Loading...
Amendment No. 16 to the Agreement with Fentress Architects in the Amount of $70,270 gal -Gus-5g AMENDMENT NO. 16 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, . DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $70,270 AA •This Amendment No. 13 to the Agreement made and entered this day of "IV , 2016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as "Consultant" or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project (the"Agreement"); and • WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and • WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and . WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and 1 • to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of $15,156,359 (part of Resolution No. 2015- 28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential •construction cost reductions, in the total amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the total amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the total amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18`h Street, 19` Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future; and WHEREAS, this Amendment No. 16, is for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works, and for the redesign of Convention Center Drive between 17`h and 18th Streets due to the postponement of the Convention Center Hotel Project; and • NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 16. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-16", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4: RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 16. 2 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 16 to be executed in their names by their duly authorized officials as of the date fir t set forth above. ATT CITY (:)F MIAMI B:ACH 7a-c-/I cu R fael do Jim 11% L. Mora es City Clerk �N�;��~��i City anager AT.T : / �' P ""' r GO,N'ULTANT: / // ��. ►jr \':.FE'NIRESS ARCHITECTS .1��� jam" �• Signature: 11111111 �i f =Sign'ature .INCORP CRATED: l r Name/Title Wr vY te /Title C Q Eltor, SQc CH a • APPROVED AS TO FORM&LANGUAGE 8 FOR EXECUTION city Attorney nrq° Date 3 Appendix"A-16" 1. SCOPE OF SERVICES 72" Stormwater Culvert— Refer to Proposal dated August 3, 2016 attached herein. Convention Center Redesign— Refer to Proposal dated August 5, 2016 attached herein. 2. TIME OF COMPLETION Per attached proposals. 3. PAYMENT AND COMPENSATION Lump Sum. Summary Project Contingency Added Scope Total Original Agreement $ 10,967,200 $ 1,096,720 $ 12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259) Amendment 8 $ 15,156,359 • $ 15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $ 25,436,700 $ 1,000,000 $ 26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballroom change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 • Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Total $ 25,436,700 $ 1,000,000 $ 308,087 $ 26,744,787 4 FENTRESS AHC HI TIC TS • tentressarchitecrs.carn August 3,2016 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 23—Temporary Box Culvert Design at South Loading Dock Project 20140021.001 A24 Dear Mr. Morales: This proposal is to provide utility design services for the temporary box culvert at the south loading dock. This work constitutes an additional service,as temporary conditions documentation is outside of the Design Team's current scope of work. SCOPE OF SERVICES: The City has requested an alternate temporary design for a 72" reinforced concrete pipe (RCP)storm culvert to serve as a bypass, interconnecting the existing box culvert crossing from 17`h Street to 18`h Street through the Fillmore Theater public parking lot,to the proposed concrete box culvert running north-south along Convention Center Drive. This work will serve as temporary storm drainage until the City can accomplish necessary utility design and construction revisions in 17th Street. • Task 1 Stormwater Route Analysis: o Investigate in more detail and evaluate different routes for the temporary 72"RCP storm pipe. It is assumed that no calculations will be required. It is expected that portions of the currently proposed and existing utilities will need to be relocated/re-designed and coordinated with the utility provider, Florida Power & Light (FPL). It is assumed that onsite portions will be redesigned by the Civil Engineer,while the offsite portions will be coordinated to be redesigned by FPL. Other utilities,such as chilled water, are assumed to be referenced and will be noted for contractor coordination and relocation. • Task 2 72"Storm Pipe Design: o Based on the meeting held June 10, 2016, with the City and the CM, the team will provide services necessary to modify and update the drawings, and related documents setting forth in detail the requirements for construction of the design of the temporary 72"storm pipe. Design will progress based on the selected route from Task 1. For the purposes of relocations by others, it is understood that this line and its associated route takes precedence over all other utilities because of its size. • Task 3 Permit Modifications: o On behalf of the City, the Design Team will prepare plan review and permit applications for the selected plan location, submit to City's representative for signatures and fees, submit to regulatory agencies for applicable permit modifications, monitor timings of reviews and provide responses for reviewers comments for these noted agencies: • Miami-Dade County Department of Regulatory and Economic Resource — Class II Permit Modification; DEN DC LA SF LON SH 421 Broatlwas 1 Denver CO 80203 I 303 722 5000 Mr. Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 23—Temporary Box Culvert at South Loading Dock August 3,2016 Page 2 • South Florida Water Management District— Environmental Resource Permit (ERP) Modification. • Task 4 Additional Construction Administration: o Civil Engineer will provide professional construction phase services for the added project scope. These services are as stipulated in the contract Amendment 08,to include visits to site, observation of construction, recommendations with respect to defective work, shop drawing and substitution reviews, inspections and tests,clarification responses,substantial completion, final notice of acceptability of the work and limitations of responsibility reviews generated for this temporary design on associated structures and improvement. SCHEDULE • Design Tasks 1 and 2: Starting July 1,2016 to August 20,2016 • Design Tasks 3 and 4: : August 21 to completion of construction as scheduled by CM. FEE Fees for all services will be a total proposed amount of Forty-five Thousand Five Hundred Twenty-five Dollars ($45,525). Reimbursable costs for printing, telephone, delivery and travel are included in the lump sum portion of this fee. Reimbursable expenses will be billed in accordance with the existing terms and conditions of our Agreement. Billings for these services will be invoiced under the heading#20140021.001,A24. If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects • Jo n Kudrycki,AIA, EED BD+C Principal encl: Design Fee Summary dated August 2,2016 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs, Strategic Advisory Group Steven DiBartolo, Hill International, Inc. Holly Carson, Anne McNeely, Mikala Casillas, Fentress Architects Scott Lawson,Clark Construction Company Project: Temporary Box Culvert South Loading Dock Miami Beach Convention Center Renovation & Expansion Culvert Design Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $5,700 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering(Lump Si Kimley-Horn 6 $39,825 Landscape West 8 7 $0 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb, Mech, Elec, Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Cost Estimate RLB 35 $0 Design Fees(Lump Sum) $45,525 Expenses 0% $0 Total Total $45,525 e Temporary Box Culvert Fentress Architects Hours Job Title Hourly Rate Hours Extension Task Management,Coordination and Oversight Architect III $200.00 24 $4,800.00 John Kudrycki $225.00 4 $900.00 Totals this activity: Hours 28.0 $5,700.00 Total,Sub 1 28.0 $5,700.00 Hours Total 28.0 $5,700.00 Fentress scope:Project management,scope assessment and determination meetings with City,Public Works,and CM,construction change directive preparation and issuance,permit monitoring,construction administration oversight with RFI and submittals processing Temporary Box Culvert Miami Beach Convention Center Fentress Project No:20140021 August 2,2016 August 11,2016 rev01 Page 1of1 Temporary Box Culvert Kimley-Horn & Associates Hours Job Title Hourly Rate Hours Extension Task 1 Stormwater Route Analysis Principal $280.00 0.0 $0.00 Senior Professional $200.00 4.0 $800.00 Professional $120.00 10.0 $1,200.00 Analyst/Junior Professional $105.00 30.0 $3,150.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 30.0 $3,150.00 Support Staff $82.50 5.0 $412.50 Totals this activity: Hours 79.0 $8,712.50 Task 2 72"Storm Pipe Design Principal $280.00 0.0 $0.00 Senior Professional $200.00 5.0 $1,000.00 Professional $120.00 15.0 $1,800.00 Analyst/Junior Professional $105.00 60.0 $6,300.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 50.0 $5,250.00 Support Staff $82.50 10.0 $825.00 Totals this activity: Hours 140.0 $15,175.00 Task 3 Permit Modifications Principal $280.00 0.0 $0.00 Senior Professional $200.00 3.0 $600.00 Professional $120.00 10.0 $1,200.00 Analyst/Junior Professional $105.00 30.0 $3,150.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 20.0 $2,100.00 Support Staff $82.50 10.0 $825.00 Totals this activity: Hours 73.0 $7,875.00 Task 4 Additional Civil Engineering Construction Administration Principal $280.00 0.0 $0.00 Senior Professional $200.00 3.0 $600.00 Professional $120.00 15.0 $1,800.00 Analyst/Junior Professional $105.00 40.0 $4,200.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 10.0 $1,050.00 Support Staff $82.50 5.0 $412.50 Totals this activity: Hours 73.0 $8,062.50 Temporary Box Culvert Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 4 August 2,2016 Total,Sub 1 79.0 $8,712.50 Total,Sub 2 140.0 $15,175.00 Total,Sub 3 , 73.0 $7,875.00 Total,Sub 4 73.0 $8,062.50 • Hours Total Lump Sum 365.0 $39,825.00 Temporary Box Culvert Miami Beach Convention Center Fentress Project No:20140021 Page 4 of 4 August 2,2016 Kim 1 ey>>> H o r n Miami Beach Convention Center Renovation KHA Project No.: 043627000 AMENDMENT NUMBER 12 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. AMENDMENT NUMBER 12 DATED August 1St, 2016 to the Agreement between Fentress Architects ("Client") and Kimley-Hom and Associates, Inc., ("Kimley-Horn") dated May 14th 2014 ("the Agreement") concerning the Miami Beach Convention Center Improvements at 1700 Convention Center Drive in Miami Beach, Florida 33139. The Consultant has entered into the Agreement with Client for the furnishing of professional services, and the parties now desire to amend the Agreement. Therefore, it is mutually agreed that the Agreement is amended to include Additional Services to be performed by Consultant and provisions for additional compensation by the Client to the Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference. KIMLEY-HORN AND ASSOCIATES, INC. Jorge L. Fernandez, P.E Associate Agreed to this day of , 2016. By: (Print or Type Name) Title: (Member or Manager, as authorized) lEmail Address) , Witness (Print or Type Name) kimley harn.corn 2151 Le Leune Road,Suite 202,Coral Gables Florida 33134 786.725.5700 Kimley>>> Ho 1 1 Page 2 Exhibit A to Amendment Number 12 • Consultant shall perform the following Additional Services: PROJECT UNDERSTANDING Kimley-Hom understands that the Client needs to construct a temporary 72" reinforced concrete pipe(RCP)storm culvert to serve as a temporary by-pass to interconnect the existing 3.5'x8.5' concrete box culvert that is crossing from 17th Street to 18th Street, through the Fillmore Theater public parking, and interconnect it with the proposed 10'x5' concrete box culvert along Convention Center Drive.This interconnection will serve as a temporary solution since no work is expected to happen on 17th Street in the near future. It is understood that the contractor needs to start the construction of the proposed 10'x5' concrete box culvert and thus to install a structure near the intersection between 18th Street and Convention Center Drive to commence the work. This shall be the limits of the proposed design for this amendment. TASK 1 —STORM WATER ROUTE ANALYSIS Based on the project understanding, Kimley-Horn will investigate in more detail and evaluate different routes for the temporary 72" RCP storm pipe. It is assumed that no calculations will be required. It is expected that portions of the currently proposed and existing utilities will need to be relocated/re-designed and coordinated with the utility provider, namely FPL. It is assumed that onsite portions will be redesigned by KHA, while the offsite portions will be coordinated to be redesigned by FPL. Other utilities, such as chill water, are assumed to be referenced and will be called out for contractor coordination and relocation. TASK 2 —72" STORM PIPE DESIGN Based on conversations with the Client and the Contractor, during a meeting held June 10, 2016, Kimley-Hom will provide services necessary to modify and update the drawings, and related documents setting forth in detail the requirements for construction of the design of the temporary 72" Storm Pipe. Said design will only occur after one route is selected from task 1 of this amendment. For the purposes the relocations by others, it is understood that this line and its associated route takes precedence over all other utilities because of its size. TASK 3 —PERMIT MODIFICATIONS On behalf of the City, Kimley-Hom will prepare plan review and permit applications, submit them to the City's representative to request signatures and fee checks, and forward them along with other supporting documentation to the following regulatory agencies for applicable permit modifications: kirrtley=homcam, 2151 Le Jeune Road,Suite.202,Coral Gables Florida 33134 786.725.5700 e ' Kimley>>> Horn Page 3 1. Miami-Dade County Department of Regulatory and Economic Resource — Class II Permit Modification 2. South Florida Water Management District — Environmental Resource Permit (ERP) Modification. All application, review, permit and impact fees are to be paid directly by the Owner. Permits will be applied for in conformance with the guidelines for the listed entities. Kimley-Hom does not guarantee the issuance of permits or approvals. If permits are issued • for this project, the conditions and expiration dates are the sole responsibility of the Owner. Kimley-Hom is not responsible for extending time-limited entitlements or permits. Kimley-Horn may provide services related to permit time extension requests and/or re-application of expired permits as an additional service. Any changes to the plans or scope of work requested by others after permit drawings are submitted to the above regulatory agencies will be addressed as additional services. After comments are received from all applicable regulatory agencies, we will upgrade the civil engineering construction drawings produced in the above Tasks to contract drawings suitable for construction. The plans will be prepared reflecting comments and/or conditions set forth by the regulatory agencies during the regulatory process. Kimley-Hom will address up to one (1) round of comments by the above listed agencies for the referenced permit modifications. TASK 4—ADDITIONAL CIVIL ENGINEERING CONSTRUCTION ADMINISTRATION Kimley-Hom will provide professional construction phase services for the additional project scope for the purpose of providing assistance to Client during construction. These services are to be provided as stipulated in the original Construction Administration task (Amendment No. 05 to the Agreement) for the additional visits to site and observation of construction, recommendations with respect to defective work, clarifications and interpretations, change orders, shop drawings and samples, substitutes and "or-equal", inspections and tests, disagreements between Client and Contractor, substantial completion, final notice of acceptability of the work, and limitations of responsibility reviews generated by the additional scope and design for the temporary 72-inch RCP and associated structures and improvements. Kimley-Hom wili perform three (3) additional site visits at up to three (3) hours each for the additional scope and design for the temporary 72-inch RCP and associated structures and improvements. kiiriley horncom 2151 Le Jeune Road,Suite 202, Coral Gables Florida 33134 786.725.5700 Kimleyo> Horn Page 4 INFORMATION PROVIDED BY CLIENT We shall be entitled to rely on the completeness and accuracy of all information provided by the City, Client or the Client's consultants. The City shall provide all information requested by Kimley-Hom during the project, including but not limited to the following: • Contractor field sketches, elevations, pictures and utility information • Design/Existing Drawings from the City of Miami Beach SCHEDULE We will perform our services based on the mutually agreed upon schedule. FEES AND BILLING • Kimley-Hom will perform the services in Tasks 1 to 4 for the total lump sum labor fees of $39,825. All permitting, plotting, application impact, and similar project fees will be paid directly by the Client. Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. Direct expenses such as mileage, express delivery services and in-house computer use is included in the lump sum labor fees. It is assumed that air travel and vehicular trips beyond the Miami-Dade County will not be required. Payment will be due within 25 days of your receipt of the invoice. • kimley horn corn,. 2151 Le Jeune Road,Suite 202,Coral Gables Florida 33134 786.725.5700 FENTRESS ARCHITECTS • lentressarch tects.com August 5,2016 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No. 2014-28538 Proposal 24—Convention Center Drive Reconfiguration Project 20140021.001 A26 Dear Mr. Morales: This proposal is to provide design services for a revised configuration of the roadway curbs and lane alignments on Convention Center Drive between 17th and 18`h Streets. This work constitutes an additional service, as redesign of previously approved conditions is outside of the Design Team's current scope of work. SCOPE OF SERVICES: The City has requested an alternate layout of street parking,curb and lane configurations and pavement markings on Convention Center Drive per the attached sketch. This scope request is due to a revised timing of development of the lot at the southwest corner of 17`h Street and this roadway. • Task 1 Roadway Redesign: o Develop sketch options and review with City staff for layout direction; o Prepare revised drawings for roadway plans, sections, profiles, drainage structures, pavement markings and signage and signalization; o Prepare revised permit applications for City signatures and fee checks, and submit to Miami- Dade County Public Works divisions for Signing and Pavement Markings and Traffic Signals. EXCLUSIONS • This proposal does not include power or low voltage support of dynamic signage. This may be evaluated upon receipt of the City requirements for this component. SCHEDULE • Design Task 1: Starting July 1,2016 to August 20,2016 FEE Fees for all services will be a total proposed amount of Twenty-four Thousand Seven Hundred Forty-five Dollars ($24,745). Reimbursable costs for printing, telephone, delivery and travel are included in the lump sum portion of this fee. Reimbursable expenses will be billed in accordance with the existing terms and conditions of our Agreement. Billings for these services will be invoiced under the heading#20140021.001,A26. OEN DC L.A SF SUN SH I 421 BroaJway I C nver CO 80203 I 3U3 722 .5000 Mr. Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 24—Convention Center Drive Reconfiguration August 5,2016 Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jo n Kud cki AlA ZEfjfrdBD±c- Principal rY encl: Design Fee Summary dated August 4,2016 Alternative 1 —Curves Kimley Horn sketch dated July 6,2016 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs, Strategic Advisory Group Steven DiBartolo, Hill International, Inc. Holly Carson,Anne McNeely, Mikala Casillas,Fentress Architects Scott Lawson,Clark Construction Company Project: Convention Center Drive Reconfiguration Miami Beach Convention Center Renovation & Expansion Culvert Design Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $6,600 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering (Lump Si Kimley-Horn 6 $18,145 Landscape West 8 7 $0 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb, Mech, Elec, Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Cost Estimate RLB 35 $0 Design Fees(Lump Sum) $24,745 Expenses 0% $0 Total Total $24,745 Convention Center Drive Reconfiguration Fentress Architects Flours Job Title Hourly Rate Hours Extension Task Management,Coordination and Oversight Architect III $200.00 24 $4,800.00 John Kudrycki $225.00 8 $1,800.00 Totals this activity: Hours 32.0 $6,600.00 Total,Sub 1 32.0 $6,600.00 Hours Total 32.0 $6,600.00 Fentress scope: Project management,attendance at meetings for alternates development,final scope definition and coordination with Traffic,oversight of ongoing documentation issues and permit monitoring,management of the construction change directive preparation and issuance. Convention Center Drive Reconfiguration Miami Beach Convention Center Fentress Project No:20140021 August 4,2016 August 11,2016 rev 01 Page 1 of 1 Convention Center Drive Reconfiguration Kimley-Horn & Associates Hours Job Title Hourly Rate Hours Extension Task 1 Roadway Redesign Principal $280.00 0.0 $0.00 Senior Professional $200.00 8.0 $1,600.00 Professional $120.00 20.0 $2,400.00 Analyst/Junior Professional $105.00 80.0 $8,400.00 Senior Technical Support $125.00 0.0 $0.00 Technical Support $105.00 50.0 $5,250.00 Support Staff $82.50 6.0 $495.00 Totals this activity: Hours 164.0 $18,145.00 Total,Sub 1 164.0 $18,145.00 Hours Total Lump Sum 164.0 $18,145.00 Convention Center Drive Reconfiguration Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 August 4,2016 KimI ey>>> H o r n Miami Beach Convention Center Renovation KHA Project No.: 043627000 AMENDMENT NUMBER 14 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. AMENDMENT NUMBER 14 DATED August 3'", 2016 to the Agreement between Fentress Architects ("Client") and Kimley-Hom and Associates, Inc., ("Kimley-Hom") dated May 14th 2014 ("the Agreement") concerning the Miami Beach Convention Center Improvements at 1700 Convention Center Drive in Miami Beach, Florida 33139. The Consultant has entered into the Agreement with Client for the furnishing of professional services for an alternate Drainage Permit Package for the Miami Beach Convention Center Improvements,and the parties now desire to amend the Agreement. Therefore, it is mutually agreed that the Agreement is amended to include Additional Services to be performed by Consultant and provisions for additional compensation by the Client to the Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference. KIMLEY-HORN AND ASSOCIATES, INC. Jorge L. Fernandez, P.E Associate Agreed to this day of , 2016. By: • (Print or Type Name) Title: (Member or Manager, as authorized) lEmail Address) ,Witness (Print or Type Name) kimley-hom.corn 2151 Le Lame Road,Suite 202, Coral Gables Florida 33134 786.725.5700 KamIey>>> Horn Page 2 Exhibit A to Amendment Number 14 Consultant shall perform the following Additional Services: PROJECT UNDERSTANDING Kimley-horn was notified by the Client on June 7"', 2016 that the future convention center hotel site (NE corner of 17th Street and Convention Center Drive where there is an existing City surface parking lot just west of the existing Jackie Gleason Theater and just south of the existing Convention Center)will not be developed as previously anticipated. The planned hotel building at the above location in conjunction with the improvements shown on the preliminary plans provided by the City were taken into consideration for during for the current roadway design along Convention Center Drive between 17"' Street and 18"' Street. The elimination of the hotel site improvements prompted the City to re-evaluate the public improvements along the previously mentioned portion of Convention Center Drive.Thus,a redesign of the roadway geometry,as well as signing and pavement markings and signals is necessary to match existing conditions today (maintain the existing surface parking lot). The following is assumed: 1. Tasks under this amendment are strictly connected to Amendment Number 11 dated June 20, 2016. Since many of the tasks overlap between the two amendments, this amendment assumes only the additional work necessary to complete the redesign. Thus, the raising elevation effort on Convention Center Drive approved under Amendment Number 11 is tied to the approval of this amendment and the schedule provided for Amendment Number 11 will commence upon obtaining a notice to proceed on this Amendment. 2. Miami-Dade County permits through the Traffic Engineering Division will need to be revised. 3. Environmental and archaeological/historical evaluations or studies are not included in this scope. 4. Maintenance of Traffic(MOT) Plans will be provided by others. 5. Preparation of CSI-format contract specifications is not included in this scope of services. 6. This scope of work is for the roadway design as illustrated on "Alternative 1" provided to the City on July 6th, 2016 and discussed / confirmed during a conference call with the City Transportation Department on July 29th, 2016. TASK 1 — ROADWAY REDESIGN Construction drawings that will require modification/updates include the following: C6.06 Typical Section 1 C6.12 Summary of Drainage Structures 1 C7.02 thru C7.03 Roadway Plans 2 C7.10 thru C7.11 Roadway Profile 2 C8.03 thru C8.16 Roadway Cross Sections 4 C9.02 thru C9.03 Signing and Pavement Marking Plans 2 C10.03 Signalization Plan 1 Total Construction Drawings Modified / Updated 13 kimley-hom conm 2151 Le Juune Road,Suite 202, Coral Gables Florida 33134 786:725.5700 Kirn ey>>> Horn Page 3 Kimley-Hom will submit the civil engineering permit drawings to the Client for review by the Project team, address two (2) round of reasonable comments, and resubmit the drawings. Roadway Regulatory Assistance Kimley-Hom will prepare revised plans and permit applications, to resubmit them to the City's representative to request signatures and fee checks, and forward them along with other supporting documentation to the following regulatory agencies: 1. Miami-Dade County Public Works Department a. Signing and Pavement Markings Division b. Traffic Signals Division For the Roadway and Civil Tasks above, all application, review, permit and impact fees are to be paid directly by the Owner. Permits will be applied for in conformance with the guidelines for the listed entities. Kimley-Hom does not guarantee the issuance of permits or approvals. If permits are issued for this project, the conditions and expiration dates are the sole responsibility of the Owner. Kimley-Hom is not responsible for extending time-limited entitlements or permits. Kimley-Horn may provide services related to permit time extension requests and/or re-application of expired permits as an additional service. Any changes to the plans or scope of work requested after permit drawings are submitted to the regulatory agencies specified will be addressed as an additional service. After comments are received from all applicable regulatory agencies, we will upgrade the construction drawings produced in the above Tasks to contract drawings suitable for construction. The plans will be prepared reflecting comments and/or conditions set forth by the regulatory agencies during the regulatory process. SCHEDULE, This additional scope of work will be included as part of the schedule provided for Amendment Number 11. However, the start date of the schedule will be the notice to proceed date provided for this amendment. FEES AND BILLING Kimley-Hom will perform the services in Task 1 for the total lump sum labor fees of $18,145.00. All permitting, plotting, application impact, and similar project fees will be paid directly by the Client. Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. Direct expenses such as mileage, express delivery services and in-house computer use is included in the lump sum labor fees. It is assumed that air travel and vehicular trips beyond the Miami-Dade County will not be required. Payment will be due within 25 days of your receipt of the invoice. k�rr l yr-bo►ncotn 2151 Le Jeune Road, Suite 202, Coral Gables Florida 33134 786.725.5700