Amendment No. 22 to the Agreement with Fentress Architects in the Amount of $17,121 c2011(- 018S- S")
•
AMENDMENT NO.22
TO THE AGREEMENT BETWEEN
THE CITY OF MIAMI BEACH, FLORIDA
AN D
FENTRESS ARCHITECTS,
DATED MAY 14, 2014,
FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION
CENTER RENOVATION PROJECT,
IN THE AMOUNT OF$17,121
This Amendment No. 19 to the Agreement made and entered this ` day of Z. roat- 2016, by and
between the CITY OF MIAMI BEACH, a municipal corporation existing.under the laws of the State of
Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami
Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421
Broadway, Denver, Colorado(hereinafter referred to as"Consultant"or"Architect-Engineer").
RECITALS
WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City
Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor
and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services
for the Miami Beach Convention Center Renovation Project(the"Agreement"); and
WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including
reimbursable expenses; and
WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 -
Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage
systems in lieu of 90%completion; and
WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil
engineering services in the amount of$41,079; and
. WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to
revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in
the amount of$179,982; and
WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump
station location analysis, and for the development of a 3D animation and custom website for the Project in
the amount of$76,605; and
WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925,
authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to
complete all design and construction administration services for the Project; and
WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design
development documents and preparation of Bid Package 1, in the amount of$2,442,400(part of Resolution
No. 2015-28925); and
WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the
Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of
Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be
superseded by a subsequent amendment with regard to the construction documentation and administration
services required for the Project(part of Resolution No. 2015-28925); and
WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to
wind loading and micro-climate services, in the amount of$117,200;
WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to
serve as Architect of Record for the Project,to clarify requirements with regard to Design Development, and
to provide for completion of Construction Documents and all construction administration services required
1
of the Architect-Engineer for the Project, in the total amount of$15,156,359 (part of Resolution No. 2015-
28925);and
WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of
Commissioning Services, in the total amount of$302,876; and
WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis
and consultation services to reduce the applicable wind pressures on the curtain wall for potential
construction cost reductions, in the amount of$15,000; and
WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event
plans background drawings to be used by event planners during construction, in the amount of $36,875;
and
WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions
related to Public Works Department's pump stations design, in the amount of$34,073; and
WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated
with the removal of the smoke control system, in the amount of$173,790;and
WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by
members of the design team for a weekly presence through July 28, 2016, and for the implementation of
alternative designs requested by the Construction Manager, in the amount of$148,999; and
WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated
with raising 18th Street, 19t Street and Convention Center Drive, requested by Public Works to allow the
raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and
WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm
culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works;
and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of
the Convention Center Hotel Project, in the amount of$70,270; and
WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation
services beyond what was originally contemplated in the basic construction administration services, in the
amount of$49,360; and
WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by
members of the design team for a weekly presence through approximately September 30, 2016, and for the
implementation of alternative designs requested by the Construction Manager, in the amount of$112,649;
and
WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes
associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress
travel distances of show layouts, in the amount of 220,291; and
WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of
steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel
2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark
Construction, in the amount of$96,710; and
WHEREAS, on , 2016, Amendment No. 21 was executed for additional design
services associated with the incorporation of additional security cameras, revisions to vaults requested by
FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details
for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included
in the original scope of work, in the amount of$80,330; and
WHEREAS, this Amendment No. 22 is for revisions to the construction documents as needed for
artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in
Public Places Program;and
2
NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants,
agreements, terms, and conditions herein contained, and other good and valuable consideration, the
respect and adequacy are hereby acknowledged, do agree as follows:
1. ABOVE RECITALS.
The above recitals are true and correct and are incorporated as a part of this Amendment No. 22.
2. MODIFICATIONS.
The Agreement is amended as provided in Appendix"A-22", attached herein.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged and in full force and effect.
4. RATIFICATION.
The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.
22.
.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.22 to be executed
in their names by their duly authorized officials as of the date first -et forth above.
I ATTEST: CITY OF i IAMI BEAC
y INvommumiiiii_
I Z,fLcs l l v per' , B -4144111. �
Rafael Gr nado � •'"" o t , my L 1 orates
City Clerk .�4,•, Man .er
Ar
-~�1 .
ATTEST i = yam"- ';' : • SUL NT:
. ARCH TE✓T'
ire.. .INCORP ORAT�
-
S gnature �' . T?ature
Print Name/Title .. „ �r1 `14y11�r4` "Z >•� Print Name/Title
�K
ye_ /"�
APPROVED AS TO
FORM&LANGUAGE
&FOR EXECUTION
OA gime 1/4---
City Attorney A/. Date
3
1
Appendix"A-22"
1. SCOPE OF SERVICES
Revisions to the construction documents as needed for proper coordination of artwork installations by
Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program.
2. TIME OF COMPLETION
Approximately four weeks
3. PAYMENT AND COMPENSATION
$17,121 lump sum upon issuance of CCDs or Field Orders
Summary
• Project Contingency Added Total
Scope
Original Agreement $ 10,967,200 $ 1,096,720 $ 12,063,920
Amendment-Reso 2015-28925 (5, 6&8)
Amendment 5 $ 2,442,400 $ 2,442,400
Amendment 6 $ (3,129,259) $ (3,129,259)
Amendment 8 $ 15,156,359 $ 15,156,359
Contingency reduction $ (96,720) $ (96,720)
Total $ 25,436,700 $ 1,000,000 $26,436,700
Amendment 2-Civil $ 41,079
Amendment 3 -Ballrm change $ 179,982
Amendment 4-Stormwater/website $ 76,605
Amendment 7-Wind study/roof survey $ 117,200
Amendment 9-Commissioning $ 302,876
Amendment 10-Parapet Analysis $ 15,000
Amendment 11 -Event Plans $ 36,875
Amendment 12 -Stormwater Revisions $ 34,073
Amendment 13 -Smoke Control Removal $ 173,790
Amendment 14-Site Visits&Alternative Design' $ - $ 148,999'
Amendment 15-Streets Regrading $ 22,520 $ 88,818
Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270
Amendment 17-GMP Reconciliation-add'' $ 49,360
Amendment 18-Additional Site Visits" $ 112,6491
Amendment 19- East Bridge Retention $ 220,291
Amendment 20-Steel submittals and Truss loading analysis' $ 96,710'
Amendment 21 -Cameras,vaults, RFIs, kitchen,transition slab $ 80,330
Amendment 22—AIPP(Morris,Ackermann& Harvey) $ 17,1212
Total $ 25,436,700 $1,000,000 $884,548 $27,321,248
1. Amendments 14, 18 and 20,totaling$358,358,funded from Clark's contract via deductive change orders.
2. Amendment 22 funded from AIPP fund.
•
4
FAA-Apt Az_ 61
FENTRESS
ARCHrFECTS "
•
tent ressarchitects.corn
October 7,2016
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
1700 Convention Center Drive
4th Floor
Miami Beach,FL 33039
Re: Miami Beach Convention Center Renovation Resolution No.2014-28538
Proposal 33—AIPP Level I Southeast Exterior Franz Ackermann Revision
Project 20140021.001 A31 Task 003
Dear Mr. Morales:
This proposal is to provide design services for a revised configuration of wall surface finish and landscape materials
in the location of the artwork wall mural. This work constitutes an additional service, as redesign of previously
approved conditions is outside of the Design Team's current scope of work.
SCOPE OF SERVICES:
The City has determined locations for artwork through the Art In Public Places program.Coordination with these
locations has occurred over the last several months. This proposal covers revisions in the areas exterior to Storage
1.26.03 on the east and west sides. The City would like to pursue the design revisions as indicated below. The
tasks for this effort are as follows:
• Revise planting types in two southeast planters.
• Define control joints that appear in cement plaster finish on exterior wall surface to the extents required
by the artwork. Provide a finish smoother than `sand' if possible.
• Assist in coordinating review of wall mounted components purchased through the CM contract.
• Issue Field Order.
SCHEDULE:
• Development of backgrounds 1 week
• Landscaping and architectural development 3 weeks
• QA and CCD finalization .5 weeks
TOTAL 4.5 weeks
FEE
Fees for all services will be a total lump sum amount of Five Thousand Seven Hundred Twenty Dollars($5,720).
Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee.
Billings for these services will be invoiced under the heading#20140021.001,A31 Task 003.
Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the
request of this additional effort as a modification to our contract is appreciated. Please feel free contact me with any
further questions or comments you may have.
DEN DC LA SF LON SH I 421 Broadway I Denver CO 80203 I 303.722.5000
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
Proposal 33—AIPP Level I Southeast Exterior Ackermann Revision
October 7,2016
Page 2
If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are
very happy to be of service to the City and continue our successful relationship.
Sincerely,
Fentress Architects
e.
ohn Kudrycki,AI ,L AP BD+C
Principal
encl: Concept Sketch series A30 dated August 12,2016,2 pages
Design Fee Summary dated October 7,2016
C: Maria Hernandez,Thais Vieira,City of Miami Beach
Jeff Sachs,Strategic Advisory Group
Steve DiBartolo,Heidi Wigand,Hill International
Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects
{
Project: AIPP Implementation -Ackermann
Miami Beach Convention Center Renovation &Expansion
10/7/16
Study & Design
Discipline Firm Name Firm Fee
Number ,
Architecture Fentress Architects 1 $2,425
Architecture Arquitectonica 4 $0
Fire/Life Safety/Code Consulting Jensen Hughes 13 $0
Civil/Utility Engineering(Lump SI Kimley-Horn 6 $0
Landscape West 8 7 $3,295
Structural Engineering Wallace 8 $0
Vertical Transportation Lerch Bates 12 $0
Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0
IT,Security,AV,Acoustics DL Adams 20 $0
Food Service Caruso 25 $0
Traffic Corradino 27 $0
Graphics and Signage TKD 28 $0
Parking Consultation Walker Parking 29 $0
Wind Analysis RWDI 35 $0
Design Fees(Lump Sum) $5,720
Expenses 2% $0
Total Total $5,720
AIPP Implementation -Ackermann
Fentress Architects
•
Hours
Job Title Hourly Rate Hours Extension
Task 3:Task-Management,Architectural Design,Coordination and Oversight-Franz_Ackermann
Architect III $175.00 8 $1,400.00
Intern Architect II $100.00 8 $800.00
John Kudrycki $225.00 I $225.00
Totals this activity: Hours 17.0 $2,425.00
Total,Sub 3 17.0 $2,425.00
Hours Total 17.0 $2,425.00
•
•
AIPP Implementation LI SE Exterior Ackermann
Miami Beach Convention Center
Fentress Project No:20140021
October 7,2016
Page 2 of 3
AIPP Implementation -Ackermann
West 8
Hours
Job Title Hourly Rate Hours Extension
Task 3 Laniiscape Design Franz Ackermann . •
Design Director $375.00 1.0 $375.00
Principal/Director $250.00 1.0 $250.00
Project Director $185.00 2.0 $370.00
Landscape Designer $115.00 20.0 $2,300.00
Totals this activity: Hours 24.0 $3,295.00
Total,Sub 3 24.0 $3,295.00
Hours Total 24.0 $3,295.00
•
•
AIPP Implementation LI SE Exterior Ackermann
• Miami Beach Convention Center
Fentress Project No:2014002I
Page 3 of 3 October 7,2016
luoKwc.al3aroad 3.0030019A30 NOISNYdX3 4 NOLLYAON321831N30 NOLLN3ANOO H MW 3Y38IN w Q
O m 413319 .0))0t1 WON il0Jmnaw 103f02d 2
81031114NY D
Cr)
00 I 7,0130 NOLLY301 HOl3>IS SS3b1N31 5
El auace 0100 uuewJepO'zuel j ddIV
91N 31009 :31W.ONIMV80 w
P 4
_ as
d
= , in 777
i al
X
i
_ • `o m rit m " I
C J ^m L
ii Wb �'vois�p'Q ? Jb W.. J8 0z8 E
t � 1Sri m =§� 7 1
S J g m g Y o
g
JiIi O C m c.z E fief J Z m Z 3
, Jilit s-�ieia a� 3 NJ Ill. k
A
Ill._ A H.."' I -1, ----
__ " 174! 5- -I i I
U I
:uit °e
i
11 1 AI i
,I Q a
1 i ii... 1
a
��� 8� !
s M
o E _ S ____.:ji A
II 1 0 K 0
1 gi II L.' f. I
annannenonnw co
C i CN
.
I
E• T. • C y'_
I
LL Ell ' I I
•Z
ill . -_
-1�®I a
■
---
4.Q ill� r 'g i
4 0 I r ; I
e•E i;G N s
P Q
- ./ — app h'e P 'I
q Id c
I� 4 r Qa B
I + — uf)fElm I
"o-0- 6
` o o
$0°00660° €
fi to n n a %
m of 0:0:m I
O000000a. s
i
i
1
=OP HZ 4133034d MVO aaanaa NOISNVdX3 V NOI1YAON3N 83.1.N33 NOIlN3ANOO H3V38 IWYIW w m
rN 113346 ......41*MN tw a3a561 f 0
l03fOLld 910311H3tlY D M
rN .,riw I Z 0
NOIlV30I H013YIS SS3II1N3J v
zI YO 010Z 31ra uuewle)CJV zUeij ddIV �[
$1.31ra6 :31111 ONIMVLIO V)
m EIDd
gr JED
m
I
i ,n.4
"
LI b
• pmQ
CL''''' J m> g
1111110 ea_
j . ...111 P ( J J W m p m
E
w 7.
e ON
_ _ai
• � ` { I VIII 9 � 1
m L E 2 $� 11 I I h
.E c 11111
-.2i I a
:■1121 - !-
><J :1111I
— �!,1®I ,p iI,I� I i
of ri ii I i 19 O
del....■fie --.Ir71 '1 m. . 1
0 . iliii lipi,a.•-:ii c‘i ri 4 .int
014 in g
C III
';13' 14 °lit i " _
.t 1M .N
co 1 .
u. m' Ili! n �, Iii.. :J J
7 O It
" .1,- I � m
NIl N• 4
F -
8£
i .S6.S e H: :_ .k111::
g s; i
52• i
u IIL� a ., iii a
ir m
°m I
4 1-co. te;0 a a a
I
°m
I Z 31nrn�o
iII 00000a E
Q1-I-03 I-CO. i
I
Wm-7+ Pateu,r
FENTRESS
tantressarchitects.corn
October 7,2016
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
1700 Convention Center Drive
4th Floor
Miami Beach,FL 33039
Re: Miami Beach Convention Center Renovation Resolution No.2014-28538
Proposal 32—AIPP Level 1 Northeast Exterior Sarah Morris Revision
Project 20140021.001 A31 Task 002
{ Dear Mr.Morales:
This proposal is to provide design services for a revised configuration of wall surface finish and landscape materials
in the location of the artwork wall mural. This work constitutes an additional service, as redesign of previously
approved conditions is outside of the Design Team's current scope of work.
SCOPE OF SERVICES:
The City has determined locations for artwork through the Art In Public Places program.Coordination with these
locations has occurred over the last several months. This proposal covers revisions in the areas exterior to
Supplies 1.06.03,Parking 1.03.01 and Open Stair ST.1.02.01. The City would like to pursue the design revisions
as indicated below. The tasks for this effort are as follows:
• Revise planting types in northeast planter;
• Delete bicycle parking and detail paving infill. This component will be relocated under a separate design
effort for the 21"Street Park;
• Delete cement plaster finish from exterior wall surface to the extents required by the artwork;
• Assist in coordinating review of wall mounted components purchased through the CM contract.
• Issue Field Order.
SCHEDULE:
• Development of backgrounds 1 week
• Landscaping and architectural development 3 weeks
• OA and CCD finalization .5 weeks
TOTAL 4.5 weeks
FEE
Fees for all services will be a total lump sum amount of Five Thousand Seven Hundred Twenty Dollars($5,720).
Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee.
Billings for these services will be invoiced under the heading#20140021.001,A31 Task 002.
Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the
request of this additional effort as a modification to our contract is appreciated.Please feel free contact me with any
further questions or comments you may have.
DEN DC LA SF LON SH I 421 Broadway I Denver CO 80203 I 303 722 5000
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
Proposal 32—AIPP Level 1 Northeast Exterior Sarah Morris Revision
October 7,2016
Page 2
If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are
very happy to be of service to the City and continue our successful relationship.
Sincerely,
Fentress Architects
ohn Kudry cki,AI ,L AP BD+C
Principal
encl: Concept Sketch series A28 dated August 4,2016,2 pages
Design Fee Summary dated October 7,2016
C: Maria Hernandez,Thais Vieira,City of Miami Beach
Jeff Sachs,Strategic Advisory Group
Steve DiBartolo,Heidi Wigand,Hill International
Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects
Project: AIPP Implementation - Morris
Miami Beach Convention Center Renovation& Expansion
10/7/16
Study & Design
Discipline Firm Name Firm Fee
Number
Architecture Fentress Architects 1 $2,425
Architecture Arquitectonica 4 $0
Fire/Life Safety/Code Consulting Jensen Hughes 13 $0
Civil/Utility Engineering(Lump Si Kimley-Horn 6 $0
Landscape West 8 7 $3,295
Structural Engineering Wallace 8 $0
Vertical Transportation Lerch Bates 12 $0
Plumb, Mech, Elec,Lighting ME Engineers 14-18 $0
IT,Security,AV,Acoustics DL Adams 20 $0
Food Service Caruso 25 $0
Traffic Corradino 27 $0
Graphics and Signage TKD 28 $0
Parking Consultation Walker Parking 29 $0
Wind Analysis RWDI 35 $0
Design Fees(Lump Sum) $5,720
Expenses 2%
Total Total $5,720
AIPP Implementation -Morris
Fentress Architects
Hours
Job Title Hourly Rate Hours Extension
Task 2:Task Management,Architectural Design,Coordination and Oversight-Sarah Morris
Architect III $175.00 8 $1,400.00
Intern Architect II $100.00 8 $800.00
John Kudrycki $225.00 1 $225.00
Totals this activity: Hours 17.0 $2,425.00
Total,Sub 2 17.0 $2,425.00
Hours Total 17.0 $2,425.00
AIPP Implementation Ll NE Exterior Morris
Miami Beach Convention Center
Fentress Project No:20140021
October 7,2016
Page 2 of 3
AIPP Implementation-Morris
West 8
Hours
Job Title Hourly Rate Hours Extension
Task 2:Landscape Design East Wall-Sarah Morris
Design Director $375.00 1.0 $375.00
Principal/Director $250.00 1.0 $250.00
Project Director $185.00 2.0 $370.00
Landscape Designer $115.00 20.0 $2,300.00
Totals this activity: Hours 24.0 $3,295.00
Total,Sub 2 24.0 $3,295.00
Hours Total 24.0 $3,295.00
AIPP Implementation L I NE Exterior Morris
Miami Beach Convention Center
Fentress Project No:20140021
Page 3 of 3 October 7,2016
IMO=61l33P0tld 3110 NO151A3Y O=
NOISNVdX3 V NOIIVAON38 1:131.N30 NOIIN3ANOO HOV38 IWVIW wm Q
6113347G 'UCH a3n36! 200
1O31Oad S13311H3W 7 N
NOLLVOO H013NS SS3d1N3J 5°
I
9LOZ env b air= SIii0W 4egS ddIV Y
•8•1•N 31 l.w.ONIMVLIO n(n
I
a
z
a
li I I .J f I 1n i� i1 :i�;
C C- '
anc § 1 I M41.4l ,
i � 1i E
I ov _ I
_ mow �x ;! IeN i
$ S,W a
��E ; -�''�_ ,x III h3 E IM
m{ ! e 1!�e kl i L i
0 i �- t?1 a 1` �'�� t r
1:.% II f Mr 9 y •$
i ..P. .;... , \ t 1
f!
. . .1. ..-.1i4 , > , 2/ l.
m 5
L W
11.'"-- it','
1.7>
4 . o
4:{ a °m 5
g {��,. y
8 w v c '4 h'- H i
in i> E m! hh4 . i t ' c ,
''' 'Se n'32' 2 c g''•m.c c \I----
�U'�GOm f3Y � y O ! I _
o p v Ts
0 tL RI-- a's C a t E
_,..I.. ----- - n
ome5$ 8 i m li 2 Q r : � `o6
E
?) g u mi mW og adn m :1-Bf-_ 4 4 a o
r, :g
_ c ' o E 3 S Z — - - I-FOm
.-NNI
O a<r cv<6 4 v N,O I : 'I '1 1 i
1113 e n*-'t -11 •-■ I_ 1 i-m !
t
E
I
.
1
7
h300PL 4131rONd 3120 NOISI23d a=
NOISNVdX3 IT NOIIVAON32i N31N30 NOIIN3ANO0 HOV38 INVIW w 0
4133HS LOA a co
1�3f021d S331IN3 V 3 co
J
NOLLV001H013 S SS3d1N3J 5 9
9I.OZ onv v 312a Swoy\J 4eleS ddld Y I
-gl-N3IrJe 31111ONIMV2i0 uJ CO
€ II
F Y
C • >> V. G C .
m O .
m O_ G H N Y O W t0 yay
8 w 2 0 3 d d
[[ c N p O Y.
J C m y C iG ■
p m J J^ j d N, W 4] 2
i C 2d 9
D W C
>, J OO
. ,
A C e E O 4 N W > O't u to i
O Qm W J W
U coE C g - m ce
C— m H r ; 1
m — O N W 9 y
I W O eJ W w a O t M N •
a W , p a v
d o5vS � ` ` .2o r
z p m ,D `5 d E .aaE m E ELL « Ow p
> o
I
j
I IH o 20 ' o � c
tm
c m f o _I m§ D p
n g v; g v c t o _ m n
•fog ox 3x�3uJ n 9W> > 0 a o�mux ; xao
d— moir6!?ouiro aa«ni of m ,LA.4, ui
i
I 6
1 $
li\ X E
1i_ I�_�I�i W N o a
10_,_.- D— 5
���i: O1 7 @ Cps J J \I� "Tr_
2— I C VV II SS F S
W LW z{ iI 1
LL LL N Q I 1
z
co
(79 xcli NMI ---19'A MI
C J.: e Q �, S
a ��� NE;1°.)ill
k i 7 AJ1IIP E
akv ".ir c) -- .....■ i- E. ,
P m . ........T. . ._. .. .el, *
..
• : - mu. . _ .1
,..,i. alki ... ii ,
In i
i.-,,,-111=-- <0 di APPIA0t i , ____ .
z _ .5 , il i
cn 1 fl 4 ' liii C7 • i mi. a
h lIq 1
ig 9. t°, I; jilt -
___, aft" III "LIZ la I
I!! _—�.... i v III !h��.�1� 1 1 7:.,,,,, • / V-
1 co t I I I � N
U no I 2
2 OOm m
N Z
J J N 07
Q.o M0 0 -
uj r2 111 C`i w°
O 1
_�-
0,69•/ ii-A14-0Letr
FENTRESS
lentressarchitects.com
October 4,2016
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
1700 Convention Center Drive
4th Floor
Miami Beach,FL 33039
Re: Miami Beach Convention Center Renovation Resolution No.2014-28538
Proposal 31—AIPP Level 2 North Ellen Harvey Revision
Project 20140021.001 A31 Task 001
Dear Mr.Morales:
This proposal is to provide design services for a revised configuration of life safety and electrical infrastructure in the
location of the artwork wall mural. This work constitutes an additional service,as redesign of previously approved
conditions is outside of the Design Team's current scope of work.
SCOPE OF SERVICES:
The City has determined locations for artwork through the Art In Public Places program.Coordination with these
locations has occurred over the last several months. This proposal covers revisions in Ballroom Prefunction
2.03.01. The City would like to pursue the design revisions as indicated below and the tasks for this effort are as
follows:
• Relocate fire extinguisher cabinets from area of mural to wood panel portals;
• Relocate convenience outlets to within stainless steel wall base;
• Relocate fire alarm speaker/strobes to north side of Prefunction;
• Provide elevation dimensioning for all items in wall;
• Issue Field Order.
SCHEDULE:
• Development of backgrounds in Revit: 1 week
• Engineering and architectural development: 2 weeks
• OA and CCD finalization: .5 weeks
TOTAL 3.5 weeks
FEE
Fees for all services will be a total lump sum amount of Five Thousand Six Hundred Eighty-One Dollars($5,681).
Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee.
Reimbursable expenses will be billed in accordance with the existing terms and conditions of our Agreement.
Billings for these services will be invoiced under the heading#20140021.001,A31 Task 001.
Attached is the breakdown of hours and associated fee for this additional effort.Your assistance in facilitating the
request of this additional effort as a modification to our contract is appreciated.Please feel free contact me with any
further questions or comments you may have.
DEN DC LA SF LON OH I 421 Broadway I Denver CO 80203 I 303 722.5000
Mr.Jimmy Morales,City Manager
City Manager's Office
City of Miami Beach
Proposal 31 —AIPP Level 2 North Ellen Harvey Revision
October 4,2016
Page 2
If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are
very happy to be of service to the City and continue our successful relationship.
Sincerely,
Fentress Architects
ohn Kudrycki,AliZjiteidAp Al BD+C
Principal
encl: Concept Sketch series A29 dated August 9,2016,9 pages
Design Fee Summary dated October 4,2016
C: Maria Hernandez,Thais Vieira,City of Miami Beach
Jeff Sachs,Strategic Advisory Group
Steve DiBartolo,Heidi Wigand,Hill International
Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects
1
mmorammoad aveomomm NOISNVdX3 4 NOLLVAON321 N31N30 NOIIN3ANO0 H3V39 114/VIIN u.1
Q
v"V13349 "nw wnw yoimnsfx 103f0LId 9.1.03.1.114011V 2 N
:NOLLV00fl431)1S I SS]U1N3d ZO
abua axVa AaA)eH uall3 ddIV r
TEN 77/32 :311LL ONIM'd80I co
c c a
co
74, a a
o
-_— lei` g — – ti la;r`
e N.11.7, _ .CN N C) y
m I .1 - h d 8Y
z
z O J t
a a 4 1 En- 04
+ g E E 1 s ° to a _, : a
Li)= N O C —ssa 0 C W 22i; V V..-=-..-• - f
..N C u) N �i J LL 2&3-1 0
° m r--E z c - ,� ` ai _- 1, . O yzz %, "r- as
A
; + 9
mV $ +-
j
•
I ' `i1r - 1
r it-;--- ,Ti.. — f--- I
I 1 ; a
....... .` '5, _ i- .—i 1
+ a
1
4, II6 N
! .— U t Ir,:d ..-00 5 L...._..—•
digl ..
W °
. 0,-. T. 2 oSe 3 3. 'w 114/1141"--I g -1 i
+ 03 a MOOR , �$ ? ,--
I !._�_ l I.:-or- .r- E T Y Z Z dim Si O _
C W N I I , LL
• N .22 Q I - t -I- 1� m -y
IT 6 a o o o
vmxos n , O E LL i�o
_
r
— -
.r>• a n
I! ( 2
I
I
c ti
c g O.
o
1
cu E c c° O,L £ N y O° U n v10 t
gc
-. V mo .. 5q 6 m d n 3 c ; g7 y 2 0 m m .0
MT, m
9 y n 9 u▪ g m o c m o 2--c
i m i a v g i m m n ` 58Q E- I a y l E
1.
_E a oc _ .2d4, c .1tckEo
2.- �
$> @ N)▪ 4,C rm g£m ,WC CI 0 °S&I E E �E a h,
!
a 5. . c m y- m ty O G o c RH EM ~ A m g O ZC��� o
� m
av 5
Nit O C _LLt WH1CN � mpGs 2L-6T= . mn 8 rm t ° d�5€ugmrU�
NU�gxES=°0=cd(A 41 U19O NU EO mO s.$ y le
O U W O O m 0 0 S W C C O N . C O. °
d. .- x0(V d lL°I LL's� 6N ; O.W x'1�x0 tp Q�N 6,D�S I� O W O ;�vi
■
120111`°Z a173ro21a 3+vanaen3u NOISNVdX3 8 NOIIVAON3N 2131N30 NOIIN3ANO0 HDV38IWVIW w m CO
VH 1133N5 a°•s's m QJ
voi��� 103fO21d
0+ 0T>13U 81731 N
1H08Y Z O
NOILV001H013NS SS3HLN33 5
1010 OW..31Va AeAleH uall3 ddIV
WIN 31V]S :31111 ONIMV2lC w 0
i
v O t
E ,L
m
m 0
U o E m W
I 1
o 3 o O
. '1, (2 a 5 1.
LL om i
U E m=
I Illir —
Mill IL'Er_
311E o▪ "E i
e1 _■INNIME '
r l t _. i
- 11.-; iiii Pii 1-
el I
e a ,� I S
F F Illh Al CD i 81'
m— u 'fl lb zi,ir, 5 ,-6 t illn €e 76 1
in
y °w E
W i
Cr) $N f
v g
r i
76 `g
Q 2 9
R ER
c i
,_„_A mat_ _
1
■■ 1�) A1) a o- m 0 8
.2 O „ �i — 0,11a i
m
l ►S y9a 5c'. t
m w '� 1 ..I �I � m�i� --- g� I
ac IIIIII : $ m9
0 0 U o C 2.T N N Qi-: ! I2E3` 0
z Z Z X 71 G y
I
!I.:I r9 I ing - aski IV 1 E -_, 0,, ie24
IE loco�� c aO ao a°''°18� •
w 'I` °$ I
LLLL 3....T0E N D c Ei
)ilitiEll ry C N Si U 2g § E !rr
z Q f, N i m 9 '6 2 3
Q a ', a Iai !gg 11 I. ° 1
m— II Z m � U fn 8 a Lii E
Iy G N 0 y N C
<>_,k cm , U u g i c En , m if o y o :
-I— 9 t
■ d z U 8 9 1
aa O .3 x_ a mm
-........"....-%-'% .1..:1: : FA"
�'OR■_�I_} ° =I 1 6 ,03g2,0 F C L_AEI
ll I o ''• CV 'ay 1 ,
aO�Qc�in ooi_!^ovi 3‘0
L
1
1
+I ' L 1
3.1 .
._ .
._ .
GD
W 3
11o111¢aia;rOlw azrallalseu NOISNYdX3 8 NOIiVAON3LI L131N33 NOIIN3ANO0 HOV38 INMW w 0
m
YN i119iN NNw WN was 103fOLId 913311HJHY i
N
VN
*WOO O
14011V00114013243 SS3a1N3A1 3 ,
110110910C MVO fanueH 118113 ddIV L
VIII MIMI 311LL ONIMVLIO N (1) pp
i
a v
�' E 1
y� T jt liq ' ii !1 1I
•�' f�. 1R R = s :1!_) U�� �� ti.. ! � ����. — ta
01 C : t1 1_ }ti �F A 1 I /
121J'th1IHi I
M 115 alf:r111i91 z
I !s i
Q 1 fr
W 0 a
t g
, K3,w
z It
N J 6
'Li" Q ► 1 F
1-LN�C7
Y nna t '�
sna 3
II
0 l 2
Q 1 a
WN N 1 f. ���I''s� j■■ y7
Y O i i_ ii V A, 5p
w B 7
co co
o �, _41 _'
4 0 4 Li-v ii; ! ac ZIMIIIIIIIIIIbr
A
ig of !
CO CD CO 4 a a < 4 w
j
1
(}� 2 CEO
m m 6a 1
t N Z N N m N N Q
a < c? < C < < 0§ !
r
O o O o o O o O O _3
It i
a
r
s
Ta 1
o i
Ta a m c I
P. < g$ a
w
3$ c Ey I
m c�
c
o & C y S 5
4 a a
2 ° o'8 a
E
Q `0 3 3 cc i
a `�'a19W
m W OI t O
41
0 a O d ' `y {
E`o g m E A g% i
N � `g21
y3 ES P,i `= a
S€,... ` mu- $� Y
U= O■'m
a— A ai 3 2101-dr
I3
Fire Extinguisher Cabinet- 1770 Series (FEC)
1750 SERIES \F IRE EXTINGUISHER&VALVE CABINETS CROKER
For Use With Fire Dept Valve, 2 1/2" Fire Dept Valve &
ilmoollici Fire Extinguisher
Series 1750 and 1770 cabinets will accommodate Fire Dept Valves, 1 1/2"and or
!l 2 1/2"size with caps and chain and a portable Fire Extinguisher.
r 6'4 STANDARD EQUIPMENT
• * Heavy gauge steel construction tub,door and trim
*White powder coat finish
1750 Series *Continuous steel piano hinge
3 * Pull handle with roller catch
I
4,0 ) CABINET OPTIONS ORDERING PROCEDURE
1I ca - { *Prefix FR for Fire Rated Cabinet *Select cabinet Figure No.
*Suffix AL for clear anodized aluminum door and frame *Select door style
' 74 *Suffix SS for Stainless Steel#4 finish door and frame *Select Fire Dept Valve with Cap
*Suffix FF for Detention Grade Heavy Steel Door And Trim and Chain(Refer to Section 5000)
. . — *Door Styles See page 2-6 *Select type and size of Fire
1770 Series *Other cabinet options See page 2-7, 2-19 and 2-20 Extinguisher
- FIRE RATED CABINETS '
FIGURE# TRIM STYLE Trim Poj.Tp Valve Cap. Inside box dimensions Overall outside dim Knockout locations Wan Opening Required Wall Opening Required FR Option
A B C 0 E .1 K M N Width Height Depth Width Height Depth
1750 Recessed 5/16' 20 27 7 314 23 318 30 318 4 4 4 4 21 28 7718 22 29118 8112
1751 Semi 4ecessed 1114" 11/2 20 27 7 314 23 318 30 318 4 4 4 4 21 28 6 314 22 29118 7 318
1752 Semi-recessed 21/2° or 20 27 7 3/4 233/8 30 318 4 4 4 4 21 28 517 22 29118 6 318
1754 Semi-recessed 4112' 21/2 20 27 7 314 23 318 30 318 4 4 4 4 21 28 3112 22 29118 4118
1758 Surface 23 3116 30 3/16 8114 23 318 303/8 4 4 4 4
1770 Recessed 318" 16 40 9 19 318 43 318 6 4114 6 4114 17 41 9 18 42118 10 •
1771 Semi-Recessed 1114' 11/2 16 40 9 19 318 43 318 6 4114 6 c 114 17 41 8 118 1B 42 1)8 91/8
1772 Semi-Recessed 2 1/2' Of 16 40 9 19 318 43 3/8 6 4114 6 4 iM 17 41 6518 18 421/8 7112
1776 Trimless 212 16 40 9 16114 40114 6 41/4 6 4114 161/2 40112 9114
1778 Surface 19 316 43 316 9112 19 3/8 43 3/8 a a a a
a•No knockouts provided unless specified on surface mounted cabinets
Note: Add 5/8"to depth of wall opening required for cabinets with aluminum frame
Note:If 21/2"x 1 1/2"reducing adapter is used for Fire Dept Valve"C"
dimension should be no less than 10".
*Trimless,recessed and semi-recessed cabinets furnished with
combination knockouts(1 1/2"and 2 1/2"on both sides)
NOTE:FIRE RATED CABINETS HAVE NO KNOCKOUTS
NN''... .':
, _\ \ -
TRESS RECESSED SEMI-RECESSED
j M. FLAT TRM WITH RETMURty SURFACE 7J-
N.,'1.. 11.. . .1;.1 1 Il ',.. I II 1..`,.
'141 :
i L•
Page 2-18
Down Lighting (LP11-DIM)
Luminaire Type:
goth a m' Catalog Number
Iaut0000ulated);
Gotham Architectural Downlighting
LED Downlights
' , -� i%-°‘ir 4 rr Evo®
Downlight
Solid-State Lighting Mgr
OPTICAL SYSTEM ELECTRICAL SYSTEM
r.
• Self-flanged or flangeless semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine
c • Patented Bounding Ray'''.optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60,000 hours
s • 45'cutoff to source and source image • Tested according to LM-79 and LM-80 standards
CA
• Top-down flash characteristic • Overload and short circuit protected
- • Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional
MECHANICAL SYSTEM LISTINGS
• I6-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location,
• Telescopic mounting bars maximum of 32"and minimum of 15",preinstalled. covered ceiling
4"vertical adjustment WARRANTY
• Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at
• Junction box capacity:8(4 in,4 out 112AWG rated for 90°C www.acu,tvbrands.com/CustomerResources/Terms and conditions.asox
• Light engine and driver accessible through aperture
• Injection molded mud ring included with flangeless trims. Ships separately. Note:Actual performance may differ as a result of end user environment and application.
Installs independently of the mounting frame to reduce cracks in plaster due to All values are design or typical values,measured under laboratory conditions at
vibration. 25°C.
= EXAMPLE:EVO 35/10 4AR MWD LSS MVOLT EZ1
v
m
x•
2
z
Series Color temperature Nominal lumen values Aperture/Trim color Trim Style Distribution Finish Voltage
p EVO 27/ 2700 K 07 750 lumens 4AR Clear (blank) Self-flanged MO Medium LSS Semi-specular MVOLT
a 30/ 3000 K 10 1000 lumens 4PR Pewter FL Flangeless (0.9 s/mh) ID Matte-diffuse 120
n
c 35/ 3500 K 15 1500 lumens 4WTR Wheat MWD Medium wide LS Specular 277
= 40/ 4000 K 20 2000 lumens 4GR Gold (1.0 s/mh) 347'
25 2500 lumens 4WR' White WD Wide(1.2 s1
30 3000 lumens 4BR' Black mh)
4WRAMF' White anti-
microbial
Driver' Options
EZ10 eldoLED ECOdrive 0-10v dimming driver.Minimum dimming level 10% SF Single fuse.Specify 120V or 277V. BUD Bodine generator transfer
EZ1 eldoLED ECOdrive 0-IOV dimming driver.Minimum dimming level 1% TRW' White painted flange device.Specify 120V or 277V.
EZB eldoLED SOLOdrive 0-10V dimming driver.Minimum dimming level<1%. TRBL' Black painted flange CR190 High CRI(90+).Specify 120V
EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming level<1%. EL' Emergency battery pack with or 277V.
EDXB eldoLED POWERdrive DMX with RDM(remote device management).Mini- integral test switch CP1c Chicago plenum
mum dimming level<1%.Includes termination resistor.Minimum lumen ELR' Emergency battery pack with RRL_ RELOC"-ready luminaire
1500/Maximum 3000.Refer to DMXR Manual, remote test switch connectors enable a simple
EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming.0-10V.Refer to XPoint NPS80EZ5 nlighte dimming pack controls and consistent factory installed
tech sheet. 0-10V eldoLED drivers. option across all ABL luminaire
EXAB XPoint Wireless,eldoLED SOLOdrive<1%dimming,0-IOV.Refer to XPoint NPSBOEZERS' plight'dimming pack controls brands.Refer to El for com-
tech sheet. 0-10V eldoLED drivers.ER con- plete nomenclature.
ECOS24' Lutrona Hi-lumee 2-wire forward-phase dimming driver.Minimum dim- trols fixtures on emergency circuit.
ming level 1%.Minimum lumen 1000/Maximum 3000.
EC0S3'•5 Lutrone Hi-Lumee 3-wire or EcoSysteme dimming driver.Minimum dim-
ming level 1%.Minimum lumen 1000/Maximum 3000.
EVO-4-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighting.com (0 got h a m
PAGE 1 OF 4 C 2014.2016 Acuity Brands Lighting.Inc.At Flights Reserved.Rev.08/01/15.Specifica;vns subject In change n4haul notice.
Down Lighting (LP11A-DIM)01°'!-- n• Luminaire Type:
got h a m' Catalog Number
1aut0000ulated):
Gotham Architectural Downlighting
LED Downlights
I, j , F- ,-....
�- Downlight A
1, i
Solid-State Lighting Vir
OPTICAL SYSTEM ELECTRICAL SYSTEM
v• • Self-flanged or flangeless semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine
c • Patented Bounding Raym"optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60.000 hours
m • 45°cutoff to source and source image • Tested according to LM-79 and LM-80 standards
H
• Top-down flash characteristic • Overload and short circuit protected
• Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional
MECHANICAL SYSTEM LISTINGS
• 16-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location,
• Telescopic mounting bars maximum of 32"and minimum of 15",preinstalled, covered ceiling
4"vertical adjustment WARRANTY
• Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at
• Junction box capacity:8(4 in,4 out 1 12AWG rated for 90°C www.acu tvbrands.com/CustomerResources/Terms and cond tions.asox
• Light engine and driver accessible through aperture
• Injection molded mud ring includedwith flangeless trims.Ships separately. Note Actual performance may differ as a result of end user environment and application.
Installs independently of the mounting frame to reduce cracks in plaster due to All values are design or typical values,measured under laboratory conditions at
vibration. 25 T.
I
o EXAMPLE:EVO 35/10 6AR MWO LSS MVOLT E21
z
0
xi
c) Series Color temperature Nominal lumen values Aperture/Trim color Trim Style Distribution Finish Voltage
z
o EVO 21/ 2700 K 10 1000 lumens 6AR Clear (blank) Self-flanged MD Medium LSS Semi-specular MVOLT
30/ 3000 K 15 1500 lumens 6PR Pewter FL Flangeless (0.9 s/mh) LEI Matte-diffuse 120
z.
s 35/ 3500 K 20 2000 lumens 6WTR Wheat MWD Medium wide LS Specular 277
= 40/ 4000 K 25 2500 lumens 6GR Gold 11.0 s/mh) 3472
30 3000 lumens 6WR' White WD Wide(1.2 s/
35 3500 lumens 6BR' Black mh)
40 4000 lumens 6WRAMF' White anti-
45 4500 lumens microbial
Driver3 Options
EZ10 eldoLED ECOdrive 0-10v dimming driver.Minimum dimming level 10% SF Single fuse.Specify 120V or BGTD Bodine generator transfer device.
EZI eldoLED ECOdrive 0-10V dimming driver.Minimum dimming level 1% 2770. Specify 1200 or 2770.
EZB eldoLED SOLOdrive 0-10V dimming driver.Minimum dimming level<1%. TRW' White painted flange CR190 High CRI(90+)
EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming level<1%. TROL' Black painted flange CV Chicago plenum.Specify 120V
EDXB eldoLED POWERdrive DMX with RDM(remote device management). EL' Emergency battery pack with or 2770.
Minimum dimming level<1%.Includes termination resistor.Refer to integral test switch RRL_ RELOCw-ready luminaire connec-
DMXR Manual. ELR' Emergency battery pack with tors enable a simple and consis-
EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming,0-100.Refer to XPoint remote test switch tent factory installed option across
tech sheet. NPS8OEZ' might*dimming pack controls all ABL luminaire brands.Refer to
EXAB XPoint Wireless.eldoLED SOLOdrive<1%dimming,0-10V.Refer to XPoint 0-10V eldoLED drivers. E61 for complete nomenclature.
tech sheet. NPS80EZER" nLigllte dimming pack controls
ECDS243 Lutrona Hi-Lumee 2-wire forward-phase dimming driver.Minimum dim- 0-10V eldoLED drivers.ER
fling level 1%.Minimum lumen 1000/Maximum lumen 3000. controls fixtures on emergency
ECOS34-2 Lutrone Hi-Lumen 3-wire or EcoSysteme dimming driver.Minimum dim- circuit.
ming level 1%.Minimum lumen 1000/Maximum lumen 4500.
EVO-6-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighling.com
PAGE 1 OF 4 ®2010-20 It Acuity Brands Lighting,Inc.All Rights Reserved.Rev.C3/17/16.Specifications subject to change without notice.
I0 gotham
Down Lighting (LP11B-DIM)
Luminaire Type:
(0 gotharrf Catalog Number
(aut0000ulated):
Gotham Architectural Downlighting
' LED Downlights
8" Evo®
a > Downlight
,,,.•.. _• . ..
Solid-State Lighting
OPTICAL SYSTEM ELECTRICAL SYSTEM
n • Self-flanged semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine
c • Patented Bounding RayTM optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60,000 hours
'm° • 45°cutoff to source and source image • Tested according to LM-79 and LM-80 standards
• Top-down flash characteristic • Overload and short circuit protected
• Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional
MECHANICAL SYSTEM LISTINGS
• 16-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location,
• Telescopic mounting bars maximum of 32'and minimum of 15",preinstalled, covered ceiling
4"vertical adjustment WARRANTY
• Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at:
• Junction box capacity:8(4 in,4 out 1 12AWG rated for 90°C www.acultvbrands.com/CustomerResources/Terms and conditions.asox
• Light engine and driver accessible through aperture
Note Actual performance may differ as a result of end user environment and application.
All values are design or typical values,measured under laboratory conditions at
25"C.
°A EXAMPLE:EVO 35/25 8AR MWD LSS 120 EZ1
0
in
a
z
• Series Color temperature Nominal lumen values Aperture/Trim color Distribution Finish Voltage
E
a EVO 21/ 2700 K 20 2000 lumens 8AR Clear VND Very narrow(0.5 s/mh) LSS Semi-specular 120
3 30/ 3000 K 25 2500 lumens 8PR Pewter ND Narrow(0.7 s/mh) LD Matte-diffuse 217
0 35/ 3500 K 30 3000 lumens BWTR Wheat MD Medium(0.9 s/mh) LS Specular 347°
= 40/ 4000 K 8GR Gold MWD Medium wide(1.0 s/mh)
8WR' White WD Wide(1.2 s/mh)
8BR' Black
8WRAMF' White anti-
microbial
Driver3 Options
EZIO eldoLED ECOdrive 0-10v dimming driver.Minimum dimming SF Single fuse.Specify 120V or 277V. BGTD Bodine generator transfer device.
level 10%. TRW' White painted flange Specify 120V or 217V.
EZ1 eldoLED ECOdrive 0-10V dimming driver.Minimum dimming TRBL' Black painted flange CRI90 High CRI(90+)
level 1% EL' Emergency battery pack with CP' Chicago plenum.Specify 120V or 277V.
EZB ekCoLED SOLOdrive 0-1OV dimming driver.Minimum dimming integral test switch RRL_ RELOC®-ready luminaire connectors
level<1%. ELR' Emergency battery pack with enable a simple and consistent factory
EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming remote test switch installed option across all ABL luminaire
level<1%. NPS80EZ' nLighte dimming pack controls brands.Refer to EL for complete
EDXB eldoLED POWERdrive DMX with RDM(remote device manage- 0-10V eldoLED drivers. nomenclature.
ment).Minimum dimming level<1%.Includes termination NPS80EZER'.e niighte dimming pack controls
resistor.Refer to DMXR Manual, 0-10V eldoLED drivers.ER
EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming,0-10V.Refer controls fixtures on emergency
to XPoint tech sheet. circuit.
EXAB XPoint Wireless,eldoLED SOLOdrive<1%dimming,0-10V.
Refer to XPoint tech sheet.
EV0-8-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighting.com (gotham'
PAGE 1 OF 4 0 2010-Z01 ti Acuity Brands Lighting.Inc.All Rights Reserved.Rev.02125/16.Specifications subject to change without notice.
Monopoint Projector (LP-10)
Space Player
LIGHTING PROJECTION
PT-JW130GBE (Black) PT-JW130GWE (White)
Specifications:
•Device material:plastic(high-gloss,matt white/matt black) •Projection ratio: 1.5-3.3:1
•Optical output:1.000 lm(ANSI) •Keystone correction:horizontal/vertical 4-paint cor
•Main voltage: 100-240 V AC 1'.4-0.6 AI,50160 Hz (corresponds to a±40°angle)
•Output:125 W •Connectors:
•Weight 3.2 kq -fiDMI IN:1 x 19-pm 110MI IHDCP-cumpatibiel
•Light source:laser diode -1 x LAN RJ-45 for network ccnnecticn,tGODase-TX.103ase-T.
•Operating lifetime:20,000 hours PJlink'"-cempat:ble lCtasstt
(as long as 50%of the original brightness are maintained.( -AUDIO OUT MS stereo mini jack
•Wireless remote control is included in the scope of delivery. -DC OUT 1 x USO port(Type Al.for voltage supply 15 V DC,max.9:0 mA)
•Projection system:DLP'1 x Chip,DLP°Method •Card slot:1 x SD card slot
•No.of pixels:1,039.680 pixels(WXGAI (SDHC card with 32 08 storage capacity);
•Recommended image resolution:1,280 x 800 pixels •WLAN:IEEE802.11a/b/g/n
•Lens:power zoom 11-2.2 xl,power focus • Compatible with Miracast wireless transmission tecn.rology
IMPORTANT:As a Class 2 laser product,the device fully complies with all provisions of the JIS C6802,2011 safety standard.
Never look straight at or into the lens when the device is in operation.
OLP is a registered trademark of Texas Instruments Incorporated.
HDMI and High-Definition Multimedia Interface are trademarks or registered trademarks of HDMI Licensing LLC.
All product images and application examples in this catalogue are provided solely for illustrative purposes.
P asonic
SINESS
Thermostat
Component Descriptions
Supervisory Controllers 61.9 Diagnostic
(2.438)
Light Emitting Diodes
The TEC Series Wireless Thermostat Controller 1s 13
System uses Web-enabled, Ethernet-based, / (6.313) --).1
supervisory controllers that connect BAS networks to v a a v v o —
IP networks and the Web.These supervisory
controllers provide scheduling, alarm and event
management, trending, energy management, data
exchange, dial-out capability,and password protection. - 122.4 With a computer running Microsoft®Internet Explorer® (4.82020
)
Web browser version 6.0(or later),you can browse to a
configured supervisory controller, and monitor and
control BAS field devices in the User Interface(UI).
Refer to the TEC Series Wireless Thermostat
Controller System Technical Bulletin(LIT-12011414)for +---y
information on configuring a TEC Series Wireless Direct Mount
Thermostat Controller System. i) Antenna
TEC20 Coordinators
LAN2(SEC) LAN1 (PRI)
A TEC20 Coordinator provides a wireless interface RJ-45 Ethernet Port RJ-45 Ethernet Port
between a supervisory controller and the TEC Wireless Figure 3: TEC20 Wireless Coordinator,
Thermostat Controllers, allowing the exchange Physical Features and Dimensions, mm(in.)
BACnet IP (TEC20-3C)or BACnet MS/TP
(TEC20-6C) messages.
The TEC20 Coordinator initiates the formation of the A
Jarman
wireless mesh network–one is required per wireless y
mesh network. Each TEC20 Coordinator and the
TEC Wireless Thermostat Controllers assigned to it
share a Personal Area Network Identification (PAN ID).
A TEC20 Coordinator requires a 15 VDC power source 125
(available separately).An optional remote-mount (4-15/16)
antenna and cable is available to allow transmission
when the TEC20 Coordinator is mounted inside a metal OrciVern)
panel.
O O O
TEC Wireless Thermostat Controllers 00000
Depending on the model, the TEC Wireless
Thermostat Controllers can communicate sensed I�
(3-3/8)
temperature, setpoint temperature, and other data with
an associated supervisory controller. Using this o o A
information, the TEC Wireless Thermostat Controllers I° ^ ^ °t 29
control rooftop units(with or without economizers), �; 1-118)
heat pumps, and single-and multi-stage
heating/cooling equipment. See Applications for more Figure 4:TEC Wireless Thermostat Controller
information.The TEC Wireless Thermostat Controllers Dimensions, mm(in.)
are designed for indoor, intra-building applications only.
The TEC Wireless Thermostat Controllers can also
serve as repeaters to extend the range of the
communications within the wireless mesh network.
TEC Series Wireless Thermostat Controller System for Staged Equipment Product Bulletin 5
Project: AIPP Implementation
Miami Beach Convention Center Renovation&Expansion
10/4116
Study & Design
Discipline Firm Name Firm Fee
Number
Architecture Fentress Architects 1 $4,665
Architecture Arquitectonica 4 $0
Fire/Life Safety/Code Consulting Jensen Hughes 13 $905
Civil/Utility Engineering(Lump Si Kimley-Horn 6 $0
Landscape West 8 7 $0
Structural Engineering Wallace 8 $0
Vertical Transportation Lerch Bates 12 $0
Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0
IT,Security,AV,Acoustics DL Adams 20 $0
Food Service Caruso 25 $0
Traffic Corradino 27 $0
Graphics and Signage TKD 28 $0
Parking Consultation Walker Parking 29 $0
Wind Analysis RWDI 35 $0
Design Fees(Lump Sum) $5,570
Expenses 2% $111
Total Total $5,681
AIPP Implementation
Fentress Architects
Hours
Job Title Hourly Rate Hours Extension
Task 1:Task Management,Architectural Design,Coordination and Oversight-Ellen Harvey
Architect III $175.00 8 $1,400.00
Intern Architect II $100.00 4 $400.00
Interior Designer II $110.00 24 $2,640.00
John Kudrycki $225.00 1 $225.00
Totals this activity: Hours 37.0 $4,665.00
Total,Sub 1 37.0 $4,665.00
Hours Total 37.0 $4,665.00
AIPP Implementation L2 North Harvey
Miami Beach Convention Center
Fentress Project No:20140021
October 4,2016
Page 2 of 3
AIPP Implemenation
Jensen Hughes
Hours
Job Title Hourly Rate Hours Extension
Task 1 Fire Alarm and Protection-Ellen Harvey
Senior Consultant/Associate Manager $205.00 1.0 $205.00
Consultant $175.00 4.0 $700.00
Totals this activity: Hours 5.0 $905.00
Total,Sub 1 5.0 $905.00
Hours Total 5.0 $905.00
AIPP Implementation L2 North Harvey
Miami Beach Convention Center
Fentress Project No:20140021