LTC 184-2017 Miami Beach Convention Center Construction Project UpdateMIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
OFFICE OF THE CITY MANAGER
LTC # 184 -2017
TO: Mayor Philip Levine and Members . he C Co, mission
FROM: Jimmy L. Morales, City Man...
DATE: April 7, 2017
SUBJECT: Miami Beach Convention Center Construction Project Update
The purpose of this LTC is to update the Mayor and City Commission on the Miami Beach
Convention Center (MBCC) Renovation and Expansion Project. Financial information
provided is through the month of February 2017. Project dashboard is attached as Exhibit A
and a corresponding Budget Summary Breakdown is attached as Exhibit B.
LETTER TO COMMISSION
Setting the Record Straight
Before proceeding with the usual information contained in the MBCC construction LTC
update, I wanted to address a couple of comments that some of you have indicated you have
received from members of the public. In particular, I am referring to comments that the
project is grossly over budget (some of you have been told $100 million) and that the project
is extremely delayed (by as much as a year). Neither of these is true, but I think some
explanation is necessary to enable you to respond to inquiries.
With respect to schedule, keep in mind that this is not the typical construction project where
there is a ground breaking on day one and then some time later a grand opening of the facility
(e.g. Frost Science Museum). The mandate from the Commission at the request of the
Hospitality sector was that the MBCC continue to host shows to the extent practicable during
the entire construction period.
In 2016, while work was taking place on the north and east sides, the two western exhibition
halls hosted 24 shows and 13 City events, and then all four halls were made available for the
successful Art Basel show in December. Not a single scheduled event was missed. The
building is now in the middle of a scheduled five month closure because of the extensive
amount of work that needed to be done on the exhibition floors and the demolition of the west
concourse of the building.
In late May, however, the Center will again be made ready to open the two eastern exhibition
halls for shows, starting with the World Out Games on May 26th, eMerge and LE Miami in
June, Fan Fest (as part of Major League Baseball's All Star Game) in July, and continuing
until December, when we will again make all four halls available for Art Basel. In 2018,
shows will continue in the two eastern halls until the first scheduled four hall show in
September. By that time, we expect the building to be fully completed, including the
restoration of the Carl Fisher Clubhouse and the park surrounding it. The large Park (P -lot)
should be completed as well, although it might need an additional month or two since work
on the park cannot begin in earnest until the site ceases to function as a staging area for the
project.
Miami Beach Convention Center Monthly Construction Project Update
April 7, 2017
Page 2 of 5
As such, we believe the City will meet the obligation to accommodate all the scheduled shows
as required. The full completion of all work may have been pushed back a couple months,
but that is mostly aesthetic work or the park, and should not affect the ability to host events.
As for budget, the City issued bonds at the end of 2015 in a total of $615 million dollars for
the project, including hard and soft costs. Included in those numbers was a Construction
Manager's (CM) contingency of $30 million and an Owner (City) contingency of $35 million.
This large combined contingency reflected three significant risk factors that needed to be
addressed:
1. The project was awarded at 65% drawings (necessitated by the need to get started
right after Art Basel 2015 so that we would be able to open all four halls in December
2016). In taking the drawings to 100 %, there was a good probability that additional
construction costs would be identified.
2. Since 70% of this project is major renovations, there are always unpleasant surprises
when you start doing the work, which adds costs to the bottom line. This project was
no exception, including lead paint removal, asbestos abatement, and permitting
issues pertaining to contaminated soil and dewatering.
3. We were told at the beginning of this project by our experts that they were not aware
of any convention center that had continued to operate while being renovated and
expanded (Louisville apparently closed its convention center for two years under
similar circumstances). As such, there was serious risk that had to be reflected in the
contingency. As it turned out, the biggest challenge we have faced is meeting the
life- safety requirements while the building is a construction site, which has added both
capital and operational costs to the project.
It is our expectation that addressing these issues will use up most, if not all, of the
contingency amounts. But at this point, we do not anticipate exceeding the $615 million
budget. We will be asking the Commission at its next meeting to allocate Convention
Development tax revenues, which the City receives from the County specifically to address
the operation of the Convention Center, to cover the operational costs incurred to date (e.g.
accommodating Design Miami in the parking lot, temporary rental space in Opa Locka for the
building operator, Spectra Venue Management, (Spectra)), as well as other temporary costs
required to keep the building open.
GUARANTEED MAXIMUM PRICE (GMP) RECONCILIATION PROCESS
The process of reconciling what the City purchased under the GMP contract, and what the
Construction Manager (Clark) and their trade contractors believe they are due from the City,
has been under negotiation for over 8 months. The City's third party cost estimator, RIB US
Cost, has completed the fair market evaluation of Clark's request for additional funds which
would be funded out of the owner's contingency.
Simultaneously, the City's consulting team, owner's representative, Hill International,
convention center consultant, Jones Lang LaSalle (JLL) and Architect, Fentress Architects,
have been advising and assisting the City during the negotiation process that is near
completion. During this process, City staff and the consulting team have continued to hold
Clark and their subs to their contractual obligations and to maintain the original project
milestones and overall project budget. A separate LTC detailing the results of the
reconciliation process will be forthcoming once an agreement is reached.
Miami Beach Convention Center Monthly Construction Project Update
April 7, 2017
Page 3 of 5
CURRENT SCHEDULE
Upcoming May Milestone Delivery
The building has been completely closed to construction since December 10, 2016 and will
re -open for the World Out Games on May 26, followed by a total of 12 one or two hall events
through the remainder of 2017. The events and entrances will be located on the east side of
the building along Washington Avenue, and will utilize the new north truck dock for loading
in and out.
The project is scheduled to be substantially completed with final testing, inspections and
LEED commissioning by mid - August, 2018. The schedule, as it has been since the start, is
aggressive but achievable barring any current unforeseen condition or potential delays not
currently known.
Art Basel Miami Beach
In November, Art Basel Miami Beach is scheduled to return to the building in the only 4 -hall
event. Spectra is currently in the process of entering into a License Agreement with Art Basel
U.S. Corp for the 2017 Art Basel event.
Design Miami
Design Miami is also anticipated to return to the preferred lot (P -Lot) in 2017. The City's
construction labor force will again be required to relocate their parking area temporarily and
relocate the material and equipment staging yard during the erection and demobilization time
of the event.
Construction Draw
Taking into account direct purchases and payments for the construction, a total of $210.9
million, or 41%, of the total updated GMP amount of $514 million has been paid through
February 2017. For a detailed breakdown, refer to Exhibit B (GMP + Direct Purchases Line
Item).
Construction Manager's (CM) Contingency
Refer to Exhibit B1 for a summary of the total CM Contingency use to date.
For the months of January and February, an additional $3.5 million was utilized to bring the
total to $17 million out of the $29.7 million CM contingency. A total amount of $13.7 million
has been utilized under the "Trade Cost" category.
Direct Purchase
The City continues its direct purchase of materials for the project originally budgeted at a
sales tax savings of approximately $6 million. Through February 28, the City has directly
purchased $56.88 million in materials resulting in sales tax savings of $3.4 million.
There are certain materials that were planned for direct purchase that have not materialized
due to a variety of reasons such as risk to the City, risk to the CM, disagreement on
purchasing terms, and disagreement on early deposit requirements. The City and the
construction team continue to pursue direct purchase opportunities to make up as much of
the shortfall as possible, however it is currently estimated that the shortfall amount will be
approximately $1.4M which will be funded from the Owner's Contingency.
OWNER COSTS
A total of $41.6 million, or 60.2 %, of the owner cost budget has been expended to date.
Below are more detailed updates for two major components of the project being funded by
Miami Beach Convention Center Monthly Construction Project Update
April 7, 2017
Page 4 of 5
Owner Costs.
Art in Public Places (AIPP)
A total of $617K out of the $7M AiPP budget has been expended.
AiPP staff is working closely with the project team and the County's Department of Cultural
Affairs to ensure the seamless integration of the six public art projects into the MBCC project.
The following provides a brief update on the status of each commission:
1. Franz Ackermann (Berlin), Southeast Corner Exterior Walls
The artist agreement with Franz Ackermann has been signed. Ackermann conducted
a site visit on March 3, 2017, and met with the project team to determine surface
treatment of the wall, lighting and landscaping for the southeast corner exterior walls.
It is anticipated the painted mural will be completed in spring 2018.
2. Michael Elmgreen and Ingar Dragset (London /Berlin), Convention Center Park
Sculpture
Art in Public Places staff is working with the studio to finalize the artist agreement with
Elmgreen and Dragset. Coordination of the project is dependent upon the final design
of the Convention Center Park. It is anticipated the work will be installed in fall 2018.
3. Ellen Harvey (Brooklyn), Grand Ballroom Pre - Function Room
The artist agreement with Ellen Harvey has been executed. Staff conducted a project
coordination meeting with Harvey on October 21, 2016. Harvey is now working with
Franz Mayer of Munich to begin fabrication of the art glass panels and the structural
system to support the glass panels. Fabrication of the art glass will take at least eight
months. It is anticipated the work will be installed in spring 2018.
4. Joseph Kosuth (New York/London), West Lobby
The artist agreement with Joseph Kosuth has been executed. Kosuth conducted a site
visit on March 21, 2017, and met with the project team and determined the position of
the neon work and electrical needs in the West Lobby. It is anticipated the work will be
installed in spring 2018.
5. Joep Van Lieshout (Netherlands), Northeast Park Collins Canal
The artist agreement with Joep Van Lieshout has been executed. Staff is working
closely with the artist studio and a conservator to finalize materials for the sculptural
seating elements. It is anticipated the work will be installed in fall 2018.
6. Sarah Morris (New York), Northeast Corner Exterior Walls
The artist agreement with Sarah Morris has been executed. Morris conducted a site
visit on March 10, 2017, and was made of existing site conditions. Additionally, Morris
met with the project team to determine surface treatment of the wall, lighting and
landscaping for the northeast corner exterior walls. It is anticipated the tile mural will be
completed in spring 2018.
Carl Fisher Clubhouse Historic Restoration
The Carl Fisher Clubhouse historic restoration is underway. A total amount of $268K out of
the $2.5M budget has been expended.
The City's CIP Department is managing the project for the MBCC project team. On
September 14, 2016 the City Commission awarded a Construction Manager at Risk contract
Miami Beach Convention Center Monthly Construction Project Update
April 7, 2017
Page 5 of 5
to Grace & Naeem Uddin, Inc. for construction management of the project. The design
consultant for the Carl Fisher project, Richard Heisenbottle Architects, is currently revising
the 90% construction documents for submittal to the Building Department in May 2017.
On a parallel path, the Construction Manager continues its pre- construction services and it
is anticipated that a Guaranteed Maximum Price (GMP) will be presented to the City
Commission for approval in July 2017. Construction is expected to commence in September
2017 and project completion concurrent with the MBCC project in the third quarter of 2018.
OWNER CONTINGENCY
For a full detailed breakdown of all Owner costs and credits, refer to Exhibit B2. A total of
$2.46 million of the available owner contingency of $35 million has been utilized.
OVERALL COSTS
From an overall project perspective, $252.6 million, or 43.3 %, has been spent on the $615.8
million project.
LOCAL HIRE
Clark Construction continues their commitment to maximizing workforce opportunities for City
of Miami Beach and Miami -Dade County residents. A total of 3,355 workers have been
employed by the project. This includes all certified payroll from October 2015 to February
28, 2017. The labor force includes full -time, part-time, temporary labor, and includes daytime
and nighttime shifts.
Attached, as Exhibit C, is a summary of the local hiring efforts to date, for Clark and its
subcontractors. The current report shows a summary of all employees on the project thus
far, sorted by zip code. Clark is currently 63% local hire by individual (Miami Beach, with 30
employees, and Miami -Dade County with a total of 2,082).
PUBLIC INFORMATION
Weekly advisories and postings for February sent on the City's social media outlets including
Twitter, Facebook, and Constant Contact are attached as Exhibit D.
If there are any questions, please do not hesitate to contact myself or Maria Hernandez at
Extension 2584.
Attachments:
Exhibit A — Project Dashboard and Site Photos
Exhibit B — Budget Summary Breakdown
Exhibit B1 — Contractor Contingency Log
Exhibit B2 — Owner Contingency Log
Exhibit C — Clark Construction Local Hiring Summary
Exhibit D — Public Outreach Report
JLM / MH
F: \cmgr \$ALL \Convention Center \Commission Updates \2017 February Monthly \LTC MBCC February Update.docx
Convention Center Renovation & Ex•ansion
Project Dashboard
EXHIBIT A
2016 2017 2018
Black Out Period
ABMB
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Project
Cost
43.3%
Net Uivll-,
Draw
41.02%
IA
Contingency
$30m
uwner
Costs
60.18%
uwners
Contingency
$35m
$500m
$450m
$400m
$350m
$300m -
$250m -
$200m
$150m -
$100m -
$50m
$0m
$25m
$20m
$15m
$10m
$5m
$0m
_
—
— —
— —
$70m
$60m -
$50m -
$40m
$30m
$20m -
$10m -
$Om
Expended
$600m j
$500m
$400m
$300m
Expended
—
_..
-
--
-
-
—
—
$30m
$25m
$20m
$15m
$10m
$5m
$0m
—
—
—
—
—
—
'
—
—
—
—
-
—
Esc
ded
-
-
-
-
Construction Notes:
• 43.3% of the total
project budget has been
expended.
• 41.02% of the total GMP
budget has been
expended.
• $17 M of CM
contingency has been
utilized. Refer to LTC
narrative and Exhibit B1
for description and
detail.
Owner Budget
Notes:
• 60.18% of owner
budget has been
expended.
• $2.46 M of the
owner's contingency
budget has been
expended.
Other Notes:
• Events will
recommence in May.
• GMP Reconciliation in
process. Refer to LTC
narrative.
$200m
$100m
$Om
—
Q) as
v
CO
1
}, —
b.0
U
CO Q
Convention Center Renovation & Ex•ansion
Project Dashboard
I
0. 120.01
Elev. 15.01 & 02 —View S from Grids 11 & 0.51
0. 120.04
Elec. 1,09.10 — View W from Grids H,71 & 5
0- 120.02
Helix 1.10.01 —View W from Grids H,71 & 3
0. 120.05
Hall B — View SW from Grids P & 17
0- 120.07 0- 102.08
0- 120.03
Maintenance 1.07.02 — View N from Grids 6 & P,72
0- 120.06
Meeting Prefun 2.16,01— View S from Grids 20 & T
0- 120.09
Exist Meet 2.26.10 — View W from Grids 23.82 & S,82 East Conc Ext Facade — View S from Grids 8 & U Exist Kit 2,16.02 — View N from G's 17.18 & S
Convention Center Renovation & Ex•ansion
Project Dashboard
March 31, 2017
0- 120.10
Public Ciro 1.18.01- View N from G's 22.16 & T
0- 119.01
Elevator 25.03 & 04 - View E from G's 21.38 & SW2
0- 120.11
Service Corr 1.21.02 - View N from G's 22.67 & 5.61
ryf;
0- 119.02
0- 120.12
Elec. Vault 1.29.40 - View NW from Grids J & 25
0- 119.03
Elevator 25.01 & 02 - View N from G's 6.15 & 20 Shear Walls 11,12;18 - View E from G's E.1 & 19.9
0- 119.04
Escalator 15.01 -03 -View S from G's 11.8 & NW2
0- 119.05
Elec. 1.09.10 - View W from Grids 11.71 & 5
0- 119.06
Grand Bali C 2.08.02 - View S from Grids J & 3
Convention Center Renovation & Ex•ansion
Project Dashboard
March 31, 2017
0- 119.07 0- 119.08
0- 119.49
East Concourse Roof— View S from Grids 21.62 & T Parking 6.08.01— View S from Grids L.3 & NE2 Exist RR 1.07.05 & 06 — View E from Grids N.53 & 7
0- 119.10
Meeting 3.16.44 — Vie
E from Grids 16 & Q.48
0- 119.11
Exist RR 3.16.03 — View E from Grids R & 15.18
0- 119,12
South Loading Dock — View W from G's L,3 & SW3
EXHIBIT B
Miami Beach Convention Center Expansion & Renovation Project
Approved Budget
Dashboard Summary
10/7/15
Current Current
Budget
Expenses
%
Budget
$411,408,479
Original
% Total
/o
50.69%
$202,853,454
Budget
- 9.79%
Variance
Trade Costs
$410,205,803
66.62%
1,202,676
Direct Purchase
0
0.00%
- 60,294,478
Storm Water Drainage Culvert
0
-0.93%
3,309,692
Change Orders
0
0.00%
13,408,288
Subtotal
410,205,803
66.62%
- 42,373,822
Contractor Soft Costs
11,880,886
16,999,787
2.76%
General Conditions (Clark Staffing)
24,465,886
3.97%
0
General Requirements
14,760,103
2.40%
2,239,684
Payment & Performance Bond
3,708,000
0.60%
- 608.505
GL Insurance
1,807,650
0.29%
77,095
CMr Fees (3.8 %)
17,288,003
2.81%
783,268
CCIP GL Wrap
0
0.00%
4,740,576
CM Contingency
29,747,613
4.83%
- 17,044,741
Base GMP
501,983,058
81.53%
- 52,186,446
Other GMP Items (Including all mark ups)
10,000,000
1.62%
0
P -Lot Park (allowance)
10,000,000
1.62%
0
Storm water Drainage Culvert
3,475,000
0.56%
- 3,475,000
Subtotal
13,475,000
2.19%
- 3,475,000
Total GMP (Clark)
515,458,058
83.72%
- 55,661,446
Direct Purchase Tax Savings
- 6,000,000
-0.97%
3,414,310
Total Net GMP
509,458,058
82.74%
- 52,247,136
Direct Purchases
0
0.00%
56,880,168
GMP + Direct Purchases
509,458,058
82.74%
4,633,032
Owner's Cost
83.47%
210,895,799
41.02%
City Staffing & Expenses
1,561,000
0.25%
793,318
Consultant Fees (SAG)
1,047,725
0.17%
0
Owner's Rep (Hill)
5,585,673
0.91%
0
Design Fees (Fentress)
26,669,442
4.33%
680,431
Owner's Cost Estimator (US Cost)
400,030
0.06%
1,011,528
Pre GMP CM Fee (Clark)
2,594,073
0.42%
0
Testing & Inspections
2,328,943
0.38%
0
Permit & Plan Reviews
2,400,000
0.39%
855,000
Other
783,526
0.13%
1,705,978
Other - Legal / DAP Board
63,515
0.01%
150,000
Other - Spectra
0
0.00%
810,000
Other - Design Miami
0
0.00%
408,000
Public Art (AIPP)
6,900,000
1.12%
143,676
MBCC FF &E
6,830,945
1.11%
250,000
408,000
0.07%
408,000
100.00%
Insurance.
OCIP GL Wrap
9,000,000
1.46%
- 9,000,000
Builder Risk/Building (net)
1,600,000
0.26%
- 450.000
Professional Liability Umbrella
1,000,000
0.16%
- 382.117
Carl Fisher Renovation Allowance
2,500,000
0.41%
1,000,000
Subtotal
71,264,872
11.57%
- 2,024,186
Total Without Owner's Contingency
580,722,930
94.32%
2,608,846
Owner's Contingency
35,000,000
5.68%
- 2,461,397
Total Owner's Contingency
35,000,000
5.68%
- 2,461,397
Total Budget With Owner's Contingency
$615,722,930
100.00%
$147,449
94.72/
252,568,010
43.30%
8
9
10
17
6
11
7
4
12
13
3
14
5
15
16
2
1. The property insurance portion of the Builders Risk policy to be reimbursed $2,000,004 by CMB Risk Dept.
2. The bond offering resulted in additional proceeds that were not included in the original budget. This amount has been added to the Owner's Contingency.
3. A portion of the savings from insurance was allocated to AiPP to provide for actual costs. Pursuant to Sec. 82 -587 of the CMB Code, the total amount allocated
to AiPP has been transferred to the Art in Public Places Fund.
4. The remaining insurance savings is temporarily allocated to "Other" until other budget line items are refined.
5. Insurance Savings as a result of implementing a CCIP (Contractor Controlled Insurance Program) rather than an OCIP (Owner Controlled Insurance Program)
6. A portion of the savings from insurance was allocated to City Staffing to cover costs from Fiscal Year 2014 through December 2018. The previous budget
estimate included only Fiscal Years 2015 through part of 2018.
7. Additional Cost Estimating services to support GMP reconciliation negotiations with Construction Manager - Clark Construction.
8. Savings from Clark Bond on Direct Purchases executed to date. These savings are added to Owner's Contingency.
9. $4.7M in general liability insurance was originally to be purchased directly by the owner, but was actually purchased by the contractor. Also refer to Footnote No. 5.
10. Total use of Contractor Contingency to Date. Refer to Exhibit B1 for detailed summary.
11. Additonal design fees required for re- grading of streets, GMP reconciliation services, and future design contingency replenishment.
12. Additional Costs for Dispute Avoidance Panel and outside legal counsel.
13. Moving expenses, parking fees and other expenses for relocation of building operator for approximately 18 months.
14. Costs for additional lift equipment for curtainwall maintenance not originally budgeted.
15. Estimate for raising the building to account for sea level rise, not previously accounted for.
16. Total use of Owner Contingency to Date. Refer to Exhibit B2 for detailed summary.
17. Projected Sales Tax Savings from submitted Direct Purchase Orders; $2.5M anticipated savings from future Direct Purchase of materials
Page 1 of 1
Dashboard Summary
Current
Forecasted
Budget
Current Current
Budget
Expenses
%
Balance
Y. Spent
Remaining
$411,408,479
66.80%
$208,555,025
50.69%
$202,853,454
- 60,294,478
- 9.79%
- 59,178,746
98.15%
- 1,115,732
3,309,692
0.54%
0
0.00%
3,309,692
13,408,288
2.18%
- 124.557
-0.93%
13,532,845
367,831,981
59.73%
149,251,722
40.58%
218,580,259
24,465,886
3.97%
12,585,000
51.44%
11,880,886
16,999,787
2.76%
7,665,304
45.09%
9,334,483
3,099,495
0.50%
3,092,056
99.76%
7,438
1,884,745
0.31%
822,777
43.65%
1,061,968
18,071,270
2.93%
7,101,314
39.30%
10,969,957
4,740,576
0.77%
4,740,576
100.00%
0
12,702,872
2.06%
148,999
1.17%
12,553,873
449,796,612
73.03%
185,407,749
41.22%
264,388,864
10,000,000
1.62%
0
0.00%
10,000,000
0
0.00%
0
0.00%
0
10,000,000
1.62%
0
0.00%
10,000,000
459,796,612
74.66%
185,407,749
40.32%
274,388,864
- 2,585,690
-0.42%
0
0.00%
- 2,585,690
457,210,922
74.24%
185,407,749
40.55%
271,803,174
56,880,168
9.24%
25,488,051
44.81 %
31,392,117
514,091,090
83.47%
210,895,799
41.02%
303,195,291
2,354,318
0.38%
1,373,792
58.35%
980,526
1,047,725
0.17%
945,149
90.21%
102,576
5,585,673
0.91%
2,629,261
47.07%
2,956,412
27,349,873
4.44%
25,423,219
92.96%
1,926,654
1,411,558
0.23%
999,341
70.80%
412,217
2,594,073
0.42%
1,556,444
60.00%
1,037,629
2,328,943
0.38%
722,650
31.03%
1,606,293
3,255,000
0.53%
3,084,095
94.75%
170,905
2,489,504
0.40%
585,792
23.53%
1,903,712
213,515
0.03%
127,251
59.60%
86,264
810,000
0.13%
476,871
58.87%
333,129
408,000
0.07%
408,000
100.00%
0
7,043,676
1.14%
617,039
8.76%
6,426,637
7,080,945
1.15%
0
0.00%
7,080,945
0
0.00%
0
0
1,150,000
0.19%
1,837,501
159.78% 1
- 687.501
617,883
0.10%
617,883
100.00%
0
3,500,000
0.57%
267,923
7.65%
3,232,077
69,240,686
11.24%
41,672,211
60.18%
27,568,475
583,331,776
94.72/
252,568,010
43.30%
301,957,338
32,538,603
5.28%
0
0.00%
32,538,603
32,538,603
5.28%
0
0.00%
32,538,603
$615,870,379
100.0%
$252,568,010
43.30%
$334,495,941
1. The property insurance portion of the Builders Risk policy to be reimbursed $2,000,004 by CMB Risk Dept.
2. The bond offering resulted in additional proceeds that were not included in the original budget. This amount has been added to the Owner's Contingency.
3. A portion of the savings from insurance was allocated to AiPP to provide for actual costs. Pursuant to Sec. 82 -587 of the CMB Code, the total amount allocated
to AiPP has been transferred to the Art in Public Places Fund.
4. The remaining insurance savings is temporarily allocated to "Other" until other budget line items are refined.
5. Insurance Savings as a result of implementing a CCIP (Contractor Controlled Insurance Program) rather than an OCIP (Owner Controlled Insurance Program)
6. A portion of the savings from insurance was allocated to City Staffing to cover costs from Fiscal Year 2014 through December 2018. The previous budget
estimate included only Fiscal Years 2015 through part of 2018.
7. Additional Cost Estimating services to support GMP reconciliation negotiations with Construction Manager - Clark Construction.
8. Savings from Clark Bond on Direct Purchases executed to date. These savings are added to Owner's Contingency.
9. $4.7M in general liability insurance was originally to be purchased directly by the owner, but was actually purchased by the contractor. Also refer to Footnote No. 5.
10. Total use of Contractor Contingency to Date. Refer to Exhibit B1 for detailed summary.
11. Additonal design fees required for re- grading of streets, GMP reconciliation services, and future design contingency replenishment.
12. Additional Costs for Dispute Avoidance Panel and outside legal counsel.
13. Moving expenses, parking fees and other expenses for relocation of building operator for approximately 18 months.
14. Costs for additional lift equipment for curtainwall maintenance not originally budgeted.
15. Estimate for raising the building to account for sea level rise, not previously accounted for.
16. Total use of Owner Contingency to Date. Refer to Exhibit B2 for detailed summary.
17. Projected Sales Tax Savings from submitted Direct Purchase Orders; $2.5M anticipated savings from future Direct Purchase of materials
Page 1 of 1
EXHIBIT B1
Miami Beach Convention Center Expansion & Renovation Project
Construction Manager's (CM) Contingency Report
Through February 28, 2017
SUMMMARY
MONTH
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
MAY
Total CM Contingency
USES
May 2016 **
Jun 2016
Jul 2016
Aug 2016
Sep 2016
Oct 2016
Nov 2016
Dec 2016
Jan 2017
Feb 2017
Total Uses
REMAINING CM CONTINGENCY
SUBCONTRACTOR
ACOUSTI
ALPHA DEMO
AMERICAN FIRE PROFF
BANKER
BARING INDUSTRIES
CAMARATA
CDPW
DAVID ALLEN
DUFFY & LEE
FORD AV
HAYWOOD BAKER
HONEYWELL
HUFCOR
ISEC
JAFFER
NASH
NFP
RITE HITE
R &M
SPECIFIED ARCH SYS
TECTA
TRIDENT
WON DOOR
WPM
SUBTOTAL
Trade Contract Buyout
DESCRIPTION
Temporary Walls
Demolition
Spray Fireproofing
Structural Steel
Food Service
Masonry
Dewatering
Tile
Carpet
Audio/Visual
Soil Stabilization
Low Voltage
Operable Partions
Expansion Joints
Dewatering - Wells
Dewatering - Underground Utility
Fire Suppression
Loading Dock
Structural Concrete
Operable Partions
Roofing
Resilient Flooring
Operable Doors
Site Civil
$29,747,613.00
$ 3,516,099.28
$ 3,539,694.47
$ 2,345,812.72
$ 678,014.32
$ 1,373,672.04
$ 555,095.86
$ 1,453,031.74
$ 82,810.97
$ 1,491,842.15
$ 2,008,667.81
17,044,741.35
$12,702,871.65
AMOUNT MARK -Ups* TOTAL COST
$1,706,560.00 $84,734.24 $1,791,294.24
- 203,020.00 - 10,080.36 - 213,100.36
- 8,828.73 - 186,640.73
- 16,590.64 - 350,728.64
1,650.63 34,894.63
- 8,500.43 - 179,700.43
- 5,878.76 - 124,277.76
- 7,079.89 - 149,669.89
- 991.30 - 20,956.30
- 528.40 - 11,170.40
21,558.18 455,743.18
- 35,419.85 - 748,780.85
- 13,270.61 - 280,542.61
7,960.07 168,277.07
70.56 1,491.56
4,743.31 100,274.31
- 5,089.34 - 107,589.34
- 327.70 - 6,927.70
55, 399.40 1,171,151.40
- 226.81 - 4,794.81
450.59 9,525.59
- 1,269.11 - 26,829.11
280.53 5,930.53
57,813.78 1,222,191.78
120,579.36 2,549,065.36
JUNE
JUNE
JULY
JULY
JULY
JULY
JULY
JULY
JULY
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
LOUVERS (Nash Mech.)
WPM
SUBTOTAL
Louvers
Site Civil
ACOUSTI
AERIAL PHOTOGRAPHY INC
GEOSYNTEC
MICHEAL WOOD
MODSPACE
GOAL ASSOCIATES
SMITH FENCE
TR PERMITTING
SUBTOTAL
NO CHANGES
SUBTOTAL
NO CHANGES
SUBTOTAL
EVENSTAR
SUBTOTAL
NO CHANGES
SUBTOTAL
Temporary Walls
Aerial Job Site Photos
Environmental Consultant
FDEP Consultant
Owner Trailer
MOT
Fencing
Permitting
- 177,812.00
- 334,138.00
33,244.00
- 171,200.00
- 118,399.00
- 142,590.00
- 19,965.00
- 10,642.00
434,185.00
- 713,361.00
- 267,272.00
160, 317.00
1,421.00
95, 531.00
- 102,500.00
- 6,600.00
1,115, 752.00
- 4,568.00
9,075.00
- 25,560.00
5,650.00
1,164, 378.00
2,428,486.00
- 433,354.00
- 429,292.00
- 862,646.00
4,480.00
43.00
5,800.00
10,200.00
- 3,197.00
46,500.00
- 367.00
66,000.00
129,459.00
-21,516.92
-21,315.24
- 42,832.16
- 454,870.92
- 450,607.24
- 905,478.16
0.00
Decking
0.00
3,000.00
3,000.00
0.00
0.00
222.44
2.14
287.98
506.45
- 158.74
2,308.82
-18.22
3,277.04
6,427.91
0.00
0.00
0.00
0.00
148.96
148.96
0.00
0.00
4,702.44
45.14
6,087.98
10,706.45
- 3,355.74
48,808.82
- 385.22
69,277.04
135,886.91
0.00
0.00
0.00
0.00
3,148.96
3,148.96
0.00
0.00
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
JANUARY
JANUARY
HOISTWAY MODIFICATION
FIREPROOFING Scraping
PILING UNBOUGHT
POCKET DOOR
SPOIL REMOVAL
UNDERPINNING
EXISTING STRUCTURE
DEWATERING EQUIPMENT
SECONDARY ELEC SERV
OPPORTUNITY TRAILER
ALUMINIUM STEPS
TEMP TRAILER
TR PERMITTING
SUBTOTAL
DEWATERING EQUIPMENT
SECONDARY ELEC SERV
SUBTOTAL
(3b) Modifications for EL16.02 not used
(3c) Related to elevator only
(16A) Additional length per GMP Clarification
(42b) Pocket Door for WON DOOR
(16c) Spoil removal for jet grouting
(16d) Underpinning for East Concourse
(16e) Monitoring of existing structure
(19f) Dewatering Equipment Temp Power & Fuel
(84.31) With MEP Subs, from GR to CM
(84.36d) Moved from GR's to CM
(84.36e) Moved from GRs to CM
(84.36f) Permitting
Permitting
(19f) Dewatering Equipment Temp Power & Fuel
(84.31) With MEP Subs, from GR to CM
- 150,000.00
- 4,571.00
- 176,952.00
- 5,000.00
- 2,500.00
- 4,000.00
- 25,000.00
- 140,000.00
- 255,000.00
- 30,000.00
-21,600.00
- 10,000.00
- 66,000.00
- 890,623.00
140,000.00
255,000.00
395,000.00
- 7,447.81
- 226.96
- 8,786.03
- 248.26
- 124.13
- 198.61
- 1,241.30
- 6,951.29
- 12,661.28
- 1,489.56
- 1,072.48
- 496.52
- 3,277.04
- 44,221.28
6,951.29
12,661.28
19,612.57
- 157,447.81
- 4,797.96
- 185,738.03
- 5,248.26
- 2,624.13
- 4,198.61
- 26,241.30
- 146,951.29
- 267,661.28
- 31,489.56
- 22,672.48
- 10,496.52
- 69,277.04
- 934,844.28
146,951.29
267,661.28
414,612.57
TOTAL SINCE INCEPTION
$1,202,676.00
$59,715.35 $1,262,391.35
Trade Costs
MONTH
MAY
MAY
MAY
MAY
MAY
MAY
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
SUBCONTRACTOR
BARING INDUSTRIES
CDPW
HAYWOOD BAKER
HJ FOUNDATION
HJ FOUNDATION
HONEYWELL
DESCRIPTION
Temporary Kitchen
Cost associated with dewatering due to the tremmie
seal pumping water disposal - Initial set up and
monthly disposals.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Building Separation
AMOUNT MARK -Ups*
$321,004.66 $0.00
186,092.37 9,239.87
23, 000.00 1,142.00
33,846.80 1,680.56
38,823.07
289,721.73
1,927.65
TOTAL COST
$321,004.66
195,332.24
24,142.00
35,527.36
40,750.72
289,721.73
SUBTOTAL
892,488.63 13,990.08
906,478.71
ACOUSTI
ALPHA WRECKING
BARRING INDUSTRIES
CDPW
HARMON
HONEYWELL
HJ FOUNDATION
JAFFER
NASH
NASH
Additional costs for the mechanical fastening of the
insulation due to inability to remove via air
compressors by demo subcontrcator
INTERIM FUNDING - costs associated with extended
dump hours, additional demolition or parapet walls,
structural members abd block removal
Cost reallocated to GR Life Safety line item
Cost associated with dewatering due to the tremmie
seal pumping water disposal - monthly expenses and
contaminated water fees.
INTERIM FUNDING - Costs associated with the
design and engineering associated with modifications
to the exterior of the building
Cost reallocated to GR Life Safety line item
INTERIM FUNDING - Costs for work in place
associated with the additional piles and ties from the
design completion
INTERIM FUNDING - Costs associated with the 3
additional dewatering required for the project
Additional dewatering costs associated with the
temporary FPL ductbank being routed from
Washington Ave to NW FPL Vault
INTERIM FUNDING - Costs associated with work in
place for replacement of the existing restrooms, misc
material changes to the sanitary, storm and chilled
water systems made during design completion, and
new duct Heaters
Exhibit B1
Page 2 of 6
300,000.00 14,895.62
420,000.00 20,853.87
- 321,004.66
89,312.00
0.00
4,434.53
160,000.00 7,944.33
- 289,721.73
141, 000.00
0.00
7,000.94
85,000.00 4,220.43
221,426.00 10, 994.26
500,000.00 24,826.04
314,895.62
440,853.87
- 321,004.66
93,746.53
167,944.33
- 289,721.73
148,000.94
89,220.43
232,420.26
524,826.04
JUNE
JUNE
JULY
JULY
JULY
JULY
JULY
JULY
JULY
JULY
AUGUST
AUGUST
NATIONAL FIRE PROTECTION INTERIM FUNDING - Costs associated with work in
place for the implementation and installation of the
higher density sprinklers requested by the AHJ
ROBINS & MARTIN
INTERIM FUNDING - Costs for completed work for
tremmie seals as requested by CM and rebar
bending; costs for work in place including structural
changes to the vault, shearwalls, footings and
elevated beams.
400,000.00 19,860.83 419,860.83
2,000,000.00 99,304.14 2,099,304.14
SUBTOTAL
ALPHA WRECKING
ALPHA WRECKING
CAMARATA
FL CIVIL
MC DEAN
MC DEAN
R &M
WPM / R&M
SUBTOTAL
JAFFER
TRU -STEEL
SUBTOTAL
INTERIM FUNDING - costs associated with extended
dump hours, additional demolition or parapet walls,
structural members abd block removal
Deletion of scope for the removal of the insulation.
Deletion of intregal water repellant per contract
Dewatering permit
INTERIM FUNDING -FPL ductbank
INTERIM FUNDING - Costs for completed work for
electrical changes to the FPL vaults and camera
infrastructure.
INTERIM FUNDING - Costs for completed work for
structural changes to the vault, shearwalls, footings
and elevated beams.
SCOPE CHANGE - Fine grading
Additional drainage wells - Phase 2
Miscellaneous metals scope
3,706,011.61 214,334.98 3,920,346.59
330,000.00 16,385.18 346,385.18
- 396,962.00
- 163,000.00
23,452.21
250,000.00
500,000.00
- 19,709.99
- 8,093.29
1,164.45
12,413.02
24,826.04
-416,671.99
-171,093.29
24,616.66
262,413.02
524,826.04
700,000.00 34,756.45 734,756.45
- 766.71 -38.07 - 804.78
1,242,723.50 61,703.80 1,304,427.30
358,500.00 17,800.27 376,300.27
50,000.00 2,482.60 52,482.60
SEPTEMBER HONEYWELL
SEPTEMBER HONEYWELL
SEPTEMBER ACOUSTI
SEPTEMBER ALPHA
SEPTEMBER ALPHA
SEPTEMBER R &M
SEPTEMBER BANKER
SEPTEMBER NFP /MARDALE
INTERIM FUNDING - Engineering
INTERIM FUNDING - Equipment
INTERIM FUNDING - Additional drywall scope
INTERIM FUNDING - credit for moneys paid under
OCO #35 for z -wall scope
INTERIM FUNDING - additional demo scope
SCOPE GAP - Additional labor for floor boxes
formwork
SCOPE CHANGE - Cutting out grating for new AHU
SCOPE GAP - Installation for fire extinguisher
cabinets
408,500.00 20,282.87 428,782.87
200,000.00 9,930.41 209,930.41
250,000.00 12,413.02 262,413.02
500,000.00 24,826.04 524,826.04
- 42,821.00 - 2,126.15 - 44,947.15
42,821.00 2,126.15 44,947.15
69,998.00 3,475.55 73,473.55
152,037.00 7,548.95 159,585.95
35,513.00 1,763.29 37,276.29
OCTOBER
OCTOBER
OCTOBER
OCTOBER
SUBTOTAL
R &M
ACOUSTI
ACOUSTI
RITE HITE
SUBTOTAL
1,207,548.00 59,957.26 1,267,505.26
TEMP WORK FOR ART BASEL - Transition slab
TEMP WORK FOR ART BASEL - NW egress tunnel
Electrical room 1.7.07 build out
Dock leveler size
408,604.00 20,288.03 428,892.03
180,001.30 8,937.44 188,938.74
18,609.80 924.02 19,533.82
1,770.00 87.88 1,857.88
608,985.10 30,237.37 639,222.47
NOVEMBER WPM
NOVEMBER FLORIDA BLACKTOP
NOVEMBER TECTA
NOVEMBER ACOUSTI
NOVEMBER ACOUSTI
NOVEMBER DASH DOORS
NOVEMBER ACOUSTI
NOVEMBER MCDEAN
NOVEMBER TECTA
NOVEMBER JAFFER
NOVEMBER JAFFER
Import fill for NE helix
TEMP WORK FOR ART BASEL
TEMP WORK FOR ART BASEL
metal deck at north loading dock
TEMP WORK FOR ART BASEL
throughout
TEMP WORK FOR ART BASEL
NW egress
TEMP WORK FOR ART BASEL
storefront
TEMP WORK FOR ART BASEL
north loading dock dry-in
Floor box shims
TEMP WORK FOR ART BASEL
1.07.07 waterproofing
Scope reduction - base contract
New scope - Additional transport
- temp asphalt
- waterproofing for
- patch & repair
- temp tunnels for
- repair exist.
- temp walls for
- electrical room
of pile spoils
Exhibit B1
Page 3 of 6
79,128.00 3,928.87 83,056.87
366,867.42 18,215.73 385,083.15
73,669.00 3,657.82 77,326.82
127,553.62 6,333.30 133,886.92
184,843.37 9,177.86 194,021.23
43,835.87 2,176.54 46,012.41
21,530.33 1,069.03 22,599.36
188,643.00 9,366.52 198,009.52
8,997.00 446.72 9,443.72
- 17,000.00 - 844.09 - 17,844.09
17,000.00 844.09 17,844.09
NOVEMBER TECTA TEMP WORK FOR ART BASEL - electrical room 5,212.00 258.79 5,470.79
1.06.04 waterproofing
NOVEMBER ALPHA Asbestos abatement 65,452.00 3,249.83 68,701.83
NOVEMBER ALPHA Lead Paint abatement 151,500.00 7,522.29 159,022.29
SUBTOTAL 1,317,231.61 65,403.28 1,382,634.89
DECEMBER CAMARATA Existing conditions - Z wall infil & patching 71,868.00 3,568.40 75,436.40
DECEMBER ALPHA West Concourse - Acceleration 100,000.00 4,965.21 104,965.21
DECEMBER ALPHA Temporary separation - GL -7 125,000.00 6,206.51 131,206.51
DECEMBER ALPHA Hall C/D SOG demo acceleration 100,000.00 4,965.21 104,965.21
DECEMBER EUGENIO PAINTING TEMP WORK FOR ART BASEL - to be voided 23,916.00 1,187.48 25,103.48
DECEMBER MCDEAN TEMP WORK FOR ART BASEL - to be voided 77,123.00 3,829.32 80,952.32
DECEMBER PJ STRIPPING TEMP WORK FOR ART BASEL 2,915.54 144.76 3,060.30
DECEMBER UNDERPOWER Repair of damaged traffic signals Wash Ave 1,938.00 96.23 2,034.23
DECEMBER DUFFY & LEE TEMP WORK FOR ART BASEL - floor prep for 7,431.00 368.96 7,799.96
carpet
DECEMBER STAGING CONCEPTS TEMP WORK FOR ART BASEL - infill plexi panels 7,776.00 386.09 8,162.09
for new guardrails at east concourse
DECEMBER EAST COAST METALS TEMP WORK FOR ART BASEL - to be voided 20,600.00 1,022.83 21,622.83
DECEMBER WPM TEMP WORK FOR ART BASEL - subgrade prep for 192,869.95 9,576.39 202,446.34
temp asphalt for loading dock and east sidewalk
DECEMBER AMERICAN FIREPROOFING TEMP WORK FOR ART BASEL - fire proofing shear 24,619.40 1,222.40 25,841.80
wall braces and beam in elec room
DECEMBER TECTA Waterproofing north elec room & FPL vault 35,049.01 1,740.26 36,789.27
DECEMBER DAVID ALLEN Acceleration for AB16 - terrazzo stairs & restrooms 5,783.37 287.16 6,070.53
tile instal.
DECEMBER NFP Replace & repair exist. fire hose & nozzles 7,428.00 368.82 7,796.82
SUBTOTAL 804,317.27 39,936.02 844,253.29
JANUARY MCDEAN Relocation of TC -D3 Telcom Room 75,761.00 3,761.69 79,522.69
JANUARY WPM Fix Storm Box Culvert 4,685.00 232.62 4,917.62
JANUARY OTIS Rembursement to Elevator Pit 2,696.00 133.86 2,829.86
JANUARY DUFFY LEE Remove and reinstall carpet - due to asbestos 8,939.00 443.84 9,382.84
removal
JANUARY ACOUSTI TEMP WORK FOR ART BASEL 23,501.00 1,166.87 24,667.87
JANUARY EAST COAST METALS TEMP WORK FOR ART BASEL - Change Order Not - 20,600.00 - 1,022.83 - 21,622.83
Executed
JANUARY DECON Rejected Change Order - Lead Paint Abatement 815,476.00 40,490.07 855,966.07
SUBTOTAL 910,458.00 45,206.13 955,664.13
FEBRUARY DECON Rejected Change Order - Lead Paint Abatement 833,128.28 41,366.54 874,494.82
FEBRUARY AMERICAN FIREPROOFING Rejected Change Order - Additional fireproofing on 79,335.06 3,939.15 83,274.21
exisiting members
FEBRUARY GLE ASSOCIATES ABESTOS ABATEMENT - ALPHA 5,872.50 291.58 6,164.08
FEBRUARY GLE ASSOCIATES LEAD ABATEMENT 27,537.72 1,367.30 28,905.02
FEBRUARY WPM FILMORE PARKING 1,405.00 69.76 1,474.76
FEBRUARY WPM DEWATERING FOR MCDEAN DUCTBANK 4,931.00 244.83 5,175.83
FEBRUARY WPM Pump Roof Drain Manhole 3,994.00 198.31 4,192.31
FEBRUARY WPM Pump Roof Drain Manhole 5,883.00 292.10 6,175.10
FEBRUARY FLORIDA BLACKTOP FILMORE PARKING 4,552.00 226.02 4,778.02
FEBRUARY ACOUSTI East Facade Exterior 312,004.51 15,491.67 327,496.18
FEBRUARY BANKER Fabrication and Installation of Floor Boxes 200,000.00 9,930.41 209,930.41
FEBRUARY BRAZOS Spray Fireproofing - Pending OCO 83,000.00 4,121.12 87,121.12
FEBRUARY EUGENIO PAINTING TEMP WORK FOR ART BASEL - Dec C/O to be - 23,916.00 - 1,187.48 - 25,103.48
voided
FEBRUARY MCDEAN TEMP WORK FOR ART BASEL - Dec C/O to be - 77,123.00 - 3,829.32 - 80,952.32
voided
FEBRUARY CAMARATA December amount adjusted - correct typo - 300.00 -14.90 - 314.90
FEBRUARY JAFFER Correction - November CO reversal was incorrectly 17,000.00 844.09 17,844.09
listed - C/O to subcontractor was issued.
FEBRUARY JAFFER Scope Reducion - 24,000.00 - 1,191.65 - 25,191.65
FEBRUARY FLORIDA CIVIL DEWATERING PLAN MODIFICATION 9,202.00 456.90 9,658.90
FEBRUARY BANKER EAST FACADE ACCELERATION 150,338.00 7,464.59 157,802.59
FEBRUARY BANKER Supply FLOOR opening penetration N. Addition 100,000.00 4,965.21 104,965.21
SUBTOTAL 1,712,844.07 84,301.47 1,797,890.33
TOTAL SINCE INCEPTION $12,811,107.79 $635,353.25 $13,447,205.82
Exhibit B1
Page 4 of 6
MONTH
MAY
SUBCONTRACTOR
* GEOSYNTEC
General Requirements
DESCRIPTION
DERM approval
AMOUNT MARK -Ups* TOTAL COST
$2,864.47 $60,555.22
$57,690.75
JUNE
SUBTOTAL
LIFE SAFETY
SUBTOTAL
57,690.75 2,864.47 60,555.22
Costs associated with the separation and life safety
costs
500,000.00 24,826.04 524,826.04
500,000.00 24,826.04 524,826.04
JULY
JULY
JULY
JULY
JULY
JULY
JULY
JULY
JULY
AUGUST
AUGUST
AUGUST
AUGUST
AUGUST
AUGUST
AUGUST
SEPTEMBER
SEPTEMBER
SEPTEMBER
SEPTEMBER
OCTOBER
SEPTEMBER
OCTOBER
OCTOBER
OCTOBER
OCTOBER
OCTOBER
OCTOBER
ACOUSTI
BISCAYNE ENGINEERING
GEOSYNTEC
GEOSYNTEC
HURRICANE PROTECTION
MICHEAL WOOD
MODSPACE
OWNER COST
OWNER - Fentress Architects
Onsite Visits
Procurement realocation from CM cont. for temporary
wall
Procurement realocation from CM cont. for Surveying
- Increase Contract
Procurement realocation from CM cont. for NPDES
permits
Procurement realocation from CM cont. for NPDES
permits
Procurement realocation from CM cont. for Hurricane
Preparation
Procurement realocation from CM for FDEP permits
Procurement realocation from CM for Owner Trailer
Realocation from CM for Life Safety expenses (ie
Fire Watch)
CM expense for additional Design Team site visits
and alternate design configurations
132,953.01 6,601.39
75,000.00 3,723.91
13,348.06 662.76
88,355.59 4,387.04
50,000.00 2,482.60
3,192.90 158.53
30, 893.69 1,533.94
320,922.14 15,934.45
148,000.00 7,348.51
139,554.40
78,723.91
14,010.82
92,742.63
52,482.60
3,351.43
32,427.63
336,856.59
155,348.51
SUBTOTAL
862,665.39 42,833.12
905,498.51
BISCAYNE ENGINEERING
VALLEY FIELD
OWNER COST
OWNER COST
BRAND ENERGY
OWNER - Fentress Architects
Onsite Visits
OWNER - Fentress Architects
Onsite Visits
Procurement realocation from CM for additional
Surveying - contract increase
Cost for the repair of damaged irrigation lines at
Filmore
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Procurement realocation from CM for scaffolding
CM expense for additional Design Team site visits
and alternate design configurations - ERROR
CM expense for additional Design Team site visits
and alternate design configurations - ACTUAL
150,000.00
1,538.00
- 320,922.14
370,138.10
35,689.00
- 148,000.00
7,447.81
76.36
- 15,934.45
18, 378.12
1,772.03
- 7,348.51
148,999.00 7,398.11
157,447.81
1,614.36
- 336,856.59
388,516.22
37,461.03
- 155,348.51
156, 397.11
SUBTOTAL
237,441.96 11,789.49
249,231.45
OWNER COST
OWNER COST
MICHEAL WOOD
BRAND ENERGY
ACOUSTI
GLE
SUBTOTAL
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Procurement realocation from CM for FDEP permits
Procurement realocation from CM for scaffolding
Temp exterior impact partition - GR
Haz -mat survey west concourse
- 370,138.10
391, 261.00
10,080.00
- 35,689.00
87,060.84
18,570.00
101,144.74
- 18,378.12
19,426.92
500.49
- 1,772.03
- 388,516.22
410,687.92
10,580.49
- 37,461.03
4,322.75 91,383.59
922.04 19,492.04
5,022.05 106,166.79
GLE
OWNER COST
OWNER COST
ACOUSTI
ACOUSTI
ACOUSTI
SUBTOTAL
Haz -Mat survey west concourse
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Realocation from CM for Life Safety expenses (ie
Fire Watch)
Temp exterior impact partition - GR
Credit for Bond Rate Adjustment
Hurricane Matthew Preparation - October 16
- 18,570.00
- 391,261.00
401, 877.54
- 87,060.84
- 431.00
12, 298.16
- 83,147.14
- 922.04 - 19,492.04
- 19,426.92 - 410,687.92
19,954.05 421,831.59
- 4,322.75 - 91,383.59
-21.40 - 452.40
610.63 12,908.79
- 4,128.43 - 87,275.57
NOVEMBER ACOUSTI
NOVEMBER HURRICANE PROTECTION
NOVEMBER HURRICANE PROTECTION
Hurricane Matthew Preparation - October 16
Additional funds for Hurricane Protection
Additional funds for Hurricane Protection
Exhibit B1
Page 5 of 6
- 12,298.16
15,000.00
16,000.00
- 610.63 - 12,908.79
744.78 15,744.78
794.43 16,794.43
NOVEMBER
NOVEMBER
NOVEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
DECEMBER
JANUARY
JANUARY
JANUARY
FEBRUARY
FEBRUARY
FEBRUARY
FEBRUARY
SCAFFOLDING SHRINKWRAP
SCAFFOLDING SHRINKWRAP
SCAFFOLDING SHRINKWRAP
SUBTOTAL
TEMP WORK FOR ART BASEL - engineering for NE
egress tunnel
Extended rental for East Concourse
Adjustments to East Concourse
2,875.00
33,535.00
11,955.00
67,066.84
142.75 3,017.75
1,665.08 35,200.08
593.59 12,548.59
3,330.01 70,396.85
EVENTSTAR
HURRICANE PROTECTION
HURRICANE PROTECTION
GEOSYNTEC
OWNER COST
OWNER COST
TRUSTEEL
SUBTOTAL
OWNER COST
OWNER COST
TEMP WORK FOR ART BASEL 2016 - metal stairs
Additional funds /NASH
Additional funds for Hurricane Protection
Environmental Consultant
Reallocation from CM for Life Safety expenses (ie
Fire Watch)
Reallocation from CM for Life Safety expenses (ie
Fire Watch)
Temporary Bracing
FPL /FILMORE VAULT
Reallocation from CM for Life Safety expenses (ie
Fire Watch)
Reallocation from CM for Life Safety expenses (ie
Fire Watch)
VAULT UPGRADE AT FILMORE
56,828.00
20,000.00
15,000.00
8,545.00
- 401,877.54
464,173.00
2,531.00
165,199.46
- 464,173.00
509,844.00
70,144.00
2,821.63 59,649.63
993.04 20,993.04
744.78 15,744.78
424.28 8,969.28
- 19,954.05 - 421,831.59
23,047.15 487,220.15
125.67 2,656.67
8,202.50 173,401.96
- 23,047.15 - 487,220.15
25,314.81 535,158.81
3,482.79 73,626.79
SUBTOTAL
OPTIKA
115,815.00
OWNER - Fentress Architects
Onsite Visits
GLE
Hurricane Protection
TRUSTEEL
SUBTOTAL
Misc Invoices - Art Basel 2016
CM expense for additional Design Team site visits
and alternate design configurations
October - GLE correction no credit was given
This is GLE Base Contract
Credit for monies not used
Rein. Existing Catwalk Grating
9,588.00
112,649.00
18,570.00
- 15,000.00
75,000.00
200,807.00
5,750.45 121,565.45
476.06 10,064.06
5,593.26 118,242.26
922.04 19,492.04
- 744.78 - 15,744.78
3,723.91 78,723.91
9,970.48 210,777.48
TOTAL SINCE INCEPTION
$2,224,684.00 $110,460.17 $2,335,144.17
TOTALS
Buyout
Trade Costs
General Requirements
Total CM Contingency Use
$1,202,676.00
12,811,107.79
2,224,684.00
$16,238,467.79
$59,715.35 $1,262,391.35
635, 353.25 13,447,205.82
110,460.17 2,335,144.17
$806,273.56 $17,044,741.35
* Mark ups include insurance, bond and CM fees.
* *May amounts are $156,070 lower than reported in May due to the reconciliation /audit process.
Exhibit B1
Page 6 of 6
EXHIBIT B2
Miami Beach Convention Center Expansion & Renovation Project
Owner's Contingency Report
Through February 28, 2017
SUMMMARY
ORIGINAL OWNER'S CONTINGENCY $35,000,000.00
MODIFICATIONS (ADDS)
Bond offering additional proceeds
DPO Payment & Performance Bond Savings
Total Modifications
$147,449.00
$762,906.42
$910,355.42
USES
Jun 2016 $ 4,630.28
Jul 2016 $
Aug 2016 $ 29,967.01
Sep 2016 $
Oct 2016 $ 2,518,080.00
Nov 2016 $ (96,710.00)
Dec 2016 $ 179,685.00
Jan 2017 $ 794,486.36
Feb 2017 $ (58,386.11)
Total Use $ 3,371,752.54
TOTAL CONTINGENCY USE ($2,461,397.12)
REMAINING OWNER'S CONTINGENCY $32,538,602.88
MONTH CHANGE ORDER # DESCRIPTION Trade Cost Mark -ups AMOUNT
June Deductive change order against CM's contingency for t
32 extra site visits by design team (148,999.00)
June Deductive change order against's CM's fee for design 2
34 remediation work (6,000.00)
June 35 Additional fire rated 2nd floor service corridor wall 107,849.83 5,354.97 113,204.80
June 36 Additional construction fence panels 44,228.45 2,196.03 46,424.48
SUBTOTAL 152.078.28 7.551.00 4,630.28
August 40 New 8" sanitary sewer line on Washington Avenue 28,549.47 1,417.54 29,967.01
SUBTOTAL 28.549.47 1.417.54 29,967.01
October N/A US Cost - GMP Reconciliation 945,080.00
October N/A Permit & Plan Reviews 855,000.00
October N/A Design Miami 2016 - Generators 408,000.00
Additional amount needed for the first 12 months of
October N/A warehouse lease payments for Spectra Staff (Total costs
of months 1 -12: 531,316.50) 287,800.00
October N/A Spectra - Cost associated with relocation of the
warehouse equipment 22,200.00
SUBTOTAL 2,518,080.00 3
Clark / Banker backcharge for additional structural
November 43 engineering services approved for Fentress in
Amendment 20. (96,710.00)
SUBTOTAL (96.710.00) 3
December N/A Design budget adjustment to increase Fentress PO
through Amendment 23. 179,685.00
SUBTOTAL 179.685.00
January N/A Design budget adjustment to increase Fentress PO
through Amendment 24 18,625.00
January 52 Additional cost of generator 319,160.50 15,846.98 335,007.48
January 57 Honeywell Interim GMP Reconciliation Funding 420,000.00 20,853.88 440,853.88
SUBTOTAL 739.160.50 36.700.86 794.486.36
February 54 Clark backcharge for additional structural engineering
services required due to non - conforming work (20,000.00)
Clark backcharge for extra design team site visits and
February 55 additional structural engineering design changes
requested by Clark (112,649.00)
February 56 Switchgear replacement due to arc flash incident 70,750.00 3,512.89 74,262.89
70.750.00 3.512.89 (58.386.11)
TOTAL SINCE INCEPTION 990.538.25 49.182.29 3.371.752.54
1. Credit to Owner Contingency from CM Contingency in month of August.
2. Credit to Owner Contingency from CM Fee.
3. Budget transfer for Owner Expenses.
Exhibit B2
Page 1 of 1
EXHIBIT C
LOCAL WORKER UTILIZATION REPORT
CLARK
CON:TRuCT ON
From Date: 10/1/2015
To Date: 3/5/2017
Zip Lists
Total
Number of
Workers
of
Total
Workers
Total
Hours
Worked
% of Total
Hours
Worked
Miami Beach
Miami Dade County
Employees Not In Specified Zip
30 0.89 % 15,978 1.26 %
2,082 62.06 % 694,358 54.59 %
1,243 37.05 % 561,540 44.15 %
Demographic Profile
African American 658 19.61 % 199,719 15.70
Native American 5 0.15 % 1,400 0.11
Asian 9 0.27 % 2,165 0.17 %
Hispanic 1,429 42.59 % 534,937 42.06
Caucasian 414 12.34 % 137,208 10.79 %
Other 840 25.04 % 396,447 31.17 %
Male 3,239 96.54 % 1,239,292 97.44 %
Female 116 3.46 % 32,585 2.56 %
Veteran 1 0.03 % 187 0.01
Disadvantaged 0 0% 0 0%
Total Employees 3,355 1,271,876
February 2017 - Media Repor
Miami Beach Convention Center Renovation Project
Social Media Posts for February 2017
fCity of Miami Beach Government dr Like Page
February 5 ti
Tomorrow: Washington Avenue will be closed between 17 Street and 18
Street for drainage work from 9 a.m. to 1 p.m.
All traffic will be detoured around the area, Drive safe and follow all posted
signs. #MBCCFuture Miami Beach Convention Center
Posted to Facebook - Published February 5, 2017
City of Miami Beach Government
February 9 • t?
di Like Page
Latest Miami Beach Convention Center Construction Advisory for Monday,
February 13. Read more http; /Fconta.ccl2kycL6h #MBCCFuture
MBCC Construction Update
rhursdar, februery 9, 2017
On Monaay, reprvary 1 }, 2017, OS west 'Pee mterseo on of Washington Avenue and 17
Street will he eantinueusly Closed for appmxumatety one week as part of the Miami Beach
Cpnvenli¢n Center Project,
All traffic will tie detoured throughout the area to use 16 Street. View the full construction
Pdeisory toe more Information. Expect deelays around the area and seek alternate routes.
Suftecribs to Other Hemp It
into+ nation from Wawa Seech
Posted to Facebook - Published February 9, 2017
, City of Miami Beach Government rfr Like Page
February 9 • is
Construction activity surrounds the Miami Beach Convention Center. From
renovations, drainage work to pump stations & more, See our work one
map #MBCCFuture
EMI
W3c4
1 �`�'F
t Sth Stree
1114 %M
a 20 lilt
2.wriL
4}
i= -
d '17th `e,1
W
. 2 17th 5kt:et .
L 1 at
ii ,r_. 4
Posted to Facebook - Published February 9, 2017
CONVENTION CENTER
City of Miami Beach Government ,d Like Page
February 13 0
The Miami Beach Convention Center project continues to help create jobs
in South Florida, Check out our recent labor stets. # MBCCFuture
1,904
Miami Beach /Miami
Dade County local
laborers being used
to date to renovate
the reimagined
Convention Center
i
Amiai
sit.
"dvi,
l P
•4
1,098
Other laborers
hired to support
this $615
million protect
Current construction
3 /002 jobs to date at the
Miami Beach
Convention Center
'Figures reported are From project inception (December 2015) to dere
(December 2016).
Posted to Facebook - Published February 13, 2017
City of Miami Beach Government lb Luce Page
The Miami Beach Convention Center is one step closer to receiving the
LEED Silver Certification by recycling construction materials!
Learn more about our program here #MBRisingAbove #MBCCFuture
MBCC rises above environmental goals andisone step
doser ortieving the LEED Silver eel/ rarron
to`
GOALS
CURRENT PRODUCTIVITY
C 96 %+
10%+
iv 10,
IIIRecycled Moleriois Used
tot�aemdcrost�rt.
Regiofcst Materials Secured
end alortiamnrg rrt o 500 runes
Construction waste Management
by 3ereg Lebro3 to Mrune Or reovk .
TOTAL TONS
WERE DIVERTED OR RECC"_ED
fit 4
1 a
3t1
2,222 Truckloads of Material
694 of the onvirnibcrldrng is rerrorrtert 8 re
Posted to Facebook - Published February 14, 2017
i1 Ileana Ros-Lehtinen 0
LFebruary 14'rA
Retweeted City of Miami Beach { @MiamiBeachNews):
. aTheMiamiBeachCC is one step closerto receiving LEED Silver
Certification by recycling construction materials! #MBRisingAbove
# MBCCFuture https: / /t.co/kYZjOoLxk3
I r` Like Page
Posted to Facebook - Published February 14, 2017
City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.co
IIIIIIIIIIIIIIIIIIIIII�IIIIII +iil,llll�,,,�ll,,,,,tttttlt
MIAMI BEACH
CONVENTION CENTER
Miami Beach Convention Center 0 added
3 new photos.
February 16• N
11r Like Page
The demolition of the west lobby area Is nearly complete!
#m bcctuture # MiamiBeachConventionCenter #MiamiBeach
Posted to Facebook - Publis - • Fe ruary 16, 017
City of Miami Beach Government dr Like Page
February 20 • w?
Read up on the latest update as part of the Miami Beach Convention
Center: http://sepurl.com/cCVY6b #MBCCFuture
UPDATE -17 Street Storm Water Drainage —
Construction Advisory
http:ffeepurl. mmlcGVY6b
EEPURLCOM
Posted to Facebook - Published February 20, 2017
City of Miami Beach Government le Like Page
it February 24 at 6:D3pnt • d
Latest advisory as part of the Miami Beach Convention Center project:
htt p: / /eepurl.com/cDFO7L #MBCCFuture
A
'PDATE•
On Monday. February 27, dr ainage improvements cOMmre along 17 Seel between
Washington Avenue and Pennsylvania Avenue All travel lanes are reduced to one
way m each 1 88178n for approamate6 One moth iaee m47 below)
This work 6 parr of the Public Works Department SIOrre water drainage
upgrades along WaSntngten Avenue tram 17 street to 18 5treel and en 17 Street
from Pennsylvanta Avenue 10 Washington Avenue
'o download the prt ecl advrs1ry.
Text "Lanzol7- to 555888 for more info on the 17 Street
project.
Posted to Facebook - Published February 24, 2017
Miami Beach Convention Center 0 Like Page
February 27 at 11 :37s0 N
Check out the new drone footage showing an aerial view of the Miami
Beach Convention Center construction. #MBCCFuture #MiamiBeach
#MiamiBeaehConventlonCenter Airborne Response Clark Construction
Group, LLC City of Miami Beach Government
htt ps: / /youtu. be/y ihuVyBgKzw
Miami Beach Convention Center 1
February 2017
iAerial video footage of the Miami Beach Convention
Center renovation and expansion protect captured by
an Airborne response (JAS drone team in February...
f" • YOUTUOE.CAM
Posted to Facebook - Published February 27, 2017
IIIIIIIIIIIIIIIIIIIIIIIIIIIII 'i,Il,l++ttrtttiliiiltttut"•..
MIAMI BEACH
CONVENTION CENTER
City of Miami Beach* @MiamieeachNews • Feb 20
Read up on the latest update as part of OTheMiamiBeachCC project:
eepurl.camlcCVY6b #MBCCFuture
ti
Posted to Twitter - Published February 20, 2017
City of Miami Beach * @MiamiBeachNews • Feb 24
Latest advisory as part of @TheMiamiBeachCC project: eepurl.eom/cDFOTL
#MBCCFuture
UPDATE.
On r;tonday, February, 27. drainage improvements continue along 17 Street between
Washington Avenue and Pennsylvania Avenue. All travel lanes are reduced to one
way in each direction for approemately one mom (See map Wow)
This work is part of the Public Works Department storm water drainage
upgrades along Washington Avenue from 17 Street to 18 Street and on 17 Street
horn Pen nsyMania Avenue to Washington Avenue .
• to download the protect advisory.
Text "Lanzo17" to 555888 for more info on the 17 Street
project,
1%
ti 2
Posted to Twitter - Published February 24, 2017
City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com
IIIIIIIIIIIIIIIIIIIIIIIIIIIII lllili+(itttiiiifittutttk,•,,
MIAMI BEACH
C O N V E N T I O N C E N T E R
Construction Update
Ongoing Work:
All events are suspended through May 2017 while work is underway. Expect the
following activities:
• The contractor continues to close the sidewalk along Convention Center Drive
adjacent to City Hall, in order to perform work safely. The sidewalk will open
and close intermittently throughout construction. Access to City Hall will
always be maintained from 17 Street and 18 Street. The contractor has
implemented dust control measures to minimize impacts to the community.
• Full closure of Convention Center Drive from 17 Street to Dade Boulevard.
Motorists can access the parking garage from 18 Street and Meridian Avenue.
• 19 Street remains closed between Meridian Avenue and Convention Center
Drive. Access to the Botanical Gardens and Holocaust Memorial parking lot
and entrance will be maintained at all times via Meridian Avenue.
• Traffic shifts will occur along Washington Avenue between Dade Boulevard
and 17 Street. Pedestrians are advised to use the sidewalk on the east side of
the road.
• One southbound travel lane will remain open between Dade Boulevard
and 17 Street.
• One northbound travel lane will remain open between 17 Street and
20 Street. Northbound traffic will be detoured at 20 Street.
• Concrete pours continue on the north end of the building adjacent to
Washington Avenue in preparation for the future parking lot entrance ramp.
Due to the high volume of concrete and project related material being used,
the contractor is required to complete this work during off peak hours between
3 a.m. and 7 a.m. The contractor has implemented noise reduction measures
to minimize the impact to the community.
• FPL continues utility work along 21 Street between Washington and Park
avenues. The road remains closed except for local traffic via Park Avenue
only. Detour signs for motorists are posted throughout the area.
• All pedestrians are directed to use the north sidewalk of Dade Boulevard
between Washington Avenue and Convention Center Drive, while the
sidewalk on the south side (along Collins Canal) remains closed.
General Construction Work Hours:
General work hours on this project are from 7 a.m. to 9 p.m., Monday through
Friday. Extended work hours and weekend work is approved in order to expedite the
construction schedules.
Other Construction Activities in the area:
• On Monday afternoon, February 20, the west side of the intersection of
Washington Avenue and 17 Street will reopen. A new work zone will be
established on 17 Street between Washington Avenue and Pennsylvania
Avenue. All travel lanes will be reduced to one way in each direction for
approximately one month. Click here to download this advisory.
• Crews continue work as part of the Public Works Storm Water Pump Station
Installation project. Click here to download this advisory.
This schedule may change due to inclement weather and /or any other unforeseen
circumstances.
u+BCC Proj.ct Bwnderi.. I f 1 fi 5155 Ran000lion.
Work Zoe.
2 Pw4 PnmP Sro�ia�
tvIC4 SKIN /4vb•r Imiall nn
D.k.., B„ rreneo
rep? 17
.��
Pod se D.1 w 3 Aepla®n.rd
S,de..alk Closed PWD P.TP Shn�o�
North did. el Dodo Blvd 4 0,Y,",;,o
Construction
Staging Area
Miami Beach`'' it
Convention
Center
+' 19th Street
it
v
441=• ,.t:
itGl M
•. 18th Street
it - 14'W
t3f
ld +•s N v
_ _ __,. ® 41 A 7th Stree.
817th Street d .y I F �"
•w 11
Sent via E -blast - Published February 17, 2017