Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2015-29114 Reso
RESOLUTION NO. 2015-29114 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.1 TO THE CONTRACT BETWEEN THE CITY AND ENVIROWASTE SERVICES GROUP, INC., FOR ROUTINE AND EMERGENCY REPAIRS FOR WATER,SANITARY SEWER AND STORM WATER PIPE BREAKS; CURED-IN PLACE LINING FOR SANITARY SEWER PIPES AND STORM WATER DRAINAGE PIPES; AND REHABILITATION OF SANITARY SEWER MANHOLES AND STORM WATER MANHOLES; SAID AMENDMENT,IN THE NOT-TO-EXCEED AMOUNT OF $168,000, PROVIDING FOR ADDITIONAL CURED-IN-PLACE LINING SIZES, TRENCHLESS METHODS OF REPAIR AS- NEEDED, AND FLOW MONITORING. WHEREAS,on December 11,2013,the Mayor and City Commission awarded a contract to EnviroWaste Services Group, Inc. pursuant to ITB 113-2013(the ITB),for Routine and Emergency Repairs for Water, Sanitary Sewer and Storm Water Pipe Breaks;Cured-In Place Lining for Sanitary Sewer Pipes and Storm Water Drainage Pipes;and Rehabilitation of Sanitary Sewer Manholes and Storm Water Manholes; and WHEREAS,the purpose of the ITB was to establish a means for the City to perform routine and emergency repairs and maintenance to the existing water,sanitary sewer,and storm water pipe infrastructure; and WHEREAS,an amendment to the contract with EnviroWaste Services Group, Inc.is needed to expand the scope to include additional cured-in-place lining sizes,trenchless methods of repair, and flow monitoring (additional services); and WHEREAS,the Administration recommends approving Amendment No. 1 to the contract to include the additional services. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Amendment No. 1 to the contract between the City and Envirowaste Services Group, Inc.,for routine and emergency repairs for water, sanitary sewer and storm water pipe breaks; cured-in place lining for sanitary sewer pipes and storm water drainage pipes; and rehabilitation of sanitary sewer manholes and storm water manholes; said Amendment, in the not-to-exceed amount of$168,000, providing for additional cured-in-place lining sizes, trenchless methods of repair as-needed, and flow monitoring. PASSED AND ADOPTED this 2nd day of September, 2015 . ATTEST: `t- ��•��A\n, B 11111; ILIP L w VIN.; /AYOR R•FAEL E. GRANADO, CITY CA'-1• ` `•••••• �Q 4�i� T:\AGENDA\2015\September\PUBLIC W. •ndme \t•:(B 11's. ��,;�:so.d• i sI s, Ca MIAMI BEACH Amendment No. 1 —Contract 2013-113-ITB-LR Part A: Additional Sanitary Sewer Lining Sizes 1. Additional sizes for Sanitary Sewer Cured-In Place Lining shall be included and priced as follows: Lining Cost Per Sewer Pipe Sizes Linear Feet 10 Inches $40.00 15 Inches $55.00 24 Inches $90.00 Any other pipe size diameters that arise after field investigation shall be priced the same as the next lowest pipe diameter. Part B: Trenchless Point Repairs 1. Sectional liners shall be used to perform mainline sanitary sewer repairs where deemed necessary by City personnel and shall be priced as follows: Pipe Size Price Per Diameter Sectional Liner Installation 8 Inches $2,500.00 10 Inches $3,500.00 12 Inches $3,800.00 15 Inches $4,000.00 18 Inches $4,250.00 24 Inches $5,500.00 30 Inches $6,500.00 36 Inches $7,200.00 2. T-liners as described below, and related work, shall be used to perform sanitary sewer lateral repairs where deemed necessary by City personnel and shall be priced as follows: T-liner in 8 to 12 Inch Mains, with 4 to 6 Inch laterals (includes 25 feet of lateral) $4,025.00 each T-liner in 15 to 18 Inch Mains, with 4 to 6 Inch $4,312.50 each laterals (includes 25 feet of lateral) T-liner in 4 to 6 Inch laterals per linear foot beyond 25 feet $40.25 per linear foot Sewer lateral cleaning &CCTV from main (up to 30 feet) $166.75 each Mechanical root or grease removal (12 Inch Pipe and smaller) $5.75 per linear foot 1 if Part C: Flow Monitoring 1. Flow monitoring, and related equipment, shall be provided by Contractor for nine (9) sanitary sewer basins as determined by City personnel. Contractor shall provide for a flow metering network utilizing open channel flow meters and tipping bucket rain gauges equipped with wireless data transmission (if applicable). Data shall be delivered via a web server application. Contractor will also maintain meters to ensure performance is accurate throughout duration of measuring time period. Flow monitoring service shall be provided at a not-to-exceed price of$168,000.00. tqA/,, Pubic Works Dir ctor, Date Y: c< President, EnviroWaste Service Group, ate 2 COMMISSION ITEM SUMMARY Condensed Title: Request To Amend The Awarded Contracts Pursuant To Invitation To Bid 113-2013, For Routine And Emergency Repairs For Water, Sanitary Sewer And Storm Water Pipe Break; Cured-In Place Lining For Sanitary Sewer Pipes And Storm Water Drainage Pipes;And Rehabilitation Of Sanitary Sewer Manholes And Storm Water Manholes. Key Intended Outcome Supported: Item Summary/Recommendation: This contract is for routine and emergency repairs for water,sanitary and storm water pipe break;cured in place lining for sanitary sewer and storm water drainage pipes; and rehabilitation of sanitary sewer manholes and storm water manholes. Contractor will provide all supervision, labor, materials and necessary equipment for these services. The purpose of the referenced ITB was to establish a means for the City to perform routine and emergency repairs/maintenance to the existing water, sanitary sewer and storm water pipe infrastructure. The contract is typical in that there is a list of items and an estimation of quantities which,when all combined, provided for the overall cost of the bids and a basis of the award. The items listed include the installation of various types of pipes and fittings and cured-in-place lining. Many of the common pipe diameter sizes have been listed in the bid documents. There are some additional sizes that were not contemplated at the time the specifications were developed. However, now that there are ongoing projects, staff has identified a need to expand the sizes of the pipes that can be repaired/maintain through the contract resulting from the ITB. The Administration is recommending an amendment to the contract which will allow the additional requirements to be addressed while the ongoing work is completed. Staff is recommending any additional work necessary regarding an unlisted sized pipe be completed utilizing the competitively secured price for the next larger item. For example, a cured-in place liner for a 10 inch pipe would be paid at the same unit cost as a 12 inch pipe. The following language is proposed under section 1.12, Additions/Deletions of Items/Products: "The pipe size(s)in the description of items/products listed and the corresponding unit prices submitted in the awardee's bid shall be deemed for items/products up to that size." In addition, trenchless methods of repair, as opposed to open-cut spot repairs, are necessary in areas of the City where an open-cut spot repair is either not feasible or not physically possible due to access concerns. These trenchless repairs would serve the same function as open-cut spot repairs without the excavation and restoration needed for open-cut repairs. Furthermore, costs for these trenchless repairs would be lower than corresponding open-cut spot repairs. Sizes would include pipe from 8" up to 36". Attached is the proposed pricing schedule for these items. As part of this amendment, trenchless methods for repair at mains and at lateral connections would also be included. Finally,the flow monitoring of sewer manholes plays an integral part in the performance of routine/emergency sewer repairs. This consists of placing monitoring devices in certain sewer manholes in order to measure flow and performance to ensure recent repairs have been completed effectively and have improved the system, as well as confirming whether or not further repairs are needed. As part of this amendment, flow monitoring for sewer manholes would also be included in the contract. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: Financial Information: Source of Amount Account Approved Funds: 1 OBPI Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric Carpenter, Public Works X6012 Sign-Offs: Department Director Assistan i-' .•nager City Ma tier ETC M =+` JL g_ G, T:AGENDA\2015\September\PUBLIC WORKS\Amendment to I . T-.r13.Sum.doc A AGENDA ITEM C 7-t DATE el.,- MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Member- : qe C. mission FROM Jimmy Morales, City Manag=.-` f I?'r DATE: September 2, 2015 SUBJECT: REQUEST TO AMEND THE AWARDED CONTRACTS PURSUANT TO INVITATION TO BID 113-2013, FOR ROUTINE AND EMERGENCY REPAIRS FOR WATER,SANITARY SEWER AND STORM WATER PIPE BREAK; CURED-IN PLACE LINING FOR SANITARY SEWER PIPES AND STORM WATER DRAINAGE PIPES; AND REHABILITATION OF SANITARY SEWER MANHOLES AND STORM WATER MANHOLES. BACKGROUND This contract is for routine and emergency repairs for water, sanitary and storm water pipe break; cured in place lining for sanitary sewer and storm water drainage pipes;and rehabilitation of sanitary sewer manholes and storm water manholes. Contractor will provide all supervision, labor, materials and necessary equipment for these services. The purpose of Invitation to Bid ( ITB) No. 113-2013 was to establish a contract, by means of sealed bids, with a qualified vendor(s), to provide for such work. At its December 11, 2013 meeting,the City Commission approved the award of contracts, pursuant to ITB No. 113-2013 for Routine and Emergency Repairs for Water, Sanitary and Storm Water Pipe Break; Cured in Place Lining for Sanitary Sewer and Storm Water Drainage Pipes; and Rehabilitation of Sanitary Sewer Manholes and Storm Water Manholes. ANALYSIS The purpose of the referenced ITB was to establish a means for the City to perform routine and emergency repairs/maintenance to the existing water, sanitary sewer and storm water pipe infrastructure. The contract is typical in that there is a list of items and an estimation of quantities which, when all combined, provided for the overall cost of the bids and a basis of the award. The items listed include the installation of various types of pipes and fittings and cured-in-place lining. Many of the common pipe diameter sizes have been listed in the bid documents. There are some additional sizes that were not contemplated at the time the specifications were developed. However, now that there are ongoing projects, staff has identified a need to expand the sizes of the pipes that can be repaired/maintain through the contract resulting from the ITB. City Commission Memorandum-Amendment to 1TB 113=2013 September 2, 2015 Page 2 of 2 For example, under the section for cured-in place lining,the listed sewer pipe sizes are 8 inches, 12 inches, 18 inches, 20 inches, 30 inches, and 36 inches. When the system was evaluated, it became evident that there were some pipes that currently exist that include 10 inches, 15 inches, and 24 inches. To complete the project, all of the pipes that are exhibiting leakage need to be lined. The cost for lining the pipes is based on a per foot basis and the size of the pipe diameter. The Administration is recommending an amendment to the contract which will allow the additional requirements to be addressed while the ongoing work is completed. Staff is recommending any additional work necessary regarding an unlisted sized pipe be completed utilizing the competitively secured price for the next larger item. For example, a cured-in place liner for a 10 inch pipe would be paid at the same unit cost as a 12 inch pipe. The following language is proposed under section 1.12,Additions/Deletions of Items/Products: "The pipe size(s) in the description of items/products listed and the corresponding unit prices submitted in the awardee's bid shall be deemed for items/products up to that size." In addition, trenchless methods of repair, as opposed to open-cut spot repairs, are necessary in areas of the City where an open-cut spot repair is either not feasible or not physically possible due to access concerns. These trenchless repairs would serve the same function as open-cut spot repairs without the excavation and restoration needed for open-cut repairs. Furthermore, costs for these trenchless repairs would be lower than corresponding open-cut spot repairs. Sizes would include pipe from 8" up to 36". Attached is the proposed pricing schedule for these items. As part of this amendment, trenchless methods for repair at mains and at lateral connections would also be included. Finally, the flow monitoring of sewer manholes plays an integral part in the performance of routine/emergency sewer repairs. This consists of placing monitoring devices in certain sewer manholes in order to measure flow and performance to ensure recent repairs have been completed effectively and have improved the system, as well as confirming whether or not further repairs are needed. As part of this amendment,flow monitoring for sewer manholes would also be included in the contract. CONCLUSION The City Manager recommends that the Mayor and the City Commission approve the Resolution authoring the City Manager to negotiate and execute and amendment to the Agreement, pursuant to ITB 113-2013,for the routine and emergency repairs for water, sanitary sewer and storm water pipe break; cured-in place lining for sanitary sewer pipes and storm water drainage pipes; and rehabilitation of sanitary sewer manholes and storm water manholes, to add the additional necessary'items. JM/MT/ETC/JJ F/BAM T:WGENDA\2015\September\PUBLIC WORKS\Amendment to ITB 113-2013.Memo.doc ` T o n � it rite Services Group , Inc . ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ENVIROWASTE SERVICES GROUP, INC. and City of Miami Beach Site: City of Miami Beach (City-Wide) ("The Client") The parties to this Specific Work Order are parties to this Professional Services dated July 28,2015(the"Agreement).The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference.The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control.Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement. ITB 113-2013 GROUP 2:A:CURED-IN PLACE LINING-SANITARY SEWER PIPES Proposed Sanitary Sewer Pipe Lining Lining Cost Per Sewer Pipe Sizes Linear Feet 10 Inches $40.00 15 Inches $55.00 24 Inches $90.00 SERVICE CHARGE:IF ANY PAYMENT DUE HEREUNDER OR PURSUANT TO ANY SPECIFIC WORK ORDER IS NOT RECEIVED BY THE CONSULTANT WITHIN THIRTY (30)DAYS AFTER ITS DUE DATE,A SERVICE CHARGE IN THE AMOUNT OF ONE AND ONE-HALF PERCENT(1.5%) OF THE UNPAID BALANCE WILL BE CHARGED TO THE CLIENT(THE"SERVICE CHARGE"). THE SERVICE CHARGE SHALL BE APPLIED MONTHLY AND ANY PREVIOUSLY UNPAID SERVICE CHARGE WILL BE ADDED TO THE UNPAID BALANCE.The Client hereby authorizes the Consultant to commence the work(commencement date)required under this Specific Work Order on .IN WITNESS WHEREOF,the parties have duly executed this Specific Work Order as of the day and year first above written. "CLIENT' "CONSULTANT" (ENVWROWASTESERVICES GROUP,INC.) City of Miami Beach A Florida Corporation JULIO FOJON Julio Fojon Director TITLE TITLE 7/28/2015 DATED DATED ERA Headquarters: 18001 Old Cutler Rd.Ste 554 Palmetto Bay,FL 33157 * (877)637-9665 * F(305)637-6606 Offices: Miami,FL * Orlando,FL * Houston,TX * Sarasota,FL * Tampa,FL www.envir©wastesq.com 4:t1 n i ro '�7 aste Services Group, Inc.. ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ENVIROWASTE SERVICES GROUP,INC. and City of Miami Beach Site: City of Miami Beach(City-Wide) Aft: Mike Alvarez The parties to this Specific Work Order are parties to this Professional Services dated July 28,2015(the"Agreement").The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference.The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control. Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement RE:Proposed 8 inch sanitary sewer pipe repair 8 ft length ITB 113-2013 Group - Trenchless Point Repair 8" $2,500.00 - Trenchless Point Repair 10" $3,500.00 - Trenchless Point Repair 12" $3,800.00 - Trenchless Point Repair 18" $4,250.00 - Trenchless Point Repair 24" $5,500.00 - Trenchless Point Repair 30" $6,500.00 - Trenchless Point Repair 36" $7,200.00 • SERVICE CHARGE:IF ANY PAYMENT DUE HEREUNDER OR PURSUANT TO ANY SPECIFIC WORK ORDER IS NOT RECEIVED BY THE CONSULTANT WITHIN THIRTY (30)DAYS AFTER ITS DUE DATE,A SERVICE CHARGE IN THE AMOUNT OF ONE AND ONE-HALF PERCENT (1.5%)OF THE UNPAID BALANCE WILL BE CHARGED TO THE CLIENT(THE"SERVICE CHARGE"). THE SERVICE CHARGE SHALL BE APPLIED MONTHLY AND ANY PREVIOUSLY UNPAID SERVICE CHARGE WILL BE ADDED TO THE UNPAID BALANCE.The Client hereby authorizes the Consultant to commence the work(commencement date)required under this Specific Work Order on .IN WITNESS WHEREOF,the parties have duly executed this Specific Work Order as of the day and year first above written. "CLIENT' "CONSULTANT" (ENVIROWASTE SERVICES GROUP,INC,) City of Miami Beach A Florida Corporation JULIO FOJON Julio Fojon Director TITLE TITLE 7/28/2015 DATED DATED i , ail Headquarters: 18001 Old Cutler Rd.Ste 554 Palmetto Bay,FL 33157 * (877)637-9665 * F(305)637-6606 Offices: Miami,FL * Orlando,FL * Houston,TX * Sarasota,FL * Tampa,FL www.envirowastesg.corn ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ENVIROWASTE SERVICES GROUP, INC. (THE"CONSULTANT") AND City of Miami Beach Site: City of Miami Beach (Alton Road Lateral Repairs) Att: Mike Alvarez The parties to this Specific Work Order are parties to this Professional Services dated August 11, 2015, (the "Agreement").The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference.The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control.Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement. RE: Proposed Lateral lining repairs along Alton Road ITB 113-2013 Group - Item D3- Install T-liner in 8-inch to 12-inch mains with 4-inch to 6- inch laterals, all depths (includes 25 feet of lateral) 13 @$4,025.00 each $52,325.00 - Item D 4 - Install T-liner in 15-inch to 18-inch mains with 4-inch to 6- inch laterals, all depths (includes 25 feet of lateral) 7 @$4,312.50 $30,187.50 - Item D6- Install T-liner in 4-inch to 6-inch laterals, all depths (per linear foot beyond 25 feet of lateral) 50 LF @ $40.25 $2,012.50 - Item D15 - Sewer lateral cleaning and TV inspection from main (up to 30 feet) 20 @$166.75 $3,335.00 - Item D 1 9 - Mechanical root or grease removal (12-inch and smaller) 2,739 LF @ $5.75 $15,749.25 CCTV is priced as per contract ITB 145-2013.8"clean and cctv$1.29, 12"$1.50, 15"$2.25, 18"$3.00,24"$5.00 Exclusions: -Off Duty when required -Bypass Pumping -Extensive MOT SERVICE CHARGE:IF ANY PAYMENT DUE HEREUNDER OR PURSUANT TO ANY SPECIFIC WORK ORDER IS NOT RECEIVED BY THE CONSULTANT WITHIN THIRTY (30)DAYS AFTER ITS DUE DATE,A SERVICE CHARGE IN THE AMOUNT OF ONE AND ONE- HALF PERCENT (1.5%) OF THE UNPAID BALANCE WILL BE CHARGED TO THE CLIENT (THE "SERVICE CHARGE"). THE SERVICE CHARGE SHALL BE APPLIED MONTHLY AND ANY PREVIOUSLY UNPAID SERVICE CHARGE WILL BE ADDED TO THE UNPAID BALANCE.The Client hereby authorizes the Consultant to commence the work(commencement date)required under this Specific Work Order on . IN WITNESS WHEREOF,the parties have duly executed this Specific Work Order as of the day and year first above written.The fees,cost or prices for the work proposed shall expire thirty(30)days from the date first above written. "CLIENT" "CONSULTANT" ENVIROWASTE SERVICES GROUP, INC, A Florida Corporation Julio A. Fojon BY EnviroWaste Services Group, Inc Director TITLE TITLE 8/11/2015 DATED DATED ;� � ��♦f* fir* 2 G/eiitiMJ'aCJ �1 F 111511EINIEMBEg 25 19 Headquarters: 18001 Old Cutler Road, Suite 554 Miami, FL 33157 * (877) 637-9665 * F (305) 637-9659* Offices: Miami, FL * Orlando, FL * Dallas, TX www.envirowastesq.com * Email: Julio.fojon @envirowastesg.com ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ENVIROWASTE SERVICES GROUP, INC. (THE"CONSULTANT") AND City of Miami Beach Site: City of Miami Beach (Alton Road Lateral Repairs) Att. Mike Alvarez The parties to this Specific Work Order are parties to this Professional Services dated August 11, 2015, (the "Agreement").The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference.The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control.Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement. RE: Proposed Lateral Cleanout installation ITB 113-2013 Group(use existing fill) 3' deep x 3'wide x 3' long Qty Unit Unit Price Extended • Excavate to bottom of lateral 27 CF $13.75 $371.25 • Sanitary 4" PVC pipe(up pipe) 3 LF $125.00 $375.00 • Backfill 27 CF $19.00 $513.00 • Sod 9 SF $1.20 $10.80 Total $1,270.05 SERVICE CHARGE:IF ANY PAYMENT DUE HEREUNDER OR PURSUANT TO ANY SPECIFIC WORK ORDER IS NOT RECEIVED BY THE CONSULTANT WITHIN THIRTY (30)DAYS AFTER ITS DUE DATE,A SERVICE CHARGE IN THE AMOUNT OF ONE AND ONE- HALF PERCENT (1.5%) OF THE UNPAID BALANCE WILL BE CHARGED TO THE CLIENT (THE "SERVICE CHARGE"). THE SERVICE CHARGE SHALL BE APPLIED MONTHLY AND ANY PREVIOUSLY UNPAID SERVICE CHARGE WILL BE ADDED TO THE UNPAID BALANCE.The Client hereby authorizes the Consultant to commence the work(commencement date)required under this Specific Work Order on . IN WITNESS WHEREOF,the parties have duly executed this Specific Work Order as of the day and year first above written.The fees,cost or prices for the work proposed shall expire thirty(30)days from the date first above written. "CLIENT" "CONSULTANT" ENVIROWASTE SERVICES GROUP, INC, A Florida Corporation Julio A. Fojon BY EnviroWaste Services Group, Inc Director TITLE TITLE 8/11/2015 DATED DATED thAVAger; HB51 fy VioeirMfasitt Headquarters: 18001 Old Cutler Road, Suite 554 Miami, FL 33157 * (877) 637-9665 * F (305) 637-9659* Offices: Miami, FL * Orlando, FL * Dallas, TX www.envirowastesq.com * Email: Julio.fojon @envirowastesg.com ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ' ENVIROWASTE SERVICES GROUP, INC. (THE"CONSULTANT") AND City of Miami Beach Site: City of Miami Beach (City Wide) Att: Mike Alvarez The parties to this Specific Work Order are parties to this Professional Services dated August 18, 2015, (the "Agreement").The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference.The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control.Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement. RE: Proposed Flow Monitoring ITB 113-2013 Group • 23 Open Chanel Meters • 13 Rain Gauges Total 182, 000.00 Delivery of factory calibrated flow instruments and communications equipment as specified. Installation re-calibration of all meters and rain gauges. Delivery of report per DERM requirement. • ESG proposes to provide for Customer a collection system flow metering network utilizing open channel flow meters and tipping bucket rain gauges (optional) equipped with wireless data transmission. Data shall be delivered via a web server application. This enables the Customer to share data across a network (or the Internet) to operating workstations with common internet browser software. Data is presented to the Customer using web application. All access to data is controlled by password permissions. Meter sites shall be selected by the Customer based on individual project goals and requirements. Price is good for the full term of ITB 113-2013. "CLIENT" "CONSULTANT" ENVIROWASTE SERVICES GROUP, INC, A.Florida Corporation Julio A. Fojon BY EnviroWaste Services Group, Inc Director TITLE TITLE 08/18/2015 DATED DATED • - v. Headquarters: 18001 Old Cutler Rd, Miami, FL 33157 Suite 554 * (877) 637-9665 * F (305) 637-9659* Offices: Miami, FL * Orlando, FL * Houston,TX* Naples, FL* Sarasota, FL* Tampa, FL www.envirowastesg.com * Email: Julio.fojon @envirowastesg.com