As part of the overall flood mitigation program, the City has contracted with AECOM,
through the Public Works Department, to install groundwater monitoring wells. The
wells, to be located across the City, will provide a better understanding of our
hydrogeology and its direct relationship with flooding and sea level rise.
A well has been proposed at 20th Street and Alton Road within the grassed median. The
work will consist of installing three groundwater monitoring wells at different depth
intervals from February 22nd to March 1st. A drill rig and a backhoe will be used to install
the well and trenching for infiltration across the street, respectively. Both sites will be
restored when the work is complete. Water and sediment produced from drilling activities
will be adequately managed by following NPDES standards. At ground level, concrete
pads will be poured around the wells to complete them. An automated measuring
system will then be installed to monitor groundwater properties on a permanent basis.
Work hours will be from 8:00 a.m. to 6:00 p.m., and extended hours are subject to City
approval. The above work schedules are contingent on weather and may change due to
unforeseen circumstances.
Please see attached project advisory issued by the Public Works Department. Should
you have additional questions regarding the installation of monitoring wells, please
contact Carlos Tamayo at (786) 910-1452.
Attachments
JLM/lJC/JJF/BAM/CT
•
... z.. :
•
;. 2grar els_
.0 ,�, "- Tia _M.
;7�� cr:P...,,", :
fti ' ` '-'11/. - * �''
:--
:.
� 1. "!;:P«
';•'''
st"'f
r...! s ab , � teW _z
r.sw.
It A
••1• rf j - -. t ��. c: a .; of
t14 01,
3•
r
r
r
Sunset Dr & Alton Rd
February 22 through March 1
Project Overview
As part of the overall flood mititation program, the City of Miami Beach has contracted AECOM to
install groundwater monitoring wells across the City for understanding the hydrogeology and its direct
relationship with flooding and sea level rise.
Work Zone and Tasks
The installation of the three groundwater monitoring wells will take place from February 22 through
March 1.
• Work hours are 8:00 a.m. to 6:00 p.m.
• Extended work hours are subject to City approval
• Work schedule may change due to weather or unforeseen circumstances
Communication
For more information, please contact: Carlos Tamayo, Public Works Department, Civil Engineering
P: 786-910-1452
E: carlostamayoCa�miamibeachfl.gov
Tr, reel/test this material in a/ternate fornmt. sign /arrgnngr interpreter (firs -dna' notir r revirrd). hybrinr;tion ou ni eest%r peanut to ith dia,In/chin and/ oalp. neon ,odafioo to ,mien aqr eke/wield or participate
in oap iitr 3ponsorrdpro.rediny. ea// 305.604.2489 and select 1 forEag/ish or 2 fir Spanish. then option 6: TTF arra may ar// sin '11 (F/orida Rdnp Srrrico.
20th St
0
Vita Squa
Rosinella
¶Dour
ny at 12200
- 19th St.
�.
()Wells Fargo Bank
19th St 19th St
To segues/ lois material in a/kr/Weformmrl. sign language intesprr/er (fur -day /Nike required), ii forsvation on nrressfor prrons n itb disabilities. nuA/or any a ronem.dation to rrrien• any dorm/tient or pariiiipate
in any sponsored proreediass. ea// 305.641.2489 end select 1 forEng/isb or 2forSpanish, then Owl l 6: TTY tam mai, rat/ ran '11 (F/ooda Reny Senire).