Loading...
HomeMy WebLinkAboutAmendment No. 7 to the PSA with Chen Moore and Associates, Inc DC"-02S10)- AMENDMENT NO. 7 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A/ E) SERVICES AGREEMENT (AGREEMENT) to BETWEEN THE CITY OF MIAMI BEACH, FLORIDA orb, d'}' AND CHEN MOORE AND ASSOCIATES, INC, ( DATED MAY 18, 2005, IN THE NEGOTIATED NOT-TO-EXCEED AMOUNT OF $10,000, FOR ADDITIONAL SURVEYING SERVICES, FOR THE SOUTH POINTE PHASE III, IV AND V RIGHT OF WAY NEIGHBORHOOD IMPROVEMENT PROJECT, WITH PREVIOUSLY APPROPRIATED FUNDING AVAILABLE FROM SOUTH POINTE CAPITAL FUND 389. 1 / This Amendment No. 7 to the Agreement made and entered this. 9 day of PA , 2016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under t e laws of the State of Florida (hereinafter referred to as the City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139,and CHEN MOORE AND ASSOCIATES, INC.,a Florida corporation a.k.a. Chen and Associates(hereinafter referred to as the Consultant), having its offices at 500 W. Cypress Creek Road, Suite 410, Fort Lauderdale, Florida 33309. RECITALS: WHEREAS, on May 18, 2005, the Mayor and City Commission approved Resolution No. 2005-25902, authorizing the execution of an NE agreement with the Consultant, in a not-to-exceed amount of$2,017,009, to provide urban design, architecture, landscape architecture, engineering and construction administration services for the South Pointe Phase III, IV, and V, Right-of-Way (ROW) Neighborhood Improvement Project pursuant to RFQ No. 08-03/04 (the Project); and WHEREAS,on August 23,2005,the Consultant was issued the Notice to Proceed(NTP)for the planning phase of the Project; and WHEREAS,on April 11,2006, pursuant to Resolution No.2006-26172,the City Commission approved and officially adopted the Basis of Design Report (BODR) for the Project, and the Consultant was then given authorization to proceed with the design phase of the Project; and WHEREAS,on March 14,2007,the City Commission approved Resolution No.2007-26477, authorizing Amendment No. 1 to the Agreement to design bike lanes along Alton Road, from 5th Street to South Pointe Drive, and along Ocean Drive, south of 5th Street, in the amount of$73,256; and WHEREAS, on September 9, 2009, the City Commission approved Resolution No. 2007- 27160, authorizing Amendment No. 2 to the Agreement, for additional design services for the re- construction of roadways and alleyways;the stormwater collection and disposal system at alleyways and"hot spots";and additional water main replacements, in the amount of$94,320, plus$13,000 for reimbursables, for a total of$107,320; and WHEREAS, on October 25, 2011, the Administration approved Amendment No.3 to the Agreement, in an amount not-to-exceed $22,286, for the additional design services for the Alton Road Triangle; two-waying of Jefferson Avenue; South Pointe Drive Landscape redesign; and additional Planning Services; and WHEREAS, on September 30, 2013, the Administration approved Amendment No.4 to the Agreement, in an amount not-to-exceed$24,977,for additional Construction Administration Services for the project due to the extended construction duration; and WHEREAS, on March 4, 2014, the Administration approved Amendment No.5 to the Agreement, in the amount of $24,250, for extended Construction Administration Services for the Project , and WHEREAS,on July 10, 2015,the Administration approved Amendment No.6 to Agreement, in the amount of$59,609, for extended Construction Administration Services and close out of the project; and WHEREAS, the final survey for the close out of this project will require additional scope including the extension of the survey limits; and WHEREAS,the overall fee being requested by the Consultant for the Survey is$10,000;and WHEREAS, the Administration recommends the approval of the Amendment No.7 to the Agreement, in an amount not-to-exceed $10,000, for the additional survey; and WHEREAS, the following Amendment No.7, to the Agreement will not increase the total Agreement fee of $2,268,998, as the $10,000, will be reallocated from available tasks within the current Agreement as documented in Schedule B - 7. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 7. 2. MODIFICATIONS a. The Agreement is amended to provide the additional services as set forth in Schedule "A-7", attached hereto. b. The Agreement is amended to incorporate Schedule B-7 attached hereto. 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The City and Consultant ratify the terms of the Agreement, as per this Amendment No. 7. IN WITNESS WHEREOF, the parties h- eto have caused this Amendment No. 7 to be executed in their names by their duly authori Ate '�-40of the date first set forth above. ATTEST: - ITY OF MIAMI BEA, H, FLORIDA INCORP ORATED: A4 /4011 44 Li ‘f - .. : Rafael E.'ranado, Cit Clerk '4%,\ 2 0_ Jimmy 1 Morales, Cit Manager ATTEST: CONSU ANT: G44E1.1 �l�(t� es-T0C,,9�.3 9 • y\ / ' 7 BW°*iliCkIM VLN■ Secretary: � P-F eei ent Siva Print Name Print Name APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION • City AttorneY • Dot SCHEDULE "A-7" SCOPE OF SERVICES Task 6.3.1 —Topographic/Route Survey for South Pointe: The CONSULTANT shall prepare a topographic survey as noted on the attached exhibit"A". The survey shall include the following: • Location and existing grades of drainage structures, identify water meters,valves,fire hydrants, sanitary sewers, pole locations, edge of pavement, curbing, trees (not identified, but located), striping, existing signs, etc. • Invert and grate elevations for all project area storm and catch basins will be provided. • Cross section elevations will be taken at 100-foot intervals, and at all high and low points,within the project area • Right-of-Way and property lines for the project area and adjacent properties will be field verified and shown graphically • All elevations will be referenced to NAVD 88 • Control points will be set outside the project limits, in locations where they can be used by the Contractor during construction • All control points will have Northing and Easting coordinates referenced to the Florida State Plane Coordinate System, based on the North American Datum of 1983/90 • As-builts will be prepared by Longitude Surveyors at the direction of Chen Moore and Associates to meet Miami Beach standards Deliverables: Topographic Survey Schedule: within 30 days of the notice to Proceed COMPENSATION • Original Agreement amount$2,017,009. • Amendment No. 1 (Design services for the installation of bike lanes/routes) amount $73,256. • Amendment No. 2 (Design services for the reconstruction of roadways and alleyways, stormwater collection and disposal system at alleyways and drainage "hot spots", and additional water main replacements)amount$94,320,plus an additional amount of$13,000, for approved reimbursables. • Amendment No. 3 (Design services for improvements to 3rd Street, east of Washington Avenue, and to improve the Alton road triangle amount$13,118, plus an additional amount of$9,168, for survey and reimbursables. • Amendment No. 4 (Additional Construction Administration Services through December 2013), in the amount of$24,977. • Amendment No.5(Additional Construction Administration Services through April 2014),in the amount of$24,150. • Amendment No.6 (Additional Construction Administration Services, Design, Reimbursable Survey, and Claims Review, through December 30 2015, in the amount of$59,609, to be reallocated from within the current Tasks (see Schedule B attached). • Amendment No. 7 (Additional survey scope) in the amount of$10,000, to be reallocated from within the current tasks (See Schedule B-7 attached). The Agreement amount of$2,268,998 remains the same. CH N-11110a RE 155 S. Miami Avenue,PH II-A Miami, FL 33130 Phone: 1 (786)497-1500 Fax:+1 (786)497-2300 &ASSOCIATES www.chenmoore.com February 12, 2016 SENT VIA E-MAIL (CarlaDixon(a�miamibeachfl.gov) Ms. Carla Dixon City of Miami Beach—CIP Department 1700 Convention Center Drive Miami Beach, FL 33139 Subject: South Pointe ROW Improvements Project CMA Project No. 099.002 Additional Service Agreement—Additional Survey Dear Ms. Dixon: Chen Moore and Associates (CMA) is pleased to submit the attached Additional Service Agreement for additional survey services as discussed for the above-referenced project. SCOPE OF SERVICES The scope of services are as follows: Task 1 —Additional Survey As-builts(Collins Court/Ocean Court)—Consultant shall prepare asbuilts for the entire right-of-way of Collins Court and Ocean Court from 5th to South Pointe Drive on 100'intervals for the segments. As-builts will be prepared by Longitude Surveyors at the direction of Chen Moore and Associates to meet Miami Beach standards. SCHEDULE AND FEES Consultant shall schedule work upon receipt of signed approval for this project as required. The total lump sum fee for this project will be divided as follows: Task(s) Task Description Lump Sum Hourly Total Fees Fees Fees Task 1 Additional Survey As-builts (Collins $10,000.00 $0.00 $10,000.00 Court/Ocean Court) TOTAL $10,000.00 $0.00 $10,000.00 CMA Project No.099.002 1 of 3 "Your Trusted Advisor for Infrastructure and Planning Needs" • CH EN•MOO RE 155'S.Miami Avenue,PH II-A Miami, FL 33130 • Phone:+1 (786)497-1500 Fax:+1 (786)497-2300 &ASSOCIATES „ www.chenmoore.com Should you have any questions, please do not hesitate to contact me at my office at+1 (786)497-1500, Ext. 1077, my cell phone at +1 (954) 260-3987 ;-or send me- an electronic message at jacosta(c�chenmoore.com Respectfully submitted; • CHEN MOORE AND ASSOCIATES Jose L. Acosta, P.E. F.,.: Vice President JLA/jla • Attachment(s): Exhibit A Cc: Mina Samadi, P.E.', Miami Beach Jose McCray, Chen ttachm •• • CMA Project No 099.002 2 of 3 - ' Your Trusted Advisor for Infrastructure and Planning Needs" l S.Miami Avenue PH II- A ."Mi a CH( •MO/� 1 55 Sl� RE : _ Miami,FL 33130'• Phone:+1"(786):497=1500 'Fax:-+1 (786):497=2300:; ' &ASSOCIATES `s www.chenmoore.cor�n. , - - EXHIBIT:A AGREEMENT FOR PROFESSIONAL.`SERVICES- WORK AUTHORIZATION CMA Project Name: South Pointe—ROW Improvement-Project Client Name: City of Miami Beach—CIP Department - . Client Contact: Ms. Carla Dixon Client Address: 1700 Convention Center Drive. Miami Beach,•FL 33139 .: Client Phone/Fax: +1 (305)673-7071/+1 (305)673-7012' Client E-mail: CDixonmiami beachfl.gov •= • CMA Project No.099.002—Additional Service Agreement(Additional As-built Survey) Agreement Date: February 12,2016 • • FEE: Lump Sum of$10,000.00 , _ RETAINER: `' N/A.. - Notice to Owner: The City of Miami Beach is the owner of th_ a ROW The undersigned agree to the General Conditions/Provisions set in the original agreement between Chen - Moore and Associates and the City of Miami Beach;-.,An y additional requested services will beaddressed - - ,.in a separate agreement.:, CHEN MOORE A 1 D AS a CIATES, INC. (CONSULTANT) - A •oriz q .. - Print Name/Title . . 3 31 1 I C. y Date CITY OF MIAMI BEACH (CLIENT); • • Authorized Signature Print Name/Title Date CMA Project No 099.002:- - 3 of 3 .. - "Your Trusted Advisor for Infrastructure and Planning Needs". • • i 1 -3. V\Ct -4. Q Q X 1 0 ••••...., 5. , . " ______ ....... \)\ )-e) . � 2 --'0 . ---. cs V 1 cc', CD CD _. 31; /, . (1) Z 1 ....1/4t. .......i .7,17,\ .....,i:::• T o , "0 k\ '\ ,j,c/fd`''\ -.)) 0 ...N . ,,,...?.....„, 0, 2 ...,...„?......:A II, a eip, \ , \ ....... .......,,..,..._„, ef.,4 itz): 71 ;----- --. n l & - .,\ ..),„•,:•:• ,•, \ \I L F p, ,,,, --,), ,,, ,,.....,. -s . ..., . . ., ...... _.. . .,\\ \ ,..„.,,,,,},,,,_' CIA Y' _ ,� i\ \---,,'-i TA t ,.... . /<\\\\\ , ,, 1 � 1 \'\%\ \ \ \\ t1 L 5.— . K \ .' �� T.4„: 's , .„,-,, 3` - �i M,,„,-'N { t 1 -.3r. rn >< .,,Q- I, 1 t 1, \ 1 1 ` 1,1 ,III, Q CO „lit_ ._ t ` • O O ` 1 .\ 1 F ` k ,i,, 11,1 V ? O cm U) �y n 1� 1 =•\� xw1 �1= .. p ? C7 , tl 1 co 1 \',,,.•.. ,. ;:arc u — .-* O \________\ t1 W '\-------IIr-r:■ (1) st _, r-----, i, . , 1- -1 f.-5, - 1L�- O + O tt;i ---- \ r i ', � �,,,,« - - tot - ) t i °,. i 11• , �r 1 (t 11.) 1 1 ' 1,\,,____-__ rr,t-_-:--_(0 , , ,,,, pi cin + ',,+ ,.,,,-•.;---; ___. �� _, 1. t _dais , L 1�_:_,__.._,_,�ir el, - ,, , ,i-N-ffr- —-- ----- -------4.-- V 11 rile(' . ....:;r:-‘,,,.-1-211:-. ite/".......Tri ii:_i.1_,_,A_,,..s.,.......,...:......::•_:._.........:___ _-__ ...,_=,. .,__....,... , „.,_, ' , ,. .. A O /7- Tff& °n. ' - .•1 1 p. „u, u !mCD - \k - TUT '-}. - g• ' I ,•� ' ,a -� I r rte / ..'S}��.t' _0 .. ,.. 1 1 ! r + i`i'Y ,.: i�t. { 1 RIL ;I;I I' 1 : ti. Ti. 1 1 r I.-,; ----7 - .,1--, - --'±-4.1,7 11.‘r -.,......7., it. . -, 1 1.rli. . 4 -...,-.'•_,iL...;.„:_i 1,, I . !- ' i C JLJI t t AN -� qr , ��, � .., 111 O+ ii Ii ; it .- + _> D.t � � -P.. 1 N �� N O� j r , CO