LTC 239-2017 SR 9A I-95 Pavement Replacement and Emergency Stopping Site Construction Project UpdateN\IAMIBE H City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miomibeochfl.gov Jimmy L. Morales, City Manager Tel: 305-673-701 0 , Fox: 305-673-7782 NO. LTC# 239-2017 TO: Mayor Philip Levine and Members FROM: Jimmy L. Morales, City Manager DATE: May 8, 2017 SUBJECT: SR 9AII-95 CONSTRUCTION PROJECT UPDATE LETTER TO COMMISSION & EMERGENCY STOPPING SITE The purpose of this Letter to Commission is to provide a construction update related to the Florida Department of Transportation's (FOOT) replacement of the concrete driving surface from NW 29th Street to NW 79th Avenue and the construction of five emergency stopping sites in the median from NW 62nd Street to NW 131 st Street. Although this falls outside the City of Miami Beach, it will have significant impacts on the causeways. This project includes the replacement of the concrete surface on northbound and southbound SR 9A/I-95 from NW 29th Street to NW 79th Street; repaving of ramps at NW 69th Street and NW 79th Street; rehabilitation of bridge joints; enhancement of storm water drainage along project corridor; and the installation of new signage, lighting and lane striping. Lane closures for concrete surface replacement will begin this week and will take place during non-peak hours and non-event nights and weekends. For driver safety and the safety of others, please use caution when driving, walking or biking around any construction zone. FOOT will take the necessary steps to reduce construction effects, but drivers may experience travel lane closures and detours, increased dust and noise, and workers and equipment moving around the area. For more information, please contact Project Engineer Moe Mabrouk at 305-528-2311 or Public Information Specialist Oscar Gonzalez at 786-280-0983 or email ogonzalez@mrgmiami.com. JM/€€1JJF/FRS ~~ CARRETERA EST A TAL 9AII-95 REEMPLAZO DE PAVIMENTO Y PROYECTO DE CONSTRUCCION DE SITIOS PARA PARADAS DE EMERGENCIAS HOJA DE DATOS FIN# 429300-3-52-01 & 429300-3-52-021 Comienza: febrero del 2017 G) ESTE PROYECTO INCLUYE Reemplazo de Ia Super1icie de Concreto • Reemplazar Ia superficie del concreto en el norte hacia el sur de Ia carretera estatal 9AII·95 desde Ia cane 29 del noroeste hasta Ia calle 79 del noroeste • Repavimentaci6n de las rampas en Ia calle 69 y Ia calle 79 • Rehabilitaci6n de las juntas de puente • Mejorar los drenajes a lo largo del corredor del proyecto • lnstalaci6n de nueva seriales, iluminaci6n y marcas en el pavimento Paradas de Emergencia • lnstalaci6n de sistemas de transporte inteligentes: camaras, sensores de vehiculos y mensajes electr6nicos • lnstalaci6n de nueva selializaci6n, iluminaci6n y franjas • Construir cinco sitios de parada de emergencia en Ia mediana de Ia carretera estatal 9AJI-95 entre Ia calle 62 del noroeste y Ia calle 131 del noroeste, ubicaciones detalladas en el mapa del proyecto 0 CIRCULACION VEHICULAR Cierres de carriles s61o se produciriln durante las horas no pico, en naches sin eventos I fines de semana. Las horas no pico son: • De domingo a jueves desde las 9 p.m. hasta las 5:30a.m. • Los cierres de fin de semana van desde: • 11 p.m. viernes a las 11 a.m. silbado • 11 p.m. s3bado a las 11 a.m. domingo • Se necesitaran cierres de doble carril extendidos al horario de las 11 p.m. del viernes hasta las 5:30a.m. dellunes e MUNICIPALIDADES AFECTADAS e Ciudad de Miami, Ciudad de North Miami, Miami Shores y El Portal e COSTO ESTIMADO DE CONSTRUCCION • $89.5 millones CD CRONOGRAMA DEL PROYECTO • Sitios de parada de emergencia: febrero del 2017 hasta febrero 2018 • Pavimento de concreto: febrero del2017 hasta junio 2020 A PONGA SIEMPRE LA SEGUR I DAD ''' PRIMERO Para su seguridad y Ia de los demas, par favor sea precavido al conducir su vehiculo o al caminar o andar en bicicleta par Ia zona de construcci6n. Usar el cintur6n de seguridad es Ia manera mas efectiva de proteger a sus pasajeros y reducir las fatalidades en accidentes de autom6viles. El Departamento toma medidas para reducir los efectos de Ia construcci6n, perc puede ser sujeto a las siguientes inconveniencias alrededor de Ia zona de construcci6n: • Cierres de calles secundarias, carriles y aceras • Aumento de polvareda y ruidos • Obreros y equipos desplaz3ndose en el area EST AS FECHAS PUEDEN CAMBIAR SEGUN LAS CONDICIONES DEL TIEMPO Y OTRAS CONDICIONES IMPREVISTAS PARA MAS INFORMACION Par favor comuniquese con ellngeniero de Proyectos Moo Mabrouk al (305) 528-2311 o al EspeciaJlsta en lnformacl6n PUblica Oscar Gonzalez al (786) 280-{)983 o ogonzalez@mrgmiami.com. 1!]:1:1:~1!] a·· ·~ [!] 0 Par favor vis ita: www.fdotmlamldade.com Para trilfico en tiempo real Uame al511 o visite: www.fl511.com ~~%> 1000 NW 111 AVENUE MIAMI, FL33172 ~~ SR 9AII-95 PAVEMENT REPLACEMENT & EMERGENCY STOPPING SITE CONSTRUCTION PROJECT FACT SHEET FIN# 429300-3-52-01 & 429300-3-52-02 I Begins: February 2017 J 1 j§_ Iii! 211 e WORK TO BE PERFORMED Concrete Driving Surface Replacement • Replace concrete surface on northbound and southbound SR 9AII-95 from NW 29 Street to NW 79 Street • Repaving of ramps at NW 69 Street and NW 79 Street e Rehabilitation of bridge joints e Enhance storm water drainage along project corridor • Install new signage, lighting and lane striping Emergency Stopping Sites e Install new Intelligent Transportation Systems components such as cameras, vehicle sensors and overhead electronic message boards • Install new signage, lighting and lane striping e Construct five emergency stopping sites in the median on SR 9AII-95 between NW 62 Street and NW 131 Street Locations detailed in the project map 0 LANE CLOSURES AND DETOURS Lane closures will occur only during non-peak hours on non·event nights/weekends. Non-peak hours are: • Sunday through Thursday from 9 p.m. to 5:30 a.m. • 11 p.m. Friday to 11 a.m. Saturday e 11 p.m. Saturday to 11 a.m. Sunday • Extended double lane closures will be required at times from 11 p.m. Friday to 5:30 a.m. Monday e AFFECTED MUNICIPALITIES • City of Miami, City of North Miami, Miami Shores and El Portal e ESTIMATED CONSTRUCTION COST e $89.5 million $ PROJECT SCHEDULE • Emergency Stopping Sites: February 2017 to February 2018 e Concrete Pavement: February 2017 to June 2020 (t') ALWAYS PUT SAFETY FIRST For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. Wearing a safety belt is the single most effective way to protect people and reduce fatalities in motor vehicle crashes. The Department takes steps to reduce construction effects, but you might experience the following around the work site: • Travel lane closures and detours e Increased dust and noise • Workers and equipment moving around the area PLEASE NOTE THIS SCHEDULE COULD CHANGE DUE TO WEATHER OR OTHER UNEXPECTED CONDITIONS FOR MORE INFORMATION Please contact Project Engineer Moe Mabrouk at (305) 528-2311 or Public Information Specialist Oscar Gonzalez at (786) 280-0983 or ogonzalez@mrgmiami.com. ~-~ [!] g Please visit: www.fdotmlamldade.com For real-time traffic information dial 511 or visit: www.fl511.com ~~%> 1000 NW 111 AVENUE MIAMI, FL 33172 ~\) SR 9/1-95 EMERGENCY STOPPING SITES (FM No. 429300-3-52-02) ,,-® >:>¢f<:;:> ~'"' --'0 ) ~<'IIi:;t.~AH· ~~ ~ ~ "' z tiJ..1;;wl';.(<t" 'lWSlh:t.·''~ ~ ~ ~ co§ ~~ 2 ~--.. -. 19·s·!~!X~s'(rt»ii~ US441 S: l>ffli!~~t trN1¢~~it~ lt.'¥1~:;,~-,t WI:';~~"<' N.;'i 1::1~~~ ~~~0 NM~!'\I'"';:r NWZfld-"·~f' ~it~:, ~o>- ® >.,!\'l';iHA~<I ~v:~t~,'?-,!$ " ~ ~ '<:'. ~ "' c e t " " . ~ ,-;, t ,:; ~ 5 <;t,'i;ID,l:ri II ~ . ~$.,'>\1¢il~ I iS -:; i .:.;: ~~ ~ N#~~-.,, @ ?iMMlllf>.-'j' hti !··,,-!!,~-,- "' ~ j& ( Cl ~ a f~ N'•"'..,~'$M"'j • Southbound Emergency Stopping Sites I Paradas de Emergencia Hacia el Sur • Northbound Emergency Stopping Sites I Paradas de Emergencia Hacia el Norte AM -.wl:....,,.:.,~ ·.~ SR 911-95 PAVEMENT RECONSTRUCTION DESIGN BUILD PROJECT (FM No. 429300-3-52-01) ~ '£;;. "' lh .<:: ¢'-.... "' z t; .t: if: w "' N\"1 Lfid A\"f' ® " NWltlAwt NW JndA·-n: N.W:i'WA'>.!. w~· ~A-.'~-< NW 1tittt Av~ ;;; 5 ,., ,. ~ NWl.-t:t_w NW2t~¢;.\V<;j s r4':H .lrdA"~ h'\'iSA'-'1" -~® ~-::;:::-____ _ ~rr----r: \~1 ® dl N>N 1-I'Hh Ali(> t:i "' ~ ~ 0 z; $ ~. ,. z • 1-95 Mainline Concrete Reconstruction Limits I Umites de Reconstrucci6n de Concreto • 1-95 Ramp Asphalt Paving Limits I Limites de Pavimentaci6n de Asfalto en Rampa M LEGEND -EMERGENCY STOPPING SITES (ESS) The ESS Project is the construction of five emergency stopping sites along 1-95 from NW 62 Slreello NW 131 Street Three slopping sites will be constructed along the northbound lanes and two along the southbound lanes. The stopping sites will be located on the inside shoulder and will be approximately 13 feet wide and at least 1 ,200 feet in length. -PARADAS DE EMERGENCIA El proyecto ESS implicara Ia construcci6n De cinco sitios de parada de emergencias a lo largo de Ia 1-95 desde Ia calle 62 del noroeste hasta Ia calle 131 del noroeste. Se construirfln Ires paradas a Ia largo de los carriles hacia el norte y des carriles hacia el sur. Los sitios de parada se ubicaran en el hombre interior y sera de aproximadamente 13 pies de ancho y menos de 1,200 pies de largo. LEGEND -PAVEMENT RECONSTRUCTION PROJECT AREA The Pavement Reconstruction Project consists of replacing the concrete pavement on 1-95 from NW 29 Street to NW 79 Street. The project includes the repaving of the NW 69 Street northbound entrance ramp to 1-95 and southbound exit ramp to NW 69 Street. As well as the northbound exit ramp to NW 79 Street and the NW 79 Street entrance ramp to soulhbound 1-95. -AREA DE RECONSTRUCCION DE PAVIMENTOS DEL PROYECTO El Proyecto de Reconstrucci6n de Pavimento consiste en reemplazar el pavimento de concreto en Ia /-95 desde Ia calle 29 del noroeste hasta Ia calle 79 del noroeste. El proyecto tambi8n incluye Ia pavimentaci6n asfil.ltica de Ia rampa de Ia salida hacia el norte hasta Ia calle 79 del noroeste y Ia rampa de Ia entrada en Ia calle 79 del noroeste hacia el sur 1-95.