2017-29934 Resolution RESOLUTION NO. 2017-29934 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND GEC ASSOCIATES, INC., FOR CONSTRUCTION SERVICES AT ALLISON PARK, WHICH CHANGE ORDER INCLUDES: 1)ADDITIONAL CONSTRUCTION SERVICES ASSOCIATED WITH CHANGING THE PLAYGROUND SURFACE FROM ENGINEERED WOOD FIBER TO A POURED-IN-PLACE RUBBERIZED SURFACE; 2) PROVIDING ADDITIONAL LANDSCAPING TO INCLUDE LARGER SHADE TREES; AT A COST NOT- TO-EXCEED $354,982; 3) INCREASING THE OWNER'S CONTINGENCY BY THE AMOUNT OF $17,749; RESULTING IN A TOTAL CHANGE ORDER AMOUNT OF $372,731; AND 4) PROVIDING THE CONTRACTOR A TIME EXTENSION OF 137 CALENDAR DAYS TO ACCOMMODATE THE CHANGE IN SCOPE; AND FUNDING THE CHANGE ORDER THROUGH PREVIOUSLY APPROPRIATED FUNDS IN THE CURRENT FISCAL YEAR BUDGET. WHEREAS, on September 14th, 2016, the City Commission, pursuant to Invitation to Bid (ITB) No. 2016-153-KB, approved the award of a contract, for the construction services for Allison Park to GEC Associates, Inc.; and WHEREAS, the contract amount was $709,835.50, including contingency; and WHEREAS, on June 8, 2017, the City Commission adopted Resolution 2017- 29896, approving changing the playground surface contemplated in the contract from engineered wood fiber to a poured-in-place rubberized surface; and WHEREAS, the City Commission also approved adding more landscaping to include larger shade trees, and opening the park once all the changes are complete; and WHEREAS, all the proposed modifications to the design plans have been reviewed by the Planning Department and have been administratively approved, therefore, the modifications do not require Design Review Board action; and WHEREAS, following the directive from the City Commission the Parks and Recreation Department and the Office of Capital Improvement Projects coordinated efforts to make the necessary changes in the design and obtained a negotiated proposal from GEC in the amount of$354,982; and WHEREAS, the change order includes the change to the playground surface from engineered wood fiber to a poured-in-place rubberized surface; additional landscaping to include larger shade trees; a contingency in the amount of $17,749; and a time extension of 137 days to accommodate the modifications to the plans, with a new substantial completion date of September 29, 2017; and WHEREAS, the proposal was reviewed by staff and the architect of record, Bruce Howard and Associates (BHA); and WHEREAS, BHA has issued a letter to the City confirming that the cost is fair and reasonable. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA to approve and authorize the City Manager to execute Change Order No. 1 to the construction contract between the City Of Miami Beach, Florida and GEC Associates, Inc., for construction services at Allison Park, which change order includes: 1) additional construction services associated with changing the playground surface from engineered wood fiber to a poured-in-place rubberized surface; 2) providing additional landscaping to include larger shade trees; at a cost not-to-exceed $354,982; 3) increasing the owner's contingency by the amount of $17,749; resulting in a total Change Order amount of $372,731; and 4) providing the contractor a time extension of 137 calendar days to accommodate the change in scope; and funding the change order through previously appropriated funds in the current fiscal year budget. PASSED and ADOPTED this 4 day of /Ny , 2017. d PH P LEV; , "OR ATTEST: , jam• ���;,.•��% �� APPROVED AS TO �, r♦ B E,q !►, FORM & LANGUAGE - • AEL E. GRANADO, «YIP;e: & FOR XECU •N \f _ \\ � z,' , elf ., 1 �' sip Ci Attorney ov Dote X444 RCH-26, . -Am...gym Resolutions-C7 Z MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: July 26, 2017 SUBJECT A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDAAND GEC ASSOCIATES, INC., FOR CONSTRUCTION SERVICES AT ALLISON PARK, WHICH CHANGE ORDER INCLUDES: 1) ADDITIONAL CONSTRUCTION SERVICES ASSOCIATED WITH CHANGING THE PLAYGROUND SURFACE FROM ENGINEERED WOOD FIBER TO A POURED-IN-PLACE RUBBERIZED SURFACE; 2) PROVIDING ADDITIONAL LANDSCAPING TO INCLUDE LARGER SHADE TREES; AT A COST NOT-TO- EXCEED $354,982; 3) INCREASING THE OWNER'S CONTINGENCY BY THE AMOUNT OF $17,749; RESULTING IN A TOTAL CHANGE ORDER AMOUNT OF $372,731; AND 4) PROVIDING THE CONTRACTOR A TIME EXTENSION OF 137 CALENDAR DAYS TO ACCOMMODATE THE CHANGE IN SCOPE; AND FUNDING THE CHANGE ORDER THROUGH PREVIOUSLY APPROPRIATED FUNDS IN THE CURRENT FISCAL YEAR BUDGET. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS On September 14th, 2016, the City Commission, pursuant to Invitation to Bid (ITB) No. 2016-153- KB, approved to award a contract, for the construction services for Allison Park to GEC Associates, Inc., The contract amount was$709,835.50, including contingency. On June 8, 2017, the City Commission adopted Resolution 2017-29896, approving the replacement of the playground surface from engineered wood fiber to a poured-in-place rubberized surface, adding more landscaping to include larger shade trees, and opening the park once all the changes are complete. The colors of the poured-in place rubberized surface will consist of light green, green, tan and brown. All changes have been reviewed by the Planning Department and have been administratively approved, therefore, not requiring Design Review Board action. Following the directive from the City Commission, the Parks and Recreation Department and the Office of Capital Improvement Projects coordinated efforts to make the necessary changes in the design and obtained a negotiated proposal from GEC (Exhibit A) in the amount of $354,982. The proposal was reviewed by staff and Bruce Howard and Associates (BHA), the architect of record. BHA has issued a letter(Exhibit B), which states that the cost is fair and reasonable. Page 1117 of 2495 The change order includes a contingency in the amount of$17,749 and a time extension of 137 days to accommodate the changes. The new substantial completion date is September 29, 2017. CONCLUSION The Administration recommends approval of the Resolution. Amount 1 $354,982 Account 1 307-0820-069357-26-410-546-00-00-00- 29620- Construction Amount 2 $ 17,749 Account 2 307-0820-069357-26-410-546-00-00-00- 29620—Contingency Total $372,731 Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description ❑ Exhibit A. GEC Proposal ❑ Exhibit B.BHA Ltr of Rec. o Resolution Page 1118 of 2495 Attachment A July 14, 2017 Mr. Jose Velez Capital Project Coordinator Office of Capital Improvement Projects 1700 Convention Center Drive Miami Beach, FL 33139 RE:Allison Park Upgrades REVISED V Proposal for New rubber surface at playground Dear Mr. Velez: In accordance with our negotiations on July 13, 2017 at your offices. We hereby submit a revised proposal that incorporates our discussion and agreement. The work involves the installation of base course of clean fill and new poured in place rubber surfacing with concrete curbs per sketch LH3 dated 6112117. The breakdown of work includes the following: Remove existing EWF: $ 24,000.00(delivered to CMB storage yard) Site prep and grade: $ 2,500.00 Clean fill plus 4"rock on top: $ 49,100.00 Rock base at curbs: $ 2,740.00 Concrete Curbs: $ 16,400.00 Survey: $ 1,600.00 Tree anchors: $ 4,000.00 PIP Rubber: $187,000.00 Temp.fencing: $ 1,900.00 New sod and irrigation $ 4,200.00 16 New Trees and relocate 8 $ 30,000.00(estimate) General Conditions: $ 0.00 Subtotal: $323,440.00 Bond 2%: $ 6,468.80 Ohl/P 7.6%: $ 25,073.07 TOTAL; $354,981.87 General Contractors—Construction Managers 9487 N.W.12th Street,Doral,Florida 33172 Page 1119 of 2495 Three Hundred Fifty-four Thousand, Nine Hundred Eighty-one Dollars and Eighty-seven cents in the spirit of cooperation to assist the CMB to meet their budget, GEC has willingly reduced their allowed Overhead and Profit from 10%to 7.6% as calculated in this proposal. Please note the following: 1. The price of the trees shown are for based on a 16'to 18' height. At the time of this proposal, 20' trees were not available in the species specified. Sincerely, --7 • Gres Tai GEC n.`.S�Cu 4 rES Project Executive General Contractors—Construction Managers 9487 N.W.12th Street, Doral,Florida 33172 Page 1120 of 2495 Allison Park Rubber Surface Unit Cost Breakdown V 7/14/2017 Remove and deliver EWF Unit Qty Time rate deliv/tax/ins Total Skid steer 2 2 weeks 1027.3/wk $726 $4,835.20 Equip oper. 2 2 weeks 32.45/hr 0 $5,192.00 Back hoe 1 2 weeks 445/day $79.6 $7,026.00 Labor 2 3 weeks 19.92/hr 0 $3,187.20 Trucking 22 170.90/load I $3,759.80 Haul 346 cy only $24,000.00 SITE PREP/GRADE Area _Unit Total 12,067 sf 0.21 $2,500.00 SURVEY Qty Rate Total 2 ea $800 ea. $1,600.00 IMPORT AND INSTALL FILL AND ROCK Unit Qty Time Rate deliv/tax/ins. Total Back hoe 1 1 week $445/day 796 $3,911.00 Equip.oper. 1 1 week 32.45/hr 0 $1,298.00 Skid steer 2 2 weeks 1027.30/wk 726 $4,835.20 Roller 1 2 weeks 839/wk 640 $2,318.00 Compactor 2 2 weeks 401/wk 567 $2,171.00 Trucks 33 $131.50/truci� 0 $4,340.00 Labor 3-2 weeks 19.92/hr 0 $4,780.80 Fill 447cy $56.93/cy $25,446.00 $49,100.00 CURBS Mat. Qty Rate Total Rock base 7761f $3.53 $2,740.00 •Concrete 7761f $21.13 $16,400.00 $19,140.00 Page 1121 of 2495 July 18,2017 Mr.Jose Velez Capital Project Coordinator Office of Capital Improvement Projects 1700 Convention Center Drive Miami Beach, FL 33139 RE:Allison Park Upgrades PIP Material Cost Dear Mr.Velez: With regard to the submitted PIP proposal dated July 14,2017,this letter will confirm the revised cost of the actual poured in place material. In the spirit of cooperation,GEC offers a reduced cost for the said material in order to assist the CMB in meeting their available budget: Original Cost: $227,704.29 Revised Cost I: $190,000.00 Credit offered: f$ 3.000.001 Revised Cost H: $187,000.00 Sincerely, Gre' Tai GEC Project Executive General Contractors—Construction Managers 9487 N.W.12th Street,Doral,Florida 33172 Page 1122 of 2495 & ace Savices 3113 Sk;:way Circle Solutions �tellxxarne,Fl.32934 tilt+:-?illPlay ,t(;) Innovative Solutions Phone 1-321-775-0600 Fax 1-321-242-2_216 Toll]Free•888.653-7329 Date: 6;19/2017 PROPOSAL Proposal# 15704 Prepared for: Greg Tai Payment Terms: Net 45 Customer Phone: Customer Fax Proposal Valid Until: 7/19/2017 Organization: GEC Associates Project: 9487 NW I2th Street Doral,FL 33172 Ship To Allison Pork 6500 Collins Ave Miami Beach,FL 33141 Sales Rep AC Scope of Services: DESCRIPTION Supply,Delivery and installation of EPDM Poured In Place Rubber Surfacing to Cover an Area of 12067 sq.11,at Varying Depths and Colors as per Plans -948 sq.It.era Depth ol'2"-50%'Pan 50%Brown - 1043 sq.ft.at a Depth a 3.5"-50%Tan/50%Brown -2923 sq.ft.at a Depth of 3.5"•50!t Light Greerzr50%Green •1872 sq.fl.at rt Depth of 3.5"- 100%Ten -2836 sq.ti..at a Depth of 3.5"-50%Tan/50%Brown -207 sq. R.nt a DJ ' -100%Tan •1394 :q.4.--At s Depth of 4"--..5.0%Light Green/50%Green •]-3';'4 aq.tl,at a Depth of 4"-10%)Tan/50%[Sr vn y`I'UTAL-$227,704.20 �.—_. 1qr(T ) fes/ . \..P.cQpossaL.iuekidesiite following:labor and insurance in accordance with manufacturer specifications. Proposal does not include the following:prevailing wage differences,performance bonds,site damages for sprinkler systems and sod,and access to construction site. Items to be managed by customer unless otherwise stated in proposal: She security and safely requirements while job is in progress, Customer to provide 110 electrical power and Iv'aler required!or proper installation All underground utilities ho marked prior to installelion, Provide waste receptacle us acconn nodale construction debris. Provide benchmark for required elevation to he established. Complete site preparations,excavation and disposal of spoil. Subtotal Sales Tax (0.001 TOTAL Signature: Print'Name:'Nile: Dale ._- P.D.r. The aiot quoin ion is based upon she access for henyequipment and soil conditions uf2000 PSI. If during excavation of Inundations necessary ler iiutnuhmntireres specifications conditions exceed normal,our contractor shalt not Ifi the nn ner immcdintely. 'Ibis shell include all typo:of rock vegetui ion and any u-sforseen hnrards. I here will additional charges incurred to clear the area and or the ebutemcm hole so Ilan installation can he completed. Page 2 Page 1123 of 2495 Attachment B July 14th,2017 1311 Attention: Jose Velez 6)4Capital Projects Coordinator Office of Capital Improvement Projects 1700 Convention Center Drive Miami Beach,FL 33139 1312t1C1 1iOWADD C5 AS&7ClATt&, INC. landscape AM-Accts.chit,:.Plaroets Golf r`UCAC 'C'a RE: Recommendation for the Change Order to Install PIP Rubber Surface at Allison Park(RFQ#01-09/1 0-Allison Park) Dear Mr.Velez: We have reviewed the proposal by GEC Associates dated July 14th, 2017 and titled"REVISED V Proposal for New rubber surface at playground".Based on our cost estimates from several different vendors, the costs given are equal to the current market prices. We are in agreement with the price given by GEC. Also,with GEC having performed the construction of the site to date,having them continue the process will allow for their warranty for all materials on site to remain in effect. As such,we would like to recommend the approval of this change order. Sincerely yours, 1b460(.21:4)Vitte Bruce Howard 4872 S.W.72nd Avenue—Miami,-FL 33155 —(305)66$-3196—Fax(305)668-2871 • Page 1124 of 2495