Loading...
2017-30004 ResolutionRESOLUTION NO. 2017 -30004 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A SUPPLEMENTAL WORK ORDER WITH SNIFF CONSTRUCTION AND DEVELOPMENT, INC., FOR ADDITIONAL WORK RELATED TO THE NORTH BEACH SENIOR CENTER FACILITY PROJECT IN THE AMOUNT OF $23,276.31, UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT. WHEREAS, on June 8th, 2016, the City Commission adopted Resolution 2016- 29449, authorizing the City Manager to approve and execute a supplemental work order with Shiff Construction and Development, Inc., for replacement of the HVAC system at the North Beach Senior Center Facility Project, in the amount of $345,682, including contingency, utilizing the competitively bid National Joint Powers Alliance (NJPA) contract (the "2016 Work Order "); and WHEREAS, following execution of the 2016 Work Order and coordination with the City's Office of Capital Improvement Projects (CIP), Shiff Construction and Development, Inc. commenced the work, which involved the replacement of all existing air handlers and condensing units, including the relocation and conversion of an existing horizontal unit into a vertical unit; and WHEREAS, during the course of construction, Shiff Construction encountered unforeseen conditions, which required retrofitting and relocation of the fire alarm, fire sprinklers, and other work; and WHEREAS, in addition, the Administration recommends proceeding with certain City requested changes to enhance the successful completion of the replacement of the HVAC system at the North Beach Senior Center, such as installation of new thermostat covers and additional returns not covered by the 2016 Work Order, and which would require a new supplemental work order; and WHEREAS, the quote for the additional work is in the amount of $23,276.31; and WHEREAS, as the City Commission has authorized the Administration to utilize the NJPA indefinite quantity contract for construction services for projects under $250,000, and as the 2016 Work Order, in the amount of $345,682, exceeded the $250,000 threshold, the proposed supplemental work order is subject to City Commission approval; and WHEREAS, CIP and the Gordian Group have reviewed the proposal for the foregoing work, find it to be fair and reasonable, and recommend that the Mayor and City Commission approve the supplemental work order, in the amount of $23,276.31, to fully complete the Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the City Manager to execute a supplemental work order with Shiff Construction and Development, Inc., for additional work related to the North Beach Senior Center Facility Project in the amount of $23,276.31, utilizing the competitively bid National Joint Powers Alliance (NJPA) cooperative contract. PASSED and ADOPTED this ATTEST: AYOR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION RAFAE E. GRANADO, • TY CLERK L,, L--- s77)0 / City Attorney l ).to t)ate WJAM BEACH Resolutions - C7 AE COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 13, 2017 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPROVE AND EXECUTE THE SUPPLEMENTAL WORK ORDER WITH SHIFF CONSTRUCTION AND DEVELOPMENT, INC., FOR ADDITIONAL WORK REQUIRED AT THE NORTH BEACH SENIOR CENTER FACILITY PROJECT UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT IN THE AMOUNT OF $23,276.31 RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS On June 8th, 2016, the City Commission adopted Resolution 2016 - 29449, authorizing the City Manager to approve and execute the supplemental work order with Shiff Construction and Development, Inc., for replacement of the HVAC system at the North Beach Senior Center Facility Project utilizing the competitively bid National Joint Powers Alliance (NJPA) contract, in the amount of $345,682, including contingency. Following the supplemental work order being executed, the Office of Capital Improvement Projects (CIP) coordinated with Shiff Construction and Development, Inc., and commenced the work which involved the replacement of all existing air handlers and condensing units including the relocation and conversion of an existing horizontal unit into a vertical unit. During the course of construction, unforeseen conditions were encountered, which required retrofitting and relocation of the fire alarm, fire sprinklers, etc. Also, certain owner requested changes, such as new thermostat covers and additional returns have been identified, which require a supplemental work order to successfully complete the replacement of the HVAC system at the North Beach Senior Center. The IQC supplemental work order received to perform the additional required work is in the amount of $23,276.31, (Exhibit A). The supplemental work order was reviewed and analyzed by CIP and the Gordian Group and was found to be fair and reasonable. CONCLUSION The Administration recommends adopting the Resolution. Page 666 of 2353 Amount 1 $17,030 Account 1 Renewal & Replacemen Fund 125-0820- 000342-26-400-592-00-00-00-61360 Amount 2 $6'240.31 Account 2 Pay As You Go Fund 302- 400-592-00-00-00-61360 Total $23,276.31 Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description o Resolution o Exhibit A - Shiff Work Order CI NB Senior HVAC/4/o1|abka Funds Page 667 of 2353 EXHIBIT A Work Order-Signature Document AN GROUP Work Order Number.: 036333.02 Work Order Title: Owner Name,' Contact: Phone NJPA EZIQC Contract No.: FLO6-02912-SCD New Work Order X Modify an Existing Work Order Work Order Date: 08/04/2017 :Senier Center tjaidad, FiVAC Supplemental City of Miami Beach ElizaPethEstevez 305-673-7071 contractor Name:: Contact: Phone:. Shiff Construction & Development, Inc. Justen Shiff 9545242676 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIOC Contract No FL06-022912,SCD, Brief Work Order Description: Senior Center Unidad FiVAC Supplemental Time of Performance Estimated .Start Date:. 06/16/2017 Estimated Completetion Date: 06/5C)/2017 Liquidated Damages Will apply: Work .Order Firm Fixed Price:: $23,276.3i Owner Purchase Order Number: Will not Approvals Jimmy L. Morales, City Manager Date David Martinez, RE,. CIP Director Date Work Order Signature Comment Page 669 of 2353 Page 1 of 1 8/4/2017 Detailed Scope of Work TFIE GORDIAN GROUP To: Justen Shiff Shiff Construction & Development; Inc. 1350 NE 56th St-Ste. 100 Fort Lauderdale, FL 33334 9545242575 Date Printed: Work Order Number: Work Order Title: Brief Scope: August 04, 2017 co8333.02 Senior Center Unidad HVAC Supplemental Senior center Unfdad HVAC Supplemental Preliminary riRevised From: Elizabeth Estevez City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 305-673-7071 IX1 Final ThafolloWing items detail the scope of work as discussed at the site. All requirements necessary to accomplish the: items set forth below shall be considered part of this scope of work, Provide additional delivery of equipment to owner's warehouse, provide drywall ceiling In kitchen in lieu of existing panels, provide return air jumper from kitchen into closet, remove and reinstall exterior decorative. panels to accommodate re-design of piping, install new louver in AFIU-'2, closet door to provided better return Into cloSet, Retrofit existing fire alarm system for functionality., relocate sprinkler in way of new duet work, additional labor and materials for the re-design of the refrigerant and condensate piping for AHU-2 and AHU-3 units, provide T-stat coverS, provide floor cleaning service for 1.st and 2nd fl, replace existing 200: amp disconnects at exterior condenser units as requeSted by City inspectors Subject to the terrn s. and conditions of JOG Contract FL06,022912.SOD, r oto Jimmy L, Morales,-City Manager. David Mattine.4', P.E, CIF Director Date Date Date 8oOpa- of Work. Page 670 of 2353 Page 1 of 1 8/4/2017 Contractor's Price Proposal - Summary Date: August 04, 2017 Re: 10C Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: FLO6- 022912 -SCD 038333.02 Senior Center Unidad I•IVAC Supplemental Shiff Construction & Development, Inc. $23,276,31 01 .Delivery 02- Kitchen Ceiling 03•Return to AHU2 04- Exterior Panel Removal and Reinstall 05 -AHU2 Louver 06 -Fire Alarm Retrofit 07 -Fire Sprinkler relocation 08- Piping Redesign 09 -T Stat covers 10 -Floor Cleaning Reimb. 11- Disconnect switch $3,105.17 $1,669.64 $462,11 $418,98 $1,456.12 $5,414.93 $ 923.25 $4,367.21 $127.58 $1,431.00 $3,900.32 Proposal Total Thisl total represents the correct total for the proposal, Any discrepancy between line totals, sub - totals and the proposal total is dUe to rounding.. $23,276.31 Contractor's Price Proposal • Summary Page 671 of 2353 Page 1 of 1 8/4/2017 Contractor's Price Proposal - Detail Date: August 04, 2017 Re: IQC Master Contract #: Work Order it: Owner PO #: Title: Contractor: Proposal Value: Sect, Labor Equip. 01- Defive Item Material Mod. (Excludes) FL06.022912 -5C0. 038333,02 Senior Center Unidad HVAC Supplemental Shlff Construction & Development, Inc. $23,276,31 UOM Description Line Total 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for the actual cost of all permits, without mark -up, for which a receipt or bit Is recelved. The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The labor cost involved in obtaining all permits Is In the Adjustment Factor, The base cost of the Reimbursable Fee is $1,00. The quantity used will adjust the base cost to the actual Reimbursable Fee (e,g. quantity of 125 = $125.00 Reimbursable Fee), If there are multiple Reimbursable Fees, each one shall be listed separately with a comment In the "note" block to identify the Reimbursable Fees (e.g, sidewalk closure, road cut, various permits, extended warrantee, expedited shipping costs, etc.). A copy of each receipt shall he included with tho Proposal, Quantity Unit Price Factor Installation 3,105,17 X 1.00 x 1,0000 Total 3,105.17 Delivery fee for additional delivery duo to jobsite not ready on original date, equipment delivered to city building for storage then picked up and delivered to jobsite when ready. $3,105,17 Subtotal for 01- Delivery $3,105,17 02- Kitchen Guilin 2 01 64 23 00 0021 WK Rolling Scaffolding 14' To 20' Complete With Wheels, Railings, Etc„ (5' Wide X 7' Long Section) Quantity Installation 2,00 X Unit Price 74,20 x Factor 1,2034 Total 178.68 $178,58 09 22 16 00 0010 SF 3.5/8" Metal Stud Channel, 16" On Center, 20 Gauge, With Tracks And Runners Quantity Unit Price Factor Installation 256,00 x 1.75 x 1.2034 = Per owner request, provide drywall ceiling in lieu of replacing existing lay -In panels. Total 539.12 $539.12 09 22 16 00 0010 0004 MOD For Horizontal. Installation Up To 10' High, Add Quantity Unit Price Factor Total Installation 266,00 x 0,27 x 1,2034 = 83.18 $83.18 5 00 22 16 00 0010 0010 MOD For > 200 To 500, Add Quantity Unit Price Factor Total Installation 256 00 x 0.24 x 1.2034 " 73,94 $73.94 6 09 29 00 00 0006 SF 5/8" Gypsum Board Quantity Installation 266.00 x Unit Price Factor Total 0,75 X 1.2034 - 231.05 $231.05 7 09 29 00 00 0006 0045 MOD For Horizontal Installation Up To 10' High, Add Quantity Unit Price Factor Total Installation 256,00 x 0.16 X 1.2034 49,29 549.29 09 29 00 00 0006 0049 MOD For > 128 To 320, Add Quantity 256,00 Installation Unit Price 0.14 X Factor 1,2034 Total 43,13 $43.13 Contractor's Price Proposal - Detail Page 672 of 2353 Page 1 of 4 8/4/2017 Contractor's Price Proposal.. Detail Continues., Work Order Number: 038333,02 Work Order Title: Senior Center Unidad HVAC Supplemental 02- Kitchen Ceitin 9 09 29 00 00 0003 SF Tape, Spackle And Finish Gypsum Board Ceilings Up TO 10' High. Installation. Quantity 253.00 x Unit Price: Factor 0;36 x 1.2034 Total 110.91 8110,91 10 09 29 00 00 0053, 0040 MOD For > 128 To 320, Add. Quantity 256,90 Installation sr Paint Interior drywall /Plaster Calling, 1 Coat Primer,, Brush Work 11 09 91 23 000156 Unit Price 0:08 x Factor 1.2034 1.6tal 24,655 $24:55 Instaltatlon Quantity Unit Price Factor 256.09 X 0,38 X 1,2034 Total 117.07 8117,07 12 09 91 23 00 0156 0295 MOD For > 250: To 500, Adct Quantity Unit Price Factor 25 6,.00 X 0.05. X 1.2034 Installation 1'gtal 10,40 010,40 13 09 91 23 00.0160 SF Paint. Interior nrywalliPtasier II rig 2 Goats Paint, BrushlRotler Work Quantity- Unit Price Faotor 25.600 x 0.69 x 1..$034: " installation Total 181,76 $181,76- 14 09 91 23 00 0150 0295 MOD For 7 250 To 500, Add Quantity 266.00. Installation Subtotal for 02- Kitchen Ceirii7c� 03- Return to:AHU2 15 01 22 20 00 0029 Unit price x 0:07 x Factor 1,2034 Total 21.56 $21,553 $1;66$.6.4 HP Sheet Metal WorkerTasks in the 070 include appropriate' casts to cover labor, These tasks: will be requested specifically by the owner for miscellaneous work not covered in the CTG, Quantity Unit Price installation 12,0 0 x 3200 X Provide additianat return from kitchen into AHU-2 closet Subtotal for 03- Return to AHU2 Factor 1.2034 Total 432.11 $462 :11 04, Exterior Panel Removal and Reins 11 10 01 22 20 00 0016 LaborerTosks lit the CTC Include appropriate> casts to cover labor, These 'tasks will be requested specifically by the owner for miscellaneous work.not covered in the GTC. installatloll. Cuantity 16,00 X Subtotal for 04. Exterior Panel Removal anti Reinstall Unit Price 21,70 x Factor 1,2034 Total 418.96 $418,.99 $44:809• 06 -AHU2 i,,CS:uva Contractor's Price Proposal - Detail Page 673 of 2353 Page 2 of 4 0/4/2017 Contractor's Price Propo I - Detail Continuos,. Work Order Number: 1)38333.02 Work Order Title: Senior Center Unidad HVAC Supplemental 05 -AHU2 Louver 17 01 22 16 00 0002 EA Reimbursable Eo9sRelmbursablo Fees will be paid to the contractor for the actual cost of all permits, without markup, for which a receipt or bill is received. The Adjustment Factor applied to Reimbursable toes will be 1.0000,. The labor cost involved in obtaining all permits Is in the Adjustment Factor. The base cost of the Reimbursable Fee is 61,00, The quantity Used will adjust the base cost to the. actual Reimbursable Fee (e.g, quantity of 125 - .6125;00 Reimbursable Fee). if there are multiple Reimbursable Pees, each one shall be listed separately with a comment in the "note" black to Identify the Reimbursable - Fees :(e.g..sidewalk,olosure, road cut, various perrr /t5, extended warrantee, expedited shipping costs,'etc), A copy of each re°olpt shall be Included with the proposal. Quantity Unit Price Factor installation 1,204,00 x 1.00 x 1.0600 Total 1,- 276.24 61,276.24 18 01 22 20 00 0006 RR • Carpenter1aske in the OTC include appropriate costs' to cover labor; These. tasks will be requested. specifically by: the owner formiseellaneous Work not covered In the CTC: Qtantity 4.00 Installation Unit Price 37.3.7 Factor 1.2054 Total 179.88 6179:68 Subtotal for 00 -AHU2 Louver $1.,456.12 O6.Fire Alarm Retrofit 19 01 22 20 06 0010 MR EiectricianTesks in the "CTG.inotudo appropriateeoststo cover labor, These tasks will be requestpd.spoclfioally by tha:ownor'for miscellaneous WortG:not covered In the: GTC. Quantity Unit Price lnstallatlan 72,00 x 42.41 x Factor 1,2034 Total 3,874.61 Labor to rework (3) existing duct detectors and 3 relays networking. and go through ell existing fire alarm. devices to ensuro(unetionalrty.'3 men, 3 days 63,674.61 20 21 22 '16 00 0258 EA Control Relay, IQ-396X Modules, CRM -4, Autopulse0 Fire Detection And Control Equipment (Ansul.41 9665) Quantity Unit.Ptice installation 2,00 X 426,43 x' Factor 1,2034 Total 1,026.33 61,024,33 • 23 00 0064 EA 5uperduct, Signature Duct Smoke CDeteetor (ISS.T IGA -SD) Quantity Unit PYlce Factor 2,00 x 243 ;25 X 1,2034 Installation Tofat 583,45: 22. 26 31 23 060100 EA Classl5 qual Input Module (One Gang Standard •Mount):;(t✓8T3 efG.A.CT2) Quantity Unit Price: Factor 1,00 x 106,31 X 1,2034 Installation. Total 128.64 Subtotal for 06-Fire Alarm Retrofit 6585 ;45 6'128.5:4 '$5;414,03 6921 b7 -Fire. Sprinkler.. relocation 23 01 22 20 00 0030 FIR Sprinkler installerT asks" la the CTC. Include appropriate costs to cover labor., These tasks will be: requested" specifically by the owner for miscellaneeus work not covered. in'tite OTC. Quantity installation 16,00 X Unit Price 47,.05. x Factor 1.,203:4. (2) men 11 day to drain system cut and rernevo sprinkler in way of now ductwork. Total 923,23 Subtotal for 07-Fire Sprinkler. relocation $923.25 08-P1 in • Rexiee' n Contractor's Price Proposal - Detail Page 674 of 2353 Page 3 of 4 8/4/2017 Contractor's Price i'roposai W Detail Continu Work Order Number: Work Order Title: 03 -Pi in Redesi n 24 01 22 20 00 0031 038333,02 Senior Center Unidad HVAC Supplemental HR Pipe Fltter,Tasks in the t1TC include appropriate costs to cover labor, These tasks will be requested specifically by the owner for miseellanebus work not covered In the OTC. Quantity Unit Price Factor Installation 00.32 x 40,18 X. 7.,2034 _ Total 4,367,21 Piping labor due to re- desIgn of all condensate and refrigerate piping for.AHU2 and .HUJ3at 2n fl to run piping' behind metal decorative. piping. (3) men, 2,2 :weeks Subtotal for 08- Piping Redesign $4367.21 $4,367.21 $127,68 $127.58 $1,431,00 O9.T Stat covers 25 23 00 23 00 0103 A In locking Cover/Wire G. u Quantity 0.00 x Installation d For Thermostat Or Wall Te Unit. Price 35.3'4 Subtotal for 09 TStatcove'rs X perature Sensor Factor 1.1634 Total 127..58 1'0-Floor Cleanin• Reimb, 26 01 22 16 00 0002'. f AA Reimbursable, F.eesRelmbursabie.Feeswillbe paid to the contractor. for the actual cost of all permits, without markup, for which a receipt or bill 18 The Adjustment Factor applied to Reimbursable Fees will be.1,0000, The labor cost involved in obtaining ail permits is in the Adjustment Factor. The base cast:of the-Reimbursable Foe fo $1,00, The quantity used will adjust the base cost to the actual Reimbursable: Fee (eg, quantity of 125 $125.00 Reimbursable Fee).. If there are multiple R.elnibursahte Fees, each one shall be listed separately With a cerement In. the "note" block to identify the Reimbursable Fees (e.g. sidewalk closure, road cut; various permits, . extended warrantee, expedited shipping costs, etc,). A copy of each receipt shall be. included with the Proposal. Quantity Unit Price Factor Total installation 1.350,00 X " 1,00 x' '1,0600 1,43''!_00 R:eimbursementfor post paid to Budget leaning USA Corp: for the cleaning of the tat fl only, Subtotal for 10-Floor Cleaning Reirnb.. $1„431.00 11- 0iiseonnest switch 27 26 26 19 00 0220 EA 200.A 1\1.00- Fused, NFMA 3R, Heavy DUty DIsconneot Switch; 600 V, 1. Phase Quantity UnIt.Prtce Factor. Total. Installation 3 00 R 961,73 x 1'.2034 2972.04 Demolition 940 x: 118,60 x 1,2034 428.28 - :Replacsmentof ($),200.emp disconneot.swtfches for the 3 outside condensers.as required by electrical Inspector,. Subtotal for 11- Disconnect switch $3,900.32 $3,900,32 Proposal Total ThIslotal represents the correct total for the proposal. Any discrepancy between tine totals, aubdotals and the proposal total is due to rounding. $2:3.,276,31 Contractor's Price Proposal - Detail Page 675 of 2353 Page 4 of 4 8/4/2017 Subcontractor Listing THE GORDIAN GROUP Date: Ail0Ust 04, 2017 Re: IQC Master Oontract it; Work Order it: Owner PO4: Title: Contractor: Proposal Value', i mon,. 4ana egioa4Mag .4,4Wto' FLO0-022912-S00 038333,02 Senior Center Unidact HVAC Supplemental Shill Construction & Development, Inc, $23,270.31 -0;z omzz.*M.gi-ba No gubcontradtors have been selected for this Work Order AIN* 0.00 Subcontractor Listing Page 1 of 1 8/4017 Page 676 of 2353