Loading...
Amendment No. 29 to the Agreement with Fentress Architects in the amount of $30,875 Zc R . 28538 AMENDMENT NO. 29 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$30,875 This Amendment No. 29 to the Agreement made and entered this 15-day of /VI T, 2017, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as "Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required 1 of the Architect-Engineer for the Project, in the total amount of$15,156,359 (part of Resolution No. 2015- 28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of$17,121; and 2 WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000;and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625; and WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisions to the signage package, in the amount of$12,030; and WHEREAS, on May 5, 2017, Amendment No. 26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$15,580; and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017 (Agenda Item R7T); and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of$2,585; and WHEREAS, this Amendment No. 29 is for design solutions for contractor-requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals,funded from a deductive change order to the Agreement with Clark Construction; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 29. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-29", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 29. 3 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 29 to be executed in their names by their duly authorized officials as of the date first s-t forth above. ATT CITY OF ,I IAMI BEA'H R ael Granado a . v, %tit Jimmy L. )orales Al:City Clerk � ` B E1 N� City Mana,er ATT : 0 i ,��.� ''�G��NSULT NT: -'' : \t;1 F TRESS ARCHITECTS .,Ilk _ /n = e;. --�.-`.._-- it f' 611,Vim--• Signature: = o„e\-[ D Sief ature ' W • =� -.\ 0°P`` •,1 i. c a / - A' 141N l' ' c��� '� r , La _ : ela.r 7 Print Name/Title ��� I'v�'� �, � ••'' �.`;int Na - /Title 9.( '� APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION ataATL , i'l-‘1 , City Attorney 11. Date • 4 Appendix"A-29" 1. SCOPE OF SERVICES RFI 3251: Refer to proposal dated July 12, 2017 attached herein. Structural Submittals additional reviews: Refer to proposal dated June 16, 2017 attached herein. 2. TIME OF COMPLETION N/A 3. PAYMENT AND COMPENSATION RFI 3251: $20,875 Structural Submittals: $10,000 Summary Project Contingency Added Total Scope Original Agreement $10,967,200 $1,096,720 $12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment6 $(3,129,259) $(3,129,259) Amendment 8 $15,156,359 $15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $25,436,700 $1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21-Cameras,vaults,RFIs,kitchen,transition slab $ 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) $ 17,121 Amendment 23-NCRs* $ 10,000 Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27-Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Total $25,436,700 $1,000,000 $1,098,483 $27,535,183 1. Amendments 14, 18,20,23,26&29 totaling$414,813,funded from Clark's contract via deductive change orders. 2. Amendment 22 funded from AIPP fund. 5 -EENTRESS-` ARLif hits ientressars;hit:pis c;r, June 16, 2017 \lr. Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 49—Structural Submittals Additional Reviews Part 3 Project 20140021.001 A51 Dear Mr. Morales: This proposal is to provide additional reviews of shop drawing submittals in excess of the two 12)provided for as part of the Design Team's basic services. The additional reviews constitutes an additional service,as this scope is outside of the Fentress team's current scope of work as dictated under Cast-In-Place Concrete Specification 03 3000 Section 1.3.F.2.b and Structural Steel Framing Specification 05 1200 Section 1.4.C.11. SCOPE OF SER This proposal includes efforts expected to review the specific list of shop drawings under Specifications 03 3000 and 05 1200 in Phase 1 and Phase 2 sequences listed in Wallace's original proposal dated June 14,2017,attached. These submittal sequences are different from those approved in Amendment 26. SCHEDULE Services for submittal items having been submitted since February 28, 2017 that were not covered in the negotiation of Amendment 26 services. FEE Fees for all services will be on a Time and Materials basis with a top set amount of Ten Thousand Dollars (S 10,000). Reimbursable costs for labor will be billed as incurred in accordance with the existing terms and conditions of our Agreement. Billings for these services will be invoiced under the heading g20140021.001 A51. The City will be performing a deductive change order against Clark's contract to fund this extended CA Services agreement. If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects -7,-7 7. /- Jo n liudrycki. A1A,KEED/1SD-C Principal enc1: Fee Summary dated June 16,2017 Wallace proposal for 1510414.36 dated June 14. 2017 DEN _C 21 Dr0. 3j,hay Denver 83203 J ,, 3 . 22.5000 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 49—Structural Submittals Additional Reviews Part 3 June 16,2017 Page 2 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Strategic Advisory Group Steven DiBartolo,Heidi Wigand,Hill International,Inc. Holly Carson,David Burkey,Anne McNeely,Mikala Casillas,Fentress Architects Jorge Mendoza,Clark Construction Company Project: Structural Submittal Additional Reviews Part 3 Miami Beach Convention Center Renovation & Expansion 6/16/17 Reviews Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $1,480 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering(Lump SKimley-Horn Landscape West 8 7 $0 Structural Engineering Wallace 8 $8,520 Plumb,Mech, Elec,Lighting ME Engineers 14-18 „ '$0. IT,Security,AV,Acoustics DL Adams 20 :4f Food Service Caruso 25 g°$0 Graphics and Signage TKD 28 .$0. Parking Consultation Walker Parking 29 $0 Sub total $10,000 Optional Services Vertical Transportation Lerch Bates 12 $0 Design Fees Total(Lump Sum) $10,000 Expenses $0 Total Total $10,000 Structural Submittals Additional Reviews Part 3 Fentress Architects .Hours Job Title Hourly Rate Hours Extension Task Management,Architectural Design,Coor' ination and Overs ge Project Architect $150.00 9.8667 $1,480.01 Architect III $200.00 0 $0.00 Architect II $120.00 0 $0.00 Interior Designer II $110.00 0 $0.00 John Kudrycki $225.00 0 $0.00 Totals this activity: Hours 9.9 $1,480.01 Total,Sub 1 9.9 $1,480.01 Hours Total 9.9 $1,480.01 Structural Submittals Additional Reviews Part 3 Miami Beach Convention Center Fentress Project No:20140021 June 16,2017 Page 2 of 3 Structural Submittals Additional Reviews Part 3 Consultant Wallace Hours Job Title Hourly Rate Hours Extension Tit&I Structural Engineering Principal $170.00 0.0 $0.00 Associate $150.00 $0.00 Registered Engineer II $135.00 $0.00 Registered Engineer I $120.00 71.0 $8,520.00 CAD Technician III $105.00 0.0 $0.00 Totals this activity: Hours 71.0 $8,520.00 Total,Sub 1 71.0 $8,520.00 Hours Total 71.0 $8,520.00 Structural Submittals Additional Reviews Part 3 Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 June 16,2017 wall ace A June 14,2017 Mr.John Kudrycki,AIA,LEED AP BD+C Fentress Architects 421 Broadway Denver, Colorado 80203 RE: Additional Services related to Repeated Reinforced Concrete and Steel Submittal Reviews(3/1/17 to 6/13/17) Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.36 Dear John: We have assembled costs associated with the repeated steel submittal reviews per the GMP spec 051200 section 1.4.C.12 between 3/1/17 and 6/13/17. STRUCTURAL STEEL GMP spec 051200 section 1.4.C.12 states". ..Time required by Wallace Engineering Structural Consultants, Inc.to review shop drawing submittals a second or third time will be billed to the General Contractor at Wallace Engineering Structural Consultants,Inc.hourly rates." Structural Steel Sequences reviewed multiple times • SEQ 2027(OPEN) o 051200-357.0 o 051200-357.1 o 051200-357.2 • SEQ 400 o 051200-376.0 o 051200-376.1 o 051200-376.2 o 051200-376.3 • SEQ 402(OPEN) o 051200-387.0 o 051200-387.1 o 051200-387.2 • SEQ 602 o 051200-336.0 Wallace Engineering Structural Consultants,Inc. 200 East Mathew Brady Street Tulsa,Oklahoma 14103 918.584.5858,800,3645858 w'. v.wallacesc.coe Mr.John Kudrycki 1510414.36-Additional Services related to Repeated Reinforced Concrete&Steel Submittal Reviews June 14,2017 Page 2 o 051200-336.1 o 051200-336.2 • SEQ 629(OPEN) o 051200-406.0 o 051200-406.1 • SEQ 700 o 051200-345.0 o 051200-345.1 o 051200-345.2 • SEQ 701 o 051200-323.0 o 051200-323.1 o 051200-323.2 • SEQ 702 o 051200-324.0 o 051200-324.1 o 051200-324.2 o 051200-324.3 o 051200-324.4 • SEQ 703 o 051200-325.0 o 051200-325.1 o 051200-325.2 o 051200-325.3 • SEQ 704 o 051200-326.0 o 051200-326.1 o 051200-326.2 o 051200-326.3 • SEQ 705 o 051200-327.0 o 051200-327.1 o 051200-327.2 o 051200-327.3 o 051200-327.4 • SEQ 706 o 051200-328.0 o 051200-328.1 o 051200-328.2 o 051200-328.3 • SEQ 707 o 051200-329.0 Mr.John Kudrycki 1510414.36-Additional Services related to Repeated Reinforced Concrete&Steel Submittal Reviews June 14,2017 Page 3 o 051200-329.1 o 051200-329.2 • SEQ 709(OPEN) o 051200-382.0 o 051200-382.1 • SEQ 710 o 051200-384.0 o 051200-384.1 o 051200-384.2 • SEQ 808(OPEN) o 051200-391.0 o 051200-391.1 • SEQ 809(OPEN) o 051200-392.0 o 051200-392.1 • SEQ 901 (OPEN) o 051200-439.0 o 051200-439.1 • SEQ 905(OPEN) o 051200-145.1 o 051200-145.2 Based on the above,the proposed fee for this work will be billed at our hourly rates with a total fee estimate of $8,500. We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING•STRUCTURAL CONSULTANTS,INC. tr"'",,- A . r*"...."- r e w Kern,P.E., S.E.,CWI,ICC-SI,MA P ncipal c : File FENTRESS tentressareNtects con July 12,2017 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 50—RFI 3251 NCR Truss Spacer Plates Project 20140021.001 A52 Dear Mr.Morales: This proposal is to provide design input or solutions for contractor-requested items relating to closing Non- Conforming conditions in the field. This work constitutes an additional service, as additional site representation is outside of the Fentress team's current scope of work. SCOPE OF SERVICES: The City and the Construction Manager(CM)have realized an ongoing need for design input and development from the Fentress team. This is for design solutions requested by the CM for non-conforming conditions that have been installed in the field related to RFI 3251. FEE Fees for all services will be a total proposed Lump Sum amount of Twenty Thousand Eight Hundred Seventy- Five Dollars($20,875). Reimbursable costs for printing,telephone,delivery and travel are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.001.A52. The City will be performing a deductive change order against Clark's contract to fund this extended CA Services agreement. If the foregoing correctly states your understanding,please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jo Kudrycki, AIA, EED BD+C Principal encl: Fee Summary dated July 12.2017 Wallace proposal for 1510414.38 dated July 10,2017 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Jones Lang LaSalle Steven DiBartolo, Heidi Wigand,Hill International,Inc. Holly Carson, David Burkey,Anne McNeely,Mikala Casillas,Fentress Architects Jorge Mendoza,Clark Construction Company DEN DC LA SF ION OH I 421 Broadway I Denver CO 80203 I 323 722 500:, Project: RFI 3251 NCR Truss Spacer Plates Miami Beach Convention Center Renovation& Expansion 7/12/17 Reviews Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $900 Fire/Life Safety/Code Consulting Jensen Hughes 13 „ ' Civil/Utility Engineering(Lump Si Kimley-Horn Landscape West 8 ” Structural Engineering Wallace 8 $19,975 Plumb,Mech,Elec,Lighting ME Engineers 14-18 0sz + , 1 IT,Security,AV,Acoustics DL Adams 20 111,14,1,11M110; Food Service Caruso • 25 116,11iMilifiniatigN Graphics and Signage TKD 28 - ,. ,_ME dgeltZ Parking Consultation Walker Parking 29 , rt ` ; Sub total $20,875 Design Fees Total(Lump Sum) $20,875 Expenses $0 Total Total $20,875 RFI 3251 NCR Truss Spacer Plates Fentress Architects Hours Job Title Hourly Rate Hours Extension Task Management,Architectural Design,Coordination unci Oversight Project Architect $150.00 6 $900.00 Architect III $200.00 0 $0.00 Architect II $120.00 0 $0.00 Interior Designer II $110.00 0 $0.00 John Kudrycki $225.00 0 $0.00 Totals this activity: Hours 6.0 $900.00 Total,Sub 1 6.0 $900.00 Hours Total 6.0 $900.00 RFI 3251 NCR Truss Spacer Plates Miami Beach Convention Center Fentress Project No 20140021 July 12,2017 Page 2 of 3 RFI 32151 NCR Truss Spacer Plates Consultant Wallace Hours Job Title Hourly Rate Hours Extension Task 1 Structural Engineering Principal $170.00 50.0 $8,500.00 Associate $150.00 $0.00 Registered Engineer II $135.00 85.0 $11,475.00 Registered Engineer I $120.00 0.0 $0.00 CAD Technician III $105.00 0.0 $0.00 Totals this activity: Hours 135.0 $19,975.00 Total,Sub 1 135.0 $19,975.00 Hours Total 135.0 $19,975.00 RFI 3251 NCR Truss Spacer Plates Miami Beach Convention Center Fentress Project No:20140021 Page 3 of 3 July 12,2017 wallace July 10,2017 Mr. John Kudrycki,AIA,LEED AP BD+C Fentress Architects 421 Broadway Denver,Colorado 80203 RE: Additional Services related to Re-evaluation of Trusses per NCR RFI 3251 Miami Beach Convention Center Renovation&Expansion 1901 Convention Center Drive Miami Beach,Florida Wallace Project No. 1510414.38 Dear John: We have assembled costs associated with the re-evaluation of trusses per the Clark NCR RFI 3251 request on 7/10/17. The proposed fee for this work will be billed at our hourly rates with a total fee estimate of$19,975. We appreciate the opportunity to provide this information. If you have any questions or need additional information,please do not hesitate to contact us. Sincerely, WALLACE ENGINEERING• STRUCTURAL CONSULTANTS,INC. An rew Kern,P.E.,S.E.,CWI, ICC-SI,MA Pr ncipal c : File Wallace Engineering Strsct ual r cnsultants,Irc 2C<)East Mathew Bratty Street Tuisa,Oklahoma 74103 918 584 5858 800 364 5858 AAA wdlld<e;(corn Vieira, Thais From: Holly Carson <carson@fentressarchitects.com> Sent: Wednesday,July 12, 2017 5:06 PM To: Vieira,Thais Cc: FA20140021; Hernandez, Maria; 'Jeff Sachs (jeff.sachs@am jll.com) stevendibartolo@hillintl.com; 'Wigand, Heidi';John Kudrycki; Anne McNeely; Mikala Casillas; David Burkey; 'Jorge Mendoza' Subject: FW: FW: New Kahua Message: RFI 3251 (Phase 1 &2 - North and East Facade Issues) on Miami Beach Convention Center Attachments: image001.png; image006 jpg; image005 jpg; 20140021 Morales L 2017 0712 Truss Spacers RFI 3251 Proposal.pdf Please see attached for the letter proposal for this service. Thank you for consideration of acceptance. Regards, Holly Carson Fentress Architects 21 E27c;+'4 See'!er. CC 3t 3 7 j1 ",771 dir fentress i, From:Wigand, Heidi [mailto:HeidiWigand@hillintl.com) Sent:Tuesday,July 11, 2017 6:34 AM To:Jorge Mendoza <jorge.mendoza@clarkconstruction.com>; Holly Carson<carson@fentressarchitects.com>; nicole.williams@clarkconstruction.com Cc: Hernan Guerra Santos<hernan.guerra@clarkconstruction.com>;juan.cesin@clarkconstruction.com; DiBartolo, Steven<StevenDiBartolo@hillintl.com>;Castrodad, Eladio<EladioCastrodad@hillintl.com>;Vieira,Thais <ThaisVieira@miarnibeachfl.gov>;John Kudrycki<Kudrycki@fentressarchitects.com>;Andre Kirby <andre.kirby@clarkconstruction.com>; Maria Hernandez<MariaHernandez@miamibeachfl.gov> Subject: RE: FW: New Kahua Message: RFI 3251 (Phase 1&2 - North and East Facade Issues)on Miami Beach Convention Center Holly- please release Wallace. Nicole - please send Banker a deductive change order today for us to include as back up for the City's deduct. Heidi Wigand Heidi wigand(cr�hillintl.com 305.699.8334 Original message From: Jorge Mendoza<jorge.mendoza@clarkconstruction.com> Date: 07/11/2017 08:08 (GMT-05:00) To: "Wigand, Heidi" <HeidiWigand@hillintl.com> Cc: Heman Guerra Santos<hernan.guerra a,clarkconstruction.com>,juan.cesin@clarkconstruction.com, "DiBartolo, Steven" <StevenDiBartolo@hillintl.com>, "Castrodad, Eladio" <EladioCastrodad@hillintl.com>, i "Vieira, Thais" <ThaisVieira@miamibeachfl.gov>, John Kudrycki <Kudrycki@fentressarchitects.com>, Holly Carson - Fentress Architects <carson crlfentressarchitects.com>, "Nichole Williams - Clark Construction Group, LLC" <Nichole.Williams(cr,clarkconstruction.com>, Andre Kirby<andre.kirby@clarkconstruction.com> Subject: Re: FW: New Kahua Message: RFI 3251 (Phase 1 & 2 - North and East Facade Issues ) on Miami Beach Convention Center Heidi, Banker has accepted the cost proposal from Wallace and Fentress. Please release Wallace to proceed with the review. Thanks for your help. On Mon, Jul 10, 2017 at 5:25 PM, Wigand, Heidi <HeidiWigand cz hillintl.com<mailto:HeidiWigand@hillintl.com>> wrote: Jorge— Please see the email from the design team below for the cost of the review. Please confirm the expense with Banker and a deductive CO will be issued today to permit the design team to proceed. Heidi Wigand Project Controls Manager Miami Beach Convention Center Project Hill International, Inc. 1800 Convention Center Drive Miami Beach, FL 33139 305-699-8334<tel:(305)%20699-8334> (cell) heidiwigand@hillintl.com<mailto:sdibartolo cr hillintl.com> [Description: Email-Hill Logo] From: Holly Carson [mailto:carson@fentressarchitects.com<mailto:carson a,fentressarchitects.com>] Sent: Monday, July 10, 2017 5:00 PM To: Wigand, Heidi <HeidiWigand cchillintl.com<mailto:HeidiWigand@hillintl.com>>; DiBartolo, Steven <StevenDiBartolo(a,hillintl.com<mailto:StevenDiBartolo@hillintl.com>> Cc: FA20140021 <SMO-FA20140021 @,fentressarchitects.com<mailto:SMO- FA2014002 l @fentressarchitects.com>>; John Kudrycki <Kudrycki(cvfentressarchitects.com<mailto:Kudrycki c@fentressarchitects.com>>; 'ThaisVieira@miamibeachfl.gov<mailto:ThaisVieira@miamibeachfl.gov>)' <Thais V ieira@miamibeachfl.gov<mailto:ThaisVieira@miamibeachfl.gov>> Subject: FW: New Kahua Message: RFI 3251 (Phase I & 2 -North and East Facade Issues ) on Miami Beach Convention Center The design team proposal for this RFI response is $20,875 (Fentress= $900, Wallace= $19,975). Please let us know we will proceed on this issue and under what funding allocation it would be assigned if approved. Regards, Holly Carson Fentress Architects 421 Broadway Denver, CO 80203 USA 2 303.722.5000<tel:(303)%20722-5000> tel J 303.282.6071<tel:(303)%20282-6071> dir fentressarchitects.com<http://www.fentressarchitects.com/> From: Juan Cesin [mailto:juan.cesin@clarkconstruction.com<mailto:juan.cesin(clarkconstruction.com>] Sent: Monday, July 10, 2017 1:25 PM To: Kim Mahnken <mahnken(fentressarchitects.com<mailto:mahnken c@rfentressarchitects.corn>> Cc: Zach Munoz<Munoz@fentressarchitects.com<mailto:Munoz@fentressarchitects.com>>; Wigand, Heidi <HeidiWigand iihillintl.com<mailto:HeidiWigand(2hillintl.com>>; Holly Carson <carson@fentressarchitects.com<mailto:carson(c7r,fentressarchitects.com>> Subject: Re: New Kahua Message: RFI 3251 (Phase 1 & 2 -North and East Facade Issues ) on Miami Beach Convention Center Kim, RFI has been revised and resubmitted. Thanks, Juan Luis Cesin 1 Project Engineer CLARK CONSTRUCTION GROUP, LLC 1800 Convention Center Drive 1 Miami Beach, FL 1 33139 m. 954.805.3259<te1:786.564.6188> www.clarkconstruction.com<http://clarkconstruction.com/> On Mon, Jul 10, 2017 at 1:37 PM, Kim Mahnken <mahnkenafentressarchitects.com<mailto:mahnken@fentressarchitects.com>> wrote: Juan, This RFI is being returned for clarification for two reasons 1. Correct the title of the RFI. These are not North and East Facade Issues. 2. Include the NCR number. Thank you, Kimberly Mahnken, AIA, NCARB Associate [cid:image001.png@01 D2F970.DFE006A0]<http://fentressarchitects.com/> Fentress Architects 421 Broadway Denver CO 80203 303.282.6123<te1:(303)%20282-6123> D 1303.722.5000<tel:(303)%20722-5000> 0 About Us<http://fentressarchitects.com/firm-profile> Website<http://fentressarchitects.com/> I Contact Us<http://fentressarchitects.com/contact> 3 From: Juan Cesin [mailto:outbox@kahua.com<mailto:outbox cr;kahua.com>] Sent: Monday,July 10, 2017 8:00 AM To: Kim Mahnken <mahnken@fentressarchitects.com<mailto:mahnkenfentressarchitects.com>> Subject: New Kahua Message: RFI 3251 (Phase 1 & 2 - North and East Facade Issues ) on Miami Beach Convention Center Kimberly, RFI 3251 (Phase 1 & 2 - North and East Facade Issues) has been submitted to you for response on Miami Beach Convention Center. Question: "The outside inspector has questioned the approval note found on E705 (copy attached) regarding connector plates in the trusses of the angle and WT trusses on this project. Our detailer did not pick up the comment on this truss (705T001) and did not originally detail connectors on most of the other trusses throughout the job. We do have stitch plates in the sequence 9 trusses and can add them to the trusses not yet shipped (sequence 624 and above in the 600 series and the 400 series trusses). We believe, based on our in-house engineering review, a large portion of the spacer plates are not required per the design requirements of the AISC Specification. We request that the design team review our data and provide their feedback. We will compensate the design team for their review. Note the following: 1)Based on AISC, Specification (360-05) spacer plates are not specifically required in tension members. From our review of the design drawings, all diagonal members are in tension and would not require the spacer plates. Slenderness ratio calculations are included per Section D4. 2) We have reviewed trusses with the double WT and Double Angle Vertical members to determine if a single vertical WT or angle (ignoring the 2nd WT or angle that is there) would work with the design loads provided. In many instances, the single members are adequate and therefore the stitch plate may not be needed. We request the loads be evaluated further for those noted as requiring a spacer and eliminate the spacers for those as well. 3) If spacers are still required in some areas, we request that Banker Steel have the option for the spacers to be bolted or welded per the attached details. ". Please sign in to respond to this RFI. Click this link<httpsJ/launch.kahua.com/link/CA2z4B65EFD> to access your task in Kahua. [Image removed by sender. Kahua snowflake.png] This message was automatically generated by the kahua<https://www.kahua.com>platform. Click here<https://launch.kahua.com/Navigate?ActionData=RG9tYWIuS2V5PW 1 haG5rZW5AZmVudHJlc3NhcmN oaXR1Y3RzLmNvbTtFbnRpdH1EZWY9a2FodWFfI'WVzc2FnZU 1 hbmFnZXIua2FodWF#TWVzc2FnZTtFbn RpdH1JZD03MikzNDkwO1 BhcnRpdGlvbklkPTc3NDQyNjtBcHBHcm91 cD07QXBwP WthaHVhX011c3NhZ2 VNYW5hZ2VyOORvbWFpbIBhcnRpdGlvbk1kPTA7QXBwUGFvdG10aW9uSWO9NzcONDI2O 1 N 1 Y1BhcnR pdGlvbklkPTA7RW50aXR5VmlldzlQcmV2aWV3> to open this message in kahua. This e-mail may contain confidential or proprietary information. If you are not the intended recipient,please advise by return e-mail and delete immediately without reading or forwarding to others. Jorge Mendoza 1 Sr. Project Manager CLARK CONSTRUCTION GROUP, LLC 4 1800 Convention Center Drivel Miami Beach, FL 1 33139 m. 786.412.7530 www.clarkconstruction.com<httpJtclarkconstruction.consl> 5