a0 i6—aCIT7s. Attachment A AMENDMENT NO. 1 TO THE DESIGN/BUILD SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND RIC-MAN INTERNATIONAL, INC., DATED NOVEMBER 25, 2014 FOR THE DESIGN/BUILD SERVICES FOR NEIGHBORHOOD NO. 8: SUNSET ISLANDS 3 &4 RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS This Amendment No. 1 to the Agreement made and entered this 2ccday ofic+t e``r�� .2016,by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida,having its principal offices at 1 700 Convention Center Drive, Miami Beach, Florida 33139(hereinafter referred to as CITY),and RIC-MAN INTERNATIONAL, INC having its offices at 2601 Wiles Road, Pompano Beach, Florida, 33073 (hereinafter referred to as RMI). RECITALS WHEREAS, on September 10,2014, the Mayor and City Commission adopted Resolution No. 2014-28749, pursuant to Request for Proposals No. 2014-051-SR, authorizing the Mayor and City Clerk to execute an agreement with Ric-Man International, Inc.(RMI), for design-build services for Neighborhood No.8: Sunset Islands 3&4 Right-of-Way(ROW)Infrastructure Improvements in the amount of$7,774,967.51 ; and WHEREAS,on January 5, 2015, Notice to Proceed No. 1 was issued directing RMI to start the work; and WHEREAS,RMI was delayed due to additional work resulting from the number of unmarked utilities that were damaged while excavating, Homeowner's Association (HOA) requested scope changes and utility undergrounding activities ; and WHEREAS, RMI submitted change order requests which consisted of additional design, permitting and construction services associated with the additional work in the total amount of $339,625; and WHEREAS,the Design Criteria Package(DCP)identified a roundabout at the intersection of 21 Street and Sunset Drive on Sunset Island 4; and WHEREAS, subsequently the City performed a traffic study that concluded that a simple intersection in lieu of the roundabout is feasible; and WHEREAS, the Sunset Islands 3&4 undergrounding of overhead utilities required Florida Power&Light(FPL),Atlantic Broadband(ABB)and ATT conduits to be installed in conjunction with the new water main in the same trench; and WHEREAS, the ABB and ATT conduits were supplied and installed by RMI alongside the new water main in the same trench; and WHEREAS, the electrical system conduits must be supplied by FPL; however, these conduits were not available for installation in conjunction with the water main construction; and WHEREAS, FPL requires the City to enter into agreements,make necessary payment and grant easements to FPL prior to supplying their conduits; and WHEREAS,the HOA requested the elimination of the type"F"curb and gutter at the edge of pavement at all intersections and replacement with a valley gutter,which was approved by the DCP; and WHEREAS, a number of existing unmarked water and sewer services were damaged and repaired by RMI during the excavation and installation of the water main; and WHEREAS, the DCP identified installation of one(1)water meter per property, and certain properties require two (2)meters, for a total of seventy-seven (77)additional water meters; and WHEREAS, the HOA requested that the storm water pump station for Sunset Island No.4 be relocated into the Sunset Island Park from the right of way; and WHEREAS, the pump station installation will require design and permitting services associated with the removal, relocation and installation of trees, landscaping and new irrigation system; and WHEREAS, RMI has provided a credit to the City for utilizing the Sunset Lake Park as a temporary staging area; and WHEREAS,the current contract is in the amount of$7,774,967.51 and this Amendment No. 1, in the amount of$339,626, will increase the total contract amount to $8,114,593.51; and WHEREAS,the amount also includes a non-compensable time extension of forty-three(43) calendar days increasing the project duration to six hundred and thirteen(613)calendar days with a revised project substantial completion date of July 11, 2016. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 1. 2. MODIFICATIONS A. The Agreement is amended to incorporate Exhibit A -- Request for Change Orders, attached hereto. B. Section 8.01.01 to the Agreement is amended to refer to the new Contract Price,in the amount of$8,114,593.51. 2 r • C. Section 6.03 to the Agreement is amended to refer to the new Contract Time of six hundred and thirteen(613)calendar days with the Project substantial completion date of July 11,2016. 3. RATIFICATION The City and Design/Build Firm ratify the terms of the Agreement, as amended by this Amendment No. 1. Design/Build Firm hereby reserves its right to claim for the additional time extension required to perform the additional work addressed herein and for the delays that have resulted from the impacts described herein,which time is not included in this Amendment. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to b-400 executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: . CITY OF MIAMI BEACH, . O' 1 B 441 A 1 A :► ...1 - City Clerk a r . : lir„.„,..,......44 t, INCORP OR'TED= * Q ATTES % .. ' J GN/: -' ? ,'r-M: . � �! -M; IN - NA •NAL,INC. 4,14-11i I-1 rai. ■44`4 1 6 _ , _ IP_,---- - Sec''"ry Prei77-tom (.). A LICA-4(5,,, 41 /7.,2"ze Z - ed,r lc I/1 Print Name Print Ntme Attachments: Exhibit A—Request For Change Order • APPROVED NGUAG�- FORM�� &FqR ECUTION q y ) -__ \VsLU City Attorney ate 3