Loading...
LTC 026-2017 Marine and Waterfront Protection Authority Resolution to Approve Proposed Seawall and Dock Layout for Maurice Gibb ParkMIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC # 026-2017 TO: Mayor Philip Levine and Members FROM: Jimmy L. Morales, City Manager DATE: January 13, 2017 LETTER TO COMMISSION of the City mmission SUBJECT: Marine and Waterfront Protection the Proposed Seawall and Dock L presented by the Public Works Shoreline Foundation Inc., for a Floating Dock uthority Resolution to Approve yout for Maurice Gibb Park as Engineering Department and Motorized and Non -Motorized The purpose of this Letter to Commission (LTC) is to transmit a resolution adopted by the Marine and Waterfront Protection Authority (MWPA) during their January 10, 2017 meeting. This resolution is a recommendation to the City Commission regarding the design and build of a motorized and non -motorized vessels floating dock. During the course of several monthly meetings, after review and discussions which included presentations made by Roger Buell, Assistant City Engineer; Milos Majstorovic, Transportation Operations Supervisor; and Joseph Stanton from Shoreline Foundation Inc., the Marine and Waterfront Protection Authority adopted the following resolution: The Marine and Waterfront Protection Authority approves the design proposed and presented by Shoreline Foundation Inc. jointly with the Public Works and Transportation Departments of the City of Miami Beach, to build a floating dock for motorized and non -motorized vessels at the Maurice Gibb Park. The purpose of this floating dock is to better coordinate launching and dockage of motorized and non -motorized vessels in this high -traffic watercraft area. Action: Motion for this resolution was made by Dr. Morris Sunshine, seconded by Robert Christoph, Jr. (Vote: 8-0) Resolution passed. JLM/SMT/HOt/SKS/MAC/RT/cIr C: Susanne M. Torriente, Assistant City Manager Hernan Cardeno, Esq., Code Compliance Department Director Sarah Saunders, Code Compliance Manager Mercedes Carcasses, Code Compliance Administrator, Acting Chair & Former MWPA Liaison Rianne Thomas, Code Compliance Administrator, MWPA Liaison Attachments: Shoreline Foundation Inc. layout drawing with most recent comments/ markups by Captain Dan Kipnis and the conceptual sketch of the upland ramp from Roger Buell F:ICODEISALLVNARINE1Minutes\2017LLTCs\Design Approval for Non-motorized.Motonzeo Vessels Floating Dock. MWPA January. 2017.docx • 7nsunto?r.Mn fAAD 1...‘R NF. m t, • • • • 4 • l; • :A -ITN r3 Q a � PROJECT NAME: Proposed Seawall and Dock Layout for Maurice Gibb Park Miami Beach, Florida Shoreline Foundation, Inc. 2781 S.W. 56 th Avenue Pembroke Pack, Florida 33029.4166 (954) 985-0460 Fax (954) 985-0462 atilk Joe Stanton From: Buell, Roger <RogerBuell@miamibeachfl.gov> Sent: Wednesday, December 14, 2016 12:40 PM To: 'Joe Stanton' Cc: Mowry, Bruce Subject: Gibb Park Water Taxi - seawall Joe, We've come up with a sketch to "lower" the seawall height which will eliminate the switch back design. We would still maintain a minimum 5.7 NAVD "barrier" with a knee wall east of the pathway. By building a ramped seawall cap, we can lower the top of the gangway from 5.7 to 3.7. This will allow a 30' gangway to accommodate a sea level range of -0.8 to 3.7 and remain in compliance with 1:12 slopes. 1 Roger MIAMIBEACH Wm. Roger Buell, P.E. / PWLF Assistant City Engineer 1700 Convention Center Drive, Miami Beach, FL 33139 Tel: 305-673-7080 ext. 6902 / Cell: 305-877-8142 RogerBuell@MiamiBeachFL.gov We are committed to providing excellent public service and safety to all who live, work and play in our vibrant, tropical, historic community MIAMIBEACH Wm. Roger Buell, P.E. / PWLF Assistant City Engineer 1700 Convention Center Drive, Miami Beach, FL 33139 Tel: 305-673-7080 ext. 6902 / Cell: 305-877-8142 RogerBuell(@MiamiBeachFL.gov We are committed to providing excellent public service and safety to all who live, work and play in our vibrant, tropical, historic community