LTC 212-2017 Update on the FDOTMDX I-395 I-95 SR836 Reconstruction ProjectMIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC # 212 -2017 LETTER TO COMMISSION TO: Mayor Philip Levine and Members f the City mmission --- FROM: Jimmy L. Morales, City Manager DATE: April 21, 2017 SUBJECT: Update on the FDOT /MDX I- 395/1- 95/SR836 Reconstruction Project The purpose of this Letter to Commission (LTC) is to provide an update on the joint Florida Department of Transportation (FDOT) /Miami -Dade Expressway Authority (MDX) planned reconstruction of 1 -395, as well as partial reconstruction of 1 -95 and SR836. The project limits are SR836 /NW 17th Avenue through the Midtown Interchange (I -95 /SR836 /MacArthur Causeway) to the MacArthur Causeway Bridge for approximately three (3) miles in the east - west direction. The improvements to 1 -395 will include the following: • Increased capacity (addition of a lane in each direction) as well as operational and safety improvements • Construction of elevated ramps to provide a direct link between 1 -95 and 1 -395 • Construction of a high -level signature bridge over Biscayne Boulevard • Improvements to areas underneath the expressway (pathways and common areas) • Reconstruction of 1 -95 mainline from NW 8th Street to NW 29th Street The related improvements to SR836 will consist of the following: • Increased capacity (one additional lane in each direction) and operational improvements • New ramps to /from NW 12 Avenue • New westbound ramps from 1 -95 to SR836 • Additional exit ramps at NW North River Drive This project will be completed through a design /build /finance project delivery method as part of a joint FDOT /MDX program. While the design /build contract be will awarded in Spring 2017, construction is anticipated to begin in late 2017, and continue for approximately five (5) years at a total estimated cost of $802 million. Similar to other FDOT Projects, City staff will work closely with FDOT staff to provide input on the Maintenance of Traffic Plan, including scheduled lane closure times and construction schedule, to help reduce traffic impacts to the City. Please feel free to contact me if you have any questions. Attac nt: FDOT /MDX Project Fact Sheet JLM /K /JRG /JFD F: \TRAN \$ALL \LTC \LTC- FDOT 1 -395 Reconstruction Project.docx FDO1 RECONSTRUCTION SAFE. CONVENIENT. RELIABLE. 1 -395 Reconstruction Project MDX SR 836 Improvements 1 -95 Concrete Pavement Reconstruction SR 836 Westbound Connector Financial Project No.: 251688- 1- 52 -01, 423126- 1- 52 -01, 423126- 2- 52 -01, 429300- 2 -52 -01 Cit of Miami, Miami -Dade Count PROJECT CHARACTERISTICS The project begins on SR 836 at NW 17 Avenue and continues through the Midtown Interchange (I- 95 /State Road 836/1 -395) along 1 -395 to the MacArthur Causeway Bridge for approximately 3 miles in the east - west direction. 1 -395 is an Interstate Principal Arterial and a major east -west connector for the beaches and port; SR 836 is a Principal Urban Arterial that is also a major east -west connection to the Midtown Interchange. The project limits also include 1 -95 from NW 8 Street to NW 29 Street. SR 9A/I -95 is an Urban Interstate Principal Arterial and major north -south connector to downtown Miami. There are both dense urban and residential areas within the project limits. The project will address roadway safety, corridor capacity, a variety of design issues, aesthetics, and provide a Signature Bridge design over Biscayne Boulevard. 1 -395 RECONSTRUCTION PROJECT The 1 -395 portion of the project involves the rebuilding of the 1 -395 corridor from the I -95 /Midtown Interchange to the MacArthur Causeway. Project improvements include • Increasing capacity • Improving safety by alleviating existing operation and geometric deficiencies • Building new elevated ramps: one eastbound and one westbound, link between 1 -95 and 1 -395 • Building a Signature Bridge over Biscayne Boulevard • Building vertically higher structures that will improve the visual quality of the bridge and streetscape • Improving the area underneath the expressway by providing pathways and common activity areas. • Design /Build /Finance that will provide a direct SR 836 I -395 For More Information: www.I- 395miami.com RECONSTRUCTION 1 -95 CONCRETE PAVEMENT RECONSTRUCTION The 1 -95 portion of the project includes 1 -95 from NW 8 St to NW 29 St. The project improvements include: • Removal and replacement of the existing mainline 1 -95 concrete pavement • Bridge railing retrofit • Guardrail upgrade MDX SR 836 IMPROVEMENTS SAFE. CONVENIENT. RELIABLE. 1118.11, 1,,. `sr i (SW SR SA/ 1.4S1 kl VW SR ON 1-n The MDX 836 Improvements Project limits are NW 17 Avenue Interchange to the Midtown Interchange. Project improvements include: SR 836 WESTBOUND CONNECTOR • Adds capacity to SR 836 mainline by adding a lane in each direction improving mobility and safety • Provides a new elevated eastbound ramp from NW 12 Avenue for traffic destined to northbound and southbound 1 -95 and eastbound 1 -395 separating these movements from the SR 836 mainline to the same destinations • Provides a new elevated ramp from southbound 1 -95 to westbound SR 836 with an additional exit at NW North River Drive which eliminates the traffic operational conflicts between the westbound SR 836 exit to NW 12 Avenue and the 1 -95 southbound entrance to westbound SR 836 The SR 836 WB Connector project includes the construction of a 9A/I -95 southbound ramp to westbound SR 836. PROJECT SCHEDULE AND COST Project Segment 1 -395 Reconstruction MDX SR 836 Improvements 1 -95 Pavement Reconstruction WB Connector Planned Construction Schedule Estimated Construction Cost Begin Construction 2017 Estimated Construction time 5 years $556M $186M $25M $35M For More Information: www.I- 395miami.com