Loading...
2001-24695 Reso RESOLUTION NO. 2001-24695 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING $5,288,934 FROM THE SERIES 2000 WATER AND SEWER BOND FUND NO. 424, AND AUTHORIZING THE AWARD OF A CONTRACT TO AZURlX NORTH AMERICA UNDERGROUND INFRASTRUCTURE, INC.; IN THE AMOUNT OF $5,288,934, AS THE LOWEST RESPONSIVE AND BEST BIDDER PURSUANT TO BID NO. 36-00/01 FOR THE REHABILITATION OF SANITARY SEWERS. WHEREAS, in 1993, the City began an InfiltrationlInflow (III) Mitigation Program, which requires the rehabilitation of sanitary sewer pipes and manholes; and WHEREAS, to date, approximately 75% of the recommended sanitary sewer pipe and manhole rehabilitation has been completed; and WHEREAS, on September 5, 2001, the City issued Invitation to Bid No, 36-00/01 for the Rehabilitation of Sanitary Sewers; and WHEREAS, one-thousand-eight-hundred-nine (1809) bid notices and thirty-four (34) bid packages were issued, resulting in the receipt of three (3) responsive bids; and WHEREAS, the lowest bid, in the amount of $5,288,934, received from Azurix North America Underground Infrastructure, Inc., is deemed as the lowest responsive and best bid; and WHEREAS, this project will complete the remaining 25% of the recommended sanitary sewer pipe and manhole rehabilitation in the City, and bring the City into compliance with the first Phase of the EPA's Consent Decree, which mandates the reduction of infiltration and inflow; and WHEREAS, the City Manager has reviewed the Administration's recommendation for the contract award to Azurix North America Underground Infrastructure, Inc. and concurs with this recommendation, NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein authorize the Administration to appropriate $5,288,934 from the Series 2000 Water and Sewer Bond Fund No, 424, and award a contract to Azurix North America Underground Infrastructure, Inc" as the lowest responsive and best bidder pursuant to Bid No, 36-00/01 for the Rehabilitation of Sanitary Sewers, ATTEST: APPROVED AI FOAM a LANGU~ I a FOR EXECUTION MAYOR Passed and Adopted this 19th day of December 2001. J z/7h( - STEPS IN REHABILITATING SEWER PIPES STAGE 1 THE RESIN SATURATED MATERIAL IS INSTALLED IN THE EXISTING PIPE THROUGH A MANHOLE J. ! \ STAGE ,3 WATER OR STEAM IS CIRCULATED TO CURE THE JOINTLESS LINER WITHIN THE PIPE STAGE 2 WATER OR STEAM IS USED TO PUSH THE RESIN SATURATED LINER THROUGH THE PIPE ~. .'t . . STAGE 4 AFTER THE LINER CURE AND HARDENS, SEWER LATERAL OPENINGS ARE' CUT' BY ROBOTICS. , I r ...- <...> Lr..J .. 0 0::: 1 a.. z 0 I ...- I <...> :::> Cl w 0::: ,--., "- '-" ~ 0 ....J ..... Z "- Z 0 0:: ... I- 3:0:: <( ...... 0::: (/)3: I- >-... o::(/) ....J < - 0->- ..... -0:: Z z<( / , <l- (/)- Z :r: <.:>< :zen <..> . 0::<:> <( ...z I- _ Lr..J zo:: lD ...... I- o::Z ...... ~ 0- <0:: <( 3:..... 01- ~ z< ::>3: ..... o~ 0::<( 0 <':>0:: II II >- Z ...- 0 <..> i= <( 0::3: 1-0 ::!...J ...... ~~ ~ J! II!' ~fl ." Q ~::; ~~ 00 "'''' z z z'" 0," ~~i5 .,,"" 00 ?:~Ii ee ." Z o ;: o '" z Z ." 0 ~ Uti) - ",'" Q us w~~% I~~:! WIUQ..W ~~o::.: U(Jg:U ~~...~ uo~(.) eeoo CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m ......... Condensed Title: A resolution to appropriate funds from the Series 2000 Water and Sewer Bond Fund No, 424, and award a contract to Azurix North America Underground Infrastructure, Inc, in the amount of $5.288,934 for the Rehabilitation of Sanitary Sewers, Issue: Shall the City appropriate funds from the Series 2000 Water and Sewer Bond Funds to fund the Rehabilitation of Sanitary Sewers and award the Contract to Azurix North America Underground Infrastructure, Inc.? Item Summarv/Recommendatlon: In order to award this project, a budget transfer IAO $421,890.00 from the Miscellaneous Wastewater Upgrades Project to the III Mitigation/Sewage Renovation Upgrade Project is required, This Project consists of the continuation of the City's Infiltrationllnflow (III) mitigation program, which began in 1993, and covers the rehabilitation of sanitary sewer lines and manholes, by the resin impregnated felt Icured in-place pipe lining method, The pipe segments requiring rehabilitation under this contract are scattered throughout various areas of the City as follows: . South Beach - south of Dade Blvd and north of 5" Street (including the Venetian ISlands) - 42.000 L.F, . Mid-Beach- north of Dade Blvd, and south of 63'" Street (including La Gorce Island and Collins Ave,) - 26,000 L.F, . North Beach - North of 63'" Street (including the south half of Normandy Island) - 27,000 L.F, This project will complete the remaining 25% of the recommended pipe rehabilitation, and once completed, should save the City approximately $880,000 per year. THE ADMINISTRATION'S RECOMMENDATION IS TO AWARD A CONTRACT TO AZURIX NORTH AMERICA UNDERGROUND INFRASTRUCTURE, INC. Advisory Board Recommendation: I NW>. Financial Information: Amount to be expended: Source of F~ Finance Dept. AGENDA ITEM me DATE/:Z-/~-(J/ CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.ci.miami-beach.fl.us - COMMISSION MEMORANDUM To: Mayor David Dermer and Members of the City Commission Date: December 19, 2001 Jorge M, Gonzalez \. A~ City Manager cJ If' - 0 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA APPROPRIATING $5,288,934 FROM THE 2000 SERIES WATER AND SEWER BOND FUND NO. 424, AND AUTHORIZING THE AWARD OF A CONTRACT TO AZURIX NORTH AMERICA UNDERGROUND INFRASTRUCTURE, INC. IN THE AMOUNT OF $5,288,934, AS THE LOWEST RESPONSIVE AND BEST BIDDER PURSUANT TO BID NO. 36-00/01 FOR THE REHABILITATION OF SANITARY SEWERS. ADMINISTRATION RECOMMENDATION From: Subject: Adopt the Resolution. BID AMOUNT AND FUNDING $5,288,934 Funding is available from the 2000 Series Water and Sewer Bond No. 424. ANALYSIS This Project consists of the continuation of the City's Infiltration/lnflow (III) mitigation program, which began in 1993, Infiltration is groundwater that enters the sanitary sewer system through leaks in pipes, pipe joints, and manholes, Inflow is typically stormwater that enters the system through or around the manhole covers or through improper connections, such as roof or yard drains that may be connected to the sanitary sewer system instead of the stormwater system, Under some conditions, such as during rainfall events, wastewater flows dramatically increase due to infiltration and inflow, Since the cost of treating wastewater is high, it is essential that infiltration and inflow be dramatically reduced. FUNDING APPROVAL Management & Budget Bid No. 36..00101 Page Two December 19, 2001 ANALYSIS (Continued) This program's objective is to systematically identify locations of infiltration and inflow within the sanitary sewer system and eliminate the problem by rehabilitating or replacing the pipe segments and manholes that have been identified as deficient. A collateral benefit of this program is an extension of the life expectancy of the components that are rehabilitated, Additionally, this program is to bring the City into compliance with the first Phase of the EPA's Consent Decree, which mandates the reduction of Infiltration and Inflow as a result of a settlement agreement between the EPA and Miami-Dade County, The Consent Decree imposes scheduled improvements for wastewater collection systems and treatment facilities in order to meet existing environmental regulations, This contract covers the rehabilitation of sanitary sewer lines and manholes throughout the City of Miami Beach and includes furnishing all labor, material and equipment for rehabilitation, by the resin impregnated felt /cured in-place pipe lining method. This includes approximately 57,000 feet of gravity sanitary sewers (6, 8, 10, 12, 15, and 18-inch), grouting of approximately 7,000 pipe joints, performing approximately 190 spot repairs, and rehabilitating approximately 100 manholes in the City of Miami Beach, Florida. The work includes cleaning the existing sewer pipes and lining them in-place by the resin impregnated liner method, grouting pipe joints, performing spot repairs, and rehabilitating manholes. The rehabilitation of the sewer line is accomplished through the manholes. Work also includes televising, making spot repairs, cleaning, and surface preparation of the interior of the existing pipeline, bypass pumping, dewatering the segment to be lined, testing for leaks, cutting, testing and grouting lateral connections, maintenance of traffic control, and all other appurtenances and miscellaneous related items and work for a completed Project. The pipe segments requiring rehabilitation under this contract are scattered throughout various areas of the City as follows: . South Beach - south of Dade Blvd and north of 5th Street (including the Venetian Islands) - 42,000 L.F. . Mid-Beach- north of Dade Blvd, and south of 63rd Street (including La Gorce Island and Collins Ave.) - 26,000 L.F. . North Beach - North of 63rd Street (including the south half of Normandy Island) - 27,000 L.F. Previous projects of this nature in Miami Beach indicate that there will be minimal disruption within the various neighborhoods, The rehabilitation process is performed within the pipe, from manhole to manhole, and requires no excavation of the actual pipe. Bid No. 36-00101 Page Three December 19, 2001 ANALYSIS (Continued) Daily flow records have been evaluated to compare the flow quantities for the year 1993, the inception of the program, to FY 2001, The County's Virginia Key flow records indicate a reduction of daily flow of approximately 3,674,000 GPD since the program's beginning, The reduction of flow is approximately 60% of the predicted removable infiltration and has saved the City an estimated $2,114,000 per year in direct treatment costs. The reduced flow volumes also result in indirect savings in the reduced operating and maintenance costs of the pump and lift stations within the City, To date, approximately 75% of the recommended pipe rehabilitation has been completed, with the greatest sources of III being addressed first. This rehabilitation has resulted in eliminating approximately 60% of the estimated 6,5 MGD of III from the sanitary sewer system. This project will complete the remaining 25% of the recommended pipe rehabilitation, and once completed, should save the City approximately $880,000 per year. The contractor will be completed with the work within four-hundred-fifty-five (455) calendar days after the issuance of the notice to proceed, The contractor will provide Performance and Payment Bonds each in the amount of one.hundred (100%) percent of the contract price. Invitation to Bid No. 36-00/01 was issued on September 5,2001, with an opening date of November 9, 2001, A non-mandatory pre-bid conference was held September 19, 2001, DemandStar.com issued bid notices to one-thousand-eight-hundred-nine (1809) prospective bidders, resulting in thirty-four (34) vendors requesting bid packages, which resulted in the receipt of three (3) responsive bids, The Consultant (Kimley-Horn & Associates, Inc,) has reviewed the three (3) bids received, and has recommended award of this contract to the lowest overall bidder, Azurix North America Underground Infrastructue, Inc, The Consultant and the Procurement Division have checked references, and this Contractor comes highly recommended, This contractor has been in business twenty- seven years as a General Contractor, and provides quality work and completes all projects within the required completion dates, This contractor received overall excellent ratings from Broward County, Hazen & Sawyer, the City of Coral Springs, and Orange County for similar projects such as this. Bid No. 36-00101 Page Four December 19,2001 ANALYSIS (Continued) Based on this analysis, the City recommends that the contract be awarded to the lowest responsive, responsible bidder, Azurix North America Underground Infrastructue, Inc. BID TABULATION Vendor Lump Sum Azurix North America $5,288,934 Insituform Technologies, Inc $5,448,673 Lanzo Lining Services, Inc, $5,486,100 JMG/RM/FB/GUje \\CH2\VOL 1\PURC\$ALL\JOHN\COMM\52-0001.doc '. STEPS IN REHABILITATING SEWER PIPES STAGE 1 THE RESIN SATURATED MATERIAL IS INSTALLED IN THE EXISTING PIPE THROUGH A MANHOLE STAGE ,3 WATER OR STEAM IS CIRCULATED TO CURE THE JOINTLESS LINER WITHIN THE PIPE STAGE 2 WATER OR STEAM IS USED TO PUSH THE RESIN SATURATED LINER THROUGH THE PIPE . STAGE4 I AFTER THE LINER CUREI AND I HARDENS, SEWER LATERAL OPENINGS ARE CUT BY ROBOTICS.