Loading...
Exhibit B: Revised Cost Tender Form EXHIBIT B Revised Cost Tender Form 5 ADDENDUM NO.2 REQUEST FOR PROPOSALS(RFP)2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE(PHASE II) APPENDIX E ..0. MIAMI B Cost Tender Form RFP NO. 2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE (PHASE II) DEPARTMENT OF PROCUREMENT MANAGEMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 6 ADDENDU REQUEST FOM R PRONO.2 POSALS(RFP)2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE(PHASE II) • Section 1 —Certification The undersigned, as Proposer, hereby declares that the only persons interested in this proposal as principal are named herein and that no person other than herein mentioned has any interest in this proposal or in the Contract to be entered into; that this proposal is made without connection with any other person, firm, or/parties making a proposal; and that it is, in all respects, made fairly and in good faith without collusion or fraud. The Proposer further declares that it has examined the site of the Work and informed itself fully of all conditions pertaining to the place where the Work is to be done;that it has examined the Contract Documents and all addenda thereto furnished before the opening of the proposals,as acknowledged below;and that it has satisfied itself about the Work to be performed;and all other required information with the proposal;and that this proposal is submitted voluntarily and willingly. The Proposer agrees, if this proposal is accepted,to contract with the City,a political subdivision of the State of Florida, pursuant to the terms and conditions of the Contract Documents and to furnish all necessary materials, equipment, machinery, tools,apparatus, means of transportation,and all labor necessary to construct and complete within the time limits specified the Work covered by the Contract Documents for the Project entitled: REQUEST FOR PROPOSALS(RFP)No.2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE The Proposer also agrees to furnish the required Performance Bond and Payment Bond or alternative form of security,if permitted by the City,each for not less than the total proposal price plus alternates, if any,provided in the RFP Price Form in Section 00408 and to furnish the required Certificate(s)of Insurance. In the event of arithmetical errors between the division totals and the total base proposal in the RFP Price Form,the Proposer agrees that the total base proposal shall govern. In the event of a discrepancy between the numerical total base proposal and the written total base proposal,the written total base proposal shall govern. In absence of totals submitted for any division cost, the City shall interpret as no proposal for the division,which may disqualify the Proposer. Name of Proposers Authorized Representative: Title of Proposer's Authorized Representative: Signature of Proposer's Authorized Representative: Date: State of FLORIDA ) On this day of , 20_, personally ) appeared before me who ) stated that (s)he is the of , a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed.Before me: Notary Public for the State of Florida My Commission Expires: . 7 ADDENDUM NO.2 REQUEST FOR PROPOSALS(RFP)2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE(PHASE II) Section 2—LUMP-SUM GUARANTEED MAXIMUM PRICE REQUEST FOR PROPOSALS(RFP) No.2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE FURTHER BREAKDOWN OF LINE ITEMS INDICATED MAY BE PROVIDED AT THE DISCRETION OF THE PROPOSER TOTAL(QUANTITY ITEM DESCRIPTION) (QUANTITY,UNIT UNIT COST X UNIT COST): 1 MOBILIZATION 1 LS $ - 2 DESIGN AND CONSTRUCTION ADMINISTRATION 1 LS $ - 3 MAINTENANCE OF TRAFFIC 1 LS $ - 4 CLEARING, GRUBBING AND DEMOLITION 1 LS $ - 5 REGULAR EXCAVATION 1 LS $ - 6 EMBANKMENT 1 LS $ - 7 HANDRAIL 1 LS $ - 8 2-INLETS(DT BOTTOM,TYPE C,10') 1 LS $ - 9 1 -JUNCTION STRUCTURE(8'X 10)W/MH COVER 1 LS $ - 10 1 -OVERFLOW STRUCTURE(8'X 14')W/ALUMINUM HATCH 1 LS $ - 2-QUALITY TREATMENT STRUCTURES(12'WX16'L)W/2 MH 11 COVERS 1 LS $ - 2-WET WELL STRUCTURES(12'WX14'L)W/2-ALUMINUM 12 HATCHES 1 LS $ - 13 CONC PIPE(CL III,48"CD) 1 LS $ - 14 CONC PIPE(CL III,72"CD) 1 LS $ - 15 CONC PIPE(CL III,96"CD) 1 LS $ - 16 2-48"HDPE FLAP VALVES 1 LS $ - 17 2-32"HDPE FLAP VALVES(FOR PUMP DISCHARGE PIPE) 1 LS $ - 18 CONC ENERGY DISSIPATER(5'x7) 1 LS $ - 19 INSTRUMENTATION AND CONTROLS 1 LS $ - 20 ELECTRICAL(INCL VFD, ELECT SERVICE, ETC.) 1 LS $ - 21 ELECTRICAL AXIAL PUMPS 1 LS $ - 22 SEAWALL W/OPENINGS AND MANATEE GRATES 1 LS $ - 23 CONC VALLEY GUTTER 1 LS $ - 24 CONCRETE SIDEWALK 6" 1 LS $ - 25 GRASS PAVEMENT(GRASSPAVE 2 OR APPROVED EQUAL) 1 LS $ - 26 BOND AND INSURANCE 1 LS $ - 27 ALLOWANCE FOR TESTING MATERIALS 1 LS $ 50,000.00 $ 50,000.00 28 ALLOWANCE FOR CONTROL CABINET ENCLOSURE 1 LS $ 100,000.00 $ 100,000.00 TOTAL MBCC PUMP STATION OWNER CONTROLLED PROJECT CONTINGENCY 10% OF THE 29 TOTAL MBCC PUMP STATION' 10% TOTAL GMP MBCC PUMP STATION CONTINUED ON THE FOLLOWING PAGE. 8 ADDENDUM NO.2 REQUEST FOR PROPOSALS(RFP)2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE(PHASE II) ANY LETTERS,ATTACHMENTS,OR ADDITIONAL INFORMATION TO BE CONSIDERED PART OF THE PROPOSAL MUST BE SUBMITTED IN DUPLICATE. WRITTEN TOTAL: PROPOSER(Print): ADDRESS: CITY/STATE: ZIP: FEDERAL I.D.#: NAME/TITLE OF REPRESENTATIVE(Print): SIGNED: (I certify that I am authorized to execute this proposal and commit the proposing firm) 9 ADDENDUM NO.2 REQUEST FOR PROPOSALS(RFP)2016-042-KB DESIGN/BUILD SERVICES FOR STORMWATER PUMP STATION AT NORTHEAST CORNER OF CONVENTION CENTER DRIVE(PHASE II)