Amendment No. 22 to the Agreement with Fentress Architects in the Amount of $17,121 c2011(- 018S- S") • AMENDMENT NO.22 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AN D FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$17,121 This Amendment No. 19 to the Agreement made and entered this ` day of Z. roat- 2016, by and between the CITY OF MIAMI BEACH, a municipal corporation existing.under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado(hereinafter referred to as"Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90%completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and . WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project,to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required 1 of the Architect-Engineer for the Project, in the total amount of$15,156,359 (part of Resolution No. 2015- 28925);and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790;and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19t Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on , 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, this Amendment No. 22 is for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program;and 2 NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 22. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-22", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 22. . IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.22 to be executed in their names by their duly authorized officials as of the date first -et forth above. I ATTEST: CITY OF i IAMI BEAC y INvommumiiiii_ I Z,fLcs l l v per' , B -4144111. � Rafael Gr nado � •'"" o t , my L 1 orates City Clerk .�4,•, Man .er Ar -~�1 . ATTEST i = yam"- ';' : • SUL NT: . ARCH TE✓T' ire.. .INCORP ORAT� - S gnature �' . T?ature Print Name/Title .. „ �r1 `14y11�r4` "Z >•� Print Name/Title �K ye_ /"� APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION OA gime 1/4--- City Attorney A/. Date 3 1 Appendix"A-22" 1. SCOPE OF SERVICES Revisions to the construction documents as needed for proper coordination of artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program. 2. TIME OF COMPLETION Approximately four weeks 3. PAYMENT AND COMPENSATION $17,121 lump sum upon issuance of CCDs or Field Orders Summary • Project Contingency Added Total Scope Original Agreement $ 10,967,200 $ 1,096,720 $ 12,063,920 Amendment-Reso 2015-28925 (5, 6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259) Amendment 8 $ 15,156,359 $ 15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $ 25,436,700 $ 1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3 -Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11 -Event Plans $ 36,875 Amendment 12 -Stormwater Revisions $ 34,073 Amendment 13 -Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design' $ - $ 148,999' Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'' $ 49,360 Amendment 18-Additional Site Visits" $ 112,6491 Amendment 19- East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis' $ 96,710' Amendment 21 -Cameras,vaults, RFIs, kitchen,transition slab $ 80,330 Amendment 22—AIPP(Morris,Ackermann& Harvey) $ 17,1212 Total $ 25,436,700 $1,000,000 $884,548 $27,321,248 1. Amendments 14, 18 and 20,totaling$358,358,funded from Clark's contract via deductive change orders. 2. Amendment 22 funded from AIPP fund. • 4 FAA-Apt Az_ 61 FENTRESS ARCHrFECTS " • tent ressarchitects.corn October 7,2016 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 33—AIPP Level I Southeast Exterior Franz Ackermann Revision Project 20140021.001 A31 Task 003 Dear Mr. Morales: This proposal is to provide design services for a revised configuration of wall surface finish and landscape materials in the location of the artwork wall mural. This work constitutes an additional service, as redesign of previously approved conditions is outside of the Design Team's current scope of work. SCOPE OF SERVICES: The City has determined locations for artwork through the Art In Public Places program.Coordination with these locations has occurred over the last several months. This proposal covers revisions in the areas exterior to Storage 1.26.03 on the east and west sides. The City would like to pursue the design revisions as indicated below. The tasks for this effort are as follows: • Revise planting types in two southeast planters. • Define control joints that appear in cement plaster finish on exterior wall surface to the extents required by the artwork. Provide a finish smoother than `sand' if possible. • Assist in coordinating review of wall mounted components purchased through the CM contract. • Issue Field Order. SCHEDULE: • Development of backgrounds 1 week • Landscaping and architectural development 3 weeks • QA and CCD finalization .5 weeks TOTAL 4.5 weeks FEE Fees for all services will be a total lump sum amount of Five Thousand Seven Hundred Twenty Dollars($5,720). Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.001,A31 Task 003. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free contact me with any further questions or comments you may have. DEN DC LA SF LON SH I 421 Broadway I Denver CO 80203 I 303.722.5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 33—AIPP Level I Southeast Exterior Ackermann Revision October 7,2016 Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects e. ohn Kudrycki,AI ,L AP BD+C Principal encl: Concept Sketch series A30 dated August 12,2016,2 pages Design Fee Summary dated October 7,2016 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Steve DiBartolo,Heidi Wigand,Hill International Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects { Project: AIPP Implementation -Ackermann Miami Beach Convention Center Renovation &Expansion 10/7/16 Study & Design Discipline Firm Name Firm Fee Number , Architecture Fentress Architects 1 $2,425 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering(Lump SI Kimley-Horn 6 $0 Landscape West 8 7 $3,295 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Wind Analysis RWDI 35 $0 Design Fees(Lump Sum) $5,720 Expenses 2% $0 Total Total $5,720 AIPP Implementation -Ackermann Fentress Architects • Hours Job Title Hourly Rate Hours Extension Task 3:Task-Management,Architectural Design,Coordination and Oversight-Franz_Ackermann Architect III $175.00 8 $1,400.00 Intern Architect II $100.00 8 $800.00 John Kudrycki $225.00 I $225.00 Totals this activity: Hours 17.0 $2,425.00 Total,Sub 3 17.0 $2,425.00 Hours Total 17.0 $2,425.00 • • AIPP Implementation LI SE Exterior Ackermann Miami Beach Convention Center Fentress Project No:20140021 October 7,2016 Page 2 of 3 AIPP Implementation -Ackermann West 8 Hours Job Title Hourly Rate Hours Extension Task 3 Laniiscape Design Franz Ackermann . • Design Director $375.00 1.0 $375.00 Principal/Director $250.00 1.0 $250.00 Project Director $185.00 2.0 $370.00 Landscape Designer $115.00 20.0 $2,300.00 Totals this activity: Hours 24.0 $3,295.00 Total,Sub 3 24.0 $3,295.00 Hours Total 24.0 $3,295.00 • • AIPP Implementation LI SE Exterior Ackermann • Miami Beach Convention Center Fentress Project No:2014002I Page 3 of 3 October 7,2016 luoKwc.al3aroad 3.0030019A30 NOISNYdX3 4 NOLLYAON321831N30 NOLLN3ANOO H MW 3Y38IN w Q O m 413319 .0))0t1 WON il0Jmnaw 103f02d 2 81031114NY D Cr) 00 I 7,0130 NOLLY301 HOl3>IS SS3b1N31 5 El auace 0100 uuewJepO'zuel j ddIV 91N 31009 :31W.ONIMV80 w P 4 _ as d = , in 777 i al X i _ • `o m rit m " I C J ^m L ii Wb �'vois�p'Q ? Jb W.. J8 0z8 E t � 1Sri m =§� 7 1 S J g m g Y o g JiIi O C m c.z E fief J Z m Z 3 , Jilit s-�ieia a� 3 NJ Ill. k A Ill._ A H.."' I -1, ---- __ " 174! 5- -I i I U I :uit °e i 11 1 AI i ,I Q a 1 i ii... 1 a ��� 8� ! s M o E _ S ____.:ji A II 1 0 K 0 1 gi II L.' f. I annannenonnw co C i CN . I E• T. • C y'_ I LL Ell ' I I •Z ill . -_ -1�®I a ■ --- 4.Q ill� r 'g i 4 0 I r ; I e•E i;G N s P Q - ./ — app h'e P 'I q Id c I� 4 r Qa B I + — uf)fElm I "o-0- 6 ` o o $0°00660° € fi to n n a % m of 0:0:m I O000000a. s i i 1 =OP HZ 4133034d MVO aaanaa NOISNVdX3 V NOI1YAON3N 83.1.N33 NOIlN3ANOO H3V38 IWYIW w m rN 113346 ......41*MN tw a3a561 f 0 l03fOLld 910311H3tlY D M rN .,riw I Z 0 NOIlV30I H013YIS SS3II1N3J v zI YO 010Z 31ra uuewle)CJV zUeij ddIV �[ $1.31ra6 :31111 ONIMVLIO V) m EIDd gr JED m I i ,n.4 " LI b • pmQ CL''''' J m> g 1111110 ea_ j . ...111 P ( J J W m p m E w 7. e ON _ _ai • � ` { I VIII 9 � 1 m L E 2 $� 11 I I h .E c 11111 -.2i I a :■1121 - !- ><J :1111I — �!,1®I ,p iI,I� I i of ri ii I i 19 O del....■fie --.Ir71 '1 m. . 1 0 . iliii lipi,a.•-:ii c‘i ri 4 .int 014 in g C III ';13' 14 °lit i " _ .t 1M .N co 1 . u. m' Ili! n �, Iii.. :J J 7 O It " .1,- I � m NIl N• 4 F - 8£ i .S6.S e H: :_ .k111:: g s; i 52• i u IIL� a ., iii a ir m °m I 4 1-co. te;0 a a a I °m I Z 31nrn�o iII 00000a E Q1-I-03 I-CO. i I Wm-7+ Pateu,r FENTRESS tantressarchitects.corn October 7,2016 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 32—AIPP Level 1 Northeast Exterior Sarah Morris Revision Project 20140021.001 A31 Task 002 { Dear Mr.Morales: This proposal is to provide design services for a revised configuration of wall surface finish and landscape materials in the location of the artwork wall mural. This work constitutes an additional service, as redesign of previously approved conditions is outside of the Design Team's current scope of work. SCOPE OF SERVICES: The City has determined locations for artwork through the Art In Public Places program.Coordination with these locations has occurred over the last several months. This proposal covers revisions in the areas exterior to Supplies 1.06.03,Parking 1.03.01 and Open Stair ST.1.02.01. The City would like to pursue the design revisions as indicated below. The tasks for this effort are as follows: • Revise planting types in northeast planter; • Delete bicycle parking and detail paving infill. This component will be relocated under a separate design effort for the 21"Street Park; • Delete cement plaster finish from exterior wall surface to the extents required by the artwork; • Assist in coordinating review of wall mounted components purchased through the CM contract. • Issue Field Order. SCHEDULE: • Development of backgrounds 1 week • Landscaping and architectural development 3 weeks • OA and CCD finalization .5 weeks TOTAL 4.5 weeks FEE Fees for all services will be a total lump sum amount of Five Thousand Seven Hundred Twenty Dollars($5,720). Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.001,A31 Task 002. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated.Please feel free contact me with any further questions or comments you may have. DEN DC LA SF LON SH I 421 Broadway I Denver CO 80203 I 303 722 5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 32—AIPP Level 1 Northeast Exterior Sarah Morris Revision October 7,2016 Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ohn Kudry cki,AI ,L AP BD+C Principal encl: Concept Sketch series A28 dated August 4,2016,2 pages Design Fee Summary dated October 7,2016 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Steve DiBartolo,Heidi Wigand,Hill International Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects Project: AIPP Implementation - Morris Miami Beach Convention Center Renovation& Expansion 10/7/16 Study & Design Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $2,425 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering(Lump Si Kimley-Horn 6 $0 Landscape West 8 7 $3,295 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb, Mech, Elec,Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Wind Analysis RWDI 35 $0 Design Fees(Lump Sum) $5,720 Expenses 2% Total Total $5,720 AIPP Implementation -Morris Fentress Architects Hours Job Title Hourly Rate Hours Extension Task 2:Task Management,Architectural Design,Coordination and Oversight-Sarah Morris Architect III $175.00 8 $1,400.00 Intern Architect II $100.00 8 $800.00 John Kudrycki $225.00 1 $225.00 Totals this activity: Hours 17.0 $2,425.00 Total,Sub 2 17.0 $2,425.00 Hours Total 17.0 $2,425.00 AIPP Implementation Ll NE Exterior Morris Miami Beach Convention Center Fentress Project No:20140021 October 7,2016 Page 2 of 3 AIPP Implementation-Morris West 8 Hours Job Title Hourly Rate Hours Extension Task 2:Landscape Design East Wall-Sarah Morris Design Director $375.00 1.0 $375.00 Principal/Director $250.00 1.0 $250.00 Project Director $185.00 2.0 $370.00 Landscape Designer $115.00 20.0 $2,300.00 Totals this activity: Hours 24.0 $3,295.00 Total,Sub 2 24.0 $3,295.00 Hours Total 24.0 $3,295.00 AIPP Implementation L I NE Exterior Morris Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 October 7,2016 IMO=61l33P0tld 3110 NO151A3Y O= NOISNVdX3 V NOIIVAON38 1:131.N30 NOIIN3ANOO HOV38 IWVIW wm Q 6113347G 'UCH a3n36! 200 1O31Oad S13311H3W 7 N NOLLVOO H013NS SS3d1N3J 5° I 9LOZ env b air= SIii0W 4egS ddIV Y •8•1•N 31 l.w.ONIMVLIO n(n I a z a li I I .J f I 1n i� i1 :i�; C C- ' anc § 1 I M41.4l , i � 1i E I ov _ I _ mow �x ;! IeN i $ S,W a ��E ; -�''�_ ,x III h3 E IM m{ ! e 1!�e kl i L i 0 i �- t?1 a 1` �'�� t r 1:.% II f Mr 9 y •$ i ..P. .;... , \ t 1 f! . . .1. ..-.1i4 , > , 2/ l. m 5 L W 11.'"-- it',' 1.7> 4 . o 4:{ a °m 5 g {��,. y 8 w v c '4 h'- H i in i> E m! hh4 . i t ' c , ''' 'Se n'32' 2 c g''•m.c c \I---- �U'�GOm f3Y � y O ! I _ o p v Ts 0 tL RI-- a's C a t E _,..I.. ----- - n ome5$ 8 i m li 2 Q r : � `o6 E ?) g u mi mW og adn m :1-Bf-_ 4 4 a o r, :g _ c ' o E 3 S Z — - - I-FOm .-NNI O a<r cv<6 4 v N,O I : 'I '1 1 i 1113 e n*-'t -11 •-■ I_ 1 i-m ! t E I . 1 7 h300PL 4131rONd 3120 NOISI23d a= NOISNVdX3 IT NOIIVAON32i N31N30 NOIIN3ANO0 HOV38 INVIW w 0 4133HS LOA a co 1�3f021d S331IN3 V 3 co J NOLLV001H013 S SS3d1N3J 5 9 9I.OZ onv v 312a Swoy\J 4eleS ddld Y I -gl-N3IrJe 31111ONIMV2i0 uJ CO € II F Y C • >> V. G C . m O . m O_ G H N Y O W t0 yay 8 w 2 0 3 d d [[ c N p O Y. J C m y C iG ■ p m J J^ j d N, W 4] 2 i C 2d 9 D W C >, J OO . , A C e E O 4 N W > O't u to i O Qm W J W U coE C g - m ce C— m H r ; 1 m — O N W 9 y I W O eJ W w a O t M N • a W , p a v d o5vS � ` ` .2o r z p m ,D `5 d E .aaE m E ELL « Ow p > o I j I IH o 20 ' o � c tm c m f o _I m§ D p n g v; g v c t o _ m n •fog ox 3x�3uJ n 9W> > 0 a o�mux ; xao d— moir6!?ouiro aa«ni of m ,LA.4, ui i I 6 1 $ li\ X E 1i_ I�_�I�i W N o a 10_,_.- D— 5 ���i: O1 7 @ Cps J J \I� "Tr_ 2— I C VV II SS F S W LW z{ iI 1 LL LL N Q I 1 z co (79 xcli NMI ---19'A MI C J.: e Q �, S a ��� NE;1°.)ill k i 7 AJ1IIP E akv ".ir c) -- .....■ i- E. , P m . ........T. . ._. .. .el, * .. • : - mu. . _ .1 ,..,i. alki ... ii , In i i.-,,,-111=-- <0 di APPIA0t i , ____ . z _ .5 , il i cn 1 fl 4 ' liii C7 • i mi. a h lIq 1 ig 9. t°, I; jilt - ___, aft" III "LIZ la I I!! _—�.... i v III !h��.�1� 1 1 7:.,,,,, • / V- 1 co t I I I � N U no I 2 2 OOm m N Z J J N 07 Q.o M0 0 - uj r2 111 C`i w° O 1 _�- 0,69•/ ii-A14-0Letr FENTRESS lentressarchitects.com October 4,2016 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33039 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 31—AIPP Level 2 North Ellen Harvey Revision Project 20140021.001 A31 Task 001 Dear Mr.Morales: This proposal is to provide design services for a revised configuration of life safety and electrical infrastructure in the location of the artwork wall mural. This work constitutes an additional service,as redesign of previously approved conditions is outside of the Design Team's current scope of work. SCOPE OF SERVICES: The City has determined locations for artwork through the Art In Public Places program.Coordination with these locations has occurred over the last several months. This proposal covers revisions in Ballroom Prefunction 2.03.01. The City would like to pursue the design revisions as indicated below and the tasks for this effort are as follows: • Relocate fire extinguisher cabinets from area of mural to wood panel portals; • Relocate convenience outlets to within stainless steel wall base; • Relocate fire alarm speaker/strobes to north side of Prefunction; • Provide elevation dimensioning for all items in wall; • Issue Field Order. SCHEDULE: • Development of backgrounds in Revit: 1 week • Engineering and architectural development: 2 weeks • OA and CCD finalization: .5 weeks TOTAL 3.5 weeks FEE Fees for all services will be a total lump sum amount of Five Thousand Six Hundred Eighty-One Dollars($5,681). Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee. Reimbursable expenses will be billed in accordance with the existing terms and conditions of our Agreement. Billings for these services will be invoiced under the heading#20140021.001,A31 Task 001. Attached is the breakdown of hours and associated fee for this additional effort.Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated.Please feel free contact me with any further questions or comments you may have. DEN DC LA SF LON OH I 421 Broadway I Denver CO 80203 I 303 722.5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 31 —AIPP Level 2 North Ellen Harvey Revision October 4,2016 Page 2 If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ohn Kudrycki,AliZjiteidAp Al BD+C Principal encl: Concept Sketch series A29 dated August 9,2016,9 pages Design Fee Summary dated October 4,2016 C: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Steve DiBartolo,Heidi Wigand,Hill International Holly Carson,Anne McNeely,Mikala Casillas Fentress Architects 1 mmorammoad aveomomm NOISNVdX3 4 NOLLVAON321 N31N30 NOIIN3ANO0 H3V39 114/VIIN u.1 Q v"V13349 "nw wnw yoimnsfx 103f0LId 9.1.03.1.114011V 2 N :NOLLV00fl431)1S I SS]U1N3d ZO abua axVa AaA)eH uall3 ddIV r TEN 77/32 :311LL ONIM'd80I co c c a co 74, a a o -_— lei` g — – ti la;r` e N.11.7, _ .CN N C) y m I .1 - h d 8Y z z O J t a a 4 1 En- 04 + g E E 1 s ° to a _, : a Li)= N O C —ssa 0 C W 22i; V V..-=-..-• - f ..N C u) N �i J LL 2&3-1 0 ° m r--E z c - ,� ` ai _- 1, . O yzz %, "r- as A ; + 9 mV $ +- j • I ' `i1r - 1 r it-;--- ,Ti.. — f--- I I 1 ; a ....... .` '5, _ i- .—i 1 + a 1 4, II6 N ! .— U t Ir,:d ..-00 5 L...._..—• digl .. W ° . 0,-. T. 2 oSe 3 3. 'w 114/1141"--I g -1 i + 03 a MOOR , �$ ? ,-- I !._�_ l I.:-or- .r- E T Y Z Z dim Si O _ C W N I I , LL • N .22 Q I - t -I- 1� m -y IT 6 a o o o vmxos n , O E LL i�o _ r — - .r>• a n I! ( 2 I I c ti c g O. o 1 cu E c c° O,L £ N y O° U n v10 t gc -. V mo .. 5q 6 m d n 3 c ; g7 y 2 0 m m .0 MT, m 9 y n 9 u▪ g m o c m o 2--c i m i a v g i m m n ` 58Q E- I a y l E 1. _E a oc _ .2d4, c .1tckEo 2.- � $> @ N)▪ 4,C rm g£m ,WC CI 0 °S&I E E �E a h, ! a 5. . c m y- m ty O G o c RH EM ~ A m g O ZC��� o � m av 5 Nit O C _LLt WH1CN � mpGs 2L-6T= . mn 8 rm t ° d�5€ugmrU� NU�gxES=°0=cd(A 41 U19O NU EO mO s.$ y le O U W O O m 0 0 S W C C O N . C O. ° d. .- x0(V d lL°I LL's� 6N ; O.W x'1�x0 tp Q�N 6,D�S I� O W O ;�vi ■ 120111`°Z a173ro21a 3+vanaen3u NOISNVdX3 8 NOIIVAON3N 2131N30 NOIIN3ANO0 HDV38IWVIW w m CO VH 1133N5 a°•s's m QJ voi��� 103fO21d 0+ 0T>13U 81731 N 1H08Y Z O NOILV001H013NS SS3HLN33 5 1010 OW..31Va AeAleH uall3 ddIV WIN 31V]S :31111 ONIMV2lC w 0 i v O t E ,L m m 0 U o E m W I 1 o 3 o O . '1, (2 a 5 1. LL om i U E m= I Illir — Mill IL'Er_ 311E o▪ "E i e1 _■INNIME ' r l t _. i - 11.-; iiii Pii 1- el I e a ,� I S F F Illh Al CD i 81' m— u 'fl lb zi,ir, 5 ,-6 t illn €e 76 1 in y °w E W i Cr) $N f v g r i 76 `g Q 2 9 R ER c i ,_„_A mat_ _ 1 ■■ 1�) A1) a o- m 0 8 .2 O „ �i — 0,11a i m l ►S y9a 5c'. t m w '� 1 ..I �I � m�i� --- g� I ac IIIIII : $ m9 0 0 U o C 2.T N N Qi-: ! I2E3` 0 z Z Z X 71 G y I !I.:I r9 I ing - aski IV 1 E -_, 0,, ie24 IE loco�� c aO ao a°''°18� • w 'I` °$ I LLLL 3....T0E N D c Ei )ilitiEll ry C N Si U 2g § E !rr z Q f, N i m 9 '6 2 3 Q a ', a Iai !gg 11 I. ° 1 m— II Z m � U fn 8 a Lii E Iy G N 0 y N C <>_,k cm , U u g i c En , m if o y o : -I— 9 t ■ d z U 8 9 1 aa O .3 x_ a mm -........"....-%-'% .1..:1: : FA" �'OR■_�I_} ° =I 1 6 ,03g2,0 F C L_AEI ll I o ''• CV 'ay 1 , aO�Qc�in ooi_!^ovi 3‘0 L 1 1 +I ' L 1 3.1 . ._ . ._ . GD W 3 11o111¢aia;rOlw azrallalseu NOISNYdX3 8 NOIiVAON3LI L131N33 NOIIN3ANO0 HOV38 INMW w 0 m YN i119iN NNw WN was 103fOLId 913311HJHY i N VN *WOO O 14011V00114013243 SS3a1N3A1 3 , 110110910C MVO fanueH 118113 ddIV L VIII MIMI 311LL ONIMVLIO N (1) pp i a v �' E 1 y� T jt liq ' ii !1 1I •�' f�. 1R R = s :1!_) U�� �� ti.. ! � ����. — ta 01 C : t1 1_ }ti �F A 1 I / 121J'th1IHi I M 115 alf:r111i91 z I !s i Q 1 fr W 0 a t g , K3,w z It N J 6 'Li" Q ► 1 F 1-LN�C7 Y nna t '� sna 3 II 0 l 2 Q 1 a WN N 1 f. ���I''s� j■■ y7 Y O i i_ ii V A, 5p w B 7 co co o �, _41 _' 4 0 4 Li-v ii; ! ac ZIMIIIIIIIIIIbr A ig of ! CO CD CO 4 a a < 4 w j 1 (}� 2 CEO m m 6a 1 t N Z N N m N N Q a < c? < C < < 0§ ! r O o O o o O o O O _3 It i a r s Ta 1 o i Ta a m c I P. < g$ a w 3$ c Ey I m c� c o & C y S 5 4 a a 2 ° o'8 a E Q `0 3 3 cc i a `�'a19W m W OI t O 41 0 a O d ' `y { E`o g m E A g% i N � `g21 y3 ES P,i `= a S€,... ` mu- $� Y U= O■'m a— A ai 3 2101-dr I3 Fire Extinguisher Cabinet- 1770 Series (FEC) 1750 SERIES \F IRE EXTINGUISHER&VALVE CABINETS CROKER For Use With Fire Dept Valve, 2 1/2" Fire Dept Valve & ilmoollici Fire Extinguisher Series 1750 and 1770 cabinets will accommodate Fire Dept Valves, 1 1/2"and or !l 2 1/2"size with caps and chain and a portable Fire Extinguisher. r 6'4 STANDARD EQUIPMENT • * Heavy gauge steel construction tub,door and trim *White powder coat finish 1750 Series *Continuous steel piano hinge 3 * Pull handle with roller catch I 4,0 ) CABINET OPTIONS ORDERING PROCEDURE 1I ca - { *Prefix FR for Fire Rated Cabinet *Select cabinet Figure No. *Suffix AL for clear anodized aluminum door and frame *Select door style ' 74 *Suffix SS for Stainless Steel#4 finish door and frame *Select Fire Dept Valve with Cap *Suffix FF for Detention Grade Heavy Steel Door And Trim and Chain(Refer to Section 5000) . . — *Door Styles See page 2-6 *Select type and size of Fire 1770 Series *Other cabinet options See page 2-7, 2-19 and 2-20 Extinguisher - FIRE RATED CABINETS ' FIGURE# TRIM STYLE Trim Poj.Tp Valve Cap. Inside box dimensions Overall outside dim Knockout locations Wan Opening Required Wall Opening Required FR Option A B C 0 E .1 K M N Width Height Depth Width Height Depth 1750 Recessed 5/16' 20 27 7 314 23 318 30 318 4 4 4 4 21 28 7718 22 29118 8112 1751 Semi 4ecessed 1114" 11/2 20 27 7 314 23 318 30 318 4 4 4 4 21 28 6 314 22 29118 7 318 1752 Semi-recessed 21/2° or 20 27 7 3/4 233/8 30 318 4 4 4 4 21 28 517 22 29118 6 318 1754 Semi-recessed 4112' 21/2 20 27 7 314 23 318 30 318 4 4 4 4 21 28 3112 22 29118 4118 1758 Surface 23 3116 30 3/16 8114 23 318 303/8 4 4 4 4 1770 Recessed 318" 16 40 9 19 318 43 318 6 4114 6 4114 17 41 9 18 42118 10 • 1771 Semi-Recessed 1114' 11/2 16 40 9 19 318 43 318 6 4114 6 c 114 17 41 8 118 1B 42 1)8 91/8 1772 Semi-Recessed 2 1/2' Of 16 40 9 19 318 43 3/8 6 4114 6 4 iM 17 41 6518 18 421/8 7112 1776 Trimless 212 16 40 9 16114 40114 6 41/4 6 4114 161/2 40112 9114 1778 Surface 19 316 43 316 9112 19 3/8 43 3/8 a a a a a•No knockouts provided unless specified on surface mounted cabinets Note: Add 5/8"to depth of wall opening required for cabinets with aluminum frame Note:If 21/2"x 1 1/2"reducing adapter is used for Fire Dept Valve"C" dimension should be no less than 10". *Trimless,recessed and semi-recessed cabinets furnished with combination knockouts(1 1/2"and 2 1/2"on both sides) NOTE:FIRE RATED CABINETS HAVE NO KNOCKOUTS NN''... .': , _\ \ - TRESS RECESSED SEMI-RECESSED j M. FLAT TRM WITH RETMURty SURFACE 7J- N.,'1.. 11.. . .1;.1 1 Il ',.. I II 1..`,. '141 : i L• Page 2-18 Down Lighting (LP11-DIM) Luminaire Type: goth a m' Catalog Number Iaut0000ulated); Gotham Architectural Downlighting LED Downlights ' , -� i%-°‘ir 4 rr Evo® Downlight Solid-State Lighting Mgr OPTICAL SYSTEM ELECTRICAL SYSTEM r. • Self-flanged or flangeless semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine c • Patented Bounding Ray'''.optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60,000 hours s • 45'cutoff to source and source image • Tested according to LM-79 and LM-80 standards CA • Top-down flash characteristic • Overload and short circuit protected - • Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional MECHANICAL SYSTEM LISTINGS • I6-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location, • Telescopic mounting bars maximum of 32"and minimum of 15",preinstalled. covered ceiling 4"vertical adjustment WARRANTY • Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at • Junction box capacity:8(4 in,4 out 112AWG rated for 90°C www.acu,tvbrands.com/CustomerResources/Terms and conditions.asox • Light engine and driver accessible through aperture • Injection molded mud ring included with flangeless trims. Ships separately. Note:Actual performance may differ as a result of end user environment and application. Installs independently of the mounting frame to reduce cracks in plaster due to All values are design or typical values,measured under laboratory conditions at vibration. 25°C. = EXAMPLE:EVO 35/10 4AR MWD LSS MVOLT EZ1 v m x• 2 z Series Color temperature Nominal lumen values Aperture/Trim color Trim Style Distribution Finish Voltage p EVO 27/ 2700 K 07 750 lumens 4AR Clear (blank) Self-flanged MO Medium LSS Semi-specular MVOLT a 30/ 3000 K 10 1000 lumens 4PR Pewter FL Flangeless (0.9 s/mh) ID Matte-diffuse 120 n c 35/ 3500 K 15 1500 lumens 4WTR Wheat MWD Medium wide LS Specular 277 = 40/ 4000 K 20 2000 lumens 4GR Gold (1.0 s/mh) 347' 25 2500 lumens 4WR' White WD Wide(1.2 s1 30 3000 lumens 4BR' Black mh) 4WRAMF' White anti- microbial Driver' Options EZ10 eldoLED ECOdrive 0-10v dimming driver.Minimum dimming level 10% SF Single fuse.Specify 120V or 277V. BUD Bodine generator transfer EZ1 eldoLED ECOdrive 0-IOV dimming driver.Minimum dimming level 1% TRW' White painted flange device.Specify 120V or 277V. EZB eldoLED SOLOdrive 0-10V dimming driver.Minimum dimming level<1%. TRBL' Black painted flange CR190 High CRI(90+).Specify 120V EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming level<1%. EL' Emergency battery pack with or 277V. EDXB eldoLED POWERdrive DMX with RDM(remote device management).Mini- integral test switch CP1c Chicago plenum mum dimming level<1%.Includes termination resistor.Minimum lumen ELR' Emergency battery pack with RRL_ RELOC"-ready luminaire 1500/Maximum 3000.Refer to DMXR Manual, remote test switch connectors enable a simple EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming.0-10V.Refer to XPoint NPS80EZ5 nlighte dimming pack controls and consistent factory installed tech sheet. 0-10V eldoLED drivers. option across all ABL luminaire EXAB XPoint Wireless,eldoLED SOLOdrive<1%dimming,0-IOV.Refer to XPoint NPSBOEZERS' plight'dimming pack controls brands.Refer to El for com- tech sheet. 0-10V eldoLED drivers.ER con- plete nomenclature. ECOS24' Lutrona Hi-lumee 2-wire forward-phase dimming driver.Minimum dim- trols fixtures on emergency circuit. ming level 1%.Minimum lumen 1000/Maximum 3000. EC0S3'•5 Lutrone Hi-Lumee 3-wire or EcoSysteme dimming driver.Minimum dim- ming level 1%.Minimum lumen 1000/Maximum 3000. EVO-4-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighting.com (0 got h a m PAGE 1 OF 4 C 2014.2016 Acuity Brands Lighting.Inc.At Flights Reserved.Rev.08/01/15.Specifica;vns subject In change n4haul notice. Down Lighting (LP11A-DIM)01°'!-- n• Luminaire Type: got h a m' Catalog Number 1aut0000ulated): Gotham Architectural Downlighting LED Downlights I, j , F- ,-.... �- Downlight A 1, i Solid-State Lighting Vir OPTICAL SYSTEM ELECTRICAL SYSTEM v• • Self-flanged or flangeless semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine c • Patented Bounding Raym"optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60.000 hours m • 45°cutoff to source and source image • Tested according to LM-79 and LM-80 standards H • Top-down flash characteristic • Overload and short circuit protected • Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional MECHANICAL SYSTEM LISTINGS • 16-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location, • Telescopic mounting bars maximum of 32"and minimum of 15",preinstalled, covered ceiling 4"vertical adjustment WARRANTY • Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at • Junction box capacity:8(4 in,4 out 1 12AWG rated for 90°C www.acu tvbrands.com/CustomerResources/Terms and cond tions.asox • Light engine and driver accessible through aperture • Injection molded mud ring includedwith flangeless trims.Ships separately. Note Actual performance may differ as a result of end user environment and application. Installs independently of the mounting frame to reduce cracks in plaster due to All values are design or typical values,measured under laboratory conditions at vibration. 25 T. I o EXAMPLE:EVO 35/10 6AR MWO LSS MVOLT E21 z 0 xi c) Series Color temperature Nominal lumen values Aperture/Trim color Trim Style Distribution Finish Voltage z o EVO 21/ 2700 K 10 1000 lumens 6AR Clear (blank) Self-flanged MD Medium LSS Semi-specular MVOLT 30/ 3000 K 15 1500 lumens 6PR Pewter FL Flangeless (0.9 s/mh) LEI Matte-diffuse 120 z. s 35/ 3500 K 20 2000 lumens 6WTR Wheat MWD Medium wide LS Specular 277 = 40/ 4000 K 25 2500 lumens 6GR Gold 11.0 s/mh) 3472 30 3000 lumens 6WR' White WD Wide(1.2 s/ 35 3500 lumens 6BR' Black mh) 40 4000 lumens 6WRAMF' White anti- 45 4500 lumens microbial Driver3 Options EZ10 eldoLED ECOdrive 0-10v dimming driver.Minimum dimming level 10% SF Single fuse.Specify 120V or BGTD Bodine generator transfer device. EZI eldoLED ECOdrive 0-10V dimming driver.Minimum dimming level 1% 2770. Specify 1200 or 2770. EZB eldoLED SOLOdrive 0-10V dimming driver.Minimum dimming level<1%. TRW' White painted flange CR190 High CRI(90+) EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming level<1%. TROL' Black painted flange CV Chicago plenum.Specify 120V EDXB eldoLED POWERdrive DMX with RDM(remote device management). EL' Emergency battery pack with or 2770. Minimum dimming level<1%.Includes termination resistor.Refer to integral test switch RRL_ RELOCw-ready luminaire connec- DMXR Manual. ELR' Emergency battery pack with tors enable a simple and consis- EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming,0-100.Refer to XPoint remote test switch tent factory installed option across tech sheet. NPS8OEZ' might*dimming pack controls all ABL luminaire brands.Refer to EXAB XPoint Wireless.eldoLED SOLOdrive<1%dimming,0-10V.Refer to XPoint 0-10V eldoLED drivers. E61 for complete nomenclature. tech sheet. NPS80EZER" nLigllte dimming pack controls ECDS243 Lutrona Hi-Lumee 2-wire forward-phase dimming driver.Minimum dim- 0-10V eldoLED drivers.ER fling level 1%.Minimum lumen 1000/Maximum lumen 3000. controls fixtures on emergency ECOS34-2 Lutrone Hi-Lumen 3-wire or EcoSysteme dimming driver.Minimum dim- circuit. ming level 1%.Minimum lumen 1000/Maximum lumen 4500. EVO-6-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighling.com PAGE 1 OF 4 ®2010-20 It Acuity Brands Lighting,Inc.All Rights Reserved.Rev.C3/17/16.Specifications subject to change without notice. I0 gotham Down Lighting (LP11B-DIM) Luminaire Type: (0 gotharrf Catalog Number (aut0000ulated): Gotham Architectural Downlighting ' LED Downlights 8" Evo® a > Downlight ,,,.•.. _• . .. Solid-State Lighting OPTICAL SYSTEM ELECTRICAL SYSTEM n • Self-flanged semi-specular,matte-diffuse or specular finishing trim • Fully serviceable and upgradeable lensed LED light engine c • Patented Bounding RayTM optical design(U.S.Patent No.5,800,050) • 70%lumen maintenance at 60,000 hours 'm° • 45°cutoff to source and source image • Tested according to LM-79 and LM-80 standards • Top-down flash characteristic • Overload and short circuit protected • Polycarbonate lens integral to light engine • 2.5 SDCM;85 CRI typical,90+CRI optional MECHANICAL SYSTEM LISTINGS • 16-gauge galvanized steel construction;maximum 1-1/2"ceiling thickness • Fixtures are CSA certified to meet US and Canadian standards;wet location, • Telescopic mounting bars maximum of 32'and minimum of 15",preinstalled, covered ceiling 4"vertical adjustment WARRANTY • Toolless adjustments post installation • 5-year limited warranty.Complete warranty terms located at: • Junction box capacity:8(4 in,4 out 1 12AWG rated for 90°C www.acultvbrands.com/CustomerResources/Terms and conditions.asox • Light engine and driver accessible through aperture Note Actual performance may differ as a result of end user environment and application. All values are design or typical values,measured under laboratory conditions at 25"C. °A EXAMPLE:EVO 35/25 8AR MWD LSS 120 EZ1 0 in a z • Series Color temperature Nominal lumen values Aperture/Trim color Distribution Finish Voltage E a EVO 21/ 2700 K 20 2000 lumens 8AR Clear VND Very narrow(0.5 s/mh) LSS Semi-specular 120 3 30/ 3000 K 25 2500 lumens 8PR Pewter ND Narrow(0.7 s/mh) LD Matte-diffuse 217 0 35/ 3500 K 30 3000 lumens BWTR Wheat MD Medium(0.9 s/mh) LS Specular 347° = 40/ 4000 K 8GR Gold MWD Medium wide(1.0 s/mh) 8WR' White WD Wide(1.2 s/mh) 8BR' Black 8WRAMF' White anti- microbial Driver3 Options EZIO eldoLED ECOdrive 0-10v dimming driver.Minimum dimming SF Single fuse.Specify 120V or 277V. BGTD Bodine generator transfer device. level 10%. TRW' White painted flange Specify 120V or 217V. EZ1 eldoLED ECOdrive 0-10V dimming driver.Minimum dimming TRBL' Black painted flange CRI90 High CRI(90+) level 1% EL' Emergency battery pack with CP' Chicago plenum.Specify 120V or 277V. EZB ekCoLED SOLOdrive 0-1OV dimming driver.Minimum dimming integral test switch RRL_ RELOC®-ready luminaire connectors level<1%. ELR' Emergency battery pack with enable a simple and consistent factory EDAB eldoLED SOLOdrive DALI dimming driver.Minimum dimming remote test switch installed option across all ABL luminaire level<1%. NPS80EZ' nLighte dimming pack controls brands.Refer to EL for complete EDXB eldoLED POWERdrive DMX with RDM(remote device manage- 0-10V eldoLED drivers. nomenclature. ment).Minimum dimming level<1%.Includes termination NPS80EZER'.e niighte dimming pack controls resistor.Refer to DMXR Manual, 0-10V eldoLED drivers.ER EXA1 XPoint Wireless,eldoLED ECOdrive 1%dimming,0-10V.Refer controls fixtures on emergency to XPoint tech sheet. circuit. EXAB XPoint Wireless,eldoLED SOLOdrive<1%dimming,0-10V. Refer to XPoint tech sheet. EV0-8-OPEN I GOTHAM ARCHITECTURAL DOWNLIGHTING 1 1400 Lester Road Conyers GA 30012 I P 800.315.4982 I gothamlighting.com (gotham' PAGE 1 OF 4 0 2010-Z01 ti Acuity Brands Lighting.Inc.All Rights Reserved.Rev.02125/16.Specifications subject to change without notice. Monopoint Projector (LP-10) Space Player LIGHTING PROJECTION PT-JW130GBE (Black) PT-JW130GWE (White) Specifications: •Device material:plastic(high-gloss,matt white/matt black) •Projection ratio: 1.5-3.3:1 •Optical output:1.000 lm(ANSI) •Keystone correction:horizontal/vertical 4-paint cor •Main voltage: 100-240 V AC 1'.4-0.6 AI,50160 Hz (corresponds to a±40°angle) •Output:125 W •Connectors: •Weight 3.2 kq -fiDMI IN:1 x 19-pm 110MI IHDCP-cumpatibiel •Light source:laser diode -1 x LAN RJ-45 for network ccnnecticn,tGODase-TX.103ase-T. •Operating lifetime:20,000 hours PJlink'"-cempat:ble lCtasstt (as long as 50%of the original brightness are maintained.( -AUDIO OUT MS stereo mini jack •Wireless remote control is included in the scope of delivery. -DC OUT 1 x USO port(Type Al.for voltage supply 15 V DC,max.9:0 mA) •Projection system:DLP'1 x Chip,DLP°Method •Card slot:1 x SD card slot •No.of pixels:1,039.680 pixels(WXGAI (SDHC card with 32 08 storage capacity); •Recommended image resolution:1,280 x 800 pixels •WLAN:IEEE802.11a/b/g/n •Lens:power zoom 11-2.2 xl,power focus • Compatible with Miracast wireless transmission tecn.rology IMPORTANT:As a Class 2 laser product,the device fully complies with all provisions of the JIS C6802,2011 safety standard. Never look straight at or into the lens when the device is in operation. OLP is a registered trademark of Texas Instruments Incorporated. HDMI and High-Definition Multimedia Interface are trademarks or registered trademarks of HDMI Licensing LLC. All product images and application examples in this catalogue are provided solely for illustrative purposes. P asonic SINESS Thermostat Component Descriptions Supervisory Controllers 61.9 Diagnostic (2.438) Light Emitting Diodes The TEC Series Wireless Thermostat Controller 1s 13 System uses Web-enabled, Ethernet-based, / (6.313) --).1 supervisory controllers that connect BAS networks to v a a v v o — IP networks and the Web.These supervisory controllers provide scheduling, alarm and event management, trending, energy management, data exchange, dial-out capability,and password protection. - 122.4 With a computer running Microsoft®Internet Explorer® (4.82020 ) Web browser version 6.0(or later),you can browse to a configured supervisory controller, and monitor and control BAS field devices in the User Interface(UI). Refer to the TEC Series Wireless Thermostat Controller System Technical Bulletin(LIT-12011414)for +---y information on configuring a TEC Series Wireless Direct Mount Thermostat Controller System. i) Antenna TEC20 Coordinators LAN2(SEC) LAN1 (PRI) A TEC20 Coordinator provides a wireless interface RJ-45 Ethernet Port RJ-45 Ethernet Port between a supervisory controller and the TEC Wireless Figure 3: TEC20 Wireless Coordinator, Thermostat Controllers, allowing the exchange Physical Features and Dimensions, mm(in.) BACnet IP (TEC20-3C)or BACnet MS/TP (TEC20-6C) messages. The TEC20 Coordinator initiates the formation of the A Jarman wireless mesh network–one is required per wireless y mesh network. Each TEC20 Coordinator and the TEC Wireless Thermostat Controllers assigned to it share a Personal Area Network Identification (PAN ID). A TEC20 Coordinator requires a 15 VDC power source 125 (available separately).An optional remote-mount (4-15/16) antenna and cable is available to allow transmission when the TEC20 Coordinator is mounted inside a metal OrciVern) panel. O O O TEC Wireless Thermostat Controllers 00000 Depending on the model, the TEC Wireless Thermostat Controllers can communicate sensed I� (3-3/8) temperature, setpoint temperature, and other data with an associated supervisory controller. Using this o o A information, the TEC Wireless Thermostat Controllers I° ^ ^ °t 29 control rooftop units(with or without economizers), �; 1-118) heat pumps, and single-and multi-stage heating/cooling equipment. See Applications for more Figure 4:TEC Wireless Thermostat Controller information.The TEC Wireless Thermostat Controllers Dimensions, mm(in.) are designed for indoor, intra-building applications only. The TEC Wireless Thermostat Controllers can also serve as repeaters to extend the range of the communications within the wireless mesh network. TEC Series Wireless Thermostat Controller System for Staged Equipment Product Bulletin 5 Project: AIPP Implementation Miami Beach Convention Center Renovation&Expansion 10/4116 Study & Design Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $4,665 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $905 Civil/Utility Engineering(Lump Si Kimley-Horn 6 $0 Landscape West 8 7 $0 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Traffic Corradino 27 $0 Graphics and Signage TKD 28 $0 Parking Consultation Walker Parking 29 $0 Wind Analysis RWDI 35 $0 Design Fees(Lump Sum) $5,570 Expenses 2% $111 Total Total $5,681 AIPP Implementation Fentress Architects Hours Job Title Hourly Rate Hours Extension Task 1:Task Management,Architectural Design,Coordination and Oversight-Ellen Harvey Architect III $175.00 8 $1,400.00 Intern Architect II $100.00 4 $400.00 Interior Designer II $110.00 24 $2,640.00 John Kudrycki $225.00 1 $225.00 Totals this activity: Hours 37.0 $4,665.00 Total,Sub 1 37.0 $4,665.00 Hours Total 37.0 $4,665.00 AIPP Implementation L2 North Harvey Miami Beach Convention Center Fentress Project No:20140021 October 4,2016 Page 2 of 3 AIPP Implemenation Jensen Hughes Hours Job Title Hourly Rate Hours Extension Task 1 Fire Alarm and Protection-Ellen Harvey Senior Consultant/Associate Manager $205.00 1.0 $205.00 Consultant $175.00 4.0 $700.00 Totals this activity: Hours 5.0 $905.00 Total,Sub 1 5.0 $905.00 Hours Total 5.0 $905.00 AIPP Implementation L2 North Harvey Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 October 4,2016