Loading...
Amendment No. 18 to the Agreement with Fentress Architects in the Amount of $112,649 ,20/1/-arc ss/ • AMENDMENT NO. 18 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$112,649 This Amendment No. 18 to the Agreement made and entered this day of , 0Vert■)e..-, 2016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant" or"Architect-Engineer"). • RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project (the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for .the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and 1 to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of $15,156,359 (part of Resolution No. 2015- 28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and ,WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on , Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and • WHEREAS, this Amendment No. 18 is for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 18. • 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-18", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 18. 2 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 17 to be executed in their names by their duly authorized officials as of the date first set forth above. ATT / CITY •F MIA BEACH Raf••el G - -do ���� B �1W4 Ji y L. M•ra es City Clerk �.j� Nat ¶ anager ATT ST : �GnNSULTANT: � FE�1T: SS ARCHITECT - Si nature: i }SCOFF' ORATED: Si'nature 9 1 (�g1.- r A �, A r. �aQi A� `Nr4rS W. heJ.1 SS t7r�61-r1/2,ntt. CEO Print Name/Title 1<- •. 't, \--,,,Print Name/Title 5.1 • s < APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION • CIV Attomey P Data • 3 Appendix "A-18" 1. SCOPE OF SERVICES Refer to Proposal dated July 25, 2016 attached herein. 2. TIME OF COMPLETION Site visits—as required through approximately September 30, 2016 Alternative design change implementation—as required through approximately November 2016 3. PAYMENT AND COMPENSATION Time and Material. A deductive Change Order will be applied against Clark Construction's CM Contingency to fund this work. Summary Project Contingency Added Scope Total Original Agreement $ 10,967,200 $ 1,096,720 $ 12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259) Amendment 8 $ 15,156,359 $ 15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $ 25,436,700 $ 1,000,000 $ 26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional site vistis-2 $ 112,649 Total $ 25,436,700 $ 1,000,000 $ 470,096 $ 26,906,796 4 FENTRESS fentressarchitects.com July 25,2016 Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach 1 700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No. 2014-28538 Proposal 22—Added Site Visits for Structural Engineer Project 20140021.001 A23 Dear Mr. Morales: This proposal is to provide additional site visits by members of the design team for a weekly presence. This work constitutes an additional service, as additional site representation is outside of the Fentress team's current scope of work. SCOPE OF SERVICES: The City and the Construction Manager(CM)have requested a continued robust design presence on site, in order to address design issues immediately. This proposal includes representatives from the structural engineer design firm on-site for five days per week during the subject period. Also, to continue to realize schedule or cost efficiencies, the City and CM has indicated that CM may propose alternate designs that differ from the configurations depicted in the contract documents. The City and CM has requested the design team to review and confirm that these concepts or details the CM proposes meets the project requirements as set forth in the contract documents. SCHEDULE • Site visits for identified engineering staff: Starting August I,2016 to September 30'h,2016 • Alternate design change implementation Phase I duration(Aug-Nov 2016) FEE Fees for all services will be an amount of One Hundred Twelve Thousand Six Hundred Forty Nine Dollars ($112,649).This amount is broken out as follows: • Additional Site Visits: o Time and material top set in the amount of Seventy-Seven Thousand Six Hundred Forty Nine Dollars($77,649). Reimbursable costs for labor and travel will be billed as incurred. Billings for these services will be invoiced under the heading#20140021.001 A23. . • Alternate design change implementation: o Time and Materials top set of Thirty-Five Thousand Dollars($35,000). Reimbursable costs for labor will be billed as incurred. Billings for these services will be invoiced under the heading #20140021.001 A24. The City will be performing a deductive change order against Clark Construction's CM contingency to fund this extended CA Services agreement. • DEN DC LA SJ SF LON SH I 421 Broadway I Denver CO 80203 I 303.722.5000 • Mr. Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 22—Added Site Visits for Structural Engineer July 25,2016 Page 2 If the foregoing correctly states your understanding, please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jo Kudrycki, ALA, EED BD+C Principal encl: Design Fee Summary dated July 25,2016 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs, Strategic Advisory Group Steven DiBartolo, Hill International, Inc. Holly Carson,Anne McNeely, Annie Goodwin,Fentress Architects Scott Lawson,Clark Construction Company Project: Added Site Visits Structural Miami Beach Convention Center Renovation & Expansion 7/25/16 - Site Visits Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $3,100 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering(Lump St Kimley-Horn 6 $0 Landscape West 8 7 $0. Structural Engineering Wallace Engineering 8 $74,549 Vertical Transportation Lerch Bates 12 $0 Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0. Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Cost Estimate RLB 35 $0 Hardware Consultation Assa Abfoy 37 $0 RFI Design Changes Team $35,000 Submittal Reviews beyond 2 Team $0 Site Visit Fees(Time&Materials) $77,649 Design Fees(Time&Materials) $35,000 Expenses 0% $0 Total Total $112,649 Added Site Visits Fentress Architects Hours Job Title Hourly Rate Hours Extension Task Management,Coordination and Oversight Architect 111 $200.00 0 $0.00 John Kudrycki $225.00 4 $900.00 Finance $110.00 20 $2,200.00 Totals this activity: Hours 24.0 $3,100.00 Total,Sub I 24.0 $3,100.00 Hours Total 24.0 $3,100.00 RFI Design Changes $35,000.001 To realize schedule or cost efficiencies,the City and CM has indicated that CM may propose alternate designs that differ from the configurations depicted in the contract documents. The City and CM has requested the design team to review and confirm that these concepts or details the CM proposes meets the project requirements as set forth in the contract documents. Submittal Reviews beyond 2 $0.001 To be assigned as T&M and distributed to the necessary design consultant for the associated RFI at the time of the directive to proceed. Added Site Visits Structural Miami Beach Convention Center Fentress Project No:20140021 July 25,2016 Page 2 of 2 8 8 TX , • 8a8a »a X333 3 3-333g-3 I 333E32 282888 E n g _ t a s H F u/ '� r �� �'- 8 8 3 m N E m E 2.a p g o m 8171E c71 f LL_ o