2017-29842 Reso2017-29842 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER TO DESIGN AND CONSTRUCT AN ADDITIONAL ESCALATOR, ELEVATOR AND RELATED IMPROVEMENTS AT THE MIAMI BEACH CONVENTION CENTER (MBCC), FOR A DIRECT CONNECTION FROM THE EXHIBIT HALLS TO THE NEW GRAND BALLROOM, FOR THE BENEFIT OF ART BASEL AND OTHER FUTURE EVENTS AT THE MBCC, WITH CONSTRUCTION OF THE ADDITIONAL IMPROVEMENTS SUBJECT TO AND CONTINGENT UPON EXECUTION OF A LONG-TERM LICENSE AGREEMENT WITH ART BASEL U.S. CORP.; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND FENTRESS ARCHITECTS FOR ADDITIONAL SERVICES RELATED TO THE DESIGN REVISIONS, IN THE NOT -TO -EXCEED AMOUNT OF $124,240. WHEREAS, since November, 2015, the City has undertaken a substantial construction renovation and expansion of the Miami Beach Convention Center ("MBCC Renovation Project"); and WHEREAS, the construction of the MBCC Renovation Project is phased to accommodate the annual Art Basel in Miami Beach ("ABMB") event as a "4 -hall show," to permit the Art Basel in Miami Beach show to continue to take place, as scheduled, during the construction period; and WHEREAS, ABMB was established in 2000 as the sister event of Switzerland's Art Basel, the world's most prestigious art fair for the past 42 years; and WHEREAS, ABMB has become the preeminent contemporary art fair in the western hemisphere and an established destination for artists, galleries, collectors, museum groups, and other individuals interested in top quality art; and WHEREAS, economists have estimated $400 million to $500 million annually in related economic impact as a result of ABMB; and WHEREAS, the ABMB team inquired about the possibility of adding an elevator and escalator connection to the second floor Grand Ballroom directly from the exhibit hall floor (the "Additional Improvements"), indicating this to be vital to its long-range plans for the venue; and WHEREAS, as part of its request relating to the Additional Improvements, ABMB has indicated a desire to enter into a long term agreement with the City, which will be subject to negotiation and City Commission approval; and WHEREAS, It is estimated that the Additional Improvements will cost approximately $2,875,000, including design and permit fees; and WHEREAS, Fentress Architects has submitted a proposal in the amount of $124,240 for design and permit revisions associated with the Additional Improvements, including modifications to architectural, mechanical, electrical, plumbing, structural, fire suppression, fire alarm, life safety, low voltage, vertical transportation and signage drawings; and WHEREAS, after carefully evaluating ABMB's request, the Administration recommends moving forward with the design portion of the Additional Improvements at this time, in order to meet construction schedule milestones, provided, however, that construction of the Additional Improvements shall be subject to and contingent upon execution of a long-term agreement between the City and Art Basel U.S. Corp. with respect to the annual Art Basel in Miami Beach show. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager to design and construct an additional escalator, elevator and related improvements at the Miami Beach Convention Center (MBCC) for a direct connection from the exhibit halls to the new grand ballroom, for the benefit of Art Basel and other future events at the MBCC, with construction of the additional improvements subject to and contingent upon execution of a long-term license agreement with Art Basel U.S. Corp.; and further authorizing the Mayor And City Clerk to execute an amendment to the Agreement between the City of Miami Beach and Fentress Architects for additional services related to the design revisions, in the not -to -exceed amount of $124,240. PASSED and ADOPTED this 26th day of April, 2017. ATTEST: R-fael E. Granada, Ci APPROVED AS TO FORM & LANGUAGE ECUTION Crtrr city Att r e v � �,. Amey (�j MIAM BEACH Resolutions - R7 T COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L, Morales, City Manager DATE: April 26, 2017 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER TO DESIGN AND CONSTRUCT AN ADDITIONAL ESCALATOR, ELEVATOR AND RELATED IMPROVEMENTS AT THE MIAMI BEACH CONVENTION CENTER (MBCC), FOR A DIRECT CONNECTION FROM THE EXHIBIT HALLS TO THE NEW GRAND BALLROOM, FOR THE BENEFIT OF ART BASEL AND OTHER FUTURE EVENTS AT THE MBCC, WITH CONSTRUCTION OF THE ADDITIONAL IMPROVEMENTS SUBJECT TO AND CONTINGENT UPON EXECUTION OF A LONG-TERM LICENSE AGREEMENT WITH ART BASEL U.S. CORP.; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND FENTRESS ARCHITECTS FOR ADDITIONAL SERVICES RELATED TO THE DESIGN REVISIONS, IN THE NOT -TO -EXCEED AMOUNT OF $124,240. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS The Miami Beach Convention Center (MBCC) has been undergoing a substantial construction renovation and expansion since November 2015. As set forth in the MBCC Construction Booking Policy adopted by the City Commission in Resolution 2014-28610, the Center will be booking "2 - hall" shows during the entire construction period of up to 36 months. Art Basel Miami Beach (Art Basel) is the sole exception to the 2 -hall booking policy, as the City has agreed to accommodate Art Basel as a "4 -hall" show, and has structured the phasing of the construction work to make the halls available to the Art Basel Miami Beach event. Throughout 2016 the City's design consultant, Fentress Architects (Fentress), owner's representative, Hill International (Hill), construction manager, Clark Construction (Clark), building operator, Spectra Venue Management (Spectra) and City staff met with Art Basel personnel on a regular basis to assess the progress of the MBCC Renovation Project, culminating in the successful 2016 event. Shortly after, the Art Basel team inquired about the possibility of adding a connection to the second floor Grand Ballroom directly from the exhibit hall floor, indicating this to be vital to Art Basel's long-range plans for the venue. As part of this request, Art Basel has indicated a desire to Page 1301 of 1596 enter into a forthcoming long term lease agreement with the City, which will be subject to negotiation and Commission approval. City staff discussed the connection option with Spectra and Fentress to confirm that the request was viable. Both have advised that this was not a common design request of major convention centers in the U.S. and therefore, not recommended. The greatest challenge was the blocking of movement through the service areas on the second level from the main kitchen to the east side of the ballroom and meeting rooms. The way to alleviate the issue is to create a second full service kitchen within the location and footprint of the existing east kitchen which would then serve as back-up and provide the Center with the redundancy required for a multi show event. (Refer to exhibit A sketch for clarification). It is estimated that the modification to the plan for the addition of the elevator / escalator will cost approximately $2,875,000, including design and permit fees. In addition, the full construction renovation of the existing kitchen will cost approximately $1,100,000. Funding for both items are being requested as part of the FY 2016/2017 capital budget amendment process. After carefully evaluating the request, and looking forward to a long term commitment from Art Basel, the Administration recommends moving forward with the design portion of the elevator / escalator revision at this time in order to meet construction schedule milestones. The administration will seek approval to proceed with the construction upon finalization of the agreement with Art Basel. It is important to note that in order to avoid delays to the project and additional cost beyond the estimated budget, the deadline to receive an approval to proceed with construction can be no later than the July 26 Commission meeting. Final occupancy of the elevator and escalator addition will not occur until 2018. Fentress Architects has submitted a proposal in the amount of $124,240 for design and permit revisions associated with this work (Exhibit B). The scope of work includes modifications to architectural, mechanical, electrical, plumbing, structural, fire suppression, fire alarm, life safety, low voltage, vertical transportation and signage drawings. Staff and Hill have evaluated the proposal and believe it to be fair and commensurate with the level of effort, CONCLUSION The Administration recommends approval to design and construct an additional escalator, elevator and related improvements at the Miami Beach Convention Center, for a direct connection from the exhibit halls to the new grand ballroom, for the benefit of Art Basel and other future events at the MBCC, with construction of the additional improvements subject to and contingent upon execution of a long-term license agreement with Art Basel U.S. Corp.; and further authorizing the Mayor and City Clerk to execute an amendment to the Agreement between the City of Miami Beach and Fentress Architects for additional services related to the design revisions, in the not -to -exceed amount of $124,240. KEY INTENDED OUTCOMES SUPPORTED Improve Alliance With Key Business Sectors, Namely Hospitality, Arts, & International Business With A Focus On Enhanced Culture, Entertainment, & Tourism FINANCIAL INFORMATION Funding, in the amount of $124,240 is being requested from Convention Center Fund 440 Page 1302 of 1596 under the FY 2016/2017 capital budget amendment process. Leaislative Tracking Convention Center District ATTACHMENTS: Description D Exhibit A; Clarification Sketch D Exhibit F3: Fentress Architects Proposal and Sketches r) Resolution Page 1303 of 1596 t' t,41$110Fit, IIINIA ) 6CITS, 'FID1f4t1141V11.1 .1\121(1831.Fla0 NMI FEIANO0 NOLLVAONH .J211\00 NOLLN2ANO9 1-10VDSftNVIV • 1 1111.111 • • • • ' 2 0 0 et ,,,,,,,, • 2nd LEVEL FLOOR EXHIBIT B March 3, 2017 Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No. 2014-28538 Proposal 44 — Art Basel North Connection Project 20140021.001 A47 Dear Mr. Morales: FENTRESS fantresss rchitects.com This proposal is to provide design services to incorporate a new vertical circulation connection in Exhibit Hall D into the current building design requested by the City. This vertical circulation connection is currently outside of the Fentress team's current scope of work. The City would like to add communicating circulation between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2. Below is our understanding of the scope of services required: SCOPE OF SERVICES 1. General: a. Provide contract documents and contract administration services for the concept design depicted in the attached sketch. 2. Amend currently designed building systems to accommodate new configuration scope: a. Architectural: 1) New flooring ceilings and walls for new components. b. Mechanical: 1) Revise and amend building HVAC system to conform to new configuration. c. Electrical: 1) New power for elevator and escalators; 2) New lighting to conform to new configuration. d. Plumbing: 1) New sanitary waste system for elevator and escalator pits. e. Structural: 1) Revise and amend building structural system to conform to new configuration including: a) Steel framing for new landing and escalator support; b) Foundations for new building elements. f. Fire Suppression: 1) Revise and amend building sprinkler system in current scope. g. Fire Alarm: 1) Revise and amend building fire alarm system in current scope. h. Life Safety: 1) Coordinate life safety plans. i. Low Voltage: 1) Security: a) Revise and amend building surveillance system; SH Page 1305 of 1596 DAN DC LA SF LON �t21 Broadway 1 Denver CO 80203 1 303.722.5000 Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach Proposal 44 — Art Basel North Connection March 3, 2017 Page 2 b) Revise and amend building access control system. Vertical Transportation by Lerch Bates (design and coordination provided by Otis): 1) Submittal Review; 2) Site acceptance testing. k. Signage Design: 1) Revise and amend building surveillance system. SCHEDULE Design Development Contract Documents and Change Directive Preparation: FEE 2 weeks 4 weeks TOTAL 6 weeks Fees for all services will be a total proposed lump sum amount of One Hundred Twenty-four Thousand Two Hundred Forty Dollars ($124,240). Reimbursable costs for printing, telephone, delivery, and travel are included in the lump Sum portion of this fee. Billings for these services will be invoiced under the heading of #20140021.001 A47. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free to contact me with any further questions or comments you may have. If the foregoing correctly states your understanding, please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jo Kudrycki, AIA EED ,`F BD+C Principal encl: Design Fee Summary dated March 1, 2017 Architectural sketches Giller & Giller dated 2/7/2017 (2 sheets) Architectural sketches Fentress Architects dated 2/14/2017 (2 sheets) c: Maria Hernandez, Thais Vieira, City of Miami Beach Jeff Sachs, Strategic Advisory Group Steven DiBartolo, Hill International, Inc. Holly Carson, Anne McNeely, Mikala Casillas, Fentress Architects Page 1306 of 1596 Project: Art Basel North Connection Miami Beach Convention Center Renovation & Expansion 3/1/17 Discipline Firm Name Firm Number Study & Design Fee Architecture Fentress Architects 1 $45,350 Fire/Life Safety/Code Consulting Jensen Hughes 13 $27,575 Civil/Utility Engineering (Lump SM Kimley-Horn 6 $0 Landscape West 8 7 >=$il_ Structural Engineering Wallace 8 $23,700 Plumb, Mech, Elec, Lighting ME Engineers 14-18 $9,180 IT, Security, AV, Acoustics DL Adams 20 $6,905 Food Service Caruso 25, ; $, Graphics and Signage TKD 28 $1,000 Parking Consultation Walker Parking 29 y6 Vertical Transportation Lerch Bates 12 $7,830 Sub total $121,540 Design Fees Total(Lump Sum) Expenses Total Total Page 1307 of 1596 $121,540 $2,700 $124,240 Art Basel North Connection Fentress Architects hours Job Title Hourly Rate Hours Extension Task Management, Architectural Design, Coordination and Oversight Project Architect Architect III Architect II Interior Designer II John Kucirycki Totals this activity: Total, Sub 1 Hours Total Hours Pacgig'e3p gf 1596 $150.00 $200.00 $130.00 $110.00 $225.00 78 $11,700.00 24 $4,800.00 104 $13,520.00 78 $8,580.00 30 $6,750.00 314.0 $45,350.00 314.0 $45,350.00 314.0 $45,350.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection Consultant Hours Job Title Jensen Hughes Hourly Rate Hours Extension Task 1 Fire Alarm & Fire Protection Engineering and Code Consultation Vice President Senior Consultant/Associate Manager Associate II Associate I Project Administrator Totals this activity: Total, Sub 1 Hours Total 5250,00 $205.00 $150.00 $135.00 $75.00 5.0 $1,250.00 60.0 $12,300.00 25.0 $3,750.00 75.0 $10,125.00 2.0 $150.00 Hours 167.0 $27,575.00 Page 3 of 8 Page 1309 of 1596 167.0 $27,575.00 167.0 $27,575.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection Consultant Hours Job Title Wallace Task 1 Structural Engineering Hourly Rate Hours Extension Principal $170.00 60.0 $10,200.00 Associate $150.00 $0.00 Registered Engineer II $135.00 $0.00 Registered Engineer I $120.00 60.0 $7,200.00 CAD Technician III $105.00 60.0 $6,300.00 Totals this activity: Total, Sub 1 Hours Total Hours 180.0 $23,700.00 Page 4 of 8 Page 1310 of 1596 180.0 $23,700.00 180.0 $23,700.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection M -E Engineers 1Hours Job Title Hourly Rate Hours Extension Task 1 HVAC Engineering Principal $200.00 $0.00 Senior Project Manager $150.00 18.0 $2,700.00 Project Engineer $120.00 $0.00 CAD Operator $95.00 $0.00 Totals this activity: Hours 18.0 82,700.00 1Task 2 Electrical Engineering Principal $200.00 9.0 $1,800.00 Associate $160.00 18.0 $2,880.00 CAD Operator $95.00 $0.00 Totals this activity: Hours 27M $4,680.00 Task3 Plumbing Ei gineerin Principal Designer Totals this activity: Total, Sub 1 Total, Sub 2 Total, Sub 3 Hours Total Hours Page 5 of 8 Page 1311 of 1596 8200.00 $110.00 9.0 $1,800.00 $0.00 9.0 $1,800.00 18.0 $2,700.00 27.0 84,680.00 9.0 $1,800.00 54.0 $9,180.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection DL Adams & Associates Hours Job Title Low Voltage Design Hourly Rate Hours Extension Principal $210.00 4.5 $945.00 Associate Principal $190.00 4.0 $760.00 Project Manager $155.00 14.0 $2,170.00 Senior Consultant $135.00 18.0 $2,430.00 Project Consultant $100.00 0.0 $0.00 Staff Consultant $90.00 0.0 $0.00 Technician $75.00 8.0 $600.00 Totals this activity: Hours 48.5 $6,905.00 Total, Sub 1 Hours Total Pa g lg1-cf 1596 48.5 $6,905.00 48.5 $6,905.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection Tamara Kudrycki Design Hours Job Title Hourly Rate Hours Extension Signage Design President $125.00 8.0 $1,000.00 Totals this activity: Hours 8.0 $1,000.00 Total, Sub 1 8.0 $1,000.00 Hours Total 8.0 $1,000.00 Pa Ngt371I4V 1596 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 Art Basel North Connection Consultant Lerch Bates Hours Job Title Hourly Rate Hours Extension Task 1 Vertical Transportation Consultation Vice President $250.00 $0.00 Senior Consultant/Associate Manager $205.00 6.0 $1,230.00 Associate II (3 reveiws) $150.00 40.0 $6,000.00 Associate I $135.00 0.0 $0.00 Project Administrator $75.00 8.0 $600.00 Totals this activity: Hours 54.0 $7,830.00 Total, Sub 1 Hours Total Page 8 of 8 Page 1314 of 1596 54.0 $7,830.00 54.0 $7,830.00 Art Basel North Connection Miami Beach Convention Center Fentress Project No:20140021 March 1, 2017 IKAK411 NM twat, touttamac; II;11't'1 ""4,:t'74 f'f--=4""m" .fZ .... Hy 3£1 MAW Ili 'nava 4,trat 'aul 401110 I Joule AGMS LIO.LYIVO9R/UIV.1.8 66, .„„ A 4 A, „A 4,444 6,, A , 6 , 4 141.3113.0.151333 31. LV r-4 0,1C. 00 E _ 13/01 ISI. i -v 91111 LI. 1 0.11 Op ft V....;;:i0X;t0,5.4,0„.0444.40.,•••i•••• 4 • • Tit] I 1 I ETI IIMINVICIIIMULIJII IPLI W. *based on Fentress A2108 drawing 5o'Jv N W(W etai.Pc3a raowflANO ftW VI i HOV39 MVIW Ul 138YEI 111V df3111s doirivos3/Hlvls CP -1 11 uu i:ad u1:ucd . ,11„Il HIJI 011, 11! ii.immiiu,uiuui 64:111C 11'I V:111 IWVIW N112.10 i131N70 NO111,eAN04, 1r361 NOISNddX3 NOI1VAONgi3 2J9.LN9O NOIIN3ANOO HOVD8 IWVIW -1 nVJMfi <) ` Com.)() () E �;X 1 I; 1( 1 [AV 21$ r 14r 1- <6 LL CODE LEG AL 11 .„»any s,C F.7 C da xsp�&a�a"eey tgip5�bN�k� 14444.n.p 9A a tet • z4 I Al,311..0001/ Af.ra21'rf =grITAOI) I(6 I SSALLN3A 1 NOISNVdX NOI1VAOND NOLLNDANOO HOVD9 "iMMMAMM,k.killUIMP,Mt ,g;;, 4,;) 44 <@> — 1 1.t. Ef_+t+ 0 0 . 0,1 ) v4,1 1 :I i , . . sA' A —A- ny F.,, Li.1111 ---K1---------N—Arkt' ' -- '"•"1-, : a 4, • ' U r I ,.. ,.. ..'.: ..,4.11 '-' ,PriVafi;+,.., I I —,14 i 1 I ie I $ I - I IN g h I i" 10.146 I ,3 fi 1-- 1 1 1, , c,› rff Ar00030,10000,. 1