Loading...
2016-29449 Reso RESOLUTION NO. 2016-29449 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPROVE AND EXECUTE THE SUPPLEMENTAL WORK ORDER WITH SHIFF CONSTRUCTION AND DEVELOPMENT, INC., FOR REPLACEMENT OF THE HVAC SYSTEM AT THE NORTH BEACH SENIOR CENTER FACILITY PROJECT LOCATED AT 7231 COLLINS AVE, UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT, IN THE AMOUNT OF $335,682, FOR CONSTRUCTION COSTS, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $10,000 FOR A TOTAL COST OF $345,682, PARTIALLY UTILIZING PREVIOUSLY APPROPRIATED FUNDS AND FUNDING SUBJECT TO A 6TH AMENDMENT TO THE FY 15/16 CAPITAL BUDGET WHEREAS, the HVAC system at the North Beach Senior Center located at 7231 Collins Ave, has demonstrated significant operational problems including, without limitation, failing to properly cool the facility, and its useful life has been severely shortened, due to construction defects; and WHEREAS, at the January 13, 2016 Commission Meeting, the Commission discussed the North Beach Senior Center/HVAC-Related Matters and during this discussion, the City Attorney advised that the City had initiated a pre-suit construction defect claim with the original contractor and if this situation becomes contentious, litigation may take some time; and WHEREAS, in the interim, because summer is approaching and the seniors utilizing the facility could be harmed, and as the facility is a City-owned building, the Commission directed staff to address the repairs; and WHEREAS, at the February 10, 2016 Commission Meeting, the Commission adopted the third amendment to the capital budget for fiscal year 2015/16, providing $250,000 in funding to the HVAC for the North Beach Senior Center; and WHEREAS, in order to provide the preceding repairs for the use and benefit of the residents, the City elected to expedite this project and utilize the Indefinite Quantity Contract (IQC) process; and whereas the IQC process, which is used extensively by local, state and federal governmental agencies throughout the United States, expedites the delivery of construction projects; and WHEREAS, the City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group, the Managers of IQC; and WHEREAS, through the NJPA process, Shiff Construction and Development, Inc., was identified as the Contractor that has the qualifications and experience in performing the identified scope of services; and whereas on February 11, 2016 an initial work order, in the amount of $10,133.95 was executed with the contractor for professional services to study, evaluate and prescribe corrective action to address defects and deficiencies with the existing HVAC system; and WHEREAS, on March 17, 2016, the City met with the Contractor to review findings from its assessment and it was concluded that significant corrective action would be required in order for the HVAC system to function properly; and WHEREAS, the Contractor submitted a supplemental work order, utilizing the NJPA cooperative contract system, which was further discussed and negotiated for a total cost amount of$335,682, for the replacement and remediation of the HVAC system at the North Beach Senior Center; and WHEREAS, the proposed remedial work will include the replacement and repair of system components to address deficiencies identified following the completion of the North Beach Senior Center Project and will involve replacement of all existing air handlers and condensing units, including relocating and converting the existing horizontal unit into a vertical unit. WHEREAS, in addition, a new energy management system will be provided; and WHEREAS, the IQC proposal received exceeds the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award, accordingly, City Commission approval is required when the amount under the NJPA exceeds the $250,000 project threshold limit; and WHEREAS, the Administration supports the approval of the NJPA at $335,682, plus owner's contingency in the amount of $10,000, for a total of $345,682 for this supplemental work order. NOW,THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA authorizing the City Manager to approve and execute the supplemental work order with Shiff Construction and Development, Inc., for replacement of the HVAC System at the North Beach Senior Center Facility Project located at 7231 Collins Ave, utilizing the competitively bid National Joint Powers Alliance (NJPA) cooperative contract, in the amount of $335,682, for construction costs, plus owner's contingency in the amount of$10,000 for a total cost of $345,682, partially utilizing previously appropriated funds and funding subject to a 6th Amendment to the FY 15/16 Capital Budget. PASSED and ADOPTED this S day of af ne.. , 2016. r° s vmstimul,,, / �s - r• 1• I►� 1 NE, MAYOR ATTEST: o N .l."........... .`7.,t/ . 'iii .,-_ li ` 3 , * : ► ORP ORATED: , J APPROVED AS TO R. AEL c RANA B O CITY C 5 FORM & LANGUAGE ' • � i &FOR EXECUTION • 9,j'.• ..._.. ... NO / , �,� .� 431114, 6 >, `' Do' . it��,-c;t�--- City Attorney �` COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach,Florida,Authorizing The City Manager To Approve And Execute The Supplemental Work Order With Shiff Construction And Development,Inc.,For Replacement Of The HVAC System At The North Beach Senior Center Facility Project Utilizing The Competitively Bid National Joint Powers Alliance(NJPA)Cooperative Contract In The Amount Of$335,682 For Construction,Plus Owner's Contingency In The Amount Of$10,000 For A Total Of$345,682 Partially Utilizing Previously Appropriated Funds And Funding Subject To The 6th Amendment To The FY 15/16 Capital Budget. Key Intended Outcome Supported: Build and maintain priority infrastructure with full accountability. Supporting Data(Surveys,Environmental Scan,etc:The 2014 Customer Satisfaction Survey indicated that over 77%of residents rated recently completed capital improvement projects as"excellent"or"good". Item Summary/Recommendation: The HVAC system at the North Beach Senior Center has demonstrated significant operational problems including,without limitation, failing to properly cool the facility, and its useful life has been severely shortened, due to construction defects. At the January 13, 2016 Commission Meeting, the Commission discussed the North Beach Senior Center/HVAC-Related Matters.During this discussion,the City Attorney advised that the City had initiated a pre-suit construction defect claim with the original contractor and if this situation becomes contentious,litigation may take some time.In the interim,because summer is approaching and the facility is a City-owned building,the Commission directed staff to address the repairs. At the February 10,2016 Commission Meeting,the Commission adopted the third amendment to the capital budget for fiscal year 2015/16.This amendment provided funding to the HVAC at the North Beach Senior Center of$250,000. In the interest of time, in order to provide the preceding repairs for the use and benefit of the residents, the City elected to expedite this project and utilize the Indefinite Quantity Contract(IQC)process.The IQC process,which is used extensively by local,state and federal governmental agencies throughout the United States,expedites the delivery of construction projects. The City,as a governmental agency member,is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance(NJPA)to the Gordian Group,the Managers of IQC. Through the NJPA process, Shiff Construction and Development, Inc., was identified as the Contractor that has the qualifications and experience in performing the identified scope. On February 11,2016 an initial work order,in the amount of $10,133.95 was executed with the contractor for professional services to study, evaluate and prescribe corrective action to address defects and deficiencies with the existing HVAC system. On'March 17,2016,the City met with the Contractor to review findings from its assessment. It was concluded that significant corrective action would be required in order for the HVAC system to function properly. The Contractor submitted a supplemental work order,utilizing the NJPA cooperative contract system(Exhibit A),which was further discussed and negotiated for a total amount of$335,682 for the replacement and remediation of the HVAC system at the North Beach Senior Center. The proposed remedial work will include the replacement and repair of system components to address deficiencies identified following the completion of the North Beach Senior Center Project.This will involve replacement of all existing air handlers and condensing units,including relocating and converting the existing horizontal unit into a vertical unit.In addition,a new energy management system will be provided. The IQC proposal received exceeds the$250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award. Accordingly,approval is required to exceed the$250,000 project threshold limit in order to move forward with the completion of this project.The amount to be approved is$335,682,plus owner's contingency in the amount of $10,000,fora total of$345,682 for this supplemental work order. The cost proposal was reviewed and analyzed by CIP and the Gordian Group and was found to be fair and reasonable. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Source of,y` ' Amount Account Funds: / 1. $239,866 125-6136-000674 Renewal&Replacement Fund 125. 2. $105,816 Subject to the 6'"Amendment to the Capital Budget OB- Total $345,682 Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Sign-Offs: Department '�irector Assistant City Manager City t. er DM +. . ETC tr JLM �)♦� T:\AGENDA\2016\June\CIP\SeniorCenterHVAC\SeniorCenterHVAC.Summary.doc / V 1 I Al V 1 I BEACH AGENDA ITEM DATE C. MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov CO ISSION MEMORANDUM TO: Mayor Philip Levine and Members of the City •(mmission FROM: Jimmy Morales, City Manager �� _ DATE: June 08, 2016 SUBJECT: A RESOLUTION OF THE MA R AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPROVE AND EXECUTE THE SUPPLEMENTAL WORK ORDER WITH SHIFF CONSTRUCTION AND DEVELOPMENT, INC., FOR REPLACEMENT OF THE HVAC SYSTEM AT THE NORTH BEACH SENIOR CENTER FACILITY PROJECT UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT IN THE AMOUNT OF$335,682 FOR CONSTRUCTION,PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $10,000 FOR A TOTAL OF $345,682 PARTIALLY UTILIZING PREVIOUSLY APPROPRIATED FUNDS AND FUNDING SUBJECT TO THE 6TH AMENDMENT TO THE FY 15/16 CAPITAL BUDGET ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution. KEY INTENDED OUTCOME Build and maintain priority infrastructure with full accountability. FUNDING $239,866 Renewal & Replacement Fund 125 $105,816 Subject to the 6th Amendment to the Capital Budget $345,682 Total BACKGROUND The HVAC system at the North Beach Senior Center has demonstrated significant operational problems including,without limitation,failing to properly cool the facility, and its useful life has been severely shortened, due to construction defects. At the January 13, 2016 Commission Meeting, the Commission discussed the North Beach Senior Center/HVAC-Related Matters. During this discussion, the City Attorney advised that the City had initiated a pre-suit construction defect claim with the original contractor and if this situation becomes contentious, litigation may take some time. In the interim, because summer is approaching and the facility is a City-owned building, the Commission directed staff to address the repairs. At the February 10, 2016 Commission Meeting, the Commission adopted the third amendment to the capital budget for fiscal year 2015/16. This amendment provided funding to the HVAC at the North Beach Senior Center of$250,000. City Commission Memorandum—Authorization To Use Existing NJPA Contract for North Beach Senior Center HVAC System Repairs June 08, 2016 Page 2 of 2 In the interest of time, in order to provide the preceding repairs for the use and benefit of the residents, the City elected to expedite this project and utilize the Indefinite Quantity Contract(IQC) process. The IQC process, which is used extensively by local, state and federal governmental agencies throughout the United States, expedites the delivery of construction projects. The City,as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group, the Managers of IQC. Through the NJPA process, Shiff Construction and Development, Inc., was identified as the Contractor that has the qualifications and experience in performing the identified scope. On February 11, 2016 an initial work order, in the amount of $10,133.95 was executed with the contractor for professional services to study, evaluate and prescribe corrective action to address defects and deficiencies with the existing HVAC system. On March 17, 2016, the City met with the Contractor to review findings from its assessment. It was concluded that significant corrective action would be required in order for the HVAC system to function properly. ANALYSIS The Contractor submitted a supplemental work order, utilizing the NJPA cooperative contract system (Exhibit A), which was further discussed and negotiated for a total amount of$335,682 for the replacement and remediation of the HVAC system at the North Beach Senior Center. The proposed remedial work will include the replacement and repair of system components to address deficiencies identified following the completion of the North Beach Senior Center Project. This will involve replacement of all existing air handlers and condensing units, including relocating and converting the existing horizontal unit into a vertical unit. In addition,a new energy management system will be provided. The IQC proposal received exceeds the$250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award. Accordingly, approval is required to exceed the $250,000 project threshold limit in order to move forward with the completion of this project. The amount to be approved is $335,682, plus owner's contingency in the amount of$10,000, for a total of$345,682 for this supplemental work order. The cost proposal was reviewed and analyzed by CIP and the Gordian Group and was found to be fair and reasonable. CONCLUSION The Administration recommends the approval of the Resolution. Attachments: Exhibit A—Shiff Construction and Development, Inc. Cost Proposal-Supplemental Work Order. JLM/IC/1 T:WGENDA\2016\June\CIP\Senior Center HVAC\Senior Center HVAC.Memo.doc Exhibit A SIQC Work Order Signature Document THE GORDIAN GROUP NJPA EZIQC Contract No.: FLO6-022912-SCD New Work Order X Modify an Existing Work Order Work Order Number.: 038333.01 Work Order Date: 05/20/2016 Work Order Title: Senior Center HVAC Supplemental Owner Name: City of Miami Beach Contractor Name: Shiff Construction&Development, Inc. Contact: Elizabeth Estevez Contact: Justen Shiff Phone: 305-673-7071 Phone: 9545242575 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FLO6-022912-SCD. Brief Work Order Description: Senior Center HVAC Renovation located on 7231 Collins Avenue. Miami Beach Fl 33141 Time of Performance Estimated Start Date: 06/30/2016 . Estimated Completetion Date: 08/30/2016 Liquidated Damages Will apply: l l Will not apply: Work Order Firm Fixed Price: $335,681.14 Owner Purchase Order Number: Approvals Jimmy L. Morales, City Manager Date Contractor Date David Martinez, P.E., CIP Director Date Work Order Signature Document Page 1 of 1 5/20/2016 SIQC THE GORDIAN GROUP Detailed Scope of Work To: Justen Shiff From: Elizabeth Estevez Shiff Construction&Development, Inc. City of Miami Beach 1350 NE 56th St-Ste. 100 1700 Convention Center Drive Fort Lauderdale, FL 33334 Miami Beach, FL 33139 9545242575 305-673-7071 Date Printed: May 20, 2016 Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental Brief Scope: Senior Center HVAC Renovation located on 7231 Collins Avenue. Miami Beach Fl 33141 nPreliminary n Revised © Final The following items detail the scope of work as discussed at the site.All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Scope of work is based on plans Thomas E Henz, PE consulting Engineers and additional HVAC Controls sheet. Sheet E-1, E-2, E-3, M-1, M-2, M-3, M-4, M-5, and Controls Plans attached.All outside equipment will be coated with special coating to assist in preventing corrosion. Contractor will provide all minor drywall repair(if needed)and install plants(if needed)to capture the elevation increase on the outside units. Contractor will need to present plans to the building department and acquire the appropriate building permits.All efforts must be coordinated with the CIP department. Construction schedule will be adjusted based on the PO issued date and the delivery of the equipment to the project site. Project is estimated to be a 3 months duration Subject to the terms and conditions of JOC Contract FLO6-022912-SCD. Contractor Date Jimmy L. Morales, City Manager Date David Martinez, P.E., CIP Director Date • Scope of Work Page 1 of 1 5/20/2016 Contractor's Price Proposal - Summary Date: May 20,2016 Re: IQC Master Contract#: FLO6-022912-SCD Work Order#: 038333.01 Owner PO#: Title: Senior Center HVAC Supplemental Contractor: Shill Construction&Development,Inc. Proposal Value: $335,681.14 Bond $6,968.69 Controls $27,988.45 Drywell $649.71 Electrical $14,964.81 Engineering Design $9,777.63 Equipment $247,775.48 GC $4,523.59 HVAC $14,484.01 Refrig Piping $3,926.10 Relief Vent $2,657.76 T&B $1,964.91 Proposal Total $335,681.14 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. Contractor's Price Proposal-Summary Page 1 of 1 5/20/2016 Contractor's Price Proposal - Detail Date: May 20,2016 Re: IQC Master Contract#: FL06-022912-SCD Work Order#: 038333.01 Owner PO#: Title: Senior Center HVAC Supplemental Contractor: Shiff Construction&Development,Inc. Proposal Value: $335,681.14 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Bond 1 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for the $6,968.69 actual cost of all permits,without mark-up,for which a receipt or bill is received.The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The labor cost involved in obtaining all permits is in the Adjustment Factor.The base cost of the Reimbursable Fee is$1.00.The quantity used will adjust the base cost to the actual Reimbursable Fee(e.g.quantity of 125=$125.00 Reimbursable Fee).If there are multiple Reimbursable Fees,each one shall be listed separately with a comment in the"note"block to identify the Reimbursable Fees(e.g.sidewalk closure,road cut,various permits, extended warrantee,expedited shipping costs,etc.).A copy of each receipt shall be included with the Proposal. Quantity Unit Price Factor Total Installation 6,574.24 x 1.00 x 1.0600 6,968.69 Bond fee of 2%on$328,712.45 Subtotal for Bond $6,968.69 Controls 2 23 09 23 00 0004 HR EMCS Engineering Project Management $2,551.69 Quantity Unit Price Factor Total Installation 20.00 x 106.02 x 1.2034 = 2,551.69 PM services for controls systems design and testing 3 23 09 23 00 0020 EA Mount An AHU Control Enclosure On Block,Masonry Or Gypsum Wall $467.88 Quantity Unit Price Factor Total Installation 4.00 x 97.20 x 1.2034 = 467.88 4 23 09 23 00 0021 EA Install AHU Power Supply In A Control Enclosure $340.23 Quantity Unit Price Factor Total Installation 4.00 x 70.68 x 1.2034 = 340.23 5 23 09 23 00 0033 EA Install And Wire Emergency Stop Switch For AHU Or Other Equipment $170.11 Quantity Unit Price Factor Total Installation 4.00 x 35.34 x 1.2034 170.11 6 23 09 23 00 0038 EA Install And Wire AHU Damper Actuator $510.34 Quantity Unit Price Factor Total Installation 4.00 x 106.02 x 1.2034 510.34 7 23 09 23 00 0108 EA Network Area Java Controller Supporting 126 Devices(Honeywell $6,798.33 WC2003B2004)Includes 128 MB RAM/32 MB Flash,10/100 MB ethernet port, 1 minimum RS-232 serial ports,1 minimum RS-485 electrically isolated ports,1 LonWorks port(supports 126 devices),and web user interface software. Quantity Unit Price Factor Total Installation 100 x 5,649.27 x 1.2034 = 6,798.33 Allowance for new controller. Contractor's Price Proposal-Detail Page 1 of 7 5/20/2016 Contractor's Price Proposal -Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental Controls 8 23 09 23 00 0159 EA 6 AO,8 Al,8 DO And 8 DI Medium Programmable Controller Assemblies $4,943.54 Quantity Unit Price Factor Total Installation 2.00 x 2,053.99 x 1.2034 4,943.54 Allow for(2)Shneider electric room controllers. 9 23 09 23 00 0236 EA Basic Application Program PackageOne per project.Includes program inputs, $1,443.41 command priorities,alarms,trends for analog and digital points,energy totalization,schedules,calendars,special events,occupied and unoccupied setpoints,ventilation and recirculation modes,hot water reset program,chilled water reset program,condenser water reset program,and fail-over logic. Quantity Unit Price Factor Total Installation 100 x 1,199.44 x 1.2034 = 1,443.41 10 23 09 23 00 0622 EA Web Server Limited Points(Maximum I/O 2500)License,Delta Controls Web $4,380.70 Server Front End(Delta Controls DWS330-M-USB) Quantity Unit Price Factor Total Installation 100 x 3,640.27 x 1.2034 = 4,380.70 Allow for(1)application server with terminal base and power supply. 11 23 09 23 00 0768 EA 10K Ohm Thermistor 3%Duct Mounted RH Sensor(Kele HD30K-T3) $1,172.79 Quantity Unit Price Factor Total Installation 4.00 x 243.64 x 1.2034 1,172.79 Humidity sensors. 12 23 09 23 00 0790 EA Wall Mounted CO2 Sensor,0-2000 ppm With LCD Display(Kele CD-AW-LCD) $1,734.97 Quantity Unit Price Factor Total Installation 4.00 x 360.43 x 1.2034 1,734.97 Carbon dioxide sensor to control the supply CFM's due to varying occupancy. 13 27 14 13 16 0005 MLF 2 Pair#12 AWG,Solid,Low Voltage,Placed In Conduit,Alarm And $3,474.46 Communications Cable Quantity Unit Price Factor Total Installation 125 x 2,309.76 x 1.2034 3,474.46 Subtotal for Controls $27,988.45 Drywell 14 31 23 16 36 0010 CY Excavation For Building Foundations And Other Structures By Hand in Loose $170.85 Rock Quantity Unit Price Factor Total Installation 2 50 x 56.79 x 1.2034 = 170.85 Hand excavate to get new electrical and refrigerant lines from condensers to building.Also hand dig for drywell. 15 33 05 16 13 0323 EA 24"x 24",15,000 LB Design Load,Heavy Duty,Polymer Concrete Handhole $285.43 Enclosure Cover Quantity Unit Price Factor Total Installation 100 x 237.19 x 1.2034 285.43 Cover for drywell 16 33 41 13 00 0007 LF 24"Diameter Class III Reinforced Concrete Pipe Without Gaskets $193.43 Quantity Unit Price Factor Total Installation 3.00 x 53.58 x 1.2034 = 193.43 Concrete pipe for drywell if needed. Subtotal for Drywell $649.71 Electrical Contractor's Price Proposal-Detail Page 2 of 7 5/20/2016 Contractor's Price Proposal - Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental Electrical 17 23 05 29 00 0656 LF C4 X 5.4-4"Wide(Channels) $1,183.84 Quantity Unit Price Factor Total Installation 125.00 x 7.87 x 1.2034 = 1,183.84 18 26 05 19 16 0187 MLF #12 AWG Cable-Type MC,2 Conductors,Solid Or Stranded,Galvanized $4,813.36 Steel Armor Quantity Unit Price Factor Total Installation 2 25 x 1,777.69 x 1.2034 = 4,813.36 New electrical wiring. 19 26 05 33 16 0227 EA 4-11/16"Junction Box,Plaster Ring And Cover Plate(Computer) $136.83 Quantity Unit Price Factor Total Installation 5.00 x 22.74 x 1.2034 136.83 J-boxes required for new work. 20 26 28 16 00 0177 EA 400 A Fused Disconnect Switch,NEMA 3R,Heavy Duty,With Fuses,240 V,3 $3,024.07 Phase Quantity Unit Price Factor Total Installation 100 x 2,512.94 x 1.2034 3,024.07 Replace existing 200A disconnect with new 400 AMP disconnect for CU-3. 21 26 28 16 00 0426 EA 100 A,Fused Disconnect Switch,NEMA 12,Heavy Duty,With Fuses,600 V, $5,806.71 3 Phase Quantity Unit Price Factor Total Installation 5.00 x 965.05 x 1.2034 5,806.71 Per E-2,for AHU-2A and 2B,remove existing disconnect serving AHU-2 removed and replace with(2)new fused disconnects.Also,@ exterior,remove existing 200A disconnect serving existing CU-2 removed and replace with 2 new fused disconnects.Also,new fused disconnect at AHU-1. Subtotal for Electrical $14,964.81 Engineering Design 22 01 22 20 00 0049 HR Investigating Senior Engineer Or Specialty ConsultantFor special investigatory $9,777.63 engineering requirements or other miscellaneous professional services. Quantity Unit Price Factor Total Installation 65.00 x 125.00 x 1.2034 9.777.63 Engineering design. Subtotal for Engineering Design $9,777.63 Equipment 23 23 63 13 00 0005 EA 15 Ton Air Cooled Condensing Unit With Compressor,Condenser,Fan And $34,273.89 Motor Quantity Unit Price Factor Total Installation 3.00 x 9,217.56 x 1.2034 = 33,277.24 Demolition 2.00 x 414.10 x 1.2034 = 996.66 Install new CU-1,CU-2A,CU-2B.Demo 1 exist 15 ton and 1 30 24 23 64 23 00 0007 EA 30 Ton Air Cooled Scroll Compressor Chiller,Electric,With Integral Heat $32,928.98 Exchanger Quantity Unit Price Factor Total Installation 100 x 26,269.16 x 1.2034 31,612.31 Demolition 1.00 x 1,094.13 x 1.2034 = 1,316.68 Removal of existing and install of(1)new 30 Ton COOL US exterior condenser. See 23731300-0042 for air handler unit. Contractor's Price Proposal-Detail Page 3 of 7 5/20/2016 Contractor's Price Proposal -Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental Equipment 25 23 73 13 00 0042 EA 45000 CFM Single Zone Air Handling Unit,Built-Up,Constant Volume, $55,487.85 Horizontal/Vertical,Draw-Through Fan Quantity Unit Price Factor Total Installation 100 x 46,109.23 x 1.2034 = 55487.85 1 30 ton Cool US 45,000CFM AHU. 26 23 73 13 00 0042 0217 MOD For Direct Expansion Cooling Coil,Aluminum Fins,Add $17,577.29 Quantity Unit Price Factor Total Installation 1.00 x 14,606.36 x 1.2034 = 17,577.29 27 23 73 13 00 0042 0354 MOD For Economizer,Panel,Controls And Damper(s),Add $3,123.95 Quantity Unit Price Factor Total Installation 100 x 2,595.94 x 1.2034 = 3,123.95 28 23 73 13 00 0042 0439 MOD For Electric Heating Coil,Add $11,322.47 Quantity Unit Price Factor Total Installation 100 x 9,408.73 x 1.2034 = 11,322.47 29 23 73 13 00 0042 0607 MOD For 2 Coils,Independent Circuits,Add $6,511.07 Quantity Unit Price Factor Total Installation 100 x 5,410.56 x 1.2034 = 6,511.07 30 23 73 13 00 0061 EA 6000 CFM Multizone Air Handling Unit,Built-Up,Horizontal/Vertical, $48,973.01 Draw-Through Fan Quantity Unit Price Factor Total Installation 3.00 x 12,679.50 x 1.2034 = 45,775.53 Demolition 3.00 x 885.68 x 1.2034 = 3,197.48 (3)15 Ton Lennox AHU'S.AHU-1,AHU-2A, AHU-2B 31 23 73 13 00 0061 0003 MOD For Economizer,Panel,Controls And Damper(s),Add $5,219.74 Quantity Unit Price Factor Total Installation 3.00 x 1,445.83 x 1.2034 5,219.74 32 23 73 13 00 0061 0383 MOD For Electric Heating Coil,Add $5,401.73 Quantity Unit Price Factor Total Installation 3.00 x 1,496.24 x 1.2034 5,401.73 33 23 73 13 00 0061 0449 MOD For Direct Expansion Cooling Coil,Aluminum Fins,Add $19,000.37 Quantity Unit Price Factor Total Installation 3.00 x 5,262.97 x 1.2034 = 19,000.37 34 23 73 13 00 0061 0607 MOD For 2 Coils,Independent Circuits,Add $5,401.73 Quantity Unit Price Factor Total Installation 3.00 x 1,496.24 x 1.2034 5,401.73 35 40 92 49 00 0020 EA 7.5 HP,480 Volt Variable Frequency DriveWall mounted. $2,553.40 Quantity Unit Price Factor Total Installation 100 x 2,121.82 x 1.2034 2,553.40 Varivable frequency drive added 2nd fl 100%OA unit. Subtotal for Equipment $247,775.48 GC 36 01 22 23 00 0814 DAY 6 Ton Lift Hydraulic Crane With Full-Time Operator $2,558.01 Quantity Unit Price Factor Total Installation 3.00 x 708.55 x 1.2034 = 2,558.01 Crane required to off-load old units and set new at 2nd fl. Contractor's Price Proposal-Detail Page 4 of 7 5/20/2016 Contractor's Price Proposal - Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental GC 37 01 71 13 00 0002 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Rollback $518.42 Flatbed TruckFor equipment such as trenchers,skid-steer loaders(bobcats), industrial warehouse forklifts,sweepers,scissor platform lifts,telescoping and articulating boom manlifts with up to 40'boom lengths,etc. Quantity Unit Price Factor Total Installation 2 00 x 215.40 x 1.2034 = 518.42 For crane 38 01 74 19 00 0013 EA 20 CY Dumpster(3 Ton)"Construction Debris"Includes delivery of dumpster, $1,086.72 rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous material. Quantity Unit Price Factor Total Installation 200 x 451.52 x 1.2034 = 1,086.72 39 02 41 19 13 0071 EA Drill 8"Diameter Core In>4"To 6"Concrete $360.44 Quantity Unit Price Factor Total Installation 3.00 x 99.84 x 1.2034 = 360.44 Concrete coring for new lines. Subtotal for GC $4,523.59 HVAC 40 23 01 60 00 0003 LB Recovery And Recharging Of Refrigerant $976.38 Quantity Unit Price Factor Total Installation 135.00 x 6.01 x 1.2034 976.38 Removal of refrigerant and recharge of new units.3Ibs per ton=45 x 3= 41 23 05 29 00 0635 EA 2"Hanger Assembly For Pipelncludes hanger,rod,saddle and clamp. $4,438.38 Quantity Unit Price Factor Total Installation 60.00 x 61.47 x 1.2034 4,438.38 Hangar assemply for new pipe and ductwork. 42 23 07 13 00 0010 SF 1-1/2"Type 100(1.0 LB/CF)FSK Fiber Glass Duct Wrap Insulation $469.33 Quantity Unit Price Factor Total Installation 250.00 x 1.56 x 1.2034 = 469.33 Insulation for galvanized Ductwork connected to relief vent to roof. 43 23 09 23 00 0029 EA Install And Wire Float Switch $340.23 Quantity Unit Price Factor Total Installation 4.00 x 70.68 x 1.2034 = 340.23 44 23 09 23 00 0278 EA 88 IN-LB,2 Position,24 VAC Spring Return Direct Coupled Damper Actuator $1,303.33 (Honeywell MS8110A1206) Quantity Unit Price Factor Total Installation 4.00 x 270.76 x 1.2034 = 1,303.33 Used to complete motorized damper assembly. 45 23 31 13 13 0004 LB Sheet Metal Ductwork,Medium Pressure,Field Fabricated,Galvanized,Field $6,267.31 Assemble And Install Quantity Unit Price Factor Total Installation 1,200.00 x 4.34 x 1.2034 6,267.31 46 23 33 13 19 0197 EA 18"x 10"Louver Type Smoke Damper,Steel Construction,UL Listed,1-1/2 $622.74 Hour Rated Quantity Unit Price Factor Total Installation 4.00 x 129.37 x 1.2034 = 622.74 4 dampers.use actuator to make motorized. Contractor's Price Proposal-Detail Page 5 of 7 5/20/2016 Contractor's Price Proposal - Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental HVAC 47 23 37 13 00 0208 EA 12"x 12"Egg Crate Wall Return Air Or Exhaust Grille,Aluminum Construction $66.31 Quantity Unit Price Factor Total Installation 2 00 x 27.55 1.2034 = 66.31 Transfer grills at 1st fl directors office. Subtotal for HVAC $14,484.01 Refrig Piping 48 23 23 16 00 0008 LF 5/8"Refrigeration Tubing Copper(Soft)Dehydrated $1,272.60 Quantity Unit Price Factor Total Installation 250.00 x 4.23 x 1.2034 = 1,272.60 Refrig piping for Liquid IN.OD for 3 exterior CU units.2 sets each.1 set equals 2 pipes each. 49 23 23 16 00 0011 LF 1-1/8"Refrigeration Tubing Copper(Soft)Dehydrated $2,653.50 Quantity Unit Price Factor Total Installation 250.00 x 8.82 x 1.2034 = 2,653.50 Refrig piping for Liquid IN.OD for 3 exterior CU units.2 sets each.1 set equals 2 pipes each. Subtotal for Refrig Piping $3,926.10 Relief Vent 50 07 13 13 00 0003 CSF 2 Ply,15#Asphalt Saturated Organic Felt Sheet Waterproofing,Hot-Mopped $154.44 Quantity Unit Price Factor Total Installation 100 x 128.34 x 1.2034 154.44 Waterproofing over flanges of new rlief vent curb. 51 07 72 13 00 0025 EA 25"x 25",8"High,18 Gauge Galvanized Steel Insulated Roof Curb $200.10 Quantity Unit Price Factor Total Installation 100 x 166.28 x 1.2034 = 200.10 New curb for relief vent. 52 07 72 23 000047 EA 42"Orifice Diameter,Spun Aluminum,Stationary Mushroom Gravity Ventilator $2,220.22 Quantity Unit Price Factor Total Installation 1.00 x 1,802.53 x 1.2034 = 2,169.16 Demolition 1.00 x 42.43 x 1.2034 = 51.06 New relief vent on roof. 53 07 92 00 00 0067 CLF 3/8"x 5/8"Joint,Flexible Polyurethane Security Sealant And Caulking $83.00 Quantity Unit Price Factor Total Installation 0.25 x 275.88 x 1.2034 = 83.00 New caulking around new rooftop curb. 9 P Subtotal for Relief Vent $2,657.76 T&B 54 23 05 93 00 0016 EA Balancing HVAC Duct System,Ceiling Height>12'Supply,Return,Exhaust, $1,964.91 Register And Diffuser Quantity Unit Price Factor Total Installation 40.00 x 40.82 x 1.2034 = 1,964.91 Subtotal for T&B $1,964.91 Contractor's Price Proposal-Detail Page 6 of 7 5/20/2016 Contractor's Price Proposal - Detail Continues.. Work Order Number: 038333.01 Work Order Title: Senior Center HVAC Supplemental Proposal Total $335,681.14 This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. Contractor's Price Proposal-Detail Page 7 of 7 5/20/2016 • SIQC Subcontractor Listing THE GORDIAN GROUP Date: May 20,2016 Re: IQC Master Contract#: FLos-o22912-SCD Work Order#: 038333.01 Owner PO#: Title: Senior Center HVAC Supplemental Contractor: Shiff Construction&Development,Inc. Proposal Value: $335,681.14 Name of Contractor Duties Amount cyo No Subcontractors have been $0.00 0.00 selected for this Work Order Subcontractor Listing Page 1 of 1 5/20/2016 ,_,.1 .iiilh 112i-52211 IPIAIIIPI! 83 pi ,.,9.. .;g1-,5 `ygj -'-g' 23e°:$4ia In I 1- o `o N -3 18_,S5 Ti --51 :'I'0,1••F s=o,5�Sg+v'>? 2 S4`a'41 0. O g t o2 ; ao r l�h 3NOZ 5 -3 = ��y - g Z y�®°i'ja[S� N � g� o zr 3 e o - c_�u :.- -;gfa ?" =3T°'3 ¢ :` l%g Fe zx w , 8 q = p a p t ` i a3i =�a wp Q 1-a 3P- `99.ii6115h2 i.61-2322 I e g S b Y'gg ?g Vg y — • g;! - - jgg Ae gy gg a J as�r 3 '' e olm,i:`s`ie a4 8 O e pera : F. j'I� P X 9 8 Ei u u !hi i " Li ! g 8 �4:0,S pa r---" —t I e Su Y_ a �aCC ;' 0 88 pQyggS BNa&6g 10 - aa°. 3 7•'_.__. �. .. ..� ._ § --E 1 - —:.:::..::.....:......:.::..:... --_ ===i u i 1-------_____i I ttt ii O .y' `.`O`.`:``.,,,,```.:s:.`;0�.`.; All Y ,.- t ;-----If.- y/. :.` �. *`,fit '.�; p 5 ,II ,� r:Q.____ -- '' ` •iS fit:-` .�j:: S "A I$ ri ' - r'`'ya; `- = a 1,-,,,'-':: ;-?:,-Ig .1g1 ::: n'n in-g:-- uuamTm-tfa u'mmawuwiuummtiommltnnifimna -`' .. .. :. . ... ..:....� •. _u s-�:_; : ,-I e .r Li , r r i A 1—------L= ____�_-_ . Il yy 1 8n iii' 7• 1 r�r 9 .R 1�i7h�� Ii 8 i L_'._:1.. _ • -- � -� d n ,▪r F ■ '- �•!O -- O uA� O 0 ' O ■ Ri u Z 1 .i • . • Q... ...-, ,a I kin i .„ , .,.: , . , .t , i i , Eg .,..„ , R• x:�•y� U I J� • Q i .-....:j. ,Y \•r .b• I r.' i a • i U :� . W ®mm®mwum•Imamm®Iml ® (`] .—._... ®Imwam® G. o a o tft ?"�" r` t 'mss - p_ o • .5a' g a,'y o _ iiggas • gwmmu,+mommmmma!u!mw relmmma!pnmomn+naa �lm = ii mtmnmmm7ml��amwulmm n�n• --pn] . Ir zi 1: 1 �ooc ';":';,:,gip 1=kn2Wiglinl llIGl4 gliiiJiwiiiIM IIPPi INIONO IIICpIZII1I BIL4I10191:au»�aaes: s8■= i . ,! is II - - • c !i;!3 ?a 3dy 4 _ f o f, cy3 l7 SF� $3¢ �ps Z C Q a >0 p eZ iig °; =,01,,ee:a ¢9.§.1, 1 j� ° a<o a °_ x j5. as ° ' � 3 3a:. r�P w ce a w um •,, "..�, H JJ rl li )h 296 & ;3X .3 ____ -�I __ - -gip- _�lC.,nI — i•i ,11111 R .r.® a !�I 'IN • .. — � 'it •• is - ------------. _ ' itea. !' - g — im l ' i; A :. ----------------;Itil LED 1 ' ----ta--- --■ MIL 111611111\ . Ilea I t--------------11 i _ z d,, Q a .eas • -f;� -----..o 1►`1 -f.le 1 z;6_ © �iiiI .. .. ..... ... .-. �� ____- 1 o z o �� y O y '0 6.T. Y G N z a - o O p O O p O a — Q J gg _ a Eig & d z• Y -I m w O - gb p • tl O p O y O p O •�& - ¢ II 1 M- r. y Y • i 1 • ,, r 1 r: o : 0 p • 0 - O O o ! ) ` ii4,! :!• '; ,, - M /pl m ! ` & 2 . c. w 1 - 2w o w, ,o`,£ § q! /G1 §§ ) ; ` \ \ - a / = ■ \( \ 4_ qr; y J Ems. h § - E /\ , \G ! / 2§§ i; /j/ ■ $ r cg 6 - _; §, ! . ). !\ ! $ & _ -- ƒm, • J� w _ . _ g/\ gEj |$]$ , . - _ i §| _§ dƒ\ )b |;$|$| , ` ® �) �� -/ M \ i �1 L'_-_-_'_'_i j }�{ 1 \�! • , el s :13".§ ® 1| $( k 1 / I j / i \ �� }� Nam .�(ƒ�( \ irry |. I z , ' a. : ? a ; ,- | :3 Alli ! I | 1 I | I I I [ --- -- _---� L � --_______ _„ ■-____-________ __-_______ = ! . i a i;40 Ai !' g 1_1 x C-. 44 E44g .'2 :5;n5 112Wlli" 6 1 w ,st!, da--; ,,,si r.511- ,q 0110§.:le _'45.tliP4—gg w i g „h, -Hill ;1:-,&I Lo fiiliodzsi7 z G 0= 7( ZE ''-, n V 5 Z.1 6 =E=, 10!..t m..12: ;0: E gi4sgsaisi 2 . w <33 ,>) 8.,< •.- ,,, ,. . ,,-_,_§,t .. pi..e, '_'0= 8=343 Z 8g8185;80 E2' Hift 8 VI "C'd 8!g•_,>5t qxr Aiit 8_,,3p VW TP-1 , pEgw, .1.182.4' ;21;x:g1 yg;t1?851 ct i' P.:1 a 4 „ ,r, , W--- il, %iffllifq ;40.05 3 < El Lq 2 @ "te"'.-- 64- 0.7.Y0- -66'i 1 e,-5 0s2i8v 902A-,>>2.22 i,g> 11.1,at ---A- igig-t!Itl AIMLIn2 giohlalts 1 2 ,,,,,, ,,,. •,.\- 1.15 r i' Igd id g X g. it Nqi 4 `i g4 8 i -- g- gy, V !' PA 2o agi 5 i?. 31h.i R g g 1 ,..4) *5 4N-1 FM g 4 n .43 f.,s5*,?.„, .- 1 ' i A r- gx 102 ,',6,.. 42 8 26 togi - q eig " PP iSigg < §15 i A 8L § @ ill N lirigl id d . - - mgg , wgig, Oi x. —1 05a c:loctirsIdisl 7it x 1 5'6 J i; '4 grg ;IgsE. g -E § d 6Ag 111-gg R i wr Atvial c) = VgIggd a , z ggg ,I,E 4 20 1 ag. g°A Y i q' ell"gg g; 6 c) gii Z. r' -1,ne6.e-ew4,B 2 i .'. g! 5 0 ' i: 5gglfrai !w % 't 8 g 4W 4 h 00 ,g100 r ig g 8 4 7 s • i - i •i w 1 e e 8 ! ;i ' 1 t :;gl'i ig 1g 1 L. • I 8 § A s s _ b g Fi 8 .-3 I EL] I .1/. ,. 8- ; '185—, ilngiWi . va - 2 ,g.82.3 V , p 0 z g :. qs A IA gi:Id 1 E5 1! 0.:P:fi , cn 888. . a 2.0182,N222 0 .A . ,2222—,- . . 1 . . I ! ' 1 . i • g F,' A 1 1g g 1 i . 1J,1 §,1 i 1p : . A a= , 8 88 @, .1 Vg Li.)Lii g $ 411 i- 0 p 4,, i..!.,-,..i. :R — 51 g . I-- q g .. 5p ;! k!kk 1 ' 'p--1 g i • • . !,i • " if 0..., . s. .1 -1-3.q . ii010!;12- Yr Aliii.!Ok!!Iiii!011,1!1.R2 w w ...s> _.. .... 0= a 5 i§2 2 a, ; ..5 .1 :!..; , g Ig, : _ E—. .. ' . 1 s . 01 H ." • ; _F,; q. 4 i . - g 6A ig,d,1 ki!188.88q ,..m0v; -sg-- g uE- 5g= a i ?,-..- "6.6.-• I i i —, ' 0" g`010 1g- LL1 13-. lqii;9 q 5 Pi;i8111g01/111111111! Hig!iiiri ;61W i IliAgg.1 6 RIg!N15 515 5.i 1 gi$51i! ., g 3 }7 AS 8 se "SKa` gg _ -Qi a 9� i/2 N OF W tl� a z=e :g9 co`3n y Z As`3 :999`s�I Z o ri o� a < N L�` 0 8 E-1 is.,a , z� $�^fi ::'"=�' :6 Y°A±g 3" s N G °i w i o u E g F'1 - 1311 WW1, a la* W a �w �a �� V 9440 4:2;f31 =3 PTO-d 1 i P ab ci + 3 t h�r �® 1g !, 12 : 1@ 3 0 g a \ ©L•/ O \@ e I V a p CX B g ggi 2 1 i 3 " 3 a S xD ^ S 3� — 8 n=n=n d=in° =n CFO 0 'pry( IV 1' pa _ a Rh 8 99 sa $ 5 �, R 0 tA V ig 3 �i "# e Ey @fie ® !9i F /I p 3 b 1 1 ca uJ ^� �n8 as 9 ¢ X ' U d G. deg Ct] ib �ly%!,/ 8 I, b ti eq U col VI as x i 8 i ii tg-gg! .1 V% 1? Tr 1--; artiRF .Y.02P1 Opp ,.. _ ,,.., E, a .i ='74 . =-__ .1 &-p! i,g1:1110 ..!,i4ii2vEp , . cd ,T.,`C, ,,./..k, 2., 11 Li-- _. 3..15--fP :az ' i ti 0-4t 1,izgi tri 8 wn 6 Lt, O 'Int e AFA ''1"g ig'26,a E ii,lli 1 ili ff,-5 . ,Oh.i. gNik'E, ,, ;v.,1 ,gv;ii 1;.A Cu ., ..1%'' ,1--_-h '].., ;- i5v-kr,, e .w '0,:_-■ 5 ' re 13- 'jc ' 1' Q", ' '*' W-- Nig! '' 11'001 gll°8&RH4 'L'a O i t,., —.A._ !MIMI 411111,4 liglillall 4 z Q,z, L9g156 I— 7 aisi iii _-. .--.. L - -.'i..1 *it w in g4 r-.1. - 11 ilW1 - •• .-1 al 0 XR ,4 ,a, .‘ , g . Eh 1014 I I—-------i-I i- -I 1 IR 1'40 i 1 : E i I i : ;t 1 I liEff , ' 01 •. 1 z ;:g i v• - .:, idgv I i___ i 1 Egg , i I__-----i 1 lug4 ,' . . -----_ , 281 / 1! ; --r.? OL r ;i 1 I 1.--------41 (----....,,,.....„. . -___ • . ; s ------:I i i---------- ! 1 1--------4 I I1----------4 .1... . •■ ■., .... .if !--..is....--as.—mow.—cair■.--.w,i—ma , ...1 1 --------------if IRosougnim=uumarnuoi.: .- ''.-.:-,:;—,i•-• ---i'rEB,..,, 77, 10 1 r It 1W T, , : --• -- \--MI . E , i i,.--_.--------_H.. I r • I .7 I It.____CL.____, 1.1 ;, r:, 0, .„. -:. • II ---: . ; § iI i E i 1 i I P . 1------7:- .'I. .-----' -7''' 05 0 11---, !. ----g - :11M01101001111870101101WIEM001101111101111110110011/11111180Thn I 1-----------.1:1 P-N I 7tai ,11-- I:. 1 ,' r: - I 414 , .. .._...,.. ■■ 1 - ;---- . . ---------,1 , I .3 --_ 0 ' 1--- ---1 I 1 - 7 I,...-....v- •_ 1 8 i ._. : I I I ; ! t - 21---------11.1------------- - . I 1 I 1. GI 0--.co , ■ ) I i CEI o E 42 I I I 2 { r'i , , , I I _ .-. i g Z •et 1 7 ±_10 I. ),_1 0 0 0 Z 0 71 ..1 'I 1 I il ' I i Cr Cg I ■ -. ' ,. W I .„..._......... ® tr— -----,, .....II momuumiommoutomummommitm '4'esammonum k; \ 1 cg o r I- . . iiN !' 4,. I go ., \ ...4 Gu '' !2pz i 1 1 11 2-:=1, ,.., i gg 1 7 -------- 1 , o . 7 ilkal .., ,uommmuntamiummi '4111111111pannerumumozaTuntanommatourmommiommasmornmolmanntoorrur :II- rn.- c:"1111111111 NTIIIII Imb, litY la 0 : a 7 J., es' . Of 1 El - m rty ( , 1 i g ,1 0 1' L '- e# - - 4i ,..I. r. — -,.- / • c. 2r.„ r, .'" ml --k-':.1 . gq15 't 0 .9 1 P- R• i■a I: t _: ) kk . '• , !,0 I / r tr..,.q. . .....■,.. ..,m■..........,■......■■........._Le■:,..,..,L■ 1,,i s . ,,.: i %,ai gi. gl-I0 11 sii 0,1 , =_. in;:A aa _..i.2p, 312VPIApii . j ,, -1-N t i u g 6 16. 1 gEgg.2, F.,.4big.-2 a <IvpEli,v 81 W 2 !ilg4i4 g= Tf16:-' 11;111!- t; 1 - '. _... _ 5. ,l'Iiiiii gifli;ivi lill p 1/1. _— 2N44 :Ilh6li6.n ial 'hi. A 2 ,- 00 e; i PO VZ 2 E.1 ;I g 827 . 111111111•1111•1011101 1 I t------------------; • / i ---H i /° h Ei i 1 rm./ ; G; ' k ----------------: 1 0-------------- L.: ,N 1 1 ,T., ■0 Me ' ',..._:0 ' i k --—--—-ij ■■ "---."7---"'""1 i t--------- !! -------, b tiI ° \/ il „ . ; ti 1,.:FAME 1 A 6o 4 __. 1 : , _ ...4. _ p i i 1 I i s I :H ean ,,R j ' :fr.----.--•-4 AIM ' ' '' • - tL F, ---4; L .1 L e g 2,5 f—- ----------- '' =1:te t• --------i; .;,. . E a 0 • a hli. - • ,r, A,'0•-•■-41 . , , 4-------------__I/ .1k It' i ' -------------:, i 1, v 12-1 i•--------- ,, P i r, • ..1 C4• - G4 co ,I1V N a . CZ O. © © E © I © '01 ,g1 8 .iix g .Rg-= 0 : l■ T •go gatts G6. r4r21 a; 01,20 . © 0 © © 0 © ,z z \It 0. g : ° © la' © 0 © M a © °' a " - q I II A yL, ;I,,,, ,Ifr 4.0! _ !.,',, ,, Pr i -.1,g 0 , . 1 ;NT. litol I. ,1 r, gin 7. 1p R 4 1 4i4 '' '. z t, , , : .6 _ i -i,• - d-.;6 :'• ..: 2 2.:_ 2 ,,g i @g@ @IV 1 hiP10,i.del 81 I 4 1 .,i1 ell :;,., .. w 5 I Y /1011 i i 1.41 1 , p61111.A g 1,,g ; 1 , thol l ;R o"8. 1 0! Ilia 4 'Illegii5 li !a'i i ' g° Th 1'441 2 -=' i i,rAkiii ;,91giloinii 1 Iii0 WO i:i 'g t!„,, w,,,,i .,04,! I ;.,., ....,4 4 4 0 @I@ •ea 0.oe gi lij 4«A'0 i cir . n IvA4I3g. te ia�p���g°js ! , eaero ° B [ ut €aef 9 .azgy' Ye Z Ym s5ay: O o C i z a S. h <$`c, cLLn _ =fie yip a;s; e2 �:p8a.� Z g @4e U1 C = 9z 8k o - -- E :� - ;#�E•yi •.yg Ep's q'3Y 3 - ��'S��e5 C - v u_< °�' , U a tl3 s :SFi°ge�[j�3 �cr �¢¢�-9(F(a - w Y 9 i � �4$$$��'."a'@ @?e �6b8�sa��9E��3 W Ba 2i �be a ■a7 blN 3 i �,� iii i is ?'.30r�iaS�• F ��4 �P�i3a� pp�4 �B IF _--6 e i ' 'SSSSSSiS � Aae �EgAiS b , gi7 vl - o! 3 ! I I - I I raa� CY2°Y 7a y ge p v P m"s si-- _. : ®q Y�l3y ASe $e s�� [._ -j__I_r.._ 8 a � ! e 1 °I TI'I TI s s a a R r l l R 1 1 1 1 1 1 ° I = ENrlri - r' g s a..1I 11 HIH 1 = W/a 2e I [ e l e II II ��- I _o I I iz � a a i e s 4 e_ i ufi a gy aSAe 9 gg ge S"qaC n. [ ; 3bY x ���e gg y9 Ig � � �•� �e�p P RL I._=_.I.1.a`al�l°rlolg _I S i g�eay�4 � 4a I� g fin• 0.� 8 a 4zfi:Y6 s k ai! g- I q■ 8 8 8 8 8 8.- G><7 a `<• - - -t: i t9ta�Cyy[Z rYe.eY: t1Y � - ft 8 8 8 8 8 $_i .. YMr332y?i[35�.' .!?�e5s'2 5181 1 M3Bb�i Ae��A� I - Y y psesio?Yi:.v i[jp� j� _a ----------- I rl Iii ) 88I I 18 1138888! e•_ IlimrrH Y II' =I= = 8 P. `� +1P/ R[R[P. //V [i R[I[tL Iv _ 5 II 58' HI I l_I J _ w I_�_ l .x18I l _I [ . .r ul.�i u.l u.m ..I �HU P ° W(� 88 aei[[[e•I[I[I<ileieil l l I I __ ___ L_ - __ 3e?v[;r46 S6;6G6[i SI _ L_ o�A: a w615zR656j516516i6;61t l Z 8 ! '.958`;u:py 5a8 58 - 8 S 88859 33 'l3: ?99 88t yei;-:a[ :[R5IY I t • Q s��1 9 11 B 934• a• i. ,y@ b 11;1:_Y k �i ° $b_ a e � p 4 • � 8 ll�T�IH Y a� pep j! f k F n e � ■ n�3g" b alygse 3 n Ee c Y � $�a@ f"� tl a� k ! I- `uq��an ° pg e g � �� "k aCtlpQ $� Ya a� a Yag A Be e @ a e bg8� a g�Y '@ Q �a f,� ���a°;� a A d��_ [ Q 9� ■` B ff � q � • R�®�5 � gq �� 8 b• g p- s� Y � eks jg Ad! a �° [5 #. @ 9�� � ! s b 3g ��� � �°g ! ��8 �e����@ k�• ®��$g� � � �� 9. �- '� 6° BLi� �� Y�e� @e. E.: 5� �{ ! s a z a Y a y ® 4 A g fi-9 p$ Q 6 2 ■ �de a e ! s 9j 8 AE■ @ �E a9 9�y •��■bgy9 g 2 ®•' A b a SI i "2g/ii iY °� xe 513aA 4��: k°e'�a=Q �8 c'8 I .e�� a! �: � s.g � �� �■A a•� � B < €g���6�°A�33 8�g � k �b! E � ��' yg � �A�� a. qa s�l! a �"k �aa Sq Y g �g` ga �• �Q� a g E'�■e :`gypp E�pp�e @ka"� lea i�� a @ g� gq a b 5°8 d a� 8 15■�0 ��P� b 5�d 4 i8�e6 �" d�e�a k 9 tl U � i g �'gAr A�A � � g � �ggi��aAyy 3° a-n �!° � g� p Ei r a ■. ��� j6 g 5 a�! 8 t ■ Y �� 4 are'■ �`�a i? � s 5m 8 'q 4eg a � $ @ e k � �aY �fi aR ��say a- A �� �- @ �$ Y S � ! � y ��� �A���g gs�g 7 s� ���- � ba ge �� a� °�g� a� .°fib{ � ��y ,z°��i ■ � Aa. y @ a e ss !y P_ Ye Yk_ k a @ @� E A a e fig$ sae@ ! p�n @ gg■ �� �d d ��•E�` a @:k�tl��4 b @d5 ellf �9■Fa? 6� �C�� 1 �� d�la k■ �P � � .� e 4 q a�•��_$�y ��� �b�b pC9 d 8 aa ad " "3�9- �A fc� a g2c g ppSSS Z;e! !88� 8-6 ea3l� 9gq a a gpddd @q ' p! g !& 9 e■: si °° �_� R �g a■ C�g � l�xi 4- � ga¢.: k8 ea_ S@g�si qp� �_ 8 � ieA � iddg�.� �� ]d (pQ U Yge!��16�lq� �� @ dg S ■ � `a3 g fA '°@ y >5�5° �q�Q�& �e�� ����8E E �8 a5e i @,�� � ��;g�� � aag e.:.A� ��@ !4e- de■'� s gga39��9p fk a b e°k Y e°A � °�p��•a �a�g i gg��° A-�° a 3 �� eA i °�-°! � @ ��� ■ tl � �� ° �A ��s_g' �@ § e F' cg tl g laaf�v� � '��3 ! A k �■gg ��`B a!g ■@ �6S fie@°-@� fi®A■ �a �9 g� 3�S '�� k@44tl @ �YCA��g e���� ■ q���8 r ��g X4$9 l��d C�� " ���g a��.�� �� ��s � 3�g a. �:g i?g i ��:- ��.k .� �°a� Q 9�ae �■ a r �A @■ Agz� � ��� ���Pe�aa�e �f � g �9 U: y a b emos2�a ■ ei be a e Ped �A° a■ i�A g g� 9 f c Ya��g � �� gA Se2 � i�q9� ke !�� 03�� gg@ g qgg g C y5g ■ a 9 y! a gg�gg � a @ � 0g ��g§§9�a� a 9 � gk �. .l�- �'j-Y �,7 , 4 �i�E9 o■��YP3�� a�� 9g A� 955 9!A�gs 9 @� 4agEs aaa ���� f�A� a�&i�A9!p��a�������� !a6 9�3��g����c ��4 991 aA: f35��! ��y���9 Aa A�9leY��m��A2 9�?� 4 r1 .MMMMM. L I 111 EA'li I • 2;' 1 '1 E=H-0' lii 1111 lei lai 1 1 tit:i a L J T i IN i 1 Al 0 wo,A18.1 • •' gi El 1 ii. .1 q Is - .8.9 112MElaii i 1 !iiii ;1 W 1 i 01 N i i Wii 12, , i1! in .., .i. ....0 1 1 4;41 1 :: It, 0 01106 : e • i 1 ;44ig t4 . A 1 a„,\ bri i „, ly..ip i ilvi §i -,-,.--„ 8 ,,..,—Irmimaq. , no HI, di i i il P § !iax.... : .ing i i iIti! i? 1 1 i vrig !! i 4/ 1 6 6120 2.6 ! \ 2 w,i gl g i i'_! Wri2 41 8 g -6,Wel.-18 I '0,30,16. 811 i OW ;6i 1 1 1 i.° rg2gq q8 - L ___ ___ ___ J 6 6 i . . 1 1 1 Ir , , 9 , i 1 4 11 „k 1g 5 '.4?.i SO 2 2 8 1 r 5 IV, ' h g. tt VW1 ° !! 11 g 13-00;:xxxne st: 61111 Li i ii ii g / ■-• , is :,f 1 I. 5 4 i 1 g ° •i. 8'61 g' i A 0- 3 1 •:. 6 1;20 i I 12g V ' gV! i' 411; i 3 a , g 1 3 21 1 1 5 .T.,. r/ fc8iP -a g g i il P 4 2/ 0 ?AM 5 LI 0 • I h 'i !i .si F, .,. • 'Y ; !i■ 3:- g '' 4 g_ il g Li NM 1 ag Al - li i '3' i 4 ' ii , hot i I II,- 5i54 2 li 60401 5144 8 3. . tq. g .4.-- ....1 mil 81,:i PM 111 F T lir ; dli li's L,' 2 111 !ill ski, 1 q !I . i .4 1 UR IlEI 1 :qa 2i d :401 . IjAl hi i ig'n =I maw... 7ii,:l ilt -, 111111k 8 i41. ti Illtr. 1 Phd g ww— ' 1. iii:li :!Axt p g A P Ni;i2g 8 i IMP. i 22 2 q,4'Alg 6 r . ; Floilvi / ?nalM 9 ; 13,i, s