Loading...
LTC 076-2017 Installation of Monitoring WellsMIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC # 076-2017 LETTER TO COMMISSION TO: Mayor Philip Levine and Members • f the City Cs mmission FROM: Jimmy L. Morales, City Manager DATE: February 9, 2017 SUBJECT: INSTALLATION OF MONITORING WELLS As part of the overall flood mitigation program, the City has contracted with AECOM, through the Public Works Department, to install groundwater monitoring wells. The wells, to be located across the City, will provide a better understanding of our hydrogeology and its direct relationship with flooding and sea level rise. A well has been proposed at 20th Street and Alton Road within the grassed median. The work will consist of installing three groundwater monitoring wells at different depth intervals from February 22nd to March 1st. A drill rig and a backhoe will be used to install the well and trenching for infiltration across the street, respectively. Both sites will be restored when the work is complete. Water and sediment produced from drilling activities will be adequately managed by following NPDES standards. At ground level, concrete pads will be poured around the wells to complete them. An automated measuring system will then be installed to monitor groundwater properties on a permanent basis. Work hours will be from 8:00 a.m. to 6:00 p.m., and extended hours are subject to City approval. The above work schedules are contingent on weather and may change due to unforeseen circumstances. Please see attached project advisory issued by the Public Works Department. Should you have additional questions regarding the installation of monitoring wells, please contact Carlos Tamayo at (786) 910-1452. Attachments JLM/lJC/JJF/BAM/CT • ... z.. : • ;. 2grar els_ .0 ,�, "- Tia _M. ;7�� cr:P...,,", : fti ' ` '-'11/. - * �'' :-- :. � 1. "!;:P« ';•''' st"'f r...! s ab , � teW _z r.sw. It A ••1• rf j - -. t ��. c: a .; of t14 01, 3• r r r Sunset Dr & Alton Rd February 22 through March 1 Project Overview As part of the overall flood mititation program, the City of Miami Beach has contracted AECOM to install groundwater monitoring wells across the City for understanding the hydrogeology and its direct relationship with flooding and sea level rise. Work Zone and Tasks The installation of the three groundwater monitoring wells will take place from February 22 through March 1. • Work hours are 8:00 a.m. to 6:00 p.m. • Extended work hours are subject to City approval • Work schedule may change due to weather or unforeseen circumstances Communication For more information, please contact: Carlos Tamayo, Public Works Department, Civil Engineering P: 786-910-1452 E: carlostamayoCa�miamibeachfl.gov Tr, reel/test this material in a/ternate fornmt. sign /arrgnngr interpreter (firs -dna' notir r revirrd). hybrinr;tion ou ni eest%r peanut to ith dia,In/chin and/ oalp. neon ,odafioo to ,mien aqr eke/wield or participate in oap iitr 3ponsorrdpro.rediny. ea// 305.604.2489 and select 1 forEag/ish or 2 fir Spanish. then option 6: TTF arra may ar// sin '11 (F/orida Rdnp Srrrico. 20th St 0 Vita Squa Rosinella ¶Dour ny at 12200 - 19th St. �. ()Wells Fargo Bank 19th St 19th St To segues/ lois material in a/kr/Weformmrl. sign language intesprr/er (fur -day /Nike required), ii forsvation on nrressfor prrons n itb disabilities. nuA/or any a ronem.dation to rrrien• any dorm/tient or pariiiipate in any sponsored proreediass. ea// 305.641.2489 end select 1 forEng/isb or 2forSpanish, then Owl l 6: TTY tam mai, rat/ ran '11 (F/ooda Reny Senire).