Amendment No. 1 to the Agreement with Ribbeck Engineering, Inc. AMENDMENT NO. 1 TO THE ENGINEERING DESIGN SERVICES FOR THE INDIAN CREEK DRIVE/STATE ROAD (SR) A1A, 26 STREET TO 41 STREET - FLOODING MITIGATION PROJECT (AGREEMENT NO. 16-29456) This Amendment (Change Order) No. 1, is made and entered as of this 2 , day of `rv = , 2017 by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the state of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139 (`City), and RIBBECK ENGINEERING, INC., having its principal offices at 14335 SW 120 St. #205, Miami, Florida 33186 (hereinafter referred to as Consultant). WHEREAS, on September 27, 2015, the City experienced severe tidal flooding caused by King Tides of 1.12 feet above mean high water, in the area of Indian Creek Drive, from 26th to 41St Streets, which severely impacted both pedestrian and vehicular traffic for several days; and WHEREAS, to avoid continued tidal flooding and severe flooding caused by high intensity rainfall events, the City, in conjunction with FDOT, must implement, as expeditiously as possible, infrastructure improvements which will include a new storm water drainage system, pump station, and seawall; and WHEREAS, at its March 9, 2016 meeting, the City Commission adopted Resolution No. 2016-29332, approving an agreement between the City and Florida Department of Transportation (FDOT) for the cost sharing of a construction project on Indian Creek Drive from 26th to 41st Streets, for certain infrastructure improvements that will include a new storm water drainage system pump station and seawall; improvements to the existing roadway, curbs, gutters and sidewalks, which will be elevated to meet new flood elevation requirements; and improvements to driveways, light poles, signals, signage and pavement markings, which will be replaced to match the new roadway alignment and configuration; and WHEREAS, at the June 8, 2016 meeting, the City Commission authorized the award of a Professional Service Agreement with Ribbeck Engineering, Inc., in the amount of $407,851, with a scope of services which consists of developing a Design Criteria Package (DCP) and conceptual plans for the design build construction of approximately 0.85 miles of Indian Creek Drive, with the conceptual plans and DCP to be developed in accordance with FDOT design requirements and City of Miami Beach requirements; and WHEREAS, the Administration continues to believe that the findings certified in Resolution No. 2016-29332 continue to exist, and that given the current condition of Indian Creek Drive, and the periodic flooding and closure of the road due to said flooding issues, there are extensive existing and potential future community hardships, including serious impacts to quality of life issues, to justify the necessity of beginning construction on Indian Creek Drive immediately; and WHEREAS, the conditions in the area are so drastic and will only worsen if the work is postponed in order to go through a three (3) to six (6) month competitive procurement process; and WHEREAS, in furtherance of the initiative to protect residents from tidal flooding within the City of Miami Beach, the Public Works Department is requesting an additional scope of work from Ribbeck Engineering, Inc., for the preparation of a set of interim construction plans from or 25th to 26th Street and 26th to 41st Street, including side streets along the entire Project limits of approximately 1.7 miles of roadway; the construction plans will include detailed roadway, traffic control plans and analysis, seawall plans, drainage analysis and plans, signing, pavement markings, lighting and signalization components, and related improvements, and the scope will include a design variations memorandum and reports including crash data analysis and benefit cost ratios which are required on FDOT projects, and which will adhere to FDOT design criteria as well as City of Miami Beach contract requirements; and WHEREAS, the interim construction plans are required in order to construct a 72" main trunk along Indian Creek Drive, as well as to provide drainage improvements along the aforementioned side streets, by upsizing the existing drainage lines to 24 inches, and the design of pump station structure will also be part of the interim plans; and WHEREAS, the cost proposal is in the amount of $863,171.92 for the preparation of interim construction plans, plus a contingency of ten percent (10%) ($86,317.19) that has been added, for a total amount of $949,489.11; and WHEREAS, a scope of work has been provided and is attached as Exhibit 1 to the Commission Memorandum accompanying this Resolution, along with the proposed hours of effort for the work, attached as Exhibit 2 thereto, and providing that Ribbeck Engineering and subcontractors will perform the work under the same hourly rates and percentages for overhead and profit as their contract with FDOT; and WHEREAS, due to the foregoing tidal flooding conditions and the urgent need for completion of the Project, and due to the fact that Ribbeck Engineering is already performing work on the Project, the City Manager, in assessing the totality of factors giving rise to this situation, believes there is ample support to find and certify to the City Commission that a public emergency exists and that it is in the best interest of the City to waive competitive bidding, as the City would greatly benefit from utilizing Ribbeck to avoid coordination problems and construction delays; and WHEREAS, pursuant to the City's cost sharing agreement with FDOT for the Project, FDOT has provided the City with notice of its concurrence to use of FDOT funds for its portion of the costs associated with the scope of work that Ribbeck Engineering will perform under Amendment No. 1 and, if this Resolution is adopted, the City will submit to FDOT the requisite compliance certifications to FDOT, pursuant to the Agreement's terms. WHEREAS, on April 26, 2017, in Resolution No. 2017-29839, the City Commission approved the additional scope of work, in the amounts as set forth in this Change Order No. 1. NOW THEREFORE, in consideration of the mutual promises and conditions contained herein, and other good valuable consideration, the sufficiency of which is hereby acknowledged, the City and Consultant hereby agree to amend the Agreement as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as part of this Amendment. 2. MODIFICATIONS. I. Article 1, Section 1.1 of the agreement is hereby amended to include TRACE CONSULTANTS, INC, as an approved Sub-consultant for the project, as part of the Definition for Consultant. II. Article 7, Section 7.1 of the Agreement is hereby amended as follows: 7.1 Consultant's "Lump Sum" fee for provision of the Services, including reimbursable expenses, for the original Project Scope shall continue to be $407,851, as more fully delineated in Schedule B of the agreement. The Consultant's "Lump Sum" fee for provision of the additional Scope of Services, as provided in this Amendment No. 1 shall be $ 863,171.92, for an overall amount of $1,271,022.92 collectively for the project. In addition, a contingency of ten percent (10%) of the additional cost for the additional scope for the amount of $ 86,317.19 ($863,171.92 x 10% = $ 86,317.19) has been set aside by the City for an overall contract Value of $1,357,340.11, including the set aside Contingency. However, the City's Contingency is available at the sole discretion of the Contract Administrator to cover and/or defray additional expenses relative to design and construction of the Project not included in or reasonably inferable from the scope of work, or for additional changes or adjustments to work items deemed desirable by the City to be included as part of the Contract Documents, or for additional costs expressly chargeable to the City or for which the City is responsible pursuant to the Contract Documents. The Consultant shall have no entitlement whatsoever to any amounts in the City's Contingency, and the City is under no obligation to assign any monies from the City's Contingency to the Consultant. Use of funds from City's Contingency shall be requested through the Additional Services process described in Article 5 and must be approved in writing by the Contract Administrator or City Manager prior to initiating any related work. Any unused amounts in the City's Contingency shall accrue solely to the City. Consultant shall have no entitlement what so ever to any unused Contingency amounts. III. Schedule A of the Agreement is hereby amended to include the following, as part of the scope of services (Basic Services): In addition to the Scope of Services described in Schedule A of the Agreement, the Consultant shall perform the following work, as set forth below and as delineated herein as follows: Task 1: The Scope of Services for this Supplemental work from Indian Creek Drive from 26th Street to 41st Street RFP and Conceptual Project General Task Additional hours for: • Progress and Coordination Meetings with City of Miami Beach • Coordination Meetings with Florida Department of Transportation (FDOT) • Coordination meetings with required discipline reviewers • Coordination meetings with key stakeholders. • Coordination with Geotechnical, Surveyor, Structure and Environmental Consultants providing services to the City of Miami Beach. • Plans review meetings and field review meetings. Roadway Analysis and Plans: Design Variations memorandum and reports including crash data analysis and benefit cost ratios as requested by the Department for the following Design Elements: • Border Width Design Variation • Horizontal Alignment Design Variation • Super elevation Design Variation • Spacing between VPI's Design Variation • Sight Distance at Intersections (Index 546) Design Variation • Stopping Sight Distance Design Variation • Minimum Parking Restrictions Design Variation • Bicycle Lane Width Design Variation Task 2: The Scope of Services for this work from Indian Creek Drive from 25th Street to 26st Street and Collins Avenue from 26th Street to 27th Street Interim Construction Phase Roadway Analysis and Plans: • Roadway restoration analysis and plans • Drainage Plan and Profile Sheets • Traffic Control analysis and plans • Roadway Quantity take off and summary of pay items in compliance with FDOT Basis of • Estimates • Field Reviews • Roadway analysis coordination with FDOT • Roadway coordination with Contractor. Drainage Analysis and Plans: • Design of Storm Drains including the evaluation and analysis for 22 new drainage structures within Collins Avenue from 25th Street to 26th Street. It also includes Collins Avenue at 26th Street intersection drainage improvements, as well as Collins Avenue from 25th Street to 26th Street 72 Inches trunk line construction to be built to meet interim condition and to later transition into ultimate condition working under gravity flow conditions. • Temporary Drainage Analysis including the evaluation to maintain drainage during construction as well the drainage interim phase between the newly constructed 72" trunk-line and the existing side-street drainage. • Drainage coordination with Contractor during construction and field reviews. • Drainage Map • Drainage Quantity take off and summary of drainage structures in compliance with FDOT Basis of Estimates. • Drainage calculations • Permit Set for SFWMD and DERM • Miscellaneous Drainage Details • Optional Pipe Material • Drainage Structure Sheets Utility Coordination: • Utility Coordination with UAO's Signing and Pavement Markings Analysis and Plans: • Signing and pavement markings analysis and plans for roadway restoration after drainage improvement construction as per MUTCD and FDOT criteria. Signalization Analysis and Plans: • Signalization analysis and plans for roadway restoration after drainage improvement construction as per MDCTS&S Division and FDOT requirements including pedestrian signal features restoration pull boxes, conduits, loops, etc. Task 3: The Scope of Services for this work from Indian Creek Drive from 26th Street to 41st Interim Construction Phase Roadway Analysis and Plans: • Roadway restoration analysis and plans • Drainage Plan and Profile Sheets • Traffic Control analysis and plans • Roadway Quantity take off and summary of pay items in compliance with FDOT Basis of estimates • Field Reviews • Roadway analysis coordination with FDOT • Roadway coordination with Contractor. Drainage Analysis and Plans: • Design of Strom Drains including the evaluation and analysis of 100 new drainage structures within Indian Creek Drive mainline to be build (to meet interim condition and to later transition into ultimate condition) for the new 72" trunk-line and 50 additional new drainage structures within side streets from Collins Avenue to Indian Creek Drive for the 24" pipe upsize working under gravity flow conditions. • Temporary Drainage Analysis including the evaluation to maintain drainage during construction as well the drainage interim phase between the newly constructed 72" trunk-line and the existing side-street drainage. • Drainage coordination with Contractor during construction and field reviews. • Drainage Map • Drainage Quantity take off and summary of drainage structures in compliance with FDOT Basis of Estimates. • Drainage calculations • Permit Set for SFWMD and DERM • Miscellaneous Drainage Details • Optional Pipe Material • Drainage Structure Sheets Utility Coordination: • Utility Coordination with UAO's Signing and Pavement Markings Analysis and Plans: • Signing and pavement markings analysis and plans for roadway restoration after drainage improvement construction as per MUTCD and FDOT criteria. Signalization Analysis and Plans: • Signalization analysis and plans for roadway restoration after drainage improvement construction as per MDCTS&S Division and FDOT requirements including pedestrian signal features restoration pull boxes, conduits, loops, etc. SRA1A from South of 25th Street to 26th Street & Collins Avenue Interim Construction Phase Scope of Work This Scope of Services consists of redesigning the previously designed set of plans for approximately 0.22 miles of roadway which includes 0.13miles along Collins Ave from South 25th Street to North of 26th Street, 0.09 miles along Indian Creek Drive from 26th Street to South of 27th Street, 50 feet along 25th Street and 50 feet along 26th Street. The revision was requested by the City of Miami Beach in order to reconstruct SR-A1A raising the profile along with transitioning to the aforementioned side streets and add drainage inlets along Collins Ave Northbound matching the new roadway elevation, in lieu of the roadway restoration plans included under the original set of plans. The revised set of plans includes roadway reconstruction, traffic control plans, drainage, signing & pavement markings, and signalization components. The construction plans will follow FDOT design criteria as well as City of Miami Beach contract requirements. Project General Task • None under this Supplemental. Hours will be included under a separate supplemental. Roadway Analysis and Plans: • Roadway reconstruction analysis and plans (raising profile and transitions at Collins and side streets as per FDOT criteria). • New pavement design for Collins Avenue • Revision to typical sections to include barrier wall, roadway reconstruction and greenway. • Traffic Control analysis and plans • Cross sections • Roadway quantity take off and summary of pay items in compliance with FDOT Basis of • Estimates • Roadway analysis coordination with FDOT • Harmonization at each private property, where required • Field reviews have not been included under this task. Hours will be included under a separate supplemental. Drainage Analysis and Plans: • Revision of drainage structure top and inlet elevations to match final roadway elevation. Signing and Pavement Markings Analysis and Plans: • Signing and pavement markings analysis and plans for new scope and project limits due to roadway reconstruction as per MUTCD and FDOT criteria • Signing and Pavement Markings quantity take off and summary of pay items Signalization Analysis and Plans: • Signalization analysis and plans per MDCTS&S Division and FDOT requirements including mast arms, pedestrian signals, pull boxes, conduits, loops, etc. due to the intersection plateau being raised by the roadway reconstruction. • Signalization quantity take off and summary of pay items TRACE CONSULTANTS, INC Lighting Analysis and Plans • Develop full lighting design analysis report to submit to City of Miami Beach, FDOT and Miami-Dade County • Perform voltage drop calculations • Develop lighting design following FDOT's latest criteria requirements which will divide the corridor into 16 different analysis zones with different horizontal and vertical illumination requirements • Develop proposed temporary lighting to be utilized during construction • Attend design meetings with City staff, FDOT and maintaining agency • Prepare construction plans following FDOT requirements for plans production, specifications and pay items • Quantities • Engineers Probable Construction Estimate • Provide required post design services including attending field reviews, progress meetings, reviewing shop drawings and making plan revisions BOLTON PEREZ AND ASSOCIATES SCOPE OF WORK Indian Creek Drive from 25th Street to 41st Street — Bulkhead Seawalls, Pump Structure and Temporary Steel Sheet Pile Cofferdam - Structural The work will be performed in accordance with City of Miami Beach and FDOT design requirements, and includes the following tasks: • Develop horizontal and vertical wall layout geometry based on survey cross sections depicting the location of the existing wall and baseline geometry. • Develop plan views of approximately 4500 LF of retaining walls with gravity wall returns. • Develop typical wall section of City of Miami Beach standard bulkhead wall, including provisions for drainage and utility pipe crossings depicting elevations at top of wall and existing grade at face of wall. • Design and develop final plans and details for the concrete drainage pump structure, including the temporary steel sheet pile cofferdam for construction of the pump structure. The geotechnical engineer shall provide recommendations and criteria for the foundation design. • Coordinate the work with the City of Miami Beach Engineer, Geotechnical Engineer, Drainage Engineer, Environmental Engineer, and Utility Engineer. • Develop permit drawings for South Florida Water Management District (SFWMD) and DERM. The permit drawings will be split into two packages. The first between 25th Street to 26th Street (includes both SFWMD and DERM) and the second from 26th Street to 41st Street (in two submittals, one for SFWMD and another for DERM). • Develop preliminary design of Temporary Critical Walls (TCW) for construction of the main drainage pipe running parallel to SR AIA (Indian Creek) and preliminary design of permanent steel sheet pile walls along FDOT RW. Design the wall to support the excavation required to install the proposed drainage pipe along SR AIA. Evaluate the feasibility for the use of the TCW or contractor proposed trench box based on proposed traffic control plans. • Review contractor shop drawings for the bulkhead walls and pump structure. IV. Article 2, Section 2.7, Sub-section 2.7.1 is hereby amended as follows: 2.7.1 Term: The term of this Agreement shall commence upon execution by the City and Consultant, which is shall continue to be the Effective Date referred to on page 4 one (1) hereof of the Agreement, and shall be in effect until all Services are completed or all Services authorized under Notices to Proceed are completed and accepted by the City, whichever is later. Notwithstanding the preceding Term, Consultant shall adhere to any and all timelines and/or deadlines, as set forth in the Scope of Services (if any) and in Schedule E, as amended on this amendment No. 1. V. Schedule E of the Agreement is hereby amended to replace and update the project schedule as follows: ter. Lb Development of Request for Proposal(RFP)and Conceptual Plans for Reconstruction of Indian Creek Drive from 26th Street to 41st Street ID Task Name al.. SMd nmsf Pre00ce.o„ 2017 Jul Aug Sep CM Nov Dec Jen Feb Mar Apr May Jun Jul Aug Sep 1 CONCEPTUAL PLANS AND REP DEVELOPMENT 299 days Use 811116 Thu 9121111 2 NOTICE TO PROCEED 1 day Mon 811116 Mon 811;16 +I 3 Receive Survey and ROW data 1.1 1 day Mon 911116 Mon Bi1;15 SS 0 Receive Utility locates and 000's as-built data I'll 1 day Mon 811116 Mon 011118 SS 8 Multi-Discipline Field Review 1 day Tue 012118 Tue 812116 • 8 Nick-off Meeting 1 day Wed 813116 Wed 813116 • 7 Request and Obtain Traffic Data 20 days Tue 812118 Mon 8129116 8 Request and Obtain Pavement Coring and Evaluation Report 1•I 30 days Tue 812116 Mon 9112116 '' OM_ 8 Profile how much road can be RT EOP profile.Including aide street profiles and driveway profiles to 50 days Tue 812118 Man 10110118 determine how much road can be raised 10 Receive Seawall layout to determine footprint of proposed road IN 1 day Mon 10110118 Mon 10110116 II Prepare and Submit Typical Section Package to dna City for concurrence and FOOT for approval 20 days Fri 11118116 Thu 12115118 1,9SS+20 days —I 12 Submit Typical Section Package for Review 30 days Fri 12118116 Thu 1126117 11 13 Address comments and Re-submit Typical Section Package to FOOT for Approval 30 days Fri 1127117 31w 319117 12 �I — 14 Receive Approved Typical Section 30 days Thu 4113117 Wad 5124117 13 • • 15 Prepare roadway horizontal layout 60 days Fri 11116118 ibis 219117 1158,91110 I:) a) • 18 Submit Roadway Horizontal Layout 14 days Fri 2110117 Wed 311117 15 �' 17 Address Comments for Horizontal Layout and resubmit layout BO days Zhu 312117 Wed 715117 16 IT Prepare roadway cross sections and final proliles 40 days Wed 11118116 Tue 1110117 `` 19 Receive drains a main trunk layout Ito be d with Sea wal layout task)I" 1 da Mon 1117178 Mon 1117118 1 ) A Y prepare Y Y la_• _ 20 Conceptual Drainage and Pump Station analysis and layout 20 days Fri 12116118 Thu 1112117 19,1555+20 days,9 ga 21 Prepare SPM and SiBnalixation conceptual design and master layout roll plat 30 days Fri 12/2119 Thu 1112117 1555+10 days II... t� 22 Submit SPM Layout for review 30 days Fri 1113117 Thu 2123117 21 II �23 Structulanalysisanddetailsforpumpstationandroadwayldraianpencidentalstructuraldetails 20days Fri2124177 Th3123117 9,2055+10 da1's,15FS+10 days 24 Prepare and Submit Pavement Design Package to FOOT 20 days Fri 12116116 Thu 1112117 7,8,11 25 Respond to comments and resubmit Pavement Design Package 14 days Fri 1113117 Wed 211117 24 28 Request ESAL for Collins Ave 90 days Thu 212117 Wed 817117 25 ., 27 Resubmit Pavement Design Packge 30 days Tlw 818117 Wed 7119117 26 28 Receive Approved Pavement Design Package 74 days Thu 7120117 Tue 018117 27 20 Identify Design Variations and Exceptions 5 days Fri 11118118 Thu 11124116 9 • 30 Prepare Design Variations 60 days Fri 11125118 Thu 2118117 29 31 Design Variation Review 45 days Fri 2117117 Thu 4120117 30 - 32 Respond to comments and Resubmit Design Variations 80 days Fri 4121117 Thu 7113117 31 -.-.. 33 Receive Approved Design Variations 14 days Fri 7114117 Wed 812117 32 34 Receive Environmental write up and any environmental assessmentlattachment for the RFP I'1 1 day Mon 11121118 Mon 11121116 1 35 Prepare Request for Proposal IRFPI Draft 40 days Thu 5125117 Wed 7119117 14 --. —�I 36 Papa turning meeting with City and DOT 1 day Thu 7120117 Thu 7120117 35 If 37 Update RFP based an page turning meedng 10 days Fri 7121117 Thu 813117 38 • 58 Production of Conceptual plans and Roll Plots to be appended to REP 15 days Thu 716117 Wed 7126117 9,15,21,23,17 P11111111 39 Suantity takeoff and preparation of Cost Estimate and Schedule of Values 15 days The 716117 Wed 7126117 3855 • 40 Submit RFP,Concepdal Plans and Schedule of Values to City and FOOT for review 20 days Thu 7127117 Wed 8123117 38,38 • at Update Conceptual Plans and RFP based on FOOT and City comments 20 days Thu 8124117 Wed 9120117 40 02 Submit Final REP.Conceptual Plans and Schedule of Values 1 day Thu 9121117 Thu 9121117 41 1 TW • I MNpwle O Read Up QblTrk I NeW keaW ay Burney c. ... ,7 Project'raw reek RFP CrNy Tesk 1 Summary 2— WNed w MNMmw 0 Ealand Tub Draw 6 DW:Fd dM Popo cezmas needed Up Task I , Wesed Up PnpOu smaespza PraleLLBurrNy J v r)NON:Oa.wen assumed for one Nam»In rod.me NnS eehed.Y will depend en tie amt du.Mal Ore M he Mamma be proNNt P.M.1 Interim 1 -Plans for Drainage Improvements along SR A1A from 25th Street to 26st Street and along Collins Avenue ID ras.Nane Duration sten Mesh Preoecesems 2017 OW Nov Dec Jen Feb Mar Apr May Jun Jul Aug ' INTERIM PHASE 1-FOR EMERGENCY DRAINAGE IMPROVEMENTS 53 drys Fri 1111806 Toe 1131117 2 NOTICE TO PROCEED 1 day Fri 11118116 Fd 11118116 3 Receive Survey and ROW data 11 1 day Fri 11118116 Fri 11118116 2SS Receive Utility locates and UAO's as-built data 11 1 day Fri 11118116 Fri 11118116 2SS 5 Multi-Discipline Field Review 1 day Mon 11121116 Man 11121116 2 6 Kick-of Meeting 1 day To.11122116 Tue 11122/16 5 7 Receive Seawall Layout to determine footprint of proposed road;'I 1 day Mon 11121116 Mon 11121116 2 • • B Prepare and Submit Drainage Plans 30 days To.11122116 Mon 112117 3,4,7 • • • • 9 Drainage Plan Review 14 days To.113117 Fri 1120117 8 • -- 15 Address comments and Resubmit Plans to FOOT ler Approval 7 days Mon 1123117 To.1131117 9 • • II POST DESIGN FOR INITIAL SERVICES 8 days Wad 3116117 Mon 3/27/17 12 Meet with Contractor to Discuss TCP Alternatives 1 day Wed 3115117 Wed 3115/17 11 • 13 Prepre Revised TCP with Detour 7 days Thu 3/16117 Fd 3124117 12 14 Submit Revised TCP with Detour 1 day Man 3127117 Mon 3127117 13 15 CHANGE IN DESIGN SCOPE.FROM ROADWAY RESTORATION TO ROADWAY RECONSTRUCTION SOdays Wed 4/28/17 Tue7118117 I) 16 Meet with City to Raise the Roadway to Final Grade 1 day Wed 4126117 Wed 4426117 17 Meet with FOOT to Discuss Pavement Options and Barrier Wall Options along Collins Ave 1 day Wed 513117 Wed 513117 18 Prepare Revised Plans Raising Collins Ave to Final Grade 30 days Thu 514117 Wed 6114117 17 19 Prepare Lighting Plans 15 days Thu 5125117 Wed 6114117 18SS+15 days eG.—i. 29 Prepare Signalization Plans 10 days Thu 5125117 Wed 617117 t sSS*15 days ea% 21 Submit Revised Plans to FOOT for Review 1 day Thu 618117 Thu 618117 20 -�� FOOT Review 14 days Fri 619117 Wed 6128117 21 23 Respond and Address FOOT Comments 14 days Thu 6129117 Tue 7118117 22 • TM Milestone O Retied Up Cr1101 Task _,..<....._. ._.m SAW Group By Summary V J Project haw Greek Detre RFP Crktel Task Summer V O Rolled Up Watena O External Teske Daetllina E Dabs Fd 6/2/17 Moon= Roiled Up Teek .__-.- ..1 RONaC UP PlePena Project Summery .____... (I Nes Defeo wens assumed for Ilne IWas In sod.The fine ecbedule WIll depend on the exact dates that the red line Isere MN be provided. Pada 1 • • • • • • 1 Interim Phase 2-Plans for Drainage Improvements along Indian Creek Drive from 26th Street to 41st Street ID Task Name Duration Starr Fnish Predecessors 7017 Jan ...Feb Mar Apr May Jun Jul Aug Sep OM I CONCEPTUAL PLANS AND REP DEVELOPMENT 158 days Mon 2120117 Wed 9127117 2 NOTICE TO PROCEED 1 day Mon 2120117 Mon 2120117 —I- 7 Receive Survey and ROW data I'I 1 day Mon 2120117 Mon 2120117 2SS if 4 Receive Utiity locates and UA O's ashuilt data I'1 1 day Mon 2120117 Mon 2120117 205 II 5 Receive Seawall Layout to determine footprint of proposed road 11 1 day Man 2120117 Mon 2120117 2SS '01 mr 6 Multi-Discipline Field Review 1 day Tue 2121117 Tue 2121117 2 h 7 Kick-off Meeting 1 day Wed 2122117 Wed 2722117 6 1 6 Prepare and Submit Preliminary Drainage Plans for Contractor and City Review 60 days Thu 2123117 Wed 5117117 7 A Prepare and Submit Preliminary Drainage Cross Sedan Sheets for Contractor and City Review 60 days Thu 2123117 Wed 5117117 7 -- 10 Meet with City to Coordinate Interim Project Scope and Limits for Roadway and Drainage Improvements 1 day Wad 5110117 Wed 5110117 755.50 days 11 Prepare TCP,Roadway and Drainage Plana 45 days Fri 6116117 Thu 8117117 10 -1I 12 Prepare Lighting Plana 30 days Wed 6121117 Toe 811117 10SS+30 days 13 Prepare Signalization Plans 15 days Wed 7112117 Tue 811117 10SSt45 days .._ 14 Submit Revised Plans to FOOT for Review 7 day Fri 8118117 Fri 811 011 7 1 3,1 1 15 FOOT Review 14 days Mon 0121117 Thu 917117 14 -- 16 Respond and Address FOOT Comments 14 days Fri 918117 Wed 9127117 15 -- Teak ® MMebw O Poled Up Carol TaNc 1 Spa Orap By Swimmy V V Project laden peek Once RFP Crateal Taek Summery V O Rolled Up Milelaerc O External Teeb I DepdgM 7 Dab:Fd 6/2/17 J Piranha Rolled Up Teak Rolled Up Payees Project Sorrows (1)Nater Dam were esmarlad far line Sena he and The Miner sambas will depend an the meat dabs that 1M and line brat all he pes'dat Pepe 1 Project Staff Hour Summary Name of Consultant:Ribbeck Engineering,Inc. Indian Creek Drive from 26th Street to 41st Street RFP and Conceptual Plans Supplemental 429228-2-58-01 Project Staff Hours Activity Enter Firm Enter Name No. Activity Name Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours 3 Project Common and General Tasks 160 160 4 Roadway Analysis 216 216 5 Roadway Plans 0 0 6a Drainage Analysis 0 0 6b Drainage Plans 0 0 7 Utilities 0 0 8 Env.Permits.Compliance 8 Clearances 0 0 9 Structures-Summary,Misc.Tasks,Dwgs. 0 0 10 BDR 0 0 11 Temporary Bridge 0 0 12 Short Span Concrete Bridge 0 0 13 Medium Span Concrete Bridge 0 0 14 Structural Steel Bridge 0 0 15 Segmental Concrete Bridge 0 0 16 Movable Span 0 0 17 Retaining Walls 0 0 18 Miscellaneous Structures 0 0 19 Signing&Pavement Meriting Analysis 0 0 20 Signing&Pavement Marking Plans 0 0 21 Slgnalization Analysis 0 0 22 Signallzation Plans 0 0 23 Lighting Analysis 0 0 24 Lighting Plans 0 0 25 Landscape Architecture Analysis 0 0 26 i,Landscape Architecture Plans 0 0 27 Survey-Field and Office Support 0 0 28 Photogrammetry 0 0 29 Mapping 0 0 30 Terrestrial Mobile LiDAR 0 0 31 Architecture Development 0 0 32 Noise Barriers Impact Design Assessment 0 0 33 ITS Analysis 0 0 34 ITS Plans 0 0 35 Geotechnical 0 0 Project Total 376 0 0 0 0 0 0 0 0 0 0 0 0 376 27 !Survey Field Crew Days 0 0 Notes. 1 Staff hours for prime consultant come directly from each discipline's worksheet. 2.Staff hours for subconsultants are to be entered manually Into columns 0 through O. 3.For workbooks prepared by subconsultants,their project hours will be totaled In column C. 2016_11_10_IndianCreek Fee_P2_Supplemental REI Summary Page 1 of 9 11/102016 ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number' 429228-2-58-01 Project Name: Indian Creek Drive from 26th Street to 41 FAP Number: TBD Date: 11/10/2016 Name of Consultant: Ribbeck Engineering,Inc. WOR „sc arnan„ EMPLOYEE CLASSIFICATION TOTAL ACTIVITY LKKy STAFF HOURS ON CADS Project Sr Project Project Engineer Staff Classi- Staff Classi- Staff Classi- Staff Classi- Staff Classi- Staff Classi- Rim 1 Manager EngineerEngineer5r.Engineer Intern &'oesgnr ficallon 7 ficatlon 8 ficallon 9 f ation 10 fication 11 fication 12 RANGE Hours Hours Hours Hour Hours Hours Hours Hours Hours Hours Hours Hours Hours I PERCENT 3.Project General and Project Common Tasks 160 160 0 0 0 0 0 0 0 0 0 0 0 160 176 4,Roadway Analysis 216 43 43 43 22 43 22 0 0 0 0 0 0 216 238 5.Roadway Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 6a.Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6b.Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.Environmental Permits,Compliance&Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.Structures-Misc.Tasks.Dwgs,Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.Structures-Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.Structures-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.Structures-Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.Structures-Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.Structures-Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.Structures-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 17.Str lures-Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.Structures-Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.Signing&Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 20.Signing&Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21,Signaliaation Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.Signal¢ation Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25.Landscape Architecture Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26.Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 27.Survey(Field&Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28.Phologrammelry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30.Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32.Noise Barners Impact Design Assessment 0 0 0 0 0 0 0 0 O 0 0 0 0 0 I 0 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 34.Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35.Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 00 TOTALS 376 203 43 43 22 43 22 0 0 0 0 0 0 376 ! 414 field Survey FWimate: Haws. 0 4-roan crew days FIRM TOTAL 378 I 414 1.This worksheet provdes the distribution of agfmsjptgl staff hours fora lrgect. 2 Percentages for staff now distribution by classtrcalion are entered below in rows 63 to 98 of this sheet. 3.Tata)Stag Hours(column O)may not patch staff hours from Summary worksheet(column S)due to rounding.Staff hours calculated for employee classifications are to he adjusted so totals in columns B and O match. 4.Formulas under Total Staff Fours Range'(columns O a P)may be adjusted to provide desired range. am_iiis trema t,,ta_sywnw)m Peaxae IYOIa 9011411eaxavam�a�IEI ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number: 429228-2-58-01 Project Name Indian Creek Drive from 26th Street to 41 FAP Number TBD Date. 11/10/2016 Name of Consultant: Ribbeck Engineering.Inc. Staff Hour Distribution Percentages-Firm Total Hourarrom mmaN Project Sr Project Project Engineer Staff Classi-Staff Classi- Staff Classi- Staff Classi- Staff Classi-Staff Classi- Fino Total Manager Engineer Engineer Sr.Engineer Intern Sr.Designer fication 7 fication 8 fication 9 fication 10 fication 11 fication 12 Total 3.Project General and Project Common Tasks 160 100.0% 00% 0.0% 00°/ 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% 00% 100.00% 4.Roadway Analysis 216 20.0% 20.0% 200% 20.0% 10.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.91% S Roadway Plans 0 00% 00% 200% 40.0% 40.0% 00% 00% 00% O.o% 0.0% O.O% 100.00% 6a.Drainage Analysis 0 20.0% 0.0% 0.0' 0.0% 00% 00% 0'r 0.0% 0.0% 0.0% 10000% 6,Drainage Plana 0 0.0% 00% 0.1 1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 7.Utilities 0 0.0% 00% 0, 1% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 100.92% 8.Environmental Permits,Compliance 8 Clearances 0 00% 0,0% 00 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.00% 9.Structures-Misc.Tasks.Dwgs,Non-Tech. 0 0.0% 00% 0.0" )0% 00% 0.0% 0.0% ,.. 0.0% 0.0% 0.0% 000% 10.Structures-Bridge Development Report 0 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 00% 0.0% 0.00% 11.Structures-Temporary Bridge 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.00% 12.Structures-Short Span Concrete Bridge 0 0.0% 0.0% 0 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 13.Structures-Medium Span Concrete Bridge 0 0.0% 00% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.00% 14.Structures-Structural Steel Bridge 0 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 15.Structures-Segmental Concrete Bridge 0 0.0% 0.0% 0.0% 0,0% 0.0% 0.0% 0.00 0.0% 0.0% 0.0% 00% 0.00% 16.Structures-Movable Span 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.00% 17.Structures-Retaining Walls 0 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 18.Structures-Miscellaneous 0 00% 00% 00% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 000% 19.Signing 8 Pavement Marking Analysis 0 0 0% 0.0% 60.0% 0.0% 20.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00% 20.Signing 8 Pavement Marking Plans 0 00% 0.0% 20.0% 0.0% 40.0% 400% 00% 0.0% 00% 0.0% 00% 100.00% 21.Signalaation Analysis 0 0.0% 100.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00% 22 Signalization Plans 0 0.0% 20.0% 0.0% 0.0% 40.0% 40.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 100.00% 23.Lighting Analysis 0 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 24.Lighting Plans 0 0.0% 00% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 25.Landscape Architecture Analysis 0 0.0% 0.0% 0.2 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 26.Landscape Architecture Plans 0 00% 0.0% 0: 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 00% 0.00% 27.Survey(Field 8 Office Support) 0 00% 0.0% 0.. 00% 0.0% 0.0% 00% 00% 0.0% 0.0% 5.0% 0.0% 0.00% 28.Photogrammetry 0 00% 0.0% 0' ]% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.00% 29.Mapping 0 00% 0.0% 0.0%= 2.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 30.Terrestrial Mobile LiDAR 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.00% 31.Architecture Development 0 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 000% 32,Noise Barriers Impact Design Assessment 0 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 33.Intelligent Transportation Systems Analysis o 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.00% 34.Intelligent Transportation Systems Plans o 00% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% o.o% 0.0% 0.0% 0.0% 000% 35.Geotechnical 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.00% ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Project' Indian Creek Drive horn 26th Street to 41st Street RFP and Conceptual Plans Supplemental Consultant Name'.Ribbeck Engineering,Inc. County' Miami-Dade Consultant No'. F-26-0460464 FPN. 429228-2-08-01 Date'. 11/10/2016 FAP No., TBD Estimator Carlos Ribbeck,P E Total Stag Project Sr Project ProjM Engineer Staff CUaai- SUR CIxsi- Staff Classi- Staff Classi- Staff Classi- staff Classi- SM Salary Average Stiff Ctaxificatim tours From Syn E Engineer Br.Engineer Intern �'Oxlgner fica600 T fica5on 8 fication 9 fica5on 1e fixation 11 fication 12 -SH Summafi manager �, By Cost By Rate Per -Firm- 56500 $5800 550.00 $6000 $31 00 52500 $000 $000 $000 $000 $0.00 5000 Activity Activity Task 3.Project General and Project Common Tasks 160 160 0 0 0 0 0 0 0 0 0 160 510.400 565.00 4 Roadway Analysis 216 43 43 43 22 43 22 0 0 0 0 2 6 510.900 550.46 5.Roadway Plans 0 0 0 0 0 0 0 0 0 0 SO 9010101 6e Drainage Analysis 0 0 0 0 0 0 0 0 0 0 50 901010' 6b.Drainage Plans 0 0 0 0 0 0 0 0 0 0 50 9010/01 7.ltilibaa 0 0 0 0 0 0 0 0 0 0 50 9010101 8.Environmental Permds.Compliance 8 Clearances 0 0 0 0 0 0 0 0 0 0 50 9010101 9.Structures-Misc.rash,Dwgs.Non-Tech. 0 0 0 0 0 0 0 0 0 0 50 901010! 10.Structures-Brdge Development Report 0 0 0 0 0 0 0 0 0 0 50 9010101 tt.Structures-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 50 9010101 12.Structures-Stag Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 50 9010/01 13.Structures-Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 50 10IV/01 14.Structures Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 50 9010/01 15.Structures-Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 SO 901010! 16.Structures-Movaae Span 0 0 0 0 0 0 0 0 0 0 So 101010, 17.Structures-Retaining Walls 0 0 0 0 0 0 0 0 0 0 50 901010! 18.Structures-Miscellaneous 0 0 0 0 0 0 0 0 0 0 50 SUMO! 19.Signing 8 Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 $0 901010! 20.Signers 8 Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 50 9010/0, 21.Signaliaadon Analysis 0 0 0 0 0 0 0 0 0 0 50 9010/01 22.Signalbation Plans 0 O 0 0 0 0 0 0 0 0 50 9010/0! 23.Lighting Analysis 0 0 0 0 0 0 0 0 0 0 SO 901010' 24 Lighting Plans 0 0 0 0 0 0 0 0 0 0 50 aDIV 0. 25.Landscape Aroheecture Analysis 0 0 0 0 0 0 0 0 0 0 SO 9DIV-0' 26 Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 SO 9010/0'. 27.Survey(Field 8 Office Support) 0 0 0 0 0 0 0 0 0 0 $0 9010/0! 28.Photogrammhy 0 0 0 0 0 0 0 0 0 0 50 1010/01 29.Mapping 0 0 0 0 0 0 0 0 0 0 50 9010/0! 30.Terrestrial Mobile UDAR 0 0 0 0 0 0 0 0 0 0 50 9010/0'. 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 $0 9010/0'. 32.Noise Barriers Impact Design Assessment 0 0 0 O 0 0 0 0 0 0 50 9010/0! 33.Iraeeigent Transportation Systema Analysis 0 0 0 0 0 0 0 0 0 0 SO 9010/0! 34.Intelligent Transportation System Plans 0 0 0 0 0 0 0 0 0 0 50 9010/01 35 Santechntcal 0 0 0 0 0 0 0 0 0 0 50 9DIVI0! Total Staff lours 376 203 43 43 22 43 22 0 0 0 0 0 0 376 Total Staff Cost 513.195.00 52.494.00 52405.00 5132000 51.333.00 5550.00 $0.00 $000 $0.00 $000 s000 $000 521,300.00 566.85 Check= 521300.00 Surrey Field Days by Subconsueant SALARY RELATED COSTS'. $21300.00 4-Person Crew'. OVERHEAD: 163.76% $34.881188 OPERATING MARGIN: 38 5% $8200.50 Notes: FCCM(Faal'Ses Captal Cost Money): 1767% 5163.37 1.This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: $000 4-men crew 2.Manually enter fee from each subconsultant Unused suhmnsueant rows may be hidden. Survey(Field-if by Prime) 0 days @ S /day $000 SUBTOTAL ESTIMATED FEE: $44,54.75 Subconsultant:Enter Name Sub 1 5000 Subconsultant Sub2 6000 Subcons,tant Sub 3 $0.00 Subconsultant:Sub4 $008 Subconsuttant'Subs 50.00 Subconsuoanh Sub6 5000 Subccnsuearo:Sub? WOO Subconsultant:Sub8 $000 Subconsueant:Sub9 SOHO Subconsultant:Sub 10 $0.00 Subconsunamo Sub11 5000 SWr0nsultaM Sub 12 5000 - SUBTOTAL ESTIMATED FEE: 364,544.75 Geotechnical Field and Lab Testing 50.00 SUBTOTAL ESTIMATED FEE: $60.54.75 Optional Services $0.00 GRAND TOTAL ESTIMATED FEE: 34.54.75 ;0.1.63111Pn10 IraCreek Fm Supgmtal een _REI meisPage 9a1 4 1/10.016249 PM Project Activity 3:General Tasks Est mato,CR Indian Creek Dnve from 26th Street to 41st Street RFP and Conceptual Plans Supplemental 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE,Signature Block is optional,per District preference Task Task Units No of Units Hours/Unit Total Hours Comments No. 3.1 Public Involvement 3.1.1 Community Awareness Plan LS1 0 0 3.1.2 Nobfica0ons LS 1 0 0 3.1.3 Prepare Mailing Lists LS1 0 0 3.1.4 Median Modification Letters LS 1 0 0 3.I.5 Driveway Mockficabon Letters LS 1 0 3.1.6 Newsletters LS 1 0 0 3.1.7 Renderings and Fly Throughs LS 1 0 3.1.8 PowerPoint Presentation LS 1 0 0 3.1.9 Pubic Meeting Preparatons LS 1 7 0 3.1.10 Pudic Meeting Attendance/Followup LS 1 .. 0 3.1.11 Other Agency Meetings LS 0 0 3.1.12 Web Site LS 10 3.1 Public Involvement Subtotal 0 3.2 Joint Project Agreements EA 0 3 0 3.3 Specifications Package Preparation LS1 0 0 3.4 Contract Maintenance and SLIMS LS 1 0 0 3.5 Value Engineering(Mult-Oisapline Team)Review LS 1 0 0 3.6 Prime Consultant Project Manager Meetings LS 1 160 160 See lisong below 3.7 Plans Update LS 1 0 0 2016_11_10_IndianCreek_Fee_P2_Suppkmental_REI 3.Project General Tasks Page 1 of 2 11110/2016 Project Activity 3:General Tasks Task Task Units No of Units Hours/Unit Total Hours Comments No. 3.8 Post Design Services LS 1 9 0 19 Digital Delivery LS 1 7 0 3.10 Risk Assessment Workshop LS 1 7 0 3.11 Railroad,Transit,and/or Airport Coordination LS 1 3 0 3.12 Other Project General Tasks LS 1 0 0 3.Project Common and Project General Tasks Total 160 3.6-List of Project Manager Meetings Units No of Units Hours/Unit Total Hours Comments Roadway Analysis EA 0 0 0 Drainage EA 0 0 0 Utilities EA 0 0 0 Environmental EA 0 0 0 Structures EA 0 0 0 Signing&Pavement Marking EA 0 0 0 Signalization EA 0 0 0 Lighting EA 0 3 0 Landscape Architecture EA 0 0 0 Survey EA 0 0 0 Photogrammetry EA 0 0 0 ROW&Mapping EA 0 0 0 Terrestrial Mobile LIDAR EA 0 0 0 Architecture EA 0 0 0 Noise Barriers EA 0 0 0 ITS Analysis EA 0 0 0 Geotechnical EA 0 0 0 Progress Meetings EA 0 3 0 Additional coordination meetings for Carlos Ribbeck and Francis Mitchell at City of Miami Beach,FOOT,DERM, Phase Reviews EA 20 8 160 SFWMD,etc.Assuming 2 people(Carlos Ribbeck and Francis Mitchell)0 4 hours per meeting(includes driving time)-6 hrs/meeting.Additional meetings include all Design Phases'.REP,Interim South and Interim North. Field Reviews EA 0 0 0 Total Project Manager Meetings 20 160 Total PM Meeting Hours carries to Task 3.6 above Notes: 1.If the hours per meeting vary in length(hours)enter the average in the hour/unit column. 2.Do not double count agency meetings between permitting agencies. 3.Project manager meetings are calculated in each discipline sheet and brought forward to Column D,except for Photogrammetry. 2016 11_10_IndianCreek_Fee P2_Supplemental_REI 3.Protect General Tasks Page 2 of 2 11/1012016 proiect Activity 4:Roadway Analysis Estimator: Indian Creek Drive from 26th Street to 41st Street RFP and Conceptual Plans Supplemental 429228-2-58-01 Representing Print Name Signature!Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Units No of Units Hours/Unit Total Hours Comments No. 4.1 Typical Section Package LS 1 0 0 4.2 Pavement Type Selection Report LS 1 0 0 4.3 Pavement Design Package LS 1 0 0 4.4 Cross-Slope Correction LS 1 0 0 4.5 Horizontal Nertical Master Design Files LS1 0 0 4.6 Access Management LS 1 0 0 4.7 Roundabout Evaluation LS 1 0 0 4.8 Roundabout Final Design Analysis LS1 0 0 4.9 Cross Section Design Flles LS1 0 0 4.10 Traffic Control Analysis LS1 0 0 4.11 Master TCP Design Files LS 1 0 0 As requested by the Department,Design Variation packages shall be included in the RFP pakcage.Based on Conceptual Design,8 Design Variations will be required and are as follows'.(1)DV Border Width,(2)DV Horizontal 4.12 Design Variations and Exceptions LS 8 24 192 Alignment,(3)DV Supereivation,(4)DV Grade on Curb and Gutter Sections,(5)DV for Sight Distance at Intersections Index 546,(6)DV for Stopping Sight Distance(7)DV for Minimum Parking Restrictions,and(8)DV for Bicycle Lane Width.Includes the Design Variation Report,crash data analysis,coordiantion with FDOT and exhibits. 4.13 Design Report LS1 0 0 4.14 Quantities LS1 0 0 4.15 Cost Estimate LS1 0 0 4.16 Technical Special Provisions LS1 0 0 4.17 Other Roadway Analyses LS 1 0 0 Roadway Analysis Technical Subtotal 192 2016_11_10_IndianCreekFee P2_Supplemental_REI 4.Roadway Analysis Page 8 of 9 11/10/2016 Project Activity 4:Roadway Analvsig Task Task Units No of Units Hours/Unit Total Hours Comments No. 4.18 Field Reviews LS0 3 0 4.19 Monitor Existing Structures LS 1 0 0 4.20 Technical Meetings LS 1 0 0 4.21 Quality Assurance/Quality Control LS % 5% 10 4.22 Independent Peer Review LS % 0% 0 4.23 Supervision LS % 5% 10 Roadway Analysis Nontechnical Subtotal 20 4.24 Coordination LS % _T 4 4.Roadway Analysis Total 216 Technical Meetings Units No of Units Hours/Unit Total Hours PM Attendance at Meeting Required? Number Typical Section EA 4 4 no 0 Pavement EA 1 4 4 no 0 Access Management EA J 0 0 0 15%Line and Grade EA _ 4 6 yes Driveways EA 0 0 0 0 Local Governments(cities,counties,MPO) EA2 4 8 yes 2 Work Zone Traffic Control EA 0 0 0 0 30/60/90/100%Comment Review Meetings EA 2 4 8 yes 3 Other Meetings EA0 0 0 Subtotal Technical Meetings 32 Subtotal Project Manager Meetings 6 Progress Meetings(if required by FOOT) EA 3 30 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 30 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 32 Total Project Manager Meetings(carnes to Tab 3) 6 2018_11_10_IndianCreek_Fee_P2 Supplemental_REI 4 Roadway Analysis Page 9 of 9 11110/2016 Project Staff Hour Summary Name of Consultant:Ribbeck Engineering,Inc. Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Project Staff Hours Activity Enter Firm Enter Name No. Activity Name Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub!! Sub 9 Sub 10 Sub 11 Sub 12 Total Hours 3 Project Common and General Tasks 0 0 4 Roadway Analysis 197 197 5 Roadway Plans 134 134 6a Drainage Analysis 106 106 60 Drainage Plans 214 214 7 Utilities 24 24 8 Env.Permits,Compliance 8 Clearances 0 0 9 Structures-Summary,Misc.Tasks,Dwgs. 0 0 10 BOO 0 0 11 Temporary Bndge 0 0 12 Short Span Concrete Bridge 0 0 13 Medium Span Concrete Bridge 0 0 14 Structural Steel Bridge 0 0 15 Segmental Concrete Bridge 0 0 16 Movable Span 0 0 17 Retaining Walls 0 0 18 Miscellaneous Structures 0 0 19 Signing 8 Pavement Marking Analysis 58 58 20 Signing 8 Pavement Marking Plans 27 27 21 Signalization Analysis 29 29 22 Signalization Plans 22 22 23 Lighting Analysis 0 0 24 Lighting Plans 0 0 25 Landscape ArchitecNre Analysis 0 0 26 Landscape Architecture Plans 0 0 27 Survey-Field and Office Support 0 0 28 Photogrammetry 0 0 29 Mapping 0 0 30 Terrestrial Mobile LSDAR 0 0 - 31 Architecture Development 0 0 32 Noise Burners Impact Design Assessment 0 0 33 ITS Analysis 0 0 34 ITS Plans 0 0 35 Geotechnical 0 0 Project Total 811 0 0 0 0 0 0 0 0 0 0 0 0 811 27 (Survey Field Crew Days 0 0 Notes: 1.Staff hours for prime consultant come directly from each discipline's worksheet. 2.Staff hours for subconsultants are to be entered manually into columns D through O. 3.For workbooks prepared by subconsultants,their project hours will be totaled in column C. 201B_11 10_IndianCreek Fee P1_InterimSouth_FeeProposal_REI Summary Page 1 0119 11/10/2016 ke ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number: 429228-2-58-01 Project Name: Indian Creek Drive from 25th Street to 26t FAP Number: TBD Date. 11/102016 Name of Corerlart: Ribbeck Engineering,Inc. WORK EMPLOYEE CLASSIFICATION TOTAL Meet ACTym, STAFF HOURS ON CADD Project Sr Project Project ., Ergineer Staff Cassi-Staff Class,- Staff Class,- Staff Class,- Staff C6ssi-Staff Clam- Firm To r Manager Eng,nee Engineer Engineer Intern Sc.Des9ner fcation7 fication8 fication9 f.tion 10 fication11 fication 12 RANGE Hours v Hours HaasHours Hours Hours Hours Hours Hours Hours Hours Hours Hours I PERCENT 3.Project General and Project Common Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.Roadway Analysis 197 39 39 39 20 39 21 0 0 0 0 0 0 197 217 5.Roadway Plena 134 0 0 27 0 53 54 0 0 0 0 0 0 134 I 147 6a.Drainage Analysis 106 21 0 0 85 0 0 0 0 0 0 0 0 106 117 6b.Drainage Plans 214 43 43 43 21 43 21 0 0 0 0 0 0 214 235 7.Utilities 24 0 0 0 0 0 24 0 0 0 0 0 0 24 II 26 8.Environmental Permits,Compliance&Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ! 0 9.Structures-Misc.Tasks.Dwgs.Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 o 1 0 10.Structures-Bridge Devebpmenl Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 11.Structures-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.Structures-Shen Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.Structures-Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ! 0 15.Structures-Segmental Concrete Bridge o 0 0 0 0 0 0 0 0 0 0 0 0 0 j 0 16.Structures-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 o I o 17.Structures-Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ! 0 18.Structures-Miscellaneous0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.Signing 8 Pavement Marking Analysis 58 12 12 12 6 10 6 0 0 0 0 0 0 58 I 64 20.Sigrirg&Pavement Marling Plana 27 0 0 5 0 11 It 0 0 0 0 0 0 27 30 21.Sigralization Analysis 29 6 6 6 3 5 3 0 0 0 0 0 0 29 32 22.Signalization Plane 22 0 0 4 0 9 9 0 0 0 0 0 0 22 I 24 23.Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 l 0 24.Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 25.Landscape Architecture Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ! 0 26.Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L 0 27.Survey(Field&Ome Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28.Photog2mmetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 30.Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32.Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0' 0 0 0 0 0 0 0 0 0 34 Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35.Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTALS 811 121 100 136 135 170 149 0 0 0 0 0 0 511 592 field Survey Estimate Notes: 0 4-man crew days FRP/TOTAL 511 592 1.Thai worksheet provides the distribution ora farts total staff Inas for a project. 2.Percentages for staff rots distribution by c9esifeetnn are altered below in rows 61 to 96 of thS shed. 3.Total Start limas as(cokmn o)may rei match staff hors from Summary worksheet(columne)due to minding.staff roes calculated for employee daoowEatbm are to be adjusted so totals in whams B and o match. 4.Formdas rater"Total Staff Hous Range-rearms s O 8 P)may be adjusted.°provide desired range. r n� � �� 00.251* We.MIN ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number: 429228-2-58-01 Project Name Indian Creek Drive from 25th Street to 261 FAP Number: TBD Dale 11/102016 Name of Consultant: Ribbeck Engineering.Inc. Staff Hour Distribution Percentages-Firm Total Hwzfine .surressbeet Project Sr Project Project Engineer Staff Classi-Staff Classi- Staff Classi- Staff Classi-Staff Classi-Staff Clasei- FneTotal Manager Engineer Engineer Sr.Engineer Irtem Sr.Designer fication7 fcatbn8 fcation9 fcalion10 ficagon11 fication12 Total 3.Project General and Project Common Tasks 00.0% 0.0% 00% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 00% 00% 0.00% 4.Roadway Analysis 197 20.0% 20.0% 20.0% 10.0% 200% 10.0% 00% 0.0% 0.0% 0.0% 00% 00% 100.00% 5.Roadway Plans 134 00% o.o% 20.0% 00% 400% 40.0% 00% 0.0% 00% 00% 00% 00% 10000% 6e.Drainage Analysis 106 20.0% 0.0% 0.0% 800% 0.0% 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% 10000% 6b.Drainage Place 214 20.0% 20.0% 20.0% 100% 20.0% 10.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 100.00% 7.5liffes 24 0.0% 0.0% O.o% 0.0% 0.0% 100.0% 0.0% 00% 00% 00% 0.0% 0.0% 100.00% 8.Environmental Permits.Compfarce B Clearances 0 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% o.o% 00% 00% 0.0% 0.0% 0.00% 9.Structures-Moc.Tasks.Dogs,Non-Tech. 0 0.0% 00% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 00% 0.0% 0.00% 10.Structures-Bridge Devebpment Report 0 0.0% 0 0% 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% 0 0% 0.0% 0.0% 0.00% 11.Structures-Temporary Bridge 0 0.0% 0.0% 0.0% O.o% 0.0% 00% 0.0% 00% 00% 00% 00% 0.0% 000% 12.Structures-Short Span Concrete Bridge o 0.0% o 0% 0.0% 00% 0.0% 0.0% 0.0% 0 0% o.o% 00% 00% o.o% 0.00% 13.Structures-Medius Span Concrete Bridge o 00% 0 0% 0.0% 0.0% 0.0% 0.0% 00% 0 0% 0.0% 00% 00% 0.0% 0.00% 14.Structures-Structural Steel Bridge 0 00% 00% 00% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 000% 15.Structures-Segmental Concrete Bridge 0 0.0% 0.0% 00% 0.0% O.o% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 16.Structures-Movably Span 0 0.0% 0.0% 00% 00% 00% 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% 000% 17.Structures-Retaining Walls 0 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.o% 00% 00% 0.0% 0.0% 0.00% 18.Structures-Miscellaneous 0 00% 00% 0.0% 0.0% 00% 0.0% 00% 0o% 0.0% 00% 0.0% 0.0% 0.00% 19.Signing S Pavement Marking Analysis 58 200% 20 0% 20.0% 10.0% 20.0% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00% 20.Signing 8 Pavement Marking Plena 27 0.0% 0.0% 200% 0.0% 40.0% 40.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 10000% 21.Sgtalization Analysis 29 20.0% 20.0% 20.0% 10.0% 20.0% 10.0% 0.0% 00% 00% 00% 0.0% 0.0% 100.00% 22.Stgnefzafon Plane 22 00% 0.0% 20.0% 00% 40.0% 40.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 100.00% 23.Lighting Aralysis 0 00% 0.0% 00% 00% 00% 00% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.00% 24 Lighting Plans 0 0.0% 0.0% 00% 00% 00% 0.0% 00% O.o% 0.0% 00% 0.0% 0.0% 000% 25.Landscape Architecture Analysis 0 00% 0.0% 00% 00% 0.0% O.o% 0.0% 0.0% 0.0% 0.0% 000% 26.landscape Architecture Plans 0 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 00% 00% 00% 0.00% 27.Survey(Field&Office Support) 0 00% O.o% 0.0% 0.0% 0.0% ... 00% 00% 00% 00% 0.0% 000% 28.Pletogrammetry 0 00% O.O% 0.0% 00% 0.0% 00 0.0% o.o% 0.0% 00% 00% 000% 29.Mapping 0 0.0% o.o% 0.0% 00% 0.0% 00% O.D% 00% 00% 00% O.o% 000% 30.Terrestrial Mobile LiDAR 0 00% 0.0% 0.0% 00% 0.0% 00% 00% 0.0% 0.0% 0.0% 00% 0.00% 31.Architecture Devebpment 0 0.0% 00% 00% 0.0% 00% 0.0% 0.0% 00% 00% 0.0% 0.0% 000% 32.Noise Barriers Impact Design Assessment 0 00% 00% 00% 0.0% 0.0% 0.0% 0.0% 00% 00% 0.0% 0.0% 0.00% 33.Steigent Transportation Systems Analysis 0 0.0% 00% 00% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 34.Intelligent Transportation Systems Plans o 00% 00% 0.0% 0.0% 0.0% 0.0% CC 00% 0.0% 00% 0.0% 00% 0.00% 35.Geotechnical 0 0.0% 00% 0.0% 0.0% 0.0% o.0% 0.0% 00°% 0.0% 00% 0.0% 00% 0.00% s.:Z e.•mw asi "w.mmsom-a mo..i ae ht.'s. mmnou ev w ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Protect. Indian Creek Dove from 25th Street to 26th Street and Collins Avenue-Interim Phase 1 Consultant Name:Ribbeck Engineering.Inc. County. Miami-Dade Consultant No.-. F-26-0460464 FPN: 429228-2-58-01 Date 11/10/2016 FAP No.'. TBD Estimator Carlos Ribbed( E. Staff Classification Total Stag Project Sr Project Project Er.Engineer Engineer Sr.Designer Staff Class*- Staff Classi- Staff Class*- Staff Class*- Staff Claes,- Staff CesH- NH Salary Average Hours From Manager Engineer Engineer entre ficabon 7 baton 8 fi0ation 9 firadon 10 ficatron 11 ficaton 12 By Cost Be Rate Per 'SH Summar, -Firm 86500 55600 556.00 560 CO Sat 00 Sts 00 $000 5000 50.00 SO 00 SOW 0000 Activity Activity Task 3.Project General and Project Common Tasks 0 0 0 0 0 0 0 0 0 0 0 0 SO eDIV101 4 Roadway Arolysls 197 39 39 39 20 39 21 0 0 0 0 197 $9915 $50.33 5.Roadway Plans 134 0 0 27 0 53 54 0 0 0 0 130 54,505 53362 8a.Drainage Analysis 106 21 0 0 85 0 0 0 0 0 0 106 $6,465 560.98 Rb.Drainage Plans 214 43 43 43 2 43 21 0 0 0 0 214 $10,815 550.54 7.Utilities24 0 0 0 0 24 0 0 0 0 24 $600 52500 8.Environmental Permits,Compliance 6 Clearances 0 0 0 0 0 0 0 0 0 0 0 $0 tO S/Oi 9.Structures-Misc.Tasks,Digs.Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 $0 IDIV0 tO.Structures-Bridge Development Report 0 0 0 0 0 0 0 0 O 0 0 SO *010/0! It Structures.Temporary fledge 0 0 0 0 0 0 0 0 0 0 0 50 *010/0! 12.Structures-Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 50 *010/01 13.Structures-Medium Span Concrete Bodge 0 0 0 0 0 0 0 0 0 0 0 SO *DIV/0! 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 SO *010/01 15.Structures-Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 SO *010/0! 16.Structures Movable Span 0 0 0 0 0 N0 0 0 0 0 0 SO *01010! 17.Shuceres-Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 50 *019/0! 18.Structures-Miscellaneous 0 0 0 0 0 0 50 *050101 19.Signing 6 Pavemeht Marking Analysis 58 12 12 12 10 6 0 0 0 0 58 $2988 551.17 20.Signing 6 Pavement Marking F5 Plans 27 0 0 11 0 0 0 0 27 5096 533.19 21.Signelee$an Analysis 29 6 6 6 5 13 0 0 0 0 29 Sr 164 $51.17 22.Sgnaleanon Plans 22 0 0 4 9 9 0 0 0 0 2 $728 $33.09 21 Lighting Analysis 0 0 0 0 0 0 0 0 0 0 SO :1015/01 24 Lighting Plans 0 0 0 0 0 0 0 0 0 0 SO *015/01 25 Landscape Architecture Analyse 0 0 0 0 0 0 0 0 0 0 S0 *DIV/01 28.Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 So *0I5/01 2n.Surrey(Field 6.Office Support) 0 0 0 0 0 0 0 0 0 0 SO *0150 28.Photogramnretry 0 0 0 0 0 0 0 0 0 0 $0 *010/01 29.Moping 0 0 0 0 0 0 0 0 0 0 SO *010/01 30.Terrestrial Mobile ODOR 0 0 0 0 0 0 0 0 0 0 SO *DIV/O 31.Architecture Development 0 0 0 11 0 0 0 0 0 0 $0 *015/0 32 Noise Barters Impel Design Assessment 0 0 0 0 0 0 0 0 0 0 SO IDIS/01 33.Intelligent Transprteoon Systems Analyse 0 0 0 0 0 0 0 0 0 0 50 *015/01 34.InteltgenO Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 50 $015/0! 35.Geotechrknal 0 0 0 0 0 0 0 SO *DIV/01 Total Staff Hours 811 121 100 136 135 170 149 0 0 0 0 811 Total Staff Cost $786500 $5,80000 57916.00 58,100.00 $5.27000 $3725.0 $000 SOW 5000 50.00 5000 5000 $38.376.00 547.32 Clank= 038,37600 Survey Field Days by Subconsukant SALARY RELATED COSTS: $38,376.00 4-Person Crew'. OVERHEAD: 163 76% 562.844.54 OPERATING MARGIN: 30.5% $1437476 Noes' FCCM(Faulilies Capel Cost Morsel' 0.767% 5294.34 1.This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 50.00 Aman crew 2.Manually enter fee from each subc0nsu8ant.Unused stbconsuEant rows may be hidden. Survey(Field-if by Prime, 0 days A S /clay $000 SUBTOTAL ESTIMATED FEE: 8118,288.64 Subconsultant Enter Name Sub 1 $0.00 Subconsultant Sub2 $000 Subconsutnt Sub3 2000 Subconsulent.5ub4 woo Subconsuent Subs SODS S18cansu881R:Sub8 $000 Subconsugant Sub 7 50.00 SWconsultant Sub 8 $0.00 Subconvdent Sub9 $0.00 Sub0onsAent'Sub 10 $000 Subconsultant Sub 11 $0.00 Subconsutnt Sub12 $0.00 SUBTOTAL ESTIMATED FEE: $118.261.5 Geotechnical Field and Lab Testing 5000 SUBTOTAL ESTIMATED FEE: S111,261.M Optional Services SOLO GRAND TOTAL ESTIMATED FEE: $111,261.64 2018 11 10 Ir anCreekFeePI lntenmSMb FeeProp0sel REI Fee 9M+t-erne Page 19.01 11/10621A6 3'.34 PM Project Activity 4:Roadway Analysis Estimator CR Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase 1 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Units No of Units Hours/Unit Total Comments No. Hours 4.1 Typical Section Package LS 1 a 42 Pavement Type Selection Report LS 1 0 0 43 Pavement Design Package LS 1 0 0 4.4 Cross-Slope Correction LS 1 0 0 4.5 Horizontal Nertcal Master Design Files LS 1 45 45 240 hrs/mile x 0.186 miles=45 hrs 4.8 Access Management LS 1 0 0 4.7 Roundabout Evaluation LS 1 0 0 4.8 Roundabout Final Design Analysis LS 1 0 0 4.9 Cross Section Design Files LS 1 0 0 4.10 Traffic Control Analysis LS 1 40 40 Level Ill-Low Range-40 hrs 4.11 Master TCP Design Files LS 1 40 40 Low range-4 Phases 4.t2 Design Variations and Exceptions LS 0 0 0 4.13 Design Report LS 1 0 0 4.14 Quantities LS 1 36 36 Low Range 4.15 Cost Estimate LS 1 0 0 418 Technical Special Provisions LS 1 0 0 4.17 Other Roadway Analyses LS 1 0 0 Roadway Analysis Technical Subtotal 161 4.18 Field Reviews LS 2 8 16 4.19 Monitor Existing Structures LS 1 0 0 2016_11_10_IndianCreek Fee_Pl_IMerimSouth FeeProposal_REI 4.Roadway Analyst _ _ Page S of 19 tide/2016 Proiect Activity 4I Roadway Analysis Task Task Units No of Units Hours/Unit TOtI Comments No. Hours 4.20 Technical Meetings LS I 0 0 4.21 Quality Assurance/Quality Control LS % 5% 8 4.22 Independent Peer Review LS % 0% 0 4.23 Supervision LS % 5% 8 Roadway Analysis Nontechnical Subtotal 32 4.24 Coordinator LS % 4 4.Roadway Analysis Total 197 Technical Meetings Units No of Units Hours/Unit HoTourstal PM Attendance at Meeting Required? Number Typical Section EA t f 4 no 0 Pavement EA I 4 4 no 0 Access Management EA 0 0 0 0 15%Line and Grade EA 2 4 8 yes 1 Driveways EA 0 0 0 0 Local Governments(cites,counties,MPO) EA 2 4 8 yes - WorkZoneTratBcControl EA 0 0 0 0 30/60/90/100%Comment Review Meetings EA 2 4 8 yes 3 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 32 Subtotal Project Manager Meetings 6 Progress Meetings It required by FDOT) EA .i 0 PM attendance at Progress Meetings Is manually entered on General Task 3 -- Phase Review Meetings EA 0 PM attendance at Phase Review Meetings Is manually entered on General Task 3 -- Total Meetings 32 Total Project Manager Meetings(carries to Tab 3) 6 2018_11_10_IndianCreek_Fee P1_InterimSouth FeeProposal_REI 4.Roadway Analysis — Page Sof 19 1100/2016 Project Activity 5:Roadway Plans Estimator Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature I Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/Unit Total No. Task Scale Units Units or Comments Sheet or Sheet Hours 5.1 Key Sheet Sheet 1 3 8 5.2 Summary of Pay Items Including Quantity Input Sheet 1 16 16 5.3 Typical Section Sheets 5.3.1 Typical Sections EA 2 10 20 5.3.2 Typical Section Details EA 0 0 5.4 General Notes/Pay Item Notes Sheet 1 8 8 5.5 Summary of Quantities Sheets Sheet 0 0 5.6 Project Layout Sheet 0 0 5.7 Plan/Profile Sheet Sheet 3 6 18 3 Drainage Plan/Profile Plan Sheets 5.8 Profile Sheet Sheet 0 0 5.9 Plan Sheet Sheet 1 4 4 Roadway Restoration Plan 5.10 Special Profile Sheet 0 0 5.11 Back-of-Sidewalk Profile Sheet Sheet 0 0 5.12 Interchange Layout Sheet Sheet 0 0 5.13 Ramp Terminal Details(Plan View) Sheet 0 0 5.14 Intersection Layout Details Sheet 0 0 5.15 Special Details BA 0 0 5.16 Cross-Section Pattern Sheet(s) Sheet 0 0 2016_11 10_IndianCreek_Fee_Pl_InterimSouth_FeeProposal_REI 5.Roadway Plans Page 7 of 19 11/10/2018 Project Activity 5:Roadway Plans Task No.of Hours/Unit Total No. Task Scale Units Units or Comments or Sheet Hours Sheet 5.17 Roadway Soil Survey Sheet(s) Sheet 0 0 5.18 Cross Sections EA 60 0 5.19 Temporary Traffic Control Plan Sheets Sheet 4 8 32 4 Phases-1 sheet each phase 5.20 Temporary Traffic Control Cross Section Sheets EA 0 0 5.21 Temporary Traffic Control Detail Sheets Sheet I 8 8 TCP General Notes 5.22 Utility Adjustment Sheets Sheet 0 0 5.23 Selective Clearing and Grubbing Sheet(s) Sheet 0 0 5.24 Project Network Control Sheet(s) Sheet 1 1 4 5.25 Environmental Detail Sheets Sheet 0 0 5.26 Utility Verification Sheet(s)(SUE Data) Sheet 1 4 4 Roadway Plans Technical Subtotal 122 5.27 Quality Assurance/Quality Control LS % 5, 6 5.28 Supervision LS % .5."': 6 5.Roadway Plans Total 134 2016_11_10_IndianCreek_Fee_P1_InterimSouth_FeeProposal_RE I 5.Roadway Plans Page 8 of 19 11/10/2016 Project Activity 6a:Drainage Analysis Estimator CR Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Units No of Units Hours/Unit Total Comments No. Hours 6a.1 Drainage Map Hydrology Per Map 0 0 Ba.2 Base Clearance Report Per Location 0 0 6a.3 Pond Siting Analysis and Report Per Basin 0 0 6a.4 Design of Cross Drains EA 0 0 6a.5 Design of Ditches Per Ditch 0 0 Mile tat Design of Stormwater Management Facility(Offsite or EA 0 0 Infield Pond) 6a.7 Design of Stormwater Management Facility(Roadside Per Cell 0 0 Ditch as Linear Pond) Per 6a.8 Design of Floodplain Compensation Floodplain 0 0 Basin Includes the evaluation 8 analysis for 22-new drainage structures within Collins Ave.from 25 St to 26 St. 6a.9 Design of Storm Drains EA 22 2 44 (Includes Collins at 26 St.Intersection drainage improvements 8 Collins from 25 St to 28 St 72"trunkline construction to(be build to meet interim conditon and to later transdon into ultimate conditon)working under gravity flow conditions 6a.10 Optional Culvert Material EA 1 8 8 6a.11 French Drain Systems Per Cell 0 0 6a.12 Drainage Wells EA 0 0 Ba.13 Drainage Design Documentation Report LS 0 0 6a.14 Bridge Hydraulic Report EA 0 0 2016_11_10_Ind ianCreek_Fee_P1_InterimSouth_FeeProposal_REI ea.Drainage Analysis 9 of 19 11/102016 Project Activity 6a:Drainage Analysis Task Task Units No of Units Hours/Unit Total Comments No. Hours 6.15 Temporary Drainage Analysis LS 1 24 24 Includes evaluation to maintain drainage during construction as well the drainage interphase between the newly constructed 72"trunk-line and the e>usting side-street drainage 6.16 Cost Estimate LS 0 0 6a.17 Technical Special Provisions LS 0 0 6a.18 Other Drainage Analysis LS 0 0 Drainage Analysis Technical Subtotal 76 6a.19 Field Reviews LS 5 4 20 Coordination with contractor during construction-Estimated 5 field review meetings 6a.20 Technical Meetings LS 1 0 0 Meetings are listed below 6a21 Environmental Look-Around(ELA)Meeting LS 1 0 0 6a.22 Quality Assurance/Quality Control LS % 5% 4 6.23 Independent Peer Review LS % 0% 0 6a.24 Supervision LS % 5% 4 Drainage Analysis Nontechnical Subtotal 28 6a.25 Coordination LS % 2 2 6a.Drainage Analysis Total 106 Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Base Clearance Water Elevation EA 0 0 0 0 Pond Siting EA 0 0 0 0 Agency EA 0 0 0 0 Local Govemments(cities,counties) EA 0 0 0 0 FOOT Drainage EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 0 Progress Meetings(if required by FDOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 3 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 2016_11_10_Ind ianCreek_Fee_P1_Interi mSouth_FeeProposal_REI 6a.Drainage Analysis 10 of 19 11/10/2016 6b.Drainaae Plans Estimator CR Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature I Date FDOT District Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No.of Units Hours/Unit Total Hours Comments No. or Sheet or Sheet Sb.1 Drainage Map(Including Interchanges) Sheet 1 24 24 6b 2 Bridge Hydraulics Recommendation Sheets Sheet 0 0 0 6b.3 Summary of Drainage Structures Sheet 1 24 24 6b.4 Optional Pipe/Culvert Material Sheet6 8 6b.5 Drainage Structure Sheet(s)(Per Structure) EA 223 66 65.6 Miscellaneous Drainage Detail Sheets Sheet 3 24 72 6b.7 Lateral Ditch Plan/Profile Sheet 3 0 0 Sb.8 Lateral Ditch Cross Sections EA 0 0 0 6b.9 Retention/Detention Ponds Detail Sheet(s) Sheet 0 0 0 6b.10 Retention Pond Cross Sections EA 0 0 0 Sb.11 Erosion Control Plan Sheet(s) Sheet 0 0 0 6b.12 SWPPP Sheet(s) Sheet 0 0 0 Drainage Plans Technical Subtotal 194 6b.13 Quality Assurance/Quality Control LS % 5% 10 6b-14 Supervision LS % 5.0 10 6.Drainage Plans Total 214 2016_11_10 IndianCreek_Fee_P 1_InterimSouth_FeeProposal_R EI 6b.Drainage Plans Page 11 of 19 11/10/2016 project Activity 7:Utilitieg Estimator. Indian Creek Dnve from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Total Task Units No of Units Hours/Unit Hours Comments No.7.1 Utility Kickoff Meeting LS 0 0 7.2 Identify Emoting Utility Agency Owners(UAO(s)) LS 0 0 7.3 Make Utility Contacts LS 0 0 7.4 Exception Processing LS 0 0 7.5 Preliminary Utility Meeting LS 0 0 7.6 Individual/Field Meetings LS 1 0 7.7 Collect and Review Plans and Data from UAO(s) LS 8 0 7.8 Subordination of Easements Coordination LS 0 0 7.9 Utility Design Meeting LS 0 0 7.10 Review Utility Markups&Work Schedules,and LS 0 0 Processing of Schedules&Agreements 7.11 Utility Coordination/Followup LS 0 0 7.12 Utility Constructability Review LS 0 0 7.13 Additional Utility Services LS 0 0 7.14 Processing Utility Work by Highway Contractor(UWHC) LS 0 0 7.15 Contract Plans to UAO(s) LS 0 0 7.16 Certification/Close-Out LS 0 0 7.17 Other Utilities LS I 24 Utility Coordination with UAO's 7.Utilities Total 24 2016 11_10_IndianCreek_Fee_P 1_InterimSouth_FeeProposal_REI 7 Utilities Page 12 of 19 11/100016 Project Activity 7:Utilities Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Kickoff(see 7.1) EA0 0 3 Preliminary Meeting(see 7.5) EA0 J 0 0 Individual UAO Meetings(see 7.6) EA 0 0 0 0 Field Meetings(see 7.6) EA0 0 0 0 Design Meeting(see 7.9) EA0 0 0 0 Other Meetings(this is automatically added into Utilities Total EA .. 0 (cell F27)) , Total Meetings I I I I 0 I Total Project Manager Meetings(carries to Tab 3)1 0 2018_11_I 0_IndianCreek_Fee_P1_InteriinSouth_FeeProposal_RE I 7.U6liees Page 13 of 19 Project Activity 19:Sinning and Pavement Marking Analysis Estimator CR Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Units No.of Hours/ Total Comments No. Units Units Hours 19.1 Traffic Data Analysis LS1 0 192 No Passing Zone Study LS 1 0 19.3 Reference and Master Design File LS 1 0 19.4 Multi-Post Sign Support Calculations EA1 dl 41 30 hrs to set up+60 hrs/mile x 0.186 miles=41 hrs 19.5 Sign Panel Design Analysis EA1 0 19.6 Sign Lighting/Electrical Calculations EA1 0 19.7 Quantities LS1 4 4 19.8 Cost Estimate LS1 0 19.9 Technical Special Provisions LS1 0 19.10 Other Signing and Pavement Marking LS1 0 Signing and Pavement Marking Analysis Technical Subtotal 45 19.11 Field Reviews LS1 3 8 19.12 Technical Meetings LS1 0 0 Meetings are listed below 19.13 Quality Assurance/Quality Control LS % 5% 2 19.14 Independent Peer Review LS % 0% 0 19.15 Supervision LS % 5% 2 Signing and Pavement Marking Analysis Nontechnical Subtotal 12 19.16 Coordination LS % 2°'., 1 19.Signing and Pavement Marking Analysis Total 58 2016_11_10_In dianCreek_Fee_P 1_Interims outh_FeeProposal_R E I 19.Signing 8 Marking Analysis Page 14 or 19 11/10/2016 Proiect Activity 19:Signing and Pavement Marking Analysis Task Task Units No.of Hours/ Total Comments No. Units Units Hours Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Sign Panel Design EA1 0 0 no Queue Length Analysis EA 0 0 0 Local Governments(cities,counties) EA0 0 0 Other Meetings EA b r, 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings li Progress Meetings(if required by FDOT) Ed 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings Ed 0 PM attendance at Phase Review Meetings is manually entered on Genera/Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 251t_11_10_I ndianC reek_Fee_P 1_I nterimSouth_FeeProposal_RE I 19.Signing a Marking Analysis Page 15 of 19 11/102016 Project Activity 20:Signing and Pavement Marking Plans Estimator: Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Intenm Phase I 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No of Units Hours/Unit Sheets Total Hours Comments 20.1 Key Sheet Sheet 1 4 1 4 20.2 Summary of Pay Items Including TRNS.Port Input LS 1 0 20.3 Tabulation of Quanhtes Sheet 1 12 1 12 20.4 General Notes/Pay Item Notes Sheet 1 1 1 4 20.5 Protect Layout Sheet 0 1 0 0 20.6 Plan Sheet Sheet 1 5 1 5 1 sheet 20.7 Typical Details EA 0 ) 0 20.8 Guide Sign Worksheet(s) EA 2 4 0 20.9 Tragic Monitoring Site EA 0 3 0 20.10 Cross Sections EA 0 ai 0 20.11 Special Service Point Details EA 0 0 0 20.12 Special Details LS 0 0 0 20.13 Interim Standards LS 0 0 0 Signing and Pavement Marking Plans Technical Subtotal 4 25 20.14 Quality Assurance/Quality Control LS % 54a 1 20.15 Supervision LS % :0 1 20.Signing and Pavement Marking Plans Total 4 27 2018_11 10_IndianCreek_Fee P1_InlerimSouth_FeeProposal_REI 20.Signing 8 Marking Plans Page 16 of 19 11/10/2016 Project Activity 21:Sionalization Analysis Estimator: Indian Creek Drive from 25th Street to 26th Street and Colins Avenue-Interim Phase I 429228-2-58-01 Representing Print Name Signature!Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/ No. Task Units Units Units Total Hours Comments 21.1 Traffic Data Collection LS 1 0 21.2 Traffic Data Analysis PI 0 0 21.3 Signal Warrant Study LS1 0 21.4 System Timings LS1 0 21.5 Reference and Master Signalization Design File PI1 22 22 Low range-I signalized intersection at Collins Avenue and 26 Street 21 6 Reference and Master Interconnect Communication LS 1 0 Design File 21.7 Overhead Street Name Sign Design EA 0 0 21.8 Pole Elevation Analysis LS1 0 21.9 Traffic Signal Operation Report LS 1 0 21.10 Quantities LS 1 4 4 Low range-1 signalized intersection at Collins Avenue and 26 Street 21.11 Cost Estimate LS1 0 21.12 Technical Special Provisions LS1 0 21.13 Other Signalization Analysis LS 1 0 Signalization Analysis Technical Subtotal 26 21.14 Field Reviews LS1 0 0 21.15 Technical Meetings LS 1 0 0 Meetings are listed below;Miami Dade County Signals 21.16 Quality Assurance/Quality Control LS % 5% 1 21.17 Independent Peer Review LS % 0% 0 21.18 Supervision LS % 5% 1 Signalization Analysis Nontechnical Subtotal 2 • 2016_11_10_IndianCreek_Fee_P1_InterirnSouth_FeeProposalREI 21.Signalizeton Analysis Page 17 of 19 11/10/2016 Project Activity 21:Sionalization Analysis 21.19 Coordination LS % 2°:b 1 21.Signalization Analysis Total 29 Technical Meetings Units No of Units Hours/Unit Total Hours PM Attendance at Meeting Required? Number FDOT Traffic Operations EA 0 0 0 0 FOOT Traffic Design EA 0 0 0 0 Power Company(service point coordination) EA 0 0 0 0 Maintaining Agency(cities,counties) EA 0 0 0 0 Railroads EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings 0 Progress Meetings(if required by FDOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 • • 2016r 1_10_IndanCreekFee P1 InterimSouth_FeeProposal_REI 21.Signalization Analysis Page 18 of 19 11110/2016 a1 Proiect Activity 22:Siunalization Plan@ Estimator: Indian Creek Drive from 25th Street to 26th Street and Collins Avenue-Intenm Phase I 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No of Units Hours/Unit She sf Total Hours Comments 22.1 Key Sheet Sheet 1 4 1 4 22 2 Summary of Pay Items Including Designer Interface Sheet 0 0 0 0 (TRNS•Port)Input 22.3 Tabulation of Quantities Sheet 1 9 1 6 22.4 General Notes/Pay Item Notes Sheet 1 1 1 4 22.5 Plan Sheet Sheet 1 4 1 4 Low range-1 signalized intersection at Collins Avenue and 26 Street 22.6 Interconnect Plans Sheet 0 0 0 0 22.7 Traffic Monitoring Site EA 0 3 0 22.8 Guide Sign Worksheet EA 0 0 0 22.9 Special Details Sheet 0 0 0 0 22.10 Special Service Point Details EA 0 0 0 22.11 Mast Arm/Monotube Tabulation Sheet PI 0 0 0 22.12 Strain Pole Schedule PI 0 0 0 22.13 TCP Signal(Temporary) EA 0 0 0 22.14 Temporary Detection Sheet PI 0 0 0 22.15 Utility Conflict Sheet Sheet 0 0 0 0 22.16 Interim Standards LS 1 0 0 Signalization Plans Technical Subtotal 4 20 22.17 Quality Assurance/Quality Control LS % ,... 1 22.18 Supervision LS % 5.% 1 22.Signalization Plans Total 4 22 2016_11 10_Indian0reek Fee P1 intenmSouth_FeeProposal_REI 22.Signalization Plans Page 19 of 19 1110/2016 Project Staff Hour Summary Name of Consultant Ribbeck Engineering,Inc. Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Project Staff Hours Activity Activity Ribbeck Enter Name bub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub& Sub 9 Sub 10 Sub 11 Sub 12 Total Hours NO. Engineering Sub 1 3 Project Common and General Tasks 0 0 4 Roadway Analysis 788 788 5 Roadway Plans 656 656 6a Drainage Analysis 516 516 6b Drainage Plans 630 630 7 Utilities 40 40 8 Env.Permits,Compliance&Clearances 0 0 9 Structures-Summary,Misc.Tasks,Dwgs 0 0 10 BDR 0 0 11 Temporary Bridge 0 0 12 Short Span Concrete Bridge 0 0 13 Medium Span Concrete Bridge 0 0 14 Structural Steel Bridge 0 0 15 Segmental Concrete Bridge 0 0 16 Movable Span 0 0 17 Retaining Walls 0 0 18 Miscellaneous Structures 0 0 19 Signing&Pavement Marking Analysis 210 210 20 Signing&Pavement Marking Plans 114 114 21 Signalizatian Analysis 157 157 22 Signalization Plans 40 40 23 Lighting Analysis 0 0 24 Lighting Plans 0 0 25 Landscape Architecture Analysis 0 0 26 Landscape Architecture Plans 0 0 27 Survey-Field and Office Support 0 0 28 Photogrammetry 0 0 29 Mapping 0 0 30 Terrestrial Mobile LiDAR 0 0 31 Architecture Development 0 0 32 Noise Barriers Impact Design Assessment 0 0 33 ITS Analysis 0 0 34 ITS Plans 0 0 35 Geotechnical 0 0 Project Total 3,151 0 0 0 0 0 0 0 0 0 0 0 3,151 27 'Survey Field Crew Days 0 0 Notes. 1 Staff hours for prime consultant come directly from each discipline's worksheet. 2 Staff hours for subconsultants are to be entered manually into columns D through O. 3.For workbooks prepared by subconsultants,their project hours will be totaled in column C. 2016_12_20_IndianCreek_Fee_P3_InterimNorth_FeeProposal REI Summary Page 1 0111 4/10/2017 1 I ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number: 429228-2-58-01 Project Name: Indian Creek Drive horn 26th Street to 41• Ribbeck Engineenng FAP Number: TBD Date 4/10/2017 Name of Consultant: Ribbeck Engineering,Inc. ) Swa . WMm., EMPLOYEE CLASSISCAMON TOTAL ; -ssss„,,,, ACTIVITY sham STAFF HOURS ON GADO I Project Sr Project Project sr s iseer Engineer sr...ner Staff Class, Staff Classi- Staff CLassi- Staff Classi-Staff Class-Staff Classi- 1 Firm T. Manager Engineer Engineer ' N Intern ' g fication 7 ficabon 8 fication 9 fication 10 fication 11 fication 12 RANGE 1 mays Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours I PERCENT ; , 1 Project General and Project Common Tasks 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 ) 4.Roadway Analysis 788 158 158 158 79 157 78 0 o 0 0 0 0 788 867 5.Roadway Plans 656 0 o 131 0 262 263 o o o 0 o o 656 722 . 6A Drainage Analysis 516 103 .. 0 o 413 0 o o 0 o o 0 0 516 568 6b.Drainage Plans 630 126 126 126 63 126 63 0 0 0 o 0 0 630 693 7.Utilities 40 0 o 0 o 0 40 0 o 0 o o o 40 44 • 8.Environmental Permits,Compliance&Clearances o 0 0 0 0 0 0 0 0 o 0 0 o 0 0 9.Structures-Misc.Tasks.Dogs.Non-Techo o :. 0 o o 0 o o 0 o o 0 o o 0 10 Structures-Bridge Development Report 0 0 0 0 0 0 o 0 0 0 0 0 0 o 0 11.Structures-Temporary Bridge 0 0 o 0 o 0 0 o o 0 o o 0 0 o 12.Structures-Short Span Concrete Bridge 0 0 0 0 0 o 0 0 o o 0 0 o 0 0 13.Structures-Medium Span Concrete Bridge 0 o o 0 o 0 o o 0 0 o o 0 0 0 1 14.Structures-Structural Steel Bridge 0 0 o 0 o 0 0 0 o 0 0 o 0 0 o 15.Structures-Segmental Concrete Bridge o 0 o o 0 0 0 0 0 ;., 0 0 o o , 0 j0 16 Structures-Movable Span 0 0 o 0 0 0 0 0 o 0 0 o 0 0 o 17.Structures-Retaining Walls 0 0 0 o 0 0 0 0 0 o 0 0 0 0 o 10 Structures-Miscellaneous o 0 0 o 0 0 0 0 0 o 0 0 ... 0 0 0 19.Signing&Pavement Marking Analysis 210 42 42 42 21 42 21 o o 0 0 o o 210 231 20.Signing&Pavement Marking Plans 114 0 o 23 o 45 46 0 o 0 0 o 0 114 125 .., 21.Signalization Analysis 157 31 31 31 16 32 16 0 o 0 0 o 0 157 173 22.Signalization Plans 40 0 , 0 el o 16 16 0 0 0 o 0 0 40 I 44 23.Lighting Analysis 0 o o 0 o 0 0 0 0 o o o o 0 o 24.Lighting Flans o 0 0 o 0 0 0 0 0 o 0 0 0 0 o 25 Landscape Architecture Analysis o 0 0 0 0 0 o o 0 o 0 0 0 0 0 26.Landscape Architecture Plans 0 0 o 0 0 o 0 0 0 0 0 0 o 0 0 27.Surrey(Field&Orrice Support) 0 o 0 0 0 0 o o 0 0 0 o 0 0 o 28.Photogrammetry 0 o 0 0 o 0 o o o 0 o o 0 0 I o 29.Mapping 0 o 0 0 o 0 o 0 0 0 o o 0 0 o 30 Terrestrial Mobile LiDAR o 0 o o 0 o 0 0 0 0 0 0 o o 0 ; 31.Architecture Development o o 0 o 0 o 0 0 0 o o 0 0 o 0 32.Noise Barriers Impact Design Assessment o 0 0 .., 0 0 o 0 0 0 o o 0 0 o 0 33 Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 o 0 0 0 o 0 0 34.Intelligent Transportation Systems Plans 0 o o 0 o 0 o o o .0 0 o 0 0 o 35.Geotechrical o 0 0 o 0 o 0 0 0 0 o 0 0 o 0 TOTALS 3.151 460 357 519 592 680 543 0 0 0 o 0 0 3,181 3,447 Field Spry.,FAimets- Notes: 0 4-man crew days FIRM TOTAL 3,151 1 3,447 1.Thia worksheet provides the distribution or aagialsrlal staff hours bra project. 1 Percentages rerun hour distribution by classification are entered below in rows 03 to 96 of this shoat. 3.Total Stoll TIMAS(column 01 may not match staff Imurs from Summary worksheet(column EP due to rounding.Statt hours calculated Mr employee classrfications ere to be eMusted so toOls ln columns 13 and 0 match. 4 Forrn.s under'Total Staff Hours Range(columns 0 8 P)may be adjusted to amide desired range. yaw.aorse -PEI 1.0•24.11.1 VOMIT Wale • ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number 429228-2-58-01 Protect Name Indian Creek Drrve from 26th Street to 41 FAP Number. TBD Date. 4/10/2012 Name of Consultant Ribbeck Engineering,Inc. Staff Hour Distribution Percentages-Finn Total Hass from •isumwr skew Project Sr Project Project Engineer Staff Classi- Staff Classi- Staff Classi- Staff Classi-Staff Classi- Staff Clasei- i Frr Tatal Manager Engineer Engineer Sr.Engineer Intern Sr.Designer fication 7 ficafion 8 Soaker)Soaker)9 ficatIon 10 fication 11 Section 12 Total 3.Project General and Project Common Tasks 0 00% 00% 00% 00% 0.0% 0.0% 0.0% 00% 00% i 0.0% 00% 0.00% 4 Roadway Analysis 788 20.0% ' 100% 20.0% 10.0% 0.0% 00°'- '2% 0.0% 00% 0.0% 100.00% 5.Roadway Plans 656 00% 0.0% 40.0% 40.0% 0.0% 00 0.0% 00' 0.0% 100.00% 6.Drainage Analysis 516 200, .. 80.0% 0.0% 0.0% 0.0% 0 3 00% 5.. 00% 100.00% 6b.Drainage Plans 630 20.0°' '.0% 100% 20.0% 10.0% 0.0% 0 77 0 0% 100.00% 7.Utilities 40 0.0% J0% 0.0% 0.0% '00.0% 0.0% 0.0 70% 0 J'Sc 100.00% 8.Environmental Permits.Compliance&Clearances 0 0.0% 0.0% no% 00% 0.0% 0.0 :0% 0.0% 0.00% 9.Structures-Misc.Tasks,Dwgs,Non-Tech. 0 0.0% 0 0.0% 00% 0.0% 0.0% 0.0 ;3% 0.0% 0.00% 10.Structures-Bridge Development Report 0 0.0% 0.0% 0.0% 0.0% 0.... 'Cv" 00% 0.00% 11.Structures-Temporary Bridge 0 00% 0 0.0% 00% 0.0% 004 0.00% 12.Structures-Short Span Concrete Bridge 0 00% 00-.a 0.0% 00% 0.0% 00% .. 000% 13.Structures-Medium Span Concrete Bridge 0 0 O% 0.0% 0.0% D 0% 00% 0 0% 0:: 0.0% : 000% 14.Structures-Structural Steel Bridge 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0- 0.0% 000% 15.Structures-Segmental Concrete Bridge 0 0.0% 0.0% 0.0% 00% 00% 0.0'16 03 00°1. 0.00% 16.Structures-Movable Span 0 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0 0 • 0.00% 17.Structures-Retaining Walls 0 00% 00% 0.0% 0.0% 00% 0.0% 004, 000% 18.Structures-Miscellaneous 0 00% 00% 0.0% 0.0% 0.0% 0.0% .i% 0.00% 19.Signing&Pavement Marking Analysis 210 200% 202" 100% 20.0% 10.0% 0.0% 0.0% 00% ]0% 100.00% 20.Signing&Pavement Marking Plans 114 0.0% 0 0% :.° 40.0% 40.0% 0.0% 0.0% 0 100.00% 21.Signalization Analysis 157 200% 20.0% 20.0% 10 0% 0.0% 0.0% 100.00% 22.Signalization Plans 40 00% 0 0% 40.0% 40.0% 0.0% 0.0% 00 . , 0 0% 100.00% 23.Lighting Analysis 0 00% .. 0.0% 0.0% 00% 00% 0.0% ., .J% 00% 0.00% 24 Lighting Plans 0 00% 0 5- . ,.= 0.0% 00% 0.0% 0.0% 0.0% 0 2 3 0% 00% 0.00% 25.Landscape Architecture Analysis 0 0.0% 0.0% 0.0% 04% 0.0% 00% 0.0% 0.0% 0.0% 00% 00% 0.0% 0.00% 26 Landscape Architecture Plans 0 0.0% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 27.Survey(Field&Office Support) 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.00% 28 Photogrammetry 0 00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%o .0% 0.0%0.0%o% .0% 00°6o00°60.0% 0°6 0.0% 0.0076 29.Map p g 0 0.0% 00% 0.0% 0.0% 0.0% 00% 0.0%o .0% 0.0% 00% 0.0% 0.0% 0.00%30.Terre5trial Mob'le LDAR 0 0.0% 0.0% '0'< 0.0% 00 0.0% 00% 2.0% 00"f. 0.0% 00°% 0.0% 0.00% 31.A hit cte Development0 0.0% 00% 0.0% 0 0 0.0%0 .0% 0.0%o .0% 0.0% 0.0% 0.0% 0.0% 0.00% 32.Noise Barriers Impact Design Assessment 0 00% 0.0% 00• 0.0% 00 00% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.00°b 33.Intelligent Transportation Systems Analysis 0 0.0% 0.0% i 0.0%. 0.0% 00 '0°k 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.00% 34 Intelligent Transportation Systems Plans 0 0.0% 0.0% 0.0% 0.0% 00u. 5% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.00% • • 35.Geotechnical 0 0.0% 0.0% 0.0% 0.0% 00% 3% 00% 0.0% 0.0% 00% 00% 0.0% 0.00% x ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Project: Indian Creek Drive from 26th Street to 419 Street-Interim Phase 2 Consultant Name:Ribbeck Engineering,Inc. County: Miami-Dade nae.e....my Consultant No.: F-26-0460464 FP1-16- 4292262-58-01 Date: 4/10/2011 FAP No.: TBD Estimator: Carlos Ribbed,.P E 7111111.8 Project Sr Project Project Engineer SUR .Desi StaRLlasai- SU%Class]- SV%Class]- Staff Class]- Staff Llacsi- Staff Claasi- SX Salary Average Hours Fmm Manager Engineer Engineer ScSt.En glneer Ili r goer ficakon] fication 8 ficalion 9 fiction 10 fication it fication 13 By Lost By eata per 'SH Summary -Firm. 56500 55800 356.00 56000 53100 52500 SO 00 5000 $0 00 5000 5000 SOW Activity Activity Task 3.Protect General ant Project Common Tasks 0 0 0 0 0 0 0 0 0 0 0 0 $0 1010/0,. A Roadway Analysis 788 158 158 158 79 157 78 0 0 0 0 785 $39839 $50.56 5 Roadway Plans 656 0 0 131 0 262 263 0 0 0 0 856 $22,033 533.59 6a Drainage Analysis 516 103 0 0 413 0 0 0 0 0 0 518 $31,475 261.00 6b.Drainage Plans 630 126 126 128 126 63 o 0 0 0 63O $31,815 $50.50 ].Utilities o0 0 0 0 0 0 ro 0 0 00 40 $1.000 $25.00 B.Environmental NIT..Compliance B Clearances 0 0 0 0 0 0 0 0 0 0 0 0 $0 RDIVO! 9 Structures-Mac.Tesla,Wags.Non-Tech. 0 0 0 0 0 0 0 0 0 $0 MVO! 10.Strucwrez-Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 50 1DIV/0! 11.StrucMez-Temporary&age 0 0 0 0 0 0 0 0 0 0 0 0 50 1OV10! 12.Structures-Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 01 0 SO 100 13.Structures-Medium Span Concrete Bridge 0 0 0 0 O 0 0 0 0 0 0 0 50 800/0! 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 $0 001,01 15.Structures-Segmental Concrete One/ge 0 0 0 0 0 0 0 0 0 0 0 0 $0 R00I0! 16.Structures-Movable Span0 0 0 0 0 0 0 0 W e011/01 17.Structures-Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 50 100/0! 19 Strucc]ras-Mar<Ilanwus 0 0 0 0 0 0 0 0 $0 ROVIO! 19.Signing B Pavement Marking Analysis 210 42 42 42 21 42 21 0 0 0 0 210 510,605 $50.50 20.Signing&Pavement Marking Rens 114 0 0 23 0 45 46 0 0 0 0 114 $3,833 $33.62 21 Signalea0on Analysis 157 31 31 31 18 32 16 0 0 00 157 $1,901 $50.32 22.Signal¢ation Plans 40 00 8 0 18 16 0 0 0 0 40 $1,314 $33.60 23 LgMing Analysis 0 0 0 00 0 0 0 0 0 SO ]*0100 20 Lighting Rens 0 0 0 0 0 0 0 0 0 0 0 $0 R0V/01 25.Landscape Architecture Analysis 0 0 0 0 0 0 0 0 00 SO 10V/0i 26.Landscape Archeecture Rans 0 0 0 0 0 0 0 0 0 0 0 $0 100101 27 Survey(Field&gfice Support) 0 0 0 0 0 0 0 0 0 0 0 50 /LOOM 28.PM1atogrammeb00IM y 0 0 0 0 0 0 0 0 0 0 0 $0 4 29.Mepsng 0 0 0 0 0 0 0 0 0 0 0 $0 RDIV14 30.Tenwtrial MoO4e UDAR 0 0 0 0 0 0 0 0 $0 *00/01 31.Architecture Development 0 0 0 0 0 0 0 0 0 00 $O 0010/0! 32.Noise Barrens Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 SO IOu/B 33.Intelligent Transportation Systems Malysa 0 0 0 0 0 0 0 0 0 00 SO 11010/0! 34.Intelligent Transportation Systems Rens 0 0 0 0 0 0 0 0 0 0 0 SO 1100/0! 35.Geotechnical 0 0 0 0 0 0 0 0 0 0 0 $0 *DIV10! Total Staff lours 3.151 460 357 519 592 E80 543 0 0 0 0 0 0 3.151 Total Staff Cost $29.90000 $2070600 $29064.00 53552000 52108000 S13.575 00 $0.00 $0.00 50.00 50.00 5000 $000 $la9,8a5.00 $41.55 Check= $149,645.00 Survey F'el Days by Subc0mutant SALARY RELATED COSTS. $14984500 4-Person Crew'. OVERHEAD' 163 76% $245386.17 OPERATING MARGIN'. 38 5, $57,690.33 Notes- FCCM(Facsses Captal Cost Money): 0 767% $1,149.31 1.This sleet to be used by Prime Consultant to calculate the Gra.Total fee. ESIFENSES. $0.00 new 2.Manually enter fee from ea.subconsutant.Unused subcansutant rows may be hidden. Survey(F(Field-if by Prime) 0 days @ S - /day 50.00 SUBTOTAL ESTIMATED FEE: $450070.81 Subunsutant.Enter Name SW1 $000 Subconwtant:Sub2 $000 Subconsultant Sub3 $000 Subconwtant:Sub4 50.00 Subconsultant Subs $0.00 Subconsultant Sub6 $000 Subconwtant Sub] $0.00 Subconsutant Sub8 $0.00 Subconsultant Sub9 $0.00 Subconsutant Sub 10 $0.00 Subconwtant Sub 11 $0.00 Subunsutant Sub 12 50.00 SUBTOTAL ESTIMATED FEE: $454.010.81 Geotechnical Field and Lab Testing $0.00 SUBTOTAL ESTIMATED FEE: 5454,070.81 Optonal Services 5000 GRAND TOTAL ESTIMATED FEE: 2151.010.81 2018 12 20_IndanCreek_Fee_P3 Inter%Port FeePmpcael_PEI Fee 914/-Pnme agef1 d4 4/102017257 PM Project Activity 4:Roadway Analysis Estimator:CR Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Ribbeck Engineering Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Units No of Units Hours/Unit Hours Comments 4.1 Typical Section Package LS 1 0 0 4.2 Pavement Type Selection Report LS 1 0 0 4.3 Pavement Design Package LS 1 0 0 4.4 Cross-Slope Correction LS 1 0 0 240 hrs/mile x 0.75 mitt along mainline+200 hrs/mile x 0.72mi of side streets(0.09mi(28 Street)+0.08mi 4.5 Horizontal Nertical Master Design Files LS 1 310 310 (29 Street)+0.09mi(30 Street)+0.06mi(32 Street)+0.05mi(34 Street)+0 05mi(35 Street)+0.08 no(38 Street)+0.05mi(41 Street)+0.06mi(Collins Ave from 31 Street to 32 Street)+0.11 mi(Collins Ave from 36 Street to 38 Street)=240 hrs/mi x 0.75+180 hrs/mi x 0.72=310 hrs for restoration plans 4.6 Access Management LS 1 0 0 4.7 Roundabout Evaluation LS 1 0 0 4.8 Roundabout Final Design Analysis LS 1 0 0 4.9 Cross Section Design Files LS 1 60 60 Low Range @ 40 hrs x 2(every 50 5)x 0.75 miles=80 hrs 4.10 Traffic Control Analysis LS 1 80 80 Level III-Mid Range=80 hrs 4.11 Master TCP Design Files LS 1 159 159 2 Phases x 1.47 miles x 54 hrs/mile=165 hrs 4.12 Design Variations and Exceptions LS 0 0 0 4.13 Design Report LS 1 0 0 4.14 Quantities LS 1 80 80 Low Range 4.15 Cost Estimate LS 1 0 0 4.16 Technical Special Provisions LS 1 0 0 4.17 Other Roadway Analyses LS 1 0 0 Roadway Analysis Technical Subtotal 689 4.18 Field Reviews LS 2 8 16 4.19 Monitor Existing Structures LS 1 0 0 2016 12 20 IndianCreek_Fee_P3_InterimNorth_FeeProposal_REI 4.Roadway Analysis Page 5 of 11 x10/2017 Proiect Activity 4:Roadway Analysis Task Task Units No of Units Hours/Unit Hours Comments 4.20 Technical Meetings LS 1 0 0 4.21 Quality Assurance/Quality Control LS % 5% 34 4.22 Independent Peer Review LS % 0% 0 4.23 Supervision LS % 5h 34 Roadway Analysis Nontechnical Subtotal 84 4.24 Coordination LS % 2% 15 4.Roadway Analysis Total 788 Technical Meetings Units No of Units Hours/Unit Hours Toil PM Attendance at Meeting Required? Number Typical Section EA1 4 4 no 0 Pavement EAI 4 4 no Access Management EA 0 0 00 15%Line and Grade EA2 4 8 yes Driveways EA 0 0 0 0 Local Governments(cities,counties.MPO) EA 2 4 8 yes 2 Work Zone Traffic Control EA 0 0 0 0 30/60190/100%Comment Review Meetings EA2 4 8 yes 3 Other Meetings EA0 0 0 0 Subtotal Technical Meetings 32 Subtotal Project Manager Meetings 0 Progress Meetings 01 required by FOOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 32 Total Project Manager Meetings(carries to Tab 3) 8 7 2016_12_20_IndianCreek_Fee_P3_InterimNadh_FeeProposalREI 4 Roadway Analysis Page 6 of 11 4x10/201 Project Activity 5:Roadway Plans Estimator' Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing neck Engjnee Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/Unit Total No. Task Scale Units Units or Comments or Sheet Hours Sheet 5.1 Key Sheet Sheet I 3 8 5.2 Summary of Pay Items Including Quantity Input Sheet 2 '6 32 5.3 Typical Section Sheets 5.3.1 Typical Sections EA 210 20 5.3.2 Typical Section Details EA 0 0 5.4 General Notes/Pay Item Notes Sheet 1 8 8 5.5 Summary of Quantities Sheets Sheet 0 0 5.6 Project Layout Sheet 0 0 5.7 Plan/Profile Sheet Sheet 13 6 108 18 Drainage Plan/Profile Plan Sheets(8 along mainline*10 along side streets) 5.8 Profile Sheet Sheet 0 0 5.9 Plan Sheet Sheet 18 4 72 18 Roadway Restoration Plan(8 along mainline*10 along side streets) 5.10 Special Profile Sheet 0 0 5.11 Back-of-Sidewalk Profile Sheet Sheet 0 0 5.12 Interchange Layout Sheet Sheet 0 0 5.13 Ramp Terminal Details(Plan View) Sheet 0 0 5.14 Intersection Layout Details Sheet 0 0 5.15 Special Details EA 0 0 5.16 Cross-Section Pattem Sheet(s) Sheet 0 0 2016_12_20_IndianCreek_Fee_P3_InterimNorth_FeeProposal_REI 5.Roadway Plans Page 7 of 11 4/10/2017 Project Activity 5:Roadway Plans • Task No.of Hours/Unit Total No. Task Scale Units Units or Comments or Sheet Hours Sheet 5.17 Roadway Soil Survey Sheet(s) Sheet0 0 5.18 Cross Sections EA 80 0.25 20 Cross Sections along Indian Creek Drive(every 50 ft) 5.19 Temporary Traffic Control Plan Sheets Sheet 30 8 240 2 Phases x 15 sheet per phase(8 along mainline+7 along some side streets)=30 sheets x 8 j hrs/sheet=240 hrs 5.20 Temporary Traffic Control Cross Section Sheets EA 0 0 5.21 Temporary Traffic Control Detail Sheets Sheet 10 8 80 TCP General Notes,Pedestrian Detours,Vehicle Detours,TCP typicals and phasing 5.22 Utility Adjustment Sheets Sheet 0 0 5.23 Selective Clearing and Grubbing Sheet(s) Sheet 0 0 5.24 Project Network Control Sheet(s) Sheet 4 1 4 5.25 Environmental Detail Sheets Sheet 0 0 5.26 Utility Verification Sheet(s)(SUE Data) Sheet I 4 4 Roadway Plans Technical Subtotal 596 5.27 Quality Assurance/Quality Control LS % 5.. 30 5.28 Supervision LS % o., 30 5.Roadway Plans Total 656 2016_12_20_IndianCreek_Fee P3 InterimNorth_FeeProposal_REI 5.Roadway Plans Page 8 0111 4/10/2017 Project Activity 6a:Drainage Analysis Estimator:CR Indian Creek Dove from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference TNosk Total Task Units No of Units Hours/Unit Hours Comments 6a.1 Drainage Map Hydrology Per Map 6a.2 Base Clearance Report Per Location 0 0 0 6a.3 Pond Siting Analysis and Report Per Basin 0 0 0 6a.4 Design of Cross Drains EA 0 0 0 6a.5 Design of Ditches Per Ditch 0 0 0 Mile 6a.8 Design of Stormwater Management Facility(Offsite or EA 0 0 0 Inneld Pond) 6a.7 Design of Stormwater Management Facility(Roadside Per Cell 0 0 0 Ditch as Linear Pond) Per 6a.6 Design of Floodplain Compensation Floodplain 0 0 0 Basin Includes evaluation 8 analysis for 100-new drainage structures within Indian Creek mainline to be build(to meet 6a.9 Design of Storm Drains EA 150 2 300 interim conditon and to later transiton into ultimate condeon)8 50-additional structures within side-streets from Collins Ave to Indian Creek Dr.for new 72"trunk-line construction along mainline&24"pipe upsize along side streets working under gravity flow conditions 6a.10 Optional Culvert Material EA 1 8 8 6a.11 French Drain Systems Per Cell 0 0 0 6a.12 Drainage Wells EA 0 0 0 6a.13 Drainage Design Documentation Report LS 1 0 0 6a.14 Bridge Hydraulic Report EA 0 0 0 2016_12_14_IndianC reek_Fee_P3_I nterimNorth_FeeProposal_REt 6a.Drainage Analysis 9 of 19 12/14/2016 Project Activity 6a:Drainage Analysis TNosk Total Task Units No of Units Hours/Unit Hours Comments 6a.15 Temporary Drainage Analysis LS 1 30 80 Includes evaluation to maintain drainage during construction as well the drainage interphase between the newly constructed 72"trunk-line and the existing side-street drainage 6a.16 Cost Estimate LS 0 0 6a.17 Technical Special Provisions LS 0 0 6a.18 Other Drainage Analysis LS 0 0 Drainage Analysis Technical Subtotal 388 6a.19 Field Reviews LS 20 4 80 Coordination with contractor during construction-Estimated 20 field review meetings 8a.20 Technical Meetings LS 1 0 0 Meetings are listed below 6a.21 Environmental Look-Around(ELA)Meeting LS1 0 0 6a.22 Quality Assurance/Quality Control LS % 5% 19 6a.23 Independent Peer Review LS % 0% 0 6a.24 Supervision LS % 5% 19 Drainage Analysis Nontechnical Subtotal 118 6a.25 Coordination LS % 2% 10 6a.Drainage Analysis Total 516 Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Base Clearance Water Elevation EA 0 0 0 Pond Siting EA 0 0 0 0 Agency FA 0 0 0 0 Local Governments(cities,counties) FA 0 0 0 0 FDOT Drainage EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 0 Progress Meetings Of required by FDOT) EA0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3 0 Carnes m O.iv r,„s„�,o nn; 2016 12 14 IndianCreek_Fee_P3_InterimNorth_FeeProposal_RP I 6a Drainage Analysis 10 of 19 12/14/2016 6b.Drainage Plans Estimator CR Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Print Name Signature/Date FOOT District Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No.of Units Hours/Unit Total Hours Comments No. or Sheet or Sheet 6b.1 Drainage Map(Including Interchanges) Sheet 1 48 48 66.2 Bridge Hydraulics Recommendation Sheets Sheet 0 0 0 66.3 Summary of Drainage Structures Sheet 3 24 72 66.4 Optional Pipe/Culvert Material Sheet 1 4 8 66.5 Drainage Structure Sheet(s)(Per Structure) EA 100 3 300 66.6 Miscellaneous Drainage Detail Sheets Sheet 6 24 144 Drainage Detail Sheets. Pump Station Wet Pit(1),Outfall/Seawall Slot Structure(1),Pollution Control Structure(3 &Sluice Gate Details(1),Total=6-Sheets 66.7 Lateral Ditch Plan/Profile Sheet 0 0 0 66.8 Lateral Ditch Cross Sections EA 0 0 0 6119 Retention/Detention Ponds Detail Sheet(s) Sheet 0 0 0 6b 10 Retention Pond Cross Sections EA 0 0 0 6b 11 Erosion Control Plan Sheet(s) Sheet 0 0 0 Sb.12 SWPPP Sheet(s) Sheet 0 0 0 Drainage Plans Technical Subtotal 572 6b.13 Quality Assurance/Quality Control LS % 5% 29 Sb.14 Supervision LS % 5% 29 6.Drainage Plans Total 630 2016_72_74_IndianCreekFee P3 InterimNorthFeeProposal_REI 6b.Drainage Plans Page 11 of 19 12/14/2016 Project Activity 7:Utilities Estimator Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Print Name Signature/Date • • City of Miami Beach Consultant Name NOTE Signature Block is optional,per District preference Task No. Total Task Units No of Units Hours/Unit Hours Comments 7.1 Utility Kickoff Meeting LS 0 0 7.2 Identify Existing Utility Agency Owners(UAO(s)) LS 0 0 7.3 Make Utility Contacts LS 0 0 7.4 Exception Processing LS 0 0 7.5 Preliminary Utility Meeting LS 0 0 7.6 Individual/Field Meetings LS 1 0 7.7 Collect and Review Plans and Data from UAO(s) LS 6 0 7.8 Subordination of Easements Coordination LS 0 0 7.9 Utility Design Meeting LS 0 0 7.10 Review Utility Markups 8 Work Schedules,and LS 0 0 Processing of Schedules 8 Agreements 7.11 Utility Coordination/Followup LS 0 0 7.12 Utility Constructability Review LS 0 0 7.13 Additional Utility Services LS 0 0 7.14 Processing Utility Work by Highway Contractor(UWHC) LS 0 0 7.15 Contract Plans to UAO(s) LS 0 0 7.16 Certification/Close-Out LS 0 0 7.17 Other Utilities LS 1 40 Utility Coordination with UAO's 7.Utilities Total 40 2016 12 14 lndariCieek Fee P3 lntevmoorth_FeeProposal_REI 7.Utilities Page 12 of 19 12/14/2016 Proiect Activity 7'Utilitieg Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Kickoff(see 7.1) EA 0 0 0 0 Preliminary Meeting(see 7.5) EA 0 0 0 0 Individual UAO Meetings(see 7.6) EA 0 0 0 0 Field Meetings(see 7.6) EA 0 0 0 0 Design Meeting(see 7.9) EA 0 0 0 0 Other Meetings(this is automatically added into Utilities Total EA 0 0 0 0 (cell F27)) Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 2016_12 14_IndianCreek_Fee_P3_InterimNorth_FeeProposal_REI 7.Utilities Page 13 of 19 12/142016 Project Activity 19:Sianina and Pavement Markina Analysis Estimator:CR Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Ribbeck Engineering Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/ Total No. Task Units Comments Units Units Hours 19.1 Traffic Data Analysis LS1 0 19.2 No Passing Zone Study LS 1 0 19.3 Reference and Master Design File LS 1 0 19.4 Multi-Post Sign Support Calculations EA1 116.2 118 30 hrs to set up r 60 hrs/mile x 1.47 miles=118.2 hrs-Low Range 19.5 Sign Panel Design Analysis EA1 0 19.6 Sign Lighting/Electrical Calculations EA1 0 19.7 Quantities LS1 54 54 18 sheets(8 along mainline+10 along side streets)x 3 hrs/sheet=54 hrs 19.8 Cost Estimate LS1 0 19.9 Technical Special Provisions LS1 0 19.10 Other Signing and Pavement Marking LS1 0 Signing and Pavement Marking Analysis Technical Subtotal 172 19.11 Field Reviews LS 1 16 16 19.12 Technical Meetings LS 1 0 0 Meetings are listed below 19.13 Quality Assurance/Quality Control LS % 5% 9 19.14 Independent Peer Review LS % ON 0 19.15 Supervision LS % 5% 9 Signing and Pavement Marking Analysis Nontechnical Subtotal 34 19.16 Coordination LS % 2% 4 19.Signing and Pavement Marking Analysis Total 210 2016_12_20_In dianC reek_Fee_P 3_I nterimN orth_FeeProposai_R E I 19.Signing 8 Marking Analysis Page 9 of 11 12/202016 Project Activity 19:Sianina and Pavement Markinu Analysis Task No.of Hours/ Total No. Task Units Comments Units Units Hours Technical Meetings Unjts No of Unjts Hours/Unit Total PM Attendance at Meeting Required? Number Hours Sign Panel Design EA 1 0 0 no 0 Queue Length Analysis EA 0 0 0 0 Local Governments(cities,counties) EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings 11 Progress Meetings(if required by FDOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 2016_12 20_IndianCreek_Fee_P3 InterimNorth_FeeProposal REI 19.Signing&Marking Analysis Page 10 of 11 12202018 • Project Activity 20:Sianina and Pavement Marking Plans Estimator Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Ribbeck Engineering • Signature l Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No of Units Hours/Unit 61teels Total Hours Comments 20.1 Key Sheet Sheet 1 1 1 4 Low range 20.2 Summary of Pay Items Including TRNS•Port Input LS 1 0 0 20.3 Tabulation of Quantities Sheet 3 B 3 24 12 hrs for first tabulation«6 hrs for second tabulation sheet+6 hrs for third tabulation sheet=24 hrs 20.4 General Notes/Pay Item Notes Sheet 1 4 1 4 20.5 Project Layout Sheet 0 0 0 0 20.6 Plan Sheet Sheet 18 4 18 72 18 sheets(8 along mainline+10 along side streets) 20.7 Typical Details EA 0 0 0 20.8 Guide Sign Worksheet(s) EA 0 0 0 20.9 Traffic Monitoring Site EA 0 0 0 20.10 Cross Sections EA 0 1 0 20.11 Special Service Point Details EA 0 0 0 20.12 Special Details LS 0 0 0 20.13 Interim Standards LS 0 0 0 Signing and Pavement Marking Plans Technical Subtotal 23 104 20.14 Quality Assurance/Quality Control LS % 5% 5 20.15 Supervision LS % 5% 5 20.Signing and Pavement Marking Plans Total 23 114 • 2016 1220 IndanCreek_Fee_P3_InterimNorth_FeeProposal REI 20.Signing a Marking Plans Page 11 or 11 12/20/2016 Proiect Activity 21:Sianalization Analvsig Estimator. Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Ribbeck Engineering Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/ No. Task Units Units Units Total Hours Comments 21.1 Traffic Data Collection LS1 0 21.2 Traffic Data Analysis PI 7 0 21.3 Signal Warrant Study LS 1 0 21.4 System Timings LS 1 0 21.5 Reference and Master Signalization Design File PI 5 24 120 Low range-signal modifications to(1)Indian Creek Drive at 29 Street,(2)3900 Block at Indian Creek Drive,(3) Indian Creek Drive at 41 Street.(4)Collins Avenue at 27th Street and(5)Collins Avenue at 3100 Block. 21 6 Reference and Master Interconnect Communication LS 1 0 Design File 21.7 Overhead Street Name Sign Design EA 0 0 21.8 Pole Elevation Analysis LS 1 0 21.9 Traffic Signal Operation Report LS 1 0 Low range-signal modifications to(1)Indian Creek Drive at 29 Street,(2)3900 Block at Indian Creek Drive,(3) 21.10 Quantities LS5 4 20 Indian Creek Drive at 41 Street,(4)Collins Avenue at 27th Street and(5)Collins Avenue at 3100 Block. 21.11 Cost Estimate LS 1 0 21.12 Technical Special Provisions LS1 0 21.13 Other Signalization Analysis LS 1 0 Signalization Analysis Technical Subtotal 140 21.14 Field Reviews LS 1 0 0 21.15 Technical Meetings LS1 0 0 Meetings are listed below;Miami Dade County Signals 21.16 Quality Assurance/Quality Control LS % 5% 7 21.17 Independent Peer Review LS % 094 0 21.18 Supervision LS % 5% 7 Signalization Analysis Nontechnical Subtotal 14 2016_12_20_1 ndianC reek_Fee_P3_Interi mNorth_FeeProposal_R EI 21.Signalization Analysis Page 9 of 11 4/102017 proiect Activity 21:Sianalization Analvsiq 2119 Coordination LS % 2% 3 21.Signalization Analysis Total 157 Technical Meetings Units No of Units Hours/Unit Total Hours PM Attendance at Meeting Required? Number FDOT Traffic Operations EA .r 0 0 0 FDOT Traffic Design EA 3 0 ,, Power Company(service point coordination) EA0 0 0 0 Maintaining Agency(cities,counties) EA 9 3 0 0 Railroads EA ., 0 0 0 Other Meetings EA 0 3 0 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings 0 Progress Meetings(if required by FDOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 2016_i2_20_1 ndianCreek_Fee_P3_I nterimNorth_FeeProposal_REI 21 Signalization Analysis Page 10 of 11 4/102017 Project Activity 22:Signalization Plans Estimator: Indian Creek Drive from 26th Street to 41st Street-Interim Phase 2 429228-2-58-01 Representing Ribbeck Engineering Signature!Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No of Units Hours/Unit Sheets Total Hours Comments 22.1 Key Sheet Sheet 1 4 1 4 22 2 Summary of Pay Items Including Designer Interface Sheet 3 7 0 0 (TRNS•Port)Input 22.3 Tabulation of Quantities Sheet 1 9 1 8 22.4 General Notes/Pay Item Notes Sheet 1 4 1 4 22.5 Plan Sheet Sheet 5 4 5 20 signal moAfications to(1)Indian Creek Drive at 29 Street,(2)3900 Block at Indian Creek Drive.(3)Indian Creek Drive at 41 Street,(4)Collins Avenue at 27th Street and(5)Collins Avenue at 3100 Block. 22.6 Interconnect Plans Sheet 0 00 0 22.7 Traffic Monitoring Site EA 9 0 0 22.8 Guide Sign Worksheet EA , 0 0 22.9 Special Details Sheet 0 0 0 0 22.10 Special Service Point Details EA 0 3 0 22.11 Mast Arm/Monotube Tabulation Sheet PI 0 3 0 22.12 Strain Pole Schedule PI 0 0 0 22.13 TCP Signal(Temporary) EA 0 0 0 22.14 Temporary Detection Sheet PI 0 0 0 22.15 Utility Conflict Sheet Sheet 0 3 0 0 22.16 Interim Standards LS 1 0 0 Signalization Plans Technical Subtotal 8 36 22.17 Quality Assurance/Quality Control LS % 5% 2 22.18 Supervision LS k 5% 2 22.Signalization Plans Total 8 40 2016 12 20 IndianC reek Fee_P3_InterimNarth_Fee Praposal_R El 22.Slgnaleation Plans Page 11 of 11 410/2017 r Project Staff Hour Summary Name of Consultant Ribbeck Engineering,Inc. Indian Creek Dr from 25 St to 26 St 8 Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Project Staff Hours Activity Activity Enter Firm Enter Name Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours No. Name Sub 1 3 Project Common and General Tasks 0 0 4 Roadway Analysis 148 148 5 Roadway Plans 130 130 6a Drainage Analysis 0 0 6b Drainage Plans 0 0 7 utilities o 0 8 Env.Permits,Compliance&Clearances 0 0 9 Structures-Summary,Misc.Tasks,Dwgs. 0 0 10 BDR 0 0 11 Temporary Bridge 0 0 12 Short Span Concrete Bridge 0 0 13 Medium Span Concrete Bridge 0 0 14 Structural Steel Bridge 0 0 15 Segmental Concrete Bridge 0 0 16 Movable Span 0 0 17 Retaining Walls 0 0 18 Miscellaneous Structures 0 0 19 Signing&Pavement Marking Analysis 35 35 20 Signing&Pavement Marking Plans 20 20 21 Signalization Analysis 57 57 22 Signalization Plans 13 13 23 Lighting Analysis 0 0 24 Lighting Plans 0 0 25 Landscape Architecture Analysis 0 0 26 Landscape Architecture Plans 0 0 27 Survey-Field and Office Support 0 0 28 Photogrammetry 0 0 29 Mapping 0 0 30 Terrestrial Mobile LiDAR 0 0 31 Architecture Development 0 0 32 Noise garners Impact Design Assessment 0 0 33 ITS Analysis 0 0 34 ITS Plans 0 0 35 Geotechnical 0 0 Project Total 403 0 0 0 0 0 0 0 0 0 0 0 0 403 27 'Survey Field Crew Days 0 0 Notes. 1.Staff hours for prime consultant come directly from each discipline's worksheet. 2 Staff hours for subconsultants are to be entered manually into columns 0 through O. 3.For workbooks prepared by subconsultants.their project hours will be totaled in column C. 2017_05_25 I ndianCreek_Fee_P 1_Supplemental_'nteri mSouth_FeeProposal_R E I Summary Page 1 0116 512612017 ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Project. Indian Creek Dr from 25 St to 26 St&Collins Ave-Interim Phase I-Supplemental 1 Consultant Name:Ribbeck Engineenng,Inc. County'. Miami-Dade Consultant No: F-26-0460464 FPN: 429228-2-58-01 Date: 54262017 FAP No.. TOD Estimator: Carlos Ribbeck,P E Total Start ProjeSr Project Project Engineer Staff Class, Staff Class). SR Claes, Staff Class, Staff Class, Staff Clack- 5H Salary Average Stag Classification Hours From 6ynagct Engineer er Engineer Engineer Sr. lnhm Sr.Designer Staff ficatlon 7 ficabon 8 ficaaen 9 fi aSon 10 ficadon 11 ficatan 12 'SH Summar) By Cast By Rah Per -Firm" $6500 $58.00 55600 56000 $3100 $2500 $000 $000 $000 $0.00 5000 4000 Activity *050160 Task 3.Project General and Project Common Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 S0 6010/' 4.Roadway Analysis 148 30 30 30 15 14 29 0 0 0 0 0 148 57,429 550.20 5.Roadway Plans 130 0 0 26 0 52 5 0 0 0 0 0 130 $4368 $33.60 6a.Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 50 6010/9 66.Drainage Plan. 0 0 0 0 0 0 0 0 0 0 0 0 $0 50IV/0! 7.Utilities 0 0 0 0 0 0 0 0 0 0 0 0 50 IDlV/0! 8.Environmental Penman,Compliance 5 Clearances 0 0 0 0 0 0 0 0 0 0 0 0 SO 501V/0') 9.Structures-Misc.Tasks,Dags,Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 50 9010/0, 10.Structures-Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 So 9010/0'. 11.Structures Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 50 11111V/O! 12.Structures-Shod Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 50 6040(0! 13 Structures.Medium Syn Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 50 9010(0! 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 50 6010(0! 15.Structures-Segmental Concrete Braise 0 0 0 0 0 0 0 0 0 0 0 0 50 6010/0! 16.Structures-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 $0 6010/' 17.Structures-Rehinng Walls 0 0 0 0 0 0 0 0 0 0 0 0 50 6010/' 18.Structures-Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 50 9DIV/' 19.Signing 5 Pavement Marking Analysis 35 7 7 7 4 6 0 0 0 0 0 35 $1,779 $50.63 20.Signing 5 Pavement Markkg Plans 20 0 0 4 0 10 0 0 0 0 0 20 $684 534.20 21.Signaluation Anaysis S7 11 12 12 6 10 0 0 0 0 0 57 52.903 550.93 22.Signal¢a.on P.rs 13 0 0 3 0 $ 0 0 0 0 0 13 $448 $34.46 23.Lighting Analyse 0 0 0 0 0 0 0 0 0 0 0 0 50 M01V(0! 24 Lighting Fans 0 0 0 0 0 0 0 0 0 0 0 0 50 9010(0) 25 Landscape Architecture Analyse 0 0 0 0 0 0 0 0 0 0 0 0 50 6DIV/s 26 Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 0 0 50 1010/' 27.Survey(Field.Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 $0 iDIV/9 28.Photogrammeby 0 0 0 0 0 0 0 0 0 0 0 0 50 MORN, 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 50 9010/0! 33.Terrestrial Mobile LIDAR 0 0 0 0 0 0 0 0 0 0 0 0 50 51210/0! 31 Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 50 6010/01 32.Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 50 600/0! 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 50 900/' 34 Intelligent Transpodagon Systema Plans 0 0 0 0 0 0 0 0 0 0 0 0 SO 90IV/0! 35 Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 50 6010(0'. Total Staff lours 403 48 49 82 25 97 102 0 0 0 0 0 0 403 Total Staff Cost $3.120.00 52,842.00 $4,592.00 $1,500.00 $3007.00 52.55000 $0.00 $0.00 50.20 5000 5020 50.00 $17,611.00 543.70 Check= $17,81100 Survey Field Days by Subcersultant SALARY RELATED COSTS: $17,61100 4-Person Crew: OVERHEAD: 163 76% $28,839.77 OPERATING MARGIN: 38 5% 56.783.84 Notes: FCCM(Facilities Capital Cost Money), 0 767% $13508 1.This sheat to be used by Prime Consultant to calculata tin Grand Total fee. EXPENSES: $0.00 4-man crew 2.Manually enter fee from each subconsultant.Unused subcorsultant rows may be hidden. Survey(Field-if by Pt..) 0 days @ 5 /day 5000 SUBTOTAL ESTIMATED FEE: 553,369.69 SWcansullant Enter Name Sub l $000 Subconsultant:Sub2 $000 Subconsultant Sub1 $0.00 Subconsuldnt.Sub4 $0.00 Subconsultant Subs $0.00 Subconsugant.Sub6 $0.00 Subconsulant Sub 7 50.00 Subconsukant Sub8 moo SubconsuEant Sub9 $0-00 Subconsultent Sub 10 SO 00 Subconsubant Sub 11 50.00 ' Subconsultant Sub 12 5000 . SUBTOTAL ESTIMATED FEE: 553,369.69 Geotechnical Field and Lab Testing $000 SUBTOTAL ESTIMATED FEE: 653,569.69 Optional Services $0 00 GRAND TOTAL ESTIMATED FEE: $63,359.69 2017 0525 IedanCreekFeePtSuppkmental__Inlen0SONn_FeePropusal REI Fee Aeet Prime Page 1 oft 5260017 450 PM ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number: 429228-2-58-01 Project Name: Indian Creek Dr from 25 St to 26 St&Col FAP Number: TBD Date: 5/2612017 Name of Consultant: Ribbeck Engineering,Inc. WORKHartshorn EH PLOYEECLA98IFl0AT0B TOTAL ., ACTVITT areaneer STAFF HOURS ON CADS - Project Sr Project Project sr.E Engineer sr.Desi Staff Classi- Staff Classi- Staff Closer-Staff Clessi- Staff Classi- Staff Class- Poo row Manager Engineer Engineer i, rpineer Inlemgran fication 7 fication 8 fication 9 fication 10 fication 11 fication 12 RANGE Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hos Hours Hours - PERCENT 3.Project General and Project Common Tasks o 0 0 0 0 0 0 0 0 0 0 0 0 0 : 0 4.Roadway Analysis 148 30 30 30 15 14 29 0 0 0 0 0 0 148 163 • 5.Roadway Plans 130 0 0 26 0 52 52 0 0 0 0 0 0 130 I 143 6a.Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 fib.Drainage Plans 0 00 0 0 0 0 0 0 0 0 0 0 0 ! 0 7 Utilities 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 I 0 8.Environmental Permits.Compliance&Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.Structures-Misc.Tasks,Dwgs.Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.Structures-Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 11.Structures-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.Structures-Short Span Concrete Bridge 0 0 0 p g 0 0 0 0 0 0 0 0 0 0 0 0 13.Structures-Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.Structures-Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.Structures-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.Structures-Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.Structures-Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.Signing 8 Pavement Marking Analysis 35 7 7 7 4 6 4 0 0 0 0 0 0 35 39 20.Signing&Pavement Marking Plans 20 0 0 4 0 10 6 0 0 0 0 0 0 20 22 21.Signalidatlon Analysis 57 11 12 12 6 10 6 0 0 0 0 0 0 57 63 22.Signal¢ation Plans 13 0 0 3 0 5 5 0 0 0 0 0 0 13 14 23.Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 25.Landscape Architecture Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26.Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27.Survey(Field&Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 28.Photogrammelry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30.Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 • I 32 Nome Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 34.Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35.Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • TOTALS 403 48 49 82 25 97 102 0 0 0 0 0 0 403 444 Field Survey Estimate: Nems. 0 4-man crew days FIRM TOTAL 403 444 1.Tho worksheet provides the di9dbition of a finis fatal staff hours for a project. 2.Percentages for staff Now distribution by classification are entered below In rows 63 to S6 of this sheet. 3.Total staff Hours(column O)may not match staff hours from Summary worksheet(column B)due to rounding.Staff hours calculated for employee classifications are to be adjusted so totals in columns B and 0 match. 4.Formulas under Total Staff Hours Range-(columns O a P)may be adjusted to provide desired range. • 2011_00,wiearti n 9ep.i.ui�ieisMwierwnyo�Lre=u evrn�smi�s ne Pa,Ma a-M/eY.W ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number 429228-268-01 Project Name Indian Creek Dr from 25 St l0 26 St 8 Col FAP Number. TBD Date. 5/26/2017 Name of Consultant. Ribbeck Engineering,Inc. Staff Hour Distribution Percentages-Firm Total Hours from sheet mmaT Project Sr Project Project Engineer Staff Classi- Staff Classi- Staff Ciessi-Staff Classi- Staff Classi- Staff Classi- i `comManager Engineer Engine Sr.Engineer Intern Sr.Designer fication 7 fication 8 fication 9 fication 10 fication 11 fication 12 Total 3.Project General and Project Common Tasks 0 ora r 00% 0.0% 0.0% o 0% 0.0% 00% 0.0% 0.0% 00% 0.0% 0.0% 00% 000% 4.Roadway Analysts 148 20.0% 20 0% 20.0% 10.0% 10.0% 20.0% 00% 0 0% 00% 0.0% 0.0% 00% 100.00% S.Roadway Plans 130 00% 0.0% 20.0% 0.0% 40.0% 40.0% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 100.00% 66.Drainage Analysis 0 20.0% 00% 0.0% 800% 0.0% 00% 0.0% 00% 00% 0.0% 00% 0.0% 100.00% 613 Drainage Plans 0 20.0% 20.0% 20.0% 100% 200% 10.0% 0.0% 00% 00% 00% 00% 0.0% 100.00% 7.utilities 0 00% 00% 00% 0.0% 0.0% 100.0% o.o% 30% 0.0% 00% 00% 0.0% 100.00% 8.Environmental Permits,Compliance B Clearances 0 30% 00% 00% 00% 0.0% 0.0% 00% 00% 00% 00% 00% 0.0% 0.00% 9.Structures-Mise-Tasks.Dwgs,Non-Tech. 0 00% 00% 00% 00% 0.0% 00% 00% 00% 0.0% 00% 0.0% 00% 0.00% 10 Structures-Bridge Development Report 0 00% 00% 00% 00% 0.0% 0.0% 0.0% 3.0% 0.0% 0.0% 0.0% 0.0% 0.00% 11.Structures-Temporary Bridge 0 00% 00% 0.0% 0.0% 00% 00% 00% 00% 00% 00% 00% 00% 0.CO% 12.Structures-Short Span Concrete Bridge 0 0 0% 0 0% 0.0% 0.0% 0 0% 0 0% 0 0% 3 0% 0 0% 0.0% 0.0% 0 0% 0.00% 13 Structures-Medium Span Concrete Bridge 0 00% 00% 0.0% 0.0% 0.0% 00% 00% 00% 00% 0.0% 00% 0.0% 0.00% 14.Structures-Structural Steel Bridge 0 0.0% 00% 0.0% 0.0% 0.0% 00% 00% 00Y,. 3.0% 00% 00% 00% 000% 15.Structures-Segmental Concrete Bridge 0 00% 00% 00% 0.0% 90% 00% 00% 00% 00% 00% 0.0% 00% 0.00% 16.Structures-Movable Span 0 00% 0.0% 00% 00% 3.0% 00% 00% 00% 0.0% 00% 0.0% 00% 000% 17.Structures-Retaining Walls 0 00% 0.0% 00% 00% 0.0% 00% 0.0% 00% 00% 00% 00% 00% 000% 10.Structures-Miscellaneous0 00% 00% 0.0% 00% 00% 00% 00% 00% 00% 0.0% 0.0% 00% 000% 19.Signing B Pavement Marking Analysis 35 20.0% 20.0% 20.0% 100% 20.0% 100% 0.0% 00% 0.0% 00% 0.0% 0.0% 100.00% 20.Signing&Pavement Marking Plans 20 00% 0.0% 200% 0.0% 45.0% 35.0% 0.0% 0.0% 0 0% 0.0% 0 0% 00% 100.00% 21 Signalization Analysis 57 20.0% 20.0% 250% 10.0% 15.0% 10.0% 0.0% 00% 0.0% 0.0% 00% 0.0% 100.0% 22 Signalization Plans 13 0.0% 0.0% 25.0% 0.0% 350% 40.0% 00% 00% 0.0% 0.0% 0.0% 00% 100.00% 23.Lighting Analysis 0 0.0% 0.0% 00% 00% 0.0% 0.0% 00% 00% 0.0% 00% 00% 00% 000% 24.Lighting Plans 0 00% 00% 00% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 000% 25.Landscape Architecture Analysis 0 00% 0.0% 00% 00% 00% 00% 0.0% 0.0% 00% 00% 00% 0.0% 0.00% 26.Landscape Architecture Plans 0 00% 00% 0.0% 0.0% 00% 00% 00% 0.0% 00% 00% 0.0% 0.0% 0.00% 27.Survey(Field 8 Office Support) 0 00% 0 0% 0.0% 0.0% 0 0% 0 0% 0.0% 0.0% o 0% 0 0% 0.0% 0.0% 0.00% 28 Photogrammetry 0 00% 00% 0.0% 0.0% 0.0% 00% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 29 Mapping 0 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.00% 30 Terrestrial Mobile LiDAR 0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00% 31.Architecture Development 0 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 00% 0.0% 0.0% 00% 00% 000% 32.Noise Barriers Impact Design Assessment 0 00% 00% 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 0.0% 00% 00% 000% 33.Intelligent Transportation Systems Analysis 0 00% 00% 00% 0.0% 0.0% 00% 0.0% 00% 00% 00% 0.0% 0.0% 0.00% 34.Intelligent Transportation Systems Plans 0 00% 0.0% 00% 00% 00% 00% 0.0% 0.0% 00% 0.0% 00% 0.0% 000% 35.Geotechnical 0 00% 00% 0.0% 00% 00% 00% 0.0% 00% 00% 00% 00% 0.0% 0.00% Proiect Activity 4:Roadway Analysis Estimator CR Indian Creek Dr from 25 St to 26 St 8 Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature I Date City of Miami Beach Consultant star, NOTE:Signature Block is optional,per District preference Task ours Task Units No of Units Hours/Unit HComments 4 1 Typical Section Package LS 1 0 0 4.2 Pavement Type Selection Report LS 1 0 0 4.3 Pavement Design Package LS 1 14 14 Addition of Collins Ave Pavement Design 4.4 Cross-Slope Correction LS 1 0 0 4.5 Horizontal Nertical Master Design Files LS 1 45 45 Roadway reconstruction-200 hrs/mile x(990+100+50+50)/5280+miles=45 hrs 4.6 Access Management LS 1 3 0 4/ Roundabout Evaluation LS 1 0 0 4.8 Roundabout Final Design Analysis LS 1 0 0 4.9 Cross Section Design Files LS 1 0 0 4.10 Traffic Control Analysis LS 1 26 26 Level III-Low Range-Redesign TCP for full reconstruction to final grade instead of roadway restoration gastric'profile about 2 ft). 4.11 Master TCP Design Files LS 1 26 26 Low range-3 Phases(new TCP design files required for full reconstruction(raising road)) 4.12 Design Variations and Exceptions LS 0 0 0 4.13 Design Report LS 1 3 0 4.14 Quantities LS 1 20 20 Low Range(new quantity take off)including earthwork 415 Cost Estimate LS 1 0 0 4.16 Technical Special Provisions LS 1 0 0 4.17 Other Roadway Analyses LS 1 0 0 Roadway Analysis Technical Subtotal 131 4.18 Field Reviews LS 0 0 0 4.19 Monitor Existing Structures LS 1 0 0 2017 05 25_IndianCreekFee PiSupplemental_InterimSouth_FeeProposal_REI 4.Roadway Analysis Page 7 of 16 424/2017 lab Project Activity 4:Roadway Analysis TNosk Task Units No of Units Hours/Unit Hours Comments 4.20 Technical Meetings LS 1 0 0 Mtg with FOOT for Barrier Wall,pavement design and TCP to be charged ata separate supplemental. 4.21 Quality Assurance/Quality Control LS % 5, 7 4.22 Independent Peer Review LS % 0% 0 4.23 Supervision LS % 5% 7 Roadway Analysis Nontechnical Subtotal 14 4.24 Coordination LS % 2% 3 4.Roadway Analysis Total 148 Technical Meetings Units No of Units Hours/Unit HTotal ours PM Attendance at Meeting Required? Number Typical Section EA 0 0 0 no Pavement EA 0 0 0 no - Access Management EA 0 0 0 ., 15%Line and Grade EA 0 0 0 yes Driveways EA 0 0 0 3 Local Governments(cities,counties,MPG) EA 0 0 0 yes WorkZoneTrafficControl EA 0 0 0 01 30/60/90/100%Comment Review Meetings EA 0 0 0 yes 3 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings 6 Progress Meetings(if required by FOOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 0 3 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 6 201705 25 IndiarCreek_Fee_P1 Supplemental_InterimSouth_FeeProposal_REI 4 Roadway Analysis Page 8 of 16 5126/2017 Project Activity 5:Roadway Plans Estimator: Indian Creek Dr from 25 St to 26 St&Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/Unit Total No. Task Scale Units Units or or Sheet Hours Comments Sheet 5.1 Key Sheet Sheet 1 2 2 Revision 5.2 Summary of Pay Items Including Quantity Input Sheet 1 4 4 Revision 5.3 Typical Section Sheets 5.3.1 Typical Sections EA 2 4 8 Revision 5.3.2 Typical Section Details EA 0 0 5.4 General Notes/Pay Item Notes Sheet 00 0 5.5 Summary of Quantities Sheets Sheet 0 0 5.6 Project Layout Sheet 0 0 5.7 Plan/Profile Sheet Sheet 3 6 18 3 Plan/Profile Plan Sheets(new design) 5.8 Profile Sheet Sheet o 0 5.9 Plan Sheet Sheet 0 4 0 5.10 Special Profile Sheet 0 0 5.11 Back-of-Sidewalk Profile Sheet Sheet 0 0 5.12 Interchange Layout Sheet Sheet 0 0 5.13 Ramp Terminal Details(Plan View) Sheet 0 0 5.14 Intersection Layout Details Sheet 1 12 12 Intersection Plateau 5.15 Special Details EA 0 0 5.16 Cross-Section Pattern Sheet(s) Sheet 0 0 0 2017_O5_25_IndianCreek_Fee_P1 Supplemental_InterimSouth_FeeProposal_REI 5.Roadway Plans Page 9 of 16 5/26/2017 Project Activity 5:Roadway Plans Task No.of Hours/Unit Total No. Task Scale Units Units or or Sheet Hours Comments Sheet 5.17 Roadway Soil Survey Sheet(s) Sheet 0 0 5.18 Cross Sections EA 0.5 12 24 Additional Sections along Collins Ave. 5.19 Temporary Traffic Control Plan Sheets Sheet 15 4 60 Low Range-3 Phases-5 sheet each phase=3 phases x 5 sheets/phase x 4 hrs/sheet=80 hrs 5.20 Temporary Traffic Control Cross Section Sheets EA 0 5.21 Temporary Traffic Control Detail Sheets Sheet 2 2 TCP General Notes 5.22 Utility Adjustment Sheets Sheet 0 0 5.23 Selective Clearing and Grubbing Sheet(s) Sheet 0 0 524 Project Network Control Sheet(s) Sheet 0 1 0 5.25 Environmental Detail Sheets Sheet 0 0 0 5.26 Utility Verification Sheet(s)(SUE Data) Sheet 0 4 0 Roadway Plans Technical Subtotal 118 5.27 Quality Assurance/Quality Control LS % 5% 6 5.28 Supervision LS % 5% 6 5.Roadway Plans Total 130 • • • • 2017_05_25_IndianCreek Fee_P1_Supplemental_InterimSouth_FeeProposal REI 5.Roadway Plans Page 10 0116 5/26/2017 Project Activity 19:Signing and Pavement Marking Analysis Estimator:CR Indian Creek Dr from 25 St to 26 St&Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/ Total No. Task Units Units Units Hours Comments 19.1 Traffic Data Analysis LS 1 0 19.2 No Passing Zone Study LS 1 0 19.3 Reference and Master Design File LS 1 22 22 Update signing and pavement markings file to final reconstruction.Includes new overhead sign layout 19.4 Multi-Post Sign Support Calculations EA 1 0 0 19.5 Sign Panel Design Analysis EA 1 4 4 19.6 Sign Lighting/Electrical Calculations EA 1 0 19.7 Quantities LS 1 4 4 New quantity take off 19.8 Cost Estimate LS 1 0 19.9 Technical Special Provisions LS 1 0 19.10 Other Signing and Pavement Marking LS 1 0 Signing and Pavement Marking Analysis Technical Subtotal 30 19.11 Field Reviews LS 1 0 0 19.12 Technical Meetings LS 1 0 0 Meetings are listed below 19.13 Quality Assurance/Quality Control LS % 5% 2 19.14 Independent Peer Review LS % 0% 0 19.15 Supervision LS % 5 2 Signing and Pavement Marking Analysis Nontechnical Subtotal 4 19.16 Coordination LS % 2% 1 • 19.Signing and Pavement Marking Analysis Total 35 2017_OO_25_IndianCreek_Fee_P1_Supplemental InterimSouth_FeeProposal REI 19.Signing 8 Marking Analysis Page 11 of to 5262017 Project Activity 19:Signing and Pavement Marking Analysis Task No.of Hours/ Total No. Task Units Units Units Hours Comments Technical Meetings Units No of Units Hours/Unit Total PM Attendance at Meeting Required? Number Hours Sign Panel Design EA I 0 0 no 0 Queue Length Analysis EA 0 0 0 0 Local Governments(cities,counties) EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings0 Subtotal Project Manager Meetings 0 Progress Meetings(if required by FDOT) EA 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 00 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 0 Total Project Manager Meetings(carries to Tab 3) 0 2017 05_25_IndianCreek_Fee_P1 Supplemental InterimSouth_FeeProposal_REI 19.Signing&Marking Analysis Page 12 of 16 5262017 Project Activity 20:Signing and Pavement Marking Plans Estimator: Indian Creek Dr from 25 St to 26 St 8 Collins Ave-Intenm Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature I Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per Distract preference Task Task Scale Units No of Units Hours/Unit Sheets Total Hours Comments 20.1 Key Sheet Sheet 1 0 0 0 20.2 Summary of Pay Items Including TRNS-Port Input LS 1 0 0 20.3 Tabulation of Quantiles Sheet 1 4 1 4 Update quantities 20.4 General Notes/Pay Item Notes Sheet I 0 1 0 20.5 Project Layout Sheet 0 0 0 0 ' 20.6 Plan Sheet Sheet 3 4 3 12 New plan sheets to updated project limits due to change in scope to full recosntructon 20.7 Typical Details EA a 0 0 20.8 Guide Sign Worksheet/sl EA r 2 1 2 20.9 Traffic Monitoring Site EA 0 0 0 20.10 Cross Sections EA 3 0 0 '20.11 Special Service Point Details EA 0 0 0 20.12 Special Details LS 0 0 0 20.13 Interim Standards LS 0 0 0 Signing and Pavement Marking Plans Technical Subtotal 6 18 20.14 Quality Assurance/Quality Control LS % 5% 1 20.15 Supervision LS % 5% 1 20.Signing and Pavement Marking Plans Total 6 20 2017 05_25_IndianCreek_Fee_P1_Supplemental_IntenmSouth Fee Proposal_R El 8 20.Signing Marking Plans Page 13 of 16 6r26/2a17 Project Activity 21:Sianalization Analysis Estimator Indian Creek Dr from 25 St to 26 St&Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task No.of Hours/ No. Task Units Units Units Total Hours Comments 21.1 Traffic Data Collection LS 1 0 21.2 Traffic Data Analysis PI 0 0 21.3 Signal Warrant Study LS 1 0 21.4 System Timings LS1 0 21.5 Reference and Master Signalization Design File PI I 40 40 Mid range-redisign 1 signalized intersection at Collins Avenue and 26 Street to final grade(full roadway reconstruciton).Includes brand new intersection. 21.6 Reference and Master Interconnect Communication LS 1 0 Design File 21.7 Overhead Street Name Sign Design EA 2 2 4 21.8 Pole Elevation Analysis LS 1 2 2 21.9 Traffic Signal Operation Report LS 1 0 21.10 Quantities LS1 4 4 Low range-1 signalized intersection at Collins Avenue and 26 Street 21.11 Cost Estimate LS 1 0 21.12 Technical Special Provisions LS 1 0 21.13 Other Signalization Analysis LS1 0 Signalization Analysis Technical Subtotal 50 21.14 Field Reviews LS 1 0 0 21.15 Technical Meetings LS1 0 0 Meetings are listed below;Miami Dade County Signals 21.16 Quality Assurance/Quality Control LS % 5% 3 21.17 Independent Peer Review LS % 0% 0 21.18 Supervision LS % 5% 3 Signalization Analysis Nontechnical Subtotal 6 2017_05_25_1 ndianCreek_Fee_P1_Supplemental_I nten m South_FeeProposal_R EI 21.Signalization Analysis Page 14 of 16 5262017 rw Protect Activity 21:Signalization Analysis 21.19 Coordination LS 1 21.Signalization Analysis Total 57 Technical Meetings Units No of Units Hours/Unit Total Hours PM Attendance at Meeting Required? Number FOOT Traffic Operations EA 0 FDOT Traffic Design EA 00 0 Power Company(service point coordination) EA 00 0 Maintaining Agency(cities,counties) EA 00 0 Railroads EA 00 0 Other Meetings EA 0 Subtotal Technical Meetings0 Subtotal Project Manager Meetings o Progress Meetings(it required by FDOT) EA0 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings0 Total Project Manager Meetings(carries to Tab 3) 0 2017_05_25_1 ndianC reek_Fee_P 1_Supplemental_I nteri mSouth_FeeProposal_REI 21.Signalization Analysis Page 15 of 16 Project Activity 22:Sienalization Plans Estimator: Indian Creek Dr from 25 St to 26 St 8 Collins Ave-Interim Phase I-Supplemental 1 429228-2-58-01 Representing Print Name Signature/Date City of Miami Beach Consultant Name NOTE:Signature Block is optional,per District preference Task Task Scale Units No of Units Hours/Unit Total Hours Comments 22.1 Key Sheet Sheet 1 0 1 0 22 2 Summary of Pay horns Including Designer Interface Sheet 0 0 0 0 (TRNS•Port)Input 223 Tabulation of Quantities Sheet 1 4 1 4 224 General Notes/Pay Item Notes Sheet 1 0 1 0 22.5 Plan Sheet Sheet 4 1 4 Low range-1 signalized intersection at Collins Avenue and 26 Street 226 Interconnect Plans Sheet 3 3 0 0 227 Traffic Monitoring Site EA 0 0 0 22.8 Guide Sign Worksheet EA 1 3 1 3 22.9 Special Details Sheet 0 0 0 0 22.10 Special Service Point Details EA 0 0 0 22.11 Mast Arm/Monotube Tabulation Sheet PI 0 0 0 22.12 Strain Pole Schedule PI 0 0 0 22.13 TCP Signal(Temporary) EA 0 0 0 22.14 Temporary Selectee Sheet PI 0 0 0 22.15 Utility Conflict Sheet Sheet 0 0 0 0 22.16 Interim Standards LS 1 0 0 Signalization Plans Technical Subtotal 5 11 2217 Quality Assurance/Quality Control LS % 5% 1 22.18 Supervision LS % 5% 1 22.Signalization Plans Total 5 13 2017 05_25_IndunCreek_Fee_P1 Supplemental_InterimSouth_FeeProposal_REI 22.Signalizaten Plans Page 16 0116 5/262017 ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number'. NA Project Name. Indian Creek Drive from 26th Street to 41 FAP Number. NA Date. 05131/2017 Name of Consultant Bolton Perez 8 Associates WORK Hours from EMPLOYEECLASSIRCATION TOTAL ACTIVITY sheat STAFF HOURS ON CADD Chief Sr.Project Project Engineer Designer Intern Staff Clam. Staff Classi- Staff Class, Staff Classi- Staff Class,Staff Classi- i Engineer Engineer Engineer Intern fication 7 fication 8 fication 9 fication 10 !tion 11 fication 12 RANGE Hours u Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours PERCENT 3.Project General and Project Common Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 5.Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 6a.Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 6b.Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.Utilities 0 0 0 0 0 0 0 0 0 0 0 0 i 0 8.Environmental Permits.Compliance 8 Clearances 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 F 0 9 Structures-Misc.Tasks.Dwgs,Non-Tech. 166 17 42 42 33 17 17 0 0 0 0 0 0 168 1 185 10.Structures-Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.Structures-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 5 0 0 0 I 0 12.Structures-Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 13.Structures-Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 14.Structures-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 15.Structures-Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 j 0 16.Structures-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.Structures-Retaining Walls 472 47 118 118 94 47 47 0 0 0 0 0 0 471 I 518 18.Structures-Miscellaneous 210 21 53 53 42 21 21 0 0 0 0 0 0 211 i 232 19.Signing 8 Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 20.Signing 8 Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 21.Signal'Ization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 Signal'Ization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 23.Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 24.Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25.Landscape Architecture Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 26.Landscape Architecture Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 j 0 27.Survey(Field 8 Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28.Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30.Terrestrial Mobile LIDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 32 Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34.Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 35.Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTALS 848 85 213 213 169 85 85 0 0 0 0 0 0 850 I 935 • •PkwaK owpwKa_r sfswsr_I-raanenI YlYrsw�x-Rn Pow ARIZ dsrlx MlY field Survey Estimate: Notes: 0 4-man crew days FIRM TOTAL 555 i 935 I.This worksheet provides the tlistribt6on of a fj921jq(gl staff hours for a project 2.Percentages for staff hour distribution by classification are entered below in rows W to 56 of[Ns sheet. J.Total Staff Hours(column 0)may not match staff hours from Summary worksheet(column B)due to rounding.Staff hours calculated for employee classifications are to be adjusted so totals in columna 8 ark O math. 4 Formulas under Total Staff Fours Range(columna O&P)may be adjusted to provide desired range. ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number'. NA Project Name Indian Creek Drive from 261h Street to 41 FAP Number'. NA Date. 05/312017 Name of Consultant: Bolton Perez&Associates Staff Hour Distribution Percentages-Firm Total Hours from s+ma7 Chief Sr.Project Project Em p glnennng StafftctionGlassi-Staffeatieo 8F Staff 1.60,r 9 Staff Ioban 10 kationtaff 11 baton 12- mTdal Engineer Engineer Engineer Engineer Designer Intern fication 7 fiwtbn 8 fiwtion 9 Scotian 10 firafpn 11 ficalbn 12 Total 3.Project General and Project Common Tasks Pr0 00% 00% 0.0% 00% 00% 00% 00% 0.0% 00% 00% 00% 0.00% 4.Roadway Analysis 0 00% 00% 00% 0.0% 0 o% 00% 0 0"6 0 0% 0 0% 00% 0 0% 000% 5.Roadway Plans 0 0.0% 00% 0.0% , 00% 0.0° 00% .._ -)% • 00% 0.0% 000% 6.Drainage Analysis 0 00% 00% 00% 00% 00' 00% J.0% 0.0% 00% 0.00% 65 Drainage Plans 0 0.0% 0.0% 0.0"<: 00% 0.0% 0: 0.0% 0.0% 00% 000% 7.Utilities 0 00% 0.0% 0.0°ti, _.,, 00% __ 00% 0 0.0% 0.0% 00% 0.00% 8.Environmental Permits,Compliance&Clearances 0 0.0% 00% 00% 00% 0.0% 0.0% 00% 0.0% 0.0% 00% 00% 0.00% 9.Structures-Misc.Tasks,Dwga,Non-Tech. 166 10.0% 25.0% 25.0% 200% 10.0% 10.0% 0 0% 0.0% 0.0% 00% 00% 100 00% 10.Structures-Bridge Development Report 0 0.0% 00% 00% 0.0% 0.0% 00% 0 0% 00% 0.0% 0 0% 00% 000% 11.Structures-Temporary Bridge 0 00% 00% 00% 00% 0,' 00°r, 00% 0.0% ii,0% 0.0% 0.00% 12.Structures-Short Span Concrete Bhdge 0 00% 0.0% 00% 0 0% 0 0 0'- , 0.0% 0.0% J 0% 00% 0.00% 13.Structures-Medium Span Concrete Bridge 0 00% 00% 00% 0.0% .. 00% 0.0% 0.0% _ 0.0% 00% 0.00% 14.Structures-Structural Steel Bridge 0 0.0% 00% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 15.Structures-Segmental Concrete Bridge 0 0.0% 00% 0.0% 0.0% J 0".t 00% 00% 0.0% 0.0% 0.0% 000% 16.Structures-Movable Span 0 00% 00% 0.0% 00% 0. 0.0% 0.0% 00% 0.0r= 0.0% 00% 0.00% 17.Structures-Retaining Walls 472 100% 25.0% 250% 20.0% 10.:'.• 100% 00% 0.0% 0.0% 00% 00% 100.00% 18.Structures-Miscellaneous 210 10.0% 25.0% 25.0% 200% 100% 100% 0.0% 0.0% 0.0% 0.0% 0.0% 100.00% 19.Signing&Pavement Marking Analysis 0 0.0% 0.0% 00% 0.0% 05% 00% 00% 0.0% 00% 5.0% 00% 0.00% 20 Signing&Pavement Marking Plans 0 0.0% 05% 00% 00% 00% 00% 00% 0.0% - 00% 00% 0.0% 0.W% 21.Signalaation Analysis 0 00% 00% 0.0% 00% 00% 00% 0.0% 00% 00% 00% 0.0% 000% 22.Signaleation Plans 0 00% 00% 0.0% 00% 0.0% 0.0% 00% 0.0% 00% 0.0% 0.0% 0.00% 23 Lighting Analysis 0 0.0% 00% t 00% 0.0% 0.0% 0.0% 0.0% 0.0% 00% 00% 000% 24.Lighting Plans 0 0.0% 00% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 00% 00% 000% 25.Landscape Architecture Analysis 0 0.0% 00% 0 0% 0.0% 0.0% 0.0% 0.0% 00% _ 0.0% 0.0% 0.00% 26.Landscape Architecture Plans 0 0.0% 00% • 00% 00% 0.0% 0.0% 00% 00% 00% 000% 27.Survey(Field&Office Support) 0 00% 00% 0.5% 00% 0.0% 0.5% 0.0% _ 0.0% 00% 000% 28.Phologrammetry 0 0.0% 00% 0.0% 0.0% 0.0% 00% 0.0% 0.0% 0.0% 000% 29.Mapping 0 00% 0.0% 0.0% 00% 00% 00% 0.0% -_, 00% 0.0% 0.00% 30 Terrestrial Mobile LiDAR 0 00% 00% 0.0% 00% 0.0% 0.0% 0.0% 00% 0.0% 00% 00% 0.00% 31.Architecture Development 0 0.0% 00% 00% 0.0% 00% 0.0% 00% 00% 00% 00% 00% 000% 32.Noise Barters Impact Design Assessment 0 00% 00% 0.0% 30% 00% 0.0% 00% 0.0% 0.0% 0.0% 00% 0.00% 33.Intelligent Transportation Systems Analysis 0 00% 00% 00% 00% 0.0% 00% 0.5% 00% 00% 00% 000% 34.Intelligent Transportation Systems Plans 0 00% 0.5% 0.0% _... _ 00% 0.0% 00% 05% 00% 0.0% 0.0% 0.00% 35.Geotechnical 0 0.0% 00% 0.0% 00% .,. 00% 0.0% 00% 0.0% 0.0% 0.0% 0.0% 000% ....1 wau...._wn+.....,...anm .10.11••••••••,... N.•4•112 06•1•1117carr Name of Consultant Project Information Sheet Financial Project Identification Number 438228-1-32-01 Federal Aid Project Identification Number: Name of Prime/Subconsultant TRACE Consultants,Inc. County:' Project Description:SR A1A/Indian Creek from 26 Street to 41 Street Begin Milepost End Milepost Project Length: 0.9 Miles(including transition to existing) Number of Lanes: 2 Typical Section: Urban (Urban/Rural/Int.) Lane Configuration:Dic:ded (Divided/Undivided: Project Type: (Minor/Major) Access Management Classification: Roadway Classification:NHS (NHS/RHS/Off Sys) CAP Leval: TCP Level: Survey Level: Design Variations:I. Design Exceptions:1. 2. 2. 3. 3. 4. 4. 5. 5. Proposed Design Contract Time: monmsrdays Date of Negotiation: Estimated By: Negotiated By:(name-firm) Project Activity: Consultant FOOT Consultant FOOT 3.Project Common 8 Project General Tasks 4.Roadway Analysis .r 5.Roadway Plans s firm r or&office _e 6a.Drainage Analysis -&firm ,.me&office 0.0 6b.Drainage Plans mmer^arne&firm e 3 office =. tmef name S office 7.Utilities Enter name&firm rfice Enter Enter name&office 8.Environmental Permits Enter name&firm ,e Enter - Enter name&office 9.Structures Summary -rater name&firm Enter name 3:rm Enter name 5 iffice 10.Structures-Bride Development Report ._r name&firm Enter name&firm Enter narn. ;'Tce 11-Structures-Temporary Bridge came 8 firm =-S office Enter name&firm Enterra• rffice 12.Structures-Short Span Concrete ^e 8 office Enter name 1 EMoe - 13.Structures-Medium Span Concrete -n&office Enter name 3 P :lice 14_Structures-Structural Steel ._ -.ter name 8 firm 15.Structures-Segmental Concrete •or name&firm rice 16.Structures-Movable Span ., _._ or name S firm Moe 17 Structures-Retaining Walls re 8 office en name 8 firm fce 18.Structures-Miscellaneous _ _.. ,me&office cor name&firm t:ce 19.Signing and Pavement Marling Analysis Ente' Enter name 8 office -r name 4 - lice 20 Signing and Pavement Marking Plans Enter Enter name&office er name a _'face 21 S:gnellzaton Analysis Enter Enter name&office _r r name 8'c': En.e,F,... Toe 22.Signalizaton Plans Enter Enter name&office Enter nacre 8 firm Enter nun 23 Lighting Analysis Enter n,.. , Enter name&office Enter name&firm Enter nen. 'Ir. 24.Lighting Plans Enter name 3 firm Enter name&office Enter ria--e&firm Enter nam 25.Landscape Architecture Analysis Enter name&firm Enter name&office Ente' -&firm Enter nan- .ice 26.Landscape Architecture Plans Enter name 3 fir: Enter name&office - -4 firm Enter nan 27.Survey Enter name&office -3 firm Enter non 28.Photogrammetry Enter name&office .0 8 firm Enter nan-. M.Mapping Enter name 8 office r lame 8firm Enter nor, 30.Terrestrial Mobile LiDAR 3 firm Enter name&office -cm name&fine Enter nan 31.Architecture Development -I firm Enter name 8 office - ante&firm Enter name S office 32.Noise Banters Impact Design Assessment 8 firm Enter name&office 'e S firm Enter name&office 33.Intelligent Transportation Systems Analysis _ -.&firm Enter name&office , e&firm Enter name&office 34.Intelligent Transportation Systems Plans Ente. -:3 firm Enter name 8 office -.name 8 firm Enter name&office 35.Geotechnical Enter -4 firm Enter name 8 office or name&firm Enter name&office Pee Estimate Lighting-Indian Creek Project Information Page 1 of 8 2!72017 Project Staff Hour Summary Name of Consultant: TRACE Consultants,Inc. SR A1A/Indian Creek front 26 Street to 41 Street 439228-1-32-01 Project Staff Hours Activity Activity TRACE Sub I Sub 2 Sub 3 Sub 4 Sub S Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub it Sub 12 Total Hours No. Consultants 3 Project Common and General Tasks 0 4 Roadway Analysis 0 5 Roadway Plans 0 6a Drainage Analysis 0 6b Drainage Plans 0 7 Utilities 0 8 Env.Permits,Compliance&Clearances 0 9 Structures-Summary,Misc.Tasks,Dwgs. 0 10 BDR 0 11 Temporary Bridge 0 12 Short Span Concrete Bridge 0 13 Medium Span Concrete Bridge 0 14 Structural Steel Bridge 0 15 Segmental Concrete Bridge 0 16 Movable Span 0 17 Retaining Walls 0 18 Miscellaneous Structures 0 19 Signing&Pavement Marking Analysis 0 20 Signing&Pavement Marking Plans 0 21 Signalization Analysis 0 22 Signalization Plans 0 23 Lighting Analysis 689 689 24 Lighting Plans 131 131 25 Landscape Architecture Analysis 0 26 Landscape Architecture Plans 0 27 Survey-Field and Office Support 0 28 Photogrammetry 0 29 Mapping 0 30 Terrestrial Mobile LiDAR 0 31 Architecture Development 0 32 Noise Barriers Impact Design Assessment 0 33 ITS Analysis 0 34 ITS Plans 0 35 Geotechnical 0 Project Total 820 0 0 0 0 0 0 0 0 0 0 0 0 820 27 (Survey Field Crew Days 0 Notes: 1.Staff hours for prime consultant come directly from each discipline's worksheet. 2 Staff hours for subconsultants are to be entered manually Into columns D through O. 3.For workbooks prepared by subconsultants,their project hours will be totaled in column C. Fee Estimate Lighting-Indian Creek Summary Page 2 of 2/72017 ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number 439228-1-32-01 Project Name: SR A1A/Indian Creek from 26 Street to FAP Number: Date. 2/7/2017 Name of Consultant:TRACE Consultants,Inc. Hours from WORK .yymmery aMFLOYEe CLAsstnoahlOK TOTAL ACTIVITY avow STAFF HOURS ON CADS Project Senior Project EngiEngineering Staff Clam-Staff Classi- Staff Classi- Staff Classi- Staff Classi- Staff Classi- StaffClassl- Non rowneer Manager Engineer Engineer Intern fication 6 fication 7 fication 8 fication 9 fication 10 fication 11 fication 12 RANGE Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours PERCENT C Project General and Project Common Tasks 4.Roadway Analysis I 5.Roadway Plans 6a.Drainage Analysis 6b.Drainage Plans r 7 Utilities 8.Environmental Permits.Compliance 8 Clearances 9.Structures-Misc.Tasks.Dwgs.Non-Tech. 10.Structures-Bridge Development Report 11.Structures-Temporary Bridge 12.Structures-Short Span Concrete Bridge 13.Structures-Medium Span Concrete Bridge 14.Structures-Structural Steel Bridge 15.Structures-Segmental Concrete Bridge 16.Structures-Movable Span 17.Structures-Retaining Walls 18.Structures-Miscellaneous 19.Signing 8 Pavement Marking Analysis 20.Signing 8 Pavement Marking Plans 21.Signalealion Analysis . 22.Signaleation Plans 23.Lighting Analysis 689 103 172 172 138 103 688 ' 757 24.Lighting Plans 131 20 33 33 26 20 132 145 25 Landscape Architecture Analysis 26.Landscape Architecture Plans 27.Survey(Field 8 Office Support) 28.Phologrammetry 29.Mapping 30.Terrestnal Mobile LiDAR 31.Architecture Development 32.Noise Barriers Impact Design Assessment 33.Intelligent Transportation Systems Analysis 34.Intelligent Transportation Systems Plans 35.Geotechnical TOTALS 820 123 205 205 164 123 820 i 902 field Surrey Estimate: mss' 4-man crew days FIRM TOTAL 820 902 I.TN,worksheet provides the diMrlbuSon or arbor's trial stall hours fora project. 2.Percentages for staff hour distribution by classificaton are entered below in rows 63 to 96 orths sheet 3.Total Staff Hours(column O)may not match staff hours from Summary worksheet(column B)due to rounding.Staff hours calculated for employee cbssRicancns are to be adjusted so totals in columns B and O match. 4.Formulas under lotel Staff Hours Range-(columns O 8 P)may be adjusted to provide desired range• . • • • M.1..Y4ws-W.Cr* 81.4oaMr.-1eu1 Pap). WM?RV 1.1 ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS-FIRM TOTAL Financial Project Number. 439226-1-32-01 Project Name SR A1A/Indian Creek from 26 Street to FAP Number: Date' 2/7/2017 Name of Consultant'.TRACE Consultants,Inc. Staff Hour Distribution Percentages-Firm Total zu uourstrow wen"Soman^ Project Senior Project Engineering nng St Staff Cffis7- Staff Staff ClassStaff Cla1-Staff Class,- - rrm Taal Manager Engineer Engineer Engineer Intern ficarron 6 fcacbn 7 ficatsbn 8 Station 9 fatbn 10fioation 11 fication 12Total 3.Project General and Project Common Tasks 4.Roadway Paralysis 5.Roadway Plans Sa.Drainage Analysis Bob.Drainage Plans 7.Utilities 8.Environmental Permits,Compliance&Clearances 9.Structures-Misc.Tasks,Des,Non-Tech. 10.Structures-Bridge Development Report 11.Structures-Temporary Bridge 12.Structures-Short Span Concrete Bridge 13.Structures-Medium Span Concrete Budge 14.Structures-Structural Steel Bridge - 15.Structures-Segmental Concrete Bridge 16.Structures-Movable Span 17.Structures-Retaining Walls 18.Structures-Miscellaneous - 19.Signing&Pavement Marking Analysis 20.Signing&Pavement Marking Plans - 21.Signalizalion Analysis 22.Signalnation Plans 23.Lighting Analysis 699 15.0% 250% 25.0% 20.0% 15.0% 10000% 24.Lighting Plans 131 150% 25.0% 25.0% 20.0% 150% 10000% 25.Landscape Architecture Analysis 26.Landscape Architecture Plans 27.Survey(Field&Office Support) 28.Photogrammetry 29.Mapping { 30.Terrestrial Mobile LiDAR 31.Architecture Development 32.Noise Barriers Impact Design Assessment 33.Intelligent Transportation Systems Analysis 34.Intelligent Transportation Systems Plans 35.Geotechnical un suns.,. ..su ss Peoea de 2/1/2011 5.11 w ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Project: SR At A/Indian Creek from 26 Street to 41 Street Consultant Name-TRACE Consultants,Me County Miami-Dade Consultant No.: nsullanls proj number FPN: 439228-1-32-01 Date. 2/7/2017 FAP No Estimator FP arnce Staff Classification Total Staff project Senior Project En Engineering Staff ClaClass, Staff Class, Staff Clasen Staff Classi- Solt Class, Staff Classi- Staff Class, So Salcey Average “burs From Manager Engineer Engineer r Intern fication a ficaticn 7 fication B fication 9 fiction 10 ficetion 11 fication 12 "SII Sunmary By Dost By Rate Per -Finn' 58000 48000 544Oa 5.1434 52900 Activity Activity Task 3.Protect General and Protect Common Tasks 90 V/0' 4.Roadway Analyse 905/0' 5.Roadway Plans 900/0' 6a.Drainage Analysis 905/01 6b.Drainage Plans 905/01 7.LEIges 905/01. 8.Environmental Permits.Compliance 8 Clearances 9DI0/0' 9.Structures-Misc.Tasks.Dogs.Non-Tech. 9010/0' 10.Structures-Bridge Development Report 900/0' 11.Structures-Temporary Bridge 900/0' 12.Structures-Short Span Concrete Bridge 900/0' 13.Structures-Medium Span Concrete Brags 900/0' 14.Structures-Structural Steel Bridge 905/0 15.Structures•Segmental Concrete Bridge 905/0'. 16.Structures-Movable Span 900/0'. IT Structures-Retaining Walk 900/0' 18.Structures-Miscellaneous 905/0' 19.Signing 8 Pavement Marking Analysis 905/01 20.Signing g Pavement Markng Plans 900/0' 21.Signalaation Analyse i00/0' 22 Signalaaoon Plans 900/0' 23.Lighting Analysis 689 103 172 172 138 103 668 137.308 $54.23 24 Lighting Plans 131 20 33 33 26 20 132 $7,187 $5430 25 Landscape Architecture Analyss 905/0'. 28.Landscape Archiecture Plans pp0/0. 2T Survey(Feld 8 Office Support) M0V/0. 28.Phoogrananahy 90V/0' 29.Mapping 900/0 30.Terrestrial Mobilo LiDAR 905/0 31.Arch tadure development #05/0• 32.Noise Bamers Impact Design Assessment 900/01 33.Intelligent Transportation Systems Analyse t0/0' b.Intelligent Transportation Systems Plans 9050/0'. 35.Geotechnical 905/0' Total Staff lours 820 123 205 205 164 123 820 Total Staff Cost 19.84000 016,400.00 59036.40 $563176 13.667 00 144,475.16 86430 Check= 144,475.16 Survey Feld Days by Subconsultant SALARY RELATED COSTS $44,475.16 4-Person Cr. OVERHEAD: 121 32% 153,957 26 OPERATING MARGIN: 44 5% 519.791 45 Notes: FCCM(Faciies Capital Cost Money)' 0.169% S.06 1.The sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: raw 2 Manually enter face from each subconsultart.Unused subconsuffant rows may be hidden. Survey(Field-ff by Prime) days® $ - /day SUBTOTAL ESTIMATED FEE: 1118,307.93 Subconsuldnt'.Sub SUBTOTAL ESTIMATED FEE: 8118,307.93 Geotedhnioal Field and Lab Testing SUBTOTAL ESTIMATED FEE: 1118,307.93 Optional Services GRAND TOTAL ESTIMATED FEE: 1118,307.93 Fee Est.,LpMing•Indian Creek Fee greet-TRACE oage 8.5 X721117 527 PM Project Activity 23:Liahtina Analysis Estimator:FP SR A1A/Indian Creek from 26 Street to 41 Street 439228-1-32-01 Representing Print Name Signature/Date FOOT District TRACE Consultants,Inc. NOTE:Signature Block is optional,per District preference TNdsk Task Units No.of Units Units) Total Hours Comments 23.1 Lighting Justification Report LS 1 0 0 N/A 23.2 Lighting Design Analysis Report LS1 80 80 23.3 Aeronautical Evaluation LS 1 0 0 N/A.Assume not needed 23.4 Voltage Drop Calculations LS1 30 30 Multiple cicuits 23.5 FDEP Coordination and Report LS1 0 0 23.6 Reference and Master Design Files LS 1 186 186 60 hours for setup and 140 hours per mile. 16 different analysis zones:4 signalized intersections and 4 additional midblock crossings.(0.9 mi.z 140 hrs/mi.=126 hours+60 hours=186 hrs.) 23.7 Temporary Lighting LS1 40 40 For developing temporary lighting treatment and details 23.8 Design Documentation LS 1 16 16 23.9 Quantities LS1 27 27 9 sheets @ 3 hours each=27 23.10 Cost Estimate LS 1 8 8 23.11 Technical Special Provisions LS 1 0 0 23.12 Other Lighting Analysis LS 1 152 152 Post design services:80 hours for field reviews and construction meetings,32 hours for shop drawings 8 40 hours for plan revisions Lighting Analysis Technical Subtota 539 23.13 Field Reviews LS1 30 30 2 person/trip c 5 hrs/person o 3 trips=30 hours 23.14 Technical Meetings LS 1 52 52 23.15 Quality Assurance/Quality Control LS % 5% 27 23.16 Independent Peer Review LS % 0% 0 23.17 Supervision LS % 5% 27 Lighting Analysis Nontechnical Subtota 136 23.18 Coordination LS % _.o 14 23.Lighting Analysis Tota 689 Fee Estimate Lighting-Indian Creek 23 Lighting Analysis Page 6 of n 2/72017 Proiect Activity 23:Liehtina Analysis Technical Meetings Units No of Units Hours/Unit Total Hours PM Attendance at Meeting Required? Number FDOT Lighting Design EA 2 4 8 FDOT Traffic Design EA 0 0 0 Power Company(service point coordination) EA 2 4 8 Maintaining Agency(cities.counties) EA 2 4 8 Airport authority EA 0 0 0 FDEP Lighting(coast areas) EA 0 0 0 - Other Meetings EA 3 4 12 City of Miami Beach Subtotal Technical Meetings 36 Subtotal Project Manager Meetings 0 Progress Meetings(if required by FDOT) EA 2 4 8 PM attendance at Progress Meetings is manually entered on General Task 3 -- Phase Review Meetings EA 2 4 8 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- Total Meetings 52 Total Project Manager Meetings(carries to Tab 3' 0 Fee Estimate Lighting-Indian Creek 23.Lighting Analysis Page 7 of 8 2/7/2017 24.Liahtina Plans Estimator:FP SR A1A/Indian Creek from 26 Street to 41 Street 439228-1-32-01 Representing Print Name Signature/Date FDOT District TRACE Consultants,Inc. NOTE:Signature Block is optional,per District preference Task Task Scale Units Nu:::of Hours/Unit No.of Total Hours Comments No. Sheets 24.1 Key Sheet Sheet 4 1 4 24 2 Summary of Pay Items Including Designer Interface Sheet 0 0 0 0 (TRNS•Port)Input 24.3 Tabulation of Quantities Sheet 2 9 2 18 12 hours for first one and 6 hours for second one 24.4 General Notes/Pay Item Notes Sheet 1 1 1 4 Project specific notes and clarification Pay Item notes 24.5 Pole Data,Legend and Criteria Sheet 1 16 1 16 24.6 Service Point Details Sheet 2 10 2 20 24.7 Project Layout Sheet 0 0 0 0 N/A 24.8 Plan Sheet Sheet 9 3 9 27 24.9 Special Details Sheet I 12 1 12 24.10 Temporary Lighting Data and Details Sheet 9 2 9 18 Based on developing required information for temporary lighting on MOT dans 24.11 Traffic Control Plan Sheets Sheet 0 0 0 0 24.12 Interim Standards LS 1 0 0 Lighting Plans Technical Subtotal 26 119 24.13 Quality Assurance/Quality Control LS % 5% 6 24.14 Supervision LS % 5% 6 24.Lighting Plans Total 26 131 Fee Estimate Lighting-Indian Creek 24 Lighting Plans Page 8 of 8 2/72017 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.1 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BE,•,g fF,. r/ i !i 4i (D 2-. 17 I 4'... 0' \..........0.......... / Rafael Granado, ity Clerk 4N ,'' •.O,,\PhiIi 'Lev':/P• yor .• '"—+ ,, 00" '•: > S f /' i•"1 * -.INCORPORATED= * 4. 1 , ��j ",&01 P ,4 VED AS TO /.1 � ' �o FOR '& LANGUAGE &FOR EXECUTION t •' . 0H 2' � ,,(,,,i2_()?,-1 l -Z I - (7 City Attorney 1-2_141,0 D to ATTEST: CONSULTANT: RIBBECK ENGINEERING, INC. 0 , „, , ,....,_ , / A (Signa re) i s to e r G.A4 CALL ()I-Wk, 811) 00/11- Car/of K114 4te i P4::-. (Print Name and Title) fI (Print Name and Title) -'es/t s /i