Loading...
Amendment No. 20 to the Agreement with Fentress Architects in the amount of $96,710 eQ°,y-ag 5-38 AMENDMENT NO. 20 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14,2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $96,710p r�� This Amendment No. 19 to the Agreement made and entered this 110 day of � ° "A/016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado(hereinafter referred to as "Consultant" or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses: and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required 1 • • of the Architect-Engineer for the Project, in the total amount of $15,156,359 (part of Resolution No. 2015- 28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions • related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17t" Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, this Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts; and WHEREAS, this Amendment No. 20 is for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; to be funded from a deductive change order to the Agreement with Clark Construction; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 20. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-20", attached herein. 3. OTHER PROVISIONS. 2 • All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 20. IN WITNESS WHEREOF, the parties hereto have caused this Amendm-nt No. 20 to be executed in their names by their duly authorized officials as of the date fir t set forth abo r•. ATT CITY tiF MIAMI B' CH L It 90 R ael Granado Jim ' L. Morale City Clerk City i,anager ATTE T: CON 4JLTANT: F ITECTS Signature: /� Signature Altus t ��►' C Y ke-5 �V�t�S S Ni Print Name/Title Ke_c� Yl e2.5t. Print Name/Title . -4\ B i9 1,,,/ • 3":0° ��•:• "`` APPROVED AS TO • INCORP ORATE; FORM & LANGUAGE �h♦� . � &FOR EXCUTION o H264 h�U� � City Attorney RA p Date 3 Appendix"A-20" 1. SCOPE OF SERVICES Truss loading revisions for levels 2 and 5: Refer to proposal dated October 17, 2016 attached herein. Steel submittals additional reviews: Refer to proposal dated October 20, 2016 attached herein. 2. TIME OF COMPLETION Through Phase 1 completion. 3. PAYMENT AND COMPENSATION Truss loading revisions: $14,910 Lump Sum Steel submittals additional reviews: $44,000 Lump Sum $37,800 Time and Materials $96,710 Total This Amendment shall be funded via a deductive change order to the Agreement with Clark Construction. Summary Project Contingency Added Scope Total Original Agreement $ 10,967,200 $ 1,096,720 $ 12,063,920 Amendment-Reso 2015-28925 (5, 6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259) Amendment 8 $ 15,156,359 $ 15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $ 25,436,700 $ 1,000,000 $ 26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4 -Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11- Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss Loading $ 96,710 Total $ 25,436,700 $ 1,000,000 $ 787,097 $ 27,223,797 4 • FENTRESSL• ARCHITECTS fentressarchitects.com September 16,2016 October 17,2016 revised October 20,2016 revised October 26,2016 revised • Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 29—Steel Submittal Additional Reviews Project 20140021.001 A33,A34 Dear Mr. Morales: This proposal is to provide additional reviews of shop drawing submittals in excess of the two(2)provided for as part of the Design Team's basic services. The additional reviews constitutes an additional service,as this scope is outside of the Fentress team's current scope of work as dictated under Structural Steel Framing Specification 05 1200 Section 1.4.C.11. • SCOPE OF SERVICES: This proposal includes efforts expended and'expected to review shop drawings under Specification 05 1200 in sequences 100 and 200(east and north sides of the building in Phase 1)through record versions. SCHEDULE • Services performed to date: Starting April 2016 to August 10,2016 • Services for submittal items currently submitted and future submittals within Phase 1: August 11,2016 through Phase 1 duration installation FEE Fees for all services will be an amount of Eighty-one Thousand Eight Hundred Dollars ($81,800).This amount is broken out as follows: • Services performed to date: o Lump Sum value in the amount of Forty-four Thousand Dollars($44,000). Billings for these services will be invoiced under the heading#20140021.001 A33. • Services for submittal items currently submitted and future submittals within Phase 1: o Time and Materials top set of Thirty-Seven Thousand Eight Hundred Dollars ($37,800). Reimbursable costs for labor will be billed as incurred. Billings for these services will be invoiced under the heading#20140021.001 A34. The City will be performing a deductive change order against Clark Construction's fee to fund this extended CA Services agreement. DEN DC LA SF LON SH 1 421 Broadway I Denver CO 80203 303 -722 .5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 29—Steel Submittal Additional Reviews September 16,2016 October 17,2016 revised October 20,2016 revised October 26,2016 revised Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jo Kudrycki,AIA, EED BD+C Principal encl: Wallace proposal for 1510414.13 dated September 15,2016 Wallace proposal for 1510414.24 dated September 15,2016 Wallace proposal for 1510414.26 dated October 5,2016 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Steven DiBartolo,Hill International, Inc. Holly Carson,Anne McNeely, Mikala Casillas,Fentress Architects Scott Lawson,Clark Construction Company • wallace r , . • September 15,2016 Mr.John Kudrycki,AIA, LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Fee Proposal for Additional Services related to Excessive Steel Submittal Connection Reviews Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.13 Dear John: We have assembled costs associated with Excessive Steel Submittal Connection Reviews as it relates to excessive structural engineering reviews of steel submittal drawings due to quality control issues between Banker Steel's connection engineer,CED,and Banker Steel's two detailers, Seacad and WSP. Upon receipt of early steel submittal drawings by Banker Steel's two detailers,Seacad and WSP,it was apparent that the steel detailers were not always following the connection calculation work of Banker Steel's connection engineer,CED.To avoid delays in the project,Wallace Engineering was asked by Clark Construction and Banker Steel representatives to mark-up the steel submittal drawings and coordinate the work of Banker Steel's connection engineer,CED,with the steel submittal drawings by Banker Steel's two detailers, Seacad and WSP.Banker Steel representatives assured Wallace Engineering that their connection engineer, CED,was checking all final steel submittals prior to steel fabrication to insure that all steel fabrication would match the CED connection calculations. The extra work by Wallace Engineering was approximately 12 additional hours per steel submittal than is typically done for steel submittal reviews.There were 37 steel submittals that needed substantial mark-ups to coordinate Banker Steel's submittal drawings with Banker Steel's connection calculations: 051200-018 051200-033 051200-057 051200-085 051200-122 051200-018.1 051200-034 051200-058 051200-086 051200-131 051200-019 051200-044 051200-059 051200-088 051200-150 051200-021 051200-046 051200-074.1 051200-089 051200-151 051200-029 051200-049 051200-076 051200-093.2 051200-152 051200-030 051200-052 051200-077 051200-094.1 051200-031 051200-054 051200-082 051200-103.1 051200-032 051200-056 051200-084 051200-121 Based on the above,the proposed fee for this work is:$44,000. Wallace Engineering Structural Consultants.Inc. 200 East Mathew Brady Street Tulsa,Oklahoma 74103 918.584.5858,800.364.5858 w Nw.wallacesc.com Mr.John Kudrycki 1510414.13 -Additional Services related to Excessive Steel Submittal Connection Reviews September 15,2016 Page 2 We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING•STRUCTURAL CONSULTANTS, INC. tr•""*■-,— An rew Kern,P.E., S.E., CWI, ICC-SI,AIA Pr ncipal cc: File wallace r September 15,2016 Mr.John Kudrycki,AIA, LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Fee Proposal for Additional Services related to Repeated Steel Submittal Reviews(original submittals prior to 8/10/16 to be reviewed multiple times) Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.24 Dear John: We have assembled costs associated with the repeated steel submittal reviews per the GMP spec 051200 section I.4.C.12.This applies to multiple reviews of steel submittals originally reviewed prior to August 10,2016. GMP spec 051200 section 1.4.C.12 states". . .Time required by Wallace Engineering Structural Consultants, Inc.to review shop drawing submittals a second or third time will be billed to the General Contractor at Wallace Engineering Structural Consultants,Inc. hourly rates." Based on the above,the proposed fee for this work will be billed at our hourly rates of$120 per hour with a total fee estimate of$19,800. We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING•STRUCTURAL CONSULTANTS,INC. An rew Kern,P.E.,S.E.,CWI,ICC-SI,MA P cipal c : File Wallace Engineering Suucu.ral Consultants,Inc. 200 East Mathew Brady Street Tulsa,Oklahoma 74103 918.584.5858,800.364.5858 AVIV.wallacesc.com wallace October 5,2016 Mr. John Kudrycki,AIA, LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Fee Proposal for Additional Services related to Repeated Steel Submittal Reviews(original submittals prior to 8/10/16 to be reviewed multiple times) Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.26 Dear John: We have assembled costs associated with the repeated steel submittal reviews per the GMP spec 051200 section I.4.C.12.This applies to multiple reviews of steel submittals originally reviewed prior to August 10,2016. GMP spec 051200 section 1.4.C.12 states". . .Time required by Wallace Engineering Structural Consultants, Inc.to review shop drawing submittals a second or third time will be billed to the General Contractor at Wallace Engineering Structural Consultants, Inc. hourly rates." Based on the above,the proposed fee for this work will be billed at our hourly rates of$120 per hour with a total fee estimate of$18,000. We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING•STRUCTURAL CONSULTANTS,INC. An rew Kern,P.E.,S.E.,CWI, ICC-SI,AIA P cipal c : File Wallace Engineering Structural Consultants,Inc 200 East Mathew Brady Street Tulsa.Oklahoma 74:03 918.584.5858,800 364.5858 w'rrw.wallacesc.com FENTRESS �' ARCHI TEC IS fentressarchitects.com October 17,2016 October 21,2016 revised Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 36—Truss Connection Review Project 20140021.001 A37 Dear Mr. Morales: This proposal is to provide updated loading for Levels 2 and 5 trusses on the north side for temporary conditions. This work constitutes an additional service,as redesign of previously approved conditions is outside of the Design Team's current scope of work. SCOPE OF SERVICES: This proposal includes efforts expended to update levels 2 and 5 loading for an open structure with metal deck at the noted levels north of gridline 7, without concrete slab using wind speeds per ADCE 37-14. This analysis assumes the following: • CED (connection engineer under Banker Steel) to evaluate the as-built connections and provide field fixes for any connections which do not meet the revised loads. Upon completion of this evaluation, a letter signed and sealed by a Professional Engineer in the State of Florida,will be provided by CED to indicate that all connections meet the required loading; • Clark to provide a signed and sealed letter by a Professional Engineer in the State of Florida, that the steel frame and concrete shear wall,in their temporary condition,is safely braced/shored with respect to ASCE 37-14. The service includes structural engineering and contributes to the finalization of a letter regarding temporary occupancy for the City of Miami Beach. FEE Fees for all services will be a Lump Sum amount of Fourteen Thousand Nine Hundred Ten Dollars ($14,910). Reimbursable costs for printing,telephone,delivery and travel are included in this fee. Billings for these services will be invoiced under the heading#20140021.001 A37. The City will be performing a deductive change order against Clark Construction's fee to fund this extended CA Services agreement. DEN DC LA SF LON SH I 421 Broadway I Denver CO 80203 j 303 .722.5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 36—Truss Connection Review October 17,2016 October 21,2016 revised Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are pleased to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ry Kud cki A1A L • Jo , EED BD+C Principal • end : Wallace proposal for 1510414.25 dated October 11,2016 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs, Strategic Advisory Group Steven DiBartolo,Hill International,Inc. Scott Lawson,Clark Construction Company Holly Carson,Anne McNeely,Mikala Casillas,Fentress Architects • wallace October 11, 2016 Mr.John Kudrycki,AIA, LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Fee Proposal for Additional Services for Revision of Levels 2&5 Truss Loading for Temporary Conditions Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.25 Dear John: We have assembled costs associated with the revision of levels 2&5 truss loading for temporary conditions. Wallace will provide updated levels 2&5 truss loading for an open structure with metal deck at levels 2&5 without concrete slab using wind speeds per ASCE 37-14. This analysis work assumes the following: - CED to evaluate the as-built connections and provide field fixes for any connections which do not meet the revised loads. Upon completion of this evaluation,a letter,signed and sealed by a Professional Engineer in the State of Florida,will be provided by CED to indicate that all connections meet the required loading. - Clark to provide a signed and sealed letter by a Professional Engineer in the State of Florida that the steel frame and concrete shear walls in their temporary condition is safely braced/shored with respect to ASCE 37-14. Based on the above,the proposed fee for this work will be$14,910. We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Wallace Engineering Structural Consultants.Inc. 200 East Mathew Brady Street Tulsa,Oklahoma 74103 918.584.5858,800.364.5858 Awry wallacesc.com Mr. John Kudrycki . i 510414.25 -Additional Services related to Revision of Level 5 Truss Loading for Temporary Conditions October 11, 2016 Page 2 Sincerely, • WALLACE ENGINEERING•STRUCTURAL CONSULTANTS,INC. • . . • A drew Kern, P.E., S.E.,CWI, ICC-SI,MA Principal cc: File • •