LTC 317-2016 Miami Beach Trolley System MIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC # 317-2016 LETTER TO COMMISSION TO: Mayor Philip Levine and Members of • e City Co fission FROM Jimmy L. Morales, City Manager !' DATE: July 29, 2016 • SUBJECT: Miami Beach Trolley System The purpose of this Letter to Commission is to provide a complete picture of the history of the trolley system and address some of the misinformation that has circulated in the community. I apologize in advance since most if not all of you are already familiar with these facts, but this document will also serve as a vehicle to educate the public about a program that really is a tribute to the efforts the City Commission has made to address traffic and mobility in the City. Chronology January 2014: The City Commission approves, on an emergency basis, a contract with Limousines of South Florida, Inc. ("LSF") to launch the Alton-West trolley. This was in direct response to the FDOT lower Alton Road project and an effort to provide relief to residents and businesses. Since this was accomplished in 52 days, LSF used existing cars form its fleet and no new trolleys were ordered. April 2014: The City Commission approves the award, pursuant to a competitive ITB process, to LSF for the turnkey operation and maintenance of the North Beach Trolley. The cost was at $1.64 million annually for five years, so as to amortize the cost of the new trolley vehicles being purchased by LSF. There were only two bidders on the contract and LSF's cost of operation was $15 per hour per vehicle less than the other bidder. The vehicles purchased were the traditional high floor trolleys used throughout Miami-Dade county by other cities. As far as we can tell, LSF was then and still is the only operator of municipal trollies in Miami-Dade county. The contract specifications provided for additional routes at the City's sole discretion. October 2015: The City Commission approves an amendment to the contract with LSF, increasing the scope of the contract to include the addition of the operation and maintenance service for two new routes, the Middle Beach loop and the Collins Link. The combined cost of the existing North Beach service and the two new routes is $6.2 million annually for five years, again to amortize the costs of the existing vehicles and the 14 new vehicles being ordered for the two new routes. The new vehicles that have been ordered are the modified trolleys that have shorter steps and will kneel to the curb to make it easier for passengers to board. These new vehicles will be used on the North Beach trolley and the two new routes. The high floor trolleys currently being used on the North Beach route will be used as spare trolleys and would also be available as extra trolleys in case we have special events. The two new routes are scheduled to begin service this fall. January 2016: The City Commission, after discussion, approves the South Beach trolley route and service plan, and authorizes staff to negotiate an interlocal agreement with Miami-Dade County to enable the City to operate the route upon the termination of the existing South Beach Local service by the County. The current City funding provided to the Local (roughly 1/3 the costs of operation) would then be available to fund a portion of the new trolley service. The Alton-West loop would also terminate and simply be serviced by the new South Beach trolley. This resolution was adopted 7-0. May 2016: The City Commission directs staff to attempt to revise the order of the 14 modified trolleys to instead be low floor trolleys, and further directs the Administration to proceed with the previously approved South Beach trolley route through a new competitive procurement for low floor trolleys. July 2016: The Administration informs the City Commission that the manufacturer of the trolleys cannot change the order and that the City would lose the full purchase price of the already special ordered vehicles. It would also have delayed the implementation of the Middle Beach and Collins Link routes until next summer. As such, the City Commission directs staff to move forward with the purchase of the 14 already ordered modified trolleys. Furthermore, in an effort to begin to introduce low floor trolleys throughout the system, the Commission directed staff to order 12 new low floor trolleys that would be interspersed throughout all of the trolley routes. As such, all four routes will have a mix of modified trolleys and low floor trolleys. The South Beach trolley is expected to commence service in Summer 2017. In order to achieve this result on all four of the routes, the only solution was to amend the existing contract with LSF to include the operation and maintenance of the South Beach trolley route, and the order of the 12 low floor vehicles. This represents an additional $5.1 million annually for five years to amortize the costs of all the vehicles, bringing the total contract amount for all four routes to a not to exceed $12 million annually for five years. Had the Commission simply issued a new ITB for the South Beach route, we would not have been able to add the low floor trolleys to the other three routes. f Ridership I have attached LTC # 272-2016, dated June 27, 2016, which has the latest ridership data for the two existing trolley routes. As you can see on Attachment B to the LTC, both the Alton-West loop and the North Beach route had their best month ever in March 2016 and their best quarter ever in the first quarter of 2016 (the latest data we have). According to Attachment A, over 3,700 people ride the two trolley routes daily, which is more than the South Beach local and Route 115/117 buses combined. The public reception to this service, therefore, has been outstanding. FAQ's a. Are the trolley cars ADA accessible? All of the trolley car models that are either in use by the City or on order comply with the Americans with Disabilities Act. Some models may be viewed as more user friendly, but all of them meet the legal requirements of the ADA. b. Who operates and maintains the trolleys? LSF, under the agreement, operates the trolley service and maintains and services the vehicles. The payments we make to them both cover those O&M costs and also amortize the capital costs of acquiring the vehicles. c. Who operates and pays for the South Beach Local? The South Beach Local is operated by Miami-Dade County at a cost of $4.1 million annually. The County contributes $2.8 million and the City contributes $1.3 million. d. Why will the South Beach Local service be terminated? The South Beach Local is operated under an Interlocal Agreement between the County and the City. That agreement expires on February 21, 2017. The County has indicated that it wants to get out of the circulator business, leaving that instead to cities. The City Commission has directed the Administration to negotiate with the County to replace the Local with a South Beach trolley. That will be part of a new Interlocal Agreement with the County. e. Will there be an interruption of service after February 21, 2017? NO. The City will negotiate with the County that the Local should continue on a month to month basis until the South Beach trolley comes on line. We anticipate that the trolleys will come on line in the summer of 2017; as such, the Local would continue until that date. f. What funds does the City use to pay for the trolley? The City utilizes a mixture of resort taxes, Parking operation revenues and Citizen's Independent Transportation Trust Surtax funds. The service is not funded by real property taxes. g. How will a person know if a low floor trolley is coming? The City's e-gov app contains a tracker for the City's trolleys, showing real time location and movement. The tracker will be modified to clearly identify the low floor trolleys on the route. h. What is the fare for riding the trolleys? There is no charge for riding a trolley on Miami Beach. • i. Will there be connectivity for the various trolley routes? Once all four routes are operating, a person will literally be able to travel, with a couple of transfers, from the north end of the City to the south end. This will mean that in the space of only 3 '/2 years, the City would have gone from zero public transportation offered by the City to a full citywide network of free trolleys. Please do not hesitate to contact me if you have any questions. Attachment MIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC# 272-2016 LE ER TO COMMISSION TO: Mayor Philip Levine and Members of he City Co ission FROM: Jimmy L. Morales, City Manager DATE: June 27,2016 SUBJECT: MIAMI BEACH TROLLEY AND MIA I-DADE TRANSIT CIRCULATOR RIDERSHIP REPORT(FY2016—2ND QUARTER) The purpose of this Letter to Commission is to report ridership figures for the City of Miami Beach Trolley System and Miami-Dade Transit (MDT) Circulators during the second quarter of Fiscal Year 2016, from January 1 to March 31, 2016. As illustrated in the attached ridership report(Attachment A), the North Beach Loop observed an average daily ridership of 2,382 passengers during this quarter. This represents an approximate 7.7% increase in ridership over the previous quarter. The overall ridership of the North Beach Loop service during the second quarter of Fiscal Year 2015/16 was 214,370 passengers. It is important to note that this service started operation on October 29, 2014. The temporary Alton-West Loop also observed an increase in ridership of approximately 13.8% over the previous quarter. The overall ridership of the Alton-West Loop during the second quarter of Fiscal Year 2015/16 was 105,607 passengers. The City of Miami Beach trolley system provided transit service to a total of 319.977 passengers during the second quarter of Fiscal Year 2015/16 and cumulatively to over 1.8 million passengers from inception to the end of the second quarter Fiscal Year 2015/16. In addition to the City's trolley system, MDT operates two (2) circulator routes entirely within City boundaries (the South Beach Local (SBL) and Route 115/117). This quarter's daily average ridership for the SBL and Route 115/117, were 2,467 and 484, respectively (Attachment A). These figures were based solely on the months of January and February, as ridership totals for the month of March has not yet been published by MDT. The MDT circulator ridership figures for this quarter will be included in the next quarterly ridership report and issued via LTC. Based on the available MDT circulators' ridership data for Fiscal Year 2015/16, the County transit service has experienced a 20.5% decrease in ridership with respect to the previous Fiscal Year. Additional ridership information for both the City's trolley system and the County's SBL and Route 115/117 for previous Fiscal Years has been included in Attachment B for reference. • Please feel free to contact me if you have any questions or concerns. Attachments: A: Trolley and Circulator Ridership Report(FY2016—2nd Quarter) B: Trolley and Circulator Ridership Comparison Report(%Change) teititti F:ITRANI SALLITC1LTCsTrolleywliami Beach Trolley and Miami-Dade Transit Circulator Ridership Report(FY2016—2"0 Quarter) FY2016 RIDERSHIP REPORT ATTACHMENT A DAILY AVERAGE PER MONTH QTR I QTR II QTR III QTR IV Route Name October November December January February March April May June July August September ALTON WEST LOOP 990 1,025 1,076 1,064 1,127 1,325 NORTH BEACH LOOP 2,169 2,231 2,234 2,293 2,403 2,451 SUBTOTAL 3,159 3,256 3,310 3,357 3,530 3,776 SOUTH BEACH LOCAL* 3,007 2,880 2,586 2,478 2,455 ROUTE 115/117• 559 531 543 44_0 528 SUBTOTAL 3,606 3,411 3,129 2,918 2,983 TOTAL OTVWIJM 6,765 6,667 6,439 6,275 6,513 Figures highlighted in yellow indicate partial ridership data of a month In progress. DAILY AVERAGE PER MONTH 3500 - -- - ---------------_-- ------ •NORTH BEACH LOOP 2500 •,ALTON WEST LOOP 1500 U 1 '100 „ I ' U , I ' I •SOUTH BEACH LOCAL' 500 /ii j , % ' ' 0 l • October November December January February March April May June July August September int DAILY AVERAGE PER QUARTER QTR I QTR II QTR III QTR IV ALTON WEST LOOP 1,030 1,172 NORTH BEACH LOOP 2,211 2,382 SOUTH BEACH LOCAL* 2,824 2,467 ROUTE 115/117* 545 484 DAILY AVERAGE PER QUARTER 3,500 3,000 - 2,500 rALTON WEST LOOP 2'000 NORTH BEACH LOOP 1,500 `ROUTE 115/117• 1,000 S00 •SOUTH BEACH LOCAL* QTRI QTR II QTR III a O E O = , , _ 0. N U U y w `^ Q N m . w -� m Z = = cc 4.-; O a I- F- Q 3 ZO o OO a Q 3 Q ■ • 5t • 3 CU 3 o94a icy cc co )6, a_ a '�, Let Let v at CC to 0 0 OO CTI 0 C' O `11 .-I III r: I d9 N W Cr 000 co 0 0 0Q10 .^-I ZI— _ �' Z — f0 1A N co 00 .-I M e' M y- 2 0 m 10 at N .--I co O H � P Y tei LL J d i V 10 o o ~ 00 /j 2 Z. a 0 0 0 en Cr u1i CZ Jib a C en N 0 N as a G c , ,I kj E � M OM N N M co N in 10 M \ JP-{/ w fa O u en N 0 000 aai 0 to N ZP to 7> a 0 en en .-+ r- oo .- 90 r N Cr 001 110 Ct O en QQa11t y d I > M 10 a1 000 .N-I O .�-1 �� a O \ '7G TO . a 10 N a1 NN t!1 N 10 �d a� .0 e0 tg y M 10 at m .-4 O �A 0 0 .1 N JdO c W ,i o CC 44 CL F. ° a% i W CL O m J m ��o E in Ea O O Z O +r tel t".5 ti v .+ o tea, 0 u u \ a9o)6 Lo_o 3 W W W ems.{ 0 CO t° t= 3 0° 00 �, 8 8 0 0 0 8 C z z = W 0 0 0 0 0 0 a t- F- N O 0 n n 0 0 00 1°0 0V O m L. f MIAMI BEACH TROLLEY RIDERSHIP (%CHANGE) ATTACHMENT B a FY2016 FY2015 FY2014 %Change* October 30,686 29,160 N/A Quarter 1 November 30,740 27,912 N/A December 33,360 32,570 N/A Quarterly Total I I 94,786 I 89,642 1 - 1 6% January 32,994 33,331 N/A ar Quarter 2 February 31,548 29,902 17,623 O _ March 41,065 32,413 24,399 I' Quarterly Total I 1 105,607 1 95,646 1 42,022 j 10% Y1 April 30,769 25,954 Quarter 3 May 31,246 29,984 O June 28,404 32,769 Q Quarterly Total r I I 90,419 I 88,707 I 2% July 27,779 28,346 Quarter 4 August 28,504 28,323 September 28,141 26,532 Quarterly Total I I 1 84,424 I 83,201 1 1% Yearly Total 360,131 213,930 October 67,247 3,705 N/A Quarter 1 November 66,913 42,551 N/A December 71,370 49,122 N/A Quarterly Total I I 205,530 I 95,378 I - I 115% T January 71,096 52,278 N/A W Quarter 2 February 67,280 49,020 N/A 0 March 75,994 58,790 N/A I- .0 Quarterly Total I 214,370 1 160,088 I - I 34% eeaa April 58,441 N/A m Quarter 3 May 63,340 N/A .0 June 63,631 N/A - Z Quarterly Total I I I 185,412 I - I N/A July 70,078 N/A Quarter 4 August 68,169 N/A September - 66,248 N/A Quarterly Total I I I 204,495 I - I N/A Yearly Total I 1 1 645,373 L I . *With respect to previous year. MDT RIDERSHIP(%CHANGE) FY2016 FY2015 FY2014 FY2013 FY2012 %Change* October 93,202 101,914 114,037 120,127 129,443 Quarter 1 November 86,401 89,271 103,363 115,609 128,727 December 80,46 97,376 107,172 110,258 124,541 J Quarterly Total I 259,849 I 288,561 I 324,572 J 345,994 1 382,711 I -11% January 76,830 97,480 101,064 117,354 127,809 6 Quarter 2 February 71,188 86,750 92,925 110,858 125,111 9 March 94,353 96,812 114,579 130,926 _ 9 _ V ■ Quarterly Total I 148,018 I 278,583 I 290,801 342,791 383,846 ] -4% g April 86,672 96,371 100,218 120,683 CO Quarter 3 May 85,562 102,220 101,181 116,184 = H June 79,288 97,250 102,528 116,068 Quarterly Total I I - I 251,522 I 295,841 303,927 j 352,935 -15% cm July 86,232 105,915 99,746 126,036 Quarter 4 August 89,567 108,677 111,885 125,589 September 84,862 96,357 104,957 117,341 Quarterly Total I I I I 310,949 I 316,588 I 368,966 I 4 N/A Yearly Total 1,222,163 1,309,300 1,488,458 October 18,526 30,669 26,978 29,249 27,784 Quarter 1 November 15,937 21,466 23,530 26,570 28,049 December 1 16,382 23,484 24,555 27,155 27,183 Quarterly Total I I 50,845 I 75,619 I 75,063 82,974 83,016 I 1% January 13,634 23,473 25,908 28,173 27,339 Quarter 2 February 15,301 22,108 25,770 26,487 28,040 .-t March 25,167 26,959 29,137 30,271 IA Quarterly Total I I 28,935 I 70,748 I 78,637 I 83,797 � 85,650 I -10%% IA April 22,251 27,785 27,735 27,542 +GA,, Quarter 3 May 20,998 26,693 27,706 28,587 0 June 19,581 24,477 24,250 27,140 OTC • Quarterly Total I I - I 62,830 I 78,9557 79,691 I 83,269 -20% July 19,924 25,183 25,354 27,004 Quarter 4 August 17,466 25,279 26,171 27,652 September 16,397 25,664 24,703 26,052 Quarterly Total I I I 53,787 I 76,126 I 76,228 1 80,708 N/A Yearly Total 1 1 I I 308,781 I 322,690 332,643 Figures highlighted in yellow indicate partial ridership data of a month in progress. *With respect to previous year. im e m * m . g * m • X v o 00 \ N N F1 8 p 0 o o �1pp 00 M M r/1 N In 10+1 O tD CC O N• I I I IN 0 Q T N 0 00 N M N N 0t N •F eV' 0 N Om O0O V1 tO tO M < t0 N N N N N N N N N N 10 O N 0 i N N •N N \ul m \ pQ\1 § N n n N 01 N M N T 0 0 0 O H O d mtp CVa 11 fA op pV to M In t0t N N (0V N N N Mt cm Ot O N f�1 (PY 00 01 t0 0 i I III .•1 .•1 .•1 .•1 .•1 .•1 .•1 .•1 1 to 1 n 1n 01 N O 0 N n No .1 t0 00 In N IN V7 NI Nn 1/410 011 0Oa01 o Go .•1 N M .a•1 011 N e•1 1 , • a) < n, v In • aa • �? . M N C M N 01 CO co In 1./1 r-` = N 01 N 0 In m N N N LO N t0 to 0■ t0 tC N Vi O N s 3 00 o CT N m a M et 0 V1 • N N N M N N N M �0pp 8 Q W • IN N V1 O`t0 D tO 00 N n C O1 n N t0 n n V1 Ot m m n 01 O N N m V1 m 00 M 1'N N N N N N N N a pppp aa t�pp pp tt0 N 00 00 W V Q1 N 01 Ot \AI N 1n N M M C1 V1 M N 01 N • • S V N 1 1 . t0 Vl 01 n Oo n 00 O O N N N m N 0 N Q)• •N N N N N N N N N �I C N� [} • • • .... N N 00 M N N N m • M ■ 0 M N ffi W ,T M 171 ,4 � • • $ 8 ° .4 .4 ^ N ° s W 0 PP' • • m N 01 t0 00 1l1 N to in N 2 r m ON0 ini 01 tN0 ..I In 01 N ONO • mc 001i 0)i .N•1 ■.m•1 .m-1 ••-I .N-1 N ry N Ln •_9-4 4 0. 00 0 V1 00 N 0 co co 0 .7 co to N V1 M N a 01 O 7 N n O1 00 N O n m V1 03 n • J �tO0 • d n CO 01 .N•1 .N•1 .N•1 .m•1 HN N .�•1 C Q it 4\glilli . I N L. m } fn H V C §1 N o t0 n n 1n ` Lr tOOG m a3 n N N n C) N _ c n n .i r: r; ri .4 Ii to ni 015. I c O N N M M M to C1 Z. . . . . . N N N M O 2 C 10 N co N 00 Ct < M I )) ' pop 8 O/ .0 N In, N N VI N .1 O n 0) In 1 LL di. • a$ nnoatcr moon I 01 O N N N M1 N V) N N I w Z C 0 ...1 I C N T 01 0 n O O O N 10 n t0 O a 0) 000 v1 n rn 1 E N M 0 t!1 N CCC N 1!1 N • 0 tO Q 1 0010 O v1.1 N N N 0) n 0 I O N N N N N N N N 1 1 111 Z 1 _a N 1 y L aa y y N 01 O .N-1 a (N i 0 In oo v_ 1 • 1 N p m 0 O O 01 N' .i M 00 00 t0 1 CI o O M N N M V N tQ t0 01 1 N N N N N N N N N :1 1 0) 0. E a) - Y > 3 ? ,) ' :1 z 2 1 1 g o LO N Q m N M 0 01 00 N t0 1 > O ✓3 a t\+1 N 'S O \ 0�0 n C y.,., ooa000 � 8 � 8 $ N N I N N N N N N N I N N L 0 00 • g § § O § § t 00 V1 .0 g N O L 0 d LL