Loading...
Amendment No. 13 to the Agreement with Fentress Architects in the Amount of $173,790 c9o/y- 28S-3k AMENDMENT NO. 13 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $173,790 This Amendment No. 13 to the Agreement made and entered this 3/ day of �A , 2016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under thaws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado(hereinafter referred to as "Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400; and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $ $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project; and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for certain Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and 1 to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project,in the total amount of$15,156,359.00; and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the total amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the total amount of $36,875;and WHEREAS, on March 29, 2016,Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design,in the total amount of$34,073;and WHEREAS, this Amendment No. 13, is for design changes associated with the removal of the smoke control system;and NOW. THEREFORE,the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged,do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 13. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-13", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement,as amended, are unchanged and in full force and effect. 4. RATIFICATION. • The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 13. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 13 to be executed in their names by their duly authorized officials as of the date first set forth above. ATT • CI ' OF MIAMI EACH Ai 1 Raf el Gran my L. a-s City Clerk ' Mana•er ATTEST: CAI SULTANT: FE TRESS ARCHITECTS nature: Signature J Print Name/Title Print Name/Title APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION 2 C9NLOtr• � - z5 1 City Attorney J 1' 5 -� • • Appendix "A-13" 1. SCOPE OF SERVICES Refer to Proposal dated April 25, 2016, revised May 31, 2016, attached herein. 2. TIME OF COMPLETION Concurrent with design completion. 3. PAYMENT AND COMPENSATION Payment will be deducted from the Owner's Contingency Allowance. Summary Project Contingency Total Contract $10,967,200 $1,096,720 $12,063,920 Amendment 1 -Scope change 0 0 - Amendment 2 -Civil 41,079 -41,079 0 Amendment 3 -BR change 179,982 -179,982 0 Amendment 4-Stormwater/Web 76,605 -76,605 0 Amendment 5 -DD 2,442,400 0 2,442,400 Amendment 6—Wind/roof 117,200 -117,200 0 Amendment 7-Deductive -3,129,259 -96,720 -3,225,979 Amendment 8 -.CD/CA 15,156,359 15,156,359 Amendment 9-Commissioning 302,876 -302,876 0 Amendment 10—Parapet Analysis 15,000 -15,000 0 Amendment 11 -Event Plans 36,875 -36,875 0 • Amendment 12-Drainage Revisions 34,073 -34,073 0 Amendment 13 -Smoke Control Removal 173,790 -173,790 0 $26,414,180 $22,520 $26,436,700 3 FENTRESS tentressarcnitects.com April 25,2016 Revised May 31,2016 Mr. Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 20—Smoke Control Removal Design Service Project 20140021.001 A20 Dear Mr.Morales: This proposal is for design work required to take out the smoke removal system for the Miami Beach Convention Center. This effort is outside of the contract scope that included a design that is both building and fire code-compliant. The revised design provides a significant reduction in the building cost but also requires a redesign of the exiting systems for the building The removal of the smoke control system resulted in an increase to a number of design activities including: • Architectural and interior design, removing air intake and exhaust to spaces provided with smoke control; • Removal of mechanical components including exhaust and supply air fans and ductwork distribution; • Revisions to electrical design required to reduce emergency power for removed equipment; • • Structural design to remove roof and floor penetrations for ductwork as well as structural support for the additional exhaust and supply fans;/ • Removal of smoke system control from Contract Documents. • Revision of exiting on life safety plans The original proposal(Proposal 17 submitted 3/11/2016)was based on a NFPA code-compliant smoke control system. The Design Team proceeded with the design of this system,as described in the Florida Building Code and the Florida Fire Prevention Code. On April 5,2016,during discussion with the City of Miami Beach and Clark Construction, it was determined that an enhanced smoke control system was cost prohibitive and Fentress was directed to remove the system. Fees for all services will be a total proposed amount of One Hundred Seventy Three Thousand,Seven Hundred Ninety- Dollars ($173,790). Reimbursable costs for printing, telephone, delivery and travel are included in the lump sum portion of this fee. Reimbursable expenses will be billed in accordance with the existing terms and conditions of our Agreement. Billings for these services will be invoiced under the heading#20140021.001 A20. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free contact me with any further questions or comments you may have. DEN DC LA SJ SF L _ N _ ■ 1 421 ,_ aa_ Denver CO 80253 307 722 = 000 Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach Proposal 20—Smoke Control Removal Design Service April 25,2016 Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ohn Kudry cki, AZEj Ap BD+C Associate Principal encl: Design Fee Summary dated May 31, 2016 Flours Build-up dated April 22,2016 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs, Strategic Advisory Group Holly Carson,Neil Suhr, Anne McNeely Fentress Architects Project: Smoke Control Removal Miami Beach Convention Center 5/31/16 Discipline Firm Name Firm Fee Number Requested Project Management Fentress Architects 1 $0.00 Architecture Fentress Architects 1 $113,220.00 Interior Design Fentress Architects 1 $0.00 Fire/Life Safety/Code Consulting Jensen Hughes 13 $18.500.00 Civil/Utility Engineering Kimley-Horn 6 $0.00 Landscape West 8 7 $0.00 Structural Engineering Wallace Engineering 8 $12,300.00 Curtain Wall Engineering CDC 8.5 $0.00 Vertical Transportation Lerch Bates 12 $0.00 Fire Protection Jensen Hughes 13 $0.00 Plumbing Engineering ME Engineers 14 $0.00 Mechanical Engineering ME Engineers 15 $23,770.00 Electrical Engineering ME Engineers 16 $0.00 Lighting Design ME Engineers Illume 18 $0.00 Info Technology DL Adams 19 $0.00 Security Systems DL Adams 20 $0.00 AV Systems DL Adams 21 $0.00 Acoustics DL Adams 22 $0.00 Food Service Caruso 25 $0.00 Traffic Corradino 27 $0.00 Graphics and Signage TKD 28 $0.00 Parking Consultation Walker Parking 29 $0.00 Cost Estimate RLB 35 $0.00 Hardware Consultation Assa Abloy 37 $0.00 Wind Engineer RWDI $0.00 Roof Specialist Turnkey Roof Consulting, Inc. Subconsultants Subtotal $54,570.00 Expenses $6,000.00 Fentress Fees Subtotal $113,220.00 Design Consultant Fees Total $173,790.00 Enhanced Smoke Control Design Fentress Architects Hours Job Title Hourly Rate Hours Extension Meetings meetings hours Project Architect 8 2 $150.00 16 $2,400.00 Architect III 4 2 $150.00 8 $1,200.00 Architect II 0 0 $130.00 0 $0.00 Interior Designer III 0 0 $160.00 0 $0.00 Interior Designer II 4 2 $1 10.00 8 $880.00 Interior Designer II 0 0 $110.00 0 $0.00 John Kudrycki 4 4 $225.00 16 $3,600.00 Mike Winters 0 0 $300.00 0 $0.00 Hours Total Hours 48.0 $8,080.00 Design Weeks hours Project Architect 4 10 $150.00 40 $6,000.00 Architect III 4 20 $150.00 80 $12,000.00 Architect II 0 0 $130.00 0 $0.00 Interior Designer III 4 3 $160.00 12 $1,920.00 Interior Designer II 4 12 $110.00 48 $5,280.00 Interior Designer II 0 0 $110.00 0 $0.00 John Kudrycki 9 8 $225.00 72 $16,200.00 Mike Winters 1 0 $300.00 0 $0.00 Hours Total Hours 252.0 $41,400.00 Production Weeks hours Project Architect 5 16 $150.00 80 $12,000.00 Architect III 5 20 $150.00 100 $15,000.00 Architect 11 0 0 $130.00 0 $0.00 Interior Designer III 3 3 $160.00 9 $1,440.00 Interior Designer II 5 32 $110.00 160 $17,600.00 Interior Designer II 3 40 $110.00 120 $13,200.00 John Kudrycki 5 4 $225.00 20 $4,500.00 Mike Winters 0 0 $300.00 0 $0.00 Hours Total Hours 489.0 $63,740.00 Hours Total 789.0 $113,220.00 Smoke Control Removal Miami Beach Convention Center Fentress Project No:20140021 April 22,2016 Page 1 of 1 JENSEN HUGHES May 25, 2016 John Kudrycki AIA, LEED AP BD +C Fentress Architects 421 Broadway St. Denver, CO 80203 RE: Miami Beach Convention Center Renovation—Add Services for the Removal of Smoke Control System Dear John: JENSEN HUGHES (JH) has prepared this add services proposal to serve as"Consultant"for Fentress Architects"Client"to provide code consulting services related to the removal of the smoke control system for the Miami Beach Convention Center(MBCC) project. JH understands the City of Miami has decided to remove the smoke control system from the design for the MBCC. SCOPE OF SERVICES Based on the most current discussions with Fentress, JH proposes the following Scope of Services. 1. Updating of technical specifications to remove references to having a smoke control system provided. 2. Updating of fire alarm and fire protection system drawing documents to remove references to having a smoke control system provided. 3. Consulting efforts related to the close out of outstanding smoke control system review comments generated by the building department and the fire department. This is expected to include a minimum of two meetings and issuance of meeting minutes to document clarifications and aspects of the fire protection and fire alarm system design that are expected to be provided. 4. Determine if Rational Analysis is still required. CLIENT RESPONSIBILITY This proposal is based on the Client providing the following at no cost to JH: 1. Provide Consultant with a complete set of hard copy construction documents including all drawings and specifications for the project. 2. Provide JH with relevant project related information. 3. Coordinate meetings and site visits. O •+3O6.-4e1-2261 2331 GaTano SL;FL 2 :oral Gables FL 331 is USA jensenhughes.com Miami Beach Convention Center Renovation—Smoke Control System Removal PAGE 2 ADDITIONAL SERVICES Work outside the Scope of Services specified in this proposal will be conducted on a mutually agreeable basis. When such work is requested, JH will submit a separate proposal and cost estimate to the Client for approval prior to proceeding. Examples of additional services JH can provide, but are not included at the present time, for this project include the following: 1. Attendance of surveys or meetings with the design team or Authority Having Jurisdiction (AHJ) not included in the above Scope of Services. • 2. Design of any fire protection systems, including fire sprinkler, fire alarm systems, and stair pressurization systems not included in the above Scope of Services. 3. Preparation of code equivalencies or variances. 4. Preparation of project cost estimates. 5. Additional consulting services not included in the above Scope of Services. 6. Computer Fire Modeling or Timed Egress Analysis. 7. Accessibility Consulting Services. 8. Security Consulting Services. PROFESSIONAL FEES Based on our knowledge of the project as outlined in this proposal, JH will perform the scope of services including all time and expenses for a lump sum of$18,500. The terms and conditions will be per the existing contract between Fentress Architects and JENSEN HUGHES for Miami Beach Convention Center. JENSEN HUGHES appreciates the opportunity to assist Fentress Architects. If you have any questions please contact me at 404-239-1000 or jastellano@jensenhughes.com. Sincerely, Joseph A. Castellano Vice President JENSEN HUGHES Smoke Control System Design Revisions Jensen Hughes Hours for Senior Consultant Job Title Hourly Rate Hours Extension Task-Fire Model Runs Job Title Hourly Rate Hours Extention Update technical specifications to remove smoke control reference Consultant $205.00 20.0 $4,100.00 Update FA&FP system drawing documents to remove smoke control Consultant $205.00 20.0 $4,100.00 Consulting efforts related to close out of oustanding smoke control system review comments generated by the building dept and fire dept. Anticipated 2 meetings and issue of meeting minutes. Consultant $205.00 20.0 $4,100.00 Determine if Rational Analysis is required. Consultant $205.00 8.0 $1,640.00 Consultant $205.00 0.0 $0.00 Consultant $205.00 0.0 $0.00 Consultant $205.00 0.0 $0.00 Consultant $205.00 0.0 $0.00 Totals this activity: Hours 68.0 $13,940.00 Meetings $205.00 0.0 $0.00 $205.00 0.0 $0.00 Totals this activity: Hours 0.0 $0.00 Total,Fire Models 68.0 $13,940.00 Total,Meetings 0.0 $0.00 Hours Total 68.0 $13,940.00 Smoke Control Design Revisions Miami Beach Convention Center Fentress Project No:20140021 Page 1 of 2 Smoke Control System Design Revisions Jensen Hughes • Hours for Other Staff Job Title Hourly Rate Hours Extension Task-Fire Model Runs Job Title Hourly Rate Hours Extention Review of updated technical documents related to removal of smoke control VP $250.00 5.0 $1,250.00 Associate II $135.00 0.0 $0.00 Update FA&FP system drawing documents to remove smoke control Associate I $135.00 24.0 $3,240.00 Update technical documents/specifications Project Administrator $75.00 1.0 $75.00 Totals this activity: Hours 30.0 $4,565.00 Meetings/Project team coordination VP $250.00 0.0 $0.00 Associate II $135.00 $0.00 Associate I $135.00 $0.00 Project Administrator $75.00 0.0 $0.00 Totals this activity: Hours 0.0 $0.00 • Total,Fire Model 30.0 $4,565.00 'Total,Meeting 0.0 $0.00 Hours Total • 30.0 $4,565.00 • Smoke Control Design Revisions Miami Beach Convention Center • Fentress Project No:20140021 Page 1 of 2 • wallace ► 1' • May 19,2016 Mr.John Kudrycki,AIA,LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Fee Proposal for Additional Services related to the Second Round of Smoke Control Changes Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.12 Dear John: At your request,we have assembled costs associated with the second round of smoke control changes as it relates to structural engineering re-design and re-drafting. Based on the above,the proposed fees for this work is: $12,300.• We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING•STRUCTURAL CONSULTANTS,INC. • An rew Kern,P.E.,S.E.,CWI,ICC-SI,AIA P ncipal cc: File • • Wallace Engineering Structural Consultants,Inc. 200 East Mathew Brady Street Tulsa,Oklahoma 74103 918 584.5858.800.364.5858 www.wallacesc.com • Smoke Control Adda Service Consultaant Wallace Engineering Hours Job Title Hourly Rate Hours Extension Task 1 Smoke Control Changes Coordination,Analysis&Design(Part 2) Principal $170.00 5.5 $935.00 Associate $150.00 13.5 $2,025.00 PE II $135.00 25.0 $3,375.00 PE I $120.00 9.5 $1,140.00 CAD Technician II $105.00 46.0 $4,830.00 Totals this activity: Hours 99.5 $12,305.00 Task 2 Principal $170.00 0.0 $0.00 Associate $150.00 0.0 $0.00 PE II $135.00 0.0 $0.00 PE I $120.00 0.0 $0.00 CAD Technician II $105.00 0.0 $0.00 Totals this activity: Hours 0.0 $0.00 Task 3 Principal $170.00 0.0 $0.00 Associate $150.00 0.0 $0.00 PE [I $135.00 0.0 $0.00 PEI $120.00 0.0 $0.00 CAD Technician II $105.00 0.0 $0.00 Totals this activity: Hours 0.0 $0.00 Total,Sub 1 99.5 $12,305.00 Total,Sub 2 0.0 $0.00 Total,Sub 3 0.0 $0.00 Hours Total 99.5 $12,305.00 Smoke Control Revisions Miami Beach Convention Center Fentress Project No:20140021 January 11,2016 Page 1 of 1 February 16,2016 SCS INT en r ^+ 1 e E�� 111z2f S ME E'CI eery In: 9 1�-i!3D?rnic'r�;1-�Sltzl:,,��� S:rr� �3� Go! ?^ CO 3C1,C. Off c , 3C3 e:2i 0,5'35 me-eng,,-eers co"' April 15, 2016 • Mr. John Kudrycki • Fentress Architects 421 Broadway Denver, CO 80203 RE: Miami Beach Convention Center Deletion of Smoke Control System from Contract Drawings (ME Engineers Project No. DV14047.02) Dear John: We are pleased to submit this proposal to you to update the design to delete the smoke control system from the construction documents. As discussed, we first designed the smoke control system to better facilitate the building. The initial smoke control system was designed in accordance to NFPA and industry standards. We then modified the smoke control system per the local Jurisdiction requirements and now, with the exception of two stairway pressurization fans, we are removing the smoke control system from the scope in its entirety due to budgetary restraints. Also included in our proposal is updating the schedules and modifying the specifications as needed. Our proposal to incorporate these changes is $23,770.00. Please refer to attached for anticipated hours and cost. Sincerely, ME ENGINEERS, INC. — – Denver Office yei? pl o,T Roger Loomis • Principal Approved and accepted this day of , 2016. Fentress Architects By: Title: . Miami Beach Convention Center '. '• . . Deletion of Smoke Control System . . . ' Contract HVAC Plumbing Plumbing Plumbing _ Electrical Electrical ' . •. Billing` Design. Design, Design Design • Design Design -_CADD CADD ` Total - rate Hours Cost, Hours Cost Hours Cost•-..."- ., Hours Cost . Cost . . - Principal 200 9 .. $ '.1,800.00 $ - , 18 $ 3,600.00 :. •- $' $5,400.00 ' Sr.Associate 180 $ - _ $ r $ - $ . -' $0.00 Associate 160 $ $ - 40 $ 6,400.00 • $ - $6,400.00 Senior Project Manager 150 • $ • • - $ - $ - • - $ - $0.00 Project Manager 140 18 $ 2,520.00 - • '$ .. - $ . -. $ - $2,520.00 Project Engineer 120 •36 „ $ 4,320.00 $ ' . -. $ $ - $4,320.00 Designer 110 . $ - • .$ $ - $ - $0.00 CADD Operator 95 ' 27 c $ 2,565.00 • - '• .$ ,. 27 _$ 2,565.00 $ - $5,130.00 Administrative Staff 80 $ $ $ • - $ - $0.00 Total $23,770.00 1