LTC 174_2016 Miami Beach Convention Center Project UpdateMIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov OFFICE OF THE CITY MANAGER LTC # 174-2016 LETTER 0 COMMISSION TO: Mayor Philip Levine and Members f the City Commission FROM: Jimmy L. Morales, City Manager DATE: April 22, 2016 SUBJECT: Miami Beach Convention Center Construction Project Update The purpose of this LTC is to update the Mayor and City Commission on the Miami Beach Convention Center renovation and expansion project for the month of March 2016. Project dashboard is attached as Exhibit A and a corresponding Budget Summary Breakdown is attached as Exhibit B. In addition, narrative updates are as follows: BIDDING 92% of the trade costs of the project have been awarded to date for a total of $373 million of the budgeted $410 million. No additional new awards were issued in the month of March since the pending awards are minor in nature and not on the critical path. The final 8% of the trades will include items such as ornamental railings, window washing equipment and miscellaneous metals, sound absorbing wall units, pavement striping, traffic signalization, landscaping, painting, toilet and bath accessories, toilet compartments, architectural precast, entrance mats and grilles, lockers, and wall protection. GUARANTEED MAXIMUM PRICE (GMP) DRAW Direct Purchase The City has begun its direct purchase of materials for the project, resulting in sales tax savings budgeted to total $6 million. Through March 31 the City has directly purchased $14.8 million in materials resulting in a sales tax savings of $882,000. In addition, the City saved on reduced payment and performance bond premiums totaling $111,424 to date. The additional payment & performance bond savings is being added to the owner's contingency. After the direct purchase amounts are taken into account, a total amount of $38,280,546, or 7.43%, of the total GMP amount of $515,458,058 has been invoiced to March 31, 2016. Fora detailed breakdown, refer to Exhibit B (Total GMP line Item). DESIGN STATUS During the month of March, the Fire Department and Building Department were continuing their reviews of the design documents submitted late February. Smoke Control System Convention centers are unique in that the large exhibition halls create longer distances to exit in the event of a fire. The life safety design concept included in the GMP utilized a smoke control system to ensure guests could exit the longer distances safely in the event of a fire emergency. That system utilized fans for smoke removal, and relied
Miami Beach Convention Center Project Monthly Construction Project Update April 22, 2016 Page 2 of 5 partially on automatically opening doors to the exterior for make-up air. Through the further development of the design concept, while respecting the constraints of an existing building structure, it was determined that relying on exterior doors for introduction of make-up air was not an optimal solution, and instead, additional equipment would need to be added to introduce make-up air into the building. This entailed additional fans, additional structure to support the fans, and additional electric and controls to service the fans. Implementing this approach is cost prohibitive. The design team is developing a new approach to the life safety design concept which eliminates the need for a smoke control system by providing more exits and closer access to exits and fire-rated corridors. The exact cost implications of this approach are still under study, but are considerably less than adding all the equipment listed above. SCHEDULE Progress remains on schedule to meet the Art Basel 2016 milestone date of November 17, 2016. Addressing the change in life safety design discussed above will have to be worked into the schedule. The contractor (Clark) has been notified of the change and the design team is working through modifications to the construction documents. Since this new approach results in less equipment and ductwork, any schedule impacts driven by changes while under construction should be mitigated by less construction activity driven by the elimination of the smoke control system. A second issue that impacted the schedule, but has been resolved, relates to addressing ground water contamination in the area of the ballroom addition, which delayed the dewatering permit issuance required to begin installation of foundations. The north loading dock is the only element of the north site that needs to be available for Art Basel 2016. The completion of the ballroom is not scheduled until the fall of 2017, therefore it is not on the critical path for this year. Clark is developing a schedule recovery plan to ensure the Art Basel milestone is maintained.
Mt* 2016 2017 I I -- I AprvtA I Na T i6 I -- I — I I -- 1 fbrM I Q.-- tat, Mitt NORM - SIVA AIWA -DEMO HALLS ASB - NIGH CEILING WORK NALL A- SIAS REMOVAL RECONITIMIION HALL - tILAS REMOVAL SEGOORMAJCION HALIA ALB • ROUGII401611,M36011 HALLS AU- EC110111 EMT CONCOURSE • 0010 EAST - STRUCTURAL WIT CONCOURN 61011:4#3 ,1115 allITEMOR EAST CONCOURSE-ELEVATORS TARS EMT allICOLAIRE - ffIR9'C-C190115 fMLVE1- 031111160111180 • Yf Miami Beach Convention Center Project Monthly Construction Project Update April 22, 2016 Page 3 of 5 The following schedule summarizes the key milestones being tracked for Phase I which ends in December 2016: Pilaw 5 Cortiit Stiiittisit 41.'5 E1 Fiiilsa 5 Flow,. CONSTRUCTION Key construction activities include: • Installed 584 auger cast in place piles. • Demolished East Concourse exterior façade; central vaulted roof structure; demolished of high level "gable" structure along Wash. Ave.; SE Mezzanine; remaining structures along North loading dock area. • Installed backfill in depressed slab area along interior SE corner. • Installed roof drains and white silicone roof coating to parapet walls. • Installed sheet pile cofferdams for dewatering of shear wall foundations. • Installed forms, reinforced and placed concrete for grade beams and shear walls along North expansion area. • Installed concrete elevator pits along East Concourse. • Installed structural reinforcing and Catwalks in Exhibit Halls A & B. • Ran power and telecommunication conduits. • Installed chilled water piping and rain leaders. • Installed roof deck insulation in Halls A and B.
Miami Beach Convention Center Project Monthly Construction Project Update April 22, 2016 Page 4 of 5 • Utility coordination meetings with franchise utilities continue to take place. • Clark submitted Class V Dewatering permit and proceeded with alternate plan to dewater foundation elements along North expansion area. • MOT for Washington Ave work was approved and implemented. • Clark is in the process of implementing Workforce Management System to track workers with ID/RFID tags and monitor manpower, local workforce and job classification. Noise Control and Mitigation The Clark team has implemented the following measures to improve noise control along the east side of the construction site (along Washington Avenue). These efforts are being communicated to residents through the project's social media outreach and/or face-to-face meetings, phone calls and e-mail communication. • Construction will start no earlier than 7am Monday- Saturday and 9am on Sundays. • All night work along Washington is required to stop at 9pm. There may be extenuating circumstances requiring a later stop due to safety or equipment problems during the construction which cannot stop until complete. The Public Information Officer (P10) team issues alerts via email and social media when these problems occur. • Work after 9 p.m. can occur inside of the building, away from the east facade. • Clark will perform periodic noise monitoring along Washington during the night shift. • All deliveries are scheduled for the day shift Monday through Saturday only. There will be no night deliveries. • The sub-contractors are using electric and pneumatic tools where ever possible in lieu of gas powered tools or jack hammers for reduced noise. • The majority of equipment being used shall be propane or electric powered, bobcats, man lifts, fork lifts, etc., reducing noise and emissions. • All gas and diesel powered equipment shall use exhaust emission scrubbers, reducing emissions and exhaust noise. • Most windows and openings along Washington shall be covered to contain construction activities inside, reducing light and noise from night operations. • Construction light shall be directed to the interior, not exterior. • Streets shall be swept daily and water shall be used to control dust and debris. OWNER COSTS A total of $42,125,323, or 59%, of the owner cost budget has been expended to date. The high percentage is due to the inclusion of design as a large component of Owner's Cost. For a full detailed breakdown refer to Exhibit B. LOCAL HIRE Clark Construction continues their commitment to maximizing workforce opportunities for City of Miami Beach and Miami-Dade County residents. A total of 756 workers have been employed by the project to date. This includes all certified payroll from October 2015 to March 28, 2016. The labor force includes full-time, part-time, and temporary
Miami Beach Convention Center Project Monthly Construction Project Update April 22, 2016 Page 5 of 5 labor and also includes daytime and nighttime shifts. Attached as Exhibit C is a summary of the local hiring efforts, to date, of Clark and its subcontractors. The current report shows a summary of all employees on the project thus far, sorted by zip code. This shows that Clark is currently over 54% local hire (Miami Beach and Miami-Dade County) by individual and over 49% by man-hours. PUBLIC INFORMATION The City continues to dedicate efforts to advise the public of the status of the project through the City's social media outlets including Twitter, Facebook, and Constant Contact. A monthly newsletter and traffic alerts are included as part of the outreach effort. For an example of the posts for the month of March, refer to Exhibit D. If there are any questions, please do not hesitate to contact myself or Maria Hernandez at Extension 2584. Attachments: Exhibit A — Project Dashboard and Site Photos Exhibit B — Budget Summary Breakdown Exhibit C — Clark Construction Local Hiring Summary Exhibit D — Public Outreach Report JLM / MH F:\cmgr\$ALL\Convention Center\Commission Updates - Monthly_Quarterly\2016 March Monthly (April Commission)WBCC Project Construction Update 2016 04 22.docx
Project Dashboard
Approved Budget 1017115 Budget Original % Total Variance Budget Trade Costs $410,205,803 66.62% 0 Direct Purchase 0 0.00% -14,778,031 Change Orders 0 0.00%I 0 Subtotal 410,205,803 66.62% -14,778,031 Contractor Soft Costs General Conditions (Clark Staffing) 24,465,886 3.97% 0 General Requirements 14,760,103 2.40%I 0 Payment & Performance Bond 3,708,000 0.60%I , -111,424 GL Insurance 1,807,650 0.29% 0 CMr Fees (3.8%) 17,288,003 2.81% 0 CM Contingency 29,747,613 4.83% 0 Base GMP 501,983,058 81.53%1 -14,889,455 Other GMP Items (Including all mark ups) P-Lot Park (allowance) 10,000,000 1.62% 0 Storm water Drainage Culvert 3,475,000 0.56%1 0 Subtotal 13,475,000 2.19% 0 Total GMP (Clark Contract) 515,458,058 83.72% -14,889,455 Direct Purchases I Direct Purchases 0.00% 1 14,778,031 Tax Savings -6,000,000 -0.97%I , 0 Total Net GMP (Less Tax Savings) 509,458,058 82.74%' -111,424 Owner's Cost City Staffing & Expenses 1,561,000 0.25% 793,318 Consultant Fees (SAG) 1,047,725 0.17%, 0 Owner's Rep (Hill) 5,585,673 0.91%1 0 Design Fees (Fentress) 26,669,442 4.33%I 0 Owner's Cost Estimator (US Cost) 400,030 0.06%1 66,448 Pre GMP CM Fee (Clark) 2,594,073 0.42% 0 Testing & Inspections 2,328,943 0.38% 0 Permit & Plan Reviews 2,400,000 0.39% 0 Other 847,041 0.14%l i 4,070,978 Public Art (AIPP) 6,900,000 1.12% 160,797 MBCC FF&E 6,830,945 1.11%1 0 Insurance: OCIP GL Wrap 9,000,000 1.46% -4,259,424 Builder Risk/Building (net) 1,600,000 0.26%' -450,000 Professional Liability Umbrella 1,000,000 0.16% -382,117 Carl Fisher Renovation Allowance 2,500,000 0.41% 0 Subtotal 71,264,872 11.57% ' 0 Total Without Owner's Contingency 580,722,930 94.32% -111,424 Owner's Contingency 35,000,000 5.68% 258,873 Total Owner's Contingency 35,000,000 5.68% 258,873 Total Budget With Owner's Contingency $615,722,930 100.00% $147,449 Dashboard Summary Current Forecasted Budget Current Budget % Current Expenses % Balance Spent Remaining $410,205,803 66.61% $41,083,755 6.67% $369,122,048 -14,778,031 -2.40%, -14,778,031 -2.40% 0 0 0.00% 0 0.00% I 0 395,427,772 64.21% 26,305,724 4.27% 369,122,048 24,465,886 3.97%1 3,320,000 0.54% 21,145,886 14,760,103 2.40% 3,457,022 0.56% 11,303,081 3,596,576 0.58%1 1 3,596,576 0.58% 0 1,807,650 0.29%l i 166,665 0.03% 1,640,985 17,288,003 2.81% 1,434,559 0.23% 15,853,444 29,747,613 4.83%1 0 0.00% 29,747,613 487,093,603 79.09% 38,280,546 6.22% I 448,813,057 10,000,000 1.62% 0 0.00% ' 10,000,000 3,475,000 0.56% 0 0.00% . 3,475,000 13,475,000 2.19% 0 0.00% 13,475,000 500,568,603 81.28% 38,280,546 6.22% , 462,288,057 14,778,031 2.40% 0 0.00% 14,778,031 -6,000,000 -0.97% -881,992 -0.14% -5,118,008 509,346,634 82.70% 37,398,554 6.07% 1 471,948,080 2,354,318 0.38%I I 595,038 0.10% 1,759,280 1,047,725 0.17%1 746,771 0.12% 300,954 5,585,673 0.91% 756,852 0.12% 4,828,821 26,669,442 4.33% 20,782,071 3.37% 5,887,371 466,478 0.08% 386,371 0.06% 80,107 2,594,073 0.42% 1,556,444 0.25% 1,037,629 2,328,943 0.38% 121,458 0.02% 2,207,485 2,400,000 0.39% 1,673,667 0.27% 726,333 4,918,019 0.80% 499,893 0.08% 4,418,126 7,060,797 1.15% 7,060,797 1.15% 0 6,830,945 1.11% 0 0.00% 6,830,945 4,740,576 0.77% 4,740,576 0.77% 0 1 ' 1,150,000 0.19% 2,587,503 0.42% -1,437,503 617,883 0.10% 617,883 0.10% 0 2,500,000 0.41% 0 0.00% 2,500,000 71,264,872 11.57%' 42,125,323 6.84% 29,139,549 580,611,506 94.27% 79,523,877 12.91% 501,087,629 35,258,873 5.73% 0 0.00% 1 35,258,873 35,258,873 5.73% 0 0.00% 35,258,873 $615,870,379 100.0% $79,523,877 12.91% $536,346,502 1 8 6 7 4 3 3 5 5 5 EXHIBIT B Miami Beach Convention Center Expansion & Renovation Project 1: The property insurance portion of the Builders Risk policy to be reimbursed $2,000,004 by CMB Risk Dept. 2: The bond offering resulted in additional proceeds that were not included in the original budget. 3: A portion of the savings from insurance was allocated to AiPP to provide for actual costs. Pursuant to Sec. 82-587 of the CMB Code, the total amount allocated to AiPP has been transferred to the Art in Public Places Fund. 4: The remaining insurance savings is temporarily allocated to "Other" until other budget line items are refined. 5: Insurance Savings as a result of implementing a CCIP (Contractor Controlled Insurance Program) rather than an OCIP (Owner Controlled Insurance Program) 6: A portion of the savings from insurance was allocated to City Staffing to cover costs from Fiscal Year 2014 through December 2018. The previous budget estimate included only Fiscal Years 2015 through part of 2018. 7: Additional Cost Estimating services to support GMP reconciliation negotiations with Construction Manager- Clark Construction. 8: Savings from Clark Bond on Direct Purchases executed to date. These savings are added to Owner's Contingency. F: \cmgr\$ALL\Convention Center\Commission Updates - Monthly_Quarterly\2016 March Monthly (April Commission)\ 4/21/2016 7:01 PM Page 1 of 1 Convention Center Financials - Tracking March\ Dashboard Summary
EXHIBIT C CLARK - #113451 - MIAMI BEACH CONVENTION CTR LOCAL WORKER UTILIZATION REPORT BY PROJECT Proiect.4113451 - MIenM Betch Goa rentbi C.Ille4 Pretest Code: 2C1B-3C3 Cantaeloler %Itch Cectirtors WWII Crafts Frani:Mr 10/1/1016 lb DM - 3.257010 Ileport MM. /25/20 le Moser/Benefits Number Warns w/o Number of Number of Number of of Owner Number of Bereft) Awakes Journeymen foreman Operators Super Area Total Number of Workers % of Total Total I lours % of Total Workers Worked flours Wiwiled Zip Data Mani Beach Mani Dade County ErripIrresNri In Specified zip u5b 4 461 11 0 93 % 5304 % 46 43 % 57300 59,554.10 63203.79 342 % 4331% 6127% 311,095.41 51.136,5031D $1.712,37953 $11 0ri 51.068,206.81 61.666,600.35 19 12 332 0 0 0 1111111111111111111111111111111 Demographic Profile Alm or Amencar 170 2249 % 39„575.75 28.30 % 1655.Z 79 $540.03271 8 102 0 0 0 Aeian 1 0 13% 24Cf3 002% 3$4306 784308 0 1 0 0 0 lisparic 314 41 53 % 41.997 30 34 0T % $043.33365 $95$18 35 3 311 0 0 0 Caucasian 92 int % 12,909.75 9 76 % $307,221 74 $317,497.19 3 70 0 0 0 Othor 199 M 00 % 33,646 50 27.29 4, ¶3 3.133 64 ¶893.13129 19 171 0 0 0 Male 723 5563 14 119,37639 97.32 % 32796,547.08 $2567.782.19 32 591 0 0 Fern* 33 4.37% 3.30150 208% 301.431.82 wane 0 33 0 0 0 Total Employees 166 123,2771 52 x,978.90 52647,442,61 32 724 0 0 0
March 2016 - Social Mec ia/\ewsletter Report CONVENTION CENTER City of Miami Beach MisimaieachNu,vs III City of Miami Beach Government Mkifet 1 al 1.50piTi 4/ Birds eye view of the work in progress over at the Miami Beach Convention Center renovation & expansion project #MBCCFuture Posted on March 1, 2016 Birds eye view of the work being done at @TheMiamiBeachCC for the renovation & expansion project 41MBCCFuture 3/1/16.11:08AM 4 RETWEETS 6 LIKES Miami Beach Convention Center Renovation Project Prepared by: INFINITESOURCE crr ,rGi Public Information Officer, Anneleise M. Sanchez Social Media Posts from March 2016: Twitter/Facebook Posted on March 1, 2016 City of Miami Beach I 1 700 Convention Center Drive Miami Beach, FL 33139 305.673.7010 I www.mbccfuture.com
doilliiiiiii111111111 110001111"'''''""" MIAMI BEACH CONVENTION CENTER City of Miami Beach Government Ma Have you seen the progress over at the Miami Beach Convention Center? iiMBCCFuture Posted on March 3, 2016 Posted on March 3, 2016 59 Views MI City of Miami Beach Government March 3 at 2:15pr , Miami Beach Fun Fact: In 1972, both the Democratic and Republican parties held their respective conventions not only in the same town but also in the same exact building, the Miami Beach Convention Center! #throwbackthursday 4MBCCFulure MIAMI BEACH HOME OF D EMO .GO NE 1972 ..P 111 City of Miami Beach 0 MiarniBeachNews FunFact In 1972 both the Democratic & Republican parties held their conventions at TheMiamiBeachCC MBCCFuture 3/3/16. 12:55 PM MIAMI BEACH E "HE OM OF I72 DEM0.4.0.P 3 RETWEETS 4 LIKES Posted on March 3, 2016 City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673.7010 I www.mbccfuture.com
III City of Miami Beach 0 Calling all construction workers! Construction job fair for _i'TheMiamiBeachCC project on 3/8 3PM-5PM MBCCFuture MIAMI BEACH CONSTRUCTION JOB FAIR kt alii , it it Posted on March 7, 2016 II City of Miami Beach Government Matcrp 7 at 1.40piii • Calling an construction workers! Come out to the Miami Beach Convention Center expansion & renovation construction job fair, tomorrow, March 8 from 3:00 PM to 5 PM at Miami Beach Botanical Garden #MBCCFuture IM.(AN! BEACH CONSTRUCTION JOB FA I R 4 lilt 111 to» p.m, ...ow. .....1.4.0•111. MIAMI BEACH CONVENTION CENTER Posted on March 7, 2016 1111 City of Miami Beach 0 U City of Miami Beach 0 omialnitscacr.Now ,3 Sign up to receive info on the tiMBCCFuture renovation & expansion project mbccfuture.com ,,iTheMiamiBeachCC For the next month there will be 1 lane going NB/SB on Washington Ave from 18 ST to 21 ST rMBCCFuture Posted on March 11, 2016 Posted on March 8, 2016 City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673.7010 I www.mbccfuture.com
MIAMI BEACH CONVENTION CENTER IIII City of Miami Beach Government Mach 24 at 10:00am • .4 Take a look & walk through our new Convention Center Map #MBCCFuture cc: Miami Beach Convention Center A Walk Through the Park N. 0 Wai** Ari Mai ti CO Mika 0100111111V111.1 ACM •••., cm bo.7•var ,1 ad. :_ sabrra 4' -4 %.° * °Lap Part 1 aro Posted on March 24, 2016 0 RoarthmAo1.4 • It 3124..'16, 8:45 AM Posted on March 24, 2016 City of Miami Beach * M.drecIGcdLI Nev's Take a look & walk through our new tConventionCenter Map #MBCCFuture cc: @TheMiamiBeachCC A Walk Through the Park 7 City of Miami Beach drAarriia..tarIlNevit3 We love our beaches for the same reasons you come to visit! Enjoy Spring Break but remember to KeepM BC lean 3(18116, 4:25 PM 7 RETWEETS 5 LIKES Posted on March 18, 2016 City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673.7010 I www.mbccfuture.com
CONVENTION CENTER Posted on March 28, 2016 Posted on March 28, 2016 Chy of Miami Beach Government fylanth 2 -t 2' 15vp From Technology, to Design, to that blue life Find them all at the Miami Beach Convention Center gMBCCFuture 5/20/16 - 5/22/16 South Florida Boat Show EVENTS SCHEDULE I 4/18/16 - 4/ 20/16 eMerge Americas Technology Conference 5 /1 0/16 - 5/13/16 Matson & Objet Design Show ill City of Miami Beach 0 4McamiBeacl iN c-ws From Technology, to Design, to that blue life Find them all at fijTiheMiamiBeachCC vMBCCF:uture 4/18/16 - 4/20/16 eMerge Americas Technology Conference 5/10/16-5/13/16 tviaison&Objet Design Show 5/20/16-5/22/16 City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673.7010 1 www.mbccfuture.com
I 1111 City of Miami Beach ‘e ,m,arrilBoa_ 1 , N 1.2...,., s "This will be the center for creative collaboration. This is the future of 4MiamiBeach" - WayorLevine #MBCCFuture 3/29/16, 2:15 PM Posted on March 29, 2016 In City of Miami Beach 0 • m airoBoi ,,:c_nric44 Crews working quickly & diligently to complete work on Washington Ave before hurricane season begins MBCCFuture , 1 11.1S AM 1151 City of Miami Beach Government 'This will be the center for creative collaboration. This is the future of Miami Beach" - Mayor Philip Levine #MBCCFuture Posted on March 29, 2016 Posted on March 30, 2016 City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673/010 www.mbccfuture cam
MIAMI BEACH tONVENTI°N CENTE Caleb in the Spotlight rose u.ar®. man mma nee wane rms.. saw. awe.. aamio waxes 6, One. 41111...3.6 Plappl MA,11 .I.41101.00.e inten1.4. 011.1.1. 1.1.1. SW. foe I. upconvinp alwrps ISS. Neb. ...Won spot.. Matt tr.... r oed Mlami Beach Convention Center Renovation & Expansion PROJECT UPDATE • MARCH 10, 2016 Washington Avenue Traffic Shift Underway &IA sae m SaM,1 AKeiVel face -Lift1 wool, ilorOamd and a.... Yong Mo. %Atm rOartol to Om tow In N. alretylon me, Wasnrnaueout Wien IS &tree .11 21 Strool Vas =sane wis11 in place for oppeagnato, Ouo• tak... Our, per, Ole Cahaµor ryar .onvatroo • Eay•M1e4e1/10..3 (MlIvang del.11.0 Ole emiairte eOst flf1.• eta laue Vieshinglon O 1 Bits Suitt Tr , A . 1 7 t h St reet _i MBCC Before Er After •••••creant mew AA , tot, ev Norte rem e•emect re elowease eAe•effi et ,[1.../0 iaewle .1,S...on Meat. ono ..tr , hand oos o.yulax tuA. Stay IAA* Ile Mg. arse Construction Update • .111.1.1. 6.5.1.1.0 la A•B Inskla Convert). GrAter • =tr... Ira teil .1.1.4.1 of No comeantbn unto along WAS.,p(Ori /Witr. • referee* we ruutrafton are Atroalaal Or10 St nee sow. i.e.. • cxy NI... U.S. ONSIT•t110.... .04,..B0 1115.0%. and Zt seM AAP.. III Itearefse• , •Vr•VjuA. 10 h. orneted I.py undo, Mg., sablott tO 0 O ,NO do. to *IferfA , A...., w.f."... arcurnseences. Open For Business — Event Schedule • 3/16/16 ,3/21/16 Wane hem. amlw & Roxrdsline Shoe • A/3/16 A/5/f 0 fAlfr roe Winthrela teeloshow • 4/9/16.4/1 1•Arelerl Inlay end Shower.* MBCC M Mogan ism.. tn sr. ana RAIN MOM eon.* c menoratIon. 011oonalonhojact attar ea ikeve Ono la{so video PI. Newsletter & Infographic: Sent Through Constant Contacts Miami Beach klsing Abase -MBCC Redrowined Facade Make 'Mee for the Future "eke a dive and have a deeper look into the inspiration behind the reimagined state-of-the-art Convention Center. leadoship in Energy & EmexonmentoiDesegn (LEED) Certified Design Architedurol desigT based on ocean elemen•s ‘9 ‘9"19 Sun-shading design concepts will allow natural lighting Environmentally sensitive design will hae a 20% energy reduction "This will be the canto for creative collaboration. This is the future of Mione Beach," AA am Bp , x - it. n0 `We ore excited to be delivering what our convention center clients need in order to book future events in Miami Beach and also a new attraction for our residents and visitors." 110 1444,1 1111 4 ..,,, I ;,,VIBEACH General Project Overview '"'"'".""''se7=====rs T. Wax pint. ooNlet .615 mili ,on mod A. 0Onn10.1Ploga roneroh•Mrp. OUr Irclold IMO /Jaem swam smoidmithserstemsent l neleteal0 mescadashilumeara City of Miami Beach I 1700 Convention Center Drive Miami Beach, FL 33139 I 305.673.7010 I www.mbccfuture.com